Essex County Council Flood Investigation Report

Size: px
Start display at page:

Download "Essex County Council Flood Investigation Report"

Transcription

1 Essex County Council Stock City of Chelmsford Rev Date Details Author Checked and Approved By 01 February 2015 Draft report for stakeholder consultation Ed Clarke Flood Investigation Engineer Lucy Shepherd Lead Local Flood Authority Manager 02 February 2015 Final revisions based on consulation response Ed Clarke Flood Investigation Engineer Lucy Shepherd Lead Local Flood Authority Manager

2 Introduction Purpose and Requirements of the Essex County Council as the LLFA has a responsibility to record and report flood incidents as detailed within Section 19 of the FWMA 2010: Section 19 (1) On becoming aware of a flood in its areas, a lead local flood authority must, to the extent that it considers it necessary or appropriate, investigate- (a) which risk management authorities have relevant flood risk management functions, and (b) whether each of those risk management authorities has exercised, or is proposing to exercise, those functions in response to the flood. (2) Where an authority carries out an investigation under subsection (1) it must- (a) publish the results of its investigation, and (b) notify any relevant risk management authorities. Essex County Council has established criteria for Section 19 Flood Investigation Reports as follows: The internal flooding* of a property on more than one occasion OR The internal flooding* of five or more properties in a single event AND An ambiguity surrounding the source or responsibility of a flood incident. *Internal flooding does not include the flooding of gardens and garages; only properties where internal flooding is above threshold level. 1

3 Site Information Site Location Mill Road & High Street, Stock (Grid Ref: ,198906) Figure 1 Indicative location of Flood Investigation Area (Base Map: Ordnance Survey, 2014). Flood Risk Figure 2 Updated Flood Map for Surface Water (ufmfsw), (Environment Agency, 2013). 2

4 As the updated Flood Map for Surface Water (ufmfsw) shown in Figure 2 demonstrates, the Flood Investigation area exhibits a high level of flood risk, with significant areas predicted to be at risk during a 1 in 30 year return period rainfall event (3.3% probability of occurring any given year). If the ufmfsw is viewed at a wider scale as shown in Appendix D, it becomes evident that the village is located on a natural drainage path towards Stock Brook, which is classified as a Main River and is a tributary of the River Wid. The area which is at the highest level of risk based on the model appears to be the centre of the village, however it is worth noting that due to the lack of specific local factors incorporated within the model this should only be viewed as an approximate indication of flood risk and is not suitable for identifying individual properties. Flood History Severe flooding affected more than five properties internally during heavy rainfall on 20 th July 2014, although exact numbers may be considerably higher than this. Evidence from affected residents suggested that floodwaters reached 2 feet in depth and a number of properties suffered extensive damage. In addition to this, reports from residents and other Risk Management Authorities suggest that an ongoing flooding issue has been present at the junction of Mill Road and High Street, although whether this has previously resulted in internal flooding to property is currently unclear. The approximate area affected by flooding is shown in Figure 3, based on photographic and anecdotal evidence. This area is indicative only and should not be used as a representation of properties experiencing internal flooding. Photos taken during the event on 20 th July 2014 are shown in Figures 4 and 5, and Appendix A. Figure 3 Indicative flood area during the events [Not to be used as indication of individual properties experiencing internal flooding]. (Base Map: Ordnance Survey, 2014). 3

5 Figure 4 Flooding in Stock on 20 th July 2014 (BBC, 2014; Photo by Samuel Myers). Figure 5 Flooding in Stock on 20 th July 2014 (Photo supplied by resident, 2014). 4

6 Drainage System Figure 6 Indicative Drainage Layout (Ordnance Survey, 2014). The key aspects of the drainage system are demonstrated in Figure 6, based on information from Digdat and site inspections. As is shown, the most significant component of the drainage system in the immediate area is an AW sewer running from the north east to south west. The AW infrastructure maps did not specify a diameter of the sewer and requests for information have been unsuccessful. As such the capacity of the system is currently unclear. A number of highway gullies drain into the sewer and are shown on the map, the concentration of the gullies around the junction of the High Street and Mill Lane is likely a result of the ongoing surface water issues in the area mentioned previously. Beyond the southern edge of the map, the sewer continues south west as shown in Appendix B, before outfalling into Stock Brook. There are discrepancies between the AW maps and site observations, so it is unclear at which point the AW sewer outfalls, however inspection revealed a large diameter pipe marked by a black dashed line on the map. 5

7 Possible Causes Rainfall/Antecedent Moisture Conditions The main event in question occurred at the end of a very warm and dry period of weather. Whilst the land was not saturated it is possible that the fields in the surrounding areas would have been very dry and the top layer of soil baked, causing the initial rainfall to be transferred as surface runoff and increasing the speed at which the rainwater drained from the area. The average monthly rainfall from the two nearest Met Office weather stations shows 52.5mm and 45.3mm for Stanford-le-Hope and Writtle respectively. As summer rainfall is very variable, the spread of data shows that 20% of the recorded values used to calculate the monthly average rainfall for July are higher than 67.8mm and 69.4mm for Stanford-le-Hope and Writtle respectively. The Met Office have stated that they expect these monthly values to be exceeded once every 5 years on average (20% of all months). The rainfall event was a very substantial convectional summer storm. During the period from 14:00-17:00 a local rainfall gauge at Hanningfield recorded 66mm rainfall, with the heaviest intensity showing 60mm falling within one hour, between 14:30-15:30. On comparison with the monthly average values for July it is evident even when using the upper values provided by the Met Office that almost the entire of the average rainfall for July fell within 3 hours. Approximately 91% of the rainfall recorded during the storm fell in the period between 14:30-15:30, with the highest intensity showing 18.2mm/per 15mins. Highway/Surface Water Drainage System This data suggests that the volume and intensity of rainfall falling during the event would have likely been substantially greater than the design capacity of the drainage system in the local area causing the system to be overwhelmed and flooded. Photographic evidence and resident reports suggested that highway gullies in the local area were surcharging and not able to remove the water from the road surface. Given the intensity of rainfall it is likely that this was due to the overwhelming of the design capacity of the infrastructure rather than any specific blockages, however drainage concerns had previously been reported by residents to the northern limit of the flood area shown in Figure 3. During inspection by Essex Highways in May 2014, a blocked gully was identified as being in need of maintenance, with subsequent clearance undertaken in Autumn It is unclear at this stage whether the blockage contributed to the flooding on 20 th July It is possible that it may have exacerbated the issue in the immediate area, however the intensity of the rainfall means that it would likely have been overwhelmed even if clear. The main surface water drainage route through the village is an Anglian Water surface water sewer of unknown 6

8 Culvert Conditions Open Watercourse Conditions System at Capacity diameter, shown in Figure 6 running from north to south. Reports and evidence from local residents suggested that there had been issues with this sewer in the past and contact with Anglian Water established that works have been done previously, the latest being in Requests for details on the works and any subsequent inspection before or following the flooding on 20 th July 2014 have been unsuccessful. The outfall of the system marked on Anglian Water sewer infrastructure maps appeared to be buried on initial inspection (Photo C3, Appendix C), however investigation downstream revealed an additional concrete culvert section which outfalls into Stock Brook. As this is not marked on the Anglian Water map it is unclear whether this is part of the adopted sewer system or whether it would influence the performance of the main sewer. The culvert section to which the Anglian Water sewer outfalls was found to be flowing freely on inspection meaning that a significant blockage upstream was unlikely. It was however evident at certain points that the culvert had become uncovered and that sections of the pipe had split from each other (see Photo C1, Appendix C). Whilst the culvert was damaged, this allows water to escape at periods of high flow and would not have contributed to the flooding. The culvert was installed under an open watercourse section, which at the time of inspection was flowing at a reasonable velocity, likely draining the adjacent land. A deep section to the north, immediately south of where the outfall of the Anglian Water system is located was completely dry at the time of inspection (Photo C2, Appendix C). It is possible that the presence of this culvert, particularly if it is of a smaller diameter than the Anglian Water sewer, may have provided a constriction on flow. If this is proven to be the case, it may be prudent to consider the reinstating of the open watercourse to provide additional capacity. There is currently no specific evidence to suggest that the condition of any open watercourse in the local area was a primary factor during the flood events, however it is possible that the historic culverting of open watercourses has increased flood risk in the area. It is probable that the intensity of rainfall previously mentioned overwhelmed the design capacity of the entire surface water system in the area, however due to the lack of information received in response to requests made of Anglian Water it is not currently possible to ascertain whether it is feasible that significant improvements could be made. 7

9 Responsibilities and Recommendations Lead Local Flood Authority To ensure that the owners of land on which a culvert, watercourse or drainage system is present are aware of their responsibility to keep the feature clear and functioning effectively. Facilitate sharing of information and collaboration between RMAs and the local community. Consider using enforcement powers under Section 25 of the Land Drainage Act 1991 should landowners fail to maintain watercourses effectively. Record and inspect any significant drainage features identified on the site as part of the Flood Risk Asset Register required under Section 21 of the Flood and Water Management Act Consider undertaking further study into mitigation options, including working with landowners to reinstate open watercourse sections if beneficial, and investigate the potential for funding for flood alleviation works. Essex Highways Consider use of powers under Section 100 of The Highways Act 1980 to prevent surface water flowing onto the public highway and/or to properly drain the highway. Continue to work in partnership with other RMAs, providing information and comments and funding when appropriate and to support hydraulic modelling work, the recommendations of which should address/consider the flood risk on the public highway. Inspect and clear highway drainage in the area on a regular basis to reduce flood risk. Consider improvements to the highway drainage system, either by installing additional drainage infrastructure or improving the capacity of existing infrastructure. Anglian Water Check and clear the adopted sections of sewer where necessary. Comply with duty to cooperate with relevant RMAs under Section 13 of the FWMA Provide information on the capacity of the main sewer in the area to the LLFA. Chelmsford City Support LLFA in raising awareness of riparian landowner responsibilities. Council Continue to share information held on drainage layouts with all RMAs. Riparian Landowners Ensure that watercourses or culverts on, or adjacent to, their land are kept clear and free flowing. Provide information to the LLFA on surface water drainage systems which may contribute to/from the infrastructure identified in this report. Residents/Business Take measures to protect themselves and their property when flooding is imminent. Owners Document and photograph flood incidents where possible, report flooding to CCC or the LLFA. 8

10 Conclusion We have investigated which Risk Management Authorities have relevant Flood Risk Management Functions in accordance with the FWMA as part of this study. Those RMA s and relevant functions are referenced above within the recommendations section. It is the conclusion of this study that the flood event on 20 th July 2014 was most likely due to a combination of the occurrence of an intense and unprecedented rainfall event, drainage infrastructure which was unable to cope with the volume and intensity of rainfall, and the high level of residual flood risk in the area. The volume of rainfall experienced over the afternoon of the 20 th July was in excess of the Met Office average rainfall for the entire of July and this, particularly the extreme intensity during the one hour period between 14:30-15:30 during which over 90% of the day s rainfall fell, would have overwhelmed the design capacity of the drainage system in the area. As demonstrated in Figure 2, the flood area exhibits a high level of residual flood risk with the junction of Mill Road and High Street predicted to be at risk in a 1 in 30 year event or greater (3.3% probability of occurring in any given year). The junction is also at relative low point within the immediate area which encourages water to gather before flowing south towards the River Wid. It is likely that this was previously the beginning of a natural flow path or possibly watercourse which forms a tributary of the river and which has been historically culverted. The boundary lines of the properties to the south of the junction (observable in Figure 6) support the historic existence of an open watercourse. Where open watercourses have been converted to culverted sections, this causes a significant loss of capacity and a constriction on the flow from upstream, increasing flood risk in the upstream area. It is probable that the installation of the culvert occurred many years ago however, so it is unlikely that a practical or feasible solution exists in reinstating the open watercourse. Given the location of the flood area relatively early in the flow path it is unlikely that a solution such as upstream attenuation would provide any benefit. The diameter of the main Anglian Water sewer is unknown, but if the private culvert section to which the sewer outfalls is of a lesser diameter it is possible that this may provide a further restriction on the system and increase flood risk upstream. It is unclear at this stage the reasons as to why the culvert was installed under a significant sized open watercourse, however it is recommended that the feasibility of reinstating the full watercourse as an outfall to the Anglian Water sewer is investigated and its effects evaluated. As no feasible option to mitigate the flooding issue is immediately discernible, it is recommended that further detailed hydrological study is undertaken to identify and evaluate options for reducing the flood risk to properties in the local area. These conclusions are based on the information currently available and may change subject to future works or subsequent investigations. 9

11 Acronyms AW Anglian Water CCC Chelmsford City Council EA Environment Agency ECC Essex County Council EH Essex Highways FIR FWMA Flood and Water Management Act 2010 LDA Land Drainage Act LLFA Lead Local Flood Authority LHA Local Highway Authority RMA Risk Management Authority Glossary of Terms Term Culvert Main River Ordinary Watercourse Surface Water Definition Covered channel/pipeline All watercourses shown as such on the statutory main river maps held by the Agency and DEFRA or Welsh Office, as appropriate. All rivers, streams, ditches, drains, cuts, dykes, sluices,sewers (other than public sewers) and other passages through which water flows that are not designated as main rivers. Rainwater which is on the surface of the ground (whether or not it is moving), and has not entered a watercourse, drainage system or public sewer. Useful Contacts and Links Essex County Council Highways Incident Line Flood Investigation Engineer All calls may be charged (24hrs) (Mon-Fri, 9am - 5pm) Legislation Highways Act 1980: Water Resources Act 1991: Land Drainage Act 1991: EA - Living on the Edge a guide to the rights and responsibilities of riverside occupation: EA - Prepare your Property for Flooding: Reducing flood damage; flood protection products and services ECC Flood and Water Management in Essex: National Flood Forum Blue Pages: Advice and contacts for flood protection products Six Steps to Flood Resilience: Step-by-step guidance and advice for property owners interested in Property Level Protection 10

12 Appendix A Photo from 20 th July 2014 (Provided by resident November 2014). 11

13 Appendix B Wider Drainage Network A B Base Map: Ordnance Survey (2014) 12

14 Appendix C Photos from site visit (December 2014) Photo C1 Taken at Point B looking north. Photo C2 Taken at Point A looking south. Photo C3 Taken at Point A looking north. 13

15 Appendix D Extended area of the Updated Flood Map for Surface Water UFMfSW: EA, 2013; Base Map: Ordnance Survey (2014) 14

Newbiggin House Farm,

Newbiggin House Farm, Newbiggin House Farm, Near Waberthwaite Flood Investigation Report 32 Flood Event 30/8/2012 Cumbria County Council Version Undertaken by Reviewed by Approved by Date Preliminary Colin Parkes Anthony Lane

More information

Action plans for hotspot locations - Ash Study

Action plans for hotspot locations - Ash Study Appendix 9 Action plans for hotspot locations - Ash Study Ash Vale North 1. Local evidence indicates the culvert could not discharge during December 2013 because the outlet was blocked on the western side

More information

London Borough of Merton Local Flood Risk Management Strategy

London Borough of Merton Local Flood Risk Management Strategy Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has recently enacted the Flood

More information

London Borough of Croydon Local Flood Risk Management Strategy

London Borough of Croydon Local Flood Risk Management Strategy London Borough of Croydon Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has

More information

Guidance Notes: GARDEN FLOODING

Guidance Notes: GARDEN FLOODING Page 1 of 7 Guidance Notes: GARDEN FLOODING If you are unsure about anything within these notes then please contact the Flood Risk Management (FRM) team using the details at the end of this document. Water

More information

St Bees. Flood Investigation Report 37

St Bees. Flood Investigation Report 37 St Bees Flood Investigation Report 37 Flood Event 30/8/2012 Cumbria County Council Version Undertaken by Reviewed by Approved by Date Preliminary Colin Parkes Anthony Lane 6 Feb 2013 Draft Colin Parkes

More information

Homes and Environment Scrutiny Committee. (Environment & Transport)

Homes and Environment Scrutiny Committee. (Environment & Transport) REPORT TO: REPORT NO: Homes and Environment Scrutiny Committee HHPPE/89/15S DATE: 9 September 2015 LEAD MEMBER: Councillor David A Bithell (Environment & Transport) CONTACT OFFICER: Neil Taunt (Tel: 729734)

More information

London Borough of Bromley LEAD LOCAL FLOOD AUTHORITY UPDATE AND GRANT DRAW-DOWN

London Borough of Bromley LEAD LOCAL FLOOD AUTHORITY UPDATE AND GRANT DRAW-DOWN Report No. ES15041 London Borough of Bromley PART ONE - PUBLIC Decision Maker: Executive Date: 9 th September 2015 Decision Type: Non-Urgent Executive Non-Key Title: Contact Officer: Chief Officer: Ward:

More information

Bolton s Flood Risk Management Strategy

Bolton s Flood Risk Management Strategy Bolton s Flood Risk Management Strategy www.bolton.gov.uk Public Summary Bolton s Flood Risk Management Strategy Public Summary Introduction Over 5.5 million properties in England and Wales are at risk

More information

Report Relating to Incidents of Flooding within the Dollar Catchment

Report Relating to Incidents of Flooding within the Dollar Catchment Joint Position Statement Report Relating to Incidents of Flooding within the Dollar Catchment October 2012 Eric McQuarrie, Scottish Water Stuart Cullen, Clackmannanshire Council TABLE OF CONTENTS 1. INTRODUCTION...

More information

MINUTES of a Public Meeting to consider Flooding issues in Shaw & Whitley held on Monday 6 th October 2014 at Shaw School Hall, Shaw at 7.

MINUTES of a Public Meeting to consider Flooding issues in Shaw & Whitley held on Monday 6 th October 2014 at Shaw School Hall, Shaw at 7. MINUTES of a Public Meeting to consider Flooding issues in Shaw & Whitley held on Monday 6 th October 2014 at Shaw School Hall, Shaw at 7.00pm Present: Melksham Without Parish Council (MWPC) Cllr Richard

More information

Vital Earth Composting Facility Flood Risk and Drainage Statement

Vital Earth Composting Facility Flood Risk and Drainage Statement Vital Earth Flood Risk and Drainage Statement Final December 2011 Prepared for Vital Earth Ltd Revision Schedule Flood Risk and Drainage Statement December 2011 Rev Date Details Prepared by Reviewed by

More information

ORCHARD WAY / BROOM GROVE Knebworth

ORCHARD WAY / BROOM GROVE Knebworth ORCHARD WAY / BROOM GROVE Knebworth Technical Assessment Report to support Section 19 Flood Investigation Project No: Date: Reviewed By: Approved By: 0469 October 2014 Tom Butler Neil Harding NHTB Consultancy

More information

2 ND SEPTEMBER 2014. Report of the Bi-Borough Executive Director for Transport and Technical Services

2 ND SEPTEMBER 2014. Report of the Bi-Borough Executive Director for Transport and Technical Services London Borough of Hammersmith & Fulham COMMUNITY SAFETY, ENVIRONMENT & RESIDENTS SERVICES POLICY & ACCOUNTABILITY COMMITTEE 2 ND SEPTEMBER 2014 SURFACE WATER MANAGEMENT PLAN (SWMP) Report of the Bi-Borough

More information

Parish Flood Report: Broadwell & Kencot

Parish Flood Report: Broadwell & Kencot Parish Flood Report: Broadwell & Kencot Version 1 This report may be revised in the future to incorporate ongoing consultation results Boardwell & Kencot Flood Report 1 of 37 June 2008 Contents 1.0 INTRODUCTION...3

More information

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document LOCAL FLOOD RISK MANAGEMENT STRATEGY Summary Document October 2013 Local Flood Risk Management Strategy Summary 1 Introduction 2 Partner responsibilities 3 What do we know about flooding in the borough?

More information

Flood Investigation Report

Flood Investigation Report Buckinghamshire County Council Flood Investigation Report Oxford Road New Denham February 2014 Page 1 Revision Schedule Buckinghamshire County council Flood Investigation Report Section 19 Flood Investigation

More information

FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY

FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY London Rd. WATERLOOVILE FOR McCarthy & Stone Ltd. July 2010 Such Salinger Peters Ltd 30558-1- Flood Risk Assessment & Drainage Strategy Contents Paragraph Page

More information

Thames Water key Messages for London Borough of Ealing 25 th October 2005

Thames Water key Messages for London Borough of Ealing 25 th October 2005 Thames Water key Messages for London Borough of Ealing 25 th October 2005 Item 1: Drainage & ownership The area of drainage is complex. Thames Water, the Local Authority, the Environment Agency and property

More information

Creating the environment for business

Creating the environment for business 1. Introduction 1.1 Introduction to Water Cycle Strategies (WCS) 1.1.1 Background The water cycle describes the pathways and processes through which water moves through the natural and built environment,

More information

London Road, Rayleigh Essex Flood Risk Assessment Addendum

London Road, Rayleigh Essex Flood Risk Assessment Addendum FINAL Countryside Properties (UK) Limited Submitted by AECOM 6-8 Greencoat Place London SW1P 1PL London Road, Rayleigh Essex Flood Risk Assessment May 2015 i Limitations AECOM Infrastructure & Environment

More information

Managing Surface Water Flooding in Paddock Wood Briefing note - June 2011

Managing Surface Water Flooding in Paddock Wood Briefing note - June 2011 Managing Surface Water Flooding in Paddock Wood Briefing note - June 2011 Information for Editors What is the reason for this initiative? 1. Legal Requirements The main drivers are the Flood Risk Regulations

More information

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Development and Regeneration Services Glasgow City Council 229 George Street Glasgow G1 1QU May 2011 1. Introduction...-

More information

Sheffield Flood Risk Management Strategy. Draft Edition 1: Version 1

Sheffield Flood Risk Management Strategy. Draft Edition 1: Version 1 Sheffield Flood Risk Management Strategy Draft Edition 1: Version 1 Prepared by: Sheffield City Council Regeneration and Development Services For further information, please contact: Sheffield City Council

More information

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details Appendix C - Risk Assessment: Technical Details Page C1 C1 Surface Water Modelling 1. Introduction 1.1 BACKGROUND URS Scott Wilson has constructed 13 TUFLOW hydraulic models across the London Boroughs

More information

Household customer. Wastewater flooding guidelines. www.thameswateruk.co.uk

Household customer. Wastewater flooding guidelines. www.thameswateruk.co.uk Household customer Wastewater flooding guidelines www.thameswateruk.co.uk We are very sorry that you have recently suffered wastewater flooding to your property. This leaflet has been designed to answer

More information

A Guide to the Role of Community Flood Wardens

A Guide to the Role of Community Flood Wardens A Guide to the Role of Community Flood Wardens What is a Community Flood Warden Scheme? Community Flood Warden schemes are completely voluntary, and can consist of a single person or several people acting

More information

1.2 This technical note provides a preliminary investigation into the Flood Risk and provides outline drainage strategies.

1.2 This technical note provides a preliminary investigation into the Flood Risk and provides outline drainage strategies. ODYSSEY MARKIDES TECHNICAL NOTE PROJECT : CHAILEY HOUSE, BLEWBURY JOB NO. : 14-216 NOTE TITLE : PRELIMINARY FLOODING AND DRAIANGE AUTHOR : STEVEN ROOTH APPROVED : ANDREAS MARKIDES DATE : 02/09/2014 1.0

More information

Cllrs T G Cutmore, B T Hazlewood, K H Hudson, Mrs J R Lumley, Mrs J E McPherson, Mrs C E Roe, Cllrs C G Seagers, D J Sperring and I H Ward.

Cllrs T G Cutmore, B T Hazlewood, K H Hudson, Mrs J R Lumley, Mrs J E McPherson, Mrs C E Roe, Cllrs C G Seagers, D J Sperring and I H Ward. Rochford District Councillors: Other Agencies: Officers: Cllrs T G Cutmore, B T Hazlewood, K H Hudson, Mrs J R Lumley, Mrs J E McPherson, Mrs C E Roe, Cllrs C G Seagers, D J Sperring and I H Ward. R Baranowski

More information

East Riding of Yorkshire Council

East Riding of Yorkshire Council East Riding of Yorkshire Council Lead Local Flood Authority Interim Standing Advice Revision A - April 2015 1. Introduction From April 2015 the Lead Local Flood Authority (LLFA) became a statutory consultee

More information

FLOOD RISK RECENT TRENDS AND POLICY RESPONSES

FLOOD RISK RECENT TRENDS AND POLICY RESPONSES FLOOD RISK RECENT TRENDS AND POLICY RESPONSES DEVELOPING WESTMINSTER S LOCAL PLAN Booklet No. 2 LDF Consultation - CMP Revision November 2013 INTRODUCTION CLLR ROBERT DAVIS Westminster is at risk of flooding

More information

London Borough of Newham. Local Flood Risk Management Strategy

London Borough of Newham. Local Flood Risk Management Strategy London Borough of Newham Local Flood Risk Management Strategy Version 5, September 2015 Local Flood Risk Management Strategy for the London Borough of Newham Document Management: Version Control Title:

More information

Managing flood risk in Camden The London Borough of Camden flood risk management strategy

Managing flood risk in Camden The London Borough of Camden flood risk management strategy Managing flood risk in Camden The London Borough of Camden flood risk management strategy Contents 1. Foreword 3 2. Executive summary 4 3. Glossary 6 4. Introduction 8 4.1 Strategy objectives 8 4.2 Guiding

More information

AGMA Policy for Investigating Flood Incidents

AGMA Policy for Investigating Flood Incidents AGMA Policy for Investigating Flood Incidents THE LEGISLATION Section 19 of the Flood and Water Management Act 2010 states that: (1) On becoming aware of a flood in its area, a lead local flood authority

More information

Cllrs T G Cutmore, J Hayter, B T Hazlewood, K H Hudson, Mrs G A Lucas-Gill, Mrs C E Roe, C G Seagers, Mrs M H Spencer, M J Steptoe and I H Ward

Cllrs T G Cutmore, J Hayter, B T Hazlewood, K H Hudson, Mrs G A Lucas-Gill, Mrs C E Roe, C G Seagers, Mrs M H Spencer, M J Steptoe and I H Ward Rochford District Councillors: Cllrs T G Cutmore, J Hayter, B T Hazlewood, K H Hudson, Mrs G A Lucas-Gill, Mrs C E Roe, C G Seagers, Mrs M H Spencer, M J Steptoe and I H Ward Rt Hon M Francois, MP for

More information

Flood Fact Sheet and Information for the Public in Essex

Flood Fact Sheet and Information for the Public in Essex Flood Fact Sheet and Information for the Public in Essex Introduction All local authorities in Essex have a responsibility to plan for, respond to and aid the recovery of their communities, as well as

More information

Community Services and Safety Scrutiny Sub-Committee 1 November 2011

Community Services and Safety Scrutiny Sub-Committee 1 November 2011 REPORT TO: Community Services and Safety Scrutiny Sub-Committee 1 November 2011 AGENDA ITEM: 6 SUBJECT: LEAD OFFICER: CABINET MEMBER: Flood Prevention Stephen McDonald Executive Director of Planning and

More information

Proposed Re-development, At 321 London Road, Wyberton. Flood Risk Assessment - Revised

Proposed Re-development, At 321 London Road, Wyberton. Flood Risk Assessment - Revised Proposed Re-development, At 321 London Road, Wyberton Flood Risk Assessment - Revised Prepared By: C Mason C.Eng M.I.C.E May 2015 Contents Page No. 1. Introduction 2 2. Site Description 2 3. Flood Hazard

More information

Carterton Drainage Strategy. Stage 1 - Initialise/Prepare

Carterton Drainage Strategy. Stage 1 - Initialise/Prepare Carterton Drainage Strategy Stage 1 - Initialise/Prepare Introduction Why sewer flooding Britain s first sewerage systems were constructed 150 years ago in the Victorian era, and have served us well for

More information

Running Water, Ineffective Drains and Highway Maintenance. Hodges v Somerset County Council

Running Water, Ineffective Drains and Highway Maintenance. Hodges v Somerset County Council Running Water, Ineffective Drains and Highway Maintenance Hodges v Somerset County Council By Geoffrey Brown and Nathan Peacey Running water can be a cause of problems, not least on the roads. A highway

More information

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes Chapter 2 Flash Flood Science A flash flood is generally defined as a rapid onset flood of short duration with a relatively high peak discharge (World Meteorological Organization). The American Meteorological

More information

Recommendations for future developments

Recommendations for future developments C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site

More information

Appendix B: SWMP Contact List

Appendix B: SWMP Contact List Appendix B: SWMP Contact List South Essex SWMP Working Group List, January 2011 Client Group Matthew Winslow Basildon BC Client SWMP Project Manager matthew.winslow@basildon.gov.uk Emmanuelle Meunier Basildon

More information

Flood Investigation Report Section 19, Flood & Water Management Act (2010)

Flood Investigation Report Section 19, Flood & Water Management Act (2010) www.calderdale.gov.u Flood Investigation Report Section 19, Flood & Water Management Act (2010) Upper Calder Valley 29 th July 2013 Flooding Incident www.calderdale.gov.uk Control Sheet Project Title:

More information

Sutton Harbour Holdings PLC. March 2007

Sutton Harbour Holdings PLC. March 2007 Sutton Harbour Holdings PLC March 2007 Contents!! " # # $ % % &'(&'' ) ) ( * + ', *!$ -,!'! #. / $$ #% 00& ' 00&1 $ Executive Summary!! " WSP Development and Transportation has been engaged by Sutton

More information

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SUSTAINABLE URBAN DRAINAGE SYSTEMS overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being

More information

Flood Risk Assessment and Drainage Statement

Flood Risk Assessment and Drainage Statement Trinity College, Cambridge Proposed Relocation of Felixstowe Rifle Range, Land north of Nicholas Road, Trimley St Mary, Felixstowe Quality Assurance Site name: Client name: Proposed Relocation of Felixstowe

More information

Flooding Matters. Introduction

Flooding Matters. Introduction Flooding Matters 19/07/2013 Issue 1 Introduction Hello and welcome to the 1 st Essex County Council flood and water management newsletter, Flooding Matters. As a Lead Local Flood Authority we now have

More information

North Somerset - 2012 Flood Investigations

North Somerset - 2012 Flood Investigations North Somerset - 2012 Flood Investigations Table of Contents Table of Contents... i 1 Introduction... 1 2 Key Responsibilities... 3 3 Rainfall in 2012... 6 4 Flood Incident Extent and Impact... 16 5 Abbots

More information

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WLPS BUNCEFIELD REBUILD Flood Risk Assessment Green Lane Hemel Hempstead Hertfordshire HP2 7HZ September 2009 Prepared

More information

WORPLESDON PARISH COUNCIL FLOOD PLAN. February 2015

WORPLESDON PARISH COUNCIL FLOOD PLAN. February 2015 Appendix A WORPLESDON PARISH COUNCIL FLOOD PLAN February 2015 This Flood Plan has been created so that, in the event of flooding in the area covered by Worplesdon Parish Council, there is a clear understanding

More information

Objective 4: Enhanced community education, flood awareness and preparedness

Objective 4: Enhanced community education, flood awareness and preparedness Objective 4: Enhanced community education, flood awareness and preparedness Understanding the extent and full impacts of flooding is essential for planning for potential future pressures on the drainage

More information

FLOOD CONTINGENCY PLAN

FLOOD CONTINGENCY PLAN Unrestricted Copy DERBYSHIRE LOCAL RESILIENCE FORUM FLOOD CONTINGENCY PLAN Issued January 2013 Revised Flood Contingency Plan CONTENTS CONTENTS RECORD OF AMENDMENTS CIRCULATION LIST Page i iii iv 1 BACKGROUND

More information

Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by

Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by Easy guide to Sustainable drainage systems 02 Contents Page Introduction 05 Purpose of this

More information

Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization

Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization Introduction A visual examination of Doolittle Creek in a highly developed suburban county in Georgia yielded telltale signs of a creek whose original streambed had been altered. Examination of official

More information

Sanitary Sewer Overflow (SSO) Incident Report Form

Sanitary Sewer Overflow (SSO) Incident Report Form Submit completed form to EHS. Date of SSO spill: Sanitary Sewer Overflow (SSO) Incident Report Form Identify the SSO category (check one): Category 1 SSO Spills of any volume that reach surface water Category

More information

Flood Risk Management in Southwark

Flood Risk Management in Southwark Flood Risk Management in Southwark 1 Presented to Borough & Bankside Community Council 25 th April 2012 By Flood and Drainage Team Agenda Item 11 IN BRIEF Background Legislation What have we done? What

More information

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality

More information

Summer 2012 Flooding in Newcastle upon Tyne

Summer 2012 Flooding in Newcastle upon Tyne Summer 2012 Flooding in Newcastle upon Tyne A report on the experiences of residents and non-residential property managers i Revision Schedule Revision Date Details Prepared by Checked by 0 Oct 2012 Initial

More information

Groundwater Flooding in Brighton and Hove City (February 2014)

Groundwater Flooding in Brighton and Hove City (February 2014) Section 19 Flood Investigations Report Groundwater Flooding in Brighton and Hove City (February 2014) May 2014 Revision Schedule Rev Date Details Author Checked and Approved by 1 April 2014 M Moran N Fearnley

More information

Preliminary Environmental Information Report: Appendix 16.C. Flood Warning and Evacuation Plan

Preliminary Environmental Information Report: Appendix 16.C. Flood Warning and Evacuation Plan Preliminary Environmental Information Report: Appendix 16.C Flood Warning and Evacuation Plan THIS PAGE IS LEFT INTENTIONALLY BLANK Page 2 of 30 Contents SUMMARY 1. INTRODUCTION... 9 1.1 Background...

More information

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year Appendix C1 Surface Water Modelling 1 Overview 1.1 The Drain London modelling was designed to analyse the impact of heavy rainfall events across each London borough by assessing flow paths, velocities

More information

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES Integra Consulting Engineers Limited NS / 2543 Fountain House

More information

Taylor Wimpey UK Ltd. December 2007

Taylor Wimpey UK Ltd. December 2007 Taylor Wimpey UK Ltd December 2007 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft For Planning Date 3 August 2007 20 December 2007 Prepared by D Gooding P Barton Signature Checked

More information

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter ENVIRONMENTAL STATEMENT: VOLUME 1 9.1 INTRODUCTION 9.1.1 This Chapter considers the effects of the Project on surface water and groundwater

More information

Floodplain Development Land Use Review

Floodplain Development Land Use Review COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone 541-917-7550 Fax 541-791-0150 www.cityofalbany.net Floodplain Development Land Use Review

More information

Document No 62/04/03 Issue Date: 16 December 2004 FLOOD DAMAGE REPAIRS TO LOCAL ROADS SPECIAL FUNDING ASSISTANCE PROCEDURE MANUAL

Document No 62/04/03 Issue Date: 16 December 2004 FLOOD DAMAGE REPAIRS TO LOCAL ROADS SPECIAL FUNDING ASSISTANCE PROCEDURE MANUAL Document No 62/04/03 Issue Date: 16 December 2004 FLOOD DAMAGE REPAIRS TO LOCAL ROADS SPECIAL FUNDING ASSISTANCE PROCEDURE MANUAL This document is owned and authorised by the Manager Budget and Program

More information

Environment Agency 0800 807 060. Anglian Water 03457 145 145. Local Authority Contact your own local authority directly for more information.

Environment Agency 0800 807 060. Anglian Water 03457 145 145. Local Authority Contact your own local authority directly for more information. NUMBERS USEFUL Environment Agency 0800 807 060 Anglian Water 03457 145 145 AND CONTACTS DEALING WITH FLOODING FROM Local Authority Contact your own local authority directly for more information. SEWERS

More information

Wiltshire SWMP Project Governance Framework

Wiltshire SWMP Project Governance Framework Wiltshire SWMP Project Governance Framework Final Framework Prepared on behalf of This document has been prepared in accordance with the scope of Scott Wilson's appointment with its client and is subject

More information

The application site is on the edge of flood zones 1 and 2 with flood zone boundary cutting across part of the southern boundary of the site.

The application site is on the edge of flood zones 1 and 2 with flood zone boundary cutting across part of the southern boundary of the site. Flood Risk Assessment Erection of Masjid/ Place of Worship, extended car parking following demolition of 11a Grafton Street & boundary treatment Land adjacent 11/ 11a Grafton Street, Preston, PR1 8JB 0723/

More information

CHAPTER 3 STORM DRAINAGE SYSTEMS

CHAPTER 3 STORM DRAINAGE SYSTEMS CHAPTER 3 STORM DRAINAGE SYSTEMS 3.7 Storm Drains 3.7.1 Introduction After the tentative locations of inlets, drain pipes, and outfalls with tail-waters have been determined and the inlets sized, the next

More information

Sample Micro Hydro Initial Report

Sample Micro Hydro Initial Report Sample Micro Hydro Initial Report Sample Micro Hydro Initial Report Introduction The Hydro Burn at Glen Water was visited by Richard Haworth of Glen Hydro to assess its suitability for a micro hydro installation.

More information

Littleport Co-located Schools

Littleport Co-located Schools Littleport Co-located Schools February 2015 Morgan Sindall Littleport Co-located Schools 330763 BNI BSE 003 C P:\Cambridge\Murdoch\EST\PROJECTS\330763 Littleport Co-located Schools\12.0 Documents\12.2

More information

Water attenuation performance of experimental green roofs at Ruislip Gardens London Underground Depot Report 1 - July 2013

Water attenuation performance of experimental green roofs at Ruislip Gardens London Underground Depot Report 1 - July 2013 Water attenuation performance of experimental green roofs at Ruislip Gardens London Underground Depot Report 1 - July 2013 1 Water attenuation performance of experimental green roofs at Ruislip Gardens

More information

UDG Spring Conference Birmingham 2016

UDG Spring Conference Birmingham 2016 Use of Monitoring Equipment to Proactively Manage the Waste Water Network Presenters James Mason (RPS), Joanna Kelsey (Severn Trent Water) Contributors Andrew Bailey (RPS), John Hateley (RPS) Ruth Clarke

More information

Land to the rear of the Black Bull Public House Flood Risk Assessment March 10, 2014 Version 1.0 Ref: RAB 148

Land to the rear of the Black Bull Public House Flood Risk Assessment March 10, 2014 Version 1.0 Ref: RAB 148 Land to the rear of the Black Bull Public House Flood Risk Assessment March 10, 2014 Ref: RAB 148 Lindsey Phillips Turnbull Tweedale Ltd 61 Oaken Lanes Codsall South Staffordshire WV8 2AW R A B C O N S

More information

SUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY

SUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY SUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY 1. Introduction 1.1 The Council recognises the threat to local communities from flooding following severe weather events and as a result

More information

Building over or close to a public sewer

Building over or close to a public sewer Building over or close to a public sewer thameswater.co.uk/developerservices thameswater.co.uk/developerservices 1 Questions and answers Did you know Thames Water is legally responsible for more than 100,000

More information

What to do if sewage floods your property

What to do if sewage floods your property What to do if sewage floods your property This leaflet will answer some of your questions and concerns, as well as give you helpful information and advice. What we will do for you Sewer flooding is unpleasant

More information

Innovative Approaches in Flood Damage Reduction

Innovative Approaches in Flood Damage Reduction Innovative Approaches in Flood Damage Reduction Solutions for the Stormwater Management High Level Results 3D geospatial model of storm water management pond (GRCA, 2013) Enhanced understanding of storm

More information

5.14 Floodplains and Drainage/Hydrology

5.14 Floodplains and Drainage/Hydrology I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important

More information

Your guide to sewer flooding

Your guide to sewer flooding Your guide to sewer flooding We re here to help 2 Severn Trent Water Your guide to sewer flooding This leaflet has been produced to give you further information on: What causes sewer flooding Who is responsible

More information

Useful information to help you protect your home or business from the risks of flooding

Useful information to help you protect your home or business from the risks of flooding communities Flood Resilience Guide Useful information to help you protect your home or business from the risks of flooding Contents Introduction...................................................................

More information

Pavement Asset Management Guidance Section 5.3: Condition Surveying and Rating - Drainage

Pavement Asset Management Guidance Section 5.3: Condition Surveying and Rating - Drainage Pavement Asset Management Guidance Section 5.3: Condition Surveying and Rating - Drainage December 2014 Document Information Title Author Description Pavement Asset Management Guidance, Section 5.3: Condition

More information

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm: Page 1 of 6 Section 1. PURPOSE This policy is an Engineering checklist of the Local Review Program for sanitary sewer improvement projects by the Bedford Regional Water Authority ( Authority ). Section

More information

Sewers and Drains A GUIDE TO MAINTENANCE RESPONSIBILITIES

Sewers and Drains A GUIDE TO MAINTENANCE RESPONSIBILITIES Sewers and Drains A GUIDE TO MAINTENANCE RESPONSIBILITIES This leaflet about drains and sewers has been prepared by Breckland Council and gives information and advice to private and commercial property

More information

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness 3 Chapter 3 of Concentration and Travel Time Time of Concentration and Travel Time Travel time ( T t ) is the time it takes water to travel from one location to another in a watershed. T t is a component

More information

SURFACE WATER MANAGEMENT PLAN

SURFACE WATER MANAGEMENT PLAN SURFACE WATER MANAGEMENT PLAN DRAIN LONDON LONDON BOROUGH OF LEWISHAM Document Information Document Information Title: Surface Water Management Plan for London Borough of Lewisham Owner: Bo Quatresols

More information

Your responsibilities...

Your responsibilities... Your responsibilities... Identify if you are living in a flood risk area: visit www.environment-agency.gov.uk/floodline or call Floodline on 0845 9881188. Protect your home or property. Provide your own

More information

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers

More information

SOAK UP YOUR STORMWATER

SOAK UP YOUR STORMWATER SOAK UP YOUR STORMWATER This booklet explains how you can apply soakage on your property to achieve efficient disposal of stormwater. The following information on soakage is intended as a guide only. All

More information

Places Directorate Environment Infrastructure PO Box 100 Wigan Council WN1 3DS. Culvert Advice Note

Places Directorate Environment Infrastructure PO Box 100 Wigan Council WN1 3DS. Culvert Advice Note Places Directorate Environment Infrastructure PO Box 100 Wigan Council WN1 3DS Culvert Advice Note Culverts Advice Note Revisions Rev Date Details Prepared by Reviewed by Approved by 1 19/07/2013 AC MAJ

More information

General Insurance - Domestic Insurance - Home Contents Storm water damage policy exclusion flood damage

General Insurance - Domestic Insurance - Home Contents Storm water damage policy exclusion flood damage Determination Case number: 227307 General Insurance - Domestic Insurance - Home Contents Storm water damage policy exclusion flood damage 4 April 2011 Background 1. The Applicants insured their home contents

More information

Our sewerage services - how we deal with your used water. www.nwl.co.uk

Our sewerage services - how we deal with your used water. www.nwl.co.uk Our sewerage services - how we deal with your used water www.nwl.co.uk Our sewerage services A sewer is a pipe which carries and removes either rain water or foul water from more than one property. This

More information

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Harmony Creek subwatershed Harmony Creek subwatershed BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT April 2011 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

TENNESSEE GAS PIPELINE COMPANY, L.L.C. TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC & HYDRAULIC CALCULATIONS FOR WATERBODIES CROSSED BY CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,

More information

Council Policy. This Policy assists in the implementation of the Council Plan 2009-2013 Revised 2010, in particular Strategy 3.1.

Council Policy. This Policy assists in the implementation of the Council Plan 2009-2013 Revised 2010, in particular Strategy 3.1. Council Policy Council Policy Title: Council Policy Ref No: Council Policy Owner: Adopted by: Discharge of Pumped Subterranean Water Associated with Basements or Below-Ground Structures C/POL/INF/024 Director

More information