1 CITY OF SANTA ROSA CITY HALL WINGS GENERAL SKYLIGHT RESTORATION - - BASE BID 1 A. Summary of work: 1. Information herein is provided as a general overview of the project scope, and as such, does not grant authority for deviation from the manufacturers specifications for product, execution, or quality assurance. References to other documents, test reports, manufacturer requirements, and certifications found within other sections of the City of Santa Rosa contract documents should be considered inclusive to define the overall scope of work to be performed. 2. Definitions: For the purpose of clarification within this scope of work the following terms are defined as listed unless otherwise noted elsewhere in City of Santa Rosa contract documents. a. Contractor: Roofing/Waterproofing. b. Manufacturer: Waterproofing materials providing system. c. Owner: City of Santa Rosa. 3. The following paragraphs are generally applicable requirements for performance of work on this project and are supplements to the contract documents: a. Any construction details for the Scope of Work are as noted. Installation shall conform to manufacturer s specifications which may be designed specifically for this project superseding their printed literature. In the event where provisions of codes, safety orders, Contract Documents, referenced manufacturer s specifications or industry standards are in conflict, the more restrictive and higher quality shall govern. In instances where specific conditions exist that vary from this scope of work, a Manufacturer approved shop drawing to be submitted for consideration to the Owner. Installation shall not begin until approval by Owner has been given. b. Unless otherwise shown or noted, existing, functional and salvageable, sheet metal counterflashings shall be carefully handled to allow reuse after the specified work is complete. Damage done to otherwise salvageable metal flashings shall be repaired via replacement with new metal in the damaged area. c. All due precautions will be taken to prevent disruption to the occupancy of the facility interior or grounds. Every effort will be employed to prevent additional damage to the existing assembly while working in an adjacent area, point overloading and damage to areas not in this scope of work. d. During periods of precipitation perform at least daily interior building inspections for leaks in the area of Work. Owner s representative will inform Contractor about known leaks. Should there be any such leaks; the Contractor shall repair them immediately to prevent interior building damage. All leak related damage to the building under Work areas shall be repaired to the satisfaction of the Owner. e. Maintain a complete set of manufacturer specifications and drawings during the course of work. f. All demolition/tear-off Work, solvent based or fume producing Work and Work interfering with the normal operations of the facility will be coordinated with the Owner prior to start of Work, except such Work as is necessary for the proper care and protection of Work already performed, or except in a case of an emergency, and in any case, only with the written permission of the Owner. B. Work to be performed: 1. Skylight Restoration: a. Metal framed skylights with safety glass incorporating past repairs that included urethane sealant. Skylights are set on sloped wood curbs at the interior of skylight and terminated on the exterior of skylight at the pre-cast concrete wall. b. The scope of work is preparation and repair of the existing skylight framing/sealant/glass panel assembly to provide an aesthetically pleasing waterproofing assembly with an anticipated minimum life span of ten (10) years. This shall include installation of a preformed silicone elastomer extrusion and all designated accessory items to provide manufacturer's warranty. c. Verify all existing conditions relative to fulfill contract documents and installation of roof system per intent of contract documents. C. Submittals: Submit the following for contract officer review and approval: 1. Product data sheets, shop drawings and literature verifying physical properties and performance parameters of materials. Copyright (ARDG Inc), Page - 1 Skylight Restoration Scope of Work
2 CITY OF SANTA ROSA CITY HALL WINGS Material safety data sheets. 3. Manufacturer approved contractor certification as required to provide listed warranty. D. Deliver materials in original sealed containers, clearly marked with: Manufacturer s logo and full product name. E. Protect all materials from freezing and other damage during transit, handling, storage and installation. F. Match existing components when possible. All replacement components to meet current code and industry standards for size, quality and applicability. G. Reasonable access for all operations to be provided by Owner. 1.1 REGULATORY & PERFORMANCE STANDARDS A. Compliance for Design: 2010 California Building Code (CBC Title 24) B. Performance standards: American Society for Testing and Materials (ASTM): Reference latest revisions of standards unless otherwise indicated. 1.2 WARRANTY & QUALITY ASSURANCE A. Skylight Restoration: 1. Manufacturers 10 year covering defective material. 2. Contractor 3 year labor/workmanship warranty. 3. Quality Assurance: a. Contractors project superintendent to complete attached daily inspection form complete with photos. Provide copies to owners designated representative. b. The Owner shall make periodic roof inspections and inspect the completed Work with the contractor. Any defects in the application will be in the form of a punch list or inspection report. c. Manufacturer inspections as required for warranty. 2.0 PRODUCTS A. Components to meet current code and industry standards for size, quality and applicability as required by shingle manufacturer for proper installation to meet project warranty. Primary materials are listed below. All additional components required to meet mfg. & code requirements will be provided. 2.1 WOOD A. Not Applicable. 2.2 FASTENERS A. Fasteners as required to repair skylights. 2.3 SKYLIGHT RESTORATION - A. Mfg: Dow-Corning. B. Primer: As supplied and required by mfg. for installation and project warranty. C. Cleaners: As supplied and/or required by mfg. for installation and project warranty. D. Preformed Silicone Extrusion: 1. Product: Dow Corning 123 Silicone Seal. 2. Description: Custom-designed, multi-dimensional, shaped silicone seals fabricated from elastomer silicone extrusions for bonding to substrates with silicone sealant. Copyright (ARDG Inc), Page - 2 Skylight Restoration Scope of Work
3 CITY OF SANTA ROSA CITY HALL WINGS Function: Used with sealant to form elastomeric cover for skylight frames, mullions, seams, transitions and penetrations. 4. Dimensions: Contractor to measure and provide manufacturer with dimensions for prefabricated extrusions to fit existing metal skylight frame & mullions. 5. As Supplied Cured Rubber Extrusion: ASTM D Day Sealant Cure 0.5 Joint, 1.5 Wide Silicone Strip, Bonded w/silicone Building Sealant - ASTM C 1135, ASTM C 719: 7 Unprimed Adhesion of Silicone Strip, Bonded w/silicone Building Sealant - ASTM C 794, ASTM C 719: Peel Strength: (Dow Corning 795) 25 pli / 4.38 N/m. E. Sealant: 1. Product: Dow Corning 795 Silicone Building Sealant. 2. Description: Neutral, one part silicone sealant. 3. Function: Used to bond preformed silicone elastomer extrusion to form elastomeric cover for skylight frame seams, transitions and penetrations. 4. Applicable Standards. Meet or exceed: a. Federal Specification TT-S A (COM-NBS) Class A. b. Federal Specification TT-S-230C (COM-NBS) Class A. c. ASTM C-920, Class 50, Type S, Grade NS, Use NT, G,A,O. d. Staining of Masonry ASTM 1248: None. 2.4 ACCESSORIES A. Additional accessories as required to complete work and manufacturers requirements for installation and warranty. 3.0 INSTALLATION - GENERAL A. Preparation requirements: 1. Verify any additional surface preparation relative to inspection and treatment of defects in the structural integrity and receiving surfaces is in accordance with good waterproofing practices. 2. Verify substrate is suitable surface to receive and hold the materials referring to manufacturers recommendations and/or requirements. 3. Comply with applicable manufacturers published instructions. Clean substrate of dust, debris, and other substances detrimental to adhesion. This includes thoroughly clean surface in a manner to remove loose materials, dirt and other debris to provide a clean dry surface for optimal application and adhesion. 4. Complete all openings or projections prior to repair installation. 5. Primer: As required by material manufacturer. B. Installation requirements: 1. Completed installation shall consist of indicated components. 2. Follow the manufacturer s requirements as they pertain to manufacturer s warranty. If a conflict exists verify acceptability/compatibility from the manufacturer prior to installation. 3. Install materials per mfg. requirements. Inspect for any deficiencies. 4. Install to insure proper application per scope of work and or additional manufacturer requirements. 5. Areas not meeting criteria to be reapplied or reinstalled. 3.1 INSTALLATION DEMOLITION A. Pre-construction requirements: 1. Contractor shall not proceed with any removal or installations until all submittals, certifications, required pre-constructions conferences, changes or variations in project specifications have been submitted, conducted and approved for start. Copyright (ARDG Inc), Page - 3 Skylight Restoration Scope of Work
4 CITY OF SANTA ROSA CITY HALL WINGS 6-10 B. Site conditions: 1. Submit to Owner a video or photographs and a written report of existing interior and exterior damage, leakage etc. 2. Provide an employee to monitor interior conditions any removals, replacements or other critical operations that may expose the occupants or property to hazard. Contractor to coordinate activities with owner. 3. Provide protection to occupants, interior activities and property unless otherwise directed by project documents or in writing by the Owner. 4. Wherever surface preparation, patching/repair, priming or coating is being performed, all walks, stairs, floors, plants or shrubbery, or other exposed surfaces and items shall be carefully protected from damage. 5. All supplies, equipment, materials, coatings, containers, etc. shall be stored in an orderly manner, carefully arranged and adequately protected. C. Demolition - general: 1. When inclement weather threatens, cease removal work and return to a watertight condition and dry in at the end of the day. 2. Coordinate demolition with other trades. 3. Only commence installation of after all maximum roof loads have been confirmed to insure that no point loading occurs beyond structural limits set by owner. 4. No removal structural supports without direct approval from Owners Structural Engineer. Immediately report any structural deficiencies to Owner and cease work until authorized by Owners Structural Engineer. D. Demolition - removals: 1. As required to complete scope of repairs / restoration. E. Demolition - Equipment / Electrical disconnects and removals: 1. Bid to include all associated cost relating to disconnect, reconnect including any necessary raising of gas lines, electrical conduits, refrigeration lines, condensate lines, duct work to accommodate installation of work. 2. Electrical conduit and junction boxes located on the roof deck and walls. Remove and/or prepare all materials without damage to electrical. Do not proceed with work until: a. Determine if existing electrical is live or abandoned, meet current regulatory requirements. b. Mark all live junction boxes prior to installation. Reconnection and disconnect as required to safely install repairs by a licensed electrician under separate contract. 3.2 INSTALLATION SKYLIGHT REPAIR A. Examine the areas and conditions under which Work will be performed. Conditions detrimental to timely and proper completion of the Work shall be brought to the attention of the Owner for resolution prior to proceeding. Incorrectly installed materials requiring changes will be at Contractor's expense. 1. Prepare all surfaces per mfg. requirements including application of primer, extrusions and sealants. All deficiencies, regardless of trade, must be corrected prior to application. Do not proceed until all areas have been inspected and approved by quality assurance representative. 2. Perform an adhesion test on all surfaces, per manufacturer s direction, prior to start of full repairs. 3. Beginning of installation means acceptance of existing conditions. B. Protect skylights & concrete walls from environmental conditions. Failure to protect the skylights, walls, accessories and sealants will result in the removal of damaged materials. Remove damage materials prior to start of new work. Copyright (ARDG Inc), Page - 4 Skylight Restoration Scope of Work
5 CITY OF SANTA ROSA CITY HALL WINGS 6-10 C. Preparation: 1. Skylight frames / mullions: Clean, remove or cut back existing repairs/sealant to provide smooth surface/transition for application of silicone extrusions. 2. Skylight glass: Remove / cut back existing skylight frame sealant/coating from skylight glass to provide a smooth surface for application of silicone extrusions. 3. Cleaning: Per mfg requirements and allow too dry thoroughly. 4. Masking: Apply masking tape outlining area where silicone seal will be applied. 5. Do not apply additional materials until after repairs have fully cured. 6. Perform adhesion test in accordance with ASTM C1193, Method A, to determine if primer is required to achieve adequate adhesion. D. Installation: 1. Install new specified prefabricated silicone extrusion to encapsulate designated skylight frame / mullion assemblies. 2 Apply primer as required. 3. Sealant: Apply bead of 795 silicone sealant on each side of joint and 1/4 inch (6 mm) inside masking tape. 4. Bead size: As specified by manufacturer. 5. Minimum bonding area: 3/8 inch (9 mm). 6. Silicone seal: Per Mfg. requirements. 7. Complete horizontal joints prior to vertical joints unless otherwise directed by manufacturer. 8. Reapply any improperly applied and/or defective materials or areas of application not meeting specified rates of application and dried mil thickness. 9. Allow curing thoroughly per manufacturer s instructions. Inspect for defects. E. Isolate between aluminum and dissimilar metals with a protective coating or plastic strip to prevent electrolytic corrosion. 3.3 DETAIL DRAWING LEGEND A. Skylight Repair Name Description A-1 Overlapping Silicone Extrusions A-2 Silicone Skylight Mullion A-3 Silicone Skylight Frame & Interior Curb A-4 Silicone Skylight Frame & Pre-cast Panel END OF Copyright (ARDG Inc), Page - 5 Skylight Restoration Scope of Work
6 ITEM # 1A PHOTO BUILDING BASE BID 1 1. General Condition: a. Typical condition at all wings under scope of work. #1.A.1.a #1.A.1.a Page 1 of 7 Pages (ARDG Inc.) c
7 ITEM # BUILDING 2A PHOTO BASE BID 1 #2.A.1.a #2.A.1.a 1. General Condition: a. Typical condition at all wings under scope of work. #2.A.1.a #2.A.1.a #2.A.1.a Page 2 of 7 Pages (ARDG Inc.) c
8 ITEM # BUILDING 3A PHOTO BASE BID 1 #3.A.1.a 1. General Condition: a. Typical condition at all wings under scope of work. #3.A.1.a #3.A.1.a Page 3 of 7 Pages (ARDG Inc.) c
9 ITEM # 4A DETAIL A-1 OVERLAPPING SILICONE EXTRUSIONS PRE-FORMED SILICONE EXTRUSION. VERTICAL STRIPS MUST OVERLAP HORIZONTAL STRIPS. PRE-FORMED SILICONE EXTRUSION. PRE-CAST CONCRETE AT EXTERIOR WALL FOR ILLUSTRATION. ACTUAL CONFIGURATION WITH 90 DEGREE TRANSITION. EXISTING FLASHING METAL AT INTERIOR CURB. SKYLIGHT FRAME SKYLIGHT FRAME SKYLIGHT MULLION SKYLIGHT GLASS Page 4 of 7 Pages
10 ITEM # 5A DETAIL A-2 SILICONE EXTRUSION AT SKYLIGHT MULLION EXISTING SKYLIGHT MULLION ASSEMBLY EXISTING URETHANE SEALANT / COATING REPAIR. CUT BACK EXCESS REPAIR FROM GLASS TO PROVIDE A SMOOTH CLEAN SURFACE FOR SILICONE EXTRUSION NEW PRE-FORMED SILICONE EXTRUSION ENCAPSULATING SKYLIGHT FRAME/MULLION ASSEMBLY. CONFIGURATION IS FOR ILLUSTRATION ONLY. ACTUAL DIMENSIONS & CONFIGURATION TO BE DETERMINED BY MANUFACTURER BASED UPON CONTRACTOR PROVIDED DIMENSIONS. BEAD OF APPROVED SEALANT PER MANUFACTURERS REQUIREMENTS. TAPE ALL AREAS NOT RECEIVING INSTALLATION PER MFG. INSTRUCTIONS. SKYLIGHT GLASS Page 5 of 7 Pages
11 ITEM # 6A DETAIL A-3 SILICONE EXTRUSION AT SKYLIGHT FRAME / INTERIOR CURB NEW PRE-FORMED SILICONE EXTRUSION ENCAPSULATING SKYLIGHT FRAME/MULLION ASSEMBLY. CONFIGURATION IS FOR ILLUSTRATION ONLY. ACTUAL DIMENSIONS & CONFIGURATION TO BE DETERMINED BY MANUFACTURER BASED UPON CONTRACTOR PROVIDED DIMENSIONS. EXISTING SKYLIGHT FRAME / MULLION ASSEMBLY EXISTING URETHANE SEALANT / COATING REPAIR. CUT BACK EXCESS REPAIR FROM GLASS TO PROVIDE A SMOOTH CLEAN SURFACE FOR SILICONE EXTRUSION BEAD OF APPROVED SEALANT PER MANUFACTURERS REQUIREMENTS. TAPE ALL AREAS NOT RECEIVING INSTALLATION PER MFG. INSTRUCTIONS. EXISTING URETHANE SEALANT / COATING REPAIR. CUT BACK /REMOVE EXCESS REPAIR FROM METAL TO PROVIDE A SMOOTH CLEAN SURFACE FOR SILICONE EXTRUSION (2) COATS OF SILICONE COATING (TOTAL 11 MIL DRY THICKNESS) APPLIED TO METAL COUNTERFLASHING AND SKYLIGHT FRAME/ FLASHING AREAS NOT ENCAPSULATED BY SILICONE EXTRUSION. PRIME AS REQUIRED BY MFG. SKYLIGHT GLASS EXISTING METAL COUNTERFLASHING. SKYLIGHT FRAME ASSEMBLY Page 6 of 7 Pages
12 ITEM # 7A DETAIL A-4 SILICONE EXTRUSION AT SKYLIGHT FRAME / PRE-CAST PANEL EXISTING PRE-CAST CONCRETE WALL WITH RAISED RIBS. TAPE ALL AREAS NOT RECEIVING INSTALLATION PER MFG. INSTRUCTIONS. EXISTING URETHANE SEALANT / COATING REPAIR. CUT BACK /REMOVE EXCESS REPAIR FROM METAL TO PROVIDE A SMOOTH CLEAN SURFACE FOR SILICONE EXTRUSION NEW PRE-FORMED SILICONE EXTRUSION ENCAPSULATING SKYLIGHT FRAME/ MULLION ASSEMBLY. CONFIGURATION IS FOR ILLUSTRATION ONLY. ACTUAL DIMENSIONS & CONFIGURATION TO BE DETERMINED BY MANUFACTURER BASED UPON CONTRACTOR PROVIDED DIMENSIONS. EXISTING URETHANE SEALANT / COATING REPAIR. CUT BACK EXCESS REPAIR FROM GLASS TO PROVIDE A SMOOTH CLEAN SURFACE FOR SILICONE EXTRUSION BEAD OF APPROVED SEALANT PER MANUFACTURERS REQUIREMENTS. TAPE ALL AREAS NOT RECEIVING INSTALLATION PER MFG. INSTRUCTIONS. SKYLIGHT GLASS Page 7 of 7 Pages
REROOFING - SCOPE OF WORK
REROOFING - SCOPE OF WORK 1.0 GENERAL A. Summary of work: 1. Information herein is provided as a general overview of the project scope, and as such, does not grant authority for deviation from the manufacturers
More informationAir-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association
Air-Conditioning, Heating, and Refrigeration Institute Sheet Metal and Air-Conditioning Contractors National Association GUIDELINE B-1997 ACKNOWLEDGEMENT These guidelines for Roof Mounted Outdoor Air-
More informationA. This Section includes rubberized asphalt sheet membrane waterproofing systems.
SECTION 07110 SHEET MEMBRANE WATERPROOFING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationCITY OF BELL PROFESSIONAL CONSULTING SERVICES FOR ROOF REPAIRS TO CITY OWNED FACILITIES
CITY OF BELL 6330 PINE AVENUE BELL, CA 90201 PH: (323) 588-6211 FAX: (323) 771-9473 CITY OF BELL PROFESSIONAL CONSULTING SERVICES FOR ROOF REPAIRS TO CITY OWNED FACILITIES I. INTRODUCTION City of Bell
More informationNEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK
ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within
More informationSECTION 07 61 13 STANDING SEAM METAL ROOFING
SECTION 07 61 13 STANDING SEAM METAL ROOFING PART 1 GENERAL 1.01 SCOPE OF WORK A. The Work shall include all labor, materials, equipment and supervision required to complete the work of the above referenced
More informationSECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront
PART 1 GENERAL 1.01 Work Included SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS System 402 Flush-Glazed Screw Spline Storefront A. Furnish and install aluminum architectural storefront system
More informationRECOATING AND RENEWING SPF ROOFING SYSTEMS
RECOATING AND RENEWING SPF ROOFING SYSTEMS Procedures, Regional Differences and type of coating systems Bruce Schenke Premium Spray Products REASONS TO RECOAT/RENEW Add a new coating layer to renew the
More information1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.
SECTION 075416 - PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system. 1.2 PERFORMANCE REQUIREMENTS A. Solar Reflectance
More informationSECTION 07720 PREFORMED METAL STANDING SEAM ROOFING
SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING PART ONE GENERAL DESCRIPTION This section includes pre-formed standing seam metal roofing and related flashings, closures, trim and accessories including,
More informationSECTION 07410 PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK
SECTION 07410 PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK A. This section covers the pre-finished, pre-fabricated Architectural standing seam roof system. All metal trim,
More informationFIRESTOPPING & SMOKE SEALS
SPECIFICATION SECTION 07 84 00 FIRESTOPPING & SMOKE SEALS 1 GENERAL 1.1 SECTION INCLUDES 1.1.1 Comply with Division 1, General Requirements and Documents referred to therein. 1.1.2 It is the intent of
More informationMETAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES
METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES REFLECTICLEAN ACRYLIC/URETHANE Elastomeric Roofing Systems, Inc 6900 Bleck Dr. Rockford, MN 55373 800.403.7747 -or- 763.565.6900 fax: 763.565.6901 email:
More informationSECTION 07400 STANDING SEAM METAL ROOF
SECTION 07400 STANDING SEAM METAL ROOF PART 1 - GENERAL 1.01 SECTION INCLUDES A. Work described in this section includes pre-formed standing seam metal roofing system complete with clips, perimeter and
More informationColorado State University. Durrell Center Roof Repair
Colorado State University Durrell Center Roof Repair SPECIFICATION: POLYURETHANE FOAM ROOFING l.0 GENERAL REQUIREMENTS The successful application of a polyurethane foam roofing system is dependent upon
More informationGeorgia State University. Urban Life Building Roof Replacement
ENGINEERING AND ENVIRONMENTAL 140 DECATUR STREET SE, ATLANTA, GA 30303 GEORGIA STATE UNIVERSITY - FACILITIES DESIGN & CONSTRUCTION 34 BROAD STREET, SUITE 100 ATLANTA, GA 30303 DRAWING INDEX A-0 PROJECT
More informationGUIDELINE SPECIFICATIONS
GUIDELINE SPECIFICATIONS GORDON SOFFIT-SHIELD - An Exterior Metal Soffit System DIVISION 05 5800 or DIVISION 07 7700 Note To Specifier: SOFFIT-SHIELD should be installed by tradesmen that are experienced
More informationINSTRUCTIONS FOR COORDINATION SECTION 06651 SOLID SURFACE FABRICATIONS
INSTRUCTIONS FOR COORDINATION SECTION 06651 SOLID SURFACE FABRICATIONS 1. Paragraph 1.02 Provide solid surface countertops at sinks locations. Provide solid surface window sills at drywall framing walls.
More informationTHERMOTEK SELF ADHESIVE MEMBRANE +G2 OVER WOOD SYSTEM DESCRIPTION SELF ADHESIVE OVER WOOD (8YR) BS-SA/CS
THERMOTEK SELF ADHESIVE MEMBRANE +G OVER DESCRIPTION SELF ADHESIVE OVER (8YR) BS-SA/CS 1 0 No 0. SUBSTRATE 1. BASE SHEET G FIBER GLASS BASE. THERMOTEK SELF ADHESIVE 3.0 FP GRANULE COMPONENTS AND WEIGHTS
More informationSpecifications. Preformed Metal Wall and Roof Panels. Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023
Specifications Preformed Metal Wall and Roof Panels Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023 Section 07410 Preformed Metal Wall and Roof Panels Structural
More informationNRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS
NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS The (NRDCA) has prepared this document to provide customers and installers information that the industry
More informationStandard Method for Sampling and Analysis of. of Chlorine Containing Bleaches. Soap Products
GUIDE SPECIFICATION FOR GENERAL CLEANING AND REMOVAL OF MOLD AND MILDEW ON EXTERIOR INSULATED AND FINISH SYSTEMS AND STUCCO DIVISION 07240 and DIVISION 09240 8/05 PART I: GENERAL 1.01 DESCRIPTION AND SCOPE
More informationHHS J.W. Peavy Center Exterior Walls Waterproofing and Roof Replacement Project WBS # H-000018-0006-4 SECTION 07610 STANDING SEAM METAL ROOFING
PART 1 - GENERAL 1.01 DESCRIPTION SECTION 07610 A. Furnish and install a weather and watertight prefabricated standing seam roof system complete, in place, as shown on the drawings and as specified herein.
More informationTHERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER
THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER DESCRIPTION TORCH OVER (15,17,19 YR) TH/BS-TH/CS 2 1 0 No 0. SUBSTRATE 1. THERMOTEK USA 2.0 FV TORCH SMOOTH 2. THERMOTEK USA PRO FP TORCH GRANULE COMPONENTS
More informationSECTION 07 42 13 METAL WALL PANELS
Mitsubishi Plastics Composites America, Inc. 401 Volvo Parkway Chesapeake, VA 23320 Phone: (800) 422-7270 Fax: (757) 436-1896 E-mail: info@alpolic.com www.alpolic-northamerica.com This MANU-SPEC utilizes
More informationExterior Elevated Elements Inspection Guidelines
Exterior Elevated Elements Inspection Guidelines Planning and Development 1. Guideline Purpose These guidelines are intended to assist practicing professionals in complying with Berkeley Municipal Code
More informationWilliamson and Associates, Inc. Report of Building Exterior Condition Evaluation, dated January 2 nd, 2013. (68 pages)
INNOVATIVE BUILDING AND ARCHITECTURE CONSULTANTS Mr. Bud Hall Senior Vice President of construction Turnberry Associates 19501 Biscayne Boulevard, Suite 400 Aventura, FL 33180 Subject: The Nashville Hilton
More informationWESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM
WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM SPECIFICATION NO. SMAA-2P-8xE UPGRADE SMOOTH SURFACE / CAP SHEET / SINGLE PLY 2 PLY POLYESTER REINFORCED ACRYLIC
More informationSECTION 07540 - THERMOPLASTIC MEMBRANE ROOFING
SECTION 07540 - THERMOPLASTIC MEMBRANE ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationITEM 599.06060008 THERMOPLASTIC MEMBRANE ROOFING
DESCRIPTION Construct adhered membrane roofing system, roof insulation, and vapor retarder in accordance with these specifications. MATERIALS: General: Provide installed roofing membrane and base flashings
More informationUNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design
Basis of Design This section applies to roofing membranes, flashing and accessories. Design Criteria Adhere to the standards and details of the latest editions of the National Contractors Association (NRCA)
More informationAvoiding Air Barrier Pitfalls
Avoiding Air Barrier Pitfalls Design & Durability November 2013 Air barriers, when correctly installed, help buildings achieve high levels of energy efficiency by decreasing heat loss. For example, great
More information7 INNOVATIONS IN SECONDARY DRAINAGE SYSTEMS
7 INNOVATIONS IN SECONDARY DRAINAGE SYSTEMS K. F. YAROSH Dow Corning S.A., Parc Industriel-Zone C, B-7180 Seneffe, Belgium SUMMARY: This paper will review innovative internal backup secondary drainage
More informationSTANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS
ROOFING APPLICATION STANDARD (RAS) No. 133 STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS 1. Scope 1.1 This application standard has been developed to provide consistent information for the
More informationPART 1 GENERAL 1.1 SECTION INCLUDES
J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including
More informationTHERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER POLYSOCYANURATE SYSTEM DESCRIPTION TORCH SYSTEM OVER POLYISO (15,17,19 YR) TH/BS-TH/CS
OPTIONAL TITLE 24 CRITICAL POINTS POLYISO THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER POLYSOCYANURATE DESCRIPTION TORCH OVER POLYISO (5,7,9 YR) TH/BS-TH/CS 2 No 0. SUBSTRATE. THERMOTEK USA PRO 2.0 FV
More informationFinal inspections are completed by site visit only. Access to fenced yards shall be planned.
ROOFING RESIDENTIAL BUILDING INSPECTIONS DEPARTMENT www.ci.blaine.mn.us This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building Code, Blaine City ordinances,
More informationRead and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS
AC TOPSEAL SELF-ADHERED, GRANULAR SURFACED, SINGLE PLY, LOW SLOPE ROLLED ROOFING 3 X 33.3 = 100 SQ. FT. 10 YEAR MATERIAL LIMITED WARRANTY For Use on Porches / Sheds / Utility Buildings / Accessory Buildings
More informationQuality Assurance and Diagnostic Water Leakage Field Check of Installed Storefronts, Curtain Walls and Sloped Glazing Systems
Method of Test Committee Approval Product Group Approval Approved via 5/21/15 MOT CC Out for Ballot (#805-15) PUBLICATION NO. AAMA 501.2-XX DRAFT #2 DATED 5/21/15 Quality Assurance and Diagnostic Water
More informationSECTION 07550 - MODIFIED BITUMINOUS MEMBRANE ROOFING. A. Vapor barrier (base ply); cover board at existing roof deck.
SECTION 07550 - PART I GENERAL 1.01 SECTION INCLUDES A. Vapor barrier (base ply); cover board at existing roof deck. B. Roof insulation at new roof deck. C. Modified bitumen membrane. D. Fluid applied
More informationADDENDUM NO. 2. DATE: September 14, 2015 INVITATION FOR BID: IFB J160004535 Fire Station #22 Roof Replacement Project DATED: August 25, 2015
ADDENDUM NO. 2 DATE: September 14, 2015 INVITATION FOR BID: IFB J160004535 Fire Station #22 Roof Replacement Project DATED: August 25, 2015 RECEIPT DATE: September 30, 2015 (CHANGED) OPENING DATE: October
More informationCity of San Diego, CWP Guidelines
PART 1 -- GENERAL SECTION 08520-1.1 WORK OF THIS SECTION City of San Diego, CWP Guidelines A. The WORK of this Section includes providing aluminum windows with frames, bracing, glazing attachments, screens,
More informationRDH Building Sciences Inc.
MAK LTR 2007 03 26 Proposal for Building Enclosure Consulting Services RDH Building Sciences Inc. 509 FAIRVIEW AVENUE N SEATTLE WA 98109-5507 TEL 206 324 2272 FAX 206 324 6339 SEA@RDHBE.COM WWW.RDHBE.COM
More informationSEAMS SEAMING USING SEAM TAPE
SEAMING USING SEAM TAPE SEAMS The membrane should be positioned so that the width of the seam is 3. Remove excess chalk from a chalk line by snapping the line into the air and then chalk a line one-quarter
More informationRESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings
More informationSCENIC VIEW SV 10 SECTION 08 87 13 SOLAR CONTROL FILMS
PART 1 GENERAL SCENIC VIEW SV 10 SECTION 08 87 13 SOLAR CONTROL FILMS 1.1 SUMMARY A. Optically clear dual reflective, neutral sputtered and aluminum metallized polyester film for solar control. 1.2 RELATED
More informationWindow Installation Instructions
Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for
More informationSECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES
1.00 PART 1 GENERAL 1.01 SCOPE A. It is the intent of this contract to install a 100% solids epoxy monolithic coating to the walls, benches and inverts of all manholes and the specified surfaces of other
More informationTundra Series Windows January 2016
Tundra Series Windows January 2016 New Construction Installation Instructions Nail Fin, J-Fin and Brickmold Aplications product. ATTENTION! Read and understand all installation instructions before installing
More information07 5423-1 THERMOPLASTIC-POLYOLEFIN ROOFING (TPO) Data Center
PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 07 5423 THERMOPLASTIC-POLYOLEFIN ROOFING (TPO) Data Center A. Tear off existing roof system down to wood deck and install new Thermoplastic membrane roofing
More informationSECTION 07560 FLUID APPLIED ROOFING (LIGHT TRAFFIC DECKS OVER CONCRETE)
SECTION 07560 FLUID APPLIED ROOFING (LIGHT TRAFFIC DECKS OVER CONCRETE) PART 1 GENERAL 1.1 DESCRIPTION 1. Fluid applied flexible acrylic waterproofing system over concrete. This work shall include the
More informationA. Work on this project shall consist of, but is not limited to, the following:
PART 1 - GENERAL CLEANING AND RESTORATION OF SECTION 05900-1 1.1 SUMMARY A. Work on this project shall consist of, but is not limited to, the following: 1. Clean and treat all exposed anodized architectural
More informationfoot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.
Skylight Installation Instructions This document provides instruction and guidelines for installation of both curb mount (CM) and self flashing (SF) unit skylights on flat, pitched (> or equal to 3/12
More informationSECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
More informationWELCOME. Recommended Window Installation. 1.5 credits Minnesota Department of Labor and Industry
WELCOME Recommended Window 1.5 credits Minnesota Department of Labor and Industry In accordance with the Department of Labor and Industry s statute 326.0981, Subd. 11, This educational offering is recognized
More informationCopyright 1999 Inter-Industry Conference On Auto Collision Repair v.4.0
Uniform Procedures For Collision Repair RO11 Removable Roof Copyright 1999 Inter-Industry Conference On Auto Collision Repair v.4.0 1. Description This procedure describes the repair and complete replacement
More informationJANUARY, 2016 TR-7100 Windows (Fixed) 1 EC 97909-071 085113 ALUMINUM WINDOWS Guide Specs
JANUARY, 2016 TR-7100 Windows (Fixed) 1 EC 97909-071 085113 ALUMINUM WINDOWS Guide Specs SECTION 085113 ALUMINUM WINDOWS This suggested guide specification has been developed using the current edition
More informationSECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES
SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with
More informationWATERPROOFING FOR CONCRETE STRUCTURES
MANUAL OF CONTRACT DOCUMENTS FOR ROAD WORKS VOLUME 1 SPECIFICATION FOR ROAD WORKS SERIES 2000 WATERPROOFING FOR CONCRETE STRUCTURES Contents Clause Title Page 2001 General 2 2002 Protection of Bridge Deck
More informationWaterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries
Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Introduction Wastewater of petrochemical industries and refineries contains high amounts of emulsified aliphatic or
More informationCHAPTER 7: Building Systems ROOFING SYSTEMS
ROOFING SYSTEMS Purpose Examples 1. Shingle roof system 2. Metal roof with blanket insulation 3. Metal roof with rigid insulation 4. Built-up asphalt roof system 5. Single-ply roof system 6. Modified Bitumen
More informationSECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
More informationSECTION 07530 SINGLE PLY MEMBRANE ROOFING. 4. Minor repair to adjacent clay tile roofing and flashings.
SECTION 07530 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section includes the flowing: 1. Removal of existing roofing membrane. Existing bur roof has one overlay and penetration mastic is asbestos containing.
More informationWATERPROOFING OF WET ROOMS
WATERPROOFING OF WET ROOMS Waterproofing under tiles For longterm enjoyment of a wetroom area a complete and resistant waterproofing system is an important precondition. Most tiles are by themselves waterproof
More informationResidential Roofing Guide
Residential Roofing Guide TABLE OF CONTENTS Building Detail and Accessories...... 1 Panel Introduction and Handling...... 2 Cutting and Trimming.... 3 Roof Preparation..... 3 Roof Slope..... 3 Re-roofing...
More informationHIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS
BSW HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW is a fully reinforced Pre-Applied system membrane designed for horizontal and vertical external blind-side
More informationGUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS 174-180 PHILLIP STREET, SYDNEY
GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS 174-180 PHILLIP STREET, SYDNEY July 2008 1.0 SCOPE These guidelines describe the way in which air conditioning units shall be installed or replaced
More informationCITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles
CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503 Re-Roofing: Asphalt Shingles This is a summary of the standard requirements based on the
More informationRehabilitation of an Aging Concrete Reservoir Adit Tower
Rehabilitation of an Aging Concrete Reservoir Adit Tower Raymond S. Tombaugh, Senior Coatings Consultant KTA-Tator, Inc. and Mongkol Mahavongtrakul, P.E. Corrosion Control Contract Manager San Francisco
More informationCREEK Technical Services, LLC
EVALUATION REPORT 2010 FLORIDA BUILDING CODE Manufacturer: Henry Company Report Issued February 20, 2013 999 North Sepulveda Blvd., Suite 800 El Segundo, CA 90245 (800) 486-1278 Manufacturing Plants: Quality
More informationThe Ultimate in Weathersealing Versatility. Dow Corning 123 Silicone Seal
The Ultimate in Weathersealing Versatility Dow Corning 123 Silicone Seal Effective and attractive EIFS restoration When urethane sealants fail on EIFS-clad buildings, leaks and interior damage typically
More informationPART E SPECIFICATIONS
PART E SPECIFICATIONS Page 1 of 5 PART E - SPECIFICATIONS GENERAL E1. APPLICABLE SPECIFICATIONS, STANDARD DETAILS AND DRAWINGS E1.1 The City of Winnipeg Works and Operations Division Standard Construction
More informationWastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
More informationThe existing roof angle change terminations and flashings when sound and intact can be reused.
January 2, 2015 Summary Specification Re-Skinning an Existing Roof Maintenance and Repair Warranty Upgrade for Up to 30 Years Re-Skinning Over an Existing Roof with a New C-EPDM Membrane Using The Existing
More information09/07/07 GLASSFIBER REINFORCED CEMENT (GRC) C. S. I. Spec 03500 Master Spec. 03 49 00 Page 1
C. S. I. Spec 03500 Page 1 PART 1 - GENERAL 1.01 SUMMARY:.01 Provide special glassfiber reinforced cement (GRC) shapes in accordance with the requirements of the contract documents..02 The installing contractor
More informationAssessing Curtain Walls
Assessing Curtain Walls Considerations and Best Practices Paul E Beers GCI Consultants, LLC pbeers@gciconsultants.com What is a Curtain Wall System? A curtain wall system is an outer covering of a building
More informationDrexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood
Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood Section 07411 Metal Roof Panels Part 1 General 1.1 Summary A. This section includes the following: a. Factory-formed
More informationALPHA 15-Year Permathane II FR w/granules
ALPHA 15-Year Permathane II FR w/granules Section 07 57 13 Sprayed Polyurethane Foam Roofing Guide Specification PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Furnish all labor, materials, tools and
More informationPhoto courtesy of Delta Stone, Heber City, UT. Installation Solutions for: Manufactured Stone, Natural Thin Veneer, and Thin Brick
Photo courtesy of Delta Stone, Heber City, UT Installation Solutions for: Manufactured Stone, Natural Thin Veneer, and Thin Brick THIN VENEER INSTALLATION SYSTEMS PREMIUM BONDING MORTARS Premium PCL Stone
More informationA D D E N D U M # 3 QUESTIONS FROM BIDDERS: DATE: November 5, 2012. All Bidders. Jenne dos Santos, CBI Consulting Inc. City of Chelsea, MA
Page 1 of 10, Addendum No. 3 Temporary Garage Structure City of Chelsea, MA November 5, 2012 CBI Job No.: 12055-A A D D E N D U M # 3 DATE: November 5, 2012 TO: FROM: PROJECT: All Bidders Jenne dos Santos,
More informationINSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW
Vinyl Windows and Doors Manufactured by Pella Corporation INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW Lea las instrucciones en español en el reverso.
More informationSTANDING SEAM SHEET METAL ROOFING
STANDING SEAM SHEET METAL ROOFING GENERAL INFORMATION 1.1 For all standing seam metal roofing work consult Columbia University Facilities Exteriors and Historic Preservation group. 1.2 Fabricator is responsible
More informationRoof Deck Installation Guidelines
Roof Deck Installation Guidelines June 2012 TABLE OF CONTENTS INTRODUCTION GENERAL INFORMATION BEFORE THE DECK ARRIVES WHEN THE DECK ARRIVES CARE OF MATERIALS CAUTIONS INSTALLATION GENERAL TECTUM I PLANK
More informationSeptember 3, 2009. Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901
September 3, 2009 Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901 RE: Ketchikan Gateway Borough Gateway Recreation Center Roof Observations and Intrusive Inspections
More informationBuilding Owners Guide to a Duro-Last System!
Building Owners Guide to a Duro-Last System Table of Contents Section 1: Introduction to Duro-Last Roofing Systems Section 2: Benefits of a Duro-Last Roofing System Section 3: Comparing a Duro-Last Roof
More informationRoof Inspection. Summary Report
Phone: (561) 866 9956 www.real-estate-inspections.com Roof Inspection Summary Report Subject Property File Number: 05-15-RF-002 Inspector: Craig Milliken, PE CPM Real Estate Inspections, Inc. Date of Inspection:
More informationTHIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150
THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150 SECTION ONE A. Objective The objective of this guide is to provide Owners and General Contractors/Construction
More informationAsphalt Shingle Application Requirements
Alberta Allied Roofing Association Asphalt Shingle Application Requirements Section 1 Roof Decks 1.1 General Asphalt Shingles are not permitted to be installed directly over rigid insulation. When Asphalt
More informationSECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
More informationDivision 9. SignaFlor Pad and Pour Flooring System
Division 9 SignaFlor Pad and Pour Flooring System SPECIFICATIONS Page 1. General... 2 1.1 Description 2 1.2 Quality Assurance 2 1.3 Submittals 2 1.4 Delivery and Storage 3 1.5 Warranty 3 1.6 Working Conditions
More informationELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1
KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 16050 A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1
More informationCHAPTER VII. TITLE: STANDARDS FOR NEW ROOFING July 2015 CONSTRUCTION, RE-ROOFING CONSTRUCTION AND ROOFING SYSTEM GUARANTEE REQUIREMENTS
TITLE: STANDARDS FOR NEW ROOFING CONSTRUCTION, RE-ROOFING CONSTRUCTION AND ROOFING SYSTEM GUARANTEE REQUIREMENTS Responsible Organization: Office of Facilities Planning Instructions: This Manual supersedes
More informationWATER LEAKAGE IN GLAZED CURTAIN WALL SYSTEMS:
WATER LEAKAGE IN GLAZED CURTAIN WALL SYSTEMS: BY WILLIAM D. SMITH Figure 1 Four Corporate Center, Franklin, TN. Architect: Little & Associates,Charlotte, NC. Gen. Contractor: Ray Bell Const. Co., Nashville,
More informationInstallation Solutions for: Manufactured Stone, Natural Thin Veneer, and Thin Brick ARCHITECTURAL SPECIFICATIONS / CAD MODELS TVISTM WARRANTIES
ARCHITECTURAL SPECIFICATIONS / CAD MODELS With more than 40 years of manufacturing high quality, innovative building products in the commercial and residential markets, Custom Building Products TVISTM
More informationVOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10
VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1
More informationSECTION 07410 METAL ROOF & WALL PANELS
This document specifies Metal Roofing Systems prefinished factory formed metal roofing marketed as MRS System 2500 steel and aluminum roofing systems and includes MRS flashing and Trim. MRS finish is a
More informationSWD URETHANE COATED FOAM ROOFING SYSTEM MASTER ROOF SPECIFICATION SECTION 075700
SWD URETHANE COATED FOAM ROOFING SYSTEM MASTER ROOF SPECIFICATION SECTION 075700 Part 1 GENERAL SUMMARY Section Includes: Coated foam roofing system and acceptable alternative applications as specified
More informationPreformed Metal Roofing and Siding
Page -1-1. GENERAL 1.1. Description This specification along with the drawings covers the furnishing of all material, products, equipment, accessories, tools, services, transportation, labor and supervision
More informationLow-slope reroofing guidelines
Low-slope reroofing guidelines by Thomas Bollnow and Joan P. Crowe, AIA The NRCA Roofing and Waterproofing Manual, Fifth Edition, contains reroofing guidelines for steep- and low-slope roofing. The August
More information