DAVIS ARCHITECTS, INC. Job No rd Street South, Birmingham, AL January 14, 2015

Size: px
Start display at page:

Download "DAVIS ARCHITECTS, INC. Job No. 3734 120 23 rd Street South, Birmingham, AL 35233 January 14, 2015"

Transcription

1 DAVIS ARCHITECTS, INC. Job No rd Strt South, Birmingham, AL 5 January 4, 05 ADDENDUM NUMBER TWO TO THE CONTRACT DOCUMENTS FOR CONSTRUCTION OF PEBBLE HILL BUILDING RENOVATIONS & NEW ADDITION AUBURN UNIVERSITY AU PROJECT NUMBER 06-76, BC PROJECT NUMBER Bid Tim/Dat: :00 PM Cntral Tim, January 0, 05 This addndum forms a part of th Contract Documnts and modifis th original Bidding Documnts datd Dcmbr, 04. This Addndum consists of 4 pag(s) with attachd 8 spcification sctions, 0 supplmntal drawings (SD), 0 miscllanous itms, and full-siz sht(s). SPECIFICATIONS ITEM SECTION JOINT SEALERS Rplac sction in its ntirty, noting th following:. Addd silicon salant products.. Add xplanation of salant typs usd in various locations.. Updatd manufacturrs to match AU standards. 4. Addd msh tap spc for us at wall shathing joints, plus installation clarifications. ITEM SECTION 000 GENERAL FIRE PROTECTION REQUIREMENTS Rplac sction in its ntirty, noting th following:. Paragraph.0 A addd. ITEM SECTION PLUMBING PUMPS Rplac sction in its ntirty, noting th following:. Sction dltd. ITEM 4 SECTION 4000 PLUMBING FIXTURES Rplac sction in its ntirty, noting th following:. Paragraph.0 C dltd. ITEM 5 SECTION 000 DUCTWORK Rplac sction in its ntirty, noting th following:. Paragraph.0 D, E, & F dltd. ITEM 6 SECTION 4000 FANS & HOODS Rplac sction in its ntirty, noting th following:. Paragraph.0 dltd. ITEM 7 SECTION GROUNDING SYSTEMS Rplac sction in its ntirty, noting th following: Addndum No. Pag

2 . Paragraph. Editd to b job spcific. ITEM 8 SECTION LIFE SAFETY SYSTEM Rplac sction in its ntirty, noting th following:. Paragraph.0 Editd to clarify sction rfrncs. DRAWINGS ITEM SHEET G.0 COVER SHEET Rplac drawing in its ntirty, noting th following:. Addd sht E0.0 Elctrical Comchck. ITEM SHEETS LS.0A PEBBLE HILL LIFE SAFETY PLAN AND LS.0B NEW BUILDING LIFE SAFETY PLAN Rplac drawing in its ntirty, noting th following:. Dltd rfrncs to 009 Intrnational Existing Building Cod. ITEM SHEET C4 SITE LAYOUT & UTILITIES PLAN Rplac drawing in its ntirty, noting th following:. Changd watr connction to City main from 4 D.I.P. To 6 D.I.P.. Changd fir protction lin from 4 D.I.P. To 6 D.I.P.. Addd 6 x6 x4 T and 6 x4 rducr to fir protction lin. 4. Changd fir protction lin to xisting Pbbl Hill building from Coppr to 4 D.I.P. 5. Addd callout to clarify that domstic srvic to nw building is a / PVC watr srvic. 6. Addd two () sanitary swr clanouts to nw 4 PVC sanitary latrals. ITEM 4 SHEET C5 SITE GRADING & ESC PLAN Rplac drawing in its ntirty, noting th following:. Addd nw concrt sidwalk on ast sid of porch at nw building.. Rvisd location of silt fnc on ast sid of nw building. ITEM 5 SHEET A.0A FLOOR PLAN PEBBLE HILL Rplac drawing in its ntirty, noting th following:. Storag : Add mop sink and shlf.. Corridor C0: Add drinking fountains.. Rvisd both rstrooms. Both ar now ADA compliant. ITEM 6 SHEET A.0B FLOOR PLAN NEW BUILDING Rplac drawing in its ntirty, noting th following:. Addd rfrnc to concrt ramp from back porch. ITEM 7 SHEET A4.0 ENLARGED TOILET PLANS PEBBLE HILL & NEW BUILDING Rplac drawing in its ntirty, noting th following:. Dtail : Rvisd ADA Toilts. Toilt 8 has bn mad ADA accssibl.. Dtail 5: Grab bar has bn addd in front of window. Coordinat location carfully with xisting construction. Addndum No. Pag

3 ITEM 8 SHEET M0.0 LEGEND, SCHEDULE & DETAILS MECHANICAL Rplac drawing in its ntirty, noting th following:. Outsid Air Calculation Tabl addd.. Fan Schdul rmarks modifid.. Diffusr typ H addd to Diffusr, Rgistr, & Grill Schdul. 4. EUH- addd to Elctric Hatr Schdul. 5. Grad Mountd Packagd HVAC Unit dtail movd to sht M Hat Pump dtail movd to sht M.0. ITEM 9 SHEET M.00 FLOOR PLAN MECHANICAL EXISTING BUILDING Rplac drawing in its ntirty, noting th following:. Supply Fan Control nots modifid to rflct fans will run whil building is occupid.. Grad Mountd Packagd HVAC Unit dtail addd. ITEM 0 SHEET M.0 FLOOR PLAN MECHANICAL NEW BUILDING Rplac drawing in its ntirty, noting th following:. Supply Fan Control nots modifid to rflct fans will run whil building is occupid.. Grad Mountd Packagd HVAC Unit dtail addd. ITEM SHEET P.00 FLOOR PLAN PLUMBING EXISTING BUILDING Rplac drawing in its ntirty, noting th following:. Fir Protction nots updatd.. Fir Risr updatd.. Drinking fountains (P-4A) and mop sink (P-6) addd to floor plan, risr, and plumbing fixtur schdul. 4. WH-6&7 addd to Elctric Watr Hatr schdul. 5. WH-6 addd to floor plan. ITEM SHEET P.0 FLOOR PLAN PLUMBING NEW BUILDING Rplac drawing in its ntirty, noting th following:. Fir Protction nots updatd.. Fir Risr updatd.. Mop sink (P-6) addd to floor plan and risr. 4. WH-7 addd to floor plan. ITEM SHEET E0.0 LEGEND, SCHEDULE & DETAILS ELECTRICAL Rplac drawing in its ntirty, noting th following:. Updatd Elctrical Gnral Not 9.. Updatd Risr Diagram with Disconnct Ground Siz.. Updatd Risr Diagram & Fdr Schdul to includ 600 Amp Ground siz & quantity whr applicabl. ITEM 4 SHEET E0.0 ELECTRICAL DETAILS AND SCHEDULES Rplac drawing in its ntirty, noting th following:. Panl DLA updatd with nw brakrs for WH-6 & EUH-.. Panl DLB updatd with nw brakr for WH-7.. Panl LA updatd with nw brakrs for () grss lighting and drinking fountain. 4. Panl LB updatd with nw brakr for grss lighting. Addndum No. Pag

4 5. Mchanical Equipmnt Connction Schdul updatd with WH-6, WH-7, & EUH-. ITEM 5 SHEET E0.0 ELECTRICAL COMCHECK Rplac drawing in its ntirty, noting th following:. Addd for Comchck ITEM 6 SHEET E.0 SITE PLAN ELECTRICAL & LIGHTING Rplac drawing in its ntirty, noting th following:. Addd photocll for Fixtur OB on/off control. ITEM 7 SHEET E.00 ELECTRICAL PLAN PEBBLE HILL RENOVATION Rplac drawing in its ntirty, noting th following:. Applid Not 8 to drawing.. Indicating Wirlss Accss Point locations.. Addd powr for drinking fountain. 4. Clarifid Tl backboard TC location. 5. Updatd rquird GFCI rcptacls in Brakroom. 6. Addd powr for EUH-. 7. Addd powr for WH-6. ITEM 8 SHEET E.0 ELECTRICAL PLAN PEBBLE HILL NEW BUILDING Rplac drawing in its ntirty, noting th following:. Indicating Wirlss Accss Point locations. Updatd rquird GFCI rcptacls in Warming Kitchn.. Updatd powr/data for Copir in Workroom Changd Janitor & Warming Kitchn smok dtctor to hat dtctor. 5. Addd FA pull station & A/V in Mting Room. ITEM 9 SHEET E.00 LIGHTING PLAN PEBBLE HILL RENOVATION Rplac drawing in its ntirty, noting th following:. Addd grss lighting to Stoop & Rar Porch.. Addd battry invrtr for xisting OIT xtrior light for grss.. Addd grss light in Corridor C0. 4. Indicating xisting light in Clost 0B. ITEM 0 SHEET E.0 LIGHTING PLAN PEBBLE HILL NEW BUILDING Rplac drawing in its ntirty, noting th following:. Addd grss lighting to Front Porch & Porch.. Addd grss lighting to Mch/Elc & Risr.. Updatd Lighting Fixtur Schdul for Typs H, K, & Z. - END OF ADDENDUM Addndum No. Pag 4

5 Pbbl Hill - Building Rnovations & Nw Addition Auburn Univrsity AU Projct No PART GENERAL.0 SECTION INCLUDES A. Salants and joint backing. B. Prcomprssd foam salrs..0 RELATED REQUIREMENTS SECTION JOINT SEALERS A. Sction Wathr Barrirs: Salants rquird in conjunction with air barrirs and vapor rtardrs: B. Sction Firstopping: Firstopping salants. C. Sction Glazing: Glazing salants and accssoris..0 REFERENCE STANDARDS A. ASTM C84 - Standard Spcification for Latx Salants; 00. B. ASTM C99 - Standard Practic for Us of Salants in Acoustical Applications; 0. C. ASTM C90 - Standard Spcification for Elastomric Joint Salants; 04. D. ASTM C9 - Standard Guid for Us of Joint Salants; ADMINISTRATIVE REQUIREMENTS A. Coordinat th work with othr sctions rfrncing this sction..05 SUBMITTALS A. S Sction Administrativ Rquirmnts, for submittal procdurs. B. Product Data: Provid data indicating salant chmical charactristics. C. Sampls: Submit two sampls, / x 8 inch in siz illustrating salant colors for slction..06 QUALITY ASSURANCE A. Maintain on copy of ach rfrncd documnt covring installation rquirmnts on sit. B. Manufacturr Qualifications: Company spcializing in manufacturing th Products spcifid in this sction with minimum fiv yars documntd xprinc. C. Applicator Qualifications: Company spcializing in prforming th work of this sction with minimum fiv yars documntd xprinc and approvd by manufacturr..07 MOCK-UP A. Provid mock-up of salant joints in conjunction with window undr provisions of Sction B. Construct mock-up with spcifid salant typs and with othr componnts notd. C. Locat whr dirctd. D. Mock-up may rmain as part of th Work..08 FIELD CONDITIONS A. Maintain tmpratur and humidity rcommndd by th salant manufacturr during and aftr installation..09 WARRANTY A. S Sction Closout Submittals, for additional warranty rquirmnts. B. Corrct dfctiv work within a fiv yar priod aftr Dat of Substantial Compltion. C. Warranty: Includ covrag for installd salants and accssoris which fail to achiv airtight sal, xhibit loss of adhsion or cohsion, or do not cur. JOINT SEALERS of 5

6 PART PRODUCTS.0 SEALANTS A. Typ A - Gnral Purpos Extrior Salant: Polyurthan; ASTM C90, Grad NS, Class 5 minimum; Uss M, G, and A; singl componnt.. Color: To b slctd by Architct from manufacturr's standard rang.. Applications: Us for: a. Control, xpansion, and soft joints in masonry. b. Joints in concrt masonry and pourd concrt within masonry cavity. c. Joints at wall shathing.. Polyurthan Products: a. Sika Corporation; Sika Flx C: b. Mastr Buildrs Solutions; MastrSal NP-: c. Trmco; Dymric 40 FC: B. Typ B - Gnral Purpos Extrior Salant: Ultra Low Modulus Silicon Salant: ASTM C 90, Grad NS, Class 00/50, Uss NT, A, G, M, O; singl componnt, solvnt curing, non-sagging, non-staining, fungus rsistant, non-blding.. Color: To b slctd by Architct from manufacturr's standard rang.. Product: 790 Silicon Building Salant manufacturd by Dow Corning.. Product: 890 Ultra Low Modulus Silicon Salant manufacturd by Pcora Corporation. 4. Product: Spctrm manufacturd by Trmco World Salants. 5. Movmnt Capability: Plus and minus 50 prcnt. 6. Srvic Tmpratur Rang: -60 to 00 dgrs F. 7. Shor A Hardnss Rang: Applications: Us for: a. Gnral xtrior and intrior uss with modrat anticipatd movmnt. b. Primtr salant btwn mtals and othr matrials at xtrior xposurs. c. Gnral intrior uss with modrat to low anticipatd movmnt. d. Concald salant bad in sht mtal work... Concald salant bad in curtain wall and aluminum storfront work whr rcommndd by manufacturr. C. Typ C - Gnral Purpos Extrior Salant: Low Modulus Silicon Salant: ASTM C 90, Grad NS, Class 50, Uss NT, A, G, M, O; singl componnt, solvnt curing, non-sagging, non-staining, fungus rsistant, non-blding.. Color: To b slctd by Architct from manufacturr's standard rang.. Product: 795 Silicon Building Salant manufacturd by Dow Corning.. Product: 864 NST Architctural Silicon Salant manufacturd by Pcora Corporation. 4. Product: Spctrm or Spctrim manufacturd by Trmco World Salants. 5. Movmnt Capability: Plus and minus 50 prcnt. 6. Srvic Tmpratur Rang: -60 to 00 dgrs F. 7. Shor A Hardnss Rang: Applications: Us for: a. Gnral xtrior and intrior uss with modrat anticipatd movmnt. b. Primtr salant btwn mtals and othr matrials at xtrior xposurs. c. Gnral intrior uss with modrat to low anticipatd movmnt. d. Concald salant bad in sht mtal work... Concald salant bad in curtain wall and aluminum storfront work whr rcommndd by manufacturr. D. Typ D - Gnral Purpos Extrior Salant: Low Modulus Silicon Salant: ASTM C 90, Grad NS, Class 50, Uss NT, A, G, M, O; singl componnt, solvnt curing, non-sagging, non-staining, fungus rsistant, non-blding.. Color: To b slctd by Architct from manufacturr's standard rang.. Product: 756 Silicon Building Salant manufacturd by Dow Corning. JOINT SEALERS of 5

7 . Movmnt Capability: Plus and minus 50 prcnt. 4. Srvic Tmpratur Rang: -60 to 00 dgrs F. 5. Shor A Hardnss Rang: Applications: Us for: a. Joints in xtrior porus ston. E. Typ E - Extrior Mtal Lap Joint Salant: Butyl or polyisobutyln, nondrying, nonskinning, noncuring.. Applications: Us for: a. Concald salant bad in sht mtal work. b. Concald salant bad in siding ovrlaps. F. Typ F - Gnral Purpos Intrior Salant: Acrylic mulsion latx; ASTM C84, Typ OP, Grad NF singl componnt, paintabl.. Color: To b slctd by Architct from manufacturr's standard rang.. Applications: Us for: a. Intrior wall and ciling control joints. b. Joints btwn door and window frams and wall surfacs. c. Othr intrior joints for which no othr typ of salant is indicatd.. Products: a. Pcora Corporation; AC-0 + Silicon Acrylic Latx Caulking Compound: b. Shrwin-Williams Company; Whit Lightning 006 Siliconizd Acrylic Latx Caulk: c. Trmco Global Salants; Trmflx 84 Siconizd Acrylic Salant: d. Substitutions: S Sction Product Rquirmnts. G. Typ G - Bathtub/Til Salant: Whit silicon; ASTM C90, Uss I, M and A; singl componnt, mildw rsistant.. Applications: Us for: a. Joints btwn plumbing fixturs and floor and wall surfacs. b. Joints btwn kitchn and bath countrtops and wall surfacs.. Products: a. BASF Construction Chmicals-Building Systms; Mastrsal NP00: b. Pcora Corporation; 898NST Sanitary Silicon Salant - Class 50: c. Trmco Global Salants; Trmsil 00 Sanitary Salant: d. Substitutions: S Sction Product Rquirmnts. H. Typ H - Acoustical Salant for Concald Locations:. Composition: Acrylic latx mulsion salant.. Composition: Prmanntly tacky non-hardning butyl salant.. Applications: Us for concald locations only: a. Salant bad btwn top stud runnr and structur and btwn bottom stud track and floor. 4. Products: a. Trmco Global Salants; Acoustical Salant: b. Hilti, Inc.; CP 506 Smok and Acoustical Salant: c. Hnkl Corporation; OSI SC-70 Salant: d. Substitutions: S Sction Product Rquirmnts. I. Typ F - Intrior Floor Joint Salant: Polyurthan, slf-lvling; ASTM C90, Grad P, Class 5, Uss T, M and A; singl componnt.. Approvd by manufacturr for wid joints up to -/ inchs.. Color: To b slctd by Architct from manufacturr's standard rang.. Applications: Us for: a. Expansion joints in floors. JOINT SEALERS of 5

8 4. Products: a. Pcora Corporation; NR-0 Slf-Lvling Traffic and Loop Salant: b. BASF Construction Chmicals-Building Systms; MastrSal SL- Slf Lvling Salant: c. Trmco Global Salants; Vulkm 45 S SL On Part Smi-Slf Lvling Salant: Trmcosalants.com. d. Substitutions: S Sction Product Rquirmnts. J. Typ G - Concrt Paving Joint Salant: Polyurthan, slf-lvling; ASTM C90, Class 5, Uss T, I, M and A; singl componnt.. Color: Gray.. Applications: Us for: a. Joints in sidwalks and vhicular paving.. Products: a. Pcora Corporation; NR-0 Slf-Lvling Traffic and Loop Salant: b. BASF Construction Chmicals-Building Systms; MastrSal SL- Slf Lvling Salant: c. Trmco Global Salants; Vulkm 45 S SL On Part Smi Slf Lvling Salant: d. Substitutions: S Sction Product Rquirmnts..0 ACCESSORIES A. Primr: Non-staining typ, rcommndd by salant manufacturr to suit application. B. Joint Clanr: Non-corrosiv and non-staining typ, rcommndd by salant manufacturr; compatibl with joint forming matrials. C. Joint Backing: Round foam rod compatibl with salant; ASTM D 667, closd cll PVC; ovrsizd 0 to 50 prcnt largr than joint width. D. Bond Brakr: Prssur snsitiv tap rcommndd by salant manufacturr to suit application. E. Rinforcing msh tap: 9 x 9 fibrglass msh tap, inchs wid. PART EXECUTION.0 EXAMINATION A. Vrify that substrat surfacs ar rady to rciv work. B. Vrify that joint backing and rlas taps ar compatibl with salant..0 PREPARATION A. Rmov loos matrials and forign mattr that could impair adhsion of salant. B. Clan and prim joints in accordanc with manufacturr's instructions. C. Prform prparation in accordanc with manufacturr's instructions and ASTM C9. D. Protct lmnts surrounding th work of this sction from damag or disfigurmnt. E. Exposd Concrt Floor Joints: Tst joint fillr in inconspicuous ara of floor slab. Vrify spcifid product dos not stain or discolor slab..0 INSTALLATION A. Prform work in accordanc with salant manufacturr's rquirmnts for prparation of surfacs and matrial installation instructions. B. Prform installation in accordanc with ASTM C9. C. Prform acoustical salant application work in accordanc with ASTM C99. D. Masur joint dimnsions and siz joint backrs to achiv th following, unlss othrwis indicatd: JOINT SEALERS of 5

9 . Width/dpth ratio of :.. Nck dimnsion no gratr than / of th joint width.. Surfac bond ara on ach sid not lss than 75 prcnt of joint width. E. Install bond brakr whr joint backing is not usd. F. Install salant fr of air pockts, forign mbddd mattr, ridgs, and sags. G. Apply salant within rcommndd application tmpratur rangs. Consult manufacturr whn salant cannot b applid within ths tmpratur rangs. H. Tool joints concav. I. Concrt Floor Joint Fillr: Install concrt floor joint fillr pr manufacturr's writtn instructions. Aftr floor joint fillr is fully curd, shav joint fillr flush with top of concrt slab. J. Wall Shathing Joints: S Drawings Sht A.50.. Fill joint with continuous bad of polyurthan salant Typ A. Trowl onto fac of shathing -/ inch both sids of joint.. Imbd rinforcing msh in salant.. Trowl-apply topcoat of urthan salant. 4. Allow salant to cur prior to application of dampproofing undr Sction CLEANING A. Clan adjacnt soild surfacs..05 PROTECTION A. Protct salants until curd. END OF SECTION JOINT SEALERS of 5

10 Pbbl Hill - Building Rnovations & Nw Addition Auburn Univrsity AU Projct No SECTION 000 GENERAL FIRE PROTECTION REQUIREMENTS PART - GENERAL.0 SUMMARY A. Provid th ncssary intrfac with othr Divisions to provid a complt projct. Carfully chck th Documnts of this Division with thos Documnts of othr Divisions. Dtrmin th rquirmnts of any intrfacing matrials or quipmnt bing furnishd and/or installd by thos Sctions and Divisions, and provid propr installation and rquird intrfac. B. No dviation from th Contract Documnts shall b mad without th writtn consnt of th Architct and Enginr. C. All Spcifications and Drawings ar to b considrd togthr as th Contract Documnts. Any work shown in on and not th othr, or is implid by ithr, shall b providd to mak a complt projct. Should conflicts xist btwn th Spcifications and Drawings or thr is an itm shown or notd for which is not clarly dfind, immdiatly submit a rqust for clarification. Undr no circumstanc will conflicts btwn th Spcifications and Drawings b grounds for additional cost to th Contract aftr th Contract is stablishd. D. Th Drawings ar schmatic and ar not intndd to show th xact location of piping, quipmnt, tc. E. Dimnsions and information rgarding accurat locations of quipmnt, and structural limitations and finish shall b coordinatd and vrifid with othr Divisions of Work. B prpard to furnish dimnsions and information rgarding th Work of this Division to othr trads. F. Th right is rsrvd to rlocat any sprinklr had a maximum of 0-0 bfor it is prmanntly installd without incurring additional cost to th Contract..0 REFERENCE STANDARDS A. All work shall comply with th most rcntly rvisd vrsions of all local, stat and fdral cods, ordinancs of th authority having jurisdiction, laws, ruls and rgulations. Any modifications rquird by any of th abov shall b mad without any additional cost to th Ownr. Whr rquirmnts btwn govrning Cods and Rgulations vary, th mor rstrictiv provision shall apply. B. Nothing containd in th Contract Documnts shall b construd as authority or prmission to disrgard lgal rquirmnts and rgulations. Th Contractor shall thoroughly rviw th Documnts and bring any such conflicts to th attntion of th Architct and Enginr prior to Installation. C. All matrials, installation, and workmanship shall comply standards and/or cods of th following:. Intrnational Building Cod 009 dition. Intrnational Mchanical Cod dition. Intrnational Plumbing Cod dition GENERAL FIRE PROTECTION REQUIREMENTS of 8

11 4. Intrnational Gas Cod dition 5. Intrnational Fir Prvntion Cod dition amndmnts 6. Intrnational Enrgy Cod dition 7. National Elctrical Cod 8. National Fir Cods 9. Alabama Stat of Alabama (ANSI 7.) Handicap Cod. ANSI - Amrican National Standards Institut. ASTM - Amrican Socity of Tsting and Matrials. NEMA - National Elctrical Manufacturr s Association 4. OSHA - Occupational Safty and Halth Act 5. UL - Undrwritr s Laboratoris 6. ASHRAE - Amrican Socity of Hating and Air Conditioning Enginrs 7. SMACNA - Sht Mtal and Air Conditioning Contractors Nat l Assoc. D. All matrials shall b nw and shall bar th labl of UL..0 EXISTING CONDITIONS A. Whr work is to b prformd in an xisting facility, th contractor shall visit th sit prior to bid and b familiar with all xisting conditions. Spcial attntion shall b givn to work to b prformd abov an xisting ciling. B. Whr xisting slabs ar to b cut or cor drilld, th contractor shall x-ray th xisting slabs to avoid cutting or disrupting xisting conduits, cabls, plumbing or structural mmbrs. C. Fir protction srvic to th building shall not b intrruptd without writtn consnt of th building ownr. D. No allowanc will b mad for lack of knowldg of xisting conditions. E. At th compltion of th projct, all work undr this Division shall b compltly intgratd with th xisting systms and lft in prfct oprating condition. F. Whr work undr this Division disrupts th continuity of any xisting to rmain lctrical circuit or fdr, th Contractor shall rpair/rplac as ncssary to rturn to a prfctly functional and saf oprating condition. G. Prior to any dmolition or construction th Contractor shall hav th xisting conditions inspctd by an EPA, OSHA crtifid asbstos abatmnt agncy to idntify th prsnc of asbstos. Should any asbstos b found it shall b brought to th immdiat attntion of th Architct and Ownr and spcifically idntifid in writing..04 DEFINITIONS A. Provid: to furnish, install and connct. B. Furnish: to supply all matrials, labor, quipmnt, tsting apparatus, controls, tsts, accssoris and all othr itms customarily rquird for th propr and complt application. C. Install: to join, unit, fastn, link, attach, st-up or connct togthr, complt, tstd, and rady for normal satisfactory opration. GENERAL FIRE PROTECTION REQUIREMENTS of 8

12 D. Enginr: th Enginr of rcord. E. Contract Documnts: th complt st of Spcifications and Drawings of all Divisions. F. Work: labor, matrials, quipmnt, accssoris, controls and othr itms rquird for a complt installation. G. Concald: mbddd in masonry or othr construction, installd in furrd spacs, within doubl partitions or hung cilings, in trnchs, in crawl spacs or in nclosurs. H. Exposd: not installd undrground or concald. I. Equal: qual in quality, workmanship, matrials, wight, siz, dsign and fficincy of th spcifid product, conforming with manufacturrs. J. Supply: to purchas, procur, acquir and dlivr complt with rlatd accssoris. K. Authority Having Jurisdiction (AHJ): applicabl local, stat and fdral authoritis having jurisdiction ovr any part of th Scop within this Division and othr Divisions. PART - PRODUCTS.0 MANUFACTURERS A. Manufacturr s nams and catalog numbrs spcifid in th Contract Documnts ar intndd to dscrib th matrial and st th standard of quality. All bids shall b basd on matrial spcifid. Rqust for approval of matrial not spcifid shall b considrd if th rqust is in writtn form and submittd to th Architct no latr than fourtn (4) days prior to th bid dat. All rqusts shall conform to th provisions of th gnral and supplmntary conditions. B. Whn spcific nams ar not statd, only th bst availabl quality of matrial or quipmnt shall b submittd for rviw and usd in th installation..0 BASIS OF DESIGN A. Whr a product is dsignatd as "BASIS OF DESIGN", th Contractor is notifid that mchanical, lctrical, structural, architctural, spac conditions and/or othr faturs of th ovrall projct dsign hav bn basd on th rquirmnts of th "BASIS OF DESIGN" product. B. Whr a product is substitutd for a "BASIS OF DESIGN" product, th Contractor is notifid that changs in projct dsign may b mandatory in ordr to prmit us and installation of th substitut product. Shop drawing submittal for a substitut product shall includ a complt schdul of changs in projct dsign, if any, which must b mad in ordr to prmit us and installation of th substitut product. Th Contractor shall bar all xpnss rlatd to th us of a substitut product..0 SHOP DRAWINGS AND PRODUCT DATA A. Fir sprinklr shop drawings will b prpard undr th suprvision of an nginr licnsd in th Stat of Alabama and ths drawings will bar thir signd and datd sal. GENERAL FIRE PROTECTION REQUIREMENTS of 8

13 B. Th Contractor shall obtain complt shop drawings, product data and sampls from th manufacturrs, supplirs, vndors, and all Division Subcontractors, for all matrials and quipmnt as spcifid hrin in various Sctions of th Spcifications, and shall submit data and dtails of such matrials and quipmnt for rviw by th Architct and Enginr. Prior to submission of th shop drawings, product data and sampls to th Architct and Enginr, th Contractor shall thoroughly rviw th shop drawings, product data and sampls and crtify thy ar in complianc with th Contract Drawings. Furthr, th Contractor shall chck all matrials and quipmnt upon thir arrival on th Projct sit and vrify thir condition and complianc with th Contract Documnts. Any Work which procds prior to rciving rviwd shop drawings shall b modifid as rquird to comply with th Contract Documnts and th shop drawings. A minimum priod of tn (0) working days, xclusiv of transmittal tim, will b rquird in th Enginr s offic ach tim a shop drawing, product data and/or sampl is submittd or rsubmittd for rviw. This tim priod shall b considrd by th Contractor whn schduling his Work. Th initial shop drawing rviw for quipmnt and matrials may b xpditd through th mutual consnt of th Contractor, Architct, Enginr, and Ownr providing th Contractor agrs to submit complt, crtifid, documntd, and coordinatd shop drawings for rviw in accordanc with th rquirmnts of th Contract Documnts. C. Th rviw of shop drawings, product data, and sampls by th Architct and Enginr shall not rliv th Contractor of th rsponsibility for dimnsions or rrors that may b containd thrin, or for dviations from rquirmnts in th Contract Documnts. It shall b clarly undrstood that th noting of som rrors by th Enginr but ovrlooking othrs dos not grant th Contractor prmission to procd in rror. D. All shop drawings and product data/submittals shall b submittd in complianc with th rquirmnts of th gnral and supplmntary conditions. No mor than four (4) copis of submittal data will b rviwd. Any additional copis will b rturnd unmarkd. Th rsponsibility of copying rviw commnts on any additional copis will rst solly with th Contractor. E. All product data/submittals shall bar th nam of th manufacturr to b usd. F. All shop drawings and submittals shall includ a stampd indication signifying that th submittal has bn rviwd for complianc with th Contract Documnts by th Contractor. This stampd indication also rprsnts th fact that th Contractor has chckd this submittal for its intraction with all othr Divisions and crtifis by his signatur or initials that all coordination has takn plac. Th stamp shall includ th dat, nam of th Contracting Firm, th signatur of th Contractor, crtification of complianc and approval. This stamp shall b on th submittal bfor th Enginr will rviw it. G. Th Enginr will rviw an individual submittal not mor than twic. If th submittal is rjctd again on th scond rviw, th Contractor will bar all rsponsibility for paying for th Enginr s tim for additional rviws. Such paymnts to th Enginr shall b withhld from th nxt monthly pay application. H. Shop drawings and/or product data shall b submittd for th following for rviw: a. Fir protction piping systm layouts. Ths drawings must includ associatd quipmnt, drawn to scal basd on submittals for that quipmnt, must b dimnsiond, and must includ piping and quipmnt lvation tags (distanc abov finishd floor to bottom). Th Contractor is ncouragd to dvlop thir own shop drawings, without having had th Enginr s CAD fils (as prviously statd, th Enginr s GENERAL FIRE PROTECTION REQUIREMENTS of 8

14 drawings ar schmatic/diagrammatic in natur). Should th Contractor insist on using th Enginr s CAD fils in th procurmnt of shop drawings, th Contractor must pay th Enginr $50.00 pr sht for th CAD fils. Th Contractor shall giv th Enginr a writtn rlas, accptabl to th Enginr, signd by a corporat officr of th Contractor. This rlas shall also includ a copyright statmnt indicating that ths drawings or lctronic data containd will not b usd on any othr projct. Th rlas and paymnt for th fils must b rcivd PRIOR to dlivry of th CAD fils. b. Equipmnt, including but not limitd to: pip, fittings, hangrs, sismic dvics, sprinklr hads, valvs, fir dpartmnt connctions, hos quipmnt, pumps, controllrs, hat tracing, insulation, piping spcialtis, tc..04 AS-BUILT DRAWINGS A. Th Contractor shall maintain on a daily basis at th Projct sit a complt st of Rcord Drawings. Th Rcord Drawings shall consist of a st of black-lin or blulin prints or AutoCAD fils of th Contractor Coordination Drawings for this Division. Th prints shall b markd or th AutoCAD fil lctronically updatd to show th prcis location of all work and quipmnt, and all changs and dviations in th work from that shown on th Contract Documnts. This rquirmnt shall not b construd as authorization for th Contractor to mak changs in th layout or work without dfinit instructions from th Architct or Enginr. Th continuously updatd coordination drawings (shop drawings prviously dscribd) shall b usd to produc th final Rcord Drawings which shall b dlivrd to th Ownr in AutoCAD lctronic format (CD) upon Projct compltion. B. Rcord dimnsions shall clarly and accuratly dlinat th work as installd; locations shall b suitably idntifid by at last two dimnsions to prmannt structurs. C. Th Contractor and Subcontractor shall mark all Rcord Drawings on th drawings with a rubbr stamp imprssion or an AutoCAD imag that stats such. PART - EXECUTION.0 INSTALLATION A. Th quipmnt slctions usd in th prparation of th Contract Documnts will fit into th physical spacs providd and indicatd, allowing ampl room for accss, srvicing, rmoval and rplacmnt of parts, tc. Adquat spac shall b allowd for claranc in accordanc with th Cod rquirmnts and th rquirmnts of th local Authoritis having jurisdiction, and th quipmnt manufacturr s rcommndations. B. In th prparation of Drawings, a rasonabl ffort to accommodat accptabl quipmnt manufacturr s spac rquirmnts has bn mad. Howvr, sinc spac rquirmnts and quipmnt arrangmnt vary according to ach manufacturr, th rsponsibility for initial accss, maintnanc accss, cod rquird accss, and propr fit rsts with th Contractor. C. Physical dimnsions and arrangmnts of quipmnt to b installd shall b subjct to th Architct s and Enginr s rviw. D. Th Gnral Contractor and all Subcontractors shall coordinat th installation of ductwork, conduit, busway, piping, cabl trays, tc., installation with lighting fixturs, spcial ciling construction, air distribution quipmnt, and th structur. Provid additional riss, drops and offsts as rquird. If aftr installd, nw ductwork, GENERAL FIRE PROTECTION REQUIREMENTS of 8

15 conduit, busway, piping or cabl is found to b in conflict with th architctur, structur, or othr trad Work which is ithr xisting or shown on th Contract Documnts, th ductwork, conduit, busway, piping or cabl shall b rlocatd without additional cost to th Ownr. E. No piping, quipmnt, tc., shall b installd in th ight (8) inch high zon dirctly abov th ciling in tnant aras to allow for tnant build-out and flxibility unlss othrwis spcifically shown on th Drawings or prior writtn authorization is rcivd from th Enginr. F. Accssibility and Claranc:. Piping, tc. shall b installd in accssibl locations, avoiding obstructions, prsrving hadroom, and kping opnings and passagways clar.. Minor adjustmnts in th locations of quipmnt shall b mad whr ncssary, providing such adjustmnts do not advrsly affct functioning of th quipmnt. G. Scaffolds and staging for installation of fir protction work shall b providd undr th work of this Division..0 STRUCTURAL FITTINGS A. Furnish and install th ncssary slvs, insrts, hangrs, anchor bolts, and rlatd structural itms. Install at th propr tim. B. Opnings may hav bn indicatd on th Architctural and Structural drawings. Should any additional opnings or hols b rquird, th sam shall b providd at no additional cost to th Ownr. C. Location: At a tim in advanc of th work, vrify opnings shown on th Architctural and Structural drawings, and coordinat any additional opnings. D. If th work of this Sction rquirs modification of th Architctural or Structural drawings, furnish nw instructions as to rquirmnts for ths opnings. Submit for rviw and coordination to Architct. E. Slvs shall b supplid for all piping passing through walls or slabs and shall b placd bfor concrt is pourd. F. Equipmnt supports for fir protction work shall b fastnd to th structur by insrts, anchor bolts, bolting to drilld and tappd structural mmbrs, or b wldd to th structur.. Wlding shall b don by th lctric arc mthod with fully comptnt wldrs. Supporting mmbrs shall b shop coatd with a suitabl primr.. Surfacs damagd by installation of supports shall b touchd up with primr to match shop coat. Any drilling of structural mmbrs shall b approvd by th Architct. G. Flashing:. Whrvr piping passs through th roof or outr walls, bas flashing and countr-flashing shall b providd.. Such flashing shall b proprly installd by skilld workmn, and shall includ grouting, mastic or tar application, or othr mans to insur a prmannt, watrproof, nat and workmanlik installation.. Insofar as possibl, flashing shall comply with and b similar to rquirmnts for flashing in Gnral Construction Work. GENERAL FIRE PROTECTION REQUIREMENTS of 8

16 H. Anchor bolts and insrts shall b galvanizd and of adquat siz and strngth for installation of lctrical work and shall b placd in forms bfor concrt is pourd.. Placmnt of bolts in bass shall b don undr othr Division. Furnish dtail drawings, tmplats, and anchor bolts for bass to th Gnral Contractor in tim to avoid dlaying work schduls.. Expansion shilds shall only b usd with spcific approval of th Architct. Woodn or soft mtal plugs shall not b usd. I. Cutting and patching:. All additional cutting, patching and rinforcmnt of construction of building, subjct to rviw by th Architct, shall b prformd undr this Sction.. Rfr to appropriat Division for rquirmnts..0 WEATHERPROOF EQUIPMENT A. Fir protction dvics or quipmnt locatd in damp, smi-xposd aras shall b wathr-rsistant. Enclosurs shall comply with NEMA Typ R rquirmnts..04 CLEANING A. Brush and clan work prior to concaling, painting and accptanc. Prform in stags if dirctd. B. Paintd xposd work soild or damagd: Clan and rpair to match adjoining work bfor final accptanc. C. Rmov dust and dbris from insid and outsid of matrial and quipmnt..05 TESTS AND DEMONSTRATIONS A. All systms shall b tstd in th prsnc of th Ownr or an Ownr dsignatd rprsntativ upon compltion of th Work and dmonstrats that th installation is in accordanc with th Contract Documnts. B. All motors shall b chckd and adjustd for corrct dirction of rotation. C. Any work found not to b in complianc with th Contract documnts shall b rpaird or rplacd without incurring additional cost to th Contract pric. D. Provid all instruction to th Ownr on maintnanc and opration of all systms and quipmnt providd undr this Division..06 WARRANTIES A. Th warranty priod for all systms, quipmnt, componnts, work, tc. shall b no lss than on () yar, unlss spcifid othrwis hrinaftr. Th warranty shall includ parts and labor. B. Th Contractor shall, without cost to th Ownr, rmdy any dfcts within a rasonabl tim to b spcifid in notic from th Architct. In dfault throf, th Ownr may hav such work don and charg all costs to th Contractor. C. Th start of th Contractor s warranty priod, as dfind in th Gnral Conditions, shall commnc on th issu of a Crtificat of Substantial Compltion, by th Ownr or th Ownr s Rprsntativ for ach itm of matrial, quipmnt or systm. GENERAL FIRE PROTECTION REQUIREMENTS of 8

17 D. Th Subcontractor shall confr with th Gnral Contractor prior to th bid dat concrning th projct schdul and dtrmin if thr is a nd to oprat any itms of quipmnt or systms for tmporary hating and/or cooling or othr rasons prior to Substantial Compltion. All rquird xtndd warranty costs for quipmnt, matrials, and systms shall b includd in th Subcontractor s bid. END OF SECTION GENERAL FIRE PROTECTION REQUIREMENTS of 8

18 Pbbl Hill - Building Rnovations & Nw Addition Auburn Univrsity AU Projct No SECTION PART - GENERAL PLUMBING PUMPS Dltd in rspons to cod commnts SUMMARY A. Th Gnral Provisions, Supplmntal Gnral Provisions, sction 0 00, Division Spcifications and Spcial Provisions apply to all Work spcifid in this Sction. B. This sction dscribs th basic matrials and installation mthods for th cooling towr systm. Comply with othr Division sctions and drawings as applicabl. Rfr to othr divisions for coordination of work. C. Furnish and install all componnts of th plumbing pump systms spcifid hrin, as indicatd on th drawings, and as rquird to provid complt and oprating systms..0 DESCRIPTION OF WORK A. Work Includd: Provid pumps as spcifid and indicatd..0 QUALITY ASSURANCE A. Manufacturrs: Provid products by on of th following:. Hyfab. Bll and Gosstt, ITT Division. Cran Company 4. Grunfoss. 5. Wil Pump Company 6. SyncroFlo, Inc. 7. PACO Pumps 8. Taco, Inc. 9. Armstrong Pumps, Inc. 0. Myrs B. Elctrical Standards: Provid lctric motors and products which hav bn listd and labld by Undrwritrs' Laboratoris, Inc. (UL) and comply with National Elctrical Manufacturrs' Association (NEMA) standards. C. Crtification, Pump Prformanc: Provid pumps whos prformanc, undr spcifid conditions, is crtifid by th manufacturr. PLUMBING PUMPS - of

19 PART - PRODUCTS.0 CIRCULATING PUMPS A. Gnral: In-lin circulating pumps shall b stainlss stl or bronz body construction of th siz, typ, and capacity rquird by th application. Pumps shall b fittd with a dynamically balancd, brass nclosd typ impllr with mchanical sal. Motor shall hav a maximum spd of 750 rpm. Pumps, casings, flangs, and sals shall b suitabl for opration with th working prssurs and tmpraturs rquird and shall b listd for potabl watr usag. Th working prssur applis to th ntir pump assmbly..0 REMOTE ALARM ANNUNCIATION A. Gnral: Th following alarms for th pumping systms ar to b annunciatd. If a Building Automation Systm is providd in th building, ths alarms shall b intgratd into th automation systm.. Domstic watr pump shutdown for ach individual pumping systm B. Labling: Each alarm lamp shall b labld with an ngravd namplat idntifying th alarm indicatd. C. Powr Sourc: Th rmot annunciator shall b srvd by a ddicatd 0 volt mrgncy powr branch circuit. PART - EXECUTION.0 INSPECTION A. Gnral: Installr shall xamin th bass upon which and conditions undr which pumps ar to b installd and notify Contractor in writing of conditions dtrimntal to propr and timly compltion of th Work. Do not procd with th Work until unsatisfactory conditions hav bn corrctd in a mannr accptabl to Installr..0 PUMP INSTALLATION A. Gnral: Install pumps in accordanc with manufacturr's writtn instructions and rcognizd industry practics to nsur that pumps comply with rquirmnts and srv intndd purposs. Comply with NEMA standards and rquirmnts of NEC. B. Alignmnt: Chck alignmnt and, whr ncssary, ralign shafts of motors and pumps within tolrancs rcommndd by manufacturr. C. Vibration Isolation: Install units on vibration mounts as rquird or spcifid. Comply with manufacturr's indicatd installation mthod and with othr applicabl Sctions of this Division..0 ELECTRICAL CONNECTIONS A. Grounding: Provid positiv lctrical pump and motor grounding in accordanc with applicabl rquirmnts of th NEC. PLUMBING PUMPS - of

20 .04 QUALITY CONTROL A. Fild Tst: Upon compltion of pump installation and aftr motor has bn nrgizd from normal powr sourc, bld air from pump casing and tst pump to dmonstrat complianc with rquirmnts. Whn possibl, fild-corrct malfunctioning units thn rtst to dmonstrat complianc. Rplac units that cannot b satisfactorily corrctd. END OF SECTION PLUMBING PUMPS - of

21 Pbbl Hill - Building Rnovations & Nw Addition Auburn Univrsity AU Projct No SECTION PLUMBING FIXTURES PART - GENERAL.0 SUMMARY A. Th Gnral Provisions, Supplmntal Gnral Provisions, sction 0 00, Division Spcifications and Spcial Provisions apply to all Work spcifid in this Sction. B. This sction dscribs th basic matrials and installation mthods for th watr sourc hat pump systms. Comply with othr Division sctions and drawings as applicabl. Rfr to othr divisions for coordination of work. C. Furnish and install all componnts of th watr sourc hat pump systms spcifid hrin, as indicatd on th drawings, and as rquird to provid complt and oprating systms..0 DESCRIPTION OF WORK A. Accptabl Manufacturrs: Th modl numbrs listd in th Spcifications stablish a lvl of quality and matrial. Th following manufacturrs ar accptabl subjct to complianc with th rquirmnts of ths Spcifications.. Fixturs a. Amrican Standard b. Kohlr Company c. Cran Company d. Toto. Faucts a. Chicago Fauct Company b. Spakman Company c. T & S Brass and Bronz Works, Inc. d. Dlta. Flush Valvs a. Sloan Valv Company b. Dlany Flush Valvs c. Zurn Industris, Inc. 4. Sats a. Church Products, Forbs-Wright Ind., Inc. b. Olsonit Corporation c. Bnk Corporation d. Bmis 5. Carrirs a. Zurn Industris, Inc. b. J. R. Smith Mfg. Co. c. Wad Div./Tylr Pip 6. Drinking Fountains a. Halsy Taylor - Div. Houshold Int. Co. b. Elkay Mfg. Company c. Ebco/Oasis 7. Stainlss Stl Sinks a. Elkay Mfg. Company b. Just Mfg. Company PLUMBING FIXTURES of

22 PART - PRODUCTS S drawings for Fixtur Schdul PART - EXECUTION.0 INSTALLATION A. Hights: St fixturs at hights as shown on th Architct's Drawings. B. Caulking: This Contractor shall caulk th joint btwn th finishd wall surfac and all plumbing fixturs. Vrify colors with th Architct. Caulking matrial shall comply with th appropriat sction of ths Spcifications. C. Emrgncy Showr: Install an mrgncy showr and y wash adjacnt to th chmical tratmnt fdr systm, and in othr locations as rquird by cod or as indicatd on th drawings. Pip domstic cold watr to showr. Rspons to cod commnts D. Each fixtur shall b providd with a shut-off valv for ach supply lin. All xposd lins shall b chromium-platd. END OF SECTION PLUMBING FIXTURES of

23 Pbbl Hill - Building Rnovations & Nw Addition Auburn Univrsity AU Projct No SECTION 0 00 DUCTWORK PART - GENERAL.0 SUMMARY A. Th Gnral Provisions, Supplmntal Gnral Provisions, sction 0 00, Division Spcifications and Spcial Provisions apply to all Work spcifid in this Sction. B. This sction dscribs th basic matrials and installation mthods for th duct systms. Comply with othr Division sctions and drawings as applicabl. Rfr to othr divisions for coordination of work. C. Furnish and install all componnts of th duct systms spcifid hrin, as indicatd on th drawings, and as rquird to provid complt and oprating systms..0 DESCRIPTION OF WORK A. Work Includd:. Provid sht mtal ductwork as spcifid hrin. B. Typs: Th typs of ductwork spcifid in this Sction includ, but ar not ncssarily limitd to th following:. Air conditioning cooling and/or hating supply and rturn air systms. Outdoor air supply systms. Mchanical xhaust systms 4. Air rlif systms C. Supply Air Ductwork Downstram of Constant Volum Rooftop Units: Ductwork shall b sht mtal dsignd for vlocitis up to,500 fpm or a friction rat of 0.0 inchs watr column pr 00 ft of duct, whichvr is most stringnt. Th ductwork shall mt th latst SMACNA Standards for construction and stiffning basd on th maximum prssur in th ductwork. Ductwork shall b W.C. prssur class. D. VAV Supply Air Ductwork Upstram of Trminal Units (round or flat oval): Ductwork shall b sht mtal dsignd for vlocitis up to,800 fpm. Th ductwork shall mt th latst SMACNA Standards for construction and stiffning basd on th maximum prssur in th ductwork. Ductwork shall b W.C. prssur class. E. VAV Supply Air Ductwork Upstram of Trminal Units (rctangular): Ductwork shall b sht mtal dsignd for vlocitis up to,00 fpm. Th ductwork shall mt th latst SMACNA Standards for construction and stiffning basd on th maximum prssur in th ductwork. Ductwork shall b W.C. prssur class. F. Supply Air Ductwork Downstram of Trminal Units: Ductwork shall b sht mtal ductwork dsignd for vlocitis up to,500 fpm or a friction rat of 0.0 inchs watr column pr 00 ft of duct, whichvr is most stringnt. Th ductwork shall mt th latst SMACNA Standards for construction and stiffning basd on th maximum prssur in th ductwork. Ductwork shall b W.C. prssur class. Rspons to cod commnts DUCTWORK of 8

24 G. Outsid Air Ductwork (passiv): Ductwork shall b sht mtal ductwork dsignd for vlocitis up to,000 fpm. Th ductwork shall mt th latst SMACNA Standards for construction and stiffning basd on th maximum prssur in th ductwork. I. Rstroom and Gnral Exhaust Ductwork: Ductwork shall b sht mtal ductwork dsignd for vlocitis up to,500 fpm. Th ductwork shall mt th latst SMACNA Standards for construction and stiffning basd on th maximum prssur in th ductwork. Ductwork shall b W.C. prssur class. J. Flxibl Ductwork: Ductwork connctions to HVAC trminal units and air dvics shall b mad with flxibl ductwork connction whr shown on th Drawings. Additional connctions may b mad using flxibl ductwork at th Contractors opinion, whr approvd in writing, in advanc, by th Enginr. K. Ductwork Insulation: Rfr to sction 07 00, HVAC Insulation, for duct insulation. L. Ductwork Accssoris: Rfr to Sction 00, Ductwork Accssoris, for accssoris and spcialtis rlatd to ductwork systms and installation..0 QUALITY ASSURANCE A. Dsign and Installation Standards:. SMACNA HVAC Duct Construction Standards, latst dition.. ASHRAE Standards: Comply with Amrican Socity of Hating, Rfrigrating and Air-Conditioning Enginrs (ASHRAE 70-7), Mthod of Tsting for Rating th air flow prformanc of outlts and inlts.. ADC Standard 06R, Air Diffusing Equipmnt Tst Cod. 4. AMCA Standard 0, Tst Cod for Air Moving Dvics. 5. NFPA 90-A, Standard for th Installation of Air Conditioning and Vntilating Systms, 00 dition. B. Fir and Smok Rating Tst Standards: ASTM E84, NFPA 55 and UL SUBMITTALS A. Shop Drawings: Submit dimnsiond layouts of ductwork showing both th accuratly scald ductwork and its rlation to spac nclosur. Show modifications of indicatd rquirmnts, mad to conform to local shop practic and how thos modifications nsur that th fr ara, matrials, and wights ar not rducd. Th shop drawings must b submittd at ¼ = -0 or largr scal and shall includ all quipmnt connctd to th duct systms, drawn to scal, basd on th quipmnt submittals. All ductwork and quipmnt must indicat bottom lvations, rfrncd to finishd floor blow (bottom of duct = X -Y AFF,.g.) PART - PRODUCTS.0 DUCTWORK MATERIALS A. Exposd Ductwork Matrials: Whr ductwork is indicatd to b xposd to viw in occupid spacs, provid matrials which ar fr from visual imprfctions including pitting, sam marks, rollr marks, oil canning, stains, discolorations, and othr imprfctions, including thos which would impair painting. B. Gaugs, Rctangular Ductwork: Fabricat galvanizd stl ductwork from th minimum gaugs for sizs up to th corrsponding maximum long-sid dimnsions as indicatd in SMACNA Duct Construction Standards. DUCTWORK of 8

25 C. Gaugs, Round Ductwork: Fabricat lock-form quality galvanizd stl ductwork from th minimum gaugs for diamtrs up to th corrsponding maximum dimnsions as indicatd in SMACNA Duct Construction Standards. D. Fibrglass Duct board: Fibrglass duct board is NOT an accptabl mans of air transport..0 MISCELLANEOUS DUCT MATERIALS A. Gnral: Provid miscllanous matrials and products of th typs and sizs indicatd and whr not othrwis indicatd, provid typ and siz rquird to comply with ductwork systm rquirmnts including propr connction of ductwork and quipmnt. B. Duct Salant: Provid non-hardning, non-migrating mastic or liquid lastic salant (typ applicabl for th fabrication/installation dtail) as compoundd and rcommndd by th manufacturr spcifically for saling joints and sams in ductwork. C. Ductwork Support Matrials: Excpt as othrwis indicatd, provid hot-dippd galvanizd stl fastnrs, anchors, rods, straps, trim, and angls for support of ductwork. D. Duct Linr Adhsiv: Comply with ASC-A-700 by Th Adhsiv and Salant Council, Inc. (pr SMACNA standards). E. Duct Linr Fastnrs: Comply with SMACNA. F. Flxibl Ductwork: Insulatd flxibl ductwork shall b Wirmold Typ VTCK. Approvd qual flxibl ductwork by Crtaintd Corporation, Flxaust Company, Gnflx or Owns-Corning Fibrglass will b accptabl. Provid ithr 45 dgr angl taps with manual volum damprs or "spin-in" taps with manual volum damprs at main duct tap as shown on Drawings. PART - EXECUTION.0 GENERAL REQUIREMENTS A. Standards: Round and rctangular sht mtal ductwork shall b constructd in accordanc with SMACNA "HVAC Duct Constructions Standards", latst Edition, ASHRAE Guid and Data Book, "Handbook of Fundamntals", latst dition, spcifically Chaptr 5 and NFPA Standard 90-A, "Standard for th Installation of Air Conditioning and Vntilating Systms". B. All ductwork rquird for th hating, vntilating and air conditioning systms shall b constructd and rctd in a first class workmanlik mannr. This work shall b guarantd for a priod of on yar from and aftr th dat of accptanc of th job against nois, chattr, whistling, vibration, and fr from pulsation undr all conditions of opration. C. Th intrior surfac of all ductwork shall b smooth with no parts projcting into th air stram unlss spcifid to do so. All sams and joints shall b xtrnal. Th insid of all ductwork shall b thoroughly cland and all fans opratd to rmov any dbris prior to connction of air dvics. D. All hols in ducts for dampr rods and othr ncssary dvics shall b ithr drilld or machin punchd (not pin punchd), and shall not b any largr than ncssary. All duct opnings shall b providd with sht mtal caps if th opnings ar to b lft unconnctd for any lngth of tim. DUCTWORK of 8

CARE QUALITY COMMISSION ESSENTIAL STANDARDS OF QUALITY AND SAFETY. Outcome 10 Regulation 11 Safety and Suitability of Premises

CARE QUALITY COMMISSION ESSENTIAL STANDARDS OF QUALITY AND SAFETY. Outcome 10 Regulation 11 Safety and Suitability of Premises CARE QUALITY COMMISSION ESSENTIAL STANDARDS OF QUALITY AND SAFETY Outcom 10 Rgulation 11 Safty and Suitability of Prmiss CQC Rf 10A 10A(1) Lad Dirctor / Lad Officr Rspons Impact Liklihood Lvl of Concrn

More information

WORKERS' COMPENSATION ANALYST, 1774 SENIOR WORKERS' COMPENSATION ANALYST, 1769

WORKERS' COMPENSATION ANALYST, 1774 SENIOR WORKERS' COMPENSATION ANALYST, 1769 08-16-85 WORKERS' COMPENSATION ANALYST, 1774 SENIOR WORKERS' COMPENSATION ANALYST, 1769 Summary of Dutis : Dtrmins City accptanc of workrs' compnsation cass for injurd mploys; authorizs appropriat tratmnt

More information

605 AUXILIARY SERVICES WAREHOUSE 605 AUXILIARY SERVICES WAREHOUSE COLD STORAGE DRIVE COLD STORAGE DRIVE EXISTING CONDITIONS & DEMOLITION PLAN

605 AUXILIARY SERVICES WAREHOUSE 605 AUXILIARY SERVICES WAREHOUSE COLD STORAGE DRIVE COLD STORAGE DRIVE EXISTING CONDITIONS & DEMOLITION PLAN ASS ASS ASS SS SS SS SS XISTING CONDITIONS & DMOLITION PLAN W W W W " CLAY TDB TF 605 AUXILIARY SRVICS WARHOUS TDB TDB COLD STORAG DRIV TDB 6" DI THH 86A APPROX ASS ASS ASS SS SS SS SS W W W W " CLAY TDB

More information

81-1-ISD Economic Considerations of Heat Transfer on Sheet Metal Duct

81-1-ISD Economic Considerations of Heat Transfer on Sheet Metal Duct Air Handling Systms Enginring & chnical Bulltin 81-1-ISD Economic Considrations of Hat ransfr on Sht Mtal Duct Othr bulltins hav dmonstratd th nd to add insulation to cooling/hating ducts in ordr to achiv

More information

Remember you can apply online. It s quick and easy. Go to www.gov.uk/advancedlearningloans. Title. Forename(s) Surname. Sex. Male Date of birth D

Remember you can apply online. It s quick and easy. Go to www.gov.uk/advancedlearningloans. Title. Forename(s) Surname. Sex. Male Date of birth D 24+ Advancd Larning Loan Application form Rmmbr you can apply onlin. It s quick and asy. Go to www.gov.uk/advancdlarningloans About this form Complt this form if: you r studying an ligibl cours at an approvd

More information

Free ACA SOLUTION (IRS 1094&1095 Reporting)

Free ACA SOLUTION (IRS 1094&1095 Reporting) Fr ACA SOLUTION (IRS 1094&1095 Rporting) Th Insuranc Exchang (301) 279-1062 ACA Srvics Transmit IRS Form 1094 -C for mployrs Print & mail IRS Form 1095-C to mploys HR Assist 360 will gnrat th 1095 s for

More information

STATEMENT OF INSOLVENCY PRACTICE 3.2

STATEMENT OF INSOLVENCY PRACTICE 3.2 STATEMENT OF INSOLVENCY PRACTICE 3.2 COMPANY VOLUNTARY ARRANGEMENTS INTRODUCTION 1 A Company Voluntary Arrangmnt (CVA) is a statutory contract twn a company and its crditors undr which an insolvncy practitionr

More information

Architecture of the proposed standard

Architecture of the proposed standard Architctur of th proposd standard Introduction Th goal of th nw standardisation projct is th dvlopmnt of a standard dscribing building srvics (.g.hvac) product catalogus basd on th xprincs mad with th

More information

REPORT' Meeting Date: April 19,201 2 Audit Committee

REPORT' Meeting Date: April 19,201 2 Audit Committee REPORT' Mting Dat: April 19,201 2 Audit Committ For Information DATE: March 21,2012 REPORT TITLE: FROM: Paul Wallis, CMA, CIA, CISA, Dirctor, Intrnal Audit OBJECTIVE To inform Audit Committ of th rsults

More information

June 2012. Enprise Rent. Enprise 1.1.6. Author: Document Version: Product: Product Version: SAP Version: 8.81.100 8.8

June 2012. Enprise Rent. Enprise 1.1.6. Author: Document Version: Product: Product Version: SAP Version: 8.81.100 8.8 Jun 22 Enpris Rnt Author: Documnt Vrsion: Product: Product Vrsion: SAP Vrsion: Enpris Enpris Rnt 88 88 Enpris Rnt 22 Enpris Solutions All rights rsrvd No parts of this work may b rproducd in any form or

More information

Switches and Indicators 01

Switches and Indicators 01 Switchs and Indicators 01 01 Switchs and Indicators Indx Sris 01 Dscription Pag 15 Product Assmbly Pag 16 Product Rang - pushbutton for standard mounting - accssoris / spar parts Tchnical Data Pag 17 Pag

More information

Continuity Cloud Virtual Firewall Guide

Continuity Cloud Virtual Firewall Guide Cloud Virtual Firwall Guid uh6 Vrsion 1.0 Octobr 2015 Foldr BDR Guid for Vam Pag 1 of 36 Cloud Virtual Firwall Guid CONTENTS INTRODUCTION... 3 ACCESSING THE VIRTUAL FIREWALL... 4 HYPER-V/VIRTUALBOX CONTINUITY

More information

Description. Rc NPT G 1/8 1/4 3/8 1/2 3/4. With drain cock Drain guide 1/8 Drain guide 1/4 Drain cock with barb fitting: For ø6 x ø4 nylon tube

Description. Rc NPT G 1/8 1/4 3/8 1/2 3/4. With drain cock Drain guide 1/8 Drain guide 1/4 Drain cock with barb fitting: For ø6 x ø4 nylon tube M Mist Sparator to M Micro Mist Sparator to Sris M ominal filtration rating: 0.3 µm Sris ominal filtration rating: µm How to Ordr Mist Sparator Micro Mist Sparator, M, Option/Smi-standard: Slct on ach

More information

Important Information Call Through... 8 Internet Telephony... 6 two PBX systems... 10 Internet Calls... 3 Internet Telephony... 2

Important Information Call Through... 8 Internet Telephony... 6 two PBX systems... 10 Internet Calls... 3 Internet Telephony... 2 Installation and Opration Intrnt Tlphony Adaptr Aurswald Box Indx C I R 884264 03 02/05 Call Duration, maximum...10 Call Through...7 Call Transportation...7 Calls Call Through...7 Intrnt Tlphony...3 two

More information

Traffic Flow Analysis (2)

Traffic Flow Analysis (2) Traffic Flow Analysis () Statistical Proprtis. Flow rat distributions. Hadway distributions. Spd distributions by Dr. Gang-Ln Chang, Profssor Dirctor of Traffic safty and Oprations Lab. Univrsity of Maryland,

More information

2SD1898 / 2SD1733 V CEO 80V I C 1.0A. Datasheet. NPN 1.0A 80V Middle Power Transistor. Outline. Features

2SD1898 / 2SD1733 V CEO 80V I C 1.0A. Datasheet. NPN 1.0A 80V Middle Power Transistor. Outline. Features NPN.0 80V Middl Powr Transistor Datasht Faturs Paramtr V CEO ) Suitabl for Middl Powr Drivr 2) Complmntary PNP Typs : 2SB260 / 2SB8 3) Low V CE(sat) V CE(sat) = 0.4V Max. (I C /I B =500m/20m) 4) Lad Fr/RoHS

More information

FACULTY SALARIES FALL 2004. NKU CUPA Data Compared To Published National Data

FACULTY SALARIES FALL 2004. NKU CUPA Data Compared To Published National Data FACULTY SALARIES FALL 2004 NKU CUPA Data Compard To Publishd National Data May 2005 Fall 2004 NKU Faculty Salaris Compard To Fall 2004 Publishd CUPA Data In th fall 2004 Northrn Kntucky Univrsity was among

More information

Adverse Selection and Moral Hazard in a Model With 2 States of the World

Adverse Selection and Moral Hazard in a Model With 2 States of the World Advrs Slction and Moral Hazard in a Modl With 2 Stats of th World A modl of a risky situation with two discrt stats of th world has th advantag that it can b natly rprsntd using indiffrnc curv diagrams,

More information

union scholars program APPLICATION DEADLINE: FEBRUARY 28 YOU CAN CHANGE THE WORLD... AND EARN MONEY FOR COLLEGE AT THE SAME TIME!

union scholars program APPLICATION DEADLINE: FEBRUARY 28 YOU CAN CHANGE THE WORLD... AND EARN MONEY FOR COLLEGE AT THE SAME TIME! union scholars YOU CAN CHANGE THE WORLD... program AND EARN MONEY FOR COLLEGE AT THE SAME TIME! AFSCME Unitd Ngro Collg Fund Harvard Univrsity Labor and Worklif Program APPLICATION DEADLINE: FEBRUARY 28

More information

Who uses our services? We have a growing customer base. with institutions all around the globe.

Who uses our services? We have a growing customer base. with institutions all around the globe. not taking xpr Srvic Guid 2013 / 2014 NTE i an affordabl option for audio to txt convrion. Our rvic includ not or dirct trancription rvic from prviouly rcordd audio fil. Our rvic appal pcially to tudnt

More information

How To Get A Job At A Corporation

How To Get A Job At A Corporation EMPLOYEES STATE INSURANCE (GENERAL) REGULATIONS, 1950 [RS/5/48, DATED 17-10-1950] In xrcis of th powrs confrrd by sction 97 of th Employs Stat Insuranc Act, 1948 (34 of 1948), th Employs Stat Insuranc

More information

FEASIBILITY STUDY OF JUST IN TIME INVENTORY MANAGEMENT ON CONSTRUCTION PROJECT

FEASIBILITY STUDY OF JUST IN TIME INVENTORY MANAGEMENT ON CONSTRUCTION PROJECT FEASIBILITY STUDY OF JUST IN TIME INVENTORY MANAGEMENT ON CONSTRUCTION PROJECT Patil Yogndra R. 1, Patil Dhananjay S. 2 1P.G.Scholar, Dpartmnt of Civil Enginring, Rajarambapu Institut of Tchnology, Islampur,

More information

Micro Satellite System

Micro Satellite System 4-226-697-71(1) Micro Satllit Systm Oprating instructions GB CS SA-V315 SA-V312 2000 Sony Corporation WARNING To prvnt fir or shock hazard, do not xpos th unit to rain or moistur. To avoid lctrical shock,

More information

AP Calculus AB 2008 Scoring Guidelines

AP Calculus AB 2008 Scoring Guidelines AP Calculus AB 8 Scoring Guidlins Th Collg Board: Conncting Studnts to Collg Succss Th Collg Board is a not-for-profit mmbrship association whos mission is to connct studnts to collg succss and opportunity.

More information

Personal Identity Verification (PIV) Enablement Solutions

Personal Identity Verification (PIV) Enablement Solutions Prsonal Idntity Vrification (PIV) Enablmnt Solutions pivclass Govrnmnt Solutions Affordabl Prsonal Idntity Vrification (PIV) Enablmnt Solutions from a Singl, Trustd Supplir Complt Solution for PIV Enablmnt

More information

OWNER S GUIDE TRANE SPLIT AC AIR CONDITIONER INTERACTIVE REMOTE SPLIT AC WITH

OWNER S GUIDE TRANE SPLIT AC AIR CONDITIONER INTERACTIVE REMOTE SPLIT AC WITH INTERACTIVE AIR CONDITIONER OWNER S GUIDE SPLIT AC WITH INTERACTIVE REMOTE TRANE SPLIT AC Dar Customr W ar TRANE, a global ladr in hating, vntilation and air conditioning quipmnt. W com from th hous of

More information

Copyright : These Drawings are the property of D Architects, Ltd, and reuse on any other project without written permission will result in legal action SYMBOL J F WH 0/0//R NMA 0/0/ SM S S S D S LV S os

More information

Lift Selection Guide

Lift Selection Guide Lift Slction Guid Hlping you choos th right lifts to kp your staff and rsidnts saf Th Dirct Supply diffrnc Kp your community saf DIRECT SUPPLY MAKES EQUIPMENT SELECTION EASY BENEFITS OF SAFE LIFTING PRACTICES

More information

EFFECT OF GEOMETRICAL PARAMETERS ON HEAT TRANSFER PERFORMACE OF RECTANGULAR CIRCUMFERENTIAL FINS

EFFECT OF GEOMETRICAL PARAMETERS ON HEAT TRANSFER PERFORMACE OF RECTANGULAR CIRCUMFERENTIAL FINS 25 Vol. 3 () January-March, pp.37-5/tripathi EFFECT OF GEOMETRICAL PARAMETERS ON HEAT TRANSFER PERFORMACE OF RECTANGULAR CIRCUMFERENTIAL FINS *Shilpa Tripathi Dpartmnt of Chmical Enginring, Indor Institut

More information

1 THRU 4 MAJOR COVERAGE 1. ENGINE

1 THRU 4 MAJOR COVERAGE 1. ENGINE 1 THRU 4 MAJOR COVERAGE 1. ENGINE: All intrnally lubricatd parts including: crankshaft, rod and main barings, camshaft, cam barings, conncting rods, wrist pins, pistons, piston rings, valvs and valv guids,

More information

by John Donald, Lecturer, School of Accounting, Economics and Finance, Deakin University, Australia

by John Donald, Lecturer, School of Accounting, Economics and Finance, Deakin University, Australia Studnt Nots Cost Volum Profit Analysis by John Donald, Lcturr, School of Accounting, Economics and Financ, Dakin Univrsity, Australia As mntiond in th last st of Studnt Nots, th ability to catgoris costs

More information

Category 7: Employee Commuting

Category 7: Employee Commuting 7 Catgory 7: Employ Commuting Catgory dscription This catgory includs missions from th transportation of mploys 4 btwn thir homs and thir worksits. Emissions from mploy commuting may aris from: Automobil

More information

Inductive proximity sensors OsiSense XS Cubic range. Catalogue

Inductive proximity sensors OsiSense XS Cubic range. Catalogue Inductiv proximity snsors OsiSns XS Cubic rang Catalogu A snsor that quickly and asily adapts to your machins With uniqu onclick mounting and a rotating dtction had, th nw OsiSns XS cubic snsor can b

More information

C H A P T E R 1 Writing Reports with SAS

C H A P T E R 1 Writing Reports with SAS C H A P T E R 1 Writing Rports with SAS Prsnting information in a way that s undrstood by th audinc is fundamntally important to anyon s job. Onc you collct your data and undrstand its structur, you nd

More information

Entry Voice Mail for HiPath Systems. User Manual for Your Telephone

Entry Voice Mail for HiPath Systems. User Manual for Your Telephone Entry Voic Mail for HiPath Systms Usr Manual for Your Tlphon About This Usr Manual About This Usr Manual This usr manual is intndd for Entry Voic Mail usrs and traind oprators who ar rsponsibl for confiurin

More information

Moving Securely Around Space: The Case of ESA

Moving Securely Around Space: The Case of ESA Moving Scurly Around Spac: Th Cas of ESA Prpard By: Andra Baldi, Jos Frnandz Balsiro, Marco Incollingo Tommaso Parrinllo, Cristiano Silvagni, Stfano Zatti Europan Spac Agncy Andra.Baldi@sa.int ESA Scnario

More information

Development of Financial Management Reporting in MPLS

Development of Financial Management Reporting in MPLS 1 Dvlopmnt of Financial Managmnt Rporting in MPLS 1. Aim Our currnt financial rports ar structurd to dlivr an ovrall financial pictur of th dpartmnt in it s ntirty, and thr is no attmpt to provid ithr

More information

Use a high-level conceptual data model (ER Model). Identify objects of interest (entities) and relationships between these objects

Use a high-level conceptual data model (ER Model). Identify objects of interest (entities) and relationships between these objects Chaptr 3: Entity Rlationship Modl Databas Dsign Procss Us a high-lvl concptual data modl (ER Modl). Idntify objcts of intrst (ntitis) and rlationships btwn ths objcts Idntify constraints (conditions) End

More information

SCHOOLS' PPP : PROJECT MANAGEMENT

SCHOOLS' PPP : PROJECT MANAGEMENT Rport Schools' PPP Sub Committ 22 April 2004 2 SCHOOLS' PPP : PROJECT MANAGEMENT 1 Rason for Rport To provid Mmbrs with information on th structur of th Schools' PPP Projct Tam 2 Background 21 Dumfris

More information

Package Information Datasheet for Mature Altera Devices

Package Information Datasheet for Mature Altera Devices Packag Information Datasht for Matur Altra Dvics DS-PKG-16.8 This datasht provids packag and thrmal rsistanc information for matur Altra dvics. Packag information includs th ordring cod rfrnc, packag acronym,

More information

UTILITY SOLUTIONS. Security & Site Monitoring. Substation Automation Solutions. Protection & Control Systems. Optical Communication Networks

UTILITY SOLUTIONS. Security & Site Monitoring. Substation Automation Solutions. Protection & Control Systems. Optical Communication Networks Scurity & Sit Monitoring Substation Automation Solutions Protction & Control Systms Optical Communication Ntworks UTILITY Intgratd Automation SOLUTIONS for Elctric Utilitis GE Powr Systms GE Industrial

More information

A Project Management framework for Software Implementation Planning and Management

A Project Management framework for Software Implementation Planning and Management PPM02 A Projct Managmnt framwork for Softwar Implmntation Planning and Managmnt Kith Lancastr Lancastr Stratgis Kith.Lancastr@LancastrStratgis.com Th goal of introducing nw tchnologis into your company

More information

Child and Adult Care Food Program

Child and Adult Care Food Program Nutrition and Wllnss Programs Illinois Stat Board of Education 100 North First Strt (W270) Springfild, Illinois 62777-0001 Child and Adult Car Food Program Day Car Homs Srious Dficincy Procss Dcmbr 2013

More information

Gliding Windows Premium Vinyl

Gliding Windows Premium Vinyl TABL OF CONTNTS Product Specifications... 6-2 QuickSpecGuide... 6-3 levations/sizes: 1/4 Scale 2 Wide Gliding Window... 6-4 3 Wide Gliding Window... 6-8 SashGlazingOptions:3 Scale... 6-10 Grilles & SDL

More information

Hi-trac Luminaire LED

Hi-trac Luminaire LED indirct mission 72 2000 LED 0q p (RAL9002) LED 12W 10lm 4000K nutral whit Switchabl Vrsion 2 Product dscription Panl profil: aluminium, powdrcoatd. Uppr part: mounting plat with LED modul. 5-pol trminal

More information

Fleet vehicles opportunities for carbon management

Fleet vehicles opportunities for carbon management Flt vhicls opportunitis for carbon managmnt Authors: Kith Robrtson 1 Dr. Kristian Stl 2 Dr. Christoph Hamlmann 3 Alksandra Krukar 4 Tdla Mzmir 5 1 Snior Sustainability Consultant & Lad Analyst, Arup 2

More information

Increasing Net Debt as a percentage of Average Equalized ValuaOon

Increasing Net Debt as a percentage of Average Equalized ValuaOon City of Orang Township Warning Trnd: Incrasing Nt Dbt as a prcntag of avrag qualizd valuation Nt Dbt 3 yr. Avg. qualizd Valuation Incrasing Nt Dbt as a prcntag of Avrag Equalizd ValuaOon rc 1.20% 1.00%

More information

Dehumidifiers: A Major Consumer of Residential Electricity

Dehumidifiers: A Major Consumer of Residential Electricity Dhumidifirs: A Major Consumr of Rsidntial Elctricity Laurn Mattison and Dav Korn, Th Cadmus Group, Inc. ABSTRACT An stimatd 19% of U.S. homs hav dhumidifirs, and thy can account for a substantial portion

More information

Econ 371: Answer Key for Problem Set 1 (Chapter 12-13)

Econ 371: Answer Key for Problem Set 1 (Chapter 12-13) con 37: Answr Ky for Problm St (Chaptr 2-3) Instructor: Kanda Naknoi Sptmbr 4, 2005. (2 points) Is it possibl for a country to hav a currnt account dficit at th sam tim and has a surplus in its balanc

More information

Natural Gas & Electricity Prices

Natural Gas & Electricity Prices Click to dit Mastr titl styl Click to dit Mastr txt styls Scond lvl Third lvl Natural Gas & Elctricity Prics Fourth lvl» Fifth lvl Glnn S. Pool Manufacturing Support Mgr. Enrgy April 4, 2013 Click Vrso

More information

The example is taken from Sect. 1.2 of Vol. 1 of the CPN book.

The example is taken from Sect. 1.2 of Vol. 1 of the CPN book. Rsourc Allocation Abstract This is a small toy xampl which is wll-suitd as a first introduction to Cnts. Th CN modl is dscribd in grat dtail, xplaining th basic concpts of C-nts. Hnc, it can b rad by popl

More information

Planning and Managing Copper Cable Maintenance through Cost- Benefit Modeling

Planning and Managing Copper Cable Maintenance through Cost- Benefit Modeling Planning and Managing Coppr Cabl Maintnanc through Cost- Bnfit Modling Jason W. Rup U S WEST Advancd Tchnologis Bouldr Ky Words: Maintnanc, Managmnt Stratgy, Rhabilitation, Cost-bnfit Analysis, Rliability

More information

Defense Logistics Agency STANDARD OPERATING PROCEDURE

Defense Logistics Agency STANDARD OPERATING PROCEDURE Dfns Logistics Agncy STANDARD OPERATING PROCEDURE DLA Information Oprations SOP 6100.04 March 12, 2015 Prformanc Optimization, J613 SUBJECT: IT Procss Improvmnt (ITPI) Standard Oprating Procdur (SOP) REFERENCES:

More information

Version 1.0. General Certificate of Education (A-level) January 2012. Mathematics MPC3. (Specification 6360) Pure Core 3. Final.

Version 1.0. General Certificate of Education (A-level) January 2012. Mathematics MPC3. (Specification 6360) Pure Core 3. Final. Vrsion.0 Gnral Crtificat of Education (A-lvl) January 0 Mathmatics MPC (Spcification 660) Pur Cor Final Mark Schm Mark schms ar prpard by th Principal Eaminr and considrd, togthr with th rlvant qustions,

More information

Lecture 20: Emitter Follower and Differential Amplifiers

Lecture 20: Emitter Follower and Differential Amplifiers Whits, EE 3 Lctur 0 Pag of 8 Lctur 0: Emittr Followr and Diffrntial Amplifirs Th nxt two amplifir circuits w will discuss ar ry important to lctrical nginring in gnral, and to th NorCal 40A spcifically.

More information

Cisco Data Virtualization

Cisco Data Virtualization Cisco Data Virtualization Big Data Eco-systm Discussion with Bloor Group Bob Ev, David Bsmr July 2014 Cisco Data Virtualization Backgroundr Cisco Data Virtualization is agil data intgration softwar that

More information

IBM Healthcare Home Care Monitoring

IBM Healthcare Home Care Monitoring IBM Halthcar Hom Car Monitoring Sptmbr 30th, 2015 by Sal P. Causi, P. Eng. IBM Halthcar Businss Dvlopmnt Excutiv scausi@ca.ibm.com IBM Canada Cloud Computing Tigr Tam Homcar by dfinition 1. With a gnsis

More information

Attached Benefit Enrollment Forms must be returned to the Business Office within 30 days after your first day of work

Attached Benefit Enrollment Forms must be returned to the Business Office within 30 days after your first day of work Attachd Bnfit Enrollmnt Forms must b rturnd to th Businss Offic within 30 days aftr your first day of work Insuranc Enrollmnt Form Elct or Waiv Halth Covrag o B sur to indicat which halth plan you ar lcting

More information

Caution laser! Avoid direct eye contact with the laser beam!

Caution laser! Avoid direct eye contact with the laser beam! Manual ontnt 1. aturs 3 2. Spcifications 3 3. Packag contnts 3 4. Th mous at a glanc 4 5. onncting to th P 5 6. Installing th softwar 5 7. Th ditor 6 7.1 Starting th ditor 6 7.2 Main ontrol window 6 7.3

More information

Category 11: Use of Sold Products

Category 11: Use of Sold Products 11 Catgory 11: Us of Sold Products Catgory dscription T his catgory includs missions from th us of goods and srvics sold by th rporting company in th rporting yar. A rporting company s scop 3 missions

More information

Asset set Liability Management for

Asset set Liability Management for KSD -larning and rfrnc products for th global financ profssional Highlights Library of 29 Courss Availabl Products Upcoming Products Rply Form Asst st Liability Managmnt for Insuranc Companis A comprhnsiv

More information

PRIMARY HEALTH CARE NURSE PRACTITIONER CERTIFICATE

PRIMARY HEALTH CARE NURSE PRACTITIONER CERTIFICATE 2016-17 PRIMARY HEALTH CARE NURSE PRACTITIONER CERTIFICATE Clinical Placmnt Packag Tabl of Contnts Clinical Placmnt Guidlins... 2 List of Rquird Forms & Supporting Documntation... 2 PHCNP Crtificat Powrpoint

More information

PACKINGHOUSE NEWSLETTER

PACKINGHOUSE NEWSLETTER Cooprativ Extnsion Srvic Institut of Food and Agricultural Scincs PACKINGHOUSE NEWSLETTER Mark Ritnour Packinghous Nwslttr No. 192 Indian Rivr REC Dcmbr 29, 2000 2199 South Rock Road Ft. Pirc, FL 34945-3138

More information

! Home%Rental%Information%and%Application%%!! NeighborWorks!Provo!is!a!non1profit!organization.!We!have!been!creating!

! Home%Rental%Information%and%Application%%!! NeighborWorks!Provo!is!a!non1profit!organization.!We!have!been!creating! Hom%Rntal%Information%and%Application%% NighborWorksProvoisanon1profitorganization.Whavbncrating opportunitisforpopltoimprovthirlivsandstrngthnthir communitissinc1992.wprovidaffordablrntalhousingforvrylow,

More information

SNDB/COK/ADMIN/TD/561/2015 COPY NO: Sindh Bank Limited. Tender Document PROVISION OF GROUP LIFE INSURANCE SERVICES. This report contains ;109 pages

SNDB/COK/ADMIN/TD/561/2015 COPY NO: Sindh Bank Limited. Tender Document PROVISION OF GROUP LIFE INSURANCE SERVICES. This report contains ;109 pages SNB/COK/AMIN/T/561/2015 COPY NO: Sindh Bank Limitd Tndr ocumnt PROVISION OF GROUP LIF INSURANC SRVICS This rport contains ;109 pags Sindh Bank Limitd Tndr ocumnt Provision of Group Lif Insuranc Srvics

More information

Stag and Capital Bids in Indian Scenario

Stag and Capital Bids in Indian Scenario SNH/01/4/Info2 CAPITAL INVESTMENT STRATEGY 2001-02 Summary 1. `This information papr provids an ovrviw of th critria and prioritis usd by Managmnt Tam in dtrmining SNH s annual capital programm, as rqustd

More information

LG has introduced the NeON 2, with newly developed Cello Technology which improves performance and reliability. Up to 320W 300W

LG has introduced the NeON 2, with newly developed Cello Technology which improves performance and reliability. Up to 320W 300W Cllo Tchnology LG has introducd th NON 2, with nwly dvlopd Cllo Tchnology which improvs prformanc and rliability. Up to 320W 300W Cllo Tchnology Cll Connction Elctrically Low Loss Low Strss Optical Absorption

More information

HowTo Reach Us. By Telephone Call us at 800-251-8736 (within the U.S. & Canada)

HowTo Reach Us. By Telephone Call us at 800-251-8736 (within the U.S. & Canada) HowTo Rach Us By Tlphon Call us at 800-51-873 (within th U.. & Canada) Prss 1 for Rsrvations & Vacation Planning Monday-Friday 8:00 a.m. to 10:00 p.m., ET aturday & unday 9:00 a.m. to :00 p.m., ET (xcpt

More information

Business rules FATCA V. 02/11/2015

Business rules FATCA V. 02/11/2015 Elmnt Attribut Siz InputTyp Rquirmnt BUSINESS RULES TYPE ERROR ACK Xpath I.Mssag Hadr FATCA_OECD Vrsion xsd: string = Validation WrongVrsion ftc:fatca_oecd/vrsion SndingCompanyIN Unlimit d xsd: string

More information

Basis risk. When speaking about forward or futures contracts, basis risk is the market

Basis risk. When speaking about forward or futures contracts, basis risk is the market Basis risk Whn spaking about forward or futurs contracts, basis risk is th markt risk mismatch btwn a position in th spot asst and th corrsponding futurs contract. Mor broadly spaking, basis risk (also

More information

SPECIAL VOWEL SOUNDS

SPECIAL VOWEL SOUNDS SPECIAL VOWEL SOUNDS Plas consult th appropriat supplmnt for th corrsponding computr softwar lsson. Rfr to th 42 Sounds Postr for ach of th Spcial Vowl Sounds. TEACHER INFORMATION: Spcial Vowl Sounds (SVS)

More information

Job Description. Programme Leader & Subject Matter Expert

Job Description. Programme Leader & Subject Matter Expert Job titl: Programm Ladr & Subjct Mattr xprt Arbitration Pathways, ducation and Training Dpartmnt Salary band: 47,500 to 56,500 (dpndnt upon xprinc) Hours: 35 hours a wk Trm: Full Tim, Prmannt Accountabl

More information

DENTAL CAD MADE IN GERMANY MODULAR ARCHITECTURE BACKWARD PLANNING CUTBACK FUNCTION BIOARTICULATOR INTUITIVE USAGE OPEN INTERFACE. www.smartoptics.

DENTAL CAD MADE IN GERMANY MODULAR ARCHITECTURE BACKWARD PLANNING CUTBACK FUNCTION BIOARTICULATOR INTUITIVE USAGE OPEN INTERFACE. www.smartoptics. DENTAL CAD MADE IN GERMANY MODULAR ARCHITECTURE BACKWARD PLANNING CUTBACK FUNCTION BIOARTICULATOR INTUITIVE USAGE OPEN INTERFACE www.smartoptics.d dntprogrss an b rsion c v o m d ss.d! A fr ntprog.d w

More information

Human Resources and Organisational Development Services. Service Area Name: Services to Schools Account Manager:

Human Resources and Organisational Development Services. Service Area Name: Services to Schools Account Manager: Srvic Ara Nam: Human Rsourcs and Organisational Dvlopmnt Srvics Srvics to Schools Account Managr: Nam: Tracy Palmr Position: Had of HR Managmnt Contact Numbr: 0191 561 1722 Email: tracy.palmr@sundrland.gov.uk

More information

N-Channel 60-V (D-S) MOSFET

N-Channel 60-V (D-S) MOSFET Nw Product N-Channl 60-V (D-S) MOSFET Si308BDS PRODUCT SUMMARY V DS (V) R DS(on) (Ω) I D (A) a Q g (Typ.) 60 0.56 at V GS = 0 V.3 0.9 at V GS = 4.5 V..3 nc TO-36 (SSOT3) FEATURES Halogn-fr According to

More information

Focus on Energy Programs Business and Residential Energy Efficiency and Renewable Energy. What s Happening in Wisconsin s Solar Electric Market

Focus on Energy Programs Business and Residential Energy Efficiency and Renewable Energy. What s Happening in Wisconsin s Solar Electric Market What s Happning in Wisconsin s Solar Elctric Markt Focus on Enrgy Programs Businss and Rsidntial Enrgy Efficincy and Rnwabl Enrgy Rural Enrgy Confrnc La Cross, WI March 11, 2010 Nils Woltr Solar Elctric

More information

Thursday, March 18, 2010-4:07 PM Page 1 of 16

Thursday, March 18, 2010-4:07 PM Page 1 of 16 Exhibit 300: Capital Asst Plan Businss Cas Summary Part I: Summary And Justification (All Capital Assts) Sction A: Ovrviw (All Capital Assts) 1. Dat of Submission: 2/1/2010 2. Agncy: Dpartmnt of Justic

More information

YouthWorks Youth Works (yüth- w rkz), n.

YouthWorks Youth Works (yüth- w rkz), n. YouthWorks Youth Works(yüth- w rkz),n. 1. Baltimor City s summr jobs program. 2. Crats carr pathways for Baltimor City youth. 3. Givs Baltimor mployrs opportunitis to train thir futur workforc. Opportunity

More information

Product Overview. Version 1-12/14

Product Overview. Version 1-12/14 Product Ovrviw Vrsion 1-12/14 W ar Grosvnor Tchnology Accss Control Solutions W dvlop, manufactur and provid accss control and workforc managmnt solutions th world ovr. Our product offring ompasss hardwar,

More information

IHE IT Infrastructure (ITI) Technical Framework Supplement. Cross-Enterprise Document Workflow (XDW) Trial Implementation

IHE IT Infrastructure (ITI) Technical Framework Supplement. Cross-Enterprise Document Workflow (XDW) Trial Implementation Intgrating th Halthcar Entrpris 5 IHE IT Infrastructur (ITI) Tchnical Framwork Supplmnt 10 Cross-Entrpris Documnt Workflow (XDW) 15 Trial Implmntation 20 Dat: Octobr 13, 2014 Author: IHE ITI Tchnical Committ

More information

embedded e e in numbers, facts and figures

embedded e e in numbers, facts and figures FACTSHEET EMBEDDED mbddd in numbrs, facts and figurs 25th Intrnational Trad Fair for Elctronic Componnts, Systms and Applications Nw Munich Trad Fair Cntr Novmbr 13 16, 2012 www.lctronica.d Focusing on

More information

ISO 9001 DIL UNIVERSAL CONTACTORS

ISO 9001 DIL UNIVERSAL CONTACTORS GANZ KK Kft ISO 0 crtifid DIL UNIVERSAL CONTACTORS 00.0. GANZ KK Ltd. applis a Quality control systm according to th rquirmnts of th standard ENISO0 Bridg Moving magnt Coil Fixd magnt Auxiliary contactunit

More information

Maintain Your F5 Solution with Fast, Reliable Support

Maintain Your F5 Solution with Fast, Reliable Support F5 SERVICES TECHNICAL SUPPORT SERVICES DATASHEET Maintain Your F5 Solution with Fast, Rliabl Support In a world whr chang is th only constant, you rly on your F5 tchnology to dlivr no mattr what turns

More information

5 2 index. e e. Prime numbers. Prime factors and factor trees. Powers. worked example 10. base. power

5 2 index. e e. Prime numbers. Prime factors and factor trees. Powers. worked example 10. base. power Prim numbrs W giv spcial nams to numbrs dpnding on how many factors thy hav. A prim numbr has xactly two factors: itslf and 1. A composit numbr has mor than two factors. 1 is a spcial numbr nithr prim

More information

TEMPERATURE COMPENSATION OF A THERMAL FLOW SENSOR BY USING TEMPERATURE COMPENSATION NETWORK. *Corresponding author: sima@tatiuc.edu.

TEMPERATURE COMPENSATION OF A THERMAL FLOW SENSOR BY USING TEMPERATURE COMPENSATION NETWORK. *Corresponding author: sima@tatiuc.edu. National Confrnc on Postgraduat sarch (NCON-PG) 2009 st Octobr 2009, UMP Confrnc Hall, Malaysia Cntr for Graduat Studis, Univrsiti Malaysia Pahang Editors: M.M. Noor; M.M. ahman and K. Kadirgama EMPEAUE

More information

CalOHI Content Management System Review

CalOHI Content Management System Review CalOHI Contnt Systm Rviw Tabl of Contnts Documnt Ovrviw... 3 DotNtNuk... 4 Ovrviw... 4 Installation / Maintnanc... 4 Documntation... 5 Usability... 5 Dvlopmnt... 5 Ovrall... 6 CMS Mad Simpl... 6 Ovrviw...

More information

SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 08332 COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Counter Fire Doors. 1.2

More information

Question 3: How do you find the relative extrema of a function?

Question 3: How do you find the relative extrema of a function? ustion 3: How do you find th rlativ trma of a function? Th stratgy for tracking th sign of th drivativ is usful for mor than dtrmining whr a function is incrasing or dcrasing. It is also usful for locating

More information

Incomplete 2-Port Vector Network Analyzer Calibration Methods

Incomplete 2-Port Vector Network Analyzer Calibration Methods Incomplt -Port Vctor Ntwork nalyzr Calibration Mthods. Hnz, N. Tmpon, G. Monastrios, H. ilva 4 RF Mtrology Laboratory Instituto Nacional d Tcnología Industrial (INTI) Bunos irs, rgntina ahnz@inti.gov.ar

More information

Argos Coversafe Looking after your purchases & payments, just in case you can t

Argos Coversafe Looking after your purchases & payments, just in case you can t V22 Find it. Gt it. Argos it. www.argos.co.uk Argos Covrsaf Looking aftr your purchass & paymnts, just in cas you can t Policy Summary This summary dos not contain th full trms and conditions of your insuranc

More information

Category 1: Purchased Goods and Services

Category 1: Purchased Goods and Services 1 Catgory 1: Purchasd Goods and Srvics Catgory dscription T his catgory includs all upstram (i.., cradl-to-gat) missions from th production of products purchasd or acquird by th rporting company in th

More information

Whole Systems Approach to CO 2 Capture, Transport and Storage

Whole Systems Approach to CO 2 Capture, Transport and Storage Whol Systms Approach to CO 2 Captur, Transport and Storag N. Mac Dowll, A. Alhajaj, N. Elahi, Y. Zhao, N. Samsatli and N. Shah UKCCS Mting, July 14th 2011, Nottingham, UK Ovrviw 1 Introduction 2 3 4 Powr

More information

How To Fund A Farm In Colombia

How To Fund A Farm In Colombia Colombia: COLCIENCIAS Dpamnto Administrativo d Cincia, Tcnología Innovación Initial Funding Committmnt 100.000 Who can apply? Thmatic Ara BIODIVERSITY / CLIMATE Rsarch, tchnological dvlopmnt and / or innovation

More information

Probabilistic maintenance and asset management on moveable storm surge barriers

Probabilistic maintenance and asset management on moveable storm surge barriers Probabilistic maintnanc an asst managmnt on movabl storm surg barrirs Patrick Wbbrs Ministry of Transport, Public Works an Watr Managmnt Civil Enginring Division A n a l y s O n r h o u F a a l k a n s

More information

Chapter 7. Fastenings. Contents. Lawrence A. Soltis

Chapter 7. Fastenings. Contents. Lawrence A. Soltis Fastnings Lawrnc A. Soltis Chaptr 7 Contnts Nails 7 Withdrawal Rsistanc 7 Latral Rsistanc 7 5 Spiks 7 8 Stapls 7 8 Drift Bolts 7 9 Wood Scrws 7 9 Withdrawal Rsistanc 7 9 Latral Rsistanc 7 1 Lag Scrws 7

More information

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

ST. MONICA FOOD PANTRY HOUSTON, TEXAS PROJECT MANUAL FOR ST. MONICA FOOD PANTRY HOUSTON, TEXAS OWNER: ST. MONICA CATHOLIC CHURCH 8421 W. MONTGOMERY ROAD HOUSTON, TEXAS 77088 ARCHITECT: C SIX ARCHITECTURE, LLC 4606 F.M. 1960 WEST, STE 400 HOUSTON,

More information

Foreign Exchange Markets and Exchange Rates

Foreign Exchange Markets and Exchange Rates Microconomics Topic 1: Explain why xchang rats indicat th pric of intrnational currncis and how xchang rats ar dtrmind by supply and dmand for currncis in intrnational markts. Rfrnc: Grgory Mankiw s Principls

More information

Combined Motor Trade. Proposal

Combined Motor Trade. Proposal Combind Motor Trad Proposal Combind Motor Trad Insuranc Proposal Policy Numbr PLEASE ANSWER ALL QUESTIONS IN BLOCK CAPITALS 1 Nam of Proposr in full: Addrss or Rgistrd Offic: 2 Businss or occupation:

More information

Host Country: Czech Republic Other parties: Denmark Expected ERUs in 2008 2012: ~ 1,250,000 tco 2

Host Country: Czech Republic Other parties: Denmark Expected ERUs in 2008 2012: ~ 1,250,000 tco 2 Projct CZ1000033: Nitrous Oxid Emission Rductions at Lovochmi Host Country: Czch Rpublic Othr partis: Dnmark Expctd ERUs in 2008 2012: ~ 1,250,000 tco 2 Th projct at Lovochmi in th Czch Rpublic aims to

More information

Cookie Policy- May 5, 2014

Cookie Policy- May 5, 2014 Cooki Policy- May 5, 2014 Us of Cookis on Sizmk Wbsits This Cooki Disclosur applis only to us of cookis on corporat wbsits (www.sizmk.com and rlatd rgional wbsits) publishd by Sizmk Inc. and its affiliats

More information