Fabrication, Delivery and Installation
|
|
|
- Marybeth Cobb
- 9 years ago
- Views:
Transcription
1 Evaporator D The Modules Fabrication, Delivery and Installation
2 Marine Access Development In order to safely deliver the modules by sea to the Sellafield site, a temporary development has been constructed adjacent to the Sellafield rail station. The development provides a steady incline between the beach and railway level crossing by the construction of a ramp across a section of the Sellafield beach, the cutting of a section from the Ehen Spit, and the erection of a bridge across the River Ehen.
3 Thorp Link Bridge Removal In addition to the offsite works, significant onsite works have taken place in order to move the modules to the Evaporator D site. A number of modifications have been required to the Sellafield site infrastructure. The most notable of these is the temporary removal of sections of the Thorp Link Bridge to provide enough height on the road to move the modules. Over 300 panels were removed ranging from 0.9m to 1.8m high and 1.2m wide.
4 Gantry Erection Sequence Another significant onsite work was the erection of the gantry system. Installation of the modules requires the gantry system to move them from their transporter into the final resting position within the Evaporator D building. Gantry erection was undertaken in a number of distinct phases the four legs being installed using a smaller (200 Te) crane and the latter sections (the beams and housings containing the lifting mechanisms) using a larger 500 Te crane.
5 Modules Fabrication The Evaporator D building is made up of 11 primary cells in which will be installed 11 prefabricated modules of varying sizes ranging from 60 to 500 tonnes. The modules are being assembled at Ellesmere Port, Cheshire. A dedicated indoor facility with a floor space of 230,000 sq ft which is the equivalent of 3 Wembley football pitches. Each module consists of structural steel, stainless steel. pipework, vessels and other equipment. The modules are built on support stools and loadspreader beams to allow clearance from the ground in order for the self propelled module transporter units (SPMT) to lift the module when completed.
6 Inactive Drains Module Shipment to Barge Once the first two modules were fabricated and packaged for transport a self propelled modular transporter (SPMT) was driven under the module support system and then driven out of the facility. The SPMT transported the modules the short distance to the dock at Ellesmere Port and onto the Terra Marique (barge) where they were secured.
7 Low Active Effluent Module Shipment to Barge The modules were escorted to the dock with the support of the Cheshire Police Constabulary. Once the two modules were on the barge they were secured and ready for shipment. Once all checks were completed the barge set sail to the beach adjacent to the Sellafield site.
8 Module Delivery to the Sellafield Site The two modules were conveyed to the Sellafield beach, off loaded from the barge and driven across a purpose built bridge across the River Ehen and over the Carlisle to Barrow rail line. The final stage of the module delivery project involved the SPMTs transporting the modules onto site and placed in a purpose built storage area awaiting installation in the Evaporator D building.
9 On-Site Module Movement The on-site module delivery project involved the SPMTs transporting the two modules to the Evaporator D building. The modules delivered were wider than a two carriageway road. That meant that there were a number of modifications made to street furniture such as road signs and rail gates to enable the wide loads to move through the site.
10 Low Active Effluent Module Lift The first module installation involved lifting the Low Active Effluent module on a lift and skid table assembly and then sliding it into its cell. Pre-installed strand jacks were attached to the module and hoisted clear of the skid table, the skid and lift table were removed to allow the module to be lowered to final position.
11 Non Active Drain Module Lift Heavy lift specialists Mammoet were responsible for design, supply and operation of the equipment including delivery to and installation of the modules within the building. Clearance between the modules and the cell walls is particularly tight and careful setting out of the equipment was assisted by the site survey team. The operatives observed all manoeuvres closely from vantage points on the lift and skid tables or concrete structure.
12 For project overviews guides, videos, newsletters, progress images and much more go to the internal Evaporator D sharepoint page or
Engineered Material Handling. Overhead Bridge Cranes and Gantry Cranes
TM Engineered Material Handling Overhead Bridge Overhead and Gantry Bridge Cranes and Gantry Cranes Custom Engineered Crane Systems Gantry Cranes EMH builds a complete range of gantry cranes including
Fourth Generation Modular Construction
Allianz Global Corporate & Specialty Fourth Generation Modular Construction Marine Insurance Challenges: A technical report. 1 2 3 4 Foreword by Ron Johnson Modular Construction Trends Challenges and common
Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since.
Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since. Liftech is the structural review engineer of record for most
Whiting Refinery Modernization Project WRMP Oct 2012 Whiting Refinery Modernization Project
WRMP Oct 2012 The Logistics Challenges of a Multibillion Dollar Expansion 1 BP Whiting Business Overview The refinery began operation in 1890 The 6 th largest refinery in the U.S. with 413,000 barrels
Scope of EN 1090-1 Clarification Document
Scope of EN 1090-1 Clarification Document This document has been submitted to the European Commission as the UK view on the scope of EN 1090-1. After discussions, including with the European Technical
Removals Glossary. for International Moves. With Bournes, it s personal.
Removals Glossary for International Moves With Bournes, it s personal. Introduction Firstly on behalf of the moving industry we re going to start with an apology for being so confusing! In compiling the
Advancements in Modularization
Advancements in Modularization Standardization, Modular Unit Operations and Global Deployment Interphex 2013 New York, NY Pär Almhem President ModWave & ModularPartners Outline Introduction to Modularization
Unique solutions for Unique challenges
Unique solutions for Unique challenges Sarens AS Established in Verdal in 1981. Core business: Heavy lifting and special transports. 100% owned by Sarens NV - Belgium OUR MISSION Our goal is to be a leader
KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER
KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER The New York State Department of Transportation (NYSDOT) is preparing an Environmental Impact Statement (EIS) to evaluate alternatives for the rehabilitation or
Whitepaper Modular Integration of Process Equipment Packages for Oil and Gas Facilities
Whitepaper Modular Integration of Process Equipment Packages for Oil and Gas Facilities Author: Allan Bozek P.Eng, MBA, EngWorks Inc, Calgary, Canada Abstract An integrated design approach to a modular
Buildings Construction Procurement Strategy
Buildings Construction Procurement Strategy Graham Strickleton Site, Buildings and Power supplies Procurement Manager JOURNEE DEDIEE AUX INDUSTRIELS ET AUX MEMBRES DU RESEAU A.P.I Disclaimer: these slides
(888)500-8700 T H E E Q U I P M E N T M O V I N G S P E C I A L I S T S
M A C H I N E R Y M O V I N G - R I G G I N G & H E A V Y L I F T I N G - F A C I L I T Y R E L O C A T I O N T R A N S P O R T A T I O N - W A R E H O U S I N G - C R A T I N G & P A C K A G I N G (888)500-8700
Automated Container Handling in Port Terminals
Automated Container Handling in Port Terminals Overview. Shipping containers revolutionized the movement of goods, driving change and efficiency throughout the global supply chain. The next revolution
PROJECT CARGO RISK MANAGEMENT
Loss Prevention Bulletin - AVA/2013/0007 June 10, 2013 PROJECT CARGO RISK MANAGEMENT AVA MARINE GROUP INC Member: AIMU - CMBU - MIABC Head Office: World Trade Center Suite 404 999 Canada Place Vancouver
Cuyahoga County s Clean Ohio Revitalization Fund Round 5 Application Great Lakes Shipyard Expansion Project Attachment A1 Application Summary Document
Cuyahoga County s Clean Ohio Revitalization Fund Round 5 Application Great Lakes Shipyard Expansion Project Attachment A1 Application Summary Document A1-1 ATTACHMENT A1 Great Lakes Shipyard Expansion
The ACR : Advanced Design Features for a Short Construction Schedule
Transactions of the 17 th International Conference on Structural Mechanics in Reactor Technology (SMiRT 17) Prague, Czech Republic, August 17 22, 2003 Paper # S01-3 The ACR : Advanced Design Features for
LOGISTICS SPECIALIST IN MINING AND OIL & GAS
LOGISTICS SPECIALIST IN MINING AND OIL & GAS ISOTEC Project Logistics & Consulting Pte Ltd Fast & Reliable Services Main Office Address: 50 Ubi Crescent Tech Park #01-08 Singapore 408588 Office: (65) 6415
Hanson Building Products. precast basement solutions
Hanson Building Products precast basement solutions Hanson Building Products Basement Systems Add an extra dimension and combine the inherent flexible, structural and waterproof properties of concrete
QUICK BUILD DEMOUNTABLE CONTAINERS & WAREHOUSES. Construct the Quick-Build Container in under 5 minutes!
DEMOUNTABLE CONTAINERS & WAREHOUSES Construct the Quick-Build Container in under 5 minutes! Quick-Build Warehouse, assembly in just a few hours... Quick & Easy! Available to order NOW! build in 15 mins!
Chaudière Crossing Bridge Rehabilitation
Chaudière Crossing Bridge Rehabilitation Douglas K. Lowry P. Eng., Armtec Infrastructure Incorporated David Delicate, P.Eng. Public Works and Government Services Canada (Retired) Prepared for presentation
CHAPTER 10. FALL PROTECTION PROGRAM
CHAPTER 10. FALL PROTECTION PROGRAM 1000 GENERAL. This chapter establishes policy for developing fall protection programs to protect all Federal Aviation Administration (FAA) personnel working at elevated
Report of Investigation. into the Crew Fatality Caused. by a Deck Lifter Onboard. M.V. Dyvi Adriatic
Report of Investigation into the Crew Fatality Caused by a Deck Lifter Onboard M.V. Dyvi Adriatic on 30 June 2005 Purpose of Investigation This incident is investigated, and published in accordance with
KOIKE ARONSON RANSOME
CUTTING, POSITIONING & WELDING EQUIPMENT KOIKE ARONSON RANSOME Welding Positioners 100-1,000,000 Lbs. Capacity Turning Rolls 3-1,400 Ton Head and Tailstocks 2.5-120 Ton Welding Manipulators 30 ft. x 30
Steel construction. Solutions for the renewable energy and offshore sectors. published by energyengineering magazine
Steel construction Solutions for the renewable energy and offshore sectors published by energyengineering magazine SCI-Energy-Supplement.indd 1 25/10/2010 13:00:22 Introduction SCI is a world leader in
Walking and Working Surface Checklist:
Walking and Working Surfaces Purpose: This information is presented to improve the level of safety in our operations, and to inform you that we will comply with the OSHA Standard 29 CFR 1910.23. Responsibility:
Power. Transport Components dimensions and weights are container-capable for cost-effective transport throughout the world.
& Premay: 11310-215 St. Edmonton, AB, T5S 2B5 PHONE: (780)447-5555; 1-800-661-9315 FAX: (780)447-3744 Sterling Crane: 2440-76 AVE. BOX 8610, STN SOUTH, Edmonton AB, T6E 6R2 PHONE (780) 440-4434 FAX (780)
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
39HQ Airovision Air Handling Units
39HQ Airovision Air Handling Units Mounting instructions CONTENTS 1 - TRANSPORT AND LIFTING INSTRUCTIONS... 3 1.1 - General... 3 1.2 - Transport and storage... 3 1.3 - Roof edge protection during transport
Removable Aluminium posts
Post Solent Sail Shades Ltd 120 Billington Gardens Hedge End Southampton SO30 2RT Tel/Fax: 01489 788243 www.solentsailshades.co.uk Email: [email protected] Removable Aluminium posts Single Pole
A SOLUTION FOR THE NEW YORK HARBOR TODAY. A LEADER FOR THE SHIPPING WORLD TOMORROW.
NYCT EXPANSION Last years record cargo volume was impressive under any circumstances. "It's kind of like having the family over for a big dinner and you've just started renovation of your kitchen," says
Memberships. W.F. Welding & Overhead Cranes Ltd. Since 1986. W.F. Welding & Overhead Cranes. 1-200 Ton Overhead Cranes. Jib Cranes.
Memberships Canadian Standards Association (CSA) W.F. is approved by the Canadian Welding Bureau and certified to CSA standard W47.1-03-Division 1. Other memberships include: W.F. Welding & Overhead Cranes
At Widnes 3MG...prestige facilties at the North West s premier location
At Widnes 3MG...prestige facilties at the North West s premier location Why Widnes? Drogheda M1 Swords Dublin M1 Dun Laoghaire Holyhead Bray Stobart Park at 3MG (Mersey Multimodal Gateway) in Widnes is
Heavy Metro Systems Light Rail Systems Automated Metros APMs Airport Link/City Shopping New & Retrofit Installations. w w w. platformscreendoors.
R a i l V e h i c l e S y s t e m s P l a t f o r m S y s t e m s A p p l i c a t i o n s Heavy Metro Systems Light Rail Systems Automated Metros APMs Airport Link/City Shopping New & Retrofit Installations
Residential Deck Safety, Construction, and Repair
Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the
Types of Prefabricated Modular Data Centers
Types of Prefabricated Modular Data Centers White Paper 165 Revision 0 by Wendy Torell Executive summary Data center systems or subsystems that are preassembled in a factory are often described with terms
COMPETENCY ANALYSIS PROFILE. Rodworker 452A. (All unshaded skill sets must be demonstrated/ completed) Lift equipment and materials
COMPETENCY ANALYSIS PROFILE Rodworker 452A (All unshaded skill sets must be demonstrated/ completed) PROTECT SELF AND OTHERS Wear personal protective (PPE) Lift and Apply housekeeping rules Interpret warning
Welcome. Hellmann Project Cargo
Welcome Hellmann Project Cargo Hellmann Project Cargo Hellmann Project Cargo, through our team of project professionals offers innovative and customized solutions to any of our clients project logistics
COMPANY ESTIMATOR BID DAY PHONE NO.
COMPANY ESTIMATOR BID DAY PHONE NO. Work Package: Structural Steel Fabrication & Erection The work in each bid package shall include but shall not be limited to all labor, burden, fringe benefits, materials,
Physical Security Assessment Form
Physical Security Assessment Form Security Self-Assessment T Wake 10 February 2012 Security Assessment Contents Facility / Site Security Assessment Form... 3 Identification Details... 3 Facility Details...
Fall Protection, Title 29 Code of Federal Regulations (CFR) Part 45, Subpart M, Fall Protection, 1926.500, 1926.501, 1926.502, and1926.
STANDARDS Fall Protection, Title 29 Code of Federal Regulations (CFR) Part 45, Subpart M, Fall Protection, 1926.500, 1926.501, 1926.502, and1926.503 1.0 Purpose This document meets the requirements outlined
Whitepaper. Modular Substation Cable Termination Design. Author: Allan Bozek P.Eng, MBA, EngWorks Inc, Calgary, Canada
Whitepaper Modular Substation Cable Termination Design Author: Allan Bozek P.Eng, MBA, EngWorks Inc, Calgary, Canada Abstract The methods for cable penetrations into modular industrial substations are
Söderströmtunnel: immersion in downtown Stockholm, Sweden
Söderströmtunnel: immersion in downtown Stockholm, Sweden J. Glückert Dipl.-Ing, Züblin Ground Engineering, Stuttgart, Germany N.H.J. Vink MSe, M. Reijm BSc, P.T. van Westendorp BSc Strukton Immersion
Art Basel Miami Beach Dec 3 6 2015 Booth Design Regulations
1 6 1 BOOTH CONSTRUCTION The Art Basel in Miami Beach form an integral part of the contract between the exhibitor and Art Basel U.S. Corp. (see Art Basel in Miami Beach Exhibition Regulations). The following
Hitachi s Involvement in Nuclear Power Plant Construction in Japan
Hitachi s Involvement in Nuclear Power Plant Construction in Japan 48 Hitachi s Involvement in Nuclear Power Plant Construction in Japan Naoki Kajiyama Kenji Hamamura Koichi Murayama OVERVIEW: To protect
Cheshunt Fabrications Ltd
Cheshunt Fabrications Ltd Unit 9a & 9b, Quickbury Farm Hatfield Heath Road Sawbridgeworth Hertfordshire CM21 9HY Phone: 01279 600866 Fax: 020 8609 0050 01279 600868 www.fabber.co.uk Quality in the making
CONSTRUCTION OF THE HOOVER DAM BYPASS BRIDGE Updated 29 May 2009
CONSTRUCTION OF THE HOOVER DAM BYPASS BRIDGE Updated 29 May 2009 www.maximumreach.com 1,600 FT. SOUTH OF THE DAM 900 FT. ABOVE WATER 2000 FT. LONG COMPLETION DATE: November 2010 Artists conception of the
ERIKKILA INDUSTRIAL CRANES
ERIKKILA INDUSTRIAL CRANES Capacity up to 20 000 kg BRIDGE CRANES - Overhead - Under running GANTRY CRANES I-GIRDER JIB CRANES LIFTING BEAMS SERVICE ERIKKILA Reliable lifting for almost 100 years ERIKKILA
For ease of reference the clauses are arranged in 12 sections as follows:-
NASC TERMS The general NASC terms under which members carry out their work are normally set out in their Standard Terms of Trading, often found on the reverse of their quotation form and referred to as
ISO 9001:2008. Quality Freight Group. Presentation
ISO 9001:2008 Quality Freight Group Presentation ABOUT US : HISTORY Quality Freight Group was founded in Ireland in 1990. Since then it has grown organically and by acquisition. 4 offices in Ireland spanning
PORTABLE CONVEYOR SYSTEM
PORTABLE CONVEYOR SYSTEM MINIVEYOR A WORLD LEADER IN SUPPLYING CONFINED SPACE EQUIPMENT TO THE CONSTRUCTION, BUILDING, LANDSCAPING AND EVEN THE MINING INDUSTRY. OUR AIM IS TO SUPPLY A CUSTOMER SERVICE
Packaged Terminal Air Conditioner Wall Sleeve Installation
Installation & Maintenance Data IM 1196 Group: PTAC Part Number: 910141799 Date: October 2013 Packaged Terminal Air Conditioner Installation x 42" PGAN with Top-Mounted Hydronic Heat Note: Installation
Huge range of lifting, transportation (land and sea) and demolition equipment to meet any need anywhere
Usabiaga Group Business activities Huge range of lifting, transportation (land and sea) and demolition equipment to meet any need anywhere Engineering department with great experience and tools to provide
Why build the Silvertown Tunnel?
Why build the Silvertown Tunnel? Over the last 30 years east London has changed with the redevelopment of former industrial areas into major commercial and residential districts. The development of Canary
Directive 2006/42/EC Classification of equipment used for lifting loads with lifting machinery
1(7) Classification of equipment used for lifting loads with lifting machinery December 2009 This classification was approved by the Machinery ing Group as a basis for a consistent application of the term
Report of Investigation into the fatal accident happened on board m.v. Najran at Kwai Chung Container Terminal on 15 May 2008
Report of Investigation into the fatal accident happened on board m.v. Najran at Kwai Chung Container Terminal on 15 May 2008 Purpose of Investigation This incident is investigated, and published in accordance
Electrical Service Guidelines
Electrical Service Guidelines Middle Tennessee Electric Membership Corporation Revised: May 23, 2013 MTEMC's Electrical Guidelines TABLE OF CONTENTS Right-of-Way Clearance Guide 3 MTEMC Requirements 4
LOS ANGELES AFB, EL SEGUNDO, CA:
LOS ANGELES AFB, EL SEGUNDO, CA: Contract #: FA2816-11-D-0001 / DO #001 Title: Building 284 Repair Lighting Location: Los Angeles AFB, El Segundo, CA Amount: $61,062.00 Start date: 4/13/12 Completion:
Installation and Maintenance Manual for SPANCO Freestanding Modular Bridge Cranes & Monorails
Manual No. 103-0045 REV. 12/08 Installation and Maintenance Manual for SPANCO Freestanding Modular Bridge Cranes & Monorails ISO 9001 REGISTERED 2 TABLE OF CONTENTS Important Dimensions for Modular Bridge
QUALIFICATION DETAILS
Qualification Title QUALIFICATION DETAILS New Zealand Certificate in Rigging (Level 4) with optional strands in Construction Rigging and Telecommunications Rigging Version 1 Qualification type Certificate
INMET Konstrukcje sp z o.o. Leading steel forms for prefabrication manufacturer in Poland
The INMET Konstrukcje company is a leading manufacturer of the steel forms in Poland. On the basis of individualised projects the company manufactures modern and complex steel forms for the prefabrication
INSTALLATION. General. Important Note. Design. Transport
General The roof trusses you are about to install have been manufactured to precise engineering standards. To ensure that the trusses perform as designed, it is essential that they be handled, erected
EVALUAT ING ACADEMIC READINESS FOR APPRENTICESHIP TRAINING Revised for ACCESS TO APPRENTICESHIP
EVALUAT ING ACADEMIC READINESS FOR APPRENTICESHIP TRAINING for ACCESS TO APPRENTICESHIP SCIENCE SKILLS SIMPLE MACHINES & MECHANICAL ADVANTAGE AN ACADEMIC SKILLS MANUAL for The Construction Trades: Mechanical
Safe ladder use. Construction Safety Series. When climbing up or down, workers should:
Safe ladder use When climbing up or down, workers should: Always face the ladder. Workers must not use ladder-type material hoists for roof access unless the hoists are designed for that purpose. Use a
REHABILITATION PACKAGE 1-a
1-a WINONA BRIDGE (BRIDGE 5900) REHABILITATION PACKAGE 1-a Rehab option 1-a is a rehabilitation package whereby all spans of the existing structure would be rehabilitated to the degree feasible and strengthened
SAFETY FENCES, SAFETY BARRIERS AND PEDESTRIAN GUARDRAILS
SERIES NG 400 SAFETY FENCES, SAFETY BARRIERS AND PEDESTRIAN GUARDRAILS Contents Clause Title Page NG 401 Performance Criteria for Safety Fences and Safety Barriers 2 NG 402 Components for Safety Fences
GATES, CATTLEGUARDS and PASSAGEWAYS. This factsheet looks at various options for allowing passage through fences for livestock, wildlife and people.
Fencing Order No. 307.400-1 Agdex: 724 March 1996 GATES, CATTLEGUARDS and PASSAGEWAYS This factsheet looks at various options for allowing passage through fences for livestock, wildlife and people. GENERAL
Port Traffic Management Plan
0. Contents Section Topic 1 Introduction 2 Objectives 3 Responsibilities 4 Speed Limits 5 Signage 6 Traffic Flows 7 Maintenance 8 Key Control for Emergency Gates 9 North Wall Access 10 Review Procedure
Port of Farsund. The exotic choice. Your first and foremost port in Norway
Port of Farsund The exotic choice Your first and foremost port in Norway Here in Farsund we have the space and the facilities to meet your needs. FFS A/S is the lead towage and barge company in the region.
Wren Kitchens Installation Tips... 3. Carefully check your kitchen delivery... 4. Measuring out and marking up... 5. Fitting the base cabinets...
tra 1 Index Wren Kitchens Installation Tips... 3 Carefully check your kitchen delivery... 4 Measuring out and marking up... 5 Fitting the base cabinets... 6 Fitting the corner cabinets... 7 The 972mm or
1,045 m length of the Deh Cho Bridge
Innovative Design Features: Lightweight truss: The principles of lightweight design led to a saving of 25% in the use of structural steel. State of the art deck system: Designed as a four-way slab, it
Cody Park One of Ark s high integrity data centre campus sites
UKC COMMERCIAL Cody Park One of Ark s high integrity data centre campus sites Ark is a privately held company that design, build, operate and finance third party data centre solutions tailored to meet
US 51 Ohio River Bridge Engineering and Environmental Study
US 51 Ohio River Bridge Engineering and Environmental Study ITEM NOS. 1-100.00 & 1-1140.00 Prepared by: Michael Baker Jr., Inc. 9750 Ormsby Station Rd Louisville, KY 40223 August 16, 2013 Table of Contents
Owner s Manual Gantry Cranes
Owner s Manual Gantry Cranes Fixed Height Gantry Crane MODEL NUMBER: SERIAL NUMBER: CAPACITY IN TONS: Telescoping Gantry Crane Bushman AvonTec 262-790-4200, 800338-7810, Fax 262-790-4200 www.bushmanavontec.com
HANDLING SYSTEMS SOLUTION
AUTOMATED HANDLING CONTINUOUS HANDLING OF UNIT LOADS LA SOLUTION TRANSITIQUE HANDLING SYSTEMS SOLUTION PALLETS RANGE S pal /// RANGE FOR TRANSPORT OF PALLETS UP TO 1500 KG /// 3 STANDARD WIDTHS ADAPTED
US&R Heavy Equipment & Rigging Specialist Training Module 3 Unit 3: Demolition Contractor Equip & Helicopter Ops
US&R Heavy Equipment & Rigging Specialist Training Module 3 Unit 3: Demolition Equip and Methods + Helicopter Ops 22Mar08 1 Unit Objective You will be able to explain how demolition contractors and their
Site Layout & Traffic Plan
Location Site address: Norbury Manor Business Enterprise College, Kensington Avenue, Thornton Heath, Croydon CR7 8BT. The new block will be constructed on the existing hard play area. The construction
MULTI-PURPOSE TEMPORARY BUILDINGS
Accommodation Structures Clear Span Structures Emergency Shelters Emergency Storage Solutions Industrial Storage Solutions Modular Buildings Prefabricated Buildings Relocatable Structures / Buildings Temporary
Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS
Business Procedure Traffic Management Document Number OHS-PROC-130 This document applies to the following sites: All Sites Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya Hydro
MEZZANINE SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE
MEZZANINE SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE This specification is intended to describe the general requirements applicable to a proper structural mezzanine design. In addition, it is to serve as
PORT OF ODENSE & LINDØ INDUSTRIAL PARK STRONG LOGISTICS FACILITY IN NORTHERN EUROPE
PORT OF ODENSE & LINDØ INDUSTRIAL PARK STRONG LOGISTICS FACILITY IN NORTHERN EUROPE 1000 t gantry crane LINDØ port of ODENSE TRANSPORT DIVISION LINDØ port of ODENSE is the home of second-to-none logistics
Allianz Global Corporate & Specialty Project Cargo
Allianz Global Corporate & Specialty Project Cargo Managing risks and protecting assets Expertise Allianz Global Corporate & Specialty has assembled a highly skilled global team of Project Cargo underwriters
HYDRAULICS. H91.8D/C - Computerized Open Surface Tilting Flow Channel - 10, 12.5, 15 and 20 m long
HYDRAULICS H91.8D/C - Computerized Open Surface Tilting Flow Channel - 10, 12.5, 15 and 20 m long 1. General The series of channels H91.8D has been designed by Didacta Italia to study the hydrodynamic
Confort 160. Sliding Systems. Sapa Building System
Confort 160 Sliding Systems Sapa Building System Confort 160 is a high performance thermally insulated sliding window system, with a user-friendly slide action. The system, which has an attractive aesthetic
Course available 24/7 for up to six months from the date of purchase or until completion
SPED ONLINE COURSE TRAINING Piper BootCamp and Process Plant Layout BOTH Piper BootCamp and Process Plant Layout online courses contain: Approximately 25 hours of online videos Printable notes Links to
[ North America. - Vehicle technology for transport specialists
GB [ North America - Vehicle technology for transport specialists [ Product range - The TII Group at a glance Road transportation SCHEUERLE Highway Trailer 2.1 2.2 SCHEUERLE HighwayCombi SCHEUERLE WideCombi
Fot. Kacper Kowalski/aeromedia.pl
Experience in construction of the offshore wind farm installation vessels CRIST S.A. Fot. Kacper Kowalski/aeromedia.pl General Info Established in 1990 by two engineers Mr. Ireneusz Ćwirko and Mr. Krzysztof
Block C Borthwick Street, London, SE8 3JY
AVAILABLE SPACE Block C Borthwick Street, London, SE8 3JY The property will comprise a mixed use building of steel portal frame construction arranged over eight floors with ground floor office/medical
Safety Flash. IMCA Safety Flash 18/13 December 2013. 1 Fatality During Lifting Operations
AB Safety Flash IMCA Safety Flash 18/13 December 2013 These flashes summarise key safety matters and incidents, allowing wider dissemination of lessons learnt from them. The information below has been
Stair Towers Public Stair Towers Universal System Scaffold Loading Towers 750 Temporary Roofs and Containment
U K S Y S T E M S C A F F O L D Stair Towers Public Stair Towers Universal System Scaffold Loading Towers 750 Temporary Roofs and Containment Why you should use UK System Scaffold Hire UK SYSTEM SCAFFOLD
47/49 TANNER ST, LONDON, SE1 3PL. www.uglyduck.org.uk
47/49 TANNER ST, LONDON, SE1 3PL www.uglyduck.org.uk 47/49 Tanner Street is a unique and atmospheric venue, available for hire for events, film and photography. The warehouse was historically a Victorian
How To Build A Luxury Apartment Complex In London
Post Tensioning Awards 2009 Project Summary Type of structure Location Architects Structural Engineer Residential with leisure suites including Swimming pool, Cinema, Virtual Golf, Wine Cellars, and Parking
Name Class Date. You do twice as much work. b. You lift two identical books one meter above the ground.
Exercises 9.1 Work (pages 145 146) 1. Circle the letter next to the correct mathematical equation for work. work = force distance work = distance force c. work = force distance d. work = force distance
