1 International No-Dig st International Conference and Exhibition Sydney, Australia 1-4 September 2013 Paper 2.12 TIDAL AFFECTED SEWER REHABILITATION IN BALLINA SHIRE Kieran Woodall Project Manager (BE Environmental) Kembla Watertech Pty Ltd ABSTRACT: Kembla Watertech was contracted by the NSW Department of Public Works to rehabilitate a number of infiltration affected reticulation sewer mains for Ballina Shire Council and Richmond Valley Council. Thorough initial planning and assessment was conducted on all sewer assets to confirm the need for rehabilitation and select the most appropriate rehabilitation method to ensure that approval would be provided to proceed. Rehabilitation consisted of approximately 6km of lining at Ballina including over 300 spot repairs (to prevent infiltration and the ingress of sand) and 200 Tiger-T s (junction rehabilitation liners). In Richmond Valley, approximately 6.5km of relining was completed with over 60 spot repairs and 300 Tiger-Ts. Complex issues presented themselves during the contract, mainly being weather and tidal influences. During the initial investigation stages, rain was experienced for 90% of a two month period which lead to multiple sewer systems running at 100%. Careful planning was required to work around the rainfall moving between Ballina and Richmond Valley in the off periods. In addition to the rain, due to the low lying areas of East and West Ballina as well as Evans Head requiring rehabilitation, multiple spot repairs had to be completed prior to lining to prevent infiltration and sand entering the system. Kembla s Quick-Lock system was heavily utilised and proved to be a success in these areas. Kembla Watertech worked closely with Department of Public Works, as well as local community members to successfully complete this project. INTRODUCTION This paper presents a case study for undertaking sewer rehabilitation in areas affected by tidal influence and major infiltration. The discussion will outline the scope of the project, the process followed to ensure efficient planning, the recommendation of appropriate rehabilitation solutions, the challenges faced and the outcomes of this project. Paper
2 BACKGROUND The coastal areas around Ballina are well known for high ground water tables affected by tidal movements. Significant areas of this project were suffering from severe infiltration throughout the sewer system that was heavily impacting the local Sewage Treatment Plant as well as serviceability for hundreds of residents. Areas issued for investigation and rehabilitation included the lowest lying areas including; East and West Ballina and Evans Head to the south. Past attempts to rehabilitate the sewerage system in this region had resulted in failures in part caused by infiltration. The principal this time around has been careful to ensure correct rehabilitation methods were chosen and designed a contract that allowed the maximum flexibility and involvement throughout to ensure the solution implemented achieved the desired outcomes. PROJECT SCOPE The complete scope of works required for this project was unknown at the start of the contract. The style of contract selected by the Principal involved the use of a schedule of rates covering investigation, cleaning, spot repairs and relining. Milestones were used to define the two major areas of work as outlined below. Milestone 1 - Ballina Shire Rehabilitation works carried out under Milestone 1, within the area of Ballina Shire, were as follows; Area 1 Ballina Island; Area 2 West Ballina; Area 3 North Ballina; Area 4 East Ballina; Area 5 Lennox Head Milestone 2 - Richmond Valley Rehabilitation works carried out under Milestone 2, within the area of Richmond Valley, were as follows; Area 6 Coraki; Area 7 Casino; Area 8 Woodburn; Area 9 Evans Head The full extent of required sewer rehabilitation works within each milestone was unknown and approval from the principal was required throughout the project on the basis of the detailed investigations undertaken on each sewer line. The benefit of this approach to the Shires of Ballina and Richmond Valley were that the principal (NSW Department of Public Works) was able to manage the approved budget on behalf of the clients to ensure the maximum amount of rehabilitation was carried out within the provisions of the contract. Rehabilitation Process The rehabilitation process developed for this project can be broken up into three main phases. 1. Investigation Phase 2. Recommendation and Approval Phase 3. Rehabilitation Phase Paper
3 Figure 1 Site Locations 1. INVESTIGATION PHASE Upon being awarded the contract for Sewer Mains Lining and Spot Repairs at Ballina Shire and Richmond Valley, immediate planning was undertaken to ensure a program of works was developed so that rehabilitation could commence as soon as possible. A work program was developed to first inspect all sewer pipes by ways of cleaning and CCTV. As outlined above, the two milestones were broken up into areas, Ballina with Areas 1-5 and Richmond Valley with areas 6-9. The plans included all information obtained through CCTV which would include and confirm: - Length and diameter of lines - Number of junctions - Severity of infiltration - Rehabilitation recommendation Challenges Faced Initial site visits and maintenance hole inspections revealed that the areas issued for investigation and rehabilitation were in the lowest lying areas including; East and West Ballina and Evans Head to the south. Depths of the maintenance holes varied but in some spots were up to 6m deep. With the ocean and rivers not far away, an approximate depth of the water table was estimated to be around 1-2m, meaning any sewer asset being investigated deeper than this was bound to have infiltration. Similar work has recently been completed by Kembla Watertech under the SRP Tidal Ingress Contract for Sydney Water, however a main difference discovered here was that in Sydney you would have a potential difference in water table of up to 2.0m due to tide shift, in Ballina and Evans Head however the ground conditions were always saturated giving no real tide gap during low tide periods to install the liners. Paper
4 In addition to the tidal issues, Kembla s Cleaning/CCTV crews couldn t have had any worse luck and arrived during a period of rainfall that lasted approximately two months and lead to nearly all sewers running at 100% in conjunction with ocean and river infiltration. Figure 2 Ballina Maintenance Hole with severe infiltration from sewer system Kembla s normal process was implemented by the Contract-Supervisor assigned to Ballina, beginning with initial site appraisals followed by letter drops and notification of residents to provide access for the work crews and eliminate any potential complaints. From here our Cleaning/CCTV crews were deployed to start the process of surveying 248 lines issued in the Ballina region and 272 in Richmond Valley. As mentioned earlier, a period of rainfall lasting approximately two months was experienced during the initial stages of investigation. Due to the unusual topography between the Ballina and Richmond Valley areas meant that Ballina could be hit with torrential downpours and yet at the same time, Richmond Valley was shining without a cloud in the sky. This predicament meant that careful planning and monitoring of the weather had to be done so that crews could jump between the two regions so that delivery of the rehabilitation plans on time was achieved. After the two month period, all nine rehabilitation plans had been submitted. 2. RECOMMENDATION AND APPROVAL PHASE The Principal reviewed the nine rehabilitation plans and recommendations and then approved the rehabilitation work program. Ballina had approved relining 135 of the sewer lines issued and the installation of spot repairs in a further 63 sewer lines. Of the sewer lines issued for relining, 74 of those required pre-patching to eliminate any infiltration and sand ingress prior to installation of a fold and form liner (Kembla s EX liner). Richmond Valley whose region was spread from Casino and Lismore in the west to Woodburn and Evans Head in the south, approved 107 sewer lines for relining and installation of spot repairs in a further 4 sewer lines. Of the work issued for relining, 7 of those located in Evans Head required spot repairs. 3. REHABILITATION PHASE By the third month into the contract, the rain had cleared but the tide was still up. A program had been developed to start with the spot repairs to deal with the running sand issue which would ultimately maximise final lining diameter. Paper
5 Kembla had recommended multiple rehabilitation systems under the contract based on the condition of the pipes. These included: - EX Method (Fold and Form lining) - SWP Diafit (Spiral Wound Lining) - Flexi-Liner (Small Diameter CIPP liner) - Tiger-T s (CIPP Junction Rehabilitation Liner) - Tiger Patch (CIPP GRP Spot Repair) - Quick-Locks (Mechanical Spot Repair Sleeve) Figure 3 Kembla EX Crew Site Setup Agreement was achieved between the client and Kembla of the suitability of each product as well as keeping costs down based on the condition of the pipe. Another key consideration in method selection was the ability to eliminate infiltration and sand ingress to ensure effective cleaning and maximising hydraulic capacity. Kembla s Quick-Lock system was utilised for all spot repairs due to ease of installation and effectiveness in stopping infiltrating sand. A number of lines were identified as having for example, three infiltrating joints. However after installing the Quick-Locks, the trench effect was observed where the head pressure of the water table was great enough to find the path of least resistance to the next joint. This meant on multiple occasions, several more Quick-Locks were required to be installed in each line to stop the infiltrating sand. Paper
6 Figure 4 Quick-Lock System These pipes, which were running at almost 100% flow due to infiltration previously, were now servicing normal dry weather flows which immediately had a positive impact on the sewage treatment plant downstream. Evans Head to the south of Ballina, seemed to be experiencing some of the worst serviceability due to the shallow depth of the water table as well as the sandy conditions of the ground. Lines required a combination of cleaning and installation of Quick-Locks at the same time to stop a significant amount of sand entering the pipes. Attempts had been made in the past to complete civil repairs on the lines however the results achieved after rehabilitation was complete were unrivalled. Figure 5 Pre rehabilitation (Sand with infiltration visible) Additional spot repairs saw Kembla utilise the Tiger Patch system which provided a seal for infiltration and damaged pipes whilst maintaining structural integrity. It was decided on using this system in lines that still had good serviceability but had infiltration at minimal points. Paper
7 Figures 6 Post Rehabilitation Whilst the EX method, a fold and form PVC based lining system was used for the majority of lines due to ease of installation, minimal impact on local residents and enhanced hydraulic liner performance, SWP Diafit, a spiral liner using PVC profile was installed in longer runs where access was an issue at intermediate maintenance holes and were generally used in larger diameter lines to avoid any hydraulic issues in reticulation pipe. Overall, the program saw a variety of rehabilitation methods used based on the effectiveness, site conditions and cost. CONCLUSIONS Upon completion of all works, all parties including NSW Department of Public Works, Ballina Shire and Richmond Valley were satisfied that a positive result was achieved and the program was a success. Kembla has completed the rehabilitation of sewer lines totalling more than 6,500m in Richmond Valley and 6,000m in Ballina Shire. Data is still being collected by treatment plant operators, however initial indications have revealed the following outcomes; A reduction in overall flows to treatment works A reduction in flash flow infiltration immediately following rain events A reduction in pump run times and overtime for operators during rain events. The successful outcomes achieved by this project highlight that infiltration alone does not dictate the most appropriate rehabilitation method as the associated ingress of sand is extremely difficult to control if infiltration pre rehabilitation is not controlled. Effective cleaning will ensure maximum hydraulic capacity will be achieved by maximising the internal diameter. A schedule of rates contract for projects such as this one, where investigation is necessary prior to rehabilitation is effective. This approach ensures the principal has flexibility in method selection and approval of rehabilitation recommendations. Paper
IS THAT LINER THICK ENOUGH?
IS THAT LINER THICK ENOUGH? Philip McFarlane, Opus International Consultants Ltd ABSTRACT The amount of pipeline rehabilitation being undertaken in New Zealand is increasing each year. Larger diameter
More informationPipeline Replacement using Relining
Pipeline Replacement using Relining Mark Heathcote, March 2006 Relining of old pipeline systems is becoming an increasingly attractive option to asset owners and operators as an effective alternative to
More informationStructural Pipe Lining Technology
Structural Pipe Lining Technology ABOUT US Nu Flow install innovative technologies to rehabilitate failing or deteriorating piping systems. These technologies are non-invasive, in-situ, and offer a greener
More informationCCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R
CCTV PIPE INSPECTION AND EVALUATION For RUNWAY 17L-35R At ST. PETERSBURG CLEARWATER INTERNATIONAL AIRPORT February 2011 CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R ST. PETERSBURG CLEARWATER INTERNATIONAL
More informationTHE BIG FIX: Public works administration would be easy if infrastructure. San Diego s Sewer Renewal Program. By Steve Gibbs
THE BIG FIX: San Diego s Sewer Renewal Program By Steve Gibbs Public works administration would be easy if infrastructure lasted forever. It does not. Roads, bridges and sewers eventually wear out. Even
More informationGreater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development
7 SPECIFICATIONS There is currently no Irish specification for construction of drainage works, or water supply works. There are several publications that give guidance on drainage works, such as the Building
More informationInteractive Decision Tree Automates Sewer Rehabilitation Planning
Interactive Decision Tree Automates Sewer Rehabilitation Planning IWPCA Annual Conference June 5, 2008 Rodney Moeller, P.E., John Schroeder, P.E. BCEE, C. Timothy Fallara, P.E. & Mel Meng, P.E. Agenda
More informationAction plans for hotspot locations - Ash Study
Appendix 9 Action plans for hotspot locations - Ash Study Ash Vale North 1. Local evidence indicates the culvert could not discharge during December 2013 because the outlet was blocked on the western side
More informationBuilding over or close to a public sewer
Building over or close to a public sewer thameswater.co.uk/developerservices thameswater.co.uk/developerservices 1 Questions and answers Did you know Thames Water is legally responsible for more than 100,000
More informationMainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology
2007 Pumper & Cleaner Environmental Expo International Wednesday February 7, 2007 Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology What is Cured-In-Place Pipe (CIPP)
More informationLars-Göran Gustafsson, DHI Water and Environment, Box 3287, S-350 53 Växjö, Sweden
Alternative Drainage Schemes for Reduction of Inflow/Infiltration - Prediction and Follow-Up of Effects with the Aid of an Integrated Sewer/Aquifer Model Introduction Lars-Göran Gustafsson, DHI Water and
More informationDrain & Tank Cleaning
Drain & Tank Cleaning Our ever growing fleet of drain cleaning vehicles ranging from small vans to Hi-spec Jet-Vac units enable us to provide you with the right equipment at the right time. Services include:
More informationSewer Rehabilitation Design Requirements
Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared
More informationUsing Frequent Sewer Inspection to Prioritize Asset Management. May 1, 2014. John Schroeder, P.E., BCEE Drew Richards, EI Tim Fallara, P.E.
Using Frequent Sewer Inspection to Prioritize Asset Management May 1, 2014 John Schroeder, P.E., BCEE Drew Richards, EI Tim Fallara, P.E. Agenda Rationale and Goals for Sewer Re-inspection How and why
More informationSASTT contact details:
SASTT contact details: Web: www.sastt.org.za President: Andries Lötz Tel: (011) 688 1483 Fax: (011) 688 1524 E-mail: alotz@jwater.co.za Honorary director: Joop van Wamelen Tel: (012) 567 4026 Fax: 086
More informationSPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)
SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer
More informationUVDB empowered by Achilles
UVDB empowered by Achilles DISAB Centurion: High Performance Wet/Dry Materials Handling Unit DISAB Centurion: High performance vacuum tanker that will vacuum dry or wet material The DISAB can vacuum material
More informationA Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015
A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015 Infiltration/Inflow (I/I) I & I Reduction: Three-Prong Attack
More informationA pipe restoration system for drainage pipes
A pipe restoration system for drainage pipes NUFLOWTECH.COM.AU 1800 NUFLOW #NUFLOW NUFLOW TECHNOLOGIES 2000 PTY LTD ABN: 25 109 601 345 ACN: 109 601 345 Head Office 20 Central Park Avenue Ashmore, QLD
More informationPORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING MULTIPLE CIPP CREWS.
North American Society for Trenchless Technology 2007 No-Dig Conference & Exhibition San Diego, California April 15-20, 2007 Paper # PORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING
More informationBolton s Flood Risk Management Strategy
Bolton s Flood Risk Management Strategy www.bolton.gov.uk Public Summary Bolton s Flood Risk Management Strategy Public Summary Introduction Over 5.5 million properties in England and Wales are at risk
More informationSewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority
Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Abstract The United States Virgin Islands Waste Management Authority
More informationLetty Arvide-Gomar, PE
Letty Arvide-Gomar, PE Outline DIP History and Applications Corrosion Issues Internal Cleaning Technologies Rehabilitation Options DIP History and Applications Corrosion Issues Internal Cleaning Technologies
More informationNewbiggin House Farm,
Newbiggin House Farm, Near Waberthwaite Flood Investigation Report 32 Flood Event 30/8/2012 Cumbria County Council Version Undertaken by Reviewed by Approved by Date Preliminary Colin Parkes Anthony Lane
More informationPipes and Fittings for Gravity Sewer Mains. SewerMAX
SewerMAX High resistance to tree root intrusion and groundwater infiltration lightweight for ease of installation low embodied energy for environmental benefits long service life Excellent chemical resistance
More informationSEWER CLEANING, INSPECTION AND ASSESSMENT
3.1 OVERVIEW Chapter 3 SEWER CLEANING, INSPECTION AND ASSESSMENT Preventive maintenance protects the investment of the sanitary sewer collection system infrastructure. Higher frequency cleaning of gravity
More informationSTANDARD OPERATING INSTRUCTION SOI-GVW-198 CCTV Inspection of Sewerage Reticulation Works 1 PURPOSE 2 REFERENCES 3 DEFINITIONS
1 PURPOSE The purpose of this SOI is to provide instruction and guidance for closed circuit television survey (CCTV) inspection, which the Corporation requires to be undertaken by the constructor as part
More informationMarch 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS
March 2006 CW 2140 - SEWER AND MANHOLE CLEANING TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Constructions... 1 3. CONSTRUCTION METHODS... 1 3.1 High
More informationMIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E.
MIAMI-DADE LATERAL PILOT PROGRAM James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. Hazen and Sawyer, P.C. 4000 Hollywood Boulevard Hollywood, FL 33021 ABSTRACT Since 1994 the Miami-Dade
More information16. Storm water drainage
16. Storm water drainage There are three principal ways to dispose of rainwater from roofs, courtyards and paved areas: storm water sewers, soakaways and collection in storage tanks. Storm water sewers,
More informationRehabilitation or Replacement? That Is The Question
Rehabilitation or Replacement? That Is The Question Chris L. Windley PE Greg Anderson, PE 94th Annual Conference November 18, 2014 Overview Project Background Existing Sewer Condition Flow Projections
More informationUseful information to help you protect your home or business from the risks of flooding
communities Flood Resilience Guide Useful information to help you protect your home or business from the risks of flooding Contents Introduction...................................................................
More informationUDG Spring Conference Birmingham 2016
Use of Monitoring Equipment to Proactively Manage the Waste Water Network Presenters James Mason (RPS), Joanna Kelsey (Severn Trent Water) Contributors Andrew Bailey (RPS), John Hateley (RPS) Ruth Clarke
More informationHome page Previous Next
n About DALROD n Drain Cleaning & Waste Disposal n CCTV Surveys n Sewer Renovation n Pumping Solutions n Gutter Cleaning Solutions n DALROD s Accreditations n Contact Us As one of the largest independent
More informationHow To Recover From A Flood In Bundaberg
BUNDABERG FLOODS NOW THE MUD HAS DRIED FLOOD RECOVERY AT MILLBANK Paper Presented by: Kym Kneebone Author: Kym Kneebone, Assistant Coastal Treatment Co-ordinator, Bundaberg Regional Council 37th Annual
More informationEssex County Council Flood Investigation Report
Essex County Council Stock City of Chelmsford Rev Date Details Author Checked and Approved By 01 February 2015 Draft report for stakeholder consultation Ed Clarke Flood Investigation Engineer Lucy Shepherd
More informationPRODUCT CATALOGUE. for. SMARTPHONE / WEBSITE / DIGITAL EDITION / BOOK / ipad / GPS
PRODUCT CATALOGUE for This product catalogue has been downloaded from COSSD.com. Listed products/services and their descriptions are shown as supplied by the title company COSSD does not guarantee the
More informationINSTALLATION OF INSITUFORM LINER
PART 1 GENERAL 1.1 SCOPE: A. This item shall include all work and materials to install, insert a flexible polyester felt liner saturated with a thermo-setting resin into the existing sewer line for rehabilitation
More informationCorporate Report. Report from Transportation and Environmental Services, Environmental Services
Corporate Report Report from Transportation and Environmental Services, Environmental Services Date of Report: January 9, 2015 Date of Meeting: January 26, 2015 Report Number: TES-020-2015 File: 68.81.4
More informationM E M O R A N D U M. Among the standard conditions contained in the NPDES permit is also a Duty to
M E M O R A N D U M DATE: August 7, 2015 TO: FROM: SUBJECT: Metropolitan Wastewater Management Commission (MWMC) Matt Stouder, MWMC General Manager Capacity Management, Operations, and Maintenance (CMOM)
More informationSEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER
Village of Shorewood, Wisconsin SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Prepared By: Thomas A. Zoulek, P.E., LEED A.P. Vice President Mid City Plumbing & Heating
More informationWastewater Collection and Treatment Systems For Small Cities
Page 1 of 13 FISCAL SUSTAINABILITY PLAN For the, Wastewater Collection and Treatment System This plan outlines a (FSP) for the City of Small Town, County of Xxxxx, State of Kansas, as required by the Kansas
More informationREPAIRS TO DAMAGED SEWERS
REPAIRS TO DAMAGED SEWERS A digout is the replacement of sewer or storm water pipes that are either broken or blocked due to tree roots, ground movement or ageing of pipes. When the use of high-pressure
More informationGround Truthing Infiltration & Inflow
Ground Truthing Infiltration & Inflow using Trenchwater Piezometers, Electro Scan and CCTV Presented by: Gordon Henrich, D.M. Robichaud Randy Kowal, D. M. Robichaud Nov. 30, 2015 Robichaud About D. M.
More informationDRAINAGE PIPE REPAIR & RELINING SOLUTIONS
DRAINAGE PIPE REPAIR & RELINING SOLUTIONS Our technology Nuflow are the specialists in trenchless pipe relining, providing a structural repair. We provide a simple, practical, cost effective solution to
More informationSAWS SSO Reduction Program
SAWS SSO Reduction Program Jeff Haby, P.E. Director Sewer System Improvements February 20, 2014 TMDL Implementation Plan Technical Committee Overview Sanitary Sewer Overflows Consent Decree Overview Major
More informationAffordable Asset Management Making Use of the Data You Have: An Owner s Perspective
Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective An Owner Operator s Approach for Asset Management on a Budget Lane Longley, City of St. Petersburg Presented by the April
More informationCOMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary
CITY OF LAKEWOOD COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary MAY 2006 storage conveyance treatment performance Prepared for: City of Lakewood, Ohio Prepared by: Metcalf & Eddy of Ohio,
More informationCCTV of Stormwater Systems. Cairns Regional Council. Commentary Guidelines #4037587
CCTV of Stormwater Systems Cairns Regional Council Commentary Guidelines Introduction Councils inherit assets through the donated asset process. In doing so, Councils immediately receive assets that are
More informationEnvironment Agency 0800 807 060. Anglian Water 03457 145 145. Local Authority Contact your own local authority directly for more information.
NUMBERS USEFUL Environment Agency 0800 807 060 Anglian Water 03457 145 145 AND CONTACTS DEALING WITH FLOODING FROM Local Authority Contact your own local authority directly for more information. SEWERS
More informationYour Pressure Sewerage System Guide
Your Pressure Sewerage System Guide The System The E-one Pressure Sewerage System is reliable and robust. There is very little you need to do and very little that can go wrong. Here s how it works: The
More informationTrouble Shooting for Trenchless Liner Installation During Sewer Line Rehabilitation
Trouble Shooting for Trenchless Liner Installation During Sewer Line Rehabilitation Salam Khan*, P.E. and Christoph Dobson, P.E. Sacramento County Sanitation District 1 (CSD-1) 10545 Armstrong Avenue,
More informationSEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT
SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT The following are minimum requirements for installation of conventional trench sewage disposal systems in St. Mary s County,
More informationPresented by: Scott E. Belz Project Manager- URS Corporation Robert P. Kelly, P.E. Director of Engineering-City of Westlake James J. Smolik, P.E.
Presented by: Scott E. Belz Project Manager- URS Corporation Robert P. Kelly, P.E. Director of Engineering-City of Westlake James J. Smolik, P.E. Engineer-City of Westlake City of Westlake Facts Founded
More informationSEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS
SEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS RESPONSE TO BIDDER S QUESTIONS Question #1: Is the Contractor required
More informationSevern Trent Water Ltd has undergone a massive investment programme in the River Tame catchment over the
Tame Urban Pollution Management Foxton Road & Sir Johns Road CSOs - collaborative working to deliver innovative solutions Severn Trent Water Ltd has undergone a massive investment programme in the River
More informationBUILDING OVER OR NEAR WATER & SEWER MAINS POLICY
MURRAY SHIRE COUNCIL BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY ADOPTED: 1 May 2012 1 BUILDING OVER OR NEAR WATER AND SEWER MAINS POLICY CONTENTS 1. Objective... 2 2. Requirements for Building Near
More informationReticulation sewers in basements Technical guidelines
Reticulation sewers in basements Technical guidelines Overview What These guidelines explain our technical requirements for laying sewers in building basements. The scope of the guide is restricted to
More informationHigh Density Polyethylene Liners for Rehabilitation of Corroded Pipelines
High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines Jeff Schell General Manager United Pipeline Middle East, Inc. Introduction HDPE Liners A cost effective and environmentally beneficial
More informationCITY OF DULUTH PRIVATE SEWER SERVICE GRANT PROGRAM PROGRAM GUIDELINES
CITY OF DULUTH PRIVATE SEWER SERVICE GRANT PROGRAM PROGRAM GUIDELINES Policy and Statement of Purpose The City of Duluth has existed as a city on the shoreline of Lake Superior for more than 100 years
More informationOVER-HEAD SEWER ASSISTANCE GRANT
OVER-HEAD SEWER ASSISTANCE GRANT The Village of North Aurora has a vested interest in the proper operation of the North Aurora sanitary system. Understanding that some residential users of the sanitary
More informationTOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion
TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion Project Overview Sanitary Sewer System 2 Town of Surfside Project Overview Potable Water System 3 Town of Surfside Project Overview Storm Water
More informationREVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC
REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC What is really out there? DO YOU DIG IT? INDUSTRY CONCERNS UNEXPECTED DEVELOPMENTS
More informationIntroduction to Pressure Pipe Rehabilitation with CIPP
Introduction to Pressure Pipe Rehabilitation with CIPP Founded in early 1990 s RS Technik is a global leader in the rehabilitation of underground pipes RS Technik uses Cured-in- Place (CIPP) technology
More informationThames Water key Messages for London Borough of Ealing 25 th October 2005
Thames Water key Messages for London Borough of Ealing 25 th October 2005 Item 1: Drainage & ownership The area of drainage is complex. Thames Water, the Local Authority, the Environment Agency and property
More informationSanitary Sewer Overflow (SSO) Incident Report Form
Submit completed form to EHS. Date of SSO spill: Sanitary Sewer Overflow (SSO) Incident Report Form Identify the SSO category (check one): Category 1 SSO Spills of any volume that reach surface water Category
More informationCITY OF COLFAX REQUIREMENTS AND STANDARDS FOR CLOSED CIRCUIT TELEVISION SEWER LATERAL INSPECTIONS
CITY OF COLFAX REQUIREMENTS AND STANDARDS FOR CLOSED CIRCUIT TELEVISION SEWER LATERAL INSPECTIONS PURPOSE AND SCOPE This document provides information and sets forth standards for sewer lateral closed
More informationSECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE
SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE PART 1 - GENERAL 1.01 WORK INCLUDED A. This section covers the initial and final cleaning, and the initial and final
More informationHow To Manage A Hydrant
USING MOBILE GIS TECHNOLOGY TO GATHER COMPREHENSIVE ASSET CONDITION DATA OF BRISBANE & IPSWICH S FIRE HYDRANT NETWORK Daniel Faccio 1, Malcolm Potts 2 1. Queensland Urban Utilities, Brisbane, OLD 2. Thiess,
More informationREQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE
REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE Submit Proposals to: Town of Woodside Public Works Department 2955 Woodside
More informationMonterey Regional Water Pollution Control Agency. Sewer System Management Plan
Monterey Regional Water Pollution Control Agency Sewer System Management Plan March 31, 2013 Sewer System Management Plan Introduction I. Goals II. Organization III. Legal Authority IV. Operation and Maintenance
More informationOakland Macomb Interceptor Drain Rehabilitation State Revolving Fund Project Plan Overview. Public Meeting June 10, 2009
State Revolving Fund Project Plan Overview Public Meeting June 10, 2009 What is the OMI? The OMI is the Oakland Macomb Interceptor Sewer. The OMI transports much of the sanitary sewage from Oakland and
More informationA quick guide to our floodcare scheme
A quick guide to our floodcare scheme What to do in case of sewer flooding We re here to help We appreciate that dealing with the results of sewage flooding is always unpleasant and we know how upsetting
More informationKAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011
KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 Kawerau District Council Private Bag 1004 Ranfurly Court KAWERAU 3169 Tel (07) 306 9009 Fax (07) 323 8072 Email kaweraudc@kaweraudc.govt.nz
More informationVILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES
VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES SEWER BACK-UP POLICY General Sewer back-ups are an unfortunate, but common problem in older communities. A sewer back-up can create a health or
More informationStormwater Control Measures for Tokyo
Stormwater Control Measures for Tokyo M. Sugai* *Planning Section, Planning and Coordination Division, Bureau of Sewerage, Tokyo Metropolitan Government, 2-8-1 Nishi-Shinjuku, Shinjuku-ku, Tokyo 163-8001
More informationPART 5 : WASTEWATER DRAINAGE
Authorised by : City Waters Unit Manager Page 1 of 15 PART 5 : WASTEWATER DRAINAGE 5.1 INTRODUCTION This Manual sets out the basic design principles for drainage of wastewater. While some construction
More informationVital Earth Composting Facility Flood Risk and Drainage Statement
Vital Earth Flood Risk and Drainage Statement Final December 2011 Prepared for Vital Earth Ltd Revision Schedule Flood Risk and Drainage Statement December 2011 Rev Date Details Prepared by Reviewed by
More informationSA Pipe Relining is dedicated to finding simple, non intrusive
SA Pipe Relining is dedicated to finding simple, non intrusive solutions to complex problems using latest technologies and methodical work practises in an environmentally friendly and cost effective manner.
More informationLOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD
www.norcalpug.com LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD Bob Fisher and Lance Stracner Ameron Protective Lining J.R. Pipeline Co Inc. Abstract: The
More informationUltraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation
Ultraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation Dan Broderick Director of Pipeline Rehabilitation ACHEN-GARDNER ENGINEERING,
More informationHow To Film On Council Land
BYRON SHIRE COUNCIL POLICY NO 3.41 FILMING ON COUNCIL OWNED AND CONTROLLED LAND #916396 INFORMATION ABOUT THIS DOCUMENT (INTERNAL USE ONLY) Date Adopted by Council 19 November 2002 Resolution No. 02-1235
More informationExecutive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division
PW8.5 STAFF REPORT ACTION REQUIRED Contract Award Request for Proposal No. 9117-15-7122 Engineering Services for the Detailed Design, Services During Construction, and Post-Construction Services for an
More informationGuidelines for As-Built CCTV Inspections of Lined/Rehabilitated Pipe
Guidelines for As-Built CCTV Inspections of Lined/Rehabilitated Pipe P r e p a r e d B y : P r o j e c t M a x L i m i t e d 8 / 1 1 / 2 0 1 3 Supplementary Document to the CCC Specification CCTV for Christchurch
More informationGuidelines for closed circuit television (CCTV) inspection of newly constructed sewers
Guidelines for closed circuit television (CCTV) inspection of newly constructed sewers These guidelines outline inspection, reporting and acceptance requirements for newly constructed rigid and flexible
More informationApplication by National Grid Gas plc for the River Humber Gas Pipeline replacement (the application)
Application by National Grid Gas plc for the River Humber Gas Pipeline replacement (the application) Examining Authority s (ExA) Record of Unaccompanied Inspection of Sites to Which the Application or
More informationSanitary Sewer Smoke Testing
Sanitary Sewer Smoke Testing Beginning March 31, 2014 The City of Brunswick will be conducting smoke testing on the City s sanitary sewer system beginning March 31, 2014. Smoke testing will occur over
More informationStorm Sewer Trenchless Upgrade Alternatives and Recommendations
Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for
More informationGuide to working on Public Sewers
Guide to working on Public Sewers affected by Building Works Introduction Severn Trent Water Ltd requires the work to be done in order to protect the public sewer and minimise the risk of us having to
More informationA NEW METHOD FOR DEVELOPING THE MOST COST- EFFECTIVE REHABILITATION PROGRAMS FOR OUR AGEING SEWER NETWORKS
A NEW METHOD FOR DEVELOPING THE MOST COST- EFFECTIVE REHABILITATION PROGRAMS FOR OUR AGEING SEWER NETWORKS Introduction Toby Bourke (MWHSoft), Graham McGonigal (MWH) There is currently widespread concern
More informationStandard Operating Procedures for Flood Preparation and Response
Standard Operating Procedures for Flood Preparation and Response General Discussion Hurricanes, tropical storms and intense thunderstorms support a conclusion that more severe flooding conditions than
More informationCLEANING, INSPECTION, AND TESTING OF SEWERS
CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and
More informationKNOWING WHEN TO GET THEM OUT - IMPROVING FLOOD EVACUATION PLANNING THROUGH FLOOD MODELLING AND STAKEHOLDER INVOLVEMENT
KNOWING WHEN TO GET THEM OUT - IMPROVING FLOOD EVACUATION PLANNING THROUGH FLOOD MODELLING AND STAKEHOLDER INVOLVEMENT K McAndrew 1, M Stubbs 2, T Anderson 1 1 Clarence Valley Council, NSW 2 State Emergency
More informationProposed Construction of Basement Flood Risk Assessment. 35 Edwardes Square London W8 6HH
Proposed Construction of Basement Flood Risk Assessment 35 Edwardes Square London W8 6HH 1 Introduction This FRA has been carried out in accordance with the National Planning Policy Statement (NPPF), the
More informationAlmonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06
Almonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06 1. Goals The goal of this SSMP is to provide a plan and schedule to properly manage, operate,
More informationCITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is
~: ~,,' " CITY OF ST. CA THARINE S BY-LAW NO. cn- Olc.4 A By-law to regulate sanitary and storm drainage. WHEREAS the Council of the Corporation of the City of St. Catharines, is authorized by the provisions
More informationCITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet
CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet WHAT IS STORMWATER MANAGEMENT? Stormwater management is the method for channeling rainfall through pipes and sewers away from property to
More informationSan Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION
ITEM 866 SEWER MAIN TELEVISION INSPECTION 866.1 DESCRIPTION: The Contractor shall furnish all labor, materials, equipment, and incidentals to provide the televising and a NASSCO-(PACP) standard video,
More informationSewer Infiltration Monitoring SWIG Sensing in Water 2015
SWIG Sensing in Water 2015 24th September 2015 David Walters BEng CEng MCIWEM Principal Research Engineer Innovation Background Widespread seasonal problem for many water companies Unaccounted for Water
More informationPlatte River Interceptor Slipline Rehabilitation
Platte River Interceptor Slipline Rehabilitation Owner: Metro Wastewater Reclamation District Contractor: American West, Denver CO Slipline Pipe Manufacturer : Hobas Pipe USA Presented by: Tom Furie, Area
More information