A Comprehensive Approach to Storm Water Asset Management Planning. City of Virginia Beach Public Works Operations

Size: px
Start display at page:

Download "A Comprehensive Approach to Storm Water Asset Management Planning. City of Virginia Beach Public Works Operations"

Transcription

1 A Comprehensive Approach to Storm Water Asset Management Planning City of Virginia Beach Public Works Operations Steve McLaughlin, PE April 2016

2 Agenda

3 City of Virginia Beach, VA Population: 450, Square Miles 1,200 miles Pipe 5,000 outfalls (1/2 to Chesapeake Bay) 160 miles Off Road Ditches 450 miles Roadside Ditches 15 Pump Stations 776 Lakes to inspect; 491 Lakes to maintain 58 Dams/Spillways

4 FY17 Proposed Revenue ERU Daily Fee = $0.433 ERU Annual Fee = $ ERU s (FY 17) = 248,723 SWU Generates $39,417,213 Annually ERU = Equivalent Residential Unit Stormwater Fee, $39,417,213 Other, $442,470

5 Storm Water Debt Debt Amount Interest Rate 2010B Storm Water Revenue Refunding Bonds 2010A Storm Water Revenue Bonds 2015 Storm Water Revenue Bonds Debt Service Payments (FY17) $ 4,530, % $641,581 $17,295, % $1,391,695 $22,270, % $1,359,106 Total $44,095,000 $3,392,383

6 Storm Water FY Funding Flood Control $29.5 M 22% Water Quality $18.1 M 13% Operations & Maintenance $88.6 M 65%

7 Storm Water FY Requested Program O&M Project CIP FY Total Budget SW Infrastructure Rehabilitation & Improvements II 56,172,866 34,300, Residential Drainage Cost Participation Program II 450, , Primary System Infrastructure Improvements II 17,430,000 13,620, Oceanfront Storm Water Facilities Maintenance 5,708,000 4,500, Stormwater Pump Station Modifications 7,416,889 5,000, Lake Management II 47,031,404 29,985, Stormwater Operations Modular Building 890, , Severe Repetitive Loss Grant Program 1,847, Flood Mitigation Assistance Grant Program 1,227,144 0 Report Total 138,173,312 88,105,912 GovMax V5 1/12/2016

8 Program Background

9 Storm Water CIP Section O&M SW Infrastructure Rehabilitation & Improvements II Neighborhood Pipe Rehabilitation Accomplishments: Neighborhood Constr. Cost Phase Princess Anne Plaza FY13 $5.5M Complete Aragona FY14 $2.8M Complete Green Run FY15/16 $2.8M Complete Glenwood FY16 $1.8M Construction Pine Ridge/Hunt Club/Middle Oaks/Strawbridge FY17 $1.1M Construction Kings Grant FY17 $2M Design Total: $16M Upcoming Neighborhood Pipe Rehabilitation Projects: Neighborhood Constr. Cost Est. Magic Hollow FY17 $2M 1970s Fairfield FY18 $2M 1970s Southgate FY18 $1M 1980s Ocean Lakes FY19 $2M 1980s Windsor Woods FY19 $2M 1960s Indian Lakes FY20 $2M 1970s Salem Woods FY20 $2M 1980s Salem Lakes FY21 $1M 1980s Red Mill Farms FY21 $2M 1980s Lagomar FY21 $1M 1980s Malibu FY22 $1M 1960s Foxfire FY22 $1M 1990s Courthouse Estates FY22 $2M 1990s

10 7-416 SW Infrastructure Rehabilitation & Improvements II - $5.5M Current/Completed Major Neighborhood Rehabs: Neighborhood Constr. Cost Phase Princess Anne Plaza FY13 $5.5M Complete Aragona FY14 $2.8M Complete Green Run FY15/16 $2.8M Complete Glenwood FY16 $1.8M Construction Pine Ridge/Hunt Club/ Middle Oaks/Strawbridge FY17 $1.1M Construction Kings Grant FY17 $2.0M Design Magic Hollow FY17 $2.0M CCTV Total: $18M Green Run Pipe Lining Green Run Pole Grouting

11 Program Overview 1. Methodology Goals 4. Apply 2. Implement 3. Results

12 Probability of Failure Methodology RISK BASED Consequence of Failure

13 Methodology Prioritization Score Factors Cave-In Notification Methods Other Projects City Staff Citizens

14 Methodology Prioritization Score Factors Above Ground Defect Codes Defect Correlation Pavement Condition Structure Interface Surface Condition

15 Methodology Prioritization Score Factors Roadway Type Roadway Type Geographic Pipe Material Risk Modifiers Pipe Size

16 Methodology Risk Modifiers Descriptor Modifier Risk Modifier Roadway Geographical Pipe Diameter Pipe Material Arterial Collector Local Tidal Influence School Park Sidewalk < >48 RCP CMP CHDPE

17 Methodology Prioritization Threshold Defect Grade Variable Grade Modifier Modifier Effective Grade Risk Modifier Descriptor Modifier Risk Modifier Roadway Geographical Pipe Diameter Pipe Material Arterial Collector Local Tidal Influence School Park Sidewalk None < >48 RCP CMP CHDPE MINIMUM TOTAL RISK MODIFIER Prioritization Threshold, 2,700 = (Min. Grade 5 Effective Grade, 450) x ( Risk Modifiers, 6)

18 Methodology Quantitative Risk Analysis Methodology Risk Threshold Improvement Prioritization

19 Implementation Green Run 100,000 LFT Glenwood 105,000 LFT Pine Ridge 40,000 LFT

20 Implementation Above Ground Defect Codes Field 2-Person Crew Document Defects Immediate Concerns Daily Record

21 Implementation Cave-in Failure Factors Office - CCTV Reviewers In-House Review Software Document Defects Preliminary Repair Methods

22 Implementation

23 Implementation Risk Modifiers Office/Field GIS Data Field Observation Institutional Knowledge Preliminary Repair Methods

24 Implementation Cured in Place Pipe Hole Lift hole with deterioration Broken Existing Point repair Poor Condition Grout Joint Offset/Separation Moderate to Severe Roots Deposits Settled Fine Deposits Ingress No Rehab Minor Roots Infiltration Existing Point repair Good Condition

25 Results by Rehabilitation Method ALL 3 BASINS Type Total Number of Assets Total Length (FT) Grouting ,591 Segmental Lining ,404 Full Length CIPP Lining ,349 Segment Costs 75% of CIPP (Lining Cost) Full Length CIPP (Lining)

26 Probability of Failure Results Of Assets By Basin Consequence of Failure

27 Results Summary All 3 Basins

28 What s Happening Now? Rehabilitation Glenwood 29,693 LFT At Construction Rehabilitation Pine Ridge 10,297 LFT At Construction Condition Assessment Kings Grant 37,000 LFT At Design

29 Benefits Of Program Reduce Cave-ins and Improve Safety Extend Useful Life of Assets Defendable, Analytical Approach Efficient Use of Capital Funding to Stretch Public Funding

30 THANK YOU QUESTIONS? Steve McLaughlin, PE City of Virginia Beach Public Works Stormwater Operations Manager

31

Using Frequent Sewer Inspection to Prioritize Asset Management. May 1, 2014. John Schroeder, P.E., BCEE Drew Richards, EI Tim Fallara, P.E.

Using Frequent Sewer Inspection to Prioritize Asset Management. May 1, 2014. John Schroeder, P.E., BCEE Drew Richards, EI Tim Fallara, P.E. Using Frequent Sewer Inspection to Prioritize Asset Management May 1, 2014 John Schroeder, P.E., BCEE Drew Richards, EI Tim Fallara, P.E. Agenda Rationale and Goals for Sewer Re-inspection How and why

More information

Kansas City s Overflow Control Program

Kansas City s Overflow Control Program Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater

More information

CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers

CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers United States Environmental Protection Agency CASE STUDY City of Grand Rapids Stormwater Asset Management Program Overview With increasing pressure to meet water quality targets, address population growth,

More information

CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R

CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R CCTV PIPE INSPECTION AND EVALUATION For RUNWAY 17L-35R At ST. PETERSBURG CLEARWATER INTERNATIONAL AIRPORT February 2011 CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R ST. PETERSBURG CLEARWATER INTERNATIONAL

More information

City of Mill Valley Sewer Capital Improvement Plan 2012 2016

City of Mill Valley Sewer Capital Improvement Plan 2012 2016 City of Mill Valley Sewer Capital Improvement Plan 2012 2016 I. BACKGROUND Between December 2004 and February 2008, the ed States Environmental Protection Agency (EPA) conducted inspections of the SASM

More information

Interactive Decision Tree Automates Sewer Rehabilitation Planning

Interactive Decision Tree Automates Sewer Rehabilitation Planning Interactive Decision Tree Automates Sewer Rehabilitation Planning IWPCA Annual Conference June 5, 2008 Rodney Moeller, P.E., John Schroeder, P.E. BCEE, C. Timothy Fallara, P.E. & Mel Meng, P.E. Agenda

More information

Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective

Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective Building the Foundation for an Effective Asset Management Program Scott D. Kelly, P.E. Assistant City Administrator

More information

Sanitation District No. 1 of Northern Kentucky. SD1's Sanitary and Storm Water Asset Management Program. KSPE Annual Convention

Sanitation District No. 1 of Northern Kentucky. SD1's Sanitary and Storm Water Asset Management Program. KSPE Annual Convention Sanitation District No. 1 of Northern Kentucky SD1's Sanitary and Storm Water Asset Management Program KSPE Annual Convention April 28, 2011 Background Outline CSAP Program Development CSAP Program Implementation

More information

Department of Planning and Community Development. Budget Workshop April 10, 2012 Jack Whitney, Director

Department of Planning and Community Development. Budget Workshop April 10, 2012 Jack Whitney, Director Department of Planning and Community Development Budget Workshop April 10, 2012 Jack Whitney, Director Planning Department Operating Budget Program Unit FY 11-12 Amended FY 11-12 FTE FY 12-13 Proposed

More information

M I D W E S T S O C I E T Y F O R T R E N C H L E S S T E C H N O L O G Y. Kansas City, Missouri s Trenchless Program

M I D W E S T S O C I E T Y F O R T R E N C H L E S S T E C H N O L O G Y. Kansas City, Missouri s Trenchless Program M I D W E S T S O C I E T Y F O R T R E N C H L E S S T E C H N O L O G Y Kansas City, Missouri s Trenchless Program Outline of Presentation Intro to Kansas City Water Services information Trenchless Program

More information

FISCAL YEAR 2014-2018 CAPITAL IMPROVEMENT PLAN WASTEWATER TREATMENT FACILITIES

FISCAL YEAR 2014-2018 CAPITAL IMPROVEMENT PLAN WASTEWATER TREATMENT FACILITIES FISCAL YEAR 2014-2018 CAPITAL IMPROVEMENT PLAN WASTEWATER TREATMENT FACILITIES 1 FISCAL YEAR 2014-2018 CAPITAL IMPROVEMENT PLAN Wastewater Treatment Facilities The Wastewater Treatment System (System)

More information

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Storm Sewer Trenchless Upgrade Alternatives and Recommendations Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for

More information

BACKUPS! Solving the Problem in a Seattle Neighborhood

BACKUPS! Solving the Problem in a Seattle Neighborhood BACKUPS! Solving the Problem in a Seattle Neighborhood MARTHA BURKE SEATTLE PUBLIC UTILITIES A ND A NDY BEHNKE HERRERA ENVIRONMENTAL CONSULTANTS PNCWA 2 009 BOISE, IDAHO Broadview Area Project Study Area

More information

ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022

ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 Town of Zionsville, Indiana December 19, 2012 PREPARED BY BEAM, LONGEST & NEFF, LLC. 8126 Castleton Road Indianapolis, Indiana

More information

2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES

2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES 2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES 2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES The Wastewater Treatment System (System)

More information

County of Fairfax, Virginia

County of Fairfax, Virginia County of Fairfax, Virginia To protect and enrich the quality of life for the people, neighborhoods and diverse communities of Fairfax County Honorable Board of Supervisors February 26, 2007 County of

More information

Sanitary Sewer Master Plan

Sanitary Sewer Master Plan , Illinois Sanitary Sewer Master Plan EXECUTIVE SUMMARY Prepared by September 9, 2010 1670 South Taylorville Road Decatur, Illinois 62521 www.bgmengineering.com Sanitary Sewer Master Plan A. SCOPE OF STUDY

More information

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion Project Overview Sanitary Sewer System 2 Town of Surfside Project Overview Potable Water System 3 Town of Surfside Project Overview Storm Water

More information

Premature Storm Drainage System Repairs and Replacement

Premature Storm Drainage System Repairs and Replacement Premature Storm Drainage System Repairs and Replacement Stewart Edwards Program Manager Design Management Team Charlotte-Mecklenburg Storm Water Services April 8, 2015 Date Agenda Storm Water Infrastructure

More information

SEWER CLEANING, INSPECTION AND ASSESSMENT

SEWER CLEANING, INSPECTION AND ASSESSMENT 3.1 OVERVIEW Chapter 3 SEWER CLEANING, INSPECTION AND ASSESSMENT Preventive maintenance protects the investment of the sanitary sewer collection system infrastructure. Higher frequency cleaning of gravity

More information

SAWS SSO Reduction Program

SAWS SSO Reduction Program SAWS SSO Reduction Program Jeff Haby, P.E. Director Sewer System Improvements February 20, 2014 TMDL Implementation Plan Technical Committee Overview Sanitary Sewer Overflows Consent Decree Overview Major

More information

Presented by: Scott E. Belz Project Manager- URS Corporation Robert P. Kelly, P.E. Director of Engineering-City of Westlake James J. Smolik, P.E.

Presented by: Scott E. Belz Project Manager- URS Corporation Robert P. Kelly, P.E. Director of Engineering-City of Westlake James J. Smolik, P.E. Presented by: Scott E. Belz Project Manager- URS Corporation Robert P. Kelly, P.E. Director of Engineering-City of Westlake James J. Smolik, P.E. Engineer-City of Westlake City of Westlake Facts Founded

More information

Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective

Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective An Owner Operator s Approach for Asset Management on a Budget Lane Longley, City of St. Petersburg Presented by the April

More information

City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007

City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007 City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007 1/12/2007 1 Briefing Purpose Provide update on Wastewater Collection Activities

More information

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY Revised: April 2014 Village of Wilmette, Illinois NPDES CSO Permit No. ILM580012 Chapter 1 Introduction This Operational and Maintenance

More information

Quantifying Inflow and Infiltration via Dyed Water Flooding

Quantifying Inflow and Infiltration via Dyed Water Flooding Quantifying Inflow and Infiltration via Dyed Water Flooding Prepared by Anna Kesler, E.I.T. Catherine Morley, P.E. Overview Historical background to City of Elmhurst I/I issues What Is Dye Flooding? What

More information

BRANDYWINE HUNDRED SEWER REHABILITATION LYNNFIELD WEBSTER FARMS

BRANDYWINE HUNDRED SEWER REHABILITATION LYNNFIELD WEBSTER FARMS BRANDYWINE HUNDRED SEWER REHABILITATION PROGRAM ND13 GREEN ACRES GREEN ACRES LYNNFIELD WEBSTER FARMS OBJECTIVES OF MEETING Review Why in Brandywine Hundred Explain County obligations regarding laterals

More information

FORT WALTON BEACH COMPREHENSIVE PLAN ELEMENT H CAPITAL IMPROVEMENTS ELEMENT. H.1 Introduction H - 3 H.2 Goals, Objectives and Policies..

FORT WALTON BEACH COMPREHENSIVE PLAN ELEMENT H CAPITAL IMPROVEMENTS ELEMENT. H.1 Introduction H - 3 H.2 Goals, Objectives and Policies.. ELEMENT H CAPITAL IMPROVEMENTS ELEMENT H.1 Introduction H - 3 H.2 Goals, Objectives and Policies.. H - 3 Page Element H - 1 Element H - 2 ELEMENT H CAPITAL IMPROVEMENTS ELEMENT H.1 Introduction The City

More information

Integrating Asset Management Principals to Watershed Management: A Risk-Based Approach to Managing Stormwater Assets

Integrating Asset Management Principals to Watershed Management: A Risk-Based Approach to Managing Stormwater Assets Integrating Asset Management Principals to Watershed Management: A Risk-Based Approach to Managing Stormwater Assets Presenters: Mark VanAuken, PE, CMS4S, ENV SP Stormwater/MS4 Discipline Leader Kevin

More information

TOWN OF GRIMSBY ASSET MANAGEMENT PLAN

TOWN OF GRIMSBY ASSET MANAGEMENT PLAN TOWN OF GRIMSBY ASSET MANAGEMENT PLAN August 20, 2014 DFA Infrastructure International Inc. Executive Summary ES1 Background The Town of Grimsby (Town) with a population of approximately 25,325 is located

More information

TO BE DELIVERED AGENDA MATERIAL

TO BE DELIVERED AGENDA MATERIAL Office of the City Manager TO BE DELIVERED AGENDA MATERIAL Meeting Date: Item Number: 23 Item Description: Presentation: Storm Water Improvements 2180 Milvia Street, Berkeley, CA 94704 Tel: (510) 981-7000

More information

Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan

Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan Amanda Lei - City of San Jose Alex Palmatier - HDR 2014 HDR, Inc., all rights reserved. Background Forecasting and Budget Data

More information

Oakland Macomb Interceptor Drain Rehabilitation State Revolving Fund Project Plan Overview. Public Meeting June 10, 2009

Oakland Macomb Interceptor Drain Rehabilitation State Revolving Fund Project Plan Overview. Public Meeting June 10, 2009 State Revolving Fund Project Plan Overview Public Meeting June 10, 2009 What is the OMI? The OMI is the Oakland Macomb Interceptor Sewer. The OMI transports much of the sanitary sewage from Oakland and

More information

Request for Proposal Public Works Asset Management System

Request for Proposal Public Works Asset Management System Request for Proposal Public Works Asset Management System Revision: 16 December 2014 The City is seeking proposals for the purchase and setup support for an Asset Management System for the Public Works

More information

Sanitary Sewer Overflow (SSO) Incident Report Form

Sanitary Sewer Overflow (SSO) Incident Report Form Submit completed form to EHS. Date of SSO spill: Sanitary Sewer Overflow (SSO) Incident Report Form Identify the SSO category (check one): Category 1 SSO Spills of any volume that reach surface water Category

More information

Asset Management Approaches to Maximize Effectiveness of Your Stormwater Program

Asset Management Approaches to Maximize Effectiveness of Your Stormwater Program Asset Management Approaches to Maximize Effectiveness of Your Stormwater Program Presenters: Mark VanAuken, PE, CMS4S, ENV SP Stormwater/MS4 Discipline Leader Celine Hyer, P.E. Conveyance Market Sector

More information

INTRODUCTION AND BACKGROUND

INTRODUCTION AND BACKGROUND Chapter 1 INTRODUCTION AND BACKGROUND 1.1 INTRODUCTION The City of Lincoln s Sewer System Management Program (SSMP) generally describes the City s sanitary sewer system operation and maintenance procedures,

More information

Implementing a Work Order and. Asset Management System? Learning Objectives. What We Have. The City of Colleyville

Implementing a Work Order and. Asset Management System? Learning Objectives. What We Have. The City of Colleyville A Small City s Story of Implementing a Work Order and Asset Management System American Public Works Association 2013 Congress August 28, 2013 Introductions Public Works Department City of Colleyville,

More information

REVISED SHORT TERM AND LONG TERM SEWER PIPE INSPECTION AND CONDITION ASSESSMENT PROGRAM SOUTH COAST WATER DISTRICT. June 2005

REVISED SHORT TERM AND LONG TERM SEWER PIPE INSPECTION AND CONDITION ASSESSMENT PROGRAM SOUTH COAST WATER DISTRICT. June 2005 REVISED SHORT TERM AND LONG TERM SEWER PIPE INSPECTION AND CONDITION ASSESSMENT PROGRAM SOUTH COAST WATER DISTRICT FOR SOUTH COAST WATER DISTRICT Prepared with the requirements identified in the United

More information

The City of Owen Sound Asset Management Plan

The City of Owen Sound Asset Management Plan The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to

More information

WSSC Ad-Hoc Committee on Large Diameter Water Mains. November 22, 2013

WSSC Ad-Hoc Committee on Large Diameter Water Mains. November 22, 2013 WSSC Ad-Hoc Committee on Large Diameter Water Mains November 22, 2013 Purpose: To Gain an Understanding of WSSC s Current Approach to Prioritizing PCCP Inspections and Repairs 2 PCCP Inspection Prioritization

More information

Asset Management: A Best Practice

Asset Management: A Best Practice Asset Management: A Best Practice Purpose Introduction This guide will help you understand: The definition of Asset Management. Why asset management is important to your utility. The best practices in

More information

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD Re Application of the Philadelphia Water Department for Increased Rates and Related Charges Fiscal Years 2017-2018 DIRECT TESTIMONY OF STEPHEN

More information

2.1 Development of Risk-Based Asset Management Framework

2.1 Development of Risk-Based Asset Management Framework SECTION 2 Development of Asset Management Framework 2.1 Development of Risk-Based Asset Management Framework As part of the master planning effort, WES developed a risk-based asset management framework

More information

DRAFT Public Outreach Document for What s an SSMP?

DRAFT Public Outreach Document for What s an SSMP? DRAFT Public Outreach Document for What s an SSMP? This easy to read document is developed and provided to interested parties to assist in educating cities, agencies, their management, elected officials

More information

CHAPTER 4 EXISTING STORMWATER MANAGEMENT SYSTEM

CHAPTER 4 EXISTING STORMWATER MANAGEMENT SYSTEM CHAPTER 4 EXISTING STORMWATER MANAGEMENT SYSTEM INTRODUCTION The analysis of stormwater management system performance requires knowledge of the system components. This chapter presents a description of

More information

Rehabilitation or Replacement? That Is The Question

Rehabilitation or Replacement? That Is The Question Rehabilitation or Replacement? That Is The Question Chris L. Windley PE Greg Anderson, PE 94th Annual Conference November 18, 2014 Overview Project Background Existing Sewer Condition Flow Projections

More information

A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015

A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015 A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015 Infiltration/Inflow (I/I) I & I Reduction: Three-Prong Attack

More information

Estimating Stormwater System Annual Maintenance and Repair Costs - A GIS Approach

Estimating Stormwater System Annual Maintenance and Repair Costs - A GIS Approach October 5 2011 Estimating Stormwater System Annual Maintenance and Repair Costs - A GIS Approach 2011 SESWA Annual Conference 2011 Southeast Stormwater Associated Annual Conference Presentation Overview

More information

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY Cured-In-Place Pipe Pressure & Gravity Lines Pipe Splitting Trenchless Pipe Replacement EcoCast Advanced

More information

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet WHAT IS STORMWATER MANAGEMENT? Stormwater management is the method for channeling rainfall through pipes and sewers away from property to

More information

Phased Assessment Strategy for Sewers

Phased Assessment Strategy for Sewers Phased Assessment Strategy for Sewers A plan for understanding sewer system condition quicker, with fewer resources. Venay Sehgal Bhatia Digital Marketing Manager Envirosight Are deteriorating infrastructure

More information

Engineering. 2006 2007 2007 2008 2008 2008 Major Service Actual Budget Projected Request Executive Adopted

Engineering. 2006 2007 2007 2008 2008 2008 Major Service Actual Budget Projected Request Executive Adopted Engineering Agency Number: 53 Budget Function: Public Works and Transportation The Engineering Division is responsible for the design, supervision and inspection of all street, highway, sidewalk and bike

More information

Home Drainage & Causes of Basement Flooding. Water

Home Drainage & Causes of Basement Flooding. Water Home Drainage & Causes of Basement Flooding Understanding Drainage There are two separate sewer systems Eavestroughs & Downspout Road Property Line Floor Drain Catch basin Access Cover Weeping Tile House

More information

Capital Projects Funds

Capital Projects Funds Capital Projects Funds Park Improvement Fund ----------------------------- To account for funding for multi-year Park Improvement projects, such as the purchase of land and development of neighborhood

More information

provided for improvements for each structure during these timeframes. Rehabilitation and Investment Strategies:

provided for improvements for each structure during these timeframes. Rehabilitation and Investment Strategies: ASSET MANAGEMENT STRATEGY BRIDGES AND LARGE CULVERTS (>3m Span) Inventory Anticipated Asset Life Cycle Fifteen (15) bridges and eleven (11) large culverts with a span greater than 3m (refer to PSAB 3150

More information

Introduction to Asset Management. Presented by: John J. Jackman, P.E. Associate - Asset Management Specialist

Introduction to Asset Management. Presented by: John J. Jackman, P.E. Associate - Asset Management Specialist Introduction to Asset Management Presented by: John J. Jackman, P.E. Associate - Asset Management Specialist Agenda Infrastructure Management Inventory Condition Assessment Maintenance Life Cycle Costs

More information

{ { { Meeting Date 08/03/10. City of Largo Agenda Item 24. Leland Dicus, P.E., City Engineer

{ { { Meeting Date 08/03/10. City of Largo Agenda Item 24. Leland Dicus, P.E., City Engineer City of Largo Agenda Item 24 Form Revision Date: 10/19/09: Meeting Date 08/03/10 Presenter: Leland Dicus, P.E., City Engineer Department: CD Community Development TITLE: GIS PROGRAM UPDATE The implementation

More information

City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405

City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405 City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405 REGULATORY CONSIDERATIONS FOR WET WEATHER COLLECTION SYSTEM BACKUPS FINAL DRAFT August 2009 2700 YGNACIO

More information

ORDINANCE NO. 15 BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:

ORDINANCE NO. 15 BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY: ORDINANCE NO. 15 Amending Chapter 60 of the Code of Ordinances of Kansas City, Missouri, entitled Sewers and Sewage Disposal by adding Sections 60-349 through 60-360; and establishing an effective date.

More information

RESPONSIBLE DEPARTMENT: ADDITIONAL DIRECTOR (S): ASSISTANT CITY MANAGER: JIM CALLAWAY

RESPONSIBLE DEPARTMENT: ADDITIONAL DIRECTOR (S): ASSISTANT CITY MANAGER: JIM CALLAWAY CITY COUNCIL AGENDA REQUEST AGENDA OF: 07-01-14 AGENDA REQUEST NO: IV-D INITIATED BY: GREG NICHOLS PROJECT MANAGER RESPONSIBLE DEPARTMENT: ENGINEERING PRESENTED BY: TIMOTHY JAHN, P.E. SENIOR ENGINEER DIRECTOR:

More information

Soapstone Sewer Rehabilitation Alternative Concepts Design and Associated Impacts

Soapstone Sewer Rehabilitation Alternative Concepts Design and Associated Impacts Soapstone Sewer Rehabilitation Alternative Concepts Design and Associated Impacts Outline Update on Soapstone Emergency Response Provide project background Provide project purpose & need Present proposed

More information

Utility Water and Sewer Project Experience

Utility Water and Sewer Project Experience - Southside 17 th Street 20 Water Main Relocation, Norfolk, 24 ½ Street Drainage Improvements, Beach, 36 SFM Designation for Providence Road/Blakley Square, HRSD, Beach, Annual Sewer System Replacement

More information

Metro Council Budget Committee June 18, 2013. Presentation of FY 2014 Budget & Proposed Rate Increase

Metro Council Budget Committee June 18, 2013. Presentation of FY 2014 Budget & Proposed Rate Increase Metro Council Budget Committee June 18, 2013 Presentation of FY 2014 Budget & Proposed Rate Increase Summary of Presentation Introduction Greg C. Heitzman,PE Executive Director Operations/Regulatory Overview

More information

For Asset Management

For Asset Management For Asset Management By: Larry Weiss SDLTAP It Begins with Accurate Inventory Inventory of existing system: The Local Roads Needs Study conducted in Aug/Sept of 08 indicated by it s results and from LTAP

More information

Evaluation of Rapid Acoustic Pipe Inspection for Prioritizing Cleaning and CCTV Resources

Evaluation of Rapid Acoustic Pipe Inspection for Prioritizing Cleaning and CCTV Resources Evaluation of Rapid Acoustic Pipe Inspection for Prioritizing Cleaning and CCTV Resources George Selembo InfoSense, Inc. Stephen Orticello Directrik, Inc. Silvano Piluso Toronto Water Colbert Clifford

More information

CMOM How to Develop Your Collection System Maintenance Program NWOWEA Pre-Conference Utility Workshop June 22, 2015 Kalahari Conference Center

CMOM How to Develop Your Collection System Maintenance Program NWOWEA Pre-Conference Utility Workshop June 22, 2015 Kalahari Conference Center CMOM How to Develop Your Collection System Maintenance Program NWOWEA Pre-Conference Utility Workshop June 22, 2015 Kalahari Conference Center Thomas A. Fishbaugh Ohio RCAP What is CMOM? CMOM: Capacity,

More information

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology 2007 Pumper & Cleaner Environmental Expo International Wednesday February 7, 2007 Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology What is Cured-In-Place Pipe (CIPP)

More information

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?

More information

Section 4 Pipe and Maintenance Hole Inspection and Condition Assessment Plan

Section 4 Pipe and Maintenance Hole Inspection and Condition Assessment Plan and Condition Assessment Plan 4.1 Introduction 4.1.1 Purpose This addresses the requirements of Section IV.A. of the EPA Order. The plan documents the progress that each agency has made to date regarding

More information

5. FLOOD PROTECTION AND STORMWATER SERVICES

5. FLOOD PROTECTION AND STORMWATER SERVICES 5. FLOOD PROTECTION AND STORMWATER SERVICES City of Capitola City of Santa Cruz City of Scotts Valley City of Watsonville Santa Cruz County Flood Control & Water Conservation District Zones 4, 5, 6, 7,

More information

INTRODUCTION. WASTEWATER MANAGEMENT PLAN MAY 2009 Metropolitan North Georgia Water Planning District 7-1

INTRODUCTION. WASTEWATER MANAGEMENT PLAN MAY 2009 Metropolitan North Georgia Water Planning District 7-1 INTRODUCTION There are approximately 16,000 miles of sewers and more than 450,000 manholes within the Metro Water District. Sewers and manholes within the Metro Water District range in age from new to

More information

CHARTER TOWNSHIP OF FENTON SEWER SYSTEM FINANCIAL OVERVIEW JANUARY, 2014

CHARTER TOWNSHIP OF FENTON SEWER SYSTEM FINANCIAL OVERVIEW JANUARY, 2014 CHARTER TOWNSHIP OF FENTON SEWER SYSTEM FINANCIAL OVERVIEW JANUARY, 2014 Fenton Township receives numerous inquiries regarding the relatively high sewer use fees that Township residents have been paying

More information

City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP

City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP PROJECT ESTIMATED COST ESTIMATED COUNCIL IDENTIFIED FUNDING SOURCES STRATEGIC COMPLETION INITIATIVES FM 2351/Beamer

More information

Complete. Project Number: 11-187 - 1. Stormwater Master Plan Update 135

Complete. Project Number: 11-187 - 1. Stormwater Master Plan Update 135 135 Stormwater Master Plan Update 11-187 - 1 The latest comprehensive drainage study and model was completed in 1999. Stormwater modeling techniques have improved drastically since then allowing for better

More information

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1 CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm

More information

Town of Greenville Policy

Town of Greenville Policy Town of Greenville Policy Piping/Filling in of Roadside Ditches The Town owns its road right of way, not the abutting landowner. Purpose of Town roadside ditches: Town roadside ditches perform three primary

More information

Wauwatosa Lateral Rehabilitation Pilot Project. CSWEA Annual Meeting Madison, WI May 15, 2013

Wauwatosa Lateral Rehabilitation Pilot Project. CSWEA Annual Meeting Madison, WI May 15, 2013 Wauwatosa Lateral Rehabilitation Pilot Project CSWEA Annual Meeting Madison, WI May 15, 2013 Overview Background Objectives Work Completed Testing Evaluation Conclusions 2 Milwaukee Metropolitan Sewerage

More information

REPORT TITLE: TERM OF COUNCIL PRIORITY NO. 6 - ENHANCE INTEGRITY OF WASTEWATER COLLECTION SYSTEM INCLUDING FLOOD REMEDIATION PROGRAM

REPORT TITLE: TERM OF COUNCIL PRIORITY NO. 6 - ENHANCE INTEGRITY OF WASTEWATER COLLECTION SYSTEM INCLUDING FLOOD REMEDIATION PROGRAM J Wokking foh y or REPORT Meeting Date: November 28,2013 Regional Council DATE: October 22,201 3 REPORT TITLE: TERM OF COUNCIL PRIORITY NO. 6 - ENHANCE INTEGRITY OF WASTEWATER COLLECTION SYSTEM INCLUDING

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

Pavement Management Program

Pavement Management Program Pavement Management Program 2013 Street Maintenance Program Executive Summary 1/15/2013 Presented by Mark Thiel Assistant Director Public Works Program Overview Start of current program 2005 812.5 Lane

More information

Gustav/Ike Hurricane Recovery

Gustav/Ike Hurricane Recovery Gustav/Ike Hurricane Recovery COMPETITIVE AFFORDABLE RENTAL PROGRAM Program Made Possible By Louisiana Recovery Authority, The Office Of Community Development s Disaster Recovery Unit And U.S. Department

More information

Proposed Program of High Capacity Transit Improvements City of Atlanta DRAFT

Proposed Program of High Capacity Transit Improvements City of Atlanta DRAFT I 20 West Heavy Rail Northside Drive Bus Rapid Contingent Multi Jurisdicitional Projects Atlanta Light Rail Clifton Light Rail * I 20 East Bus Rapid * Atlanta BeltLine Central Loop Irwin AUC Line Downtown

More information

City of Indian Rocks Beach, Florida NFIP Number 125117

City of Indian Rocks Beach, Florida NFIP Number 125117 City of Indian Rocks Beach, Florida NFIP Number 125117 Floodplain Management Plan / Local Mitigation Strategy Annual Report - September 2015 Introduction The City of Indian Rocks Beach has been an active

More information

City of Bakersfield Public Works Department Sewer System Management Plan December 2014

City of Bakersfield Public Works Department Sewer System Management Plan December 2014 City of Bakersfield Public Works Department Sewer System Management Plan December 2014 C:\Users\hmayberry\Desktop\SEWER SYSTEM MANAGEMENT PLAN 2014.doc 1 Sewer System Management Plan Index: Section 1 Goals

More information

Little Maumelle Wastewater Treatment Facility. 2016 LRW Budget Overview

Little Maumelle Wastewater Treatment Facility. 2016 LRW Budget Overview Little Maumelle Wastewater Treatment Facility 2016 LRW Budget Overview Goals and Accomplishments 2015 Accomplishments 1. 2015 Sewer Bond Refunding for $160,070,000 2. CAO and Sierra Club Settlement Agreement

More information

Office of Environment, Health and Safety (EH&S) - Sanitary Sewer Overflow Incident Form (rev. 12/2014)

Office of Environment, Health and Safety (EH&S) - Sanitary Sewer Overflow Incident Form (rev. 12/2014) STEP 1 Immediately call EH&S at (510) 642-3073 with the following details of the incident: Name of First Responder Phone Number of First Responder Location of Spill Is the spill potentially greater than

More information

MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E.

MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. MIAMI-DADE LATERAL PILOT PROGRAM James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. Hazen and Sawyer, P.C. 4000 Hollywood Boulevard Hollywood, FL 33021 ABSTRACT Since 1994 the Miami-Dade

More information

Sewer Rehabilitation Design Requirements

Sewer Rehabilitation Design Requirements Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared

More information

Town of Essex NE Lagoon. Service Area. Essex Plant. Service Area. Pumping Station No. 4. Wastewater Pumped To NE Lagoons (Treatment Plant No.

Town of Essex NE Lagoon. Service Area. Essex Plant. Service Area. Pumping Station No. 4. Wastewater Pumped To NE Lagoons (Treatment Plant No. Town of Essex Basement Flooding Study Town of Essex NE Lagoon Service Area Pumping Station No. 4 Essex Plant Service Area Wastewater Pumped To NE Lagoons (Treatment Plant No. 2) Essex Treatment Plant (Treatment

More information

Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis

Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Transportation & Mobility projects that meet the following criteria: enhances regional mobility; supports public transit;

More information

Appendix J: Pipe Evaluation and Replacement Options and Costs

Appendix J: Pipe Evaluation and Replacement Options and Costs Appendix J: Pipe Evaluation and Replacement Options and Costs STORMWATER SYSTEM INVENTORY The City of Olympia has an extensive stormwater conveyance system. As a matter prudent management of the Stormwater

More information

Toronto s Wet Weather Flow Master Plan

Toronto s Wet Weather Flow Master Plan Toronto s Wet Weather Flow Master Plan 1. The Master Plan 2. The Don And Waterfront Study 3. What the Individual Can Do Wet Weather Flow Management Master Plan 2000 Storm Presentation to Don Mouth Naturalization...

More information

AGENDA ITEM C9. COST/FUNDING SOURCE: $431,847.40/ Uniform Rate

AGENDA ITEM C9. COST/FUNDING SOURCE: $431,847.40/ Uniform Rate AGENDA ITEM C9 DATE: February 2, 2015 TO: FROM: SUBJECT: Matt Jordan, General Manager Charles Carden, Chief Operating Officer South Pasco Transmission Main Condition Assessment Services with Pure Technologies

More information

Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION 6.2 AUTHORITY FOR THE ELEMENT 6.3 KEY THEMES AND VISION FOR GENERAL PLAN

Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION 6.2 AUTHORITY FOR THE ELEMENT 6.3 KEY THEMES AND VISION FOR GENERAL PLAN Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION Public infrastructure is an important support network for the City. Well-designed and maintained infrastructure systems are critical to the community s

More information

Work Practice: Wastewater Collection System Maintenance Plan Potential Safety Hazards

Work Practice: Wastewater Collection System Maintenance Plan Potential Safety Hazards Potential Safety Hazards Required items Potential PPE None Additional References - Collection System Related Work Practices & Forms Jet Truck Cleaning Work Practice (Do not drive on peoples driveway) CDL

More information

Summary 7/11/2012. Michigan Water Environment Association 2012 Annual Conference Boyne Mountain Resort

Summary 7/11/2012. Michigan Water Environment Association 2012 Annual Conference Boyne Mountain Resort Michigan Water Environment Association 2012 Annual Conference Boyne Mountain Resort June 25, 2012 Thomas Gossiaux, PE (AECOM) Matt Raysin, PE (GCDC-WWS) Dave Barnas, PE (AECOM) Ed Tharp, PE (AECOM) Summary

More information

SCOPE OF WORK SEWER LINE CLEANING FOR CITY OF THE OF HUNTINGTON BEACH PROPERTY

SCOPE OF WORK SEWER LINE CLEANING FOR CITY OF THE OF HUNTINGTON BEACH PROPERTY SCOPE OF WORK SEWER LINE CLEANING FOR CITY OF THE OF HUNTINGTON BEACH PROPERTY A. General The City of Huntington Beach is an urban city with a population of 197,000 residents. It contains approximately

More information

Capital Improvement Program: Public Input and the Need for a Multi-year Plan

Capital Improvement Program: Public Input and the Need for a Multi-year Plan Attachment 1 OFFICE OF THE INDEPENDENT BUDGET ANALYST REPORT Date Issued: September 21, 2012 IBA Report Number: 12-39 Budget and Finance Committee Docket Date: September 26, 2012 Item Number: 8 OVERVIEW

More information

Pine Creek Culvert Upgrade $ 560,000. Located at exiting hump dike, just south of Fire Training Center

Pine Creek Culvert Upgrade $ 560,000. Located at exiting hump dike, just south of Fire Training Center To: BOS From: Joseph Michelangelo, P.E. Director of Public Works Re: CDBG-DR Pine Creek Culvert Upgrade Date: April 20, 2015 On June 19, 2014, the Town of Fairfield was awarded the above referenced project

More information