Howard D. Woodson STEM High School District of Columbia Public Schools
|
|
|
- Laurel Holland
- 10 years ago
- Views:
Transcription
1 Howard D. Woodson STEM High School District of Columbia Public Schools Washington, DC AIA DC 2012 Chapter Awards The new Woodson weaves the [history of the] Tower of Power with a new breathtaking, contemporary-looking, stateof-the-art facility that can serve as a national model for public school modernization. Mayor Vincent Gray Washington, DC
2 Howard D. Woodson STEM High School District of Columbia Public Schools Washington, DC AIA DC 2012 Chapter Awards Project Category Architecture Type of Client Academic/ Public High School Project Scope New Construction Size of Project 235,000 sf Completion Date Fall 2011 Project Cost $ 95,000, Sustainable Design Pursuing LEED Gold Howard D. Woodson High School first opened its doors in 1973 occupying an eight-story concrete tower built upon a raised outdoor plaza. While hailed as a state-of-the-art campus when it opened, the building fell into disrepair when money for maintenance didn t materialize. By the early 2000 s the deteriorating building was slated for demolition to be replaced by a new educational facility built on the foundations of a STEM educational model, community engagement and environmental stewardship. The new building is a 235,000 gross square foot, three-story structure with a strong central entrance. A sky-lit atrium with dramatic open stairs floods the core with natural light, links each floor level and serves as the primary student access to educational spaces. Extensive new site development includes a football stadium as well as tennis courts, a softball field, practice fields and connections to the newly opened Marvin Gaye Park. The school is specifically designed to support a progressive curriculum based on STEM (Science, Technology, Engineering and Math). Upper floors of the building feature distinct learning communities, each configured for integrated learning. Each classroom can operate as a collaborative workspace or can be sub-divided into traditionally sized learning units. Supported by an advanced technology infrastructure, each learning community includes an integrated learning suite with laboratories and break-out areas surrounding a forum/gathering space. The school s media center is located on the second level of the central bay, adjacent to the atrium. The media center is the heart of the STEM learning community, reflecting the culture of the academic program through technology and a collaborative learning environment. Additionally, the building is focused on meeting the program needs of its vibrant surrounding community. Facilities that serve students by the day are configured to support neighborhood cultural and recreational activities during off-hours. Through careful planning, gathering spaces can be accessed and function independently from adjacent academic facilities. A 1,000 seat theater/performing arts venue includes a proscenium, raised stage, dressing rooms and support spaces. Accessed through its own entrance and lobby/gallery, this state of the art theater is supported by technology infrastructure that supplements theatrical performances, concerts, lectures as well as meetings, cultural festivals and community celebrations. In addition, a new natatorium houses an eight-lane pool and separate community locker rooms. Working in close collaboration with DC Public Schools and the Woodson community, the design team has created an innovative new educational facility that will address the academic needs of Ward 7 students far into the future. Through strategic planning, community engagement, will and perseverance, the new facility embodies the vision of an integrated center for academic and community engagement.
3 Sustainable Design The District of Columbia Public Schools strongly believes in the principles of sustainable design and their obligation to practice, as well as demonstrate, responsible environmental stewardship. To that end, the new Howard D. Woodson STEM High School was developed as a model for large-scale academic architecture conceived to reflect the school system s commitment to building and operating efficient and sustainable programs. The 235,000 sf of new construction and extensive site development was designed to achieve Leadership in Energy and Environmental Design (LEED) Gold certification in accordance with the US Green Building Council s LEED for Schools rating system criteria. It is currently pursuing LEED Gold certification. Sustainable and high performance design features include innovative measures to collect and manage storm water run-off. Over 75% of the building s roof area contains vegetative plantings. Remaining areas contribute to a rainwater harvesting system that collects and stores runoff in below-grade cisterns that provide recycled gray water to supplement the plumbing system. In addition, the Natatorium pool s back-wash is stored to support a plumbing system that features low-flow and water conserving fixtures. The building was designed with high performance glazing that supports natural ventilation and provides extensive views to the exterior while limiting heat gain from abundant natural light that floods occupiable spaces. Daylight harvesting and automated controls maximize use of natural light within the building s core. A super-insulated perimeter shell supports a high-efficiency mechanical system with an energy recovery system maximizing usage of outside air. Estimated energy use is 50,500 Btu/sf/yr. Intelligent interior controls and management systems link to individual room sensors and roof top weather stations monitor that maintain interior comfort depending on occupancy and climactic conditions. A skylit atrium with dramatic open stairs floods the school s core with natural light and serves as a vertical mainstreet, linking the building s stacked program spaces. Additional sustainable features include water-conserving elements such as the use of natural habitat plantings that require no additional irrigation and bio-swales that capture and purify rainwater. The building features recycled and replenishable, low-voc, natural materials and maximum use of local building materials coming from within a 500 mile radius to stimulate local economies and to reduce the environmental impact of transporting building materials. Careful site selection to maximize the use of public transportation, incentives for car pooling and bicycle use as well as proximity to residential density and community services all contribute to the core mission of creating a beautiful and sustainable educational facility that meets diverse educational and neighborhood needs of DC s Ward 7 through active engagement and environmental stewardship.
4 Site Plan Key 1. HD Woodson STEM High School 2. Entrance Plaza 3. Athletic Stadium 4. Field House 5. Practice Field 6. Marvin Gaye Park 7. Softball Stadium 8. Parking 9. Parking N
5 The eight-story Tower of Power is gone... So are the bleak stretches of windowless concrete that gave HD Woodson the look and feel of a penal institution rather than a high school in far Northeast Washington. A view looking south toward the new Woodson STEM High School s front door and the Natatorium s community entrance. Bill Turque Washington Post
6 The entry plaza with sweeping access ramps creates a pedestrian gathering space for students and neighbors. Woodson s dramatic entrance canopy provides sun shading and an iconic identity.
7 Natural habitat plantings and bio-swales manage storm water runoff while demonstrating environmental awareness and sustainable design best practices A secondary entrance provides access to an auditorium designed to accommodate after-hours community cultural arts functions.
8 The school s west façade forms a formal backdrop for activities in the new Woodson athletic complex. Exterior elevations are classic and civic, conveying an appropriate sense of permanence.
9 STEM academic spaces are stacked directly above the school s Natatorium creating a compact and efficient floor plate on the dense urban site A view looking south toward the school s classic rear facade
10 FIRST FLOOR PLAN KEY: ACADEMICS SPORT 1 LOBBY 2 ADMINISTRATIVE OFFICES 3 FACULTY WORK ROOM 4 CONFRENCE / MEETING ROOM 5 CHILD CARE 6 HEALTH SUITE 7 ENGINEERING OFFICE 9 MECHANICAL ATHLETICS 10 NATATORIUM LOBBY 12 RECREATION OFFICES 13 NATATORIUM BLEACHERS FOOD SERVICES 1 LOADING / SERVICES 2 KITCHEN 3 SERVERY 4 DINING HALL VISUAL + PERFORMING ARTS 1 THEATER LOBBY / GALLERY 2 AUDITORIUM (1,000 SEATS) 3 STAGE 4 STAGE SPORT 5 BAND ROOM 6 CHORAL ROOM 7 PRACTICE ROOMS N
11 The main stair is located in the heart of the school and actively demonstrates the schools commitment to STEM. Acoustical panels spanning the second and third floors feature specially designed graphics intended to not only provide subtle orientation and way-finding, but also to inspire. Graphics visible on the third floor center around individuals who have made significant contributions to the fields of Science, Technology, Engineering and Mathematics. Graphics visible on the second floor feature scenes of the school s history and demonstrate the legacy of Woodson Warrior pride. Woodson s main stair serves as the school s vertical main street.
12 A separate two story performing arts center entrance lobby is also a gallery for display of student and community art. RAMP RAMP RAMP RAMP 14" DIA. DW A 1,000 seat auditorium is designed to accommodate a wide variety of school and community gathering functions including concerts, dramatic performances and lectures. The auditorium features retractable theater seating and a motorized divider wall that allows the space to be used for multiple simultaneous functions.
13 Saw-toothed skylights flood the dining hall with natural light. RAMP RAMP RAMP RAMP 14" DIA. DW The cafeteria at Woodson offers seating for 400. It is designed for large assemblies and is outfitted with complete presentation technologies to support community gatherings. Students have a large variety of nutritionally sound menu options, all prepared and served from the cafeteria s kitchen. Approximately 85% of Woodson students receive free or reduced lunch.
14 N
15 SC RD DW Teacher Labs provide a defined space for staff to work together facilitating engagement in the STEM culture. A large collaborative forum space on the second floor. Woodson is equipped with wireless internet access throughout the school. Every student has access to a netbook and much of the students STEM work is completed electronically. We are very proud of its design, as it stands as a bold statement in terms of the value places on public education in the District of Columbia. Allen Y. Lew DC City Administrator
16 SC RD DW All classrooms ae equipped with both interactive smart boards as well as ceiling projectors for dual format digital display. Classrooms feature adjacent collarborative learning spaces that visually communicate with academic forums. The school promotes interior transparency. Half-sized lockers provide counter-height work surfaces and display platforms.
17 SC 14" DIA. RD DW Cafe tables and soft seating allow students to use the library for informal study. Students are able to connect to the school s wireless network for access to study material and research. Woodson s media center is located immediately off of the main stair on the second floor. It is designed with a variety of flexible collaboration spaces to support the STEM pedagogy. It also contains the school s broadcast lab.
18 SC RD DW The robotics lab is located adjacent to the main street stair on the second floor. It says something to the students and to the community that the District is serious about preparing its youth for the new, technologically advanced job market. They see hope. Principal Thomas Whittle The robotics lab serves as the command headquarters for Woodson implementation of the STEM curriculum in their 10th grade academy. This learning space is unique because it is designed for flexible setup with movable furniture, lab tables, and a garage door to support STEM curriculum.
19 THIRD FLOOR PLAN KEY: ACADEMICS 1 CLASSROOM 2 INTEGRATED CLASSROOMS 3 INTEGRATED LABS 4 SPECIALTY LAB 5 COLLABORATIVE LEARNING SPACE / FORUM SPORT 2 ADMINISTRATIVE OFFICES 3 FACULTY WORK ROOM 4 CONFERENCE / MEETING ROOM ATHLETICS FOOD SERVICES VISUAL + PERFORMING ARTS N
20 DW DW Third floor classrooms take advantage of their double-height providing abundant daylighting. This space is half of an Integrated Classroom, shown here with its white board wall dividing it into a traditional-size learning space.
21 DW DW Extensive exterior glazing fill classroom spaces with natural light. Wet labs are configured to support the school s integrated science curriculum. The third floor s science forum features an interactive smart board for student presentations. Forums are gathering spaces that promote collaborative learning. This forum faces the front of the school and offers floor to ceiling views of the main entry. On the left side, there is a tackboard with lights to display student work.
22 N
23 STOR LOCKER LOCKABLE FILE STOR ICE STAIR STEPPER ELLIP UBE LOCKABLE STORAGE CLOSET SC COPIER STATIONARY EXERCISE MAT TAPING STATION TAPING STATION UTIL BENCH REF 3'-0" 3'-0" LOCKABLE STORAGE CLOSET UTIL BENCH REHAB EQUIP STOR TREATMENT TABLE TREATMENT TABLE TREATMENT TABLE WASHER DRYER RAMP Locker rooms and athletic offices support the gymnasium. Windows on all for sides of the space promote natural lighting and transparency. Woodson s competition gymnasium offers seating for 1,000. Bleachers are retractable to create full-sized cross courts. The auxiliary gymnasium is adjacent to the competition gym and provides a secondary location for athletic events and assemblies.
24 STOR LOCKER LOCKABLE FILE STOR ICE STAIR STEPPER ELLIP UBE LOCKABLE STORAGE CLOSET SC COPIER STATIONARY EXERCISE MAT TAPING STATION TAPING STATION UTIL BENCH REF 3'-0" 3'-0" LOCKABLE STORAGE CLOSET UTIL BENCH REHAB EQUIP STOR TREATMENT TABLE TREATMENT TABLE TREATMENT TABLE WASHER DRYER RAMP The Natatorium features a separate entrance and community locker rooms that accomodate after hours community use. The 8-lane pool is equipped with a wheelchair ramp and diving boards. The school uses the pool for physical education as well as for competition swimming.
25 We believe this new facility will serve as a national model of architectural and educational excellence in the District of Columbia and the nation for years to come. Ollie Harper, Jr. Former Executive Director of OPEFM
DISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf
DISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf Discovery Hall reflects its dynamic program and dramatic site, as well as the collaborative and student-centered spirit of
FRANCIS L. CARDOZO HIGH SCHOOL 1200 CLIFTON STREET NW WASHINGTON, DC 20009
FRANCIS L. CARDOZO HIGH SCHOOL 1200 CLIFTON STREET NW WASHINGTON, DC 20009 FRANCIS L. CARDOZO HIGH SCHOOL SCHOOL HISTORY Francis L. Cardozo High School, located at 1200 Clifton Street and bounded by Florida
SELECTED SPECIAL EVENTS PROJECTS
1 5 SELECTED SPECIAL EVENTS PROJECTS 3 1 DONNA AND MARVIN SCHWATZ CENTER FOR PERFORMING ARTS, ATLANTA, GEORGIA, USA. COBB ENERGY PERFORMING ARTS CENTRE, COBB COUNTY, GEORGIA, USA. 3 OLYMPIC AQUATIC CENTER,
john jay college of criminal justice
AIA NEW YORK CHAPTER 2013 DESIGN AWARDS ARCHITECTURE john jay college of criminal justice NEW YORK, NEW YORK FULL PROJECT NARRATIVE John Jay College of Criminal Justice s new building provides all the
ARTS. presented by: TOM SHERRY HAMILTON ANDERSON ASSOCIATES
DETROIT SCHOOL OF ARTS presented by: TOM SHERRY HAMILTON ANDERSON ASSOCIATES of DSA OVERVIEW ONE TEACHER S VISION DR. DENISE DAVIS-COTTON RECOGNIZED MILKEN EDUCATOR Picture of Old DSA FOUNDED IN 1992 RECEIVED
1/9/2015 P:\130217-03\Project Management\Program\Ripon Space Program - 7 January 2015.xlsx
MIDDLE SCHOOL Administration Office Principal's Office 200 1 200 Desk, conference table for 4-6 Conference Room 250 1 250 Conference table for 12 Open Office Area 250 1 250 2 Workstations Mail / copier
Schematic Plan Submittal, 21 November, 2011 Roesling Nakamura Terada Architects
To r r e y P i n e s H i g h S c h o o l M a s t e r P l a n Schematic Plan Submittal, 21 November, 2011 Roesling Nakamura Terada Architects I n t r o d u c t i o n 1.0 INTRODUCTION The vision for the
MURCH ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1929 BUILDING AREA 47,700 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 491 WARD 3 PROPOSED PROGRAM CAPACITY 500 Site Plan MURCH - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
HERMANTOWN COMMUNITY SCHOOLS. New High School Addition End of DD Design Review
HERMANTOWN COMMUNITY SCHOOLS New High School Addition End of DD Design Review SITE AERIAL HIGH SCHOOL ELEMENTARY SCHOOL BUS GARAGES HOCKEY ARENA / DISTRICT OFFICE SITE FORCES EXISTING BUILDING INFORMATION
FAUQUIER HIGH SCHOOL FAUQUIER HIGH SCHOOL 200 E MARKET STREET, CHARLOTTESVILLE, VA PH : 434.296.5684 WWW VMDO.COM
FAUQUIER HIGH SCHOOL 00 E MARKET STREET, CHARLOTTESVILLE, VA PH :.9. WWW VMDO.COM PROJECT OVERVIEW The strategy for the addition and renovation of Fauquier High School unites disparate school wings into
JUNIOR AND SENIOR ACADEMY
JUNIOR AND SENIOR ACADEMY EXECUTIVE SUMMARY Fifteen years ago, East Lake Meadows, a public housing project with 1,400 residents was a terrifying place to live. Nine out of 10 residents had been a victim
Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule
Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal
Public Building Commission of Chicago. Board Meeting August 20, 2013
Public Building Commission of Chicago Board Meeting August 20, 2013 Board Meeting August 20, 2013 Recent Events Enrico Tonti Elementary School Kindergarten Modular Opening August 5, 2013 Board Meeting
New Jersey City University Gilligan Student Union Center
New Jersey City University Gilligan Student Union Center The RBA Group worked with New Jersey City University in a major renovation of their Gilligan Student Union building. We were contracted to reassess,
Secondary Educational Visioning Meeting 1
Secondary Educational Visioning Meeting 1 SANTA BARBARA UNIFIED SCHOOL DISTRICT FACILITIES MASTER PLAN LPA PROJECT NO. 13200.10 DATE: April 1, 2014 TIME: 3:30-5:00 pm PLACE: District Office AGENDA Purpose
CHAPTER 29 PLUMBING SYSTEMS
CHAPTER 29 SYSTEMS Note: The amendments to Chapter 29 are different than the 2009 Seattle Building Code and are not marked with margin bars or arrows. SECTION 2901 GENERAL [P] 2901.1 Scope. The provisions
CNMCC Learning Resource Center (Westside 1) Central New Mexico Community College
CNMCC Learning Resource Center (Westside 1) Central New Mexico Community College Design Plus & Gould Evans Phoenix Jaynes Corporation 70,000sf The CNMCC Resource Learning Center was designed by Design
Riverside Community College District / Renaissance Block
Riverside Community College District / Renaissance Block Site Location Parking Structure Four levels 224 parking spaces Access Street Coil School of the Arts Two levels 36,420 sf Plaza of the Arts Culinary
Centinela Valley Union High School District. Measure CV Masterplan Update June 2011
Centinela Valley Union High School District Measure CV Masterplan Update June 2011 Hawthorne High School (Phase 1) Hawthorne High School Phase 1: Science, Engineering, and Media Arts Center (Funded) 3
DRAPER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
Each icon on this map represents the physical location of a station.
ABBOTSFORD SCHOOL DISTRICT: GREEN TOUR TOMORROW S SUSTAINABLE SOLUTIONS TODAY Welcome to the Abbotsford School District: Green Tour. Our goal is to create an interactive learning experience for visitors
SYSTEMS INTEGRATION SYSTEMS INTEGRATION. Air handler uses heat recovery on exhaust air to temper incoming ventilation air Oxbow skylight
100% outside air intake Air handler uses heat recovery on exhaust air to temper incoming ventilation air Oxbow skylight Smoke evacuation Natural convection exhaust Atrium skylight Phase change material
Location Amenities HVAC Parking Technology Security and Life Safety Elevators Ownership and Management
MA A RR KK EE T T TOWER M R Location Market Tower is centrally located adjacent to Monument Circle in the heart of the Indianapolis Central Business District. Situated within a block of the State Capitol
RAISBECK AVIATION HIGH SCHOOL Tukwila, WA
RAISBECK AVIATION HIGH SCHOOL Tukwila, WA Building Gross Square Footage: 86,000 (including mechanical penthouse) Raisbeck Aviation High School (RAHS) is an innovative college preparatory school focusing
Newtown and Holland Middle Schools Construction Project Bid Review
Newtown and Holland Middle Schools Construction Project Bid Review *Includes clarifications requested at 30MAR16 FACCOM Meeting (italicized) Facilities Committee Meeting March 30, 2016 (Updated March 31,
Going for LEED Gold: SUSTAINABLE DESIGN IN THE RICHARD IVEY BUILDING
Going for LEED Gold: SUSTAINABLE DESIGN IN THE RICHARD IVEY BUILDING Natural lighting is an important tool in attaining sustainability. Using large windows and glass enclosures to bring in natural light
HOUSTON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1962 BUILDING AREA 59,900 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 291 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan HOUSTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
Design and Construction Planning Process Strongsville City Schools
Design and Construction Planning Process Strongsville City Schools THANK YOU. OUR TEAM 50+ years experience Headquartered in Akron, Ohio Full-service A&E firm Over 400 professionals Employee owned OUR
BUILD NYC RESOURCE CORPORATION PROJECT COST/BENEFIT ANALYSIS January 7, 2016
BUILD NYC RESOURCE CORPORATION PROJECT COST/BENEFIT ANALYSIS January 7, 2016 APPLICANT The Chapin School, Ltd. 100 East End Avenue New York, New York 10028 PROJECT LOCATION 100 East End Avenue New York,
GREEN SCHOOLS CASE STUDY. West Wing Elementary
GREEN SCHOOLS CASE STUDY School School name: School Deer Valley Union School District Address: 26716 N. High Desert Drive, Peoria, Arizona Contact: Jerry Cipriano Phone number: 602-467-5131 General location:
DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN
DISTRICT "SHELL" SUBMISSION DATE: 11/13/12 questions 11/26/12 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 11/19/12 revised 11/26/12 (delete following Hearing) KBE APPROVAL DATE: FEBRUARY
Za abeel Energy City Master Plan. Dubai, United Arab Emirates
Dubai, United Arab Emirates Dubai, United Arab Emirates The Energy Master Plan is uniquely positioned as a center for both commerce and residential development. The project will embody modern, sustainable
ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT
1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.2 Water damage in many classrooms. Replace tiles. 1.1.3 Cabinets, Equipment 1.1.4 Portables
Glossop Design & Place Making Strategy
Supplementary Planning Document to the High Peak Local Plan June 2011 Design Brief for the Town Hall Complex GILLESPIES I GERALD EVE Reproduced from the Ordnance Survey map with the permission of Ordnance
Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study
Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study Robert C. Burns, AIA, LEED AP Principal Director of Historic Architecture 804. 648. 5040, ext. 1107
Bohlin Cywinski Jackson Architecture Planning Interior Design
Bohlin Cywinski Jackson Architecture Planning Interior Design Dental School Experience Dental School Experience Overview Bohlin Cywinski Jackson has provided services to six dental schools: the University
PATTERSON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1945 BUILDING AREA 78,300 SF CURRENT PROGRAM CAPACITY 368 ENROLLMENT 2008 463 WARD 8 PROPOSED PROGRAM CAPACITY 500 Site Plan PATTERSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
Case Study Design For Innovative Learning
Case Study Design For Innovative Learning Roosevelt and Jackson Elementary Schools Medford School District 549C, Medford Oregon opsis architecture Design for Innovative Learning In 2007, major seismic
Part 2 Definitions for this Policy 2.1. ADA / TAS the Americans with Disabilities Act / Texas Accessibility Standards.
Office of Space Management Page 1 of 6 Part 1 Purpose 1.1. This policy establishes space allocation and space use guidelines for UTSA entities occupying space in UTSA-owned and UTSA-leased facilities.
How To Help Your School With A Health Care Program
Metropolitan Learning Center School Services MLC provides services to support the development of the whole child. In addition to academic services, MLC provides a full service guidance, counseling and
SPONSORSHIP PROPOSAL 2014-2015
HOUGHTON COLLEGE ATHLETICS SPONSORSHIP PROPOSAL 2014-2015 One Willard Avenue Houghton, NY 14744 P 585.567.9556 F 585.567.9365 [email protected] athletics.houghton.edu THE HIGHLANDER EXPERIENCE
Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School
Introduction Background The Duke School of Nursing building offers a new three-story state of the art facility that has helped strengthen the quality and integrity of the School of Nursing at Duke. The
University of Washington Foster School of Business. Seattle, Washington
University of Washington Foster School of Business Seattle, Washington University of Washington Foster School of Business LMN PACCAR Hall Phase I of the University of Washington Michael G. Foster School
MASTER FACILITIES PLAN EVALUATION CHECKLIST
1.0 VISION The Standard: The MFP should provide a clear, inspiring vision for the District s public facilities that will be broadly acceptable to its citizens. The plan must build confidence in DCPS ability
Nine Story, LEED Certified Class A Office Building ONE SUMMERLIN. 1980 Festival Plaza Drive, Las Vegas, Nevada 89135
Nine Story, LEED Certified Class A Office Building ONE SUMMERLIN 1980 Festival Plaza Drive, Las Vegas, Nevada 89135 PROPERTY HIGHLIGHTS LEED Certified Silver, core and shell. Green building initiatives
DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines
DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines A. Offices a. Office buildings should be built to the minimum required setback. b. Surface parking should be located towards the
PLUMMER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
PAGE INTENTIONALLY LEFT BLANK
PAGE INTENTIONALLY LEFT BLANK TABLE OF CONTENTS I. Introduction 1 Page II. Documentation of Existing Educational Programs 1 and Instructional Space III. State Square Footage Standards 2 IV. Space Allocation
Columbia Theological Seminary to Celebrate Ground-blessing for New, Green Residence Hall
FOR IMMEDIATE RELEASE News Release Contact: Anne Taylor Lord, Aeck & Sargent 404-253-6710 [email protected] or Ann Kohut Kohut Communications Consulting 770-913-9747 [email protected] Columbia
Fishermen s Market. Indoor Public Space. Shipping Container Follies. Under the Steps Gallery. Beach
1- Little Forest 2- Big Slide 3- Under the Steps Gallery 4- Green Slope 5- Swimming Pool 6- Hot Tub 7- Wood Beach 8- Bio Swale 9- Big Screen 10- Amphitheatre 11- Rocky Beach 12- Playground 13- Shipping
DESIGN DEVELOPMENT PRESENTATION
October 26, 2015 DESIGN DEVELOPMENT PRESENTATION NEW SHIRLEY HALL MIDDLE SCHOOL & JOE M. TISON MIDDLE SCHOOL ADDITIONS AND RENOVATION WEATHERFORD INDEPENDENT SCHOOL DISTRICT Acknowledgments 3 Narrative
PARKVILLE HIGH SCHOOL LIMITED RENOVATION
PARKVILLE HIGH SCHOOL LIMITED RENOVATION DESIGN BRIEFING For Dr. Joe A. Hairston BALTIMORE COUNTY PUBLIC SCHOOLS August 11, 2009 Smolen 3 Emr + Associates Architects 1355 Piccard Drive, Suite 200 Rockville,
Facilities Operations Customer Service Standards WORK ORDER PRIORITIES
Facilities Operations Customer Service Standards WORK ORDER PRIORITIES In order to provide fair and consistent maintenance service to all University faculty, staff and students, a work priority system
SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM
Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and
SCHEMATIC DESIGN PRESENTATION ACTON ELEMENTARY SCHOOL
March 16, 2015 SCHEMATIC DESIGN PRESENTATION ACTON ELEMENTARY SCHOOL DUNCANVILLE INDEPENDENT SCHOOL DISTRICT Acknowledgments 2 Narrative 3 The Process 4 Site Analysis 6 Site Plan 7 ACTON ELEMENTARY SCHOOL
Green House, Hungary
Further information Skanska AB www.skanska.com Contact Noel Morrin, SVP Sustainability & Green Support [email protected] Green House, Hungary Case Study 109 Aspects of Sustainability This project
MARQUETTE UNIVERSITY: McCabe Hall
MARQUETTE UNIVERSITY: McCabe Hall THE SITE Newly acquired by Marquette, the vintage 1920 s building is located on the northeast corner of Wisconsin and 17th Streets. The urban setting offers immediate
HAZELWOOD HIGH SCHOOLS SCHEMATIC DESIGN PRESENTATION
HAZELWOOD HIGH SCHOOLS SCHEMATIC DESIGN PRESENTATION 1 AGENDA Hazelwood 1 st Planning Process High School Program Schematic Designs Schedule 2 HAZELWOOD 1 ST GOALS Life, health and safety improvements
SECTION XI OPINION OF PROBABLE COST
SECTION XI OPINION OF PROBABLE COST OPINION OF PROPABLE COSTS HARBOR ISLAND THE PAVILION 1) Provide a sprinkler system for the entire building. 8000 SF X $15/SF $120,000 2) Remove and replace existing
Industrial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations
16.20.110 - Industrial Suburban District ( IS ) Figure REFERENCE Typical Buildings in the IS District Figure REFERENCE Site Plan of a typical development in the IS District Sections: 16.20.110.1 Composition
Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016
Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Year Opened 2003 Current Square Footage 391,000 Site Acreage 86.22 cherokeetrail.cherrycreekschools.org $279,200 Asphalt and concrete
Frequently Asked Questions
Byron Area Schools Frequently Asked Questions Bond Proposal How did this come about? For several years the Byron Area Schools Board of Education has included upgrading facilities as one of the district
Hunter College school of Social Work Thesis Proposal
Fall 2009 Hunter College school of Social Work Thesis Proposal To analyze how energy efficiency can be implemented using facade and green roof redesign. It ties structural engineering concepts with existing
100% 50% 92% 99% LEED Facts PROJECT HIGHLIGHTS. Multi-occupant spaces have adjustable thermostats and lighting. Reduced water usage for landscaping
UNIVERSITY OF RICHMOND CAROLE WEINSTEIN INTERNATIONAL CENTER 28 Westhampton Way, Richmond VA 23173 LEED NC v2.2 GOLD 2015 Completed in 2010, the Carole Weinstein International Center showcases the University
BUILDING NAMING RIGHTS
NEW HEALTH SCIENCE BUILDING Davis Applied Technology College METHODSTUDIO INC. BUILDING NAMING RIGHTS NAMING RIGHTS OPPORTUNITIES Building Areas $500,000 Building Naming Right $100,000 LEED Gold Sponsorship
TAMPA S UNIVERSITY MALL ANNOUNCES MAJOR REDEVELOPMENT PLANS. Construction is slated to begin as soon as first quarter 2016
PRESS RELEASE FOR IMMEDIATE RELEASE Contact: Elizabeth Cross Daniel Jimenez +1 305 428 6373 +407.839.3191 [email protected] [email protected] TAMPA S UNIVERSITY MALL ANNOUNCES MAJOR REDEVELOPMENT
Special Events & Space Rentals
Special Events & Space Rentals history University Settlement is the nation s first settlement house, pioneering social justice programs for nearly 130 years that continue to shape New York City today.
Five-Year Capital Plan Request FY 2015-16 through FY 2019-20
Section Contents Five-Year Capital Plan Request FY 2015-16 through FY 2019-20 Project Funding Type Total ($ 000s) Critical Maintenance for Community Colleges bonded $417,500 Health and Safety bonded $91,088
Capital Projects Town Hall Meeting
Capital Projects Town Hall Meeting Planning, Architectural & Engineering Services September 15, 2014 Agenda Project Updates Recently Completed and in Construction Projects in Design Projects in Planning
HOLLAND HALL DESIGN UPDATE. Design Team 11.11.15
DESIGN UPDATE Design Team.. AGENDA Design Team Presentation Vision + Design Drivers Review Offices - s/labs - Common Spaces Floor Plan Review VISION STATEMENT The reimagined Holland Hall will be a light-filled,
A001.01. Project Description/Project Title and Data: Building Area: (sf) Addition 28,142 Renovation 14,302. Cost per Square Foot: +/- $106.
Project Description/Project Title and Data: KEVIN I. SULLIVAN CAMPUS CENTER ADDITION & RENOVATION Medaille College - Buffalo, NY Functioning as Medaille College's campus heart, The Kevin I Sullivan Campus
Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components
Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development
Students were surveyed by Brailsford & Dunlavey in the fall of 2000 to determine their priorities for Commons program spaces.
I-1 2.0 INTRODUCTION 2.1 BACKGROUND Located in the rapidly growing Inland Empire area of Southern California (Riverside and San Bernardino Counties), the University of California, Riverside is well positioned
HAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA
INITIAL YEAR BUILT 1968 BUILDING AREA 187,700 SF CURRENT PROGRAM CAPACITY N/A ENROLLMENT 2008 129 WARD 5 PROPOSED PROGRAM CAPACITY N/A Site Plan HAMILTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
Griffin-Icen Cottage ASHEVILLE, NC DESCRIPTION:
Griffin-Icen Cottage This cottage renovation and addition in the historic Montford neighborhood published in Southern Living Magazine includes a new master bedroom suite in what was the unused attic, and
General Lighting Recommendations
Design Guidelines for Energy Efficient Lighting Systems Thank you for your interest in energy efficiency! According to the US Department of Energy, 51% of the energy used in commercial buildings is consumed
28.0 Development Permit Area #2 (Neighbourhood District)
28.0 Development Permit Area #2 (Neighbourhood District) Goals and Objectives To provide a guide for infill and new development in the Neighbourhood District. To outline the nature, form and character
IMAGINE INDIANA LIFE SCIENCES ACADEMY WEST
2.21.107 Introduction Imagine Indiana Life Sciences Academy West (Imagine ILSA West) is a charter elementary and middle school located on the west side of Indianapolis, Indiana. The school is the second
REFERENCES-COMMERCIAL. Montgomery County Community College. 60,000 Sq. Ft. Montgomery County Community College 12,000 Sq. Ft.
Montgomery County Community College West Campus Expansion 60,000 Sq. Ft. Warehouse adaptive reuse of the former Vaughn Knitting Mill, a major architectural component of Pottstown s Industrial Heritage.
V I S I O N 2 0 2 0 REV. 1
V I S I O N 2 0 2 0 F A C I L I T I E S M A S T E R P L A N COAST COMMUNITY COLLEGE DISTRICT : CAMBRIDGE WEST PARTNERSHIP LLC : HPI ARCHITECTURE REV. 1 J u l y 2 0 1 5 T a b l e o f C o n t e n t s GOLDEN
Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014
Los Angeles Union Station, CA Sustainable Neighborhood Assessment April 22-23, 2014 Sustainable Neighborhood Assessment Through the Sustainable Neighborhood Assessment Tool developed by Global future development
Civil Engineering and Architecture (CEA) Detailed Outline
Civil Engineering and Architecture (CEA) Detailed Outline Unit 1: Overview of Civil Engineering and Architecture (23 days) Lesson 1.1: History of Civil Engineering and Architecture 1. Many features of
Siemens Gebze Location FIRST GREEN BUILDING IN TURKEY CERTIFICIED AS LEED GOLD
FIRST GREEN BUILDING IN TURKEY CERTIFICIED AS LEED GOLD Slide 1 Energy Efficiency Workshop with KFW & TSKB Sep 28th, 2010 The LEED Green Building Rating System is a voluntary standard that defines high
Saint Cloud Business Center
Saint Cloud Business Center 14 7th Avenue North Saint Cloud, MN 56303 For Sale Located on 7th Avenue in the heart of downtown across from the Court House Square. A large professional reception area with
Bond Priorities. Repairs and Maintenance. School Safety. Capacity
Replace old windows, boilers, heating and air conditioning system. Improve accessibility for disabled persons. Keyless entry lock systems, redesign of school entrance, and wireless access throughout building.
01/31/13 ACHIEVING THE VISION FOR RESTON. Reston Master Plan Special Study Task Force
ACHIEVING THE VISION FOR RESTON Reston Master Plan Special Study Task Force The Reston Master Plan Special Study Task Force was appointed by Hunter Mill District Supervisor Catherine Hudgins to review
