3 SECTION STANDING SEAM METAL ROOF PART 1 - GENERAL 1.01 SECTION INCLUDES A. Work described in this section includes pre-formed standing seam metal roofing system complete with clips, perimeter and penetration flashing, flashing, and closures for new building. B. Associated accessories and trim RELATED SECTIONS A. Section Structural Steel B. Section Carpentry C. Section Vapor Layer D. Section Flashing and Sheet Metal REFERENCES A. Underwriters' Laboratories (UL): B. American Society for Testing and Materials (ASTM): C. American Architectural Manufacturer Association (AAMA): Standard Standard Test Method for Metal Curtain Walls for Water Penetration. D. American Society of Civil Engineers (ASCE): 1. ASCE 7-Current Editions (2002) - Minimum Design Loads for Buildings and Other Structures. E. Sheet Metal and Air Conditioning Contractors National Association (SMACNA): Edition - Architectural Sheet Metal Manual, 5th edition REGULATORY REQUIREMENTS A. Underwriter's Laboratories, Inc. (UL): Class A Fire Hazard Classification. B. System to meet requirements of UL 90 for uplift resistance. 5th Street Reservoir -1- January 2013
4 1.05 SUBMITTALS A. Shop Drawings - Show roofing system with flashings and accessories in plan, sections, and details. Include metal thickness' and finishes, panel lengths, joining details, anchorage details, flashings and special fabrication provisions for termination and penetrations; thermal expansion provisions and special supports. Indicate relationships with adjacent and interfacing work. Indicate fastener types and spacing; and provide fastener pullout values. Shop drawings must be completed by the metal panel manufacturer's engineering department. B. Product Data: Include manufacturer's detailed material and system description, sealant and closure installation instructions, engineering performance data and finish specifications. Indicate fastener types and spacing; and required fastener pullout values. C. Design Loads: Submit copy of manufacturer's minimum design load calculations according to most current ASCE 7, Method 2 for Components and Cladding, sealed by a registered professional engineer employed by the system manufacturer as a full-time staff engineer. In no case shall the design loads be taken to be less than those specified. Design Test Reports: Provide certified test reports from an independent testing laboratory that bear the seal of a registered professional engineer to show compliance with the performance criteria specified in article QUALITY CONTROL A. All systems submitted to meet the specified material must be accompanied by a copy of manufacturer s specifications. Roofing specifications and shop drawings shall be signed and sealed by a professional engineer licensed in the state of Oregon. Roof system submittals without licensed engineer certification shall be rejected. B. Engage an experienced metal roofing contractor (erector) to install standing seam system who has a minimum of three (3) years' experience specializing in the installation of structural standing seam metal roof systems. C. Successful contractor is required to maintain a full-time supervisor/foreman who is on the job-site at all times during installation of new roof system. Foreman must have a minimum of five (5) years' experience with the installation of system similar to that specified. D. Successful contractor must obtain all components of roof system from a single manufacturer including any roll good materials if required. Any secondary products that are required which cannot be supplied by the specified manufacturer must be recommended and approved in writing by primary manufacturer prior to bidding. E. Design and Test Reports: Provide certified test reports from an Independent testing laboratory for approved system. 5th Street Reservoir -2- January 2013
5 1.07 DELIVERY, STORAGE, AND HANDLING. A. Manufacturer's responsibility: 1. Protect components during fabrication and packing from mechanical abuse, stains, discoloration, and corrosion. 2. Provide protective interleaving between contact areas of exposed surfaces to prevent abrasion during shipment, storage, and handling. B. Installer's responsibility: 1.08 JOB CONDITIONS 1. Store materials off ground providing for drainage; under cover providing for air circulation; and protected from wind movement, foreign material contamination, mechanical damage, cement, lime or other corrosive substances. 2. Handle materials to prevent damage to surfaces, edges and ends of roofing sheets and sheet metal items. Damaged material shall be rejected and removed from the site. 3. Protect panels from wind-related damages. 4. Inspect materials upon delivery. Reject and remove physically damaged or marred material from project site. 5. Protective film on roof panels must be removed in a period of time which allows for FULL removal of all film. If any film residue remains on panel(s), it is the installer's responsibility to clean and remove residue at Owner's request. Note: Cure time may vary based on environmental conditions. A. Determine that work of other trades will not hamper or conflict with necessary fabrication and storage requirements for pre-formed metal roofing system. B. Protection: 1. Provide protection or avoid traffic on completed roof surfaces. 2. Do not overload roof with stored materials. 3. Support no roof-mounted equipment directly on roofing system. C. Ascertain that work of other trades which penetrates the roof or is to be made watertight by the roof is in place and approved prior to installation of roofing DESIGN AND PERFORMANCE CRITERIA A. Thermal Expansion and Contraction: 1. Completed metal roofing and flashing system shall be capable of withstanding expansion and contraction of components caused by changes in temperature without buckling, producing excess stress on structure, anchors or fasteners, or reducing performance ability. 2. The design temperature differential shall be not less than 120 degrees F. 5th Street Reservoir -3- January 2013
6 3. Interface between panel and clip shall provide for thermal movement in each direction along the longitudinal dimension. 4. Location of metal roofing rigid connector shall be as shown on the plans or as required by the roofing engineer B. Uniform Wind Uplift Load Capacity: Installed roof system shall withstand negative (uplift) design wind loading pressures complying with the following criteria. 1. Design Code: Current ASCE 7, Method 2 for Components and Cladding. 2. Safety Factor: 1.65 after any load reduction or material stress increase. 3. Category II Building with an Importance Factor of Wind Speed: 94.5 mph. 5. Ultimate Pullout Value: 590 pounds per each of the two fasteners holding the panel anchor to the roof decking or framing system. 6. Exposure Category: B C. Capacity shall be determined using pleated airbag method in accordance with ASTM E 1592, testing of sheet metal roof panels. Allowable safe working loads shall be determined by dividing the ultimate test load by the safety factor specified above. D. Uniform Positive Load Capacity. 1. The installed roof system shall be capable of resisting the following positive uniform roof loads: Roof Live Load of 25 psf; Roof Snow Load of 25 psf. 2. Capacity to resist positive loads shall be determined by empirical calculations in accordance with AISI. Calculation shall be sealed by a registered professional engineer. 3. Installed roof system shall carry positive uniform design loads with a maximum system deflection of L/180 as measured at the rib (web) of the panel. 4. Underwriters' Laboratories, Inc., (UL) fire resistance P ratings for roof assemblies: If applicable, panel system shall be approved for use in an appropriate Construction Assembly, as defined by UL 26C. 5. Underwriters Laboratories, Inc., (UL) Class A roofing material acceptable for use in an approved Class A fire rating per UL 790. E. Water penetration: Provide hydrostatic assembles for no water penetration, other than condensation, when exposed to ponding water from rain and wind and damming by ice and snow WARRANTIES A. Provide Manufacturer s 20 year warranty. 5th Street Reservoir -4- January 2013
7 PART 2 - PRODUCTS 2.01 APPROVED MANUFACTURES AND PROFILES A. AEP Span "Span Lok hp" manufactured by ASC Profiles, Inc, Tacoma, WA, with 16-inch pan width. B. MS200 from Taylor Metal Products, Inc., Salem, OR, with 18-inch panel width. C. Substitutions: Approval of substitute systems per Section MATERIALS A. Roof Panels: gauge, prefinished, Galvalume or Zincalume sheet with Kynar 500 finish 2. Fabricate panels with sufficient thickness to meet specified UL 90 wind uplift requirements. 3. Factory fabricated panel with integral continuous overlapping seams suitable for continuous locking or crimping by mechanical means during installation. 4. Provide factory installed, high grade, hot-melt elastomeric sealant, within the confines of female seam flange, on bottom edge of female seam flange, designed to seal against adjacent male panel leg. B. Clip/ Fastener Assemblies: 1. Typical clip meeting UL 90 requirements: 2. Fasteners: Manufacturer s standard #12-14 x 1 1/4" long self-drilling, self-tapping hex head drive screws for metal; no corrosive base material. 3. UL Rated Clip: Sliding 22 gauge galvanized steel hook in combination with a double fastened 16 gauge galvanized steel base, both at Fy (MIN) = 33 ksi. Clip hook shall have a shop installed hot-melt butyl sealant for continuity of seal at clip locations. C. Accessories: 1. Provide manufacturer s standard accessories and other items essential to completeness of standing seam roof installation. 2. Gutters will be fabricated to the same gauge and specification as panel. D. Field Sealant: 1. Color coordinated primerless silicone or high grade, nondrying butyl as recommended by panel manufacturer. 2. Do not use sealant containing asphalt. 5th Street Reservoir -5- January 2013
8 2.03 FABRICATION A. Panels: 1. Provide factory formed panel widths of 16" by 2" high standing seam, or 16" by 3" high standing seam. 2. Provide panels in full length from ridge to eave. 3. Where single length panels are not practical, provide positive joint end laps, fabricated with overlap in direction of water flow to accommodate water run-off. 4. Roof panels shall have flush horizontal and vertical or panned surfaces to facilitate sealing at terminations. B. Seams: C. Clips: 1. Panel seams shall interlock entire length of seam. 2. Design standing seam to lock up and resist joint disengagement during design wind uplift conditions as calculated according to local building codes. 3. Provide factory sealant within confines on trailing edge of female seam leg to aid in resistance of leaks and provide panel-to-panel seal while allowing expansion and contraction movement, and the seams shall be continuously locked or crimped together by mechanical means during installation. 1. Provide UL listed clip designed to allow panels to thermally expand and contract and provide ± 1 inch of thermal movement. Clip shall incorporate a self-centering feature to allow 1" of movement in both directions along panel length. 2. Clip shall be designed to meet positive and negative pressures as calculated per local building code. D. Engineer panels to use concealed anchors that permit expansion and contraction, except at eaves, end laps, ridges, valleys, hips and gables FINISH A. Fluorocarbon Coating: 1. Full strength 70% Kynar 500 coating baked on for 15 minutes at 450 degrees F to dry-film thickness of 1.0 mil % reflective gloss (ASTM D 523) (Low Gloss) mil baked on epoxy primer. 4. Color: See finish schedule drawing A100. 5th Street Reservoir -6- January 2013
9 PART 3 - EXECUTION 3.01 INSTALLATION A. Comply with manufacturer s instructions for assembly, installation, and erection in order to achieve weather tight installation. Install in accordance with approved shop drawings. B. Standing Seam System: 1. Install panels in accordance with engineered shop drawings and manufacturer s instructions and recommendations. 2. Anchor securely in place using clips and fasteners spaced in accordance with manufacturer s recommendations for design wind load criteria. C. Roof Penetrations 1. Provide water tight flashing assemblies with standing seam metal roof. D. Dissimilar Metals: 1. Where sheet metal is in contact with dissimilar metals, execute juncture to facilitate drainage and minimize possibility of galvanic action. 2. At point of contact with dissimilar metal, coat metal with protective paint or tape which can be placed between metals. E. Field apply sealant to penetrations, transitions, and other locations necessary (not standing seam) for airtight, waterproof installation CLEANING A. Clean exposed surfaces of work promptly after completion of installation PROTECTION A. Protect work as required to ensure roofing will be without damage at time of final completion SCHEDULES OF ROOFING A. Building: See Contract Plans B. Approved Color: AEP Cool Old Town Gray END OF SECTION 5th Street Reservoir -7- January 2013
10 SECTION STANDING SEAM METAL ROOF WARRANTY PART 1 - GENERAL 1.01 SECTION INCLUDES A. Standing Seam Metal Roofing System Warranty. B. Associated accessories and trim RELATED SECTIONS A. Section Standing Seam Metal Roof 1.03 SUBMITTALS A. Submit manufacturer's warranty form. Submit in accordance with Section PART 2 - PRODUCTS - NOT USED PART 3 - EXECUTION 3.01 GENERAL A. Roof Manufacturer shall provide a 20-year warranty meeting the requirements of the following form: END OF SECTION City of Lebanon Standing Seam Metal Roof Warranty 5th Street Reservoir -1- January 2013
SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING
SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING PART ONE GENERAL DESCRIPTION This section includes pre-formed standing seam metal roofing and related flashings, closures, trim and accessories including,
SECTION 07410 PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK
SECTION 07410 PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK A. This section covers the pre-finished, pre-fabricated Architectural standing seam roof system. All metal trim,
Holiday Inn Express & Suites Covington (Newton County) 1. Standing-seam metal roofing, custom fabricated.
PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standing-seam metal roofing, custom fabricated. 1.2 SUBMITTALS A. Product Data: For each type of product indicated. B. Shop Drawings: Show installation
GUIDELINE SPECIFICATIONS
GUIDELINE SPECIFICATIONS GORDON SOFFIT-SHIELD - An Exterior Metal Soffit System DIVISION 05 5800 or DIVISION 07 7700 Note To Specifier: SOFFIT-SHIELD should be installed by tradesmen that are experienced
Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood
Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood Section 07411 Metal Roof Panels Part 1 General 1.1 Summary A. This section includes the following: a. Factory-formed
STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS
ROOFING APPLICATION STANDARD (RAS) No. 133 STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS 1. Scope 1.1 This application standard has been developed to provide consistent information for the
238T Standing Seam Metal Roof System (SSMRS)
238T Standing Seam Metal Roof System (SSMRS) Text in red are instructions to the specifier and should be deleted. Text in blue are choices that need to be made, with those not selected, deleted. McElroy
SECTION 07 61 13 STANDING SEAM METAL ROOFING
SECTION 07 61 13 STANDING SEAM METAL ROOFING PART 1 GENERAL 1.01 SCOPE OF WORK A. The Work shall include all labor, materials, equipment and supervision required to complete the work of the above referenced
Specifications. Preformed Metal Wall and Roof Panels. Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023
Specifications Preformed Metal Wall and Roof Panels Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023 Section 07410 Preformed Metal Wall and Roof Panels Structural
Residential Roofing Guide
Residential Roofing Guide TABLE OF CONTENTS Building Detail and Accessories...... 1 Panel Introduction and Handling...... 2 Cutting and Trimming.... 3 Roof Preparation..... 3 Roof Slope..... 3 Re-roofing...
Standing Seam Roof Systems
Standing Seam Roof Systems REAL PEOPLE. REAL PRODUCTS. REAL SOLUTIONS. www.a-s.com Building Benefits You Can Expect From A&S Materials Standing Seam roof panels weigh a relatively modest 11/2 pounds per
MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)
MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER) 11805 SW 26 Street, Room 208 BOARD AND CODE ADMINISTRATION DIVISION Miami, Florida 33175-2474 T (786) 315-2590
Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers..
Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide Table of Contents Section Page Section Page Notes to Designer /Installers.. 1 Fastener Placement and Selection.2-3
SECTION 07411 STANDING SEAM METAL ROOFING
PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following: 1. Standing-seam metal roof. 2. Metal gutters. 1.2 DEFINITIONS A. Metal Roof Panel Assembly: Metal roof panels, waterproofing membrane (underlayment),
SECTION 07410 METAL ROOF & WALL PANELS
This document specifies Metal Roofing Systems prefinished factory formed metal roofing marketed as MRS System 2500 steel and aluminum roofing systems and includes MRS flashing and Trim. MRS finish is a
STANDING SEAM SHEET METAL ROOFING
STANDING SEAM SHEET METAL ROOFING GENERAL INFORMATION 1.1 For all standing seam metal roofing work consult Columbia University Facilities Exteriors and Historic Preservation group. 1.2 Fabricator is responsible
City of San Diego, CWP Guidelines
PART 1 -- GENERAL SECTION 08520-1.1 WORK OF THIS SECTION City of San Diego, CWP Guidelines A. The WORK of this Section includes providing aluminum windows with frames, bracing, glazing attachments, screens,
Preformed Metal Roofing and Siding
Page -1-1. GENERAL 1.1. Description This specification along with the drawings covers the furnishing of all material, products, equipment, accessories, tools, services, transportation, labor and supervision
PART 1 GENERAL 1.1 SECTION INCLUDES
J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including
VERTICAL LOCK Table of Contents
Table of Contents TABLE OF CONTENTS Vertical Lock Product Data Sheet... 2 Vertical Lock Engineering Data... 3 General Information... 6 Material Testing... 7 Panel Overview... 8 Handling Material & Storage
Nucor VR16 II TM Vertical Rib Standing Seam Roof System
Nucor VR16 II TM Vertical Rib Standing Seam Ro System www.nucorbuildingsystems.com Nucor VR16 II Vertical Rib Standing Seam Ro Perfect for the Marketplace The Nucor Building Systems VR16 II Ro Panel is
The Butler MR-24 Standing Seam Roof Difference. A comparison between metal roof systems
The Butler MR-24 Standing Seam Roof Difference A comparison between metal roof systems Roof Systems Necessities Weathertight (don t leak!) Low maintenance Weathertightness Roof clips, seams, panel alignment
TABLE OF CONTENTS" SECTION 3: Comparing Standing Seam Metal to Other Metal Roofs PAGE 7"
2 TABLE OF CONTENTS SECTION 1: What is a Standing Seam Metal Roof PAGE 3 SECTION 2: Common Types of Standing Seam Metal Roofs..PAGE 5 SECTION 3: Comparing Standing Seam Metal to Other Metal Roofs PAGE
DENVER MODEL 30 X 30 SPECIFICATIONS
DENVER MODEL 30 X 30 SPECIFICATIONS Dimensions: Roof Dimensions 30-0 x 30-0 (4) Columns (Center to Center) 25-6½ x 25-6½ Minimum Clearance 8-0 Roof Height @ Peak Dependent on Col. Ht. Hip Roof 4:12 pitch
SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront
PART 1 GENERAL 1.01 Work Included SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS System 402 Flush-Glazed Screw Spline Storefront A. Furnish and install aluminum architectural storefront system
Table of Contents. Western States RustWall Wall and Soffit Panels Installation, Flashings & Shop Drawing Detail Guide
Western States RustWall Wall and Soffit Panels Installation, Flashings & Shop Drawing Detail Guide Table of Contents Section Page Section Page Notes to Designer /Installers.. 1 Fastener Placement and Selection.2-3
CHAPTER 7: Building Systems ROOFING SYSTEMS
ROOFING SYSTEMS Purpose Examples 1. Shingle roof system 2. Metal roof with blanket insulation 3. Metal roof with rigid insulation 4. Built-up asphalt roof system 5. Single-ply roof system 6. Modified Bitumen
Slim Seam Architectural Design Manual
Slim Seam Architectural Design Manual Headquarters: 3449 Hempland Road Lancaster, PA 17601 Phone: 800-477-2741 Fax: 800-283-4289 Architectural Products Division: 308 Alabama Blvd. Jackson, GA 30233 Phone:
SECTION 07 42 13 METAL WALL PANELS
Mitsubishi Plastics Composites America, Inc. 401 Volvo Parkway Chesapeake, VA 23320 Phone: (800) 422-7270 Fax: (757) 436-1896 E-mail: [email protected] www.alpolic-northamerica.com This MANU-SPEC utilizes
- - - - Steel Panel Frame. Exterior Steel Sheeting. Optional Rigid Insulation. Optional Steel Insulation Liner
The Kelly Klosure pre-framed modular panel has 4 components that are factory finished to create an easy and versatile bolt-together system in the field. Steel Panel Frame Exterior Steel Sheeting Optional
SECTION 07411 PREFORMED METAL ROOF PANELS
SECTION 07411 PREFORMED METAL ROOF PANELS PART 1 GENERAL 1.01 SECTION INCLUDES A. Roofing system of preformed aluminum panels. B. Fastening system. C. Underlayment. D. Accessories and miscellaneous components.
Rouse Life Sciences Roof Repair or Replacement 07 61 13 SECTION 07 61 13
1. PART 1 - GENERAL 1.1 DESCRIPTION OF WORK SECTION 07 61 13 STANDING SEAM METAL ROOFING 1. This Section covers the pre-finished, pre-fabricated Architectural standing seam roof system. All metal trim,
INSTALLATION MANUAL For Grand Rib-3 / Multi Purpose / & Classic Rib Roofing Panels
INSTALLATION MANUAL For Grand Rib-3 / Multi Purpose / & Classic Rib Roofing Panels Grand Rib-3 / Multi-Purpose / Classic Rib Grand Rib-3 / Multi-Purpose / & Classic Rib Grand Rib 3 panels are a strong,
A. Double lock standing seam, single element, metal roof panels.
Specifiers: Click on the icon in the WORD toolbar to reveal detailed instructions SECTION 07 41 13 METAL ROOF PANELS Morin Metal Panels Double Lock Standing Seam Metal Roof Panels PART 1 - GENERAL 1.1
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings
METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES
METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES REFLECTICLEAN ACRYLIC/URETHANE Elastomeric Roofing Systems, Inc 6900 Bleck Dr. Rockford, MN 55373 800.403.7747 -or- 763.565.6900 fax: 763.565.6901 email:
CB-100 CB-150 CS-100 SL-100 SL-150 SLZ-1000
CB-100 CB-150 CS-100 SL-100 SL-150 SLZ-1000 Details and Installation Guide October 2013 All information, descriptions and dimensions in this manual are current at the time of printing. As always, Custom-Bilt
PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS
Application Instructions for THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR OTHER ROOFING
September 3, 2009. Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901
September 3, 2009 Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901 RE: Ketchikan Gateway Borough Gateway Recreation Center Roof Observations and Intrusive Inspections
SECTION 07410 METAL ROOF SYSTEM
SECTION 07410 METAL ROOF SYSTEM PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and other Division 1 Specification Sections, apply to
Metal Building Systems Installation and Flashings & Details Guide. Table of Contents
Table of Contents Section Page Notes to Designer/User..................1-2 Map of Typical Roof Conditions............3 Fastener Placement.......................4 Fastener Selection........................5
Discount Direct Metal Roofing Plus Rib Roofing Panels Installation Instructions
Discount Direct Metal Roofing Plus Rib Roofing Panels Installation Instructions All questions and concerns please call 904-696-9700 Discount Direct Metal Roofing Plus Rib metal roofing panels are a strong,
Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association
Air-Conditioning, Heating, and Refrigeration Institute Sheet Metal and Air-Conditioning Contractors National Association GUIDELINE B-1997 ACKNOWLEDGEMENT These guidelines for Roof Mounted Outdoor Air-
JANUARY, 2016 TR-7100 Windows (Fixed) 1 EC 97909-071 085113 ALUMINUM WINDOWS Guide Specs
JANUARY, 2016 TR-7100 Windows (Fixed) 1 EC 97909-071 085113 ALUMINUM WINDOWS Guide Specs SECTION 085113 ALUMINUM WINDOWS This suggested guide specification has been developed using the current edition
DIVISION: 07 00 00 THERMAL AND MOISTURE PROTECTION SECTION: 07 41 13 METAL ROOF PANELS REPORT HOLDER: FIRESTONE BUILDING PRODUCTS COMPANY, LLC
0 ICC ES Report ICC ES (800) 423 687 (62) 699 043 www.icc es.org 000 Most Widely Accepted and Trusted ESR 3422 Reissued 09/201 This report is subject to renewal 09/2016. DIVISION: 07 00 00 THERMAL AND
COLORADO MODEL. 35 x 65 SPECIFICATIONS
COLORADO MODEL 35 x 65 SPECIFICATIONS Dimensions: Roof Dimensions 35-0 x 65-0 Column Dimensions (center to center) 31-0 x 30-6 Minimum Clearance 14-0 Roof Height @ Peak ±18-8 Curved Roof ±42-6 radius Square
GUIDE SPECIFICATION. Manufacturer: DECRA Roofing Systems, Inc.
GUIDE SPECIFICATION Manufacturer: DECRA Roofing Systems A Fletcher Building Company 1230 Railroad Street Corona, CA 92882 951-272-8180 phone 951-272-4476 facsimile www.decra.com SECTION 07313 [07 31 13]
GUIDE SPECIFICATION. Manufacturer: DECRA Roofing Systems, Inc.
GUIDE SPECIFICATION Manufacturer: DECRA Roofing Systems A Fletcher Building Company 1230 Railroad Street Corona, CA 92882 951-272-8180 phone 951-272-4476 facsimile www.decra.com SECTION 07314 [07 31 14]
Final inspections are completed by site visit only. Access to fenced yards shall be planned.
ROOFING RESIDENTIAL BUILDING INSPECTIONS DEPARTMENT www.ci.blaine.mn.us This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building Code, Blaine City ordinances,
PRODUCT SPECIFICATIONS
LokSeam LokSeam 12" One of the most versatile architectural metal panels available today, LokSeam by ABC, is a snap-together, concealed fastener, standing seam roof system with a 13/4" tall vertical rib,
UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design
Basis of Design This section applies to roofing membranes, flashing and accessories. Design Criteria Adhere to the standards and details of the latest editions of the National Contractors Association (NRCA)
Installation Manual for STANDING SEAM ROOFING
Installation Manual for STANDING SEAM ROOFING Absolute Steel Toll Free 877-833-3237 / Phone 480-768-1618 / Fax 480-768-1514 www.metalroofingsource.com Standing Seam features approximately one-inch high
HHS J.W. Peavy Center Exterior Walls Waterproofing and Roof Replacement Project WBS # H-000018-0006-4 SECTION 07610 STANDING SEAM METAL ROOFING
PART 1 - GENERAL 1.01 DESCRIPTION SECTION 07610 A. Furnish and install a weather and watertight prefabricated standing seam roof system complete, in place, as shown on the drawings and as specified herein.
SECTION 07320 ROOFING TILE
SECTION 07320 ROOFING TILE PART 1 - GENERAL 1.1 SUMMARY: A. Section Includes: 1. Vitrified clay roofing tiles. 2. Tile accessories. 3. Felt underlayment. 4. Self-adhering sheet underlayment. 5. Snow guards.
Metal Roofing Practical Design
Metal Roofing Practical Design Metal Roofing Practical Design Learning Outcomes Minimum Requirements Design Resources Low Slope Metal Roofing Design Details Continuously Insulated (Ci) Systems Minimum
NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK
ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within
A. This Section includes rubberized asphalt sheet membrane waterproofing systems.
SECTION 07110 SHEET MEMBRANE WATERPROOFING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
MOCK-UP TEST REPORT. Rendered to: TUBELITE, INC. PROJECT: 200 Series Curtain Wall Mock-Up
MOCK-UP TEST REPORT Rendered to: TUBELITE, INC. PROJECT: 200 Series Curtain Wall Mock-Up Report No: 85616.01-120-32 Test Completion Date: 01/15/09 Report Date: 02/11/09 Record Retention End Date: 01/15/13
TARRANT COUNTY DETAIL STANDARDS
TARRANT COUNTY DETAIL STANDARDS 1. Standard Coping 2. Coping at End Wall 3. Standard Sheet Metal Engagement Details 4. Gravel Guard 5. Gravel Guard Wall Termination 6. Gravel Guard, Gutter, and Downspout
SECTION 07 41 13.16 - STANDING-SEAM METAL ROOF PANELS PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 07 41 13.16 - STANDING-SEAM METAL ROOF PANELS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
metal Duil~ing manufacturers Association
metal Duil~ing manufacturers Association ApplicatiDns metal Building Systems Conventional Buildings Retrofit Roofing Projects l~e Perfect Cover.One of the most important technological advances in building
AIA PRESENTATION. Standing Seam Metal Roofing Seminar SSRLU2B 1 LU/HSW Hour
AIA PRESENTATION Standing Seam Metal Roofing Seminar SSRLU2B 1 LU/HSW Hour Best Practice MBCI is a Registered Provider with the American Institute of Architects Continuing Education Systems. Credit earned
CHAPTER VII. TITLE: STANDARDS FOR NEW ROOFING July 2015 CONSTRUCTION, RE-ROOFING CONSTRUCTION AND ROOFING SYSTEM GUARANTEE REQUIREMENTS
TITLE: STANDARDS FOR NEW ROOFING CONSTRUCTION, RE-ROOFING CONSTRUCTION AND ROOFING SYSTEM GUARANTEE REQUIREMENTS Responsible Organization: Office of Facilities Planning Instructions: This Manual supersedes
SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)
SECTION 08332 COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Counter Fire Doors. 1.2
SECTION 05 7360 ALUMINUM HANDRAIL AND RAILING SYSTEMS WITH DECORATIVE METAL PANEL INFILLS
1 SECTION 05 7360 ALUMINUM HANDRAIL AND RAILING SYSTEMS WITH DECORATIVE METAL PANEL INFILLS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and
SECTION 07530 SINGLE PLY MEMBRANE ROOFING. 4. Minor repair to adjacent clay tile roofing and flashings.
SECTION 07530 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section includes the flowing: 1. Removal of existing roofing membrane. Existing bur roof has one overlay and penetration mastic is asbestos containing.
Asphalt Shingle Application Requirements
Alberta Allied Roofing Association Asphalt Shingle Application Requirements Section 1 Roof Decks 1.1 General Asphalt Shingles are not permitted to be installed directly over rigid insulation. When Asphalt
ICC-ES Evaluation Report Reissued March 1, 2011 This report is subject to renewal in one year.
ICC-ES Evaluation Report www.icc-es.org (800) 423-6587 (562) 699-0543 ESR-900* Reissued March, 20 This report is subject to renewal in one year. A Subsidiary of the International Code Council DIVISION:
SECTION 07 61 13 STANDING SEAM METAL ROOFING
SECTION 07 61 13 STANDING SEAM METAL ROOFING PART 1 - GENERAL 1.01 REFERENCE STANDARDS A. American Society of Civil Engineers (ASCE): 1. 7 Minimum Design Loads for Buildings and Other Structures including
NRCA s steep-slope manual is thoroughly revised for 2013
Photo courtesy of Boone Brothers Roofing, Omaha, Neb. NRCA s steep-slope manual is thoroughly revised for 2013 by Maciek Rupar 38 www.professionalroofing.net MARCH 2013 P ublished in January, The NRCA
Chapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
4572 N Old US 31, Rochester, IN 46975 Toll Free: 877-889-7802 Fax: 574-223-7846 www.ramcosupply.com DETAIL MANUAL. and guide to Ramco Supply products
4572 N Old US 31, Rochester, IN 46975 DETAIL MANUAL and guide to Ramco Supply products Metal Roofing and Siding Panels & Accessories 1 4572 N Old US 31, Rochester, IN 46975 Ramco Supply s RAM Roofing Panels
Technical Installation Information
Technical Installation Information IMPORTANT NOTICE READ THIS MANUAL COMPLETELY PRIOR TO BEGINNING THE INSTALLATION OF THE ULTRA-DEK ROOFING SYSTEM. ALWAYS INSPECT EACH AND EVERY PANEL AND ALL ACCESSORIES
CENTRIA SRS3 Structural Standing Seam Metal Roof Panels
CENTRIA SRS3 Structural Standing Seam Metal Roof Panels CENTRIA SRS3 Structural Standing Seam Metal Roof Panels are manufactured in many different coil coating systems and painted with a wide variety of
ROOF FLASHING SPRINGLOK FLASHING SYSTEM FEATURES & BENEFITS PRODUCT DESCRIPTION
SPRINGLOK SYSTEM PRODUCT DESCRIPTION FEATURES & BENEFITS Fry Reglet offers five flashing systems, each tailored for a particular type of substrate so you can get exactly what you need. SM Surface mounted
PERFORMANCE TEST REPORT. Rendered to: ARCHITECTURAL METAL SOLUTIONS, INC.
PERFORMANCE TEST REPORT Rendered to: ARCHITECTURAL METAL SOLUTIONS, INC. SERIES/MODEL: AMS ARMOR-LOCK PRODUCT TYPE: STANDING SEAM METAL ROOF PANEL SYSTEM Report No: 97123.02-901-44 Test Date: 05/17/10
Metal Roof Systems in High-Wind Regions
Metal Roof Systems in High-Wind Regions http://www.fema.gov HURRICANE IKE RECOVERY ADVISORY Purpose: To recommend practices for designing and installing metal roof systems that will enhance wind resistance
ATLANTA MODEL SPECIFICATIONS
ATLANTA MODEL 50 SPECIFICATIONS Dimensions: Roof Dimensions (point to point) 50-0 Column Dimensions (out to out of columns) 44-0 Eave Height 8-0 Roof Height @ Peak ±21-8⅞ Hip Roof 6:12 pitch Square Feet
The Perfect Fit For Metal Retrofit
D u r o - S h i e l d M e t a l R e t r o f i t R o o f i n g S y s t e m The Perfect Fit For Metal Retrofit Lock out leaks. Lock in your investment. Has time caught up with your metal roof? There are
Section Page Section Page
Western States Western Rib Panel Installation, Flashings & Shop Drawing Detail Guide Table of Contents Section Page Section Page Notes to Designer / Installers..1 Fastener Placement and Selection.2-3 Key
WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM
WESTERN COOL ROOF SYSTEMS Sustainable - Energy Efficient FLUID APPLIED REINFORCED ROOF SYSTEM SPECIFICATION NO. SMAA-2P-8xE UPGRADE SMOOTH SURFACE / CAP SHEET / SINGLE PLY 2 PLY POLYESTER REINFORCED ACRYLIC
RB271 06/07 R807.1 RB272 06/07 R807.1. Public Hearing: Committee: AS AM D Assembly: ASF AMF DF. Proponent: Rick Davidson, City of Hopkins, MN
3. The use of asphalt shingles and other roof coverings has been successful over these composite insulation panels, so the extra details about vapor retarders, etc. can be eliminated. RB271 06/07 R807.1
TABLE OF CONTENTS. Roof Decks 172 B, BA, BV Deck N, NA Deck. Form Decks 174.6 FD,.6 FDV Deck 1.0 FD, 1.0 FDV Deck 1.5 FD Deck 2.0 FD Deck 3.
Pages identified with the NMBS Logo as shown above, have been produced by NMBS to assist specifiers and consumers in the application of New Millennium Building Systems Deck products. Pages identified with
EDD-401. Stationary Louver Dual Drainable Blade. Application and Design. Standard Construction
Application and Design is a weather louver designed to protect air intake and exhaust openings in building exterior walls. Design incorporates a drainable head member and stationary horizontal blades to
Window Installation Instructions
Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for
foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.
Skylight Installation Instructions This document provides instruction and guidelines for installation of both curb mount (CM) and self flashing (SF) unit skylights on flat, pitched (> or equal to 3/12
1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.
SECTION 075416 - PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system. 1.2 PERFORMANCE REQUIREMENTS A. Solar Reflectance
A. Work on this project shall consist of, but is not limited to, the following:
PART 1 - GENERAL CLEANING AND RESTORATION OF SECTION 05900-1 1.1 SUMMARY A. Work on this project shall consist of, but is not limited to, the following: 1. Clean and treat all exposed anodized architectural
DETAIL MANUAL. for Standing Seam. 2308 East 23rd Street Chattanooga, TN 37407. 1652 South Lee Hwy. Cleveland, TN 37311
DETAIL MANUAL for Standing Seam 1652 South Lee Hwy. Cleveland, TN 37311 2308 East 23rd Street Chattanooga, TN 37407 Best Buy Metals Standing Seam Roofing Panels Fig. 2 Standing Seam Panel Has 1 high nail-strip
Sapa: SECTION 05520 ARCHITECTURAL ALUMINUM HANDRAILS AND RAILINGS
PART 1 GENERAL Sapa: SECTION 05520 ARCHITECTURAL ALUMINUM HANDRAILS AND RAILINGS 1.1 SECTION INCLUDES A. Aluminum and Glass Handrails B. Aluminum Railings 1.2 RELATED SECTIONS A. Section 05700 - Ornamental
HERITAGE WOODGATE LAMINATED ASPHALT SHINGLES Dallas, TX
Application Instructions for THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR OTHER ROOFING
VALOR STEEL BUILDINGS STANDARD SPECIFICATIONS
VALOR STEEL BUILDINGS STANDARD SPECIFICATIONS For Rigid/I- Beam Construction as designed, engineered, and fabricated by Valor Steel Buildings. General 1.1) Valor shall use standards, specifications, recommendations,
SECTION 07540 - THERMOPLASTIC MEMBRANE ROOFING
SECTION 07540 - THERMOPLASTIC MEMBRANE ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles
CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503 Re-Roofing: Asphalt Shingles This is a summary of the standard requirements based on the
ABSeam Panel Overview and Installation Instructions
82 Garden Spot Road Ephrata, PA 17522 717-445-6885 35 Ridge Road Newville, PA 17241 717-776-5951 ABSeam Panel Overview and Installation Instructions Applications: The ABSeam panel is an architectural panel
Assessing Curtain Walls
Assessing Curtain Walls Considerations and Best Practices Paul E Beers GCI Consultants, LLC [email protected] What is a Curtain Wall System? A curtain wall system is an outer covering of a building
SECTION 074100 STANDING SEAM ROOF PANELS
SECTION 074100 STANDING SEAM ROOF PANELS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
PANELIZED HOME INSTALLATION GUIDELINE
PANELIZED HOME INSTALLATION GUIDELINE A typical home package will be constructed of Snap-N-Lock Insulated Panels clad with steel skins. 4" panels will be used for the walls, and 6" panels for the roof.