Swannanoa River Flood Risk Management Study
|
|
- Peregrine Whitehead
- 8 years ago
- Views:
Transcription
1 Swannanoa River Flood Risk Management Study Measures Evaluated to Reduce Future Flood Damages City of Asheville U.S. Army Corps of Engineers
2 Flooding History Part of the 132 square mile Swannanoa River watershed lies within the Asheville city limits. The river has a history of flooding and significant related damages. In 2004, back-to-back hurricane remnants hit the area especially hard, with the greatest damages occurring in Biltmore Village, a historical area just outside the Biltmore Estate, in the City of Asheville. The Corps estimated that flood damages in the watershed in 2004, to commercial businesses alone, were $25 million
3 Study Purpose Flood Risk Management Study was initiated after the 2004 hurricanes in partnership with the State of North Carolina, the City of Asheville, local contractors, and the US Army Corps of Engineers. Intent is to develop and evaluate alternatives to reduce flood-related damages and the risk of loss of life in the Swannanoa River watershed. With public and stakeholder input, prepare a Detailed Project Report and Environmental Assessment that recommends a plan to reduce flood risk. 3
4 Flood Risk Management Measures Identified 4
5 Structural Measures Evaluated Biltmore Avenue Bridge Channel Modification Removing historic fill upstream and downstream of the bridge. Allows greater flow capacity, reducing overtopping flood events. Looking Downstream Sweeten Creek Detention Reconfiguring existing culverts through railroad embankment or constructing a new structure upstream of railroad. Would detain floodwater upstream of existing embankment thereby reducing flows downstream. Lake Craig Dam Rehabilitation or Replacement Modify outlet structure to efficiently reduce flooding downstream while passing base flow (peak flow control structure). 5
6 Structural Measures Evaluated - Cont I-40 Construction Disposal Area Removal Removes constriction on Swannanoa River. Also provides additional storage capacity for Lake Craig Dam. Peak Flow Control Structure at Warren Wilson River Bend Field Passes normal flow but detains floodwater upstream of dry dam, reducing flows downstream. The recommended site is the only location in the basin with capacity (largest amount of available storage area) and is located above damage centers where rainfall can be captured to temporarily slow flood water. 6
7 Structural Measures Evaluated - Cont Bee Tree Dam Operations Modifications Modifying dam and/or dam operations to provide temporary flood control storage before a large storm event. Install pump station to provide ability to draw down reservoir in anticipation of imminent heavy rains. Pump Station Black Mountain Levee/Floodwall Constructing levees and/or floodwalls along the confluence of Flat Creek and the Swannanoa River to reduce flood damages and life-safety concerns in Black Mountain. Levee and/or floodwalls
8 Non-Structural Solutions Evaluated Elevation Raising structures in place using fill, walls, piers, posts, or columns Relocation Moving structures to locations away from flood hazards Buyout/Acquisition Purchasing and eliminating flood prone structures Local Berms or Floodwalls Dry Flood Proofing Sealing building walls with waterproofing materials to prevent the entry of floodwaters into damageable structures Wet Flood Proofing Allows floodwater to enter structure but vulnerable items such as furnaces are located and moved to higher locations Flood Warning & Preparedness Alert inhabitants in flood prone areas of impending high water 8
9 Combine Measures into Alternatives Measures were eliminated because costs > benefits Sweeten Creek Detention Structure I-40 Disposal Area/Beneficial landfill removal as standalone measure Will be combined with Lake Craig Dam as mitigation instead of purchasing upstream real estate Bee Tree Dam Operations Modification Concerns over water quality for water treatment and storm warning time Black Mountain Levee/Floodwall High induced damages Five measures were combined to create 30 alternatives Biltmore Avenue Bridge Channel Modification Non-Structural Lake Craig Dam Rehab Peak Flow Control Structure I-40 Construction Landfill Removal 9
10 Results of Cost Benefit Analysis Alt # Alt 6 Swannanoa & Tributaries Economic Analysis Dollars = FY 2014, 3.50% Annual Description of Measure or Alternative Benefits Total Cost BCR Net Benefits Biltmore Ave. Bridge Channel Modification, Lake Craig Dam Rehabilitation, Peak Flow Control Structure 2,857,890 21,528, ,940,072 Alt 5 Lake Craig Dam Rehabilitation, Peak Flow Control Structure 2,366,190 20,493, ,492,497 Alt 3 Biltmore Ave. Bridge Channel Modification, Peak Flow Control Structure 1,677,920 11,657, ,180,939 Alt 14 Biltmore Ave. Bridge Channel Modification, Buyout 10 Justifiable Structures, selected by BCR 1,331,867 7,663, ,063 M1 Biltmore Ave. Bridge Channel Modification 583, , ,537 There are five cost effective alternatives ranging from a local solution to a basin-wide alternative with three project sites. Alternative 6 consists of a channel modification near Biltmore Avenue Bridge, rehabilitating Lake Craig Dam so that it functions as a peak flow control structure, and construction of a new peak flow control structure at upstream of Warren Wilson College Road. Alternative 6 is estimated to cost $22M, has a 3.11 benefit-cost-ratio, and reduces almost half of the damages in the basin. 10
11 Alt 6: Benefits of Project Significant flood reductions throughout the Swannanoa River Up to 3.5 reduction in flooding in historic Biltmore Village Area Protects communities downstream of Warren Wilson to the mouth of Swannanoa Reduces average annual damages in the basin by 34% Lessens environmental degradation brought by extreme flooding including impacts to cultural resources. 11
12 Peak Flow Control Structure River Bend Location 12
13 Peak Flow Control Structure Artist Rendering To Scale 13
14 Peak Flow Control Structure Artist Rendering To Scale The opening is 24 feet wide by 12 feet tall, large enough for the river and associated species to pass through unobstructed. 14
15 Peak Flow Control Structure Inundation 2 Year Event
16 Peak Flow Control Structure Inundation 5 Year Event
17 Peak Flow Control Structure Inundation 10 Year Event
18 Peak Flow Control Structure Inundation 25 Year Event
19 Peak Flow Control Structure Inundation 100 Year Event
20 Peak Flow Control Structure Depth Comparison 2 Year Event Flooding Current 0 Hrs Add l Depth With Project 0 Hrs 3.6
21 Peak Flow Control Structure Depth Comparison 5 Year Event Flooding Current 3 Hrs Add l Depth With Project 3 Hrs 0.7 Flooding Current 0 Hrs Add l Depth With Project 5.25 Hrs 7.5
22 Peak Flow Control Structure Depth Comparison 25 Year Event Flooding Current 3.5 Hrs Flooding Current Add l Depth With Project Hrs Hrs Add l Depth With Project 10 Hrs 4.1 Flooding Current Hrs Add l Depth With Project Hrs 1.1 Warren Wilson College Road Flooding Current With Project 0.75 Hrs 1.5 Hrs
23 Peak Flow Control Structure Depth Comparison 100 Year Event Flooding Current Flooding Current Hrs Add l Depth With Project Hrs Hrs Add l Depth With Project Hrs 19.5 Flooding Current 25 Hrs Add l Depth With Project 25 Hrs 6.2 Warren Wilson College Road Flooding Current With Project 4.75 Hrs 5 Hrs
24 Emergency Access Proposed peak flow control structure will not change flood event that overtops Warren Wilson Road. Warren Wilson Road will be flooded starting at the 25-year flood event. Duration and depth of flooding is slightly increased. Flood Event Warren Wilson Road (Elev. = 2123) Current Conditions With Proposed Project Increased Max Flood Depth (ft) Duration Flooded (hr) Max Flood Depth (ft) Duration Flooded (hr) Flood Depth (ft) Duration (hr) year event flow decreased with proposed project from 9665 CFS to 9180 CFS Fire protection unchanged. Hospital access increase no more than 5 minutes. Flooding impacts to routes along Davidson Road, Riverwood Road, and Whitson Avenue are unchanged. 24
25 Cultural Resource Compliance and Considerations National Historic Preservation Act Identify and assess effects to historic properties archaeological sites, buildings, structures, objects, and landscapes All steps involve consultation with the State Historic Preservation Office, Tribes, Warren Wilson College, and other consulting parties such as historical societies. Outcomes may include recommendations for site management and preservation, recovering information, or public interpretation. Tribal Consultation Occurs at a Government-to-Government level USACE has Trust responsibility to consult with Tribes Consultation with Tribes is pre-decisional Eastern Band of Cherokee Indians, Catawba Nation, Cherokee Nation, United Keetoowah Band of Cherokee Indians 25
26 Environmental Compliance and Aesthetics Archeological investigations conducted during study and design and implementation phase Cultural Resource Management Plan developed includes presence and absence of sites within area of inundation and recommended management practices for continued preservation Educational signage could be added to the project at the request of the sponsor and land owner US Fish and Wildlife Service and other environmental organizations coordinated through Environmental Assessment Example Educational mural at Murfree Springs, TN 26
27 Real Estate Requirements 27
28 Summary In order to reduce flood risk in the Swannanoa River Watershed, a three part project is recommended: Biltmore Avenue Bridge channel modification, rehabilitation of Lake Craig to serve as a peak flow control structure, and construction of a peak flow control structure at Warren Wilson river bend. Results in significant flood reductions throughout the Swannanoa River Up to 3.5 reduction in flooding in historic Biltmore Village Area Reduces average annual damages in the basin by 34% Lessens environmental degradation brought by extreme flooding including impacts to cultural resources. 28
29 Summary Close coordination will occur throughout study, design, and implementation to ensure a mutually beneficial design for peak flow control structure site. Access road location Cultural resource survey results Trail functionality Operation and maintenance by City of Asheville 29
30 Summary Significant flood reductions are not possible in the community without Warren Wilson s involvement. Without the support of the College flood depths can only be reduced up to a maximum of a foot and benefits in the region will be cut in half. Proposed project would increase community partnerships to decrease flood related risk and damages in the Swannanoa River Watershed. 30
31 Feasibility Study Timeline Feasibility Study Design and Construction Select Recommended Plan Environmental Investigations And Design Reviews Report Approval Detailed Design Property Acquisition Construction Significant work remains before construction of a flooding solution can begin. Before additional money can be spent on investigations and engineering designs to complete the feasibility study, the viability of implementing a peak flow control structure downstream of Warren Wilson Road needs to be determined so a plan can be selected for recommendation. 31
32 Partnership Reducing flooding to protect the environment, reduce flood damages, and help the community can only be accomplished through partnerships with local, state, and federal offices. A letter of support from the Warren Wilson Board of Trustees would provide the city and agencies with the information it needs to move forward with the feasibility study with the goal of strengthening the greater Asheville and Buncombe County community. 32
5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES
5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES Flood damage reduction consists of two basic techniques structural and non-structural. Structural methods modify the flood and take the flood away from people
More informationFlood Risk Management
Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment
More informationFlood Risk Management
Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting
More informationLower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1
Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the
More informationUpper Des Plaines River & Tributaries, IL & WI Feasibility Study
Upper Des Plaines River & Tributaries, IL & WI Feasibility Study Jeffrey Zuercher Project Manager Chicago District February 19, 2014 Study Partnership: US Army Corps of Engineers Agenda Background Study
More informationCOMMUNITY CERTIFICATIONS
National Flood Insurance Program Community Rating System COMMUNITY CERTIFICATIONS Public reporting burden for this form is estimated to average 4 hours for annual recertification, per response. The burden
More informationFederal Triangle Stormwater Working Group Federal Triangle Floodproofing Seminar BUILDING STRONG SM
Federal Triangle Stormwater Working Group Federal Triangle Floodproofing Seminar Initial Risk Flood Risk = Probability of Flooding x Consequences Zoning Building Codes Outreach Evacuation Planning Risk
More informationVermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town
Vermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town MEETING NOTES April 16, 2015 6:00 8:00 PM VERI Project Overview With funding from the US Economic Development Administration
More informationNorfolk Flooding Strategy Update. Presentation to Norfolk City Council March 27, 2012
Norfolk Flooding Strategy Update Presentation to Norfolk City Council March 27, 2012 Presentation Overview The purpose of this presentation is to provide City Council an update on activities carried out
More informationMission Creek Flood Control & Restoration Project. City of Fremont, Alameda County
Mission Creek Flood Control & Restoration Project City of Fremont, Alameda County Agenda Background Why are proposed improvements necessary? Proposed project components Challenges Construction schedule/phasing
More informationFINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012
FINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012 Table of Contents TABLE OF CONTENTS Table of Contents... 1 Executive Summary... 2 1 Objective... 4 2 Study Approach...
More informationKing County Flood Hazard Management Plan Update Cedar/ Sammamish Rivers. Public Meeting December 5, 2012
King County Flood Hazard Management Plan Update Cedar/ Sammamish Rivers Public Meeting December 5, 2012 Goals of the Presentation Cedar and Sammamish R. Plan Update Context - Brief summary info about the
More informationBINGHAMTON FLOOD DAMAGE REDUCTION PROJECT
BINGHAMTON FLOOD DAMAGE REDUCTION PROJECT Department of Environmental Conservation Region 7 Counties: Broome, Cayuga, Chenango, Cortland, Madison, Onondaga, Oswego, Tioga, Tompkins Operated and Maintained
More informationDevelop hazard mitigation policies and programs designed to reduce the impact of natural and human-caused hazards on people and property.
6.0 Mitigation Strategy Introduction A mitigation strategy provides participating counties and municipalities in the H-GAC planning area with the basis for action. Based on the findings of the Risk Assessment
More informationSection 19. Basin-wide Mitigation Action Plans
Section 19. Basin-wide Mitigation Action Plans This Mitigation Plan identifies twelve specific hazards that could affect the Basin. Section 20 of this Plan set forth mitigation action plans to be carried
More informationECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project
ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION Lower Carmel River Floodplain Restoration and Enhancement Project I. Description of the Project and its Relationship to Other Projects in the Proposal The Lower
More informationStandard Operating Procedures for Flood Preparation and Response
Standard Operating Procedures for Flood Preparation and Response General Discussion Hurricanes, tropical storms and intense thunderstorms support a conclusion that more severe flooding conditions than
More informationLockport Pool Chicago Sanitary & Ship Canal Illinois Waterway
Presentation to the Inland Waterways Users Board Lockport Pool Chicago Sanitary & Ship Canal Illinois Waterway by Gary Loss, P.E. Rock Island District July 13, 2006 Chicago Sanitary and Ship Canal A
More informationFlood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005
Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005 Speakers: Tom Chan, CEO, Global Risk Miyamoto Greg Bates, Principal, Global Risk Consultants Learning Objectives
More informationEMERGENCY ACTION PLAN
EMERGENCY ACTION PLAN INDIAN SPRINGS LAKE ESTATES PROPERTY OWNERS ASSOCIATION WILD INDIAN LAKE DAM Inventory No.: TX04915 Water Right Adjudication: 04416 Prepared April 12, 2010 by ISLEPOA PARTIALLY REVISED
More informationDRAFT SOUTH FORK SKYKOMISH RIVER
DRAFT SOUTH FORK SKYKOMISH RIVER 9 levees and revetments / Approximately 1.1 miles of river bank are armored Revetments provide limited, localized erosion protection, but impact habitat Frequent and costly
More information5-Day Training Workshop On Flood Mitigation. On: February 17, 2010. Islamabad. Sequence of Lecture
5-Day Training Workshop On Flood Mitigation Title: Flood Proofing On: February 17, 2010 At: Organized By: Islamabad NDMA-UNDP Sequence of Lecture Definition; Objectives; Types of flood proofing; Structural
More informationPost-Flood Assessment
Page 1 of 7 Post-Flood Assessment CHAPTER 4 AGENCY COORDINATION Agency coordination is an essential element for the operation of the flood management systems in the Central Valley. Due to the nature of
More informationChehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013
Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate
More informationSan Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits
Attachment 9 San Diego Integrated Regional Water Management Economic Analysis Flood Damage Reduction Costs and Benefits Attachment 9 consists of the following items: Flood Damage Reduction Costs and Benefits.
More informationThe Basics of Chapter 105 Waterways and Wetlands Permitting in PA
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers
More informationSmall Dam Hazard Assessment Inventory
Small Dam Hazard Assessment Inventory What would happen if your dam were to fail? This is a question that most dam owners hope they will never have to answer. However it is a question you, as a responsible
More informationSims Bayou Federal Flood Damage Reduction Project
Sims Bayou Federal Flood Damage Reduction Project A. Gene Rushing, Jr., P.E., PMP HCFCD Project Manager January 15, 2014 Harris County s Watersheds Historical Flooding in Harris County 1929 1935 HCFCD
More informationU.S. Naval Academy. Flood Damage Reduction Project Using Structural and Non-Structural Measures
U.S. Naval Academy Flood Damage Reduction Project Using Structural and Non-Structural Measures 3 August 2005 Presentation by Stacey Underwood, U.S. Army Corps of Engineers, Baltimore District Co-Author,
More informationA. Flood Management in Nevada
Nevada Division of Water Planning A. Flood Management in Nevada Introduction Flooding has been a concern for Nevada communities since the first settlers moved to the territory in the mid-1800 s. Fourteen
More informationNew Orleans Hurricane Storm Damage Risk Reduction System Tour March 23 24, 2012
New Orleans Hurricane Storm Damage Risk Reduction System Tour March 23 24, 2012 Host: Falcolm E. Hull, Vice President/Technical Expert, ARCADIS, U.S. Inc. Attending: Cherie Coffman, Coastal Projection
More informationWhy does Kittitas County want to form a Flood Control Zone District?
KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS Kirk Holmes, Director What is a Flood Control Zone District (FCZD)? A Kittitas County Flood Control Zone District (FCZD) would be a special-purpose government
More informationFLOOD PROTECTION BENEFITS
IV. (340 points) Flood Protection Benefits A. Existing and potential urban development in the floodplain (50) 1. Describe the existing and potential urban development at the site and the nature of the
More informationTookany Creek Flood Damage Reduction Feasibility Study Section 205 Continuing Authorities Program
Tookany Creek Flood Damage Reduction Feasibility Study Section 205 Continuing Authorities Program Field Inspection Notes 27 29 September 2012 Introduction The U.S. Army Corps of Engineers (Corps), in
More informationThe City of Ottawa Flood Hazards
The City of Ottawa Flood Hazards The City of Ottawa is located in North Central LaSalle County, approximately 45 miles West of Joliet and 90 miles South of Rockford. The primary water course and sources
More informationFlash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes
Chapter 2 Flash Flood Science A flash flood is generally defined as a rapid onset flood of short duration with a relatively high peak discharge (World Meteorological Organization). The American Meteorological
More informationHistoric Flood Impact on the Nashville Drinking Water System. Scott Potter, Director Metro Water Services, Nashville, TN
Historic Flood Impact on the Nashville Drinking Water System Scott Potter, Director Metro Water Services, Nashville, TN Historic Event = 13.53 /48 Hours May 1 6.32 of Rain = 3rd greatest one-day rainfall
More information2012 Flood Hazard Prevention By Building and Planning Operations Manager Lou Ann Patellaro
2012 Flood Hazard Prevention By Building and Planning Operations Manager Lou Ann Patellaro In 1968, Congress created the National Flood Insurance Program (NFIP) to provide affordable flood insurance to
More information2. BENEFIT:COST ECONOMIC ANALYSIS
2. BENEFIT:COST ECONOMIC ANALYSIS 2.1 Riverine and Coastal A-Zone Flood Model Overview The Riverine and Coastal A-Zone Flood model (RCAZF) (Version 1.0, January 1995), a spreadsheetbased model developed
More informationLocal hazard mitigation plans Disaster recovery plans Flood preparedness activities/public education Mitigation projects (construction) Post-disaster
Local hazard mitigation plans Disaster recovery plans Flood preparedness activities/public education Mitigation projects (construction) Post-disaster recovery and mitigation efforts Others? We have a significant
More informationManagement of flooding downstream of dams
Management of flooding downstream of dams Attachment to Victoria State Flood Emergency Plan Version 1.0 (6 February 2013) This plan is produced by the Victoria State Emergency Service and Department of
More informationGreater New Orleans Hurricane and Storm Damage Risk Reduction System
Greater New Orleans Hurricane and Storm Damage Risk Reduction System Mike Park Chief Task Force Hope Mississippi Valley Division U.S. Army Corps of Engineers March 15, 2011 US Army Corps of Engineers BUILDING
More informationLEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN
1 AUGUST 2011 LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN KEY ELEMENTS OF THE PLAN: 1. Replace the existing unsafe Ragged Mountain dam with a new dam and raise the reservoir pool level initially
More informationPortion of Smith Tract and Weber Tract Flood Contingency Map
ACEC California 2012 Engineering Excellence Awards SAN JOAQUIN COUNTY FLOOD CONTINGENCY MAPPING FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA) PILOT PROJECT San Joaquin County Office of Emergency Services
More informationAppendix F Benefit-Cost Analysis of Flood Protection Measures
Appendix F Benefit-Cost Analysis of Flood Protection Measures Acronyms used in Appendix F: AA B AA C AA D BC BFE EAD FEMA NED O&M PV RED USACE Average Annual Benefits Average Annual Cost Average Annual
More informationChapter 4. Flood Control
Chapter 4. Flood Control As noted by their name, flood control measures control floodwaters and keep them from reaching damageable property. They are also called structural measures because they involve
More informationFlooding Hazards, Prediction & Human Intervention
Page 1 of 10 EENS 3050 Tulane University Natural Disasters Prof. Stephen A. Nelson Flooding Hazards, Prediction & Human Intervention This page last updated on 19-Oct-2015 Hazards Associated with Flooding
More informationGold Ray Dam Interagency Technical Team Meeting
Gold Ray Dam Interagency Technical Team Meeting Agenda Public Outreach, Funding, Monitoring EA/BA/Permit Updates Deconstruction Plans Fish Passage & Salvage Plan Hydraulic Modeling Next Steps Public Outreach,
More informationCITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.
More informationWatershed Rehabilitation Program in Texas
Watershed Rehabilitation Program in Texas 1 Dams Constructed by Year (nationwide) 700 600 500 PL-566 Pilot/RC&D PL-534 400 300 200 100 0 48 51 54 57 60 63 66 69 72 75 78 81 84 87 90 93 96 99 Year 2 Number
More informationUnited States Army Corps of Engineers, Civil Works
United States Army Corps of Engineers, Civil Works Fiscal Year 2013 Federal Program Inventory May 2013 Table of Contents Introduction... 2 Program Inventory... 3 1. Navigation... 3 2. Flood Risk Management...
More informationFlooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami).
Flooding Fast Facts What is a flood? Flooding is the unusual presence of water on land to a depth which affects normal activities. Flooding can arise from: Overflowing rivers (river flooding), Heavy rainfall
More informationROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND
ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND The Rose Creek Watershed (RCW) consists of three planning
More informationArapaho & Roosevelt National Forests 2013 Flood: Long-term Recovery in a Changed Landscape
Arapaho & Roosevelt National Forests 2013 Flood: Long-term Recovery in a Changed Landscape Spring 2014 The flood of September 2013 changed the landscape of the Boulder and Canyon Lakes Ranger Districts.
More informationHYDROLOGIC/HYDRAULIC MODELING OF WESTMINSTER WATERSHED ORANGE COUNTY, CALIFORNIA
HYDROLOGIC/HYDRAULIC MODELING OF WESTMINSTER WATERSHED ORANGE COUNTY, CALIFORNIA James Chieh, Ph.D., P.E., Senior Hydraulic Engineer, USACE, Los Angeles, California, Shih.H.Chieh@usace.army.mil; Jay Pak,
More informationREVIEW PLAN For FLOOD RISK MANAGEMENT FOR DICKENSON COUNTY PUBLIC SCHOOLS LEVISA FORK BASIN DICKENSON COUNTY, VIRGINIA SECTION 202 NONSTRUCTURAL
REVIEW PLAN For FLOOD RISK MANAGEMENT FOR DICKENSON COUNTY PUBLIC SCHOOLS LEVISA FORK BASIN DICKENSON COUNTY, VIRGINIA SECTION 202 NONSTRUCTURAL PROJECT Huntington District October 2010 REVIEW PLAN FLOOD
More informationMarch 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633
ADDENDUM TO THE MICHELSON WATER RECLAMATION PLANT PHASE 2 & 3 CAPACITY EXPANSION PROJECT FEBRUARY 2006 FINAL ENVIRONMENTAL IMPACT REPORT AND THE SAN JOAQUIN FRESHWATER MARSH ENHANCEMENT PLAN REVISED SEPTEMBER
More informationBiltmore Village Emergency Flood Response Plan
Biltmore Village Emergency Flood Response Plan US Army Corps of Engineers Nashville District March 2009 Executive Summary 1.0 PROJECT PURPOSE AND HISTORY 1.1 Project Purpose The purpose of this project
More informationPERFORMANCE OF DAMS AND SPILLWAYS 2009 GEORGIA FLOOD. Randall P. Bass, P.E. 1, 2. James R. Crowder, P. Joseph S. Monroe, P.E.
PERFORMANCE OF DAMS AND SPILLWAYS 2009 GEORGIA FLOOD Randall P. Bass, P.E. 1, 2 James R. Crowder, P. Joseph S. Monroe, P.E. 3 ABSTRACT During the latter part of September 2009, the Atlanta metro area received
More informationRhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.
American Recovery and Reinvestment Act (ARRA) Emergency Watershed Protection Program Floodplain Easements Rhode Island Natural Resources Conservation Service Rhode Island NRCS received approximately $2.4
More informationURBAN DRAINAGE CRITERIA
URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities
More informationFlood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún
Flood mitigation program for Gatun lake Programa de mitigación de inundaciones del lago Gatún Moffatt & Nichol Engineers 10 de febrero de 2005 Contrato No. 126161 Introducción y Recomendaciones 1 INTRODUCTION
More informationDevelopment of Technical Data For Long Term Flood Solutions For the Red River Basin
IDENTIFYING WHAT WE DIDN T KNOW Development of Technical Data For Long Term Flood Solutions For the Red River Basin LTFS Study Area U.S. Portion of Red River Basin (MN, ND & SD) Main Stem Red River Tributaries
More informationFlood After Fire Fact Sheet
FACT SHEET Flood After Fire Fact Sheet Risks and Protection Floods are the most common and costly natural hazard in the nation. Whether caused by heavy rain, thunderstorms, or the tropical storms, the
More informationLand Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
More informationMethods for Determination of Safe Yield and Compensation Water from Storage Reservoirs
US Army Corps of Engineers Hydrologic Engineering Center Methods for Determination of Safe Yield and Compensation Water from Storage Reservoirs October 1966 Approved for Public Release. Distribution Unlimited.
More informationDISCUSSION PAPER. The Economics and Politics of Green Flood Control
DISCUSSION PAPER April 2014 RFF DP 14-07 The Economics and Politics of Green Flood Control A Historical Examination of Natural Valley Storage Protection by the Corps of Engineers C a r o l yn K o u s k
More informationDisaster Recovery Managing and Leveraging Multiple Funding Sources
Disaster Recovery Managing and Leveraging Multiple Funding Sources Jordan Williams, CFM June 3, 2015 Overview Programs FEMA Public Assistance (PA) and Hazard Mitigation Grant Program HUD s Community Development
More informationHydrologic Engineering Techniques for Regional Water Resources Planning
US Army Corps of Engineers Hydrologic Engineering Center Hydrologic Engineering Techniques for Regional Water Resources Planning October 1969 Approved for Public Release. Distribution Unlimited. TP-17
More informationThe 1951 Kansas - Missouri Floods... Have We Forgotten?
The 1951 Kansas - Missouri Floods... Have We Forgotten? Introduction - This report was originally written as NWS Technical Attachment 81-11 in 1981, the thirtieth anniversary of this devastating flood.
More informationTOWN OF HARRISBURG FIRE DEPARTMENT 6450 Morehead Road, Harrisburg North Carolina 28075 Phone: 704 455 3574 Fax 704 455 6391 www.harrisburgfd.
FLOOD FACTS AND SAFETY TIPS Floods are one of the most common hazards in the United States. Flood effects can be local, impacting a neighborhood or community, or very large, affecting entire river basins
More informationHEADWATERS CONTROL STRUCTURE MANAGEMENT POLICY AND OPERATING PROCEDURES
HEADWATERS CONTROL STRUCTURE MANAGEMENT POLICY AND OPERATING PROCEDURES INTRODUCTION The Headwaters Control Structure at Gray's Bay is the outlet of Lake Minnetonka to Minnehaha Creek. It is an adjustable
More informationMicromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience
Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Robert W. Carr 1 * and Stuart G. Walesh 2 1 Water Resources Modeling, LLC, 4144 S. Lipton Ave,
More information11 Flooding 11.1 HISTORICAL FLOODS
11 Flooding Flood hazards in Humboldt County are attributable to rivers, dam failure, and coastal high water hazards (tsunamis and flood tides), with river flooding being by far the most prevalent. Flooding
More informationOutlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
More informationUS Army Corps of Engineers Los Angeles District. Rio Salado Oeste Salt River-Phoenix, Arizona FEASIBILITY REPORT SUMMARY
US Army Corps of Engineers Los Angeles District Rio Salado Oeste Salt River-Phoenix, Arizona FEASIBILITY REPORT SUMMARY U.S. Army Corps of Engineers South Pacific Division, Los Angeles District September
More informationCLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,
More informationUS Army Corps of Engineers BUILDING STRONG
Fort Worth District Public Meeting 20 August 2013 US Army Corps of Engineers Lewisville Dam - Authorization Authorized by the River and Harbor Act, approved 2 March 1945 (Public Law 14, 79th Congress,
More information3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN
3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards
More informationMEETING DATE: February 08, 2008
Truckee River Flood Management Project FLOOD PROJECT COORDINATING COMMITTEE STAFF REPORT MEETING DATE: February 08, 2008 DATE: February 1, 2008 TO: Flood Project Coordinating Committee Members FROM: Naomi
More informationProposal to the Trinity Adaptive Management Working Group (TAMWG)
Proposal to the Trinity Adaptive Management Working Group (TAMWG) Request that the TAMWG recommend that the Trinity River Restoration Program fund BLM to purchase the Weigel parcel at Gold Bar (river mile
More informationGeneral Insurance - Domestic Insurance - Home Contents Storm water damage policy exclusion flood damage
Determination Case number: 227307 General Insurance - Domestic Insurance - Home Contents Storm water damage policy exclusion flood damage 4 April 2011 Background 1. The Applicants insured their home contents
More informationFlood Mitigation Efforts in the Red River Basin. Slobodan P. Simonovic University of Manitoba University of Western Ontario
Flood Mitigation Efforts in the Red River Basin Slobodan P. Simonovic University of Manitoba University of Western Ontario Presentation outline Introduction Red River basin experience legislation structural
More informationArkansas River Corridor Vision & Master Plan
A r k a n s a s R I v e r C o r r I d o r P l a n Arkansas River Corridor Vision & Master Plan July 2005 Indian Nations Council of Governments A r k a n s a s R I v e r C o r r I d o r P l a n Partnership
More informationAction plans for hotspot locations - Ash Study
Appendix 9 Action plans for hotspot locations - Ash Study Ash Vale North 1. Local evidence indicates the culvert could not discharge during December 2013 because the outlet was blocked on the western side
More informationMulti-Jurisdictional Hazard Mitigation Plan
Flooding General Flooding is the leading cause of death among all types of natural disasters throughout the United States, with its ability to roll boulders the size of cars, tear out trees, and destroy
More informationUntreated (left) and treated (right) Sierra Nevada forests in Amador County, CA. Photos: Sierra Nevada Conservancy
Case Study Mokelumne Watershed, CA and Santa Fe, NM Avoided Costs: The Economics of Watershed Restoration Forested headwaters are the source of much of the West s drinking water. Protecting and restoring
More informationThe Mississippi River & Tributaries Project
Following the Great Mississippi River Flood of 1927, the nation galvanized in its support for a comprehensive and unified system of public works within the lower Mississippi Valley that would provide enhanced
More informationFrequently-Asked Questions about Floodplains and Flood Insurance FLOOD INSURANCE
Frequently-Asked Questions about Floodplains and Flood Insurance What is a floodplain? The floodplain is any area covered by water during normal water flows, and which could be inundated as a result of
More informationTravel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness
3 Chapter 3 of Concentration and Travel Time Time of Concentration and Travel Time Travel time ( T t ) is the time it takes water to travel from one location to another in a watershed. T t is a component
More informationFLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN. May 2010. Prepared by. for the. 2010 by Earth Economics
FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN May 2010 Prepared by for the Execubve Summary The Chehalis Basin experienced catastrophic flooding in 2007 and 2009. In response, the
More informationCommunity Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects
City of Los Angeles Department of Public Works Bureau of Engineering Machado Lake Ecosystem Rehabilitation Project & Wilmington Drain Multi-Use Project Community Workshop 5 February 24, 2009 In association
More informationTENNESSEE GAS PIPELINE COMPANY, L.L.C.
TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC & HYDRAULIC CALCULATIONS FOR WATERBODIES CROSSED BY CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,
More informationGreater Los Angeles County Region Attachment 3
Introduction The (Project) includes improvement of three existing Los Angeles County Flood Control District facilities and the construction of a new interconnecting pipeline. The existing facilities are
More informationCatchment and Lake Research
LARS 2007 Catchment and Lake Research Flood Forecasting and Early Warning System (FFEWS) an Alternative Technology for Flood Management System and Damage Reduction in Ethiopia: A Concept Note Semu Ayalew
More informationPioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and
Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and Water Resources Division Presentation Outline Background
More information3.1 Historical Considerations
3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible
More informationCounty Watersheds. Total Project Cost - $11.1 M. Project Description. Funding Sources. Project Milestones. Service Impact
County Watersheds Total Project Cost - $11.1 M Project Description These funds are for watershed capital projects throughout the County. Projects can include stream restoration, best management practices
More informationFlood Risk Considerations
CHECKLIST FOR MITIGATING OR AVOIDING FLOOD DAMAGE It may not seem the case, but individuals are not powerless in influencing their potential exposure to catastrophes, such as floods. Property owners have
More informationTropical Storm Allison
Tropical Storm Allison June 13, 2003, 2:41PM Two years after Allison, Houston has reached a watershed moment By KEVIN SHANLEY Houston is exploding with growth. But city building can be a messy business,
More information