l;.* ffi''g* (ifaprit, 2ol 5

Size: px
Start display at page:

Download "l;.* ffi''g* (ifaprit, 2ol 5"

Transcription

1 NATURAL PETROCHEMICALS PVT. LTD. (Formerly Divine Petrochemicals Pvt. Ltd.) 101-8, Mehta Estate, lst Floor, Chakala, Andheri - Kurla Road, Andheri (East), Mumbai lndla. Member Secretary (Expert Appraisal Committee; Industry-llpr r ar*it1ar-^^^r ^^^^^F^^r /ra\ nn,i6i^^ llf.llt/-dta et lmpact Assessment (la) Division Ministry of Environment, Forests & Climate Change, S f,x. lndira Paryavaran Bhawan, Aliganj, Jor Bagh Road, New Delhi Kind Attention : Subject : Reference Dear Sir, Mr. Lalit Bokolia (Director) l;.* ffi''g* (ifaprit, 2ol <) z"t -,.,\ t 7'\ Submission of revised EIA-EMP reoort for Environmental Clearance for our proposed expansion project for the manufacturing of Synthetic Organic Resin 1. F. No. J-11011t lA ll (l) 2. Minutes for 34'" EAC (lndustry 2) meeting held on We would like mentioned here that presentation for the final appraisal of our proposed expansion project for the manufacturing of Synthetic Organic Resin was held during 34'" EAC (lndustry 2) meeting held on During the meeting it was advised to incorporate the following in the EIA-EMP report and submit the same for appraisal; 1. Reexamining / rechecking of all the ambient air quality data as the same was not properly documented: The ambient air quality data were properly documented in the Chapter-3 of EIA report. However, there was typographical error in the air quality data mentioned in oresentation conducted on and further we assure that it will be taken care in future. Details of wastewater treatment scheme: The details of Effluent Treatment Plant with the flow diagram and treatment scheme are incorporated in Section 2.11 of Chapter-2 of EIA report. lnlet and Outlet characteristics of waste water: The characteristics of raw effluent and treated effluent are incorporated in the Section 2.11 of Chapter-z of EIA report. Point wise response to public hearing issues: The crux of the Public Hearing was already given in the Chapter - 10 of EIA report and the whole documents of Public Hearing Proceedings comprising public point wise response to public hearing issues were also given as an Annexure-20 with the EIA report. However, during presentation conducted on only crux of the Public Hearing covering public hearing issues and response given was mentioned without the name of participant. We, further, assure that it will be taken care in future.

2

3 FINAL REPORT ON ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED EXPANSION OF UNSATURATED POLYESTER RESIN & ALKYD RESIN MANUFACTURING (FROM 1200 TPM TO 3500 TPM) NATURAL PETROCHEMICALS PVT. LTD. S No. 443, Village: Bhimasar, Anjar-Bhimasar Road, Taluka: Anjar, District: Kutch, Gujarat. Prepared By: (QCI-NABET ACCREDITED EIA CONSULTANT) 3 rd Floor, Akashganga Complex, B/s. Suvidha Shopping Centre, Nr. Parimal Underpass, Paldi, AHMEDABAD , Gujarat. Telefax: (079) , ; envisafe@gmail.com April, 2015

4 EIA-EMP REPORT

5 TABLE OF CONTENTS Contents List of Tables List of Figures List of Annexure List of Abbreviations List of Symbols / Notations Copy of TOR issued by MoEF TOR Compliance i vii x xii xiii xiv xv xxi CONTENTS SR. NO. TITLE PAGE NO. CHAPTER 1: INTRODUCTION 1.1 Preamble Promoters & their Background Need of the EIA study Objectives of EIA Study Purpose of EIA Study Structure of Report Regulatory Framework 1.6 CHAPTER 2: PROJECT DESCRIPTION 2.1 Preamble Justification of the Project Project Location Justification of site selection Product Profile 2.7 Table of Contents Page i

6 SR. NO. TITLE PAGE NO. 2.6 Manufacturing Process Solvent Requirements & Recovery System Details of Raw materials Energy Balance Resource Requirements Land Machineries & Utilities Capital Cost Power / Electricity Water Fuel Man Power Pollution Potential & Management Water Pollution Air Pollution Hazardous waste Noise & Vibration 2.29 CHAPTER 3: BASELINE ENVIRONMENTAL STATUS 3.1 Preamble Approach & methodology of baseline study Study Area Study Period Sampling Location Frequency of Monitoring Method of Sampling & Analysis Baseline environment Topography & Geology Seismology Land use Pattern Meteorology 3.10 Table of Contents Page ii

7 SR. NO. TITLE PAGE NO Temperature Humidity Cloudiness Wind Speed & Wind Direction Rainfall Mixing Height Micrometeorology Ambient Air Quality Hydrology Soil Quality Noise Level Ecological Status Flora Fauna Socio-economic Structure Population Growth Literacy Occupational Structure Infrastructural Facilities 3.38 CHAPTER- 4: ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES 4.1 Preamble Identification of Environmental Impacts Construction Phase Operation Phase Prediction of Environmental Impacts Impacts During Construction Phase and Its Mitigative Measures Impacts During Operation Phase and Its Mitigative Measures Water Environment Air Environment Land/ Soil Environment 4.23 Table of Contents Page iii

8 SR. NO. TITLE PAGE NO Noise Environment Ecological Environment Aesthetic Environment Socio-Economic Environment 4.26 CHAPTER 5: ENVIRONMENTAL MANAGEMENT PLAN (EMP) 5.1 Preamble Objectives of the EMP Environmental Management Plan (EMP) Greenbelt Development Plan Rainwater Harvesting System Application Of Cleaner Production Technology Pollution Prevention Water Conservation Energy Conservation Reuse / Recycle Good Housekeeping Budgetary Allocation for Environment protection 5.13 CHAPTER 6: ENVIRONMENTAL MONITORING PROGRAM 6.1 Preamble Monitoring Program Infrastructural requirement & procurement schedules Corporate Environmental Responsibility Environment management cell Administrative actions & documentation Data Analysis Reporting Schedules Environmental Monitoring Expenditure 6.7 CHAPTER 7: ANALYSIS OF ALTERNATIVES (TECHNOLOGY & SITE) 7.1 Table of Contents Page iv

9 SR. NO. TITLE PAGE NO. CHAPTER 8: RISK AND SAFETY MANAGEMENT 8.1 Preamble Objective, philosophy and methodology of risk assessment Objective Philosophy Methodology Hazardous material, process & safety management Hazardous Chemicals Safety measures for transportation, storage & handling of 8.5 chemicals Critical safety measures for process units Safety Measures For Preventive Maintenance Safety measures to prevent spillage / leakage of toxic chemicals Occupational Health & Safety Program Risk assessment study Identification of High Risk Areas Modes of Failure Maximum Credible Accident Analysis and Its Mitigation Measures Consequences Analysis Definitions & Explanation of Terms Used Possible Accident Scenario Risk Mitigative Measures Fire Fighting System Emergency Management Onsite Emergency Plan And Disaster Management Plan Emergency Control Centre Assembly Points Codification of Sirens Training and Education Mock Rehearsal 8.34 Table of Contents Page v

10 [ Environmental Impact Assessment (EIA) Report SR. NO. TITLE PAGE NO Updating the Plan Key Personnel & their Responsibilities Emergency Organization Chart Emergency Action Plan Offsite Emergency Plan Earthquake History & Management Plan Landslide Hazard Map & Mitigation Plan 8.51 CHAPTER 9: PROJECT BENEFITS 9.1 Employment Opportunities Corporate Social Responsibility (CSR) & Socio-economic Development Direct Revenue Earning to the National and State Exchequer Infrastructural benefit Other tangible Benefits 9.5 CHAPTER 10: PUBLIC CONSULTATION 10.1 CHAPTER 11: PROJECT SUMMARY & CONCLUSION 11.1 Salient Features of the Project Conclusion 11.3 CHAPTER 12: DISCLOSURE OF CONSULTANT 12.1 Table of Contents Page vi

11 LIST OF TABLES TABLE PAGE TITLE NO. NO. 1.1 Promoters & Their Background Structure of EIA Report Applicable Regulatory Provision for Proposed Expansion Project Salient features of the project site List of Products & Production Capacity Details of Products List of Raw Materials with Requirement Details of Products & Raw Materials storage & Handling Energy Balance of Thermic Fluid Heater Break-up of Area Details of Machineries and Utilities Capital Cost of the project Details of Fuel requirement Details of Manpower Requirement Product wise Water Consumption & Wastewater Generation Category wise Water Consumption & Wastewater Generation Details of Effluent Treatment Plant Stage-wise Characteristics of Effluent Details of Flue Gas Stacks Technical Specifications of Air Pollution Control Equipment Details of Hazardous waste generation and management Sampling & Monitoring Locations Frequency of Environmental Monitoring and Method of Sampling & Analysis Land Use Pattern of the Study Area Meteorological Parameters Ambient Air Quality Status Details of Nearby Wells Physico-Chemical Characteristics of Water Physico-Chemical Characteristic of Soil 3.24 Table of Contents Page vii

12 TABLE PAGE TITLE NO. NO. 3.9 Noise Level in Study Area Enumeration of Flora in the study area List of Flora in the study area List of Fauna in the study area Socio economic profile (a) Identification of Impacts during Construction Phase (b) Identification of Impacts during Operation Phase (a) Prediction of Impacts during Construction Phase (b) Prediction of Impacts during Operation Phase Impacts & its Mitigative Measures during Construction Phase Details of Stacks emission due to proposed expansion First Three Highest 24-Hourly Average GLC Values First Highest 24-Hourly Average GLC Values for AAQM Stations Incremental ground level concentration of pollutants Environmental management plan Details of plant species Estimation of availability of yearly runoff Recurring cost for environmental management Environmental Monitoring Program Details of Hospitals Tie-up for Medical Assistance Responsibilities of EMC Details of Hazardous Chemicals Details of Personal Protective Equipments Storage details of hazardous chemicals Threshold values of the Hazardous Chemicals Atmospheric Conditions Assumed Source Strength considered for Styrene Monomer Threat zone of toxic liquid concentration Flammable area of vapor cloud Threat zone of thermal radiation from pool fire Threat zone of thermal radiation from BLEVE Source Strength considered for Xylene 8.22 Table of Contents Page viii

13 TABLE PAGE TITLE NO. NO Toxic Threat zone Flammable area of vapor cloud Threat zone of thermal radiation from pool fire Threat zone of thermal radiation from BLEVE Details of Fire Extinguishers List of Fire Fighting & Rescue Squad Members CSR Activities Carried Out by Unit CSR Plan towards Enterprise Social Commitment 9.4 Table of Contents Page ix

14 LIST OF FIGURES FIGURE PAGE TITLE NO. NO. 2.1 Location Map of Project Site Key Infrastructure & Administrative Map of Study Area Google Map showing Project site and surrounding area in 20 Km Google map showing Project site and nearby industries Key Plan & Plant Lay-out Water Balance Diagram (After Proposed Project) Schematic Diagram of Effluent Treatment Plant Map of Study Area showing Sampling & Monitoring Locations Satellite Image of the Study Area Land use / Land Cover Map of the Study Area Wind Rose Diagram Map showing hydrology of the study area Map of Study Area Showing Population Distribution Map of Study Area showing population literacy rate Map of Study Area showing workers distribution Contour plot showing highest Incremental GLC for PM Contour plot showing highest Incremental GLC for SO Contour plot showing highest Incremental GLC for NOx Beneficial Impacts due to the Project Typical Cross Section of Rain Water Harvesting Pit Environment Health & Safety Policy Environmental management cell Source Strength in case of Styrene Monomer escapes Isopleths result of Toxic threat at a point for Styrene Monomer Source Strength in case of Styrene Monomer escapes (Pool Fire) Thermal radiation at a point in case of Styrene Monomer escapes (Pool Fire) Isopleths result of threat zone of thermal radiation from BLEVE Source Strength in case of Xylene escapes 8.23 Table of Contents Page x

15 FIGURE PAGE TITLE NO. NO. 8.7 Isopleths result of toxic threat at a point for Xylene Source Strength in case of Xylene escapes (Pool Fire) Isopleths result of threat zone of thermal radiation from BLEVE Plant Emergency Evacuation Plan Seismic Zone Map of Gujarat Landslide Hazard Zonation Map of India 8.52 Table of Contents Page xi

16 LIST OF ANNEXURES ANNEXURE NO. TITLE PAGE NO. 1. No Objection Certificate (NOC/ CTE) from GPCB for the existing A-2 unit 2. Consent to Operate (CTO/CCA) from GPCB for the existing unit A-5 3. Compliance report of NOC/CTE A Certified copy of compliance status of CTO from GPCB A The questionnaire for industry sector specified by MoEF A Land possession documents A NA Certificate for the acquired land A List of industries in nearby area A Permission of water supply from GWIL A Membership certificate of Common Hazardous Waste A-47 Management Facility 11. AAQ monitoring results A Gaseous emissions reports of NABL approved laboratory and A-56 recent monitoring reports from SPCB 13. Medical Examination Report of workers A Format for maintaining occupational health records of workers A Photographs Showing (a) Existing plant A-67 (b) Greenbelt area A-68 (c) Proposed expansion area A-69 (d) ETP and Hazardous waste storage area A-70 (e) Safety management in existing plant A Photographs of baseline monitoring during EIA study A National Ambient Air Quality standards A Drinking Water Specification as per IS:10500:2012 A Ambient Air Quality standards in respects of noise A Public Hearing Proceeding A-81 Table of Contents Page xii

17 LIST OF ABBREVIATIONS AAQM APHA APCM APTI BDL CP CPCB CHWIF CSR EAC EIA EC EHS EMP EMS EPA ETP DMP GLC GOI GPCB HAZOP IMD IS ISCST ISO MOC MoEF MSL MSDS NH NOC : Ambient Air Quality Monitoring : American Public Health Association : Air Pollution Control Measure : Air Pollution Tolerance Index : Below Detectable Limit : Cleaner Production : Central Pollution Control Board : Common Hazardous Waste & Incineration facility : Corporate Social Responsibility : Expert Appraisal Committee : Environmental Impact Assessment : Environment Clearance : Environment, Health & Safety : Environment Management Plan : Environment Management System : Environmental Protection Act : Effluent Treatment Plant : Disaster Management Plan : Ground Level Concentration : Government of India : Gujarat Pollution Control Board : Hazard & Operability Study : Indian Metrological Data : Indian Standard : Industrial Source Complex Short term : International Standard Organization : Material Of Construction : Ministry of Environment & Forest : Mean Sea Level : Material Safety Data Sheets : National Highway : No Objection Certificate Table of Contents Page xiii

18 OSHA PAC PM PPEs RA TOR TSDF TDS : Occupational Safety And Health Administration : Poly Aluminum Chloride : Particulate Matter : Personal Protective Equipments : Risk Assessment : Terms of Reference : Treatment, Storage and Disposal Facility : Total Dissolved Solid LIST OF SYMBOLS / NOTATIONS C : Degree Celsius db(a) : Decibels(A-Weighted) gm/cc : Gram per Cubic Centimeter Kcal/ Hr : Kilo Calorie per Hour KVA : Kilo Volts Ampere KLD : Kilo Liters per Day KW : Kilo Watt m : meters m/s : Meters per Second mg/lit : Milligram/ Liters mg/m 3 : Milligram/cube meter of air MW : Mega Watt µg/m 3 : Microgram/cube meter of air µs : Microgram second NO X : Oxides of Nitrogen ppm : Parts per Million SO 2 : Sulphur dioxide Sq.km : Square kilometer Sqm : Square Meter TPM : Tonne per Month Table of Contents Page xiv

19 COPY OF TOR ISSUED BY MoEF

20 Terms of Reference (TOR) Page xv

21 Terms of Reference (TOR) Page xvi

22 Terms of Reference (TOR) Page xvii

23 Terms of Reference (TOR) Page xviii

24 Terms of Reference (TOR) Page xix

25 This page has been left intentionally blank Terms of Reference (TOR) Page xx

26 TOR COMPLIANCE

27 COMPLIANCE OF TOR TOR No. TOR Points Compliance Status 1. Executive summary of the project Separately provided with the EIA report 2. Photographs of the existing and Refer Annexure-15 (a) proposed plant area 3. Compliance to the conditions stipulated The existing unit was not covered under in the Environmental Clearance / NOC the old EIA Notification-1994 prevalent granted by the SPCB. at the time of its establishment and hence Environmental Clearance was not obtained by the unit. 4. A certified copy of the report of the status of compliance of the conditions stipulated in the environmental clearance and Consent to Operate for the ongoing existing operation of the project by the Regional Office of the Ministry of Environment and Forests and SPCB. 5. Recent monitoring report from SPCB, which shall include data on AAQ, water quality, solid waste etc. shall be submitted. 6. Has the unit received any notice under the Section 5 of Environment (Protection) Act, 1986 or relevant Sections of Air and Water Acts? If so, compliance to the notice(s) Refer Annexure-1 & 3 for Copy of NOC & Compliance report of NOC respectively. Refer Annexure-4 for the certified copy of the compliance report of CTO from Gujarat Pollution Control Board (GPCB) for our existing plant and recommendation for our proposed project. The existing unit was not covered under the old EIA Notification-1994 prevalent at the time of its establishment and hence Environmental Clearance was not obtained by the unit. Therefore unit does not require to obtain certified compliance report of the conditions stipulated in the environmental clearance for the ongoing existing operation of the project by the Regional Office of the MEF&CC. Refer Chapter-1, Section-1.7 Refer Annexure-12 for monitoring report from GPCB as well as NABL approved laboratory. No such notice has been received in last two years 7. A line diagram/flow sheet for the Refer Chapter-2, Section-2.6 and Compliance of TOR Page xxi

28 TOR No. TOR Points Compliance Status process and EMP Chapter-5 8. The earlier questionnaire for industry Refer Annexure-5 sector should be submitted while submitting EIA/EMP. 9. A site location map on Indian map of Refer Chapter-2, Figure-2.1, 2.2, 2.3 & 1:10,00,000 scale followed by 1:50,000/ 2.4 (Pg. No. 2.3, 2.4, 2.5 & 2.6) 1:25,000 scale on an A3/A2 sheet with at least next 10 kms of terrains i.e. circle of 10 kms and further 10 kms on A3/A2 sheets with proper longitude /latitude /heights with min. 100/200 m. contours should be included. 3-D view i.e. DEM (Digital Elevation Model) for the area in 10 km radius from the proposal site. 10. Present land use should be prepared based on satellite imagery. Highresolution satellite image data having 1m-5m spatial resolution like quick bird, Ikonos, IRS P-6 pan sharpened etc. for the 10Km radius area from proposed site. The same should be used for land used/land-cover mapping of the area. 11. Location of national parks / wildlife sanctuary / reserve forests within 10 km. radius should specifically be mentioned. A map showing land use / land cover, reserved forests, wildlife sanctuaries, national parks, tiger reserve etc. in 10 km of the project site. 12. Project site layout plan to scale using AutoCAD showing raw materials, fly ash and other storage plans, bore well or water storage, aquifers (within 1 km.) dumping, waste disposal, green areas, water bodies, rivers/drainage passing through the project site should be included. 13. Details and classification of total land (identified and acquired) should be included. Refer Chapter-3, Section-3.3.3, Figure- 3.3 (Pg. No. 3.9) There is no national parks / wildlife sanctuary / reserve forests within 10 Km radius areas from the Plant Site. For land use/ land cover Refer Chapter-3, Section-3.3.3, Figure-3.3 (Pg. No. 3.9) Refer Chapter-2, Section , Figure-2.5 (Pg. No. 2.17) Proposed expansion will be carried out within the existing premises having an total area of 42,290 sqmt. For the area break-up and plant lay-out refer Chapter-2, Section , Figure-2.5 Compliance of TOR Page xxii

29 TOR No. TOR Points 14. Proposal should be submitted to the Ministry for environment clearance only after acquiring total land. Necessary documents indicating acquisition of land should be included. 15. A list of industries containing name and type in 10 km radius shall be incorporated. 16. List of raw material required and source along with mode of transportation should be included. All the trucks for raw material and finished product transportation must be Environmentally Compliant. 17. Manufacturing process details for the synthetic chemicals unit should be included. 18. Mass balance for the raw material and products should be included. 19. Energy balance data for all the components should be incorporated. 20. Site-specific micro-meteorological data using temperature, relative humidity, hourly wind speed and direction and rainfall should be collected. 21. Sources of secondary emissions, its control and monitoring as per the CPCB guidelines should be included. A full chapter on fugitive emissions and (Pg. No. 2.17) Compliance Status Refer Annexure-6 & 7 for land possession documents and NA permission respectively. Proposed expansion will be carried out within the existing premises having an total area of 42,290 sqmt. No additional land will be required for the proposed expansion. Refer Annexure-6 & 7 for land possession documents and NA permission for the acquired land. Refer Annexure-8 for the list of industries and refer Figure 2.4 (Pg. No. 2.6) for Google map showing nearby industries Refer Chapter-2, Section-2.8 Refer Chapter-2, Section-2.6 Refer Chapter-2, Section-2.6 Unit has made all the necessary provisions in existing plant for energy conservation and unit is also planning to conduct energy audit regularly after the proposed expansion. Refer Chapter-2, Section-2.9 for energy balance Refer Chapter-3, Section Refer Chapter-2, Section and Chapter-4, Section (C) Compliance of TOR Page xxiii

30 TOR No. TOR Points control technologies should be provided. 22. An action plan to control and monitor secondary fugitive emissions from all the sources as per the latest permissible limits issued by the Ministry vide G.S.R. 414(E) dated 30th May, Compliance Status G.S.R. 414(E) dated 30th May, 2008 is for Sponge Iron Plant whereas this is an existing synthetic organic resins manufacturing unit and intend to do expansion in existing production capacity and therefore, this is not applicable to this unit. However, unit has taken all the adequate measures to control the fugitive emissions as described in Chapter-4, Section-4.5.2(C) 23. Vehicular pollution control and its Refer Chapter-4, Section-4.5.2(C) and management plan should be submitted. Chapter-5, Section Ambient air quality at 8 locations within Refer Chapter-3, Section the study area of 10 km aerial coverage from project site with one AAQMS in downwind direction should be carried out. 25. Determination of atmospheric inversion Refer Chapter-3, Section and level at the project site and assessment Chapter-4, Section of ground level concentration of pollutants from the stack emission based on site-specific meteorological features. 26. Air quality modeling for all the plants proposed for specific pollutants needs to be done. APCS for the control of emissions within 50 mg/nm3 should be included. 27. Action plan to follow National Ambient Air Quality Emission Standards issued by the Ministry vide G.S.R. No. 826(E) dated 16th November, 2009 should be included. 28. Ambient air quality monitoring should be included for the day (24 hrs) for maximum GLC along with following : i. Emissions (g/second) with and without the air pollution control measures ii. Meteorological inputs (wind speed, Refer Chapter-4, Section and Chapter-2, Section Refer Chapter-4, Section Refer Chapter-3, Section & 3.3.6; Chapter-4, Section and Chapter-8, Section 8.4 Compliance of TOR Page xxiv

31 TOR No. TOR Points m/s), wind direction, ambient air temperature, cloud cover, relative humidity iii. Model input options for terrain, plume rise, deposition etc. iv. Print-out of model input and output on hourly and daily average basis v. A graph of daily averaged concentration (MGLC scenario) with downwind distance at every 500 m interval covering the exact location of GLC. vi. Details of air pollution control methods used with percentage efficiency that are used for emission rate estimation with respect to each pollutant vii. Applicable air quality standards as per LULC covered in the study area and % contribution of the proposed plant to the applicable Air quality standard. In case of expansion project, the contribution should be inclusive of both existing and expanded capacity. viii. No. I-VII are to be repeated for fugitive emissions and any other source type relevant and used for industry ix. Graphs of monthly average daily concentration with down-wind distance x. Specify when and where the ambient air quality standards are exceeded either due to the proposed plant alone or when the plant contribution is added to the background air quality. xi. Fugitive dust protection or dust reduction technology for workers within 30 m of the plant active areas. Compliance Status Compliance of TOR Page xxv

32 TOR TOR Points Compliance Status No. 29. Impact of the transport of the raw Refer Chapter-4, Section materials and end products on the surrounding environment should be assessed and provided. 30. One season data for gaseous emissions Refer Annexure-12 other than monsoon season is necessary. 31. Presence of aquifer(s) within 1 km of the Refer Chapter-3, Section and project boundaries and management Chapter-5, Section-5.5 plan for recharging the aquifer should be included. 32. Source of surface/ground water level, site (GPS), cation, anion (Ion Chromatograph), metal trace element (as above) chemical analysis for water to be used along with a Piper and Piper Duro-V diagram. If surface water is used from river, rainfall, discharge rate, quantity, drainage and distance from project site should also be included. 33. Ground water analysis with bore well data, litho-logs, drawdown and recovery tests to quantify the area and volume of aquifer and its management. 34. Action plan for rainwater harvesting measures at plant site should be submitted to harvest rainwater from the roof tops and storm water drains to recharge the ground water and also to use for the various activities at the project site to conserve fresh water and reduce the water requirement from other sources. Rain water harvesting and groundwater recharge structures may also be constructed outside the plant premises in consultation with local Gram Panchayat and Village Heads to augment the ground water level. Compliance of TOR Page xxvi Refer Chapter-3, Section Source of water for the existing unit as well as proposed expansion is Narmada water supplied through pipeline by Gujarat Water Infrastructure Ltd. Refer Chapter-3, Section Source of water for the existing unit as well as proposed expansion is Narmada water supplied through pipeline by Gujarat Water Infrastructure Ltd. No ground water is used for any purpose in existing unit and this practice will also be followed after proposed expansion also. Refer Chapter-5, Section-5.5

33 TOR No. TOR Points Incorporation of water harvesting plan for the project is necessary, if source of water is bore well. 35. Permission for the drawl of water from the concerned authority and water balance data including quantity of effluent generated, recycled and reused and discharged is to be provided. Methods adopted/to be adopted for the water conservation should be included. 36. Surface water quality of nearby River (60 m upstream and downstream) and other surface drains at 8 locations must be ascertained. 37. If the site is within 10 km radius of any major river, Flood Hazard Zonation Mapping is required at 1:5000 to 1;10,000 scale indicating the peak and lean river discharge as well as flood occurrence frequency. 38. Ground water monitoring minimum at 8 locations and near solid waste dump zone. Geological features and Geohydrological status of the study area are essential as also. Ecological status (Terrestrial and Aquatic) is vital. 39. Detailed description of the flora and fauna (terrestrial and aquatic) should be given with special reference to rare, endemic and endangered species. 40. Action plan for the green belt development plan in 33 % area should be included. The green belt should be around the project boundary and a scheme for greening of the travelling roads should also be incorporated. All rooftops/terraces should have some Compliance Status Refer Annexure-9 for permission of water. For water balance data refer Chapter-2, Section For water conservation methods, refer Chapter-5, Section-5.5 & There is not any perennial river, reservoir etc in the study area. However, in certain villages, ponds have been seen during study period from which water samples have been collected to find out the water quality as a part of baseline study. Refer Chapter-3, Section No major perennial river exists within the study area. Refer Chapter-3, Section & For ecological status, refer Chapter-3, Section Refer Chapter-3, Section Refer Chapter-5, Section-5.4 Compliance of TOR Page xxvii

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed

More information

Sir, 1. Executive summary of the project 2. Photographs of the proposed plant area. 3. Copies of iron ore/coal linkage documents

Sir, 1. Executive summary of the project 2. Photographs of the proposed plant area. 3. Copies of iron ore/coal linkage documents F. No. J-11011/218/2013-IA-II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail:gkk37@rediffmail.com Tele fax:

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

Annexure-A. No additional land used. acquired for any activity of project without obtaining proper permission. v For controlling fugitive natural dust

Annexure-A. No additional land used. acquired for any activity of project without obtaining proper permission. v For controlling fugitive natural dust Annexure-A Compliance Report SEAC 2010/CR.824/TC-2 Dated 02/11/2011 Reporting Date : 27/06/2014 Manufacture of alpha Pinene, Beta Pinene, Limonene and byproducts by way of backward integration at MIDC,

More information

Dated: 27 th June 2014

Dated: 27 th June 2014 To Shri T.N. Venkatesh, I.A.S, CEO M/s. Tamil Nadu Cements Corporation Ltd. 2 nd Floor, LLA Building, 735 Anna Salai, Chennai-600002, Tamil Nadu. Email: co@tancem.com Fax: 044 28523991 F. No. J-11011/83/2014-IA-II

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

BHARAT PETROLEUM CORPORATION LIMITED

BHARAT PETROLEUM CORPORATION LIMITED TERMS OF REFERENCE (TOR) FOR CARRYING OUT ENVIRONMENT IMPACT ASSESSMENT (EIA) FOR BPCL- KOCHI REFINERY MS BLOCK PROJECT AT KOCHI, KERALA PROPONENT: BHARAT PETROLEUM CORPORATION LIMITED 1.0 INTRODUCTION

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

TERMS OF REFERENCE FOR THE RAPID EIA STUDY TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment

More information

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the following: 1 Executive summary of the project giving a

More information

PROPOSED TOR FOR EIA STUDY

PROPOSED TOR FOR EIA STUDY JAWAHARPUR VIDYUT UTPADAN NIGAM LIMITED 2x660 MW JAWAHARPUR THERMAL POWER PROJECT JAWAHARPUR, DISTRICT ETAH, UTTAR PRADESH PROPOSED TOR FOR EIA STUDY SEPTEMBER- 2015 DESEIN PRIVATE LIMITED CONSULTING ENGINEERS

More information

TORs for proposed EIA & RA study

TORs for proposed EIA & RA study TORs for proposed EIA & RA study 1. The EIA study for the proposed project shall be carried out based on the latest environmental quality status around the project site (10 km radial distance) for one

More information

(IV) Proposed Terms of Reference for EIA Studies

(IV) Proposed Terms of Reference for EIA Studies ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN 1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:

More information

Compliance to the Environmental Clearance Conditions Sl, No Specific Conditions Compliance to the conditions 1 The gaseous emissions (S0x, NOx,.& HCL) particulate The gaseous emissions (S0x, NOx,.& matter

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS

More information

No. J-11015/290/2013-IA.II(M) GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT AND FORESTS IA-II (Coal-Mining) Division

No. J-11015/290/2013-IA.II(M) GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT AND FORESTS IA-II (Coal-Mining) Division No. J-11015/290/2013-IA.II(M) GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT AND FORESTS IA-II (Coal-Mining) Division Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi- 110 003 To The Managing Director

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

PRE- FEASIBILITY STUDY REPORT

PRE- FEASIBILITY STUDY REPORT PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66

More information

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite

More information

Description of Condition. Status of compliance. Natural Gas/ RNLG shall be used as fuel for the power plant. (No change in fuel is envisaged)

Description of Condition. Status of compliance. Natural Gas/ RNLG shall be used as fuel for the power plant. (No change in fuel is envisaged) Status of Compliance of the stipulated conditions of the Environment Clearance No. J 13012/36/2011-IA.II (T) Dt. October 21, 2011 Period from June, 2011 to Nov., 2011 A. Specific Conditions Condition No.

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION EUROPEAN COMMISSION Brussels, XXX [ ] (2013) XXX draft Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION Providing minimum principles for the exploration and production of hydrocarbons (especially

More information

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At Final Plot No. 1274, situated at T.P.S. IV, Mahim, Hatiskar Marg, Prabhadevi, Mumbai 400 025. EXECUTIVE SUMMARY PREPARED

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING

More information

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT 29.00 WASTE RECOVERY SYSTEM Plant 3 (proposed ) YARD INCINERATOR 3 (proposed ) WASTE RECOVERY SYSTEM Plant 1 INCINERATOR 1 45 46 INCINERATOR 2 WASTE RECOVERY SYSTEM PLANT 2 3 NOS STORAGE TANKS AQUEOUS

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

CONTENTS. S. NO. PARTICULARS PAGE NO. A. TOR LETTER & TOR COMPLIANCE 1. ToR Letter 1-6 2. ToR Compliance 7-20

CONTENTS. S. NO. PARTICULARS PAGE NO. A. TOR LETTER & TOR COMPLIANCE 1. ToR Letter 1-6 2. ToR Compliance 7-20 CONTENTS S. NO. PARTICULARS PAGE NO. A. TOR LETTER & TOR COMPLIANCE 1. ToR Letter 1 6 2. ToR Compliance 7 20 B. FINAL EIA / EMP REPORT Chapter I Introduction 21 27 Chapter II Project Description 28 40

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description Birmingham City University / Students Union and Impacts Register Waste Production of non - hazardous waste Production of hazardous waste Storage of non - hazardous waste Potential for waste to be disposed

More information

M/s. Anjaniya Industries Plot No. 37/A, AKVNL, Industrial Area, Meghnagar, Dist: Jhabua, Madhya Pradesh.

M/s. Anjaniya Industries Plot No. 37/A, AKVNL, Industrial Area, Meghnagar, Dist: Jhabua, Madhya Pradesh. M/s. Anjaniya Industries Plot No. 37/A, AKVNL, Industrial Area, Meghnagar, Dist: Jhabua, Madhya Pradesh. ENVIRONMENTAL IMPACT & RISK ASSESMENT REPORT FOR PROPOSED SPECIALTY CHEMICAL PLANT AT MEGHNAGAR,

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION. PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION. PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI OF ABDUL MUNAF ABDUL KADAR SHAIKH (50 MT/DAY) (0-28-50 Hectors)

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT

More information

The Ministry of Environment and Forest says No Discharge from Red Mud Pond in Lanjigarh

The Ministry of Environment and Forest says No Discharge from Red Mud Pond in Lanjigarh The Ministry of Environment and Forest says No Discharge from Red Mud Pond in Lanjigarh In response to allegations raised by certain groups claiming leakage from the Red Mud Pond at the Alumina refinery

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Rojnaguda Stone Quarry In Kalahandi district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) ENVIRONMENTAL MANAGEMENT PLAN Of Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) at Khasra Nos. 1353Min,1354Min,1355, 1356, 1358, 1357, 1587 Ka, 1587Kha,

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur

More information

Concept of Environmental Accounting and Practice in India

Concept of Environmental Accounting and Practice in India A C C O U N T I N G Concept of Environmental Accounting and Practice in India Dr. Mukesh Chauhan (The author is a Lecturer in Commerce at Mahatma Gandhi, Govt. Arts College, Mahe (Pondicherry). He can

More information

F.N. J-11011/80/2012-IA.II(I) Government of India Ministry of Environment, Forest & Climate Change. Dated: 27 th February, 2015

F.N. J-11011/80/2012-IA.II(I) Government of India Ministry of Environment, Forest & Climate Change. Dated: 27 th February, 2015 F.N. J-11011/80/2012-IA.II(I) Government of India Ministry of Environment, Forest & Climate Change Indira Paryavaran Bhawan Jor Bagh Road, Ali Ganj, New Delhi 110003 E-mail: satish.garkoti@nic.in Tele

More information

Environmental guidelines for preparation of an Environment Management Plan

Environmental guidelines for preparation of an Environment Management Plan Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use

More information

TERMS OF REFERENCES (TOR) ASBESTOS CEMENT SHEET MANUFACTURING UNIT PROPOSED EXPANSION CAPICITY FROM 120,000 TPA to 320,000 TPA

TERMS OF REFERENCES (TOR) ASBESTOS CEMENT SHEET MANUFACTURING UNIT PROPOSED EXPANSION CAPICITY FROM 120,000 TPA to 320,000 TPA VISAKA INDUSTRIES LIMITED TERMS OF REFERENCES (TOR) ASBESTOS CEMENT SHEET MANUFACTURING UNIT PROPOSED EXPANSION CAPICITY FROM 120,000 TPA to 320,000 TPA Proposed Capacity : 200000 TPA Phase 1 : 40000 TPA

More information

GUIDANCE DOCUMENT FOR PREPARATION AND SUBMISSION OF ENVIRONMENTAL MANAGEMENT PLAN (EMP) 1.0 INTRODUCTION TO GUIDANCE DOCUMENT

GUIDANCE DOCUMENT FOR PREPARATION AND SUBMISSION OF ENVIRONMENTAL MANAGEMENT PLAN (EMP) 1.0 INTRODUCTION TO GUIDANCE DOCUMENT GUIDANCE DOCUMENT FOR PREPARATION AND SUBMISSION OF ENVIRONMENTAL MANAGEMENT PLAN (EMP) A. THE GUIDANCE DOCUMENT 1.0 INTRODUCTION TO GUIDANCE DOCUMENT Environmental Management Plan (EMP) translates the

More information

Environmental Guidelines for Preparation of an Environmental Management Plan

Environmental Guidelines for Preparation of an Environmental Management Plan 2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block

More information

Published in "Official Gazette of the Republic of Macedonia" No. 67/2004 LAW ON AMBIENT AIR QUALITY I. GENERAL PROVISIONS

Published in Official Gazette of the Republic of Macedonia No. 67/2004 LAW ON AMBIENT AIR QUALITY I. GENERAL PROVISIONS Published in "Official Gazette of the Republic of Macedonia" No. 67/2004 LAW ON AMBIENT AIR QUALITY I. GENERAL PROVISIONS Article 1 Subject of regulation (1) This Law shall regulate the measures for avoidance,

More information

National Planning Policy for Waste

National Planning Policy for Waste National Planning Policy for Waste October 2014 Department for Communities and Local Government Crown copyright, 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,

More information

CHAPTER 24: ENVIRONMENTAL MANAGEMENT

CHAPTER 24: ENVIRONMENTAL MANAGEMENT Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document

More information

Climate and Disaster Resilience Index of Asian Cities

Climate and Disaster Resilience Index of Asian Cities Climate and Disaster Resilience Index of Asian Cities Coexistence of Contrast Rajib Shaw Professor, http://www.iedm.ges.kyoto-u.ac.jp/ Increasing Trend 4000 3500 Source: UNPD, 2010 3000 2500 2000 1500

More information

APPENDIX I. (See Paragraph-6) FORM 1

APPENDIX I. (See Paragraph-6) FORM 1 APPENDIX I (See Paragraph-6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the Project/s Dankari Granite Black Stone Quarry 2. Sl. in the schedule Sairat case no- 91/ 12-13 3. Proposed capacity

More information

URBAN LOCAL BODIES, HARYANA SHORT TERM TENDER

URBAN LOCAL BODIES, HARYANA SHORT TERM TENDER URBAN LOCAL BODIES, HARYANA SHORT TERM TENDER Urban Local Bodies, Haryana invites sealed tenders, under two envelop system, from eligible bidders for Integrated Web Based Software Development of various

More information

The Control of Major Accident Hazards Regulations (Northern Ireland) 2015

The Control of Major Accident Hazards Regulations (Northern Ireland) 2015 STATUTORY RULES OF NORTHERN IRELAND 2015 No. 325 HEALTH AND SAFETY The Control of Major Accident Hazards Regulations (Northern Ireland) 2015 Made - - - - 26th August 2015 Coming into operation - 28th September

More information

F. No. J-11011/43/2011-IA II (I) Government of India Ministry of Environment, Forest and Climate Change (Impact Assessment Division)

F. No. J-11011/43/2011-IA II (I) Government of India Ministry of Environment, Forest and Climate Change (Impact Assessment Division) F. No. J-11011/43/2011-IA II (I) Government of India Ministry of Environment, Forest and Climate Change (Impact Assessment Division) Indira Paryavaran Bhawan Jor Bagh Road, Ali Ganj, New Delhi - 110003

More information

APPENDIX I (See Paragraph -6) FORM I

APPENDIX I (See Paragraph -6) FORM I APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage

More information

TABLE OF CONTENTS CHAPTER NO. TITLE PAGE NO. ABSTRACT

TABLE OF CONTENTS CHAPTER NO. TITLE PAGE NO. ABSTRACT vii TABLE OF CONTENTS CHAPTER NO. TITLE PAGE NO. ABSTRACT LIST OF TABLES LIST OF FIGURES LIST OF SYMBOLS AND ABBREVIATIONS iii xvii xix xxvii 1 INTRODUCTION 1 1.1 GENERAL 1 1.2 OBJECTIVES AND SCOPE OF

More information

COASTAL APPLICATION FOR A MAJOR SITING PERMIT

COASTAL APPLICATION FOR A MAJOR SITING PERMIT Frank M. Rabauliman Administrator Commonwealth of the Northern Mariana Islands OFFICE OF THE GOVERNOR Bureau of Environmental and Coastal Quality Division of Coastal Resources Management Gualo Rai Center

More information

INDUSTRIAL POLLUTION CONTROL AND RISK MANAGEMENT QUESTIONNAIRE IPPC Directive

INDUSTRIAL POLLUTION CONTROL AND RISK MANAGEMENT QUESTIONNAIRE IPPC Directive INDUSTRIAL POLLUTION CONTROL AND RISK MANAGEMENT QUESTIONNAIRE IPPC Directive Legal reference Council Directive 96/61/EC of 24 September 1996 concerning integrated pollution prevention and control (Official

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

sustainability report

sustainability report sustainability report Sustainable development In the midst of turbulent macro-economic conditions adversely impacting the coal sector, we maintain our focus on building a business that has a viable, long-term

More information

GENCO HOLDING COMPANY LIMITED (GHCL) PROFORMA PC-II

GENCO HOLDING COMPANY LIMITED (GHCL) PROFORMA PC-II GENCO HOLDING COMPANY LIMITED (GHCL) PROFORMA PC-II HIRING OF CONSULTANTS FOR EIAs, PC-1 & BIDDING DOCUMENTS FOR COAL FIRED POWER PLANT 2X660 MW (Gross) AT LAKHRA, AND FEASIBILITY OF 1x660 MW (Gross) AT

More information

Proposed Terms of Reference (TOR) For

Proposed Terms of Reference (TOR) For Proposed Terms of Reference (TOR) For OBJECTIVE Environmental Impact Assessment of Proposed Delhi to Jaipur Expressway of 8/6/4 lanes ( Green Field Project) Terms of Reference (TOR) are proposed for preparation

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram

More information

KATHARINE HOUSE HOSPICE JOB DESCRIPTION. Advanced Nurse Practitioner (Independent Prescriber)

KATHARINE HOUSE HOSPICE JOB DESCRIPTION. Advanced Nurse Practitioner (Independent Prescriber) KATHARINE HOUSE HOSPICE JOB DESCRIPTION Advanced Nurse Practitioner (Independent Prescriber) Post Holder: Area of Work: Responsible to: Vacant Day Therapies Director of Nursing Services Mission To offer

More information

GUIDELINE FOR THE INSTALLATION AND OPERATION OF CONTINUOUS EMISSION MONITORING SYSTEMS (CEMS) AND THEIR USE FOR REPORTING UNDER THE PROVISIONS OF

GUIDELINE FOR THE INSTALLATION AND OPERATION OF CONTINUOUS EMISSION MONITORING SYSTEMS (CEMS) AND THEIR USE FOR REPORTING UNDER THE PROVISIONS OF GUIDELINE FOR THE INSTALLATION AND OPERATION OF CONTINUOUS EMISSION MONITORING SYSTEMS (CEMS) AND THEIR USE FOR REPORTING UNDER THE PROVISIONS OF REGULATION O.Reg. 127/01 Ontario Ministry of the Environment

More information

1311/P, Khata No-570. Mariwada Malkangiri Malkangiri. APPENDIX I (See Paragraph-6) FORM 1. Basic Information. S. No. Item Details

1311/P, Khata No-570. Mariwada Malkangiri Malkangiri. APPENDIX I (See Paragraph-6) FORM 1. Basic Information. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Mariwada Stone Quarry In Malkangiri district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

Prepared and Submitted by

Prepared and Submitted by Technical Feasibility Study Report of Proposed Sulfuric Acid and Phosphoric Acid Unloading Facilities, Acid Storage Tanks at the existing Wharf and Acid Transfer Pipeline Falling within the CRZ area &

More information

CHANDAM7AIL,P SAND DEPOSIT

CHANDAM7AIL,P SAND DEPOSIT 1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub

More information

Environment Impact Assessment of Thermal Power Plant for Sustainable Development

Environment Impact Assessment of Thermal Power Plant for Sustainable Development International Journal of Environmental Engineering and Management. ISSN 2231-1319, Volume 4, Number 6 (2013), pp. 567-572 Research India Publications http://www.ripublication.com/ ijeem.htm Environment

More information

(M/s. Sundaram Steels Pvt Ltd )

(M/s. Sundaram Steels Pvt Ltd ) EXECUTIVE SUMMARY For Expansion of existing DRI Kiln Plant from x90 TPD to 72,000 TPA (CC Billet) at B-7, Bokaro Industrial Area, Village Baldih, District Bokaro, Jharkhand (M/s. Sundaram Steels Pvt Ltd

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri

More information

TAMIL NADU POLLUTION CONTROL BOARD FORM I

TAMIL NADU POLLUTION CONTROL BOARD FORM I TAMIL NADU POLLUTION CONTROL BOARD FORM I Application for consent under Section 21 of the Air (Prevention and Control of Pollution) Act, 1981 as amended (Central Act 14 of 1981) (See Rule 7 of the Tamilnadu

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

SPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA

SPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA SPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA Regulated Substance Management: All Regulated Substances, including chemical wastes, are to be managed

More information

Half Yearly Compliance Report for the period from April 2013 to September 2013

Half Yearly Compliance Report for the period from April 2013 to September 2013 Half Yearly Compliance Report for the period from April 2013 to September 2013 Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka) EC to expansion of Cement Grinding Unit

More information

THE CORPORATION OF THE CITY OF COURTENAY BYLAW NO. 2182. A bylaw to amend Storm Sewer Bylaw No. 1402, 1986

THE CORPORATION OF THE CITY OF COURTENAY BYLAW NO. 2182. A bylaw to amend Storm Sewer Bylaw No. 1402, 1986 THE CORPORATION OF THE CITY OF COURTENAY BYLAW NO. 2182 A bylaw to amend Storm Sewer Bylaw No. 1402, 1986 The Council of the Corporation of the City of Courtenay in open meeting assembled enacts as follows:

More information

CRZ_Welspun India Ltd Page 1 of 8

CRZ_Welspun India Ltd Page 1 of 8 F.No.11-22/2015-IA-III Government of India Ministry of Environment, Forest & Climate Change (IA.IIISection) Indira Paryavaran Bhawan, Jor Bagh Road, New Delhi - 3 Dated: 9 th October, 2015 To M/s Welspun

More information

A clean energy solution from cradle to grave

A clean energy solution from cradle to grave Environmental Product Declaration A clean energy solution from cradle to grave Offshore wind power plant employing SWT-6.0-154 siemens.com / wind 2 Assessing the performance of a wind power plant The environmental

More information

The key points of the 2013 Annual Compliance Report are described fully in the following sections of this report:

The key points of the 2013 Annual Compliance Report are described fully in the following sections of this report: Introduction Snowy Hydro Limited (Snowy Hydro) relies on precipitation falling over the catchments of the Snowy Mountains to supply water for the production of hydro-electricity. Cloud seeding over this

More information

PROPASAL FROM FOR PUBLIC LIABILITY INSURANCE (For Industrial Risks and Storage Risks)

PROPASAL FROM FOR PUBLIC LIABILITY INSURANCE (For Industrial Risks and Storage Risks) PROPASAL FROM FOR PUBLIC LIABILITY INSURANCE (For Industrial Risks and Storage Risks) LIABILITY OF THE COMPANY DOES NOT COMMENCE UNTIL THE PROPOSAL HAS BEEN ACCEPTED AND THE PREMIUM PAID THE TERRITORIAL

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT In Respect Of MAHUMUHAN STONE MINE 9 OVER 2.00 ACRES (0.81 HECTARE) IN VILLAGE MAHUMUHAN, SORO TAHASIL OF BALASORE DISTRICT, ODISHA (FOR THE PERIOD: 2015 16 TO 2019 20) APPLICANT

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: Rakesh Kumar, Partner M/s Maluka Bricks Industry Village Maluka, Sub-Tehsil Bhagta Bhaika, Tehsil & District Bathinda. (Punjab) (M): 0-98141-22141 1 ACTIVITY 2 1. Construction,

More information

Development of Rural Drinking Water Security Plan A Case Study from Raipur Block, Bhilwara District, Rajasthan

Development of Rural Drinking Water Security Plan A Case Study from Raipur Block, Bhilwara District, Rajasthan Development of Rural Drinking Water Security Plan A Case Study from Raipur Block, Bhilwara District, Rajasthan Dr. B. K. Bhadra Scientist/Engr. SF Regional Remote Sensing Centre (RRSC-W) NRSC/ISRO, Dept.

More information