ASPHALT PAVEMENT RECYCLING
|
|
|
- Noah Sherman
- 10 years ago
- Views:
Transcription
1 HOT IN-PLACE RECYCLING THE ENERGY SAVING METHOD ASPHALT PAVEMENT RECYCLING Hot In-Place alt ec cl n The Energy Saving Method! HIGHWAY REHAB CORP Highway Rehab Corp 2258 Route 22 Brewster, NY Tel (845) Fax (845)
2 HIGHWAY REHAB CORP ASPHALT PAVEMENT RECYCLING A History of Highway Rehab Corp Highway Rehab Corp has more than 30 years experience in Asphalt Milling and Hot In-Place Asphalt Recycling Founded by Ken Carr and Jerry Starbuck in 1973, Highway Rehab Corp first introduced asphalt milling to the United States when the pair purchased a German-made Wirtgen Milling Machine for use in the US Road and bridge deck milling became commonplace throughout the United States in the 1970s, leading to the development of Hot In-Place Asphalt Recycling, a low-cost maintenance strategy that effectively re-uses existing material Hot In-Place Asphalt Recycling is now the oldest recycling discipline within the Asphalt Recycling & Reclaiming Association (ARRA), an organization founded in 1976, with a membership comprised of contractors who performed heater-scarification work Ken and Jerry are among its founding members In addition to performing the work, Highway Rehab Corp now manufactures the recycling machines at their Cheektowaga, NY facility 2 Hot In-Place alt ec cl n The Energy Saving Method! Highway Rehab Corp 2258 Route 22 Brewster, NY Tel (845) Fax (845)
3 HOT IN-PLACE RECYCLING Definition: Heater scarification is a rehabilitation process that restores cracked, brittle, and irregular pavement in preparation for final thin wearing course as selected by the awarding authority Application: Roadways that possess a stable and structural adequate base are appropriate candidates for this process The depth and nature of the existing material must be evaluated prior to constructions A truck mounted surface recycler is capable of recycling speeds and highway speeds with a change in gears Multiple rows of spring loaded scarifiers penetrate the softened asphalt to the desired depth Two machines operating in tandem insure deep heating and softening of the aged payment The recycled material levels the previously deformed surface in preparation for an overlay or seal coat Application of rejuvenating agent along with dual milling heads improves the viscosity of the aged asphalt HOT IN-PLACE RECYCLING THE ENERGY SAVING METHOD 3
4 HIGHWAY REHAB CORP HOT IN-PLACE RECYCLING APPLICATIONS Hot In-Place Asphalt Recycling Hot In-Place Recycling is an on-site, in-place method that rehabilitates deteriorated bituminous pavements, minimizing the use of new materials Because asphalt is a unique construction material that can be effectively and economically restored, Hot In-Place Recycling encourages restoration rather than applying new material over deteriorating pavement or losing the asphalt altogether through grinding the material The process involves heating, scarifying/milling, adding a rejuvenating agent, mixing, placing and re-compacting the new bituminous pavement Hot In-Place Asphalt Recycling presents the opportunity to spread available funds over a much greater area, especially during times of rapidly increasing costs and limited funding In other words, the process allows communities and property owners to address roadway deterioration, ensuring that pavements are preserved and upgraded, and costly reconstruction is avoided Benefits Hot In-Place recycling effectively addresses the classic symptoms of deteriorated oxidized pavement In addition to being financially practical, the benefits of asphalt recycling include: Cracks are interrupted and filled Aggregate stripped of the bitumen is remixed and recoated Ruts and holes are filled, shoves and bumps are leveled, drainage and crowns are re-established Flexibility is restored by chemically rejuvenating the aged and brittle pavement Aggregate gradation and asphalt content may be modified by some variations of this process Pavement is corrected without applying a leveling course The use of in-place material reduces the amount of new asphalt applied in the overlay Stronger bonding of old and new asphalt compared to conventional overlay Later occurrences of reflection cracking in the overlay is eliminated or significantly reduced Thinner overlays produce longer retention of draining capacity of in-place curbs and gutters, allowing grade restrictions to be met with greater ease Enhanced highway safety through improved ride and skid resistance Flexibility restored by rejuvenating aged asphalt Lower engineering and traffic control costs 4 Highway Rehab Corp 2258 Route 22 Brewster, NY Tel (845) Fax (845)
5 HOT IN-PLACE RECYCLING APPLICATIONS FIRST IN THE PAVEMENT MAINTENANCE LINE OF DEFENSE Source: World Bank Each $100 spent during the first 40% drop in quality will cost $400 to $500 if delayed until the pavement loses 80% of its original quality HOT IN-PLACE RECYCLING THE ENERGY SAVING METHOD 5
6 HIGHWAY REHAB CORP DESIGN CONSIDERATIONS TYPICAL PAVEMENT CROSS SECTION DESIGN CONSIDERATIONS FOR HOT IN-PLACE RECYCLING 1 Pavement Must Be Structurally Sound 2 Material Testing 3 Traffic 4 Environment 6 Highway Rehab Corp 2258 Route 22 Brewster, NY Tel (845) Fax (845)
7 ROAD COMPARISONS BEFORE AFTER BEFORE AFTER HOT IN-PLACE RECYCLING THE ENERGY SAVING METHOD 7
8 HIGHWAY REHAB CORP CONTACT US Corporate Headquarters 2258 Route 22 Brewster, NY Phone: Fax: Manufacturing/Maintenance Location 100 Stradtman Street Cheektowaga, NY Phone: Fax: Lower Hudson Valley Region Ken Carr 2258 Route 22 Brewster, NY Phone: Mobile: Fax: Western/Central NY Region Terry Lucey 100 Stradtman Street Cheektowaga, NY Phone: Mobile: Fax: Upper Hudson Valley/Capital Region Dan Poley PO Box 774 Hunter, NY Mobile: New England Region Kurt Freudenreich 19A Fairway Drive Mechanicville, NY Mobile: Fax: Dave Capelle PO Box 81 Shrewsbury, MA Mobile: Thank You Past, Present, & Future Customers Highway Rehab Corp 2258 Route 22 Brewster, NY Tel (845) Fax (845)
CHAPTER 9. HOT IN-PLACE RECYCLING (CONSTRUCTION METHODS AND EQUIPMENT)
CHAPTER 9. HOT IN-PLACE RECYCLING (CONSTRUCTION METHODS AND EQUIPMENT) INTRODUCTION Hot in-place recycling (HIR) has been described as an on-site, in-place method that rehabilitates deteriorated asphalt
Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling
7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling Asphalt Pavements 7-7 Chapter 7 Pavement Rehabilitation Pavement rehabilitation can be accomplished
Decision Matrix for Pavement Preservation. Mike Mamlouk Arizona State University
Decision Matrix for Pavement Preservation Mike Mamlouk Arizona State University Outline 1. Concept of preventive maintenance 2. Effectiveness of treatments 3. Treatment selection 2 Pavement Pavement Preservation
Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005
Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005 Purpose The purpose of this review is to capture for technical deployment the most advanced
SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.
Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to
DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job
MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION Using the Full Range of Tools for a Challenging Job Report To: TTI Committee May 13, 2014 1 Pavement Management - Suggested Treatments
COST EFFECTIVE ROAD MAINTENANCE MARCH 2015
COST EFFECTIVE ROAD MAINTENANCE MARCH 2015 According to the University of New Hampshire technology transfer Center the goal of a Road Surface Management Plan should be the following: Maximize Return on
KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS
KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS I. GENERAL The following policy shall apply when the intent of the project is to
Summary of FHWA In-Place Recycling Activities
Summary of FHWA In-Place Recycling Activities 2014 International and 7 th Western States In- Place Recycling Conference Lee Gallivan FHWA Asphalt Materials Engineer Office of Asset Management, Pavement,
CHAPTERS 600 670 PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS
HIGHWAY DESIGN MANUAL 600-1 May 7, 2012 CHAPTERS 600 670 PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS Topic 601 - Introduction Pavement engineering involves the determination of the type and thickness
APPENDIX B. I. Background Information
APPENDIX B GUIDELINES FOR IDENTIFYING AND REPAIRING LOCALIZED AREAS OF DISTRESS IN AC PAVEMENTS PRIOR TO CAPITAL PREVENTIVE MAINTENANCE OR REHABILITATION REPAIRS I. Background Information A. AC Pavement
OHIO ASPHALT PAVING CONFERENCE
OHIO ASPHALT PAVING CONFERENCE 38 th Annual Conference Wednesday, 2/6/2013 Fawcett Center Campus of The Ohio State University 2400 Olentangy River Road Columbus, Ohio 43210 REHAB STRATEGIES FOR LOCAL
HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS
HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS Research & Development Division RD/GN/033 June 2008 THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE
Transportation Infrastructure Asset Management
2015 NW Region TTAP& BIA Symposium Transportation Infrastructure Asset Management March, 2015 Happy Longfellow, PE [email protected] (206) 394-3649 ASSET MANAGEMENT OVERVIEW What? Why? How? Inventory
Cost Considerations of In-Place Recycling as a Pavement Rehabilitation Alternative Brian Diefenderfer, PhD, PE Alex Apeagyei, PhD, PE
Cost Considerations of In-Place Recycling as a Pavement Rehabilitation Alternative Brian Diefenderfer, PhD, PE Alex Apeagyei, PhD, PE A partnership of the Virginia Department of Transportation and the
NOTES TO THE PERFORMANCE BASED SPECIFICATION FOR HOTMIX ASPHALT WEARING COURSE SURFACING
TNZ P/23 NOTES: 2005 FOR HOTMIX ASPHALT WEARING COURSE SURFACING 1. BACKGROUND 1.1 Specification Use The specification is to be used where the Engineer requires a dense graded, open graded (permeable)
Benefits of Preventative Maintenance Pavement Sealers
Pavement Coatings Technology Council WWW.PAVEMENTCOUNCIL.ORG Benefits of Preventative Maintenance Pavement Sealers Introduction Pavement Sealers have been used successfully for around 60 years. Recently,
Pavement Management Office
Department of Transportation and Public Works Puerto Rico Pavement Management Office PAVEMENT PRESERVATION SEPPP 1 GOALS AND OBJECTIVES PRHTA has been collecting data for more than twenty (20) years with
Paving Capitalization Work Categories and Treatments
Statement of ODOT Infrastructure Capitalization Policy Government Accounting Standards Board (GASB) 34 requires public agencies to capitalize infrastructure assets on their financial statements for periods
Case Studies - Concrete Overlays
Case Studies - Concrete Overlays Lessons Learned - Concrete Overlays Purdue Road School March 6, 2013 Today s Topic 1. Overlays 2. New Full-depth 3. Pervious 4. Roller Compacted 5. Full Depth Patching
Airfield Pavement Rehabilitation Planning Choosing the right fix. Rob McLure, M.Eng., P.Eng. Senior Associate Hatch Mott MacDonald
Airfield Pavement Rehabilitation Planning Choosing the right fix Rob McLure, M.Eng., P.Eng. Senior Associate Hatch Mott MacDonald Presentation Objective ¾ Review the pavement rehabilitation strategy development
Pavement Management Program
Pavement Management Program 2014 Street Maintenance Program Executive Summary 01/21/2014 Presented by Mark Thiel Assistant Director of Public Works Program Overview Start of current program 2005 825.1
HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS
HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS Research & Development Division RD/GN/032 June 2007 1. Purpose ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS
WATERPROOFING FOR CONCRETE STRUCTURES
MANUAL OF CONTRACT DOCUMENTS FOR ROAD WORKS VOLUME 1 SPECIFICATION FOR ROAD WORKS SERIES 2000 WATERPROOFING FOR CONCRETE STRUCTURES Contents Clause Title Page 2001 General 2 2002 Protection of Bridge Deck
CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON
Council Meeting Date: August 11, 2014 Agenda Item: 7(c) CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON AGENDA TITLE: Motion Authorizing the City Manager to Execute a Contract with Transmap Corporation
Pavement Rehabilitation Using Hot Mix Asphalt. - National Perspective -
Pavement Rehabilitation Using Hot Mix Asphalt - National Perspective - Rehabilitation Process Evaluate Existing Pavement and Conditions Evaluate Options Construct Project Monitor Performance Evaluate Existing
Eric Ross Federal Highway Administration Proposed Office of Performance Management
Life-Cycle Cost Analysis a Decision Making Tool Eric Ross Federal Highway Administration Proposed Office of Performance Management FHWA Tools Team Evaluation and Economic Investment Team development and
Construction Specifications for Keyhole Pavement Coring and Reinstatement
F I N A L Construction Specifications for Keyhole Pavement Coring and Reinstatement Gas Technology Institute 1700 S. Mount Prospect Rd. Des Plaines, Illinois 60018 www.gastechnology.org Version 13 October
Surface Retexturing Services
Surface Retexturing Services Puts the grip back on roads and runways Reduces accidents www.jmslincoln.com JMS is a highly successful organization which has many years experience of providing specialist
Evaluation of Long-Lasting Perpetual Asphalt Pavement Using Life-Cycle Cost Analysis. Arnar Agustsson Sulton Azamov
Evaluation of Long-Lasting Perpetual Asphalt Pavement Using Life-Cycle Cost Analysis Arnar Agustsson Sulton Azamov Contents 1. Perpetual Asphalt Pavement 2. Scope 3. Methodology 4. Performance 5. Alternatives
HIGHWAYS DEPARTMENT GUIDANCE NOTES ON PRESERVATION OF BITUMINOUS CARRIAGEWAY
HIGHWAYS DEPARTMENT GUIDANCE NOTES ON PRESERVATION OF BITUMINOUS CARRIAGEWAY Research & Development Division RD/GN/039 September 2012 CONTENTS 1. INTRODUCTION 3 Page 2. PRESERVATION STRATEGY 2.1 Backgrounds
INTERIM ADVICE NOTE 96 /07 Revision 1 GUIDANCE ON IMPLEMENTING RESULTS OF RESEARCH ON BRIDGE DECK WATERPROOFING
Interim Advice Note 96/07 INTERIM ADVICE NOTE 96 /07 Revision 1 GUIDANCE ON IMPLEMENTING RESULTS OF RESEARCH ON BRIDGE DECK WATERPROOFING Summary This interim advice note provides guidance on improving
Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D
Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D Contents Introduction... 3 Introduction to Corridor Targets... 3 Surface Targets... 4 Width and Offset Targets... 5 Elevation or Slope Targets...
Pavement Management Implementation: Success Stories for Maryland Counties
Pavement Management Implementation: Success Stories for Maryland Counties September 25, 2015 Aaron D. Gerber, P.E. How Does Your Organization Manage Pavement Assets? By Experience/Past Practice? By Customer
CID STREET INFRASTRUCTURE ASSESSMENT
ABSTRACT An evaluation of the street infrastructure in Foxberry Estates Phase 1, including pavement condition, verification of construction techniques, and subgrade quality. Recommendations and costs for
1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP
5 INDEX TO SHEETS. NOTES AND TYPICAL SECTIONS. H. R. SMITH RD.CULVERT.3 0/5 END BARRIER ACCESS ROAD REPAIR. KISSIMMEE RD. AT MORGAN HOLE CR. ROAD REPAIR.5 RANGE INFRASTRUCTURE REPAIR N 0 000' 3 0,000'
Greening our Roads. Approach
Greening our Roads Approach To create a Sustainable Future for the world, by achieving Resource Extension economically, by reducing usage of limiting resources and extending life cycle Ensuring Green Roads
Chapter 22. Lump Sum Project Guidelines
Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11
CHAPTER 2 LCCA APPROACHES
2.1 LCCA Basis CHAPTER 2 LCCA APPROACHES When making decisions about pavement design, LCCA: Compares pavement alternatives; and Identifies the best strategy based on current information as well as meeting
A View From The Bureau of Materials & Physical Research. IAPA March 2015 Matt Mueller, PE BMPR Illinois Dept of Transportation
A View From The Bureau of Materials & Physical Research IAPA March 2015 Matt Mueller, PE BMPR Illinois Dept of Transportation HMA Issues HMA Issues HMA Issues HMA Issues a Technical Opinion Cautious HMA
Advancements in GPR for a Sustainable Tomorrow
Advancements in GPR for a Sustainable Tomorrow Shawn Lapain, BSc. E., EIT Pavement Specialist Applied Research Associates Inc. 5401 Eglinton Avenue West, Suite 105, Toronto, ON, Canada, M9C 5K6 Tel: 416-621-9555,
September 1, 2003 CONCRETE MANUAL 5-694.900 CONCRETE PAVEMENT REHABILITATION 5-694.900
September 1, 2003 CONCRETE MANUAL 5-694.900 5-694.901 GENERAL CONCRETE PAVEMENT REHABILITATION 5-694.900 Concrete Pavement Rehabilitation is an extremely valuable tool of the Minnesota Department of Transportation
RANDOM/GRID BLOCK CRACKING EXTREME SEVERITY. Transverse Cracking- Extreme Severity. Alligator Cracking- High. Severity
RANDOM/GRID BLOCK CRACKING EXTREME SEVERITY Transverse Cracking- Extreme Severity Slab Cracking Class II Regular Joint- High Severity Pattern Cracking-High Severity Alligator Cracking- High Severity Shoulder
CHAPTER 2 PAVEMENT MANAGEMENT SYSTEM
CHAPTER 2 PAVEMENT MANAGEMENT SYSTEM 2.1. INTRODUCTION TO PAVEMENT MANAGEMENT The ability of a pavement system to serve a society is largely a function of planning. Planning is the intersection between
Why Maintain Your Asphalt?
Asphalt Maintenance Why Maintain Your Asphalt? Asphalt pavement is basically sand, gravel and glue. The glue used to keep the sand and gravel together is asphalt, a heavy by-product of oil refining. While
Pavement Surface Evaluation and Rating. Manual RATING RATING RATING PASER RATING. Concrete Roads
Pavement Surface Evaluation and Rating PASER Manual Concrete Roads RATING 10 RATING 7 RATING 4 RATING 1 Contents Introduction 2 Rigid pavement performance 2 Pavement conditions and defects 3 Evaluation
PAVEMENT STRUCTURE DESIGN GUIDELINES
PAVEMENT STRUCTURE DESIGN GUIDELINES Technical Circular T- 01/15 (Replaces Technical Circular T-01/04) Final Update: Jan. 26, 2015 Geotechnical, Materials and Pavement Engineering TABLE OF CONTENTS 1.0
TAC Primer Pavement Asset Design and Management
Transportation Association of Canada TAC Primer Pavement Asset Design and Management Introduction Transportation infrastructure plays an important role in the social and economic development of a country,
Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements
University of Pittsburgh Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements Authors: J. M Vandenbossche S. Sachs August 2013 1. Introduction Bonded concrete overlays of asphalt
LIFE-CYCLE COST COMPARISON FOR MUNICIPAL ROAD PAVEMENTS
LIFE-CYCLE COST COMPARISON FOR MUNICIPAL ROAD PAVEMENTS HEIN, David K., P.Eng. Applied Research Associates, Inc., 5401 Eglinton Avenue West, Suite 105, Toronto, ON, CANA- DA, M9C 5K6. Tel: 416-621-9555
TERMOSIGN APPLICATION INSTRUCTIONS
TERMOSIGN APPLICATION INSTRUCTIONS Product s characteristics Termosign - preformed thermoplastic pavement marking system must be applied to a completely dry surface; must be applied to a surface free of
Pavement Management Program
Pavement Management Program 2013 Street Maintenance Program Executive Summary 1/15/2013 Presented by Mark Thiel Assistant Director Public Works Program Overview Start of current program 2005 812.5 Lane
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,
Hello viewers welcome to lesson 4.7 which is on pavement materials part IV and in this lesson we will be covering bituminous binders.
Introduction to Transportation Engineering Prof. K. Sudhakar Reddy Department of Civil Engineering Indian Institute of Technology, Kharagpur Lecture - 30 Pavement Materials IV Hello viewers welcome to
CONCRETE REPAIR GUIDELINES. Concrete repairs can be broken down into four basic types, plus special repairs and planing.
CONCRETE REPAIR GUIDELINES Concrete repairs can be broken down into four basic types, plus special repairs and planing. Note: It is recommended that investigation into soundness of pavement be performed
Fly Ash Slurry Injection (FASI) of Bituminous Thermal Cracks
Fly Ash Slurry Injection (FASI) of Bituminous Thermal Cracks Schedule What is Fly Ash Slurry Injection (FASI) Thermal Cracks and Why They Depress Pavement Rehab Strategies Special Provisions Upcoming Projects
Texas Transportation Institute The Texas A&M University System College Station, Texas 77843-3135
1. Report No. FHWA/TX-05/0-4498-P4 4. Title and Subtitle DRAFT WARRANTY IMPLEMENTATION PLAN 2. Government Accession No. 3. Recipient's Catalog No. Technical Report Documentation Page 5. Report Date January
asphalt applications Resurfacing of roads and other paved areas using asphalt mpa asphalt Asphalt Information Service Mineral Products Association
asphalt applications 3 Resurfacing of roads and other paved areas using asphalt Asphalt Information Service mpa asphalt November 2009 Mineral Products Association Introduction Resurfacing of a road pavement
Reinforcement HUESKER. HaTelit. Engineering with geosynthetics
HUESKER Engineering with geosynthetics rhuesker HUESKER HUESKER HUESKER HUESKER HUESKERr SKER HUESKER HUESKER Asphalt HUESKER HUESKER HUESKERHUES Reinforcement - the answer to reflective cracking in asphalt
SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES
SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES 1. DESCRIPTION. Asphalt Waterproofing Mix (AWM) is a highly elastomeric, polymermodified, impermeable asphalt
Section 300 Base Courses
Table of Contents 1. Importance of Base Courses... 300-1 2. Types of Bases... 300-3 A. Cement Treated Permeable Base Course... 300-3 B. Bituminous Concrete Base Courses... 300-6 C. Superpave Asphalt HMA
4-02 Gravel Base. 4-04 Ballast and Crushed Surfacing
Chapter 4 Bases 4-02 Gravel Base GEN 4-02.1 General Instructions Gravel Base is typically used in the construction of the roadway section and provides support for the pavement. For the pavement to provide
How To Improve Road Quality
A Customer Service Level Approach for Maine DOT s Asset Management System Jeffrey L. Zavitski, B.A. Senior Implementation Specialist Deighton Associates Limited Chip Getchell, P.E. Director, Work Plan
CHAPTER I. INTRODUCTION
CHAPTER I. INTRODUCTION 1.1 Background There is a national need to develop asphalt wearing surfaces for modern timber bridges that are not only skid resistant, but also limit the transport of moisture
DEVELOPMENT OF A NATIONAL ROAD ASSET MANAGEMENT SYSTEM FOR THE KINGDOM OF SAUDI ARABIA. Hazim M Abdulwahid Abdullah Al Kahtani Mustafa Abdulaziz
DEVELOPMENT OF A NATIONAL ROAD ASSET MANAGEMENT SYSTEM FOR THE KINGDOM OF SAUDI ARABIA Hazim M Abdulwahid Abdullah Al Kahtani Mustafa Abdulaziz Contents Introduction Methodology Pavement Management System
asphalt applications Construction and surfacing of footways and cycleways using asphalt mpa asphalt Asphalt Information Service
asphalt applications 11 Construction and surfacing of footways and cycleways using asphalt Asphalt Information Service mpa asphalt November 2009 Mineral Products Association Introduction The main use of
DRAFT ENRICHMENT DESIGN MANUAL. Pavements Engineering No. 1988-45M. R D Leach SENIOR RESEARCH OFFICER. MAIN ROADS Western Australia R:1988-45M
DRAFT ENRICHMENT DESIGN MANUAL Pavements Engineering No. 1988-45M R D Leach SENIOR RESEARCH OFFICER ABSTRACT This report takes the form of a draft surface enrichment design manual. It describes the design
GAF StreetBond Asphalt & Concrete Pavement Coatings Brochure
GAF StreetBond Asphalt & Concrete Pavement Coatings Brochure (COMCO102) Updated: 1/16 gaf.com gaf.com ASPHALT & CONCRETE PAVEMENT COATINGS this is asphalt? extend pavement life transform with color revitalize
Pavement Management Systems
Pavement Management Systems Presented by Bill Weiss, P.E. Applied Pavement Technology, Inc. (APTech) At the 2015 Municipal Streets Seminar Ames, Iowa Why Pavement Management??? Pavements are expensive
Infrastructure assets are distinguished from other capital assets because they normally:
4. REPORTING 4.2 Government-Wide Financial Statements 4.2.6 Infrastructure Reporting 4.2.6.10 Governments are required to report all of their capital assets in the statement of net position. Infrastructure
Pavement Engineering & Asset Management. Meeting the requirements of our existing & future diverse road networks
Pavement Engineering & Asset Management Meeting the requirements of our existing & future diverse road networks 3 Introduction Pavement Engineering Services Jean Lefebvre (UK) are able to provide analysis
Thin Whitetopping Application at Williamsburg Regional Airport and Other Thin Whitetopping Airport Applications.
Thin Whitetopping Application at Williamsburg Regional Airport and Other Thin Whitetopping Airport Applications. Author: Gary L. Mitchell, P.E. Director Airports, American Concrete Pavement Association
Asphalt Pavement Association Of Michigan Selecting the Right Mix. 2937 Atrium Drive, Suite 202 Okemos, MI 48864 517-323-7800 www.apa-mi.
2937 Atrium Drive, Suite 202 Okemos, MI 48864 517-323-7800 www.apa-mi.org History Performance Graded Binders MDOT Local Agency Guide NAPA Guide Outline Other Considerations For each there are: Right
Cost-Effective Pavement Preservation Solutions for the Real World
Cost-Effective Pavement Preservation Solutions for the Real World W. James Wilde, Principal Investigator Center for Transportation Research and Implementation Minnesota State University, Mankato September
CURRENT PRACTICE SHEET
CURRENT PRACTICE SHEET INTRODUCTION An expansion joint can be defined as a device to support the surfacing, or to provide a running surface, across the expansion gap, ie the area between adjacent spans
Surface Treatment Cost - Based on 100,000 Sq. Yds.
$7.96 PCMO $2.07 Thermo seal w/o aggregate $3.72 Thermo Slurry Fine $2.00 Slurry Seal $2.40 Chip Seal $1.08 Rejuvenator $1.65 FOG Seal $5.00 Ekrete $9.00 Surtreat $5.00 Magnesium Phosphate Cement $18.00
Date: 10/10/2014 Initiated by: AAS-100
U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Airport Pavement Management Program (PMP) Date: 10/10/2014 Initiated by: AAS-100 AC No: 150/5380-7B Change:
Pervious Concrete Pavement Maintenance and Operations Guide
Pervious Concrete Pavement Maintenance and Operations Guide NRMCA Pervious Concrete Pavement Maintenance and Operations Guide Pervious concrete pavement is a Portland cement-based, rigid permeable pavement
Built-up roofing solutions with rigid insulation boards on concrete decks for new-build and refurbishment E-a5
Cl Sfb (27-9) Rn7 M2 December 2004 Built-up roofing solutions with rigid insulation boards on concrete decks for new-build and refurbishment E-a5 Fesco, Fesco S, Retrofit, Retrofit S, Fesco Fillet, PF,
Asphaltic Wedge Paving
OFFICIAL NOTICE ADVERTISEMENT FOR BIDS Notice is hereby given by the Town of Oregon, Dane County, Wisconsin, will receive sealed bids for Road Construction as listed in this request until 4:00 P.M., Local
SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE
PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE 311.1 DESCRIPTION: This item shall consist of a cement treated subgrade base course composed of a mixture of local soil, portland
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial
Pavement Patching Repair for AC and PCC Pavement Surfaces. Vern Thompson www.crafco.com
Pavement Patching Repair for AC and PCC Pavement Surfaces Vern Thompson www.crafco.com Overview and Objective New Methods For Pavement Patching-Overview What are they How they are applied New Methods Secti
Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E.
Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir Presented By: Doug Stachler, P.E. Project Organization Owner Delaware County Engineers Office Design Consultant CH2M HILL Contractor Double
CULVERT AND STORM SEWER PIPE MATERIAL POLICY ON FEDERALLY FUNDED LOCAL AGENCY PROJECTS UPDATED March 2013
CULVERT AND STORM SEWER PIPE MATERIAL POLICY ON FEDERALLY FUNDED LOCAL AGENCY PROJECTS UPDATED March 2013 Background Section 5514, a final rule for SAFETEA-LU was issued on November 15, 2006 and became