SKYLIGHT RESTORATION - SCOPE OF WORK- BASE BID 1

Size: px
Start display at page:

Download "SKYLIGHT RESTORATION - SCOPE OF WORK- BASE BID 1"

Transcription

1 CITY OF SANTA ROSA CITY HALL WINGS GENERAL SKYLIGHT RESTORATION - - BASE BID 1 A. Summary of work: 1. Information herein is provided as a general overview of the project scope, and as such, does not grant authority for deviation from the manufacturers specifications for product, execution, or quality assurance. References to other documents, test reports, manufacturer requirements, and certifications found within other sections of the City of Santa Rosa contract documents should be considered inclusive to define the overall scope of work to be performed. 2. Definitions: For the purpose of clarification within this scope of work the following terms are defined as listed unless otherwise noted elsewhere in City of Santa Rosa contract documents. a. Contractor: Roofing/Waterproofing. b. Manufacturer: Waterproofing materials providing system. c. Owner: City of Santa Rosa. 3. The following paragraphs are generally applicable requirements for performance of work on this project and are supplements to the contract documents: a. Any construction details for the Scope of Work are as noted. Installation shall conform to manufacturer s specifications which may be designed specifically for this project superseding their printed literature. In the event where provisions of codes, safety orders, Contract Documents, referenced manufacturer s specifications or industry standards are in conflict, the more restrictive and higher quality shall govern. In instances where specific conditions exist that vary from this scope of work, a Manufacturer approved shop drawing to be submitted for consideration to the Owner. Installation shall not begin until approval by Owner has been given. b. Unless otherwise shown or noted, existing, functional and salvageable, sheet metal counterflashings shall be carefully handled to allow reuse after the specified work is complete. Damage done to otherwise salvageable metal flashings shall be repaired via replacement with new metal in the damaged area. c. All due precautions will be taken to prevent disruption to the occupancy of the facility interior or grounds. Every effort will be employed to prevent additional damage to the existing assembly while working in an adjacent area, point overloading and damage to areas not in this scope of work. d. During periods of precipitation perform at least daily interior building inspections for leaks in the area of Work. Owner s representative will inform Contractor about known leaks. Should there be any such leaks; the Contractor shall repair them immediately to prevent interior building damage. All leak related damage to the building under Work areas shall be repaired to the satisfaction of the Owner. e. Maintain a complete set of manufacturer specifications and drawings during the course of work. f. All demolition/tear-off Work, solvent based or fume producing Work and Work interfering with the normal operations of the facility will be coordinated with the Owner prior to start of Work, except such Work as is necessary for the proper care and protection of Work already performed, or except in a case of an emergency, and in any case, only with the written permission of the Owner. B. Work to be performed: 1. Skylight Restoration: a. Metal framed skylights with safety glass incorporating past repairs that included urethane sealant. Skylights are set on sloped wood curbs at the interior of skylight and terminated on the exterior of skylight at the pre-cast concrete wall. b. The scope of work is preparation and repair of the existing skylight framing/sealant/glass panel assembly to provide an aesthetically pleasing waterproofing assembly with an anticipated minimum life span of ten (10) years. This shall include installation of a preformed silicone elastomer extrusion and all designated accessory items to provide manufacturer's warranty. c. Verify all existing conditions relative to fulfill contract documents and installation of roof system per intent of contract documents. C. Submittals: Submit the following for contract officer review and approval: 1. Product data sheets, shop drawings and literature verifying physical properties and performance parameters of materials. Copyright (ARDG Inc), Page - 1 Skylight Restoration Scope of Work

2 CITY OF SANTA ROSA CITY HALL WINGS Material safety data sheets. 3. Manufacturer approved contractor certification as required to provide listed warranty. D. Deliver materials in original sealed containers, clearly marked with: Manufacturer s logo and full product name. E. Protect all materials from freezing and other damage during transit, handling, storage and installation. F. Match existing components when possible. All replacement components to meet current code and industry standards for size, quality and applicability. G. Reasonable access for all operations to be provided by Owner. 1.1 REGULATORY & PERFORMANCE STANDARDS A. Compliance for Design: 2010 California Building Code (CBC Title 24) B. Performance standards: American Society for Testing and Materials (ASTM): Reference latest revisions of standards unless otherwise indicated. 1.2 WARRANTY & QUALITY ASSURANCE A. Skylight Restoration: 1. Manufacturers 10 year covering defective material. 2. Contractor 3 year labor/workmanship warranty. 3. Quality Assurance: a. Contractors project superintendent to complete attached daily inspection form complete with photos. Provide copies to owners designated representative. b. The Owner shall make periodic roof inspections and inspect the completed Work with the contractor. Any defects in the application will be in the form of a punch list or inspection report. c. Manufacturer inspections as required for warranty. 2.0 PRODUCTS A. Components to meet current code and industry standards for size, quality and applicability as required by shingle manufacturer for proper installation to meet project warranty. Primary materials are listed below. All additional components required to meet mfg. & code requirements will be provided. 2.1 WOOD A. Not Applicable. 2.2 FASTENERS A. Fasteners as required to repair skylights. 2.3 SKYLIGHT RESTORATION - A. Mfg: Dow-Corning. B. Primer: As supplied and required by mfg. for installation and project warranty. C. Cleaners: As supplied and/or required by mfg. for installation and project warranty. D. Preformed Silicone Extrusion: 1. Product: Dow Corning 123 Silicone Seal. 2. Description: Custom-designed, multi-dimensional, shaped silicone seals fabricated from elastomer silicone extrusions for bonding to substrates with silicone sealant. Copyright (ARDG Inc), Page - 2 Skylight Restoration Scope of Work

3 CITY OF SANTA ROSA CITY HALL WINGS Function: Used with sealant to form elastomeric cover for skylight frames, mullions, seams, transitions and penetrations. 4. Dimensions: Contractor to measure and provide manufacturer with dimensions for prefabricated extrusions to fit existing metal skylight frame & mullions. 5. As Supplied Cured Rubber Extrusion: ASTM D Day Sealant Cure 0.5 Joint, 1.5 Wide Silicone Strip, Bonded w/silicone Building Sealant - ASTM C 1135, ASTM C 719: 7 Unprimed Adhesion of Silicone Strip, Bonded w/silicone Building Sealant - ASTM C 794, ASTM C 719: Peel Strength: (Dow Corning 795) 25 pli / 4.38 N/m. E. Sealant: 1. Product: Dow Corning 795 Silicone Building Sealant. 2. Description: Neutral, one part silicone sealant. 3. Function: Used to bond preformed silicone elastomer extrusion to form elastomeric cover for skylight frame seams, transitions and penetrations. 4. Applicable Standards. Meet or exceed: a. Federal Specification TT-S A (COM-NBS) Class A. b. Federal Specification TT-S-230C (COM-NBS) Class A. c. ASTM C-920, Class 50, Type S, Grade NS, Use NT, G,A,O. d. Staining of Masonry ASTM 1248: None. 2.4 ACCESSORIES A. Additional accessories as required to complete work and manufacturers requirements for installation and warranty. 3.0 INSTALLATION - GENERAL A. Preparation requirements: 1. Verify any additional surface preparation relative to inspection and treatment of defects in the structural integrity and receiving surfaces is in accordance with good waterproofing practices. 2. Verify substrate is suitable surface to receive and hold the materials referring to manufacturers recommendations and/or requirements. 3. Comply with applicable manufacturers published instructions. Clean substrate of dust, debris, and other substances detrimental to adhesion. This includes thoroughly clean surface in a manner to remove loose materials, dirt and other debris to provide a clean dry surface for optimal application and adhesion. 4. Complete all openings or projections prior to repair installation. 5. Primer: As required by material manufacturer. B. Installation requirements: 1. Completed installation shall consist of indicated components. 2. Follow the manufacturer s requirements as they pertain to manufacturer s warranty. If a conflict exists verify acceptability/compatibility from the manufacturer prior to installation. 3. Install materials per mfg. requirements. Inspect for any deficiencies. 4. Install to insure proper application per scope of work and or additional manufacturer requirements. 5. Areas not meeting criteria to be reapplied or reinstalled. 3.1 INSTALLATION DEMOLITION A. Pre-construction requirements: 1. Contractor shall not proceed with any removal or installations until all submittals, certifications, required pre-constructions conferences, changes or variations in project specifications have been submitted, conducted and approved for start. Copyright (ARDG Inc), Page - 3 Skylight Restoration Scope of Work

4 CITY OF SANTA ROSA CITY HALL WINGS 6-10 B. Site conditions: 1. Submit to Owner a video or photographs and a written report of existing interior and exterior damage, leakage etc. 2. Provide an employee to monitor interior conditions any removals, replacements or other critical operations that may expose the occupants or property to hazard. Contractor to coordinate activities with owner. 3. Provide protection to occupants, interior activities and property unless otherwise directed by project documents or in writing by the Owner. 4. Wherever surface preparation, patching/repair, priming or coating is being performed, all walks, stairs, floors, plants or shrubbery, or other exposed surfaces and items shall be carefully protected from damage. 5. All supplies, equipment, materials, coatings, containers, etc. shall be stored in an orderly manner, carefully arranged and adequately protected. C. Demolition - general: 1. When inclement weather threatens, cease removal work and return to a watertight condition and dry in at the end of the day. 2. Coordinate demolition with other trades. 3. Only commence installation of after all maximum roof loads have been confirmed to insure that no point loading occurs beyond structural limits set by owner. 4. No removal structural supports without direct approval from Owners Structural Engineer. Immediately report any structural deficiencies to Owner and cease work until authorized by Owners Structural Engineer. D. Demolition - removals: 1. As required to complete scope of repairs / restoration. E. Demolition - Equipment / Electrical disconnects and removals: 1. Bid to include all associated cost relating to disconnect, reconnect including any necessary raising of gas lines, electrical conduits, refrigeration lines, condensate lines, duct work to accommodate installation of work. 2. Electrical conduit and junction boxes located on the roof deck and walls. Remove and/or prepare all materials without damage to electrical. Do not proceed with work until: a. Determine if existing electrical is live or abandoned, meet current regulatory requirements. b. Mark all live junction boxes prior to installation. Reconnection and disconnect as required to safely install repairs by a licensed electrician under separate contract. 3.2 INSTALLATION SKYLIGHT REPAIR A. Examine the areas and conditions under which Work will be performed. Conditions detrimental to timely and proper completion of the Work shall be brought to the attention of the Owner for resolution prior to proceeding. Incorrectly installed materials requiring changes will be at Contractor's expense. 1. Prepare all surfaces per mfg. requirements including application of primer, extrusions and sealants. All deficiencies, regardless of trade, must be corrected prior to application. Do not proceed until all areas have been inspected and approved by quality assurance representative. 2. Perform an adhesion test on all surfaces, per manufacturer s direction, prior to start of full repairs. 3. Beginning of installation means acceptance of existing conditions. B. Protect skylights & concrete walls from environmental conditions. Failure to protect the skylights, walls, accessories and sealants will result in the removal of damaged materials. Remove damage materials prior to start of new work. Copyright (ARDG Inc), Page - 4 Skylight Restoration Scope of Work

5 CITY OF SANTA ROSA CITY HALL WINGS 6-10 C. Preparation: 1. Skylight frames / mullions: Clean, remove or cut back existing repairs/sealant to provide smooth surface/transition for application of silicone extrusions. 2. Skylight glass: Remove / cut back existing skylight frame sealant/coating from skylight glass to provide a smooth surface for application of silicone extrusions. 3. Cleaning: Per mfg requirements and allow too dry thoroughly. 4. Masking: Apply masking tape outlining area where silicone seal will be applied. 5. Do not apply additional materials until after repairs have fully cured. 6. Perform adhesion test in accordance with ASTM C1193, Method A, to determine if primer is required to achieve adequate adhesion. D. Installation: 1. Install new specified prefabricated silicone extrusion to encapsulate designated skylight frame / mullion assemblies. 2 Apply primer as required. 3. Sealant: Apply bead of 795 silicone sealant on each side of joint and 1/4 inch (6 mm) inside masking tape. 4. Bead size: As specified by manufacturer. 5. Minimum bonding area: 3/8 inch (9 mm). 6. Silicone seal: Per Mfg. requirements. 7. Complete horizontal joints prior to vertical joints unless otherwise directed by manufacturer. 8. Reapply any improperly applied and/or defective materials or areas of application not meeting specified rates of application and dried mil thickness. 9. Allow curing thoroughly per manufacturer s instructions. Inspect for defects. E. Isolate between aluminum and dissimilar metals with a protective coating or plastic strip to prevent electrolytic corrosion. 3.3 DETAIL DRAWING LEGEND A. Skylight Repair Name Description A-1 Overlapping Silicone Extrusions A-2 Silicone Skylight Mullion A-3 Silicone Skylight Frame & Interior Curb A-4 Silicone Skylight Frame & Pre-cast Panel END OF Copyright (ARDG Inc), Page - 5 Skylight Restoration Scope of Work

6 ITEM # 1A PHOTO BUILDING BASE BID 1 1. General Condition: a. Typical condition at all wings under scope of work. #1.A.1.a #1.A.1.a Page 1 of 7 Pages (ARDG Inc.) c

7 ITEM # BUILDING 2A PHOTO BASE BID 1 #2.A.1.a #2.A.1.a 1. General Condition: a. Typical condition at all wings under scope of work. #2.A.1.a #2.A.1.a #2.A.1.a Page 2 of 7 Pages (ARDG Inc.) c

8 ITEM # BUILDING 3A PHOTO BASE BID 1 #3.A.1.a 1. General Condition: a. Typical condition at all wings under scope of work. #3.A.1.a #3.A.1.a Page 3 of 7 Pages (ARDG Inc.) c

9 ITEM # 4A DETAIL A-1 OVERLAPPING SILICONE EXTRUSIONS PRE-FORMED SILICONE EXTRUSION. VERTICAL STRIPS MUST OVERLAP HORIZONTAL STRIPS. PRE-FORMED SILICONE EXTRUSION. PRE-CAST CONCRETE AT EXTERIOR WALL FOR ILLUSTRATION. ACTUAL CONFIGURATION WITH 90 DEGREE TRANSITION. EXISTING FLASHING METAL AT INTERIOR CURB. SKYLIGHT FRAME SKYLIGHT FRAME SKYLIGHT MULLION SKYLIGHT GLASS Page 4 of 7 Pages

10 ITEM # 5A DETAIL A-2 SILICONE EXTRUSION AT SKYLIGHT MULLION EXISTING SKYLIGHT MULLION ASSEMBLY EXISTING URETHANE SEALANT / COATING REPAIR. CUT BACK EXCESS REPAIR FROM GLASS TO PROVIDE A SMOOTH CLEAN SURFACE FOR SILICONE EXTRUSION NEW PRE-FORMED SILICONE EXTRUSION ENCAPSULATING SKYLIGHT FRAME/MULLION ASSEMBLY. CONFIGURATION IS FOR ILLUSTRATION ONLY. ACTUAL DIMENSIONS & CONFIGURATION TO BE DETERMINED BY MANUFACTURER BASED UPON CONTRACTOR PROVIDED DIMENSIONS. BEAD OF APPROVED SEALANT PER MANUFACTURERS REQUIREMENTS. TAPE ALL AREAS NOT RECEIVING INSTALLATION PER MFG. INSTRUCTIONS. SKYLIGHT GLASS Page 5 of 7 Pages

11 ITEM # 6A DETAIL A-3 SILICONE EXTRUSION AT SKYLIGHT FRAME / INTERIOR CURB NEW PRE-FORMED SILICONE EXTRUSION ENCAPSULATING SKYLIGHT FRAME/MULLION ASSEMBLY. CONFIGURATION IS FOR ILLUSTRATION ONLY. ACTUAL DIMENSIONS & CONFIGURATION TO BE DETERMINED BY MANUFACTURER BASED UPON CONTRACTOR PROVIDED DIMENSIONS. EXISTING SKYLIGHT FRAME / MULLION ASSEMBLY EXISTING URETHANE SEALANT / COATING REPAIR. CUT BACK EXCESS REPAIR FROM GLASS TO PROVIDE A SMOOTH CLEAN SURFACE FOR SILICONE EXTRUSION BEAD OF APPROVED SEALANT PER MANUFACTURERS REQUIREMENTS. TAPE ALL AREAS NOT RECEIVING INSTALLATION PER MFG. INSTRUCTIONS. EXISTING URETHANE SEALANT / COATING REPAIR. CUT BACK /REMOVE EXCESS REPAIR FROM METAL TO PROVIDE A SMOOTH CLEAN SURFACE FOR SILICONE EXTRUSION (2) COATS OF SILICONE COATING (TOTAL 11 MIL DRY THICKNESS) APPLIED TO METAL COUNTERFLASHING AND SKYLIGHT FRAME/ FLASHING AREAS NOT ENCAPSULATED BY SILICONE EXTRUSION. PRIME AS REQUIRED BY MFG. SKYLIGHT GLASS EXISTING METAL COUNTERFLASHING. SKYLIGHT FRAME ASSEMBLY Page 6 of 7 Pages

12 ITEM # 7A DETAIL A-4 SILICONE EXTRUSION AT SKYLIGHT FRAME / PRE-CAST PANEL EXISTING PRE-CAST CONCRETE WALL WITH RAISED RIBS. TAPE ALL AREAS NOT RECEIVING INSTALLATION PER MFG. INSTRUCTIONS. EXISTING URETHANE SEALANT / COATING REPAIR. CUT BACK /REMOVE EXCESS REPAIR FROM METAL TO PROVIDE A SMOOTH CLEAN SURFACE FOR SILICONE EXTRUSION NEW PRE-FORMED SILICONE EXTRUSION ENCAPSULATING SKYLIGHT FRAME/ MULLION ASSEMBLY. CONFIGURATION IS FOR ILLUSTRATION ONLY. ACTUAL DIMENSIONS & CONFIGURATION TO BE DETERMINED BY MANUFACTURER BASED UPON CONTRACTOR PROVIDED DIMENSIONS. EXISTING URETHANE SEALANT / COATING REPAIR. CUT BACK EXCESS REPAIR FROM GLASS TO PROVIDE A SMOOTH CLEAN SURFACE FOR SILICONE EXTRUSION BEAD OF APPROVED SEALANT PER MANUFACTURERS REQUIREMENTS. TAPE ALL AREAS NOT RECEIVING INSTALLATION PER MFG. INSTRUCTIONS. SKYLIGHT GLASS Page 7 of 7 Pages

REROOFING - SCOPE OF WORK

REROOFING - SCOPE OF WORK REROOFING - SCOPE OF WORK 1.0 GENERAL A. Summary of work: 1. Information herein is provided as a general overview of the project scope, and as such, does not grant authority for deviation from the manufacturers

More information

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association Air-Conditioning, Heating, and Refrigeration Institute Sheet Metal and Air-Conditioning Contractors National Association GUIDELINE B-1997 ACKNOWLEDGEMENT These guidelines for Roof Mounted Outdoor Air-

More information

A. This Section includes rubberized asphalt sheet membrane waterproofing systems.

A. This Section includes rubberized asphalt sheet membrane waterproofing systems. SECTION 07110 SHEET MEMBRANE WATERPROOFING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

CITY OF BELL PROFESSIONAL CONSULTING SERVICES FOR ROOF REPAIRS TO CITY OWNED FACILITIES

CITY OF BELL PROFESSIONAL CONSULTING SERVICES FOR ROOF REPAIRS TO CITY OWNED FACILITIES CITY OF BELL 6330 PINE AVENUE BELL, CA 90201 PH: (323) 588-6211 FAX: (323) 771-9473 CITY OF BELL PROFESSIONAL CONSULTING SERVICES FOR ROOF REPAIRS TO CITY OWNED FACILITIES I. INTRODUCTION City of Bell

More information

NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within

More information

SECTION 07 61 13 STANDING SEAM METAL ROOFING

SECTION 07 61 13 STANDING SEAM METAL ROOFING SECTION 07 61 13 STANDING SEAM METAL ROOFING PART 1 GENERAL 1.01 SCOPE OF WORK A. The Work shall include all labor, materials, equipment and supervision required to complete the work of the above referenced

More information

SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront PART 1 GENERAL 1.01 Work Included SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS System 402 Flush-Glazed Screw Spline Storefront A. Furnish and install aluminum architectural storefront system

More information

RECOATING AND RENEWING SPF ROOFING SYSTEMS

RECOATING AND RENEWING SPF ROOFING SYSTEMS RECOATING AND RENEWING SPF ROOFING SYSTEMS Procedures, Regional Differences and type of coating systems Bruce Schenke Premium Spray Products REASONS TO RECOAT/RENEW Add a new coating layer to renew the

More information

1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.

1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system. SECTION 075416 - PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system. 1.2 PERFORMANCE REQUIREMENTS A. Solar Reflectance

More information

SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING

SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING PART ONE GENERAL DESCRIPTION This section includes pre-formed standing seam metal roofing and related flashings, closures, trim and accessories including,

More information

SECTION 07410 PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK

SECTION 07410 PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK SECTION 07410 PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK A. This section covers the pre-finished, pre-fabricated Architectural standing seam roof system. All metal trim,

More information

FIRESTOPPING & SMOKE SEALS

FIRESTOPPING & SMOKE SEALS SPECIFICATION SECTION 07 84 00 FIRESTOPPING & SMOKE SEALS 1 GENERAL 1.1 SECTION INCLUDES 1.1.1 Comply with Division 1, General Requirements and Documents referred to therein. 1.1.2 It is the intent of

More information

METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES

METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES REFLECTICLEAN ACRYLIC/URETHANE Elastomeric Roofing Systems, Inc 6900 Bleck Dr. Rockford, MN 55373 800.403.7747 -or- 763.565.6900 fax: 763.565.6901 email:

More information

SECTION 07400 STANDING SEAM METAL ROOF

SECTION 07400 STANDING SEAM METAL ROOF SECTION 07400 STANDING SEAM METAL ROOF PART 1 - GENERAL 1.01 SECTION INCLUDES A. Work described in this section includes pre-formed standing seam metal roofing system complete with clips, perimeter and

More information

Colorado State University. Durrell Center Roof Repair

Colorado State University. Durrell Center Roof Repair Colorado State University Durrell Center Roof Repair SPECIFICATION: POLYURETHANE FOAM ROOFING l.0 GENERAL REQUIREMENTS The successful application of a polyurethane foam roofing system is dependent upon

More information

Georgia State University. Urban Life Building Roof Replacement

Georgia State University. Urban Life Building Roof Replacement ENGINEERING AND ENVIRONMENTAL 140 DECATUR STREET SE, ATLANTA, GA 30303 GEORGIA STATE UNIVERSITY - FACILITIES DESIGN & CONSTRUCTION 34 BROAD STREET, SUITE 100 ATLANTA, GA 30303 DRAWING INDEX A-0 PROJECT

More information

GUIDELINE SPECIFICATIONS

GUIDELINE SPECIFICATIONS GUIDELINE SPECIFICATIONS GORDON SOFFIT-SHIELD - An Exterior Metal Soffit System DIVISION 05 5800 or DIVISION 07 7700 Note To Specifier: SOFFIT-SHIELD should be installed by tradesmen that are experienced

More information

INSTRUCTIONS FOR COORDINATION SECTION 06651 SOLID SURFACE FABRICATIONS

INSTRUCTIONS FOR COORDINATION SECTION 06651 SOLID SURFACE FABRICATIONS INSTRUCTIONS FOR COORDINATION SECTION 06651 SOLID SURFACE FABRICATIONS 1. Paragraph 1.02 Provide solid surface countertops at sinks locations. Provide solid surface window sills at drywall framing walls.

More information

THERMOTEK SELF ADHESIVE MEMBRANE +G2 OVER WOOD SYSTEM DESCRIPTION SELF ADHESIVE OVER WOOD (8YR) BS-SA/CS

THERMOTEK SELF ADHESIVE MEMBRANE +G2 OVER WOOD SYSTEM DESCRIPTION SELF ADHESIVE OVER WOOD (8YR) BS-SA/CS THERMOTEK SELF ADHESIVE MEMBRANE +G OVER DESCRIPTION SELF ADHESIVE OVER (8YR) BS-SA/CS 1 0 No 0. SUBSTRATE 1. BASE SHEET G FIBER GLASS BASE. THERMOTEK SELF ADHESIVE 3.0 FP GRANULE COMPONENTS AND WEIGHTS

More information

Specifications. Preformed Metal Wall and Roof Panels. Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023

Specifications. Preformed Metal Wall and Roof Panels. Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023 Specifications Preformed Metal Wall and Roof Panels Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023 Section 07410 Preformed Metal Wall and Roof Panels Structural

More information

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS The (NRDCA) has prepared this document to provide customers and installers information that the industry

More information

Standard Method for Sampling and Analysis of. of Chlorine Containing Bleaches. Soap Products

Standard Method for Sampling and Analysis of. of Chlorine Containing Bleaches. Soap Products GUIDE SPECIFICATION FOR GENERAL CLEANING AND REMOVAL OF MOLD AND MILDEW ON EXTERIOR INSULATED AND FINISH SYSTEMS AND STUCCO DIVISION 07240 and DIVISION 09240 8/05 PART I: GENERAL 1.01 DESCRIPTION AND SCOPE

More information

HHS J.W. Peavy Center Exterior Walls Waterproofing and Roof Replacement Project WBS # H-000018-0006-4 SECTION 07610 STANDING SEAM METAL ROOFING

HHS J.W. Peavy Center Exterior Walls Waterproofing and Roof Replacement Project WBS # H-000018-0006-4 SECTION 07610 STANDING SEAM METAL ROOFING PART 1 - GENERAL 1.01 DESCRIPTION SECTION 07610 A. Furnish and install a weather and watertight prefabricated standing seam roof system complete, in place, as shown on the drawings and as specified herein.

More information

THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER

THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER DESCRIPTION TORCH OVER (15,17,19 YR) TH/BS-TH/CS 2 1 0 No 0. SUBSTRATE 1. THERMOTEK USA 2.0 FV TORCH SMOOTH 2. THERMOTEK USA PRO FP TORCH GRANULE COMPONENTS

More information

SECTION 07 42 13 METAL WALL PANELS

SECTION 07 42 13 METAL WALL PANELS Mitsubishi Plastics Composites America, Inc. 401 Volvo Parkway Chesapeake, VA 23320 Phone: (800) 422-7270 Fax: (757) 436-1896 E-mail: info@alpolic.com www.alpolic-northamerica.com This MANU-SPEC utilizes

More information

Exterior Elevated Elements Inspection Guidelines

Exterior Elevated Elements Inspection Guidelines Exterior Elevated Elements Inspection Guidelines Planning and Development 1. Guideline Purpose These guidelines are intended to assist practicing professionals in complying with Berkeley Municipal Code

More information

Williamson and Associates, Inc. Report of Building Exterior Condition Evaluation, dated January 2 nd, 2013. (68 pages)

Williamson and Associates, Inc. Report of Building Exterior Condition Evaluation, dated January 2 nd, 2013. (68 pages) INNOVATIVE BUILDING AND ARCHITECTURE CONSULTANTS Mr. Bud Hall Senior Vice President of construction Turnberry Associates 19501 Biscayne Boulevard, Suite 400 Aventura, FL 33180 Subject: The Nashville Hilton

More information

WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM

WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM SPECIFICATION NO. SMAA-2P-8xE UPGRADE SMOOTH SURFACE / CAP SHEET / SINGLE PLY 2 PLY POLYESTER REINFORCED ACRYLIC

More information

SECTION 07540 - THERMOPLASTIC MEMBRANE ROOFING

SECTION 07540 - THERMOPLASTIC MEMBRANE ROOFING SECTION 07540 - THERMOPLASTIC MEMBRANE ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

ITEM 599.06060008 THERMOPLASTIC MEMBRANE ROOFING

ITEM 599.06060008 THERMOPLASTIC MEMBRANE ROOFING DESCRIPTION Construct adhered membrane roofing system, roof insulation, and vapor retarder in accordance with these specifications. MATERIALS: General: Provide installed roofing membrane and base flashings

More information

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design Basis of Design This section applies to roofing membranes, flashing and accessories. Design Criteria Adhere to the standards and details of the latest editions of the National Contractors Association (NRCA)

More information

Avoiding Air Barrier Pitfalls

Avoiding Air Barrier Pitfalls Avoiding Air Barrier Pitfalls Design & Durability November 2013 Air barriers, when correctly installed, help buildings achieve high levels of energy efficiency by decreasing heat loss. For example, great

More information

7 INNOVATIONS IN SECONDARY DRAINAGE SYSTEMS

7 INNOVATIONS IN SECONDARY DRAINAGE SYSTEMS 7 INNOVATIONS IN SECONDARY DRAINAGE SYSTEMS K. F. YAROSH Dow Corning S.A., Parc Industriel-Zone C, B-7180 Seneffe, Belgium SUMMARY: This paper will review innovative internal backup secondary drainage

More information

STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS

STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS ROOFING APPLICATION STANDARD (RAS) No. 133 STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS 1. Scope 1.1 This application standard has been developed to provide consistent information for the

More information

PART 1 GENERAL 1.1 SECTION INCLUDES

PART 1 GENERAL 1.1 SECTION INCLUDES J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including

More information

THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER POLYSOCYANURATE SYSTEM DESCRIPTION TORCH SYSTEM OVER POLYISO (15,17,19 YR) TH/BS-TH/CS

THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER POLYSOCYANURATE SYSTEM DESCRIPTION TORCH SYSTEM OVER POLYISO (15,17,19 YR) TH/BS-TH/CS OPTIONAL TITLE 24 CRITICAL POINTS POLYISO THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER POLYSOCYANURATE DESCRIPTION TORCH OVER POLYISO (5,7,9 YR) TH/BS-TH/CS 2 No 0. SUBSTRATE. THERMOTEK USA PRO 2.0 FV

More information

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

Final inspections are completed by site visit only. Access to fenced yards shall be planned. ROOFING RESIDENTIAL BUILDING INSPECTIONS DEPARTMENT www.ci.blaine.mn.us This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building Code, Blaine City ordinances,

More information

Read and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS

Read and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS AC TOPSEAL SELF-ADHERED, GRANULAR SURFACED, SINGLE PLY, LOW SLOPE ROLLED ROOFING 3 X 33.3 = 100 SQ. FT. 10 YEAR MATERIAL LIMITED WARRANTY For Use on Porches / Sheds / Utility Buildings / Accessory Buildings

More information

Quality Assurance and Diagnostic Water Leakage Field Check of Installed Storefronts, Curtain Walls and Sloped Glazing Systems

Quality Assurance and Diagnostic Water Leakage Field Check of Installed Storefronts, Curtain Walls and Sloped Glazing Systems Method of Test Committee Approval Product Group Approval Approved via 5/21/15 MOT CC Out for Ballot (#805-15) PUBLICATION NO. AAMA 501.2-XX DRAFT #2 DATED 5/21/15 Quality Assurance and Diagnostic Water

More information

SECTION 07550 - MODIFIED BITUMINOUS MEMBRANE ROOFING. A. Vapor barrier (base ply); cover board at existing roof deck.

SECTION 07550 - MODIFIED BITUMINOUS MEMBRANE ROOFING. A. Vapor barrier (base ply); cover board at existing roof deck. SECTION 07550 - PART I GENERAL 1.01 SECTION INCLUDES A. Vapor barrier (base ply); cover board at existing roof deck. B. Roof insulation at new roof deck. C. Modified bitumen membrane. D. Fluid applied

More information

ADDENDUM NO. 2. DATE: September 14, 2015 INVITATION FOR BID: IFB J160004535 Fire Station #22 Roof Replacement Project DATED: August 25, 2015

ADDENDUM NO. 2. DATE: September 14, 2015 INVITATION FOR BID: IFB J160004535 Fire Station #22 Roof Replacement Project DATED: August 25, 2015 ADDENDUM NO. 2 DATE: September 14, 2015 INVITATION FOR BID: IFB J160004535 Fire Station #22 Roof Replacement Project DATED: August 25, 2015 RECEIPT DATE: September 30, 2015 (CHANGED) OPENING DATE: October

More information

City of San Diego, CWP Guidelines

City of San Diego, CWP Guidelines PART 1 -- GENERAL SECTION 08520-1.1 WORK OF THIS SECTION City of San Diego, CWP Guidelines A. The WORK of this Section includes providing aluminum windows with frames, bracing, glazing attachments, screens,

More information

RDH Building Sciences Inc.

RDH Building Sciences Inc. MAK LTR 2007 03 26 Proposal for Building Enclosure Consulting Services RDH Building Sciences Inc. 509 FAIRVIEW AVENUE N SEATTLE WA 98109-5507 TEL 206 324 2272 FAX 206 324 6339 SEA@RDHBE.COM WWW.RDHBE.COM

More information

SEAMS SEAMING USING SEAM TAPE

SEAMS SEAMING USING SEAM TAPE SEAMING USING SEAM TAPE SEAMS The membrane should be positioned so that the width of the seam is 3. Remove excess chalk from a chalk line by snapping the line into the air and then chalk a line one-quarter

More information

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings

More information

SCENIC VIEW SV 10 SECTION 08 87 13 SOLAR CONTROL FILMS

SCENIC VIEW SV 10 SECTION 08 87 13 SOLAR CONTROL FILMS PART 1 GENERAL SCENIC VIEW SV 10 SECTION 08 87 13 SOLAR CONTROL FILMS 1.1 SUMMARY A. Optically clear dual reflective, neutral sputtered and aluminum metallized polyester film for solar control. 1.2 RELATED

More information

Window Installation Instructions

Window Installation Instructions Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for

More information

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES 1.00 PART 1 GENERAL 1.01 SCOPE A. It is the intent of this contract to install a 100% solids epoxy monolithic coating to the walls, benches and inverts of all manholes and the specified surfaces of other

More information

Tundra Series Windows January 2016

Tundra Series Windows January 2016 Tundra Series Windows January 2016 New Construction Installation Instructions Nail Fin, J-Fin and Brickmold Aplications product. ATTENTION! Read and understand all installation instructions before installing

More information

07 5423-1 THERMOPLASTIC-POLYOLEFIN ROOFING (TPO) Data Center

07 5423-1 THERMOPLASTIC-POLYOLEFIN ROOFING (TPO) Data Center PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 07 5423 THERMOPLASTIC-POLYOLEFIN ROOFING (TPO) Data Center A. Tear off existing roof system down to wood deck and install new Thermoplastic membrane roofing

More information

SECTION 07560 FLUID APPLIED ROOFING (LIGHT TRAFFIC DECKS OVER CONCRETE)

SECTION 07560 FLUID APPLIED ROOFING (LIGHT TRAFFIC DECKS OVER CONCRETE) SECTION 07560 FLUID APPLIED ROOFING (LIGHT TRAFFIC DECKS OVER CONCRETE) PART 1 GENERAL 1.1 DESCRIPTION 1. Fluid applied flexible acrylic waterproofing system over concrete. This work shall include the

More information

A. Work on this project shall consist of, but is not limited to, the following:

A. Work on this project shall consist of, but is not limited to, the following: PART 1 - GENERAL CLEANING AND RESTORATION OF SECTION 05900-1 1.1 SUMMARY A. Work on this project shall consist of, but is not limited to, the following: 1. Clean and treat all exposed anodized architectural

More information

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs. Skylight Installation Instructions This document provides instruction and guidelines for installation of both curb mount (CM) and self flashing (SF) unit skylights on flat, pitched (> or equal to 3/12

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

WELCOME. Recommended Window Installation. 1.5 credits Minnesota Department of Labor and Industry

WELCOME. Recommended Window Installation. 1.5 credits Minnesota Department of Labor and Industry WELCOME Recommended Window 1.5 credits Minnesota Department of Labor and Industry In accordance with the Department of Labor and Industry s statute 326.0981, Subd. 11, This educational offering is recognized

More information

Copyright 1999 Inter-Industry Conference On Auto Collision Repair v.4.0

Copyright 1999 Inter-Industry Conference On Auto Collision Repair v.4.0 Uniform Procedures For Collision Repair RO11 Removable Roof Copyright 1999 Inter-Industry Conference On Auto Collision Repair v.4.0 1. Description This procedure describes the repair and complete replacement

More information

JANUARY, 2016 TR-7100 Windows (Fixed) 1 EC 97909-071 085113 ALUMINUM WINDOWS Guide Specs

JANUARY, 2016 TR-7100 Windows (Fixed) 1 EC 97909-071 085113 ALUMINUM WINDOWS Guide Specs JANUARY, 2016 TR-7100 Windows (Fixed) 1 EC 97909-071 085113 ALUMINUM WINDOWS Guide Specs SECTION 085113 ALUMINUM WINDOWS This suggested guide specification has been developed using the current edition

More information

SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES

SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with

More information

WATERPROOFING FOR CONCRETE STRUCTURES

WATERPROOFING FOR CONCRETE STRUCTURES MANUAL OF CONTRACT DOCUMENTS FOR ROAD WORKS VOLUME 1 SPECIFICATION FOR ROAD WORKS SERIES 2000 WATERPROOFING FOR CONCRETE STRUCTURES Contents Clause Title Page 2001 General 2 2002 Protection of Bridge Deck

More information

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Introduction Wastewater of petrochemical industries and refineries contains high amounts of emulsified aliphatic or

More information

CHAPTER 7: Building Systems ROOFING SYSTEMS

CHAPTER 7: Building Systems ROOFING SYSTEMS ROOFING SYSTEMS Purpose Examples 1. Shingle roof system 2. Metal roof with blanket insulation 3. Metal roof with rigid insulation 4. Built-up asphalt roof system 5. Single-ply roof system 6. Modified Bitumen

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

SECTION 07530 SINGLE PLY MEMBRANE ROOFING. 4. Minor repair to adjacent clay tile roofing and flashings.

SECTION 07530 SINGLE PLY MEMBRANE ROOFING. 4. Minor repair to adjacent clay tile roofing and flashings. SECTION 07530 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section includes the flowing: 1. Removal of existing roofing membrane. Existing bur roof has one overlay and penetration mastic is asbestos containing.

More information

WATERPROOFING OF WET ROOMS

WATERPROOFING OF WET ROOMS WATERPROOFING OF WET ROOMS Waterproofing under tiles For longterm enjoyment of a wetroom area a complete and resistant waterproofing system is an important precondition. Most tiles are by themselves waterproof

More information

Residential Roofing Guide

Residential Roofing Guide Residential Roofing Guide TABLE OF CONTENTS Building Detail and Accessories...... 1 Panel Introduction and Handling...... 2 Cutting and Trimming.... 3 Roof Preparation..... 3 Roof Slope..... 3 Re-roofing...

More information

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW is a fully reinforced Pre-Applied system membrane designed for horizontal and vertical external blind-side

More information

GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS 174-180 PHILLIP STREET, SYDNEY

GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS 174-180 PHILLIP STREET, SYDNEY GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS 174-180 PHILLIP STREET, SYDNEY July 2008 1.0 SCOPE These guidelines describe the way in which air conditioning units shall be installed or replaced

More information

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503 Re-Roofing: Asphalt Shingles This is a summary of the standard requirements based on the

More information

Rehabilitation of an Aging Concrete Reservoir Adit Tower

Rehabilitation of an Aging Concrete Reservoir Adit Tower Rehabilitation of an Aging Concrete Reservoir Adit Tower Raymond S. Tombaugh, Senior Coatings Consultant KTA-Tator, Inc. and Mongkol Mahavongtrakul, P.E. Corrosion Control Contract Manager San Francisco

More information

CREEK Technical Services, LLC

CREEK Technical Services, LLC EVALUATION REPORT 2010 FLORIDA BUILDING CODE Manufacturer: Henry Company Report Issued February 20, 2013 999 North Sepulveda Blvd., Suite 800 El Segundo, CA 90245 (800) 486-1278 Manufacturing Plants: Quality

More information

The Ultimate in Weathersealing Versatility. Dow Corning 123 Silicone Seal

The Ultimate in Weathersealing Versatility. Dow Corning 123 Silicone Seal The Ultimate in Weathersealing Versatility Dow Corning 123 Silicone Seal Effective and attractive EIFS restoration When urethane sealants fail on EIFS-clad buildings, leaks and interior damage typically

More information

PART E SPECIFICATIONS

PART E SPECIFICATIONS PART E SPECIFICATIONS Page 1 of 5 PART E - SPECIFICATIONS GENERAL E1. APPLICABLE SPECIFICATIONS, STANDARD DETAILS AND DRAWINGS E1.1 The City of Winnipeg Works and Operations Division Standard Construction

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,

More information

The existing roof angle change terminations and flashings when sound and intact can be reused.

The existing roof angle change terminations and flashings when sound and intact can be reused. January 2, 2015 Summary Specification Re-Skinning an Existing Roof Maintenance and Repair Warranty Upgrade for Up to 30 Years Re-Skinning Over an Existing Roof with a New C-EPDM Membrane Using The Existing

More information

09/07/07 GLASSFIBER REINFORCED CEMENT (GRC) C. S. I. Spec 03500 Master Spec. 03 49 00 Page 1

09/07/07 GLASSFIBER REINFORCED CEMENT (GRC) C. S. I. Spec 03500 Master Spec. 03 49 00 Page 1 C. S. I. Spec 03500 Page 1 PART 1 - GENERAL 1.01 SUMMARY:.01 Provide special glassfiber reinforced cement (GRC) shapes in accordance with the requirements of the contract documents..02 The installing contractor

More information

Assessing Curtain Walls

Assessing Curtain Walls Assessing Curtain Walls Considerations and Best Practices Paul E Beers GCI Consultants, LLC pbeers@gciconsultants.com What is a Curtain Wall System? A curtain wall system is an outer covering of a building

More information

Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood

Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood Section 07411 Metal Roof Panels Part 1 General 1.1 Summary A. This section includes the following: a. Factory-formed

More information

ALPHA 15-Year Permathane II FR w/granules

ALPHA 15-Year Permathane II FR w/granules ALPHA 15-Year Permathane II FR w/granules Section 07 57 13 Sprayed Polyurethane Foam Roofing Guide Specification PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Furnish all labor, materials, tools and

More information

Photo courtesy of Delta Stone, Heber City, UT. Installation Solutions for: Manufactured Stone, Natural Thin Veneer, and Thin Brick

Photo courtesy of Delta Stone, Heber City, UT. Installation Solutions for: Manufactured Stone, Natural Thin Veneer, and Thin Brick Photo courtesy of Delta Stone, Heber City, UT Installation Solutions for: Manufactured Stone, Natural Thin Veneer, and Thin Brick THIN VENEER INSTALLATION SYSTEMS PREMIUM BONDING MORTARS Premium PCL Stone

More information

A D D E N D U M # 3 QUESTIONS FROM BIDDERS: DATE: November 5, 2012. All Bidders. Jenne dos Santos, CBI Consulting Inc. City of Chelsea, MA

A D D E N D U M # 3 QUESTIONS FROM BIDDERS: DATE: November 5, 2012. All Bidders. Jenne dos Santos, CBI Consulting Inc. City of Chelsea, MA Page 1 of 10, Addendum No. 3 Temporary Garage Structure City of Chelsea, MA November 5, 2012 CBI Job No.: 12055-A A D D E N D U M # 3 DATE: November 5, 2012 TO: FROM: PROJECT: All Bidders Jenne dos Santos,

More information

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW Vinyl Windows and Doors Manufactured by Pella Corporation INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW Lea las instrucciones en español en el reverso.

More information

STANDING SEAM SHEET METAL ROOFING

STANDING SEAM SHEET METAL ROOFING STANDING SEAM SHEET METAL ROOFING GENERAL INFORMATION 1.1 For all standing seam metal roofing work consult Columbia University Facilities Exteriors and Historic Preservation group. 1.2 Fabricator is responsible

More information

Roof Deck Installation Guidelines

Roof Deck Installation Guidelines Roof Deck Installation Guidelines June 2012 TABLE OF CONTENTS INTRODUCTION GENERAL INFORMATION BEFORE THE DECK ARRIVES WHEN THE DECK ARRIVES CARE OF MATERIALS CAUTIONS INSTALLATION GENERAL TECTUM I PLANK

More information

September 3, 2009. Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901

September 3, 2009. Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901 September 3, 2009 Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901 RE: Ketchikan Gateway Borough Gateway Recreation Center Roof Observations and Intrusive Inspections

More information

Building Owners Guide to a Duro-Last System!

Building Owners Guide to a Duro-Last System! Building Owners Guide to a Duro-Last System Table of Contents Section 1: Introduction to Duro-Last Roofing Systems Section 2: Benefits of a Duro-Last Roofing System Section 3: Comparing a Duro-Last Roof

More information

Roof Inspection. Summary Report

Roof Inspection. Summary Report Phone: (561) 866 9956 www.real-estate-inspections.com Roof Inspection Summary Report Subject Property File Number: 05-15-RF-002 Inspector: Craig Milliken, PE CPM Real Estate Inspections, Inc. Date of Inspection:

More information

THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150

THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150 THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150 SECTION ONE A. Objective The objective of this guide is to provide Owners and General Contractors/Construction

More information

Asphalt Shingle Application Requirements

Asphalt Shingle Application Requirements Alberta Allied Roofing Association Asphalt Shingle Application Requirements Section 1 Roof Decks 1.1 General Asphalt Shingles are not permitted to be installed directly over rigid insulation. When Asphalt

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information

Division 9. SignaFlor Pad and Pour Flooring System

Division 9. SignaFlor Pad and Pour Flooring System Division 9 SignaFlor Pad and Pour Flooring System SPECIFICATIONS Page 1. General... 2 1.1 Description 2 1.2 Quality Assurance 2 1.3 Submittals 2 1.4 Delivery and Storage 3 1.5 Warranty 3 1.6 Working Conditions

More information

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 16050 A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1

More information

CHAPTER VII. TITLE: STANDARDS FOR NEW ROOFING July 2015 CONSTRUCTION, RE-ROOFING CONSTRUCTION AND ROOFING SYSTEM GUARANTEE REQUIREMENTS

CHAPTER VII. TITLE: STANDARDS FOR NEW ROOFING July 2015 CONSTRUCTION, RE-ROOFING CONSTRUCTION AND ROOFING SYSTEM GUARANTEE REQUIREMENTS TITLE: STANDARDS FOR NEW ROOFING CONSTRUCTION, RE-ROOFING CONSTRUCTION AND ROOFING SYSTEM GUARANTEE REQUIREMENTS Responsible Organization: Office of Facilities Planning Instructions: This Manual supersedes

More information

WATER LEAKAGE IN GLAZED CURTAIN WALL SYSTEMS:

WATER LEAKAGE IN GLAZED CURTAIN WALL SYSTEMS: WATER LEAKAGE IN GLAZED CURTAIN WALL SYSTEMS: BY WILLIAM D. SMITH Figure 1 Four Corporate Center, Franklin, TN. Architect: Little & Associates,Charlotte, NC. Gen. Contractor: Ray Bell Const. Co., Nashville,

More information

Installation Solutions for: Manufactured Stone, Natural Thin Veneer, and Thin Brick ARCHITECTURAL SPECIFICATIONS / CAD MODELS TVISTM WARRANTIES

Installation Solutions for: Manufactured Stone, Natural Thin Veneer, and Thin Brick ARCHITECTURAL SPECIFICATIONS / CAD MODELS TVISTM WARRANTIES ARCHITECTURAL SPECIFICATIONS / CAD MODELS With more than 40 years of manufacturing high quality, innovative building products in the commercial and residential markets, Custom Building Products TVISTM

More information

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1

More information

SECTION 07410 METAL ROOF & WALL PANELS

SECTION 07410 METAL ROOF & WALL PANELS This document specifies Metal Roofing Systems prefinished factory formed metal roofing marketed as MRS System 2500 steel and aluminum roofing systems and includes MRS flashing and Trim. MRS finish is a

More information

SWD URETHANE COATED FOAM ROOFING SYSTEM MASTER ROOF SPECIFICATION SECTION 075700

SWD URETHANE COATED FOAM ROOFING SYSTEM MASTER ROOF SPECIFICATION SECTION 075700 SWD URETHANE COATED FOAM ROOFING SYSTEM MASTER ROOF SPECIFICATION SECTION 075700 Part 1 GENERAL SUMMARY Section Includes: Coated foam roofing system and acceptable alternative applications as specified

More information

Preformed Metal Roofing and Siding

Preformed Metal Roofing and Siding Page -1-1. GENERAL 1.1. Description This specification along with the drawings covers the furnishing of all material, products, equipment, accessories, tools, services, transportation, labor and supervision