GUIDANCE DOCUMENT FOR PREPARATION AND SUBMISSION OF ENVIRONMENTAL MANAGEMENT PLAN (EMP) 1.0 INTRODUCTION TO GUIDANCE DOCUMENT
|
|
|
- Jerome Hardy
- 9 years ago
- Views:
Transcription
1 GUIDANCE DOCUMENT FOR PREPARATION AND SUBMISSION OF ENVIRONMENTAL MANAGEMENT PLAN (EMP) A. THE GUIDANCE DOCUMENT 1.0 INTRODUCTION TO GUIDANCE DOCUMENT Environmental Management Plan (EMP) translates the EIA approval conditions into action. The EMP is neither a report of another study nor a document which is descriptive in character. As a contrast, the EMP document states in explicit terms what actions will be taken, what measures will be instituted, what structures will be built, what will be installed, when the actions will be executed; etc. in order for the project activities to be compliant with the EIA approval conditions. The EMP is a concrete plan of action which is explicit, illustrative, action-oriented, time-bound and definitive. Eventhough the EMP exhibits all of the above characteristics, the EMP is by nature, a living document which needs to be revised and updated when there exists certain circumstances which demand changes to be made. These factors may include changes to project details and surrounding areas and inadequacy of the control measures to comply with regulatory standards. 2.0 OBJECTIVE OF GUIDANCE DOCUMENT The objective of the Guidance Document is to: Provide general guidance to consultants in the preparation of EMPs to be submitted to the DOE for approval. Pertinent aspects to be incorporated in the document are stipulated to ensure that the EIA approval conditions are translated into actionable items. 1
2 3.0 HOW TO GET STARTED Firstly the project proponent and the consultant who has been tasked to prepare the EMP should study and understand each of the EIA approval conditions. Secondly, for each of the approval conditions, whether they are administrative or physical in nature, identify actions required to be executed in order to comply with them. Thirdly, compute an estimated cost to be incurred for each of the executable actions. Fourthly, the project proponent needs to be thoroughly briefed on the executable actions to be undertaken and the cost implication. Later, the proponent also needs to make a declaration that all the actions stipulated in the EMP will be implemented (see paragraph C 1.0). The logical steps to be followed in the EMP preparation as outlined above are depicted in Figure 1. Step: Action by: 1 Study EIA approval condition s EMP preparer 2 Translate conditions into EMP preparer executable actions 3 Prepare cost estimate EMP preparer 4 Make declaration Project proponent 2
3 Figure 1: Typical steps in EMP Preparation B. THE ENVIRONMENTAL MANAGEMENT PLAN (EMP) The EMP shall at the minimum, contain the following chapters: chapter 1 to chapter 5. However, the depth of treatment and details discussed in chapter 5 shall be tailored to suit the individual project and the EIA approval conditions. 1.0 INTRODUCTION a. Project layout as approved in the Development Order by Local Authority. b. Project implementation schedule. c. Name of the EMP preparer and his consulting firm. 2.0 POLICY a. Company s corporate policy statement on environmental management and protection. 3.0 ORGANIZATIONAL STRUCTURE a. Organization chart of the company s top management with responsibilities on environmental management and protection (provide names, positions, mobile phone contact numbers and addresses). b. Name, mobile phone contact number and address of environmental manager, engineering consultant, contractor, site supervisor and industrial effluent treatment system (IETS)/air pollution control (APC) competent person (wherever relevant and available). 3
4 c. Name of environmental consultant and accredited laboratory conducting environmental monitoring, analysis of environmental samples and submitting reports to DOE. 4.0 TRAINING REQUIREMENT a. Plan for staff training in order to develop competency to discharge responsibilities on environmental requirements and compliance. 5.0 ENVIRONMENTAL REQUIREMENTS a. EIA Approval Conditions. b. Table of Mitigating Measures to be Implemented as in the Appendix I. 5.1 IMPLEMENTATION OF EROSION AND SEDIMENT CONTROL a. Name and contact (mobile phone number, address) of professional who is CPESC certified,* preparing the ESCP that would comply with the Guidance Document on ESCP preparation issued by the DOE. b. Schedule of project phasing and submission of ESCP. Schedule of project phasing, ESCP preparation and submission and pre construction meeting to be attended by project proponent/management, ESCP design engineer, contractor and DOE officer. (*Note: As an interim measure, an equivalent certification may be accepted. The non-cpesc certified professional must submit certified evidence to the DOE and obtain DOE s consent before undertaking any assignment on ESCP preparation). 4
5 (c) Method Statement Method statement and layout plan to be implemented for the major activities of the project that may cause erosion and sedimentation. 5.2 WATER POLLUTION CONTROL a. Ambient monitoring Detailed environmental monitoring program inclusive of map indicating location, longitude, latitude, frequency, parameters, equipment, personnel and schedule. b. Effluent treatment Proposed treatment technology; schedule for submission of Notification for new source of effluent discharge, design of IETS, recruitment of competent person and purchase of relevant equipment. c. Temporary sullage and sewage treatment Detailed proposal for management and treatment of sullage and provision of temporary sewage facilities for workers. d. Permanent sullage and sewage treatment Proposed treatment technology; schedule for submission of Notification for new source of sewage discharge, design of sewage treatment system (STS), recruitment of competent person and purchase of relevant equipment. 5
6 5.3 CONTROL OF AIR POLLUTION AND NOISE a. Ambient monitoring Detailed environmental monitoring program inclusive of map indicating location, longitude latitude, frequency, parameters, equipment, personnel and schedule. b. Air pollution control Proposed control technology; list of equipment requiring approval from DOE; schedule for submission of application for air pollution control system (APCS) Written Approvals, recruitment of competent person and purchase of relevant equipment. 5.4 MATERIALS AND WASTE MANAGEMENT a. Raw materials and stockpiles. Detailed proposal for management of raw materials, including chemicals, fuels, etc., and stockpiles. b. Solid waste. Detailed proposal for management of solid waste during earthwork and construction phase. c. Scheduled waste. Detailed proposal for management of scheduled waste to comply with Environmental Quality (Scheduled Waste) Regulations d. Biomass. 6
7 Detailed proposal for management of biomass during land clearing and construction phase. e. Spoils/dredge materials/construction waste. Detailed proposal for management of spoils/ dredge materials/ construction waste during earthwork and construction phase. f. Open burning. Measures to prevent occurrence of open burning. g. Housekeeping. Proposal for implementing best practices in general housekeeping including housekeeping of the vehicles and machinery maintenance area EMERGENCY RESPONSE PLAN (ERP) Name and contact (mobile phone number, address) of professional who will prepare the ERP and the schedule for its preparation and submission to the DOE. C. DECLARATION AND CHECKLIST 1.0 DECLARATION The project proponent is required to make a declaration that all the actions/measures/plans outlined in the EMP will be implemented by using the format in Appendix II. 7
8 2.0 CHECKLIST To assist the consultant who has been assigned to prepare the EMP and submit it to the DOE, a checklist/form (Appendix III) has been prepared. The form is required to be filled out and submitted to the DOE together with the EMP document. Department of Environment (Headquarters) Putrajaya December 28,
9 Appendix I MITIGATION MEASURES TO BE IMPLEMENTED Table: Mitigation Measures to be Implemented Project activities and environmental issues concerned Impacts Mitigation measures recommended in EIA Mitigations measures to be implemented * * * Note: The contents of the above Table are to be derived from Table I: Summary of Impacts and Mitigation Measures presented in the EIA report and additional requirements stipulated in the EIA approval conditions. 9
10 Appendix II DECLARATION BY PROJECT PROPONET/AUTHORIZED PERSON I certify that the Environmental Management Plan has been prepared with my knowledge and I shall undertake the responsibility to ensure the actions/measures/plans stated in the EMP will be implemented. PROJECT TITLE:..... PROJECT ADDRESS/LOCATION: Name of project proponent/authorized person Signature: ( ) Date: 10
11 Appendix III ENVIRONMENTAL MANAGEMENT PLAN PREPARATION CHECKLIST PROJECT TITLE: NAME OF PROJECT PROPONENT: NAME OF CONSULTANT: EIA APPROVAL CONDITIONS COMPLIANCE CHECKLIST EIA APPROVAL CONDITION, NUMBER. ACTIONABLE ITEM IN EMP ON PAGE.. NOTES Name of project proponent/authorized person.. Signature: ( ) Date: 11
Environmental guidelines for preparation of an Environment Management Plan
Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use
COMPANY NAME. Environmental Management System Manual
Revision No. : 1 Date : DD MM YYYY Prepared by : Approved by : (EMR) (Top Management) Revision History Revision Date Description Sections Affected Revised By Approved By Table of Content 0.0 Terms and
ENVIRONMENTAL MANAGEMENT PLAN :-
ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for
Environmental Guidelines for Preparation of an Environmental Management Plan
2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF
COASTAL APPLICATION FOR A MAJOR SITING PERMIT
Frank M. Rabauliman Administrator Commonwealth of the Northern Mariana Islands OFFICE OF THE GOVERNOR Bureau of Environmental and Coastal Quality Division of Coastal Resources Management Gualo Rai Center
TERMS OF REFERENCE FOR SCOPING OF EIA STUDY
TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking
Proposed (Concrete Cutting And Drilling) Environmental Management Plan
SAMPLE ENVIRONMENTAL MANAGEMENT PLAN This EMP is designed for (Concrete Cutting and drilling), however you may insert your business activities with only minor changes needed. This EMP should become part
Annex IV of MARPOL 73/78. Regulations for the Prevention of Pollution by Sewage from Ships
Annex IV of MARPOL 73/78 Regulations for the Prevention of Pollution by Sewage from Ships Annex IV of MARPOL 73/78* Regulations for the Prevention of Pollution by Sewage from Ships Regulation 1 Definitions
R000. Revision Summary Revision Number Date Description of Revisions R000 Feb. 18, 2011 Initial issue of the document.
2 of 34 Revision Summary Revision Number Date Description of Revisions Initial issue of the document. Table of Contents Item Description Page 1. Introduction and Purpose... 5 2. Project Management Approach...
STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date
STORMWATER POLLUTION PREVENTION PLAN TEMPLATE Disclaimer: This template was developed for guidance purposes only in an effort to assist Construction Storm Water permit applicants in meeting state and local
GENERAL SPECIFICATION
R64 - PAVEMENT MARKING August 1996 GENERAL SPECIFICATION G10 CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN Date JUNE 2012 Department 1 DOT Spec R64 of Infrastructure, Energy and Resources Index DEPARTMENT
Subordinate Local Law No. 1.12 (Operation of Temporary Entertainment Events) 2015
Redland City Council Subordinate Local Law No. 1.12 (Operation of Temporary Entertainment Events) 2015 Redland City Council Subordinate Local Law No. 1.12 (Operation of Temporary Entertainment Events)
Contractor Safety Management
1.0 Introduction Memorial University will ensure that a diligent contractor management process is established. This procedure establishes requirements for contract administration and oversight of contractor
C. Storm Water Pollution Prevention Plan (SWPPP) Yes No Response / Comment. D. Good Site Management Housekeeping Yes No Response / Comment
CE 2063 (Rev. 12/11) Page 1 of 8 PROJECT NAME AND SITE ADDRESS: CONTRACT NUMBER: CONTRACTOR NAME AND ADDRESS: Submitted by (Print Name and Sign): ORACLE NUMBER: WDID NUMBER: PROJECT SITE RISK LEVEL: Risk
QSS 0: Products and Services without Bespoke Contracts.
QSS 0: Products and Services without Bespoke Contracts. Amendment History Version Date Status v.1 Dec 2014 Updated For 2015 deployment Table of Contents 1. DEFINITIONS 3 2. INTRODUCTION 3 3. WORKING WITH
8.0 ENVIRONMENTAL PROTECTION MONITORING AND FOLLOW-UP
8.0 ENVIRONMENTAL PROTECTION MONITORING AND FOLLOW-UP 8.1 INTRODUCTION Mitigation measures, monitoring and other follow-up actions identified in Chapter 7 (Environmental Effects Assessment and Mitigation)
Storm Water Management Requirements for Construction Projects Less than One Acre
Storm Water Management Requirements for Construction Projects Less than One Acre Purpose: UC Irvine s Phase II Small MS4 Storm Water Permit requires construction projects less than one acre in size to
PROPOSED TERMS OF REFERENCE
Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed
Incident Reporting Requirements
Incident Reporting Requirements Directive PNG014 February 2016 Revision 1.0 Governing Legislation: Acts: The Oil and Gas Conservation Act The Pipelines Act, 1998 Regulations: The Oil and Gas Conservation
VICTORIAN GOVERNMENT DEPARTMENT ENVIRONMENTAL MANAGEMENT SYSTEM MODEL MANUAL
MODEL FINAL VERSION 1, MARCH 2003 ACKNOWLEDGMENTS This Manual is based on Environment Australia s Model EMS 1 and has been adapted for use by Victorian Government agencies by Richard Oliver International.
Annex K. Environmental Management Programme (EMPr)
Annex K Environmental Management Programme (EMPr) CONTENTS ABBREVIATIONS 0 DEFINITIONS AND TERMINOLOGY 1 1 BACKGROUND TO PROJECT 4 1.1 REGULATORY REQUIREMENT FOR THE EMPR 4 1.2 OBJECTIVES OF THE EMPR 4
ANNEX 2 Emergency / Pollution Incident Response Plan
ANNEX 2 Emergency / Pollution Incident Response Plan Volume 5 of 5 Appendix 21.1 Annex 2 EPIRP Page 1 of 9 1 WIND FARM CONSTRUCTION ENVIRONMENTAL EMERGENCY / POLLUTION RESPONSE PLAN... 3 1.1 Policy...
Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers
Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Development and Regeneration Services Glasgow City Council 229 George Street Glasgow G1 1QU May 2011 1. Introduction...-
Environmental Management Plan
Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project
WHS Contractor Management Procedure
Wudinna District Council 1. Overview Wudinna District Council as part of its commitment under its Policy recognises its obligation to: Ensure, so far as is reasonably practicable, the health and safety
City of Beaumont, Texas Grading Permit Information
General Information City of Beaumont, Texas Grading Permit Information The permit application shall be signed by the property owner (or lessee) or his authorized representative and by the contractor (if
OSWER OSWER OSWER DIRECTIVE DIRECTIVE DIRECTIVE
United States Environmental Protection Agency Office of Solid Waste and Emergency Response DIRECTIVE NUMBER: 9650.12 TITLE: Suggested Procedures For Review Of State UST Applications DATE: May 1992 ORIGINATING
TERMS OF REFERENCE. for an ENVIRONMENTAL IMPACT ASSESSMENT. for a PROPOSED RESORT DEVELOPMENT
TERMS OF REFERENCE for an ENVIRONMENTAL IMPACT ASSESSMENT for a PROPOSED RESORT DEVELOPMENT at BIG AND LITTLE PELICAN CAY PORTLAND BIGHT, ST. CATHERINE, JAMAICA TABLE OF CONTENTS BACKGROUND 4 1. Executive
EDITION 1/2011 DEPARTMENT OF ENVIRONMENT MINISTRY OF NATURAL RESOURCES AND ENVIRONMENT. Environmental Audit Guidance Manual
EDITION 1/2011 DEPARTMENT OF ENVIRONMENT MINISTRY OF NATURAL RESOURCES AND ENVIRONMENT Environmental Audit Guidance Manual i DEPARTMENT OF ENVIRONMENT MALAYSIA Environmental Audit Guidance Manual Note
IMPLEMENTING ISO 14001:2004. www.aecos.co.uk
IMPLEMENTING ISO 14001:2004 www.aecos.co.uk What is an Environmental Management System? A systematic framework to manage the immediate and long term environmental impacts of an organisation s products,
Guide Document for Development of WHS Management Plans
DISCLAIMER: THIS DOCUMENT IS PROVIDED AS GUIDANCE TO ASSIST CONTRACTORS IN MEETING THEIR OBLIGATIONS UNDER THE WHS LAW AND NTG CONTRACTS. NTG DOES NOT ACCEPT ANY RESPONSIBILITY FOR THE CONTENTS OF CONTRACTORS
ENVIRONMENTAL MANAGEMENT SYSTEM ISO-14001:2004 POLICY MANUAL
ENVIRONMENTAL MANAGEMENT SYSTEM ISO-14001:2004 POLICY MANUAL WATERFORD CARPETS LIMITED CONTROLLED COPY R EVISION DATE: 11/10/12 PAGE 1 OF 17 Noel CUNNINGHAM TABLE OF CONTENTS Section X1 Section 1.0 Section
SAFETY and HEALTH MANAGEMENT STANDARDS
SAFETY and HEALTH STANDARDS The Verve Energy Occupational Safety and Health Management Standards have been designed to: Meet the Recognised Industry Practices & Standards and AS/NZS 4801 Table of Contents
13 ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM
13 ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM This ESIA has identified impacts (both positive and negative) to the physical, natural and socio-economic environments, as well as to community and worker
MLD: Domestic Maritime Transport Project
Environmental Monitoring Report Project Number: 37265 December 2010 MLD: Prepared by Japan Port Consultants Co., Ltd. Malé, Maldives For Ministry of Finance and Treasury Ministry of Transport and Communication
(3) CATEGORY III means a permanent heliport facility. (4) COMMISSION means the City of Austin Airport Advisory Commission.
13-1-171 DEFINITIONS. (A) Terms not otherwise defined in this article have the meaning prescribed by applicable aviation law, including Federal Aviation Administration Advisory Circular 150/5390-2A (Heliport
Identifying Environmental Aspects
Identifying Environmental Aspects How an organization interfaces with the environment Environmental Aspect: Element of an organization s activities, products, or services that can interact with the environment.
Project Management Guidelines
Project Management Guidelines Overview Section 86-1506 (5) directs the NITC to adopt guidelines regarding project planning and management. The goal of project management is to achieve the objectives of
JOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management
JOHN HART GENERATING STATION REPLACEMENT PROJECT Schedule 9 Quality Management SCHEDULE 9 QUALITY MANAGEMENT TABLE OF CONTENTS 1. QUALITY MANAGEMENT SYSTEM... 1 1.1 Quality Management System...1 1.2 Project
40 CFR 262.11 Hazardous Waste Determination
262.11 states, the following: 40 CFR 262.11 Hazardous Waste Determination [which is incorporated into 391 3 11.08(1) of the Georgia Rules for Hazardous Waste Management by reference] A person who generates
M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At
M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At Final Plot No. 1274, situated at T.P.S. IV, Mahim, Hatiskar Marg, Prabhadevi, Mumbai 400 025. EXECUTIVE SUMMARY PREPARED
CHAPTER 24: ENVIRONMENTAL MANAGEMENT
Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document
UNCONTROLLED DOCUMENT ENVIRONMENTAL MANAGEMENT SYSTEM MANUAL UNCONTROLLED DOCUMENT
ENVIRONMENTAL MANAGEMENT SYSTEM MANUAL TABLE OF CONTENTS 1.0 PURPOSE...1 2.0 SCOPE...1 3.0 ISSUE AND UPDATE...1 4.0 ENVIRONMENTAL POLICY...2 5.0 ENVIRONMENTAL ASPECTS...2 6.0 LEGAL AND OTHER REQUIREMENTS...3
Dairy NZ Effluent Systems - What You Need to Know
DairyNZ effluent resources Publications and tools catalogue 0800 4 DairyNZ (0800 4 324 7969) dairynz.co.nz Designing or upgrading effluent systems PLANNING THE RIGHT SYSTEM FOR YOUR FARM When making the
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE The following template may be used as a general guide for development of a Stormwater Pollution Prevention Plan (SWPPP) for construction activities.
2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited
(IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]
Pollution Incident Response Management Plan
Pollution Incident Response Management Plan DOCUMENT CONTROL DOCUMENT DETAILS Title Pollution Incident Response Management Plan Reference Document Status ENV 002 12 Pollution Incident Response Management
Supplier Environmental Health and Safety Certification
Supplier Environmental Health and Safety Certification It is the intention of Cisco Systems, Inc. (Cisco) to take reasonable and practicable steps to ensure workplace safety and protect the environment
CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1
CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1 1 This Chapter of the FERC Engineering Guidelines has been prepared under contract with R & H Thomas, Inc. JANUARY 1993 Chapter VII Construction
Standards for Laboratory Accreditation
Standards for Laboratory Accreditation 2013 Edition cap.org Laboratory Accreditation Program Standards for Accreditation 2013 Edition Preamble Pathology is a medical specialty essential to patient care
Environmental Policy. JRI Orthopaedics Limited
JRI Orthopaedics Limited October 2014 Contents Clause 1. Policy Statement 1 2. Who is covered by the policy? 2 3. Organisation and Responsibilities 2 4. Training and Communication 3 5. Suppliers and Customers
QUESTIONNAIRE TO ASSIST PREPARATION FOR AN ISO 14001 AUDIT
Questionnaire to prepare for a Certification Audit for Environmental Management Systems (EMS) 0.05.2010 of 9 1 General Details With the help of this questionnaire you can provide a detailed description
DRAFT MODEL REGULATIONS for STATE ELECTRICITY REGULATORY COMMISSION UNDER SETION 86 (1) (e) OF THE ACT. No. Dated: October, 2009 NOTIFICATION (DRAFT)
DRAFT MODEL REGULATIONS for STATE ELECTRICITY REGULATORY COMMISSION UNDER SETION 86 (1) (e) OF THE ACT No. Dated: October, 2009 NOTIFICATION (DRAFT) In exercise of powers conferred under sections 61, 66,
VALIDATION REQUIREMENTS FOR PLANNING APPLICATIONS
Planning Services, Civic Offices, New Road, Grays, Essex RM17 6SL VALIDATION REQUIREMENTS FOR PLANNING APPLICATIONS Checklists to ensure prompt validation: Checklist 1 for ALL applications for planning
ENVIRONMENTAL IMPACT ASSESSMENTS AND ENVIRONMENTAL IMPACT STATEMENTS
GOVERNMENT OF BERMUDA Department of Planning ENVIRONMENTAL IMPACT ASSESSMENTS AND Section 1: Introduction... 2 Section 2: What are Environmental Impact Assessments and Environmental Impact Statements and
PREPARING INDUSTRIAL ENGINEERING REPORTS
PREPARING INDUSTRIAL ENGINEERING REPORTS EARLE HARTLING, LOS ANGELES COUNTY SANITATION DISTRICT JOHN ROBINSON, JOHN ROBINSON CONSULTING, INC WateReuse LA Chapter December 2, 2014 Presentation Overview
APPLICATION for ISO Certification (All Standards)
APPLICATION for ISO Certification (All Standards) Contents Section 1 General Information (Please complete this section for All standards) (Please complete ONLY the sections for the Standard(s) that you
Smart Meters Programme Schedule 2.5. (Security Management Plan) (CSP South version)
Smart Meters Programme Schedule 2.5 (Security Management Plan) (CSP South version) Schedule 2.5 (Security Management Plan) (CSP South version) Amendment History Version Date Author Status v.1 Signature
How To Manage Risk At Atb Financial
Guidelines for Financial Institutions Legislative Compliance Management (LCM) Date: July 2004 Introduction Regulatory risk is the risk of non-compliance with applicable regulatory requirements. For the
Pollution Incident Response Management Plan
Pollution Incident Response Management Plan POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN 1. Introduction This Pollution Incident Response Management Plan (PIRMP) has been prepared to describe the processes
WHS CONTRACTOR MANAGEMENT PROCEDURE
1. Overview The Port Augusta City Council as part of its commitment under its WHS Contractor Management policy, recognises its obligation to: Ensure, so far as is reasonably practicable, the health and
TAMIL NADU POLLUTION CONTROL BOARD FORM I
TAMIL NADU POLLUTION CONTROL BOARD FORM I Application for consent under Section 21 of the Air (Prevention and Control of Pollution) Act, 1981 as amended (Central Act 14 of 1981) (See Rule 7 of the Tamilnadu
Baseline Questionnaire
FEDERAL AGEC OCCUPATIOAL SAFET AD HEALTH PROGRAMS Baseline Questionnaire Instructions: Respond to each question below by circling "" or "" to indicate "yes" or "no." An explanation is required for each
Environmental Management Systems in Hotels. 15 Steps to the Successful Implementation of an Environmental Management System in a Hotel
Environmental Management Systems in Hotels 15 Steps to the Successful Implementation of an Environmental Management System in a Hotel 2 15 STEPS 1. Assemble the team 2. Initial Review 3. Environmental
Liquid Effluent Treatment Plant (LETP) Land Clean-Up
Liquid Effluent Treatment Plant (LETP) Land Clean-Up Frequently Asked Questions What is proposed? Magnox Ltd is proposing to remove the redundant Liquid Effluent Treatment Plant (LETP) at Harwell and to
Minnesota Health Insurance Exchange (MNHIX)
Minnesota Health Insurance Exchange (MNHIX) 1.2 Plan September 21st, 2012 Version: FINAL v.1.0 11/9/2012 2:58 PM Page 1 of 87 T A B L E O F C O N T E N T S 1 Introduction to the Plan... 12 2 Integration
LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT
LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government
Real Estate Investment Funds Regulations
Real Estate Investment Funds Regulations Contents Part 1 : Preliminary Provisions Article 1 : Preliminary... 5 Article 2 : Definitions... 5 Part 2 : Authorization Article 3 : Authorization Requirements...
CONSTRUCTION PERMIT SUBMITTAL CHECKLIST
LAS VEGAS VALLEY STORMWATER QUALITY MANAGEMENT PROGRAM CONSTRUCTION PERMIT SUBMITTAL CHECKLIST (Applies to all Grading Site Development Building and Encroachment Permits and plans including Final Parcel
STATEMENT OF QUALIFICATIONS. Pre-qualification Submissions for. Prime Engineering Consultant Services. on Geotechnical Projects
STATEMENT OF QUALIFICATIONS Pre-qualification Submissions for Prime Engineering Consultant Services on Geotechnical Projects INTRODUCTION Alberta Transportation is accepting submissions from Consulting
MANAGEMENT STANDARD CLOSURE PLANNING
AngloGold Ashanti Limited \ Reg. No.1944/017354/06 76 Jeppe Street \ Newtown \ 2001 \ PO Box 62117 \ Marshalltown \ 2107 \ South Africa Tel +27 (0)11 637 6000 \ Fax +27 (0)11 637 6624 \ Website: www.anglogoldashanti.com
Exhibit 1 to Part 3 Project-Specific Terms
Exhibit 1 to Part 3 Project-Specific Terms (Date of Standard Exhibit 1 to Part 3: May 2014) Part 3 (2013 Lump Sum Agreement Between Department and Design-Builder), Part 4 (2013 General Conditions of Contract
June 2010 HEALTH, SAFETY, AND ENVIRONMENT MANAGEMENT SYSTEM (HSEMS)
June 2010 HEALTH, SAFETY, AND ENVIRONMENT MANAGEMENT SYSTEM (HSEMS) TABLE OF CONTENTS PAGE PART I INTRODUCTION Corporate Health, Safety and Environment Policy.. 1 Purpose... 2 HSEMS Framework... 3 PART
Appendix VIII: Spill Prevention, Control and Countermeasure (SPCC) Plans
Appendix VIII: Spill Prevention, Control and Countermeasure (SPCC) Plans Background What is a Spill Prevention, Control and Countermeasure (SPCC) Plan? An SPCC plan is a written document that describes
Company Header POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN. For [site name] [EPL number]
Company Header POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN For [site name] [EPL number] Pollution Incident Response Management Plan for [insert site name] Contents [need to check correct page numbers]
CHAGUARAMAS TERMINALS LTD.
POLICY MANUAL All rights reserved to CrewsInn Limited. No part of this document may be reproduced in any form or by any means, without permission in writing from the company CHAGUARAMAS TERMINALS LTD.
Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements
Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements Wichita KS Effective: 3-11-15 Rev. IR Page 1 of 6 1.0 Introduction This document establishes Cessna Interiors Manufacturing
SECTION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
SECTION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies the control of environmental pollution and damage that the Contractor must consider for air,
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project
Low Impact Development Checklist
New Jersey Stormwater Best Management Practices Manual February 2004 A P P E N D I X A Low Impact Development Checklist A checklist for identifying nonstructural stormwater management strategies incorporated
*** CHAPTER VI Length and Organization of Working Time. Section I Normal Working Time. ARTICLE 96 (Length of working time)
NATLEX Database ISN 56677 Unofficial translation prepared by the International Labour Office. This translation is intended for information purposes only and does not substitute consultation of the authoritative
History of the SPCC Rule
2010 SPCC Training SPCC Rule History of the SPCC Rule The SPCC plan is a document required under the clean water act (CWA) It became effective in 1972 and has changed little in 32 years. The rule was formally
REPORT 2016/035 INTERNAL AUDIT DIVISION
INTERNAL AUDIT DIVISION REPORT 2016/035 Audit of the use of consultants and individual contractors in the United Nations Stabilization Mission in Haiti Overall results relating to the effective hiring
Contractor Environment, Health and Safety Management Plan
EHSMS10 Contractor and Supplier EHS Management Contractor Environment, Health and Safety Management Plan Purpose Guidelines Record Keeping This template provides an example to Santos Contractors of the
Construction Management Program
Use and Limitation: The Sponsor may use this document as a guide in preparing a construction management program for their specific project. Sponsors and Consultants are cautioned that the provision of
PREVENTION. City of Orem FLOOD DAMAGE PREVENTION 10-1-1
City of Orem FLOOD DAMAGE PREVENTION 10-1-1 CHAPTER 10. Article 10-1. Article 10-2. Article 10-3. Article 10-4. Article 10-5. FLOOD DAMAGE PREVENTION Purposes Definitions General Provisions Administration
Fit and Proper Assessment Best Practice
Fit and Proper Assessment Best Practice Final Report EMERGING MARKETS COMMITTEE OF THE INTERNATIONAL ORGANIZATION OF SECURITIES COMMISSIONS DECEMBER 2009 CONTENTS Chapter Page 1 Introduction 3 1.1 Objectives
Incident Investigation Procedure
Incident Investigation Procedure Document Number 001001 Date Approved 27 November 2012 1 Introduction When a serious incident occurs there shall be a review of the system which is in place to manage the
Temporary Batch Plants
Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category
GUIDELINE. Professional Engineers Providing Reports for Pre-Start Health and Safety Reviews CONTRIBUTORS. Jim Scott, P.Eng.
GUIDELINE Professional Engineers Providing Reports for Pre-Start Health and Safety Reviews CONTRIBUTORS Regulation 528/00 Subgroup Members David Stinson, P.Eng. Chair Ralph Balbaa, P.Eng. Aaron Chim, P.Eng.
