1 Resource Piling Large Load Tests using a Reaction System
2 RESOURCE PILING S BACKGROUND
3 Core businesses Bored Piles Reaction System Load Test Secant Piles RESOURCE PILING Contiguous Bored Pile Wall Kentledge Load Test Ancillary Services 3
4 Achievements Over 30 years of Piling (since 1981) >489 piling projects completed Grade L6 (unlimited piling contracts value) Largest & deepest piles: Ø2.5m & 92m Largest Kentledge in Singapore: 5,700 ton Largest Reaction test in Singapore: 7,652 ton Recent major projects: Sengkang Hospital, Marina Coastal Expressway, Garden by the Bay, Marina Barrage, Singapore Deep Tunnel Sewerage System, Business and Financial Centre, Tuas-A Power Station,
5 THE PROBLEM
6 Singapore is land scarce (~700 km 2 ). However it has an ever growing population (latest figures are above 5.3 million people). This dense population results in a change in infrastructure design. Hence a need for taller buildings and underground infrastructure.
7 Taller Buildings = Larger and deeper piles Marina South The Marina Bay
8 Deep Tunnel, soft soil = Larger & deeper piles MCE Marina Coastal Expressway
9 Therefore larger & taller load tests These taller buildings and deep underground infrastructures (tunnels, basements, etc.) require larger and deeper piles. To ensure that these piles have sufficient capacity they are tested using load tests. A kentledge using concrete blocks is one of the most common method of doing a load test in Singapore ton Kentledge Test, Jun 10. Biggest in Singapore
10 However... If not done properly If it is not properly carried out, the outcome can be catastrophic. Such an example is seen at the Gilstead road incident on 16 Jan A Kentledge load test failed and blocks landed onto a public road causing: Road closure & traffic congestion Gas pipe disrupted / leakage Church evacuated & Kindergarten temporary stop Negative public perception Deploy SCDF, SP Power Grid, Police, etc.
11 Reaction from authorities WSH Council s alert GEOSS committee Guidelines on good practices Resource Piling (Mr. Foo Hee Kang) invited
12 THE TEAM
13 The team Project Team Name - Designation A team of management staff, operational staff, and safety personnel was gathered to work on a better solution to the Kentledge using concrete blocks for high capacity load test. Chairman Technical Advisor Leader Foo Hee Kang MD Tan Hock Seng - GM Benjamin Lee - PM Facilitators Calvin Ng Coordinator Mitram Gopal HSE Executive (Keller) Members Donald Choo Plant Mngr Kumaresan Site Mngr Prabakar Site Engineer
14 SCHEDULE
15 Project planning Gilstead rd collapse Root cause analysis Team formation Schedule of project Design solution Schedule was developed to plan and monitor progress of the progress Corrective actions were taken when deadlines were not met Overall progress was in line with plan Oasis Hotel Review Implementation
16 ROOT CAUSE ANALYSIS
17 Root cause analysis The Ishikawa model along with the 5 Why model were used to postulate the cause of the accident at Gilstead road. The main conclusions were: Height of Kentledge leading to large toppling zone Inadequacy of design
18 ALTERNATIVE SOLUTIONS
19 Alternative solutions Description Test time Safety improvment Statnamic 10 days No dead weight but explosive O-cell 8 days All inside the pile. Good safety improvement. Kentledge (steel plates) 35 days Reduced 1. height, 2. toppling zone Reaction system 15 days Reduced: 1. height, 2. lift, 3. Toppling zone, 4. Vehicular movement 4 alternative solutions to the Kentledge using concrete blocks were considered: Statnamic test, O-cell, Kentledge using steel plates, and Reaction system (using reaction from piles). The table above shows the test times and safety imrovements. Further analysis of the solutions are on next slide.
20 Alternative solutions Statnamic O-cell Steel plates Reaction system $7.8 million $0.78 million Explosive Statnamic is an explosive test. There are inherent risks with the handling explosive material especially with increase of test loads. 2 main difficulties with O- cells are in terms of the design (accurate placement of the O-cell in the pile) and quality of construction (especially with the concrete just below the O-cell). Estimated cost of steel plates for a 7,068 ton Kentledge test is S$7.8 million. This is a huge investment. Estimated cost for a 7,068 ton Reaction load test is S$0.78. Hence this is the preferred option
21 Current Capacity Limitations However, reactions systems capacities have so far been in the range of 1,500 tons to 2,000 tons. Hence the Reaction System load test would need to be redesigned to allow test of more than 4,000 tons. Addition factors considered during the re-designing process were - Ease of transport, - Assembly technique, - New safety risks (if any), - Time of fabrication, - Detailed cost calculations - etc.
22 SELECTED SOLUTION
23 Reaction system Reaction Piles Test Pile
24 BENEFITS
25 21,145mm 16,500 Height reduction A 7,068 ton Kentledge using concrete blocks (left) would require employees to work at a maximum height of 21.2 m whereas a Reaction load test of the same capacity would require employees to work at a much reduced 6.4 m. 21.2m m Pile Head
26 78.6m Toppling zone 21,145mm Pile Head ,500 Height: 21.2m Height: 6.4m Area = 5,300 m² 78.6m Area = 900m² A 7,068 ton Kentledge using concrete blocks (left) has a toppling area of 5,300 m 2 whereas a Reaction load test of the same capacity has a toppling area of 900 m 2
27 Benefits at a glance Height Toppling Zone Lifts Traffic Cost Reaction System 15 m (70%) 4,400 m 2 (83%) 3,900 (97%) 425 (94%) S$ 182,000 (15%) Reduced Reduced Reduced Reduced annual savings Figures are based on 7,068 ton tests Figures compares a Reaction System load test to a Kentledge load test using concrete blocks Savings calculations are based on annualized costs and includes estimates of life cycles of materials such as concrete, steel, jacks, etc.
28 DESIGN & STANDARDIZATION
29 Design & Standardization The solution is standardized through the following methods: Engineering design Method Statement Risk Assessments Safe Work Procedures
30 IMPLEMENTATION
31 Communication To ensure successful implementation of the solution, the work procedures, risks and hazards need to be communicated to the supervisors, and workers. The following are the main methods used to communicate the solution: Discuss with execution team Brief RA & SWP Brief lifting plan Pre-start talks
32 Execution Having communicated the solution, the work is executed on site. Execution is monitored at several points to ensure that work being carried out complies to safe work procedures, risk assessments, permit-to-work (PTW), etc.
33 Execution An example of the completed setup (a 7,652 ton) load test using the Reaction System at Ophir road, Singapore.
34 EXPANDABILITY
35 Projects completed Project Test Load Done on Oasis Peck Seah St. M+S Ophir Road 5380t 7652t 7652t 6240t 5046t 2012 Aug Nov Nov Feb Apr. 6240t 7532t 2013 Mar May TRX(Tun Razak Malaysia) Tampines Town Tampines Ave t 7500t 7068t 2013 Oct 2013 Oct 2013 Nov
36 RESULTS
37 Results Tangible results o Height of load test o Work-at-Height exposure height & hours o Number of lifts using cranes o Toppling zone o Vehicular movement on the road o Productivity = Reduced = Reduced = Reduced = Reduced = Reduced = Increased Intangible results o Workers morale o Safety awareness o Public perception = Improved = Improved = Improved
38
Analysis One Code Desc. Transaction Amount. Fiscal Period
Analysis One Code Desc Transaction Amount Fiscal Period 57.63 Oct-12 12.13 Oct-12-38.90 Oct-12-773.00 Oct-12-800.00 Oct-12-187.00 Oct-12-82.00 Oct-12-82.00 Oct-12-110.00 Oct-12-1115.25 Oct-12-71.00 Oct-12-41.00
Dead load (kentledge) A structure over the test pile. Ground anchorage either by tension piles or ground anchors. Bi-directional (Osterberg-cell)
Introduction Fugro LOADTEST Overview STATIC LOAD TESTING O-cell Bi-directional testing State of the art Dr Melvin England Fugro LOADTEST Static load tests Previous/existing technology Developments O-cell
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 Product Support Matrix Following is the Product Support Matrix for the AT&T Global Network Client. See the AT&T Global Network
Training Approved by JAC (C&S)
1 & IES Training for Year 2015 Civil & Structural Engineering Technical Committee (Structural Division) Training Approved by JAC (C&S) Course name Date STU* Technical Site Visit to Marina One 17-Jan-2015
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
Event Space Rental at the Marina Barrage
Event Space Rental at the Marina Barrage List of Required Documents* 1. Public Liability Insurance for the event including pre/post event setup/teardown which names PUB as: a. co-insured b. loss payee
Tunnelling & Underground. Specialists
Tunnelling & Underground Specialists Mined Tunnels Excavation at Ayer Rajah Avenue, Singapore Introduction Amberg & TTI Engineering Pte Ltd (AETTI) was established in Singapore in 2002 by Amberg Engineering
Gas Explosion at a Subway Construction Site
Gas Explosion at a Subway Construction Site Apr. 8th, 1970, Osaka city KOBAYASHI, Hideo (Tokyo Institute of Technology) (Summary) On April 8th, 1970, a huge gas explosion occurred at the site of construction
Health & Safety Monthly Report. Waterfront Auckland. February - March 2013
Health & Safety Monthly Report FOR Waterfront Auckland February - March 2013 1 Contents Executive Summary... 3 Services Update... 4 Project Quality Plan (PQP)... 4 Policy... 4 Programme... 4 Management
Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8
Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138 Exhibit 8 Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 2 of 138 Domain Name: CELLULARVERISON.COM Updated Date: 12-dec-2007
SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM
SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM www.duqm.gov.om 1. INTRODUCTION 2. ACCESSIBILITY TO DUQM 3. SEZAD PREVIOUS MASTERPLAN 4. DUQM URBAN PLANNING 5. SPECIAL ECONOMIC ZONE DISTRICTS
Ardessie Hydro Electric Project
Ardessie Hydro Electric Project Appendix T - Traffic Management Plan 13 th December 2014 V1.0 Jacinta MacDermot DHG Hydro Ltd 7 St James s Gardens London W11 4RB [email protected] 077 888
Enhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017
From -JAN- To -JUN- -JAN- VIRP Page Period Period Period -JAN- 8 -JAN- 8 9 -JAN- 8 8 -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -FEB- : days
Managing Stormwater in Urbanised Singapore for Flood Control
Managing Stormwater in Urbanised Singapore for Flood Control Flood and Storm Surge Control Training Tokyo, Japan 25 27 Jan 2011 Singapore Representatives: Dorinda Hua / Senior Engineer 1 Loh Yee Wen /
The integrity evaluation of the reactor building at unit4 in the Fukushima Daiichi nuclear power station
The integrity evaluation of the reactor building at unit4 in the Fukushima Daiichi nuclear power station May 2012 Government and TEPCO s Mid-to Long Term Countermeasure Meeting Management Council Outline
How To Build The Burj Dubai Tower
Burj Dubai Tower History Rising Burj Dubai Tower History Rising 2003 All rights reserved. 1 Burj Dubai Tower History Rising Burj Dubai Tower Introduction Architecture Structure Sustainability Issues Construction
METHOD OF STATEMENT FOR STATIC LOADING TEST
Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents
ESTABLISHMENT OF A NEW BUSINESS
ESTABLISHMENT OF A NEW BUSINESS ATTENTION BUSINESS OWNERS Certificate of Occupancy Permit Requirements & Application Prior to any materials associated with your business being moved into the property that
Alphington sewer replacement
Alphington sewer replacement Frequently asked questions We understand you might have some questions for us so here are a few to provide you with more information. You are also welcome to call us on 1800
Marina Bay Sands. George Tanasijevich President and CEO of Marina Bay Sands
Marina Bay Sands George Tanasijevich President and CEO of Marina Bay Sands MBS Starts Strong and Continues to Ramp Marina Bay Sands Starts Strong and Continues to Ramp Adjusted Property EBITDA and Adjusted
SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN
SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN Facility Name: Address: QUALIFIED PERSONNEL All tasks shall be completed by a person that is qualified to that task (see operators qualification of individuals
Coordination and air quality monitoring during emergencies. Colin Powlesland Environment Agency
Coordination and air quality monitoring during emergencies Colin Powlesland Environment Agency Contents h Introduction h What do we want to achieve? h Implementation programme h Incident timeline h Proposed
BIM for Infrastructure GeoSmart Asia 2015
BIM for Infrastructure GeoSmart Asia 2015 Presented by : Sonny ANDALIS Building and Construction Authority (Singapore) Jugal Makwana AECOM (Singapore) Agenda What is Infrastructure? Ongoing Singapore Infrastructure
P/T 2B: 2 nd Half of Term (8 weeks) Start: 25-AUG-2014 End: 19-OCT-2014 Start: 20-OCT-2014 End: 14-DEC-2014
2014-2015 SPECIAL TERM ACADEMIC CALENDAR FOR SCRANTON EDUCATION ONLINE (SEOL), MBA ONLINE, HUMAN RESOURCES ONLINE, NURSE ANESTHESIA and ERP PROGRAMS SPECIAL FALL 2014 TERM Key: P/T = Part of Term P/T Description
P/T 2B: 2 nd Half of Term (8 weeks) Start: 26-AUG-2013 End: 20-OCT-2013 Start: 21-OCT-2013 End: 15-DEC-2013
2013-2014 SPECIAL TERM ACADEMIC CALENDAR FOR SCRANTON EDUCATION ONLINE (SEOL), MBA ONLINE, HUMAN RESOURCES ONLINE, NURSE ANESTHESIA and ERP PROGRAMS SPECIAL FALL 2013 TERM Key: P/T = Part of Term P/T Description
Planned Procurement Opportunities Report. March 2015
HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report March 2015 Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted
Sector Design Concepts
Section C Sector Design Concepts C7 Sector 7 Great North Road Underpass 6 6 6 C7. Existing situation Sector 7 refers to the cut and cover section of the project linking the northern end of the deep tunnels
P/T 2B: 2 nd Half of Term (8 weeks) Start: 24-AUG-2015 End: 18-OCT-2015 Start: 19-OCT-2015 End: 13-DEC-2015
2015-2016 SPECIAL TERM ACADEMIC CALENDAR For Scranton Education Online (SEOL), Masters of Business Administration Online, Masters of Accountancy Online, Health Administration Online, Health Informatics
FALL PREVENTION PLAN FPP. Sharing of Safe Work at Height
FALL PREVENTION PLAN FPP Sharing of Safe Work at Height Howard How Boustead Singapore Limited The Group Established in 1828, Boustead Singapore is a progressive global infrastructure-related engineering
Important Dates Calendar 2014-2015 FALL
Important Dates Calendar 204-205 FALL Rev. 6-8-4 st 8 H st 0 2nd 0 st 5 2nd 5 3rd 5 LSC Advanced Registration Begins May 27 May 27 May 27 May 27 May 27 May 27 May 27 May 27 May 27 Returning Students Advanced
Fire Safety In High Rise Building
Fire Safety In High Rise Building CLASSIFICATION OF BUILDINGS AS PER NATIONAL BUILDING CODE 1. GROUPING. Group A - Residential : Lodgings, Dwellings, Dormitories, Flats, Hotels. Group B Group C - Educational
RED 5 Limited The next gold producer
The next gold producer May 2011 Company highlights Target production Sept 2011 quarter at Siana Gold project Construction 0% complete, all plant equipment in country Forecast cash costs sub $400 per ounce,
Indianapolis Midfield Terminal Thermal Utility Construction
Indianapolis Midfield Terminal Thermal Utility Construction CGCU Background Public Charitable Trust is managed only for the benefit of customers and the community 266,000 customers 3,700 Miles of Gas Distribution
CENTERPOINT ENERGY TEXARKANA SERVICE AREA GAS SUPPLY RATE (GSR) JULY 2015. Small Commercial Service (SCS-1) GSR
JULY 2015 Area (RS-1) GSR GSR (LCS-1) Texarkana Incorporated July-15 $0.50690/Ccf $0.45450/Ccf $0.00000/Ccf $2.85090/MMBtu $17.52070/MMBtu Texarkana Unincorporated July-15 $0.56370/Ccf $0.26110/Ccf $1.66900/Ccf
49 CFR 192 Transportation of Natural and Other Gas By Pipeline: Minimum Federal Safety Standards
49 CFR 192 Transportation of Natural and Other Gas By Pipeline: Minimum Federal Safety Standards THIS DOCUMENT CONTAINS ONLY THE SECTIONS NEEDED FOR THE API 1169 ICP EXAMS Subpart G General Construction
MLD: Domestic Maritime Transport Project
Environmental Monitoring Report Project Number: 37265 December 2010 MLD: Prepared by Japan Port Consultants Co., Ltd. Malé, Maldives For Ministry of Finance and Treasury Ministry of Transport and Communication
Boston Traffic Management Center Activity Report for FY 2013 Real-time Traffic Signal Adjustments
Boston Traffic Management Center Activity Report for FY 2013 Real-time Traffic Signal Adjustments The mission of the Traffic Management Center (TMC) within the Boston Transportation Department is to monitor,
PTC Creo 2.0 Hardware Support Dell
PTC Creo 2.0 Hardware Support Dell Last updated: February 2, 2016 The Desktop Virtualization Environment Support Dell table displays at the end of this document, after the standard Creo certification table.
GIO Workers Compensation Training Calendar. Tasmania July 2010 to June 2011
GIO Workers Compensation Training Calendar Tasmania July 2010 to June 2011 Tasmania Training Calendar July 2010 June 2011 Course Time July Aug Sept Oct Nov Dec Feb Mar Apr May Jun Hobart (GIO Offices Level
Trenching and Excavation Safety
1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines related to excavation and trenching in pipeline construction activities. These guidelines are applicable to the locating, marking
2015-16 BCOE Payroll Calendar. Monday Tuesday Wednesday Thursday Friday Jun 29 30 Jul 1 2 3. Full Force Calc
July 2015 CM Period 1501075 July 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 August 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
EMERGENCY PREPAREDNESS
EMERGENCY PREPAREDNESS Page 1 SECTION 11 EMERGENCY PREPAREDNESS CONSIDERATIONS FOR APPROPRIATE EMERGENCY PREPAREDNESS...3 EMERGENCY PREPAREDNESS POLICY Emergency Preparedness Policy - Sample...5 EMERGENCY
FLOOD RISK RECENT TRENDS AND POLICY RESPONSES
FLOOD RISK RECENT TRENDS AND POLICY RESPONSES DEVELOPING WESTMINSTER S LOCAL PLAN Booklet No. 2 LDF Consultation - CMP Revision November 2013 INTRODUCTION CLLR ROBERT DAVIS Westminster is at risk of flooding
Planned Procurement Opportunities Report. April 2015
HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report April 2015 Prepared by the Procurement Department Planned Procurement Opportunities Report - April 2015 Overview The Planned
Airport Rail Link is gathering speed. Wolfgang Rueprich, Project Manager Airport Rail Link, October 21, 2009
Airport Rail Link is gathering speed Wolfgang Rueprich, Project Manager Airport Rail Link, October 21, 2009 Integrated Public Transit System for Metropolitan Regions Regional / Long Distance Rail Service
Choosing a Cell Phone Plan-Verizon
Choosing a Cell Phone Plan-Verizon Investigating Linear Equations I n 2008, Verizon offered the following cell phone plans to consumers. (Source: www.verizon.com) Verizon: Nationwide Basic Monthly Anytime
DESIGN CRITERIA. Determination of earthquake demand. Building importance level. Component categories SEISMICALLY RESILIENT NON-STRUCTURAL ELEMENTS
FACT SHEET 2 NZS 4219:2009 Seismic performance of engineering systems in buildings requires the arrangement and layout of engineering systems within a building to allow for earthquake actions. NZS 4219:2009
Congestion Pricing Experiences in Singapore. Dr Kian-Keong Chin Chief Engineer, Transportation Land Transport Authority Singapore
Congestion Pricing Experiences in Singapore Dr Kian-Keong Chin Chief Engineer, Transportation Land Transport Authority Singapore Congestion Pricing just one component of a Transport Strategy Cannot work
SECOND PENANG BRIDGE PROJECT
INTRODUCTION PROJECT PARTICULARS Jambatan Kedua (JKSB), a wholly-owned company of the Minister of Finance, Incorporated (MoF Inc.) was appointed as the concessionaire for the Second Penang Bridge Project
Ashley Institute of Training Schedule of VET Tuition Fees 2015
Ashley Institute of Training Schedule of VET Fees Year of Study Group ID:DECE15G1 Total Course Fees $ 12,000 29-Aug- 17-Oct- 50 14-Sep- 0.167 blended various $2,000 CHC02 Best practice 24-Oct- 12-Dec-
GEOTECHNICAL ISSUES OF LANDSLIDES CHARACTERISTICS MECHANISMS PREPARDNESS: BEFORE, DURING AND AFTER A LANDSLIDE QUESTIONS FOR DISCUSSIONS
GEOTECHNICAL ISSUES OF LANDSLIDES CHARACTERISTICS MECHANISMS PREPARDNESS: BEFORE, DURING AND AFTER A LANDSLIDE QUESTIONS FOR DISCUSSIONS Huge landslide Leyte, Phillipines, 1998 2000 casulties Small debris
Workplace Incident Fatalities Accepted by the Workers Compensation Board in 2014
Workplace Incident Fatalities Accepted by the Workers Compensation Board in 2014 Workplace Incident Fatalities Year to date, numbers as of December 31, 2014 Workplace Incident fatalities are cases where
Enhancing Safe Use of Cranes A Great Workforce A Great Workplace
Enhancing Safe Use of Cranes A Great Workforce A Great Workplace Ian Teh Yi Tian Engineering Safety Branch OSH Specialists Department Occupational Safety and Health Division, MOM Safe use of Cranes Scope
E ER TITAN PRODUCTS. Foundation Repair
E GIN E ER E D N EX CEL ENCE L Foundation Repair ENGINEERED EXCELLENCE Authorized Installer of Titan Products, Inc. Titan Products, Inc. 615.746.6876 2111 Boat Factory Rd., Pleasant View, TN www.titanproductsinc.com
Working together. to prevent cable damage. a partnership for reliable and quality power
Working together to prevent cable damage a partnership for reliable and quality power contents introduction...1 cable damage can be prevented...2 3 how you can help...4 7 good practices to do it right...8
CARBON THROUGH THE SEASONS
DESCRIPTION In this lesson plan, students learn about the carbon cycle and understand how concentrations of carbon dioxide (CO 2 ) in the Earth s atmosphere vary as the seasons change. Students also learn
Undergrounding high voltage electricity transmission. The technical issues
Undergrounding high voltage electricity transmission The technical issues This is an interactive PDF document with clickable links from the contents to all sections and back and also to URL and email links.
Guide to Carrying Out Engineering Works within Road Structure Safety Zone and Engineering Activity on Land adjoining Public Streets
Guide to Carrying Out Engineering Works within Road Structure Safety Zone and Engineering Activity on Land adjoining Public Streets January 2011 Edition All rights reserved. No part of this publication
Natural Gas Wholesale Prices at PG&E Citygate as of November 7, 2006
QUARTERLY GAS ISSUES UPDATE December 26 I. Supply Issues Wholesale Natural Gas Prices Above normal temperatures and a lack of hurricane activity caused market prices to decrease in October. By November,
Fabrication, Delivery and Installation
Evaporator D The Modules Fabrication, Delivery and Installation Marine Access Development In order to safely deliver the modules by sea to the Sellafield site, a temporary development has been constructed
Project Cost & Schedule Monitoring Process Using MS Excel & MS Project
Project Cost & Schedule Monitoring Process Using MS Excel & MS Project Presented by: Rajesh Jujare About Us Solutions is founded with objectives a. To share its expertise and experiences to overcome the
SAFETY BULLETIN. Human interaction with backhoes and excavators
SAFETY BULLETIN BACKGROUND Human interaction with backhoes and excavators Statistical incident data collected by Industry & Investment NSW in the four years to August 2009 identifies significant numbers
Construction Safety: Accident Case Studies & Enforcement Analysis
Construction Safety: Accident Case Studies & Enforcement Analysis Eric Tan Kun Tien Group Head (Operations Branch) Occupational Safety and Health Division 31 March 2011 Construction demand increased 14%
ACCESS Nursing Programs Session 1 Center Valley Campus Only 8 Weeks Academic Calendar 8 Weeks
Session 1 Academic Calendar August 24, 2015 to October 17, 2015 Tuesday / Thursday, 5:30 pm to 8:30 pm M/W T/TH T/W TH S Saturday lab as scheduled Classes Begin 24-Aug 25-Aug 25-Aug 27-Aug 29-Aug NU205
ACCESS Nursing Programs Session 1 Center Valley Campus Only 8 Weeks Academic Calendar 8 Weeks
Session 1 Academic Calendar August 24, 2015 to October 17, 2015 Tuesday / Thursday, 5:30 pm to 8:30 pm M/W T/TH T/W TH S Saturday lab as scheduled Classes Begin 24-Aug 25-Aug 25-Aug 27-Aug 29-Aug NU205
Grid Operations and Planning
Grid Operations and Planning Report Kent Saathoff ERCOT Board of Directors April 20, 2010 Kent Content Summary March 2010 Operations Peak Demand: Actual vs. Forecast On-line Resources: Total at Peak and
Red Alert Program In Drilling Rigs:
: A Strong Decision To Show Leadership And To Involve Work Force Towards Zero Serious Or Fatal Incidents PETROBRAS J. M. Cabral, F. M. Pinheiro and W. F. Marozzi, PETROBRAS; L.C. Marchi - STRATAGEO SOLUÇÕES
Cover page. Introduction to the Earthquake Resistance Capacity Assessment and Reinforcement of Taipei Water Department Office Building.
Cover page Title: Authors: Introduction to the Earthquake Resistance Capacity Assessment and Reinforcement of Taipei Water Department Office Building. Ming-Fuw Wang (Presenter and Contact person) Chief
Buildings Construction Procurement Strategy
Buildings Construction Procurement Strategy Graham Strickleton Site, Buildings and Power supplies Procurement Manager JOURNEE DEDIEE AUX INDUSTRIELS ET AUX MEMBRES DU RESEAU A.P.I Disclaimer: these slides
Frequently Asked Transmission Pipeline Questions
Frequently Asked Transmission Pipeline Questions Who is PennEast, LLC? PennEast was formed by the partnership of AGL Resources, NJR Pipeline Company, South Jersey Industries and UGI Energy Services (UGIES).
CHILDREN AND YOUNG PEOPLE'S PLAN: PLANNING AND PERFORMANCE MANAGEMENT STRATEGY
CHILDREN AND YOUNG PEOPLE'S PARTNERSHIP BOARD CHILDREN AND YOUNG PEOPLE'S PLAN: PLANNING AND PERFORMANCE MANAGEMENT STRATEGY 1 Introduction 1.1 The purposes of this strategy are to set out: i) the arrangements
Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS
Business Procedure HS Contract Management Document Number OHS-PROC-136 This document applies to the following site(s): Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya Hydro
Appendix 1: Asbestos Register 5 High Wycombe Campus 5 Windsor House 6 Brook Street 6 Hughenden Student Village 6 Missenden Abbey 6 Uxbridge Campus 6
Policy Policy Contents General Statement 2 Assessment 2 A Written Plan 2 Control of Access to -containing Materials 2 Monitoring and Maintenance 2 -related Emergencies 3 Arrangements for Controlling Work
Human Resources Management System Pay Entry Calendar
Human Resources Management System Pay Entry Calendar http://www1.umn.edu/ohr/payroll/calendars/index.html Important Information The system is unavailable for entry, due to maintenance, during the following
Jeff Haby, P.E. Director Sewer System Improvements. September 15, 2015. Agenda
SAWS Sanitary Sewer Overflow Reduction Program Jeff Haby, P.E. Director Sewer System Improvements SA Military Engineers Meeting Agenda SAWS Overview Consent Decree CD Compliance Programs Program Transition
Project Management Planning
Overview of Resource Planning Every organization has a limited number of resources to perform tasks. A project manager's primary role is to find a way to successfully execute a project within these resource
UPCOMING PROGRAMMES/COURSES APRIL, 2014 MARCH, 2015 (MIND KINGSTON & MANDEVILLE CAMPUSES)
UPCOMING PROGRAMMES/ IL, CH, 2 UPCOMING PROGRAMMES/ IL, CH, Table of Contents Programme/Course Awards Page(s) Certificates Secretarial Qualifying Examination 5 Minute Writing 5 Public Speaking & Presentation
Department of Public Welfare (DPW)
Department of Public Welfare (DPW) Office of Income Maintenance Electronic Benefits Transfer Card Risk Management Report Out-of-State Residency Review FISCAL YEAR 2012-2013 June 2013 (March, April and
Academic Calendar 2015-2018 Arkansas State University - Jonesboro
Shared Governance Proposal Any constituent (individual or group) may submit a proposal into the shared governance process. In order to be considered, each proposal must contain the following and be directed
Technical Advisory for Safe Operation of Lifting Equipment. Programme-Based Engagement
Technical Advisory for Safe Operation of Lifting Equipment Programme-Based Engagement Contents 1. Introduction and Background 03 2. Case Studies of Accidents Involving Lifting Equipment 05 3. Common Systemic
Academic Calendars. Term I (20081) Term II (20082) Term III (20083) Weekend College. International Student Admission Deadlines
Academic Calendars Term I (20081) Term II (20082) Academic Calendars Term III (20083) Weekend College International Student Admission Deadlines Final Examination Schedule Broward Community College Catalog
IR Best Practice & the Tools Needed to Achieve it
IR Best Practice & the Tools Needed to Achieve it Belgrade March 2011 Andrew Crockett Senior Specialist Corporate Services Thomson Reuters INTRODUCING THOMSON REUTERS We provide intelligent information
Proposal to Reduce Opening Hours at the Revenues & Benefits Coventry Call Centre
Proposal to Reduce Opening Hours at the Revenues & Benefits Coventry Call Centre Proposal To change the opening hours of the Revenues & Benefits Call Centre to 9am until 5pm Monday to Friday with effect
Pre-Existing Structures at the Site Project Duration Type of Structure Under Construction Any Other Entities with Interests in the Property
Speakers: Vice President, Global Risk Management & Insurance Starwood Hotels & Resorts Worldwide Senior Vice President - National Director National Property Claims - Strategic Outcomes Practice Willis
Baader Investment Conference
Baader Investment Conference Bernhard Kleinermann, Director Corporate Communication and IR Munich, September 23, 20 1 Market Situation 2 Financial Accounts First Half of 20 3 Salzgitter AG 20 / Prospects
SEISMIC RETROFITTING STRATEGIES FOR BRIDGES IN MODERATE EARTHQUAKE REGIONS
SEISMIC RETROFITTING STRATEGIES FOR BRIDGES IN MODERATE EARTHQUAKE REGIONS ABSTRACT Ayaz H. Malik, P.E. Project Engineer New York State Department of Transportation Certain parts of the United States have
Offshore Windfarm Egmond aan Zee 4 years of Operation
Offshore Windfarm Egmond aan Zee 4 years of Operation CUEN Offshore Wind Energy Conference 28 June 2011, Cambridge Elke Delnooz Operations Support Manager www.noordzeewind.nl 1 Contents Project description
Working together to prevent leaks. dripping
Working together to prevent leaks A A dripping dripping tap tap can can waste waste more more than than 2,000 2,000 litres litres of of water water a a month month Sydney Water delivers essential and sustainable
ABLE CONSTRUCTION PTE LTD. Company Profile. Project Management Construction Services
ABLE CONSTRUCTION PTE LTD Company Profile Project Management Construction Services History & Philosophy ABLE Construction began as a general works contractor in 1995. Over the years, the group has undertaken
PROMG4 Install mining backup services
Overview This standard is about: 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing, installing, using and removing below
Demolition Works Measures for Public Safety
Re-issued under new categorization in August 2009 as Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-21 Buildings Department Practice Note