BENNINGTON LOCAL ROADWAY NETWORK TRAFFIC ANALYSIS

Size: px
Start display at page:

Download "BENNINGTON LOCAL ROADWAY NETWORK TRAFFIC ANALYSIS"

Transcription

1 Documentation for: BENNINGTON LOCAL ROADWAY NETWORK TRAFFIC ANALYSIS Bennington, VT Prepared for: Bennington County Regional Commission & Town of Bennington August 2003

2 TABLE OF CONTENTS 1.0 INTRODUCTION DATA COLLECTION PROJECT BACKGROUND TRAVEL TIME ANALYSIS ROUTE IDENTIFICATION METHODOLOGY RESULTS INTERSECTION MITIGATION MEASURES INTERSECTION SELECTION ANALYSIS OF RECOMMENDATIONS INTERSECTION SUMMARY SHEETS ADDITIONAL RECOMMENDATIONS TRUCK ROUTING CURRENT TRUCK ROUTE AND RESTRICTIONS PROPOSED TRUCK MITIGATION RECOMMENDATIONS CONCLUSIONS...22

3 August 2003 page 2 LIST OF FIGURES Figure 1: VT 2 Segments:...1 Figure 2: US / VT Intersection...3 Figure 3: Anticipated Traffic Adjustments after Opening of Western Segment...4 Figure 4: Selected Travel Time Routes (Routes denoted in black)...6 Figure 5: Intersections Selected for Evaluation... Figure 6: Truck Volumes as a Percentage of AADT...20 Figure : Example Truck Route Sign...20 Figure 8: Example Truck Restriction Signs...21 Figure : Proposed Truck Routes...21 LIST OF TABLES Table 1: Identified Travel Time Routes from NY /2 Split to VT / Branch Street Intersection...5 Table 2: Travel Time Results... Table 3: Intersections Identified for Further Analysis...8 Table 4: Critical Intersection Criteria... Table 5: Analysis of Previous Recommendations...11 Table 6: VT / US Intersection Data...12 Table : US / County Street Intersection Data...13 Table 8: US / VT A / Kocher Drive Intersection Data...14 Table : Kocher Drive / North Branch Street / Park Street Intersection Data...15 Table 10: VT / Branch Street Intersection Data...16 Table 11: VT / Safford Street Intersection Data...1

4 1.0 INTRODUCTION Bennington sits at the crossroads of two major roadways (Vermont Route and US Route ) in the southwestern corner of Vermont. As a result of this confluence, downtown Bennington experiences a high level of pass-through vehicular and truck traffic. To address this situation, the Vermont and New York State Transportation Departments are moving forward with the design and construction of a new $135 million limited-access highway that will eventually connect NY in Hoosick, NY to points north, south, and east of downtown Bennington (Figure 1). VTrans and NYDOT are currently constructing the western leg of the new VT 2 (VTrans project DPI 0145(1)) with a projected Fall 2004 opening. Figure 1: VT 2 Segments: Once complete, the new Bennington highway (VT 2) is projected to reduce a significant portion of through traffic from the downtown network. However, between phases of the new highway, rerouted traffic may create additional congestion and delays at certain intersections and through neighborhoods around Bennington. This study addresses the potentially adverse impacts of the re-routed traffic during the period between the opening of the Western and Northern Segments (hereinafter referred to as the interim

5 August 2003 page 2 period ). More specifically, this report identifies six key intersections likely to be affected by the rerouted traffic and develops short-term, low-cost recommendations for these locations. A second outcome of this study is the development of alternative truck routing schemes to address the potential for re-routed through trucks during the interim period. 2.0 DATA COLLECTION A number of recent reports have focused on transportation in the Bennington area, with some specifically focused on the need for and the potential impacts of a new highway around Bennington. The following reports were reviewed and their findings considered in the development of this study: Traffic Study and Analysis for the Greater Bennington Area, Clough, Harbour, & Associates, 1; Bennington County Regional Transportation Plan, Bannon Engineering and Von Grossmann & Company for the Bennington County Regional Commission, 2002; Northside Drive Transportation Study and Plan, Wilbur Smith Associates, Resource Systems Group staff conducted a series of site visits to observe current traffic conditions and to collect a variety of data elements to assist in the development of the project recommendations. These data elements included: travel times, traffic control device operations, signal timings, lane geometries, signage, traffic flow conditions, pavement markings, and pedestrian movements. Recent turning movement counts at various intersections were obtained from VTrans to supplement field observations and prior study findings. (See Appendix A for traffic count data.) In addition, RSG staff held discussions with various local and state officials to help gain a better understanding of the current and future conditions in and around Bennington. 3.0 PROJECT BACKGROUND Due to the crossroads nature of Bennington, most through car and truck traffic is currently routed through town along VT and US through the busy 4 Corners intersection of VT and US. Some cut-through traffic does occur today, primarily along Benmont Avenue and Depot Street to the west, and along Park Street, County Street, North Branch Street, and Safford Streets to the east. However, recent traffic counts show that a significant portion of the traffic in Bennington is utilizing VT and US. One result of these traffic flow patterns through Bennington has been recurring congestion along many portions of VT and US during peak periods. A Level of Service 1 (LOS) analysis 1 Level of Service (LOS) is a qualitative measure describing the operating conditions as perceived by motorists driving in a traffic stream, based on the average delay per vehicle. LOS A signifies free flow conditions while LOS F denotes extreme delays.

6 August 2003 page 3 conducted by Clough, Harbour and Associates in their 1 report, Traffic Study and Analysis for the Greater Bennington Area, found that 5 of the signalized intersections along VT and US were operating at LOS F conditions. Figure 2: US / VT Intersection To address this traffic issue, planners, engineers, and residents developed a plan for a new highway system around Bennington. That plan, first conceived of more than 40 years ago, is currently under design with the Western Segment (see Figure 1 above) under construction with an opening scheduled for Fall The remainder of the new highway system (i.e. the Northern and Southern Segments) are currently undergoing design and permitting. The scheduled completion dates for these segments have not yet been finalized. The opening of the Western Segment will primarily benefit trips headed to/from the north and west. For example, a trip headed from Hoosick, NY to Manchester, VT will be able to reduce its travel time, on average, by approximately 8 minutes using the Western Segment rather than VT and US. 1 The net impact of this new route for north/west traveling through trips will be a reduction of traffic volumes on US north of VT and on VT west of US (See Figure 3). The potential impacts from the rerouting of trips headed to/from the east and west are a little more complex with only the Western Segment in place. For a hypothetical trip from Hoosick, NY to Woodford, VT, the driver will be presented with a choice at the NY /VT 2 split to either remain on NY /VT or utilize the new highway. The signage and roadway geometry at the split as well as driver perception will play a large role in determining the routing choice. The interim signage to be placed at the NY / VT 2 split will direct trips headed to Rutland and Manchester to follow VT 2 and trips headed to Bennington and Brattleboro to follow VT. To help better understand the changing traffic patterns once the Western Segment opens, we referenced the Clough, Harbour and Associates report, Traffic Study and Analysis for the Greater Bennington Area. The report s analysis utilizes the Statewide TRANPLAN Travel Demand Model to estimate daily travel patterns and volumes in and around Bennington as subsequent phases of VT 2 are completed. 1 Travel time estimates for existing roadways measured in the field. Travel time figures along VT 2 were estimated based on length and average speed of 55 mph. Travel time reduction for this hypothetical trip from the Route 2/NY split to the Route 2/VT ramps are reduced from approximately 13 minutes to 5 minutes. For more information see Section Travel Time Analysis.

7 August 2003 page 4 Figure 3: Anticipated Traffic Adjustments after Opening of Western Segment 1 Based on the results of this modeling, the following traffic patterns were noted after the opening of the Western Segment but before the opening of the other segments (See Figure 3): For eastbound NY traffic, 42% will use VT 2, while 58% will remain on NY / VT. Based on 2000 traffic volumes, this translates into 4,300 daily trips on VT 2 and 5,00 on NY / VT east of the split Daily traffic volumes on VT in Old Bennington will decrease by 42% Daily traffic volumes on Northside Drive will decrease by % Daily traffic volumes on US north of Depot Street will decrease by 13% Based on our review of previous traffic modeling results, site observations, the proposed signage plan at the NY / VT 2 split, and discussions with local and state officials, we concur with the findings of the 1 report, Traffic Study and Analysis for the Greater Bennington Area, that the opening of the Western Segment will result in generally lower traffic volumes through downtown Bennington and that the majority of west/north traveling through trips will utilize VT 2 and the majority of west/east traveling trips will utilize VT. 1 Based on results from: Traffic Study and Analysis for the Greater Bennington Area, Clough, Harbour, & Associates, 1

8 August 2003 page TRAVEL TIME ANALYSIS The opening of the Western Segment of VT 2 will provide an attractive alternative route for cars and trucks passing through Bennington. As discussed above, the Western Segment s primary benefits will be to traffic traveling to and from the west and north. However, the route may also be taken advantage of by vehicles traveling to and from the east and west. To better understand the potential travel time savings resulting from the opening of the Western Segment, as well as the average travel times for certain cut-through routes, RSG staff collected travel time data along seven routes. 4.1 ROUTE IDENTIFICATION Seven routes were identified as likely routes for vehicles traveling from the NY /VT 2 spilt to the VT / Branch Road intersection (two points of convergence for various east-west routes). These identified routes are shown in Table 1 and Figure 4. Table 1: Identified Travel Time Routes from NY /2 Split to VT / Branch Street Intersection 1. NY - VT 2. Route 2 - Kocher Street - North Branch Street 3. Route 2 - US - VT 4. Route 2 - Kocher Street - Park Street - County Street - North Branch Street 5. Route 2 - US - County Street - North Branch Street 6. Route 2 - Kocher Street - Park Street - County Street - Safford Street - VT. Route 2 - US - County Street - Safford Street - VT

9 August 2003 page 6 Figure 4: Selected Travel Time Routes (Route numbers denoted in black) 4.2 METHODOLOGY To determine average travel times along these routes, RSG staff drove each section a few times during off-peak hours and recorded distance and elapsed time for each run. The travel times for each segment were averaged to determine the mean travel time for that route. The total route distance was divided by this mean speed to determine an average travel speed on the corridor. Since the new highway was not open for data collection, we assumed an average travel speed of 55 miles per hour for the 5 miles from the NY/2 split to the US /2 ramps, and an average travel speed of 45 miles per hour through the ramp segments from the US /2 interchange to the US /Kocher Drive intersection. See Appendix B for raw travel time data and calculations. 4.3 RESULTS The results of the travel time runs and subsequent calculations are shown in Table 2. This table shows the route name, average travel time for the route, total route length, average travel speed, and the route s rank compared with the other six. See Appendix C for detailed route maps and travel time data.

10 August 2003 page Table 2: Travel Time Results # Route Time (min) Distance (mi) Avg. Speed (mph) Rank (1=Fastest) 1 NY - VT Route 2 - Kocher Street - North Branch Street Route 2 - US - VT Route 2 - Kocher Street - Park Street - County Street - North Branch Street Route 2 - US - County Street - North Branch Street Route 2 - Kocher Street - Park Street - County Street - Safford Street - VT Route 2 - US - County Street - Safford Street - VT The following conclusions can be drawn from the results of the travel time analysis: Although the NY / VT is nearly a mile shorter than the other routes, its travel time and average speed are the second slowest of the group. This is the result of two major factors: 1) the travel speed along this route cannot match the other six routes that follow the limitedaccess VT 2 at an average of 55 mph, and 2) the relatively long delays along this corridor at intersections with Benmont Avenue, Depot Street, US, and Safford Street. The two routes utilizing the US/State routes (i.e. Routes 1 and 3) registered the two slowest travel times. This implies that if drivers have complete knowledge of the system and will choose their route based on shortest travel time, that a portion of re-routed trips may use the neighborhood streets north and east of downtown. The fastest route from the NY /2 split to the VT /Branch Street intersection is along VT 2 to Kocher Drive to North Branch Street (Route 2). This route encounters the fewest number of delays along its route and allows for a relatively high average travel speed along its length. The three fastest routes utilize North Branch Street north of VT. However, the posted truck limitations on this section of North Branch Street limit trucks from using these routes. The fastest route not posted with truck restrictions is Route #6. (For more detail on truck routing, see Section 6.0) Between the existing east/west route (Route 1) and the fastest new route (Route 2), there is only a 1. second difference in total travel time. Relative to a long, through trip, a 1. minute travel savings will likely not be an important factor for most drivers. To supplement the travel time survey results, RSG staff interviewed a truck driver who has driven through Bennington frequently over the last 20 years. Presented with the layout of the Western Segment and the travel time results, he suggested that he would still follow the posted signage and utilize VT for through east/west trips as this was the straighter and more familiar route. He mentioned, however, that he might consider using the new highway during the winter to avoid the tight turns on VT in Old Bennington.

11 August 2003 page INTERSECTION MITIGATION MEASURES With an understanding of the existing road network, the timing of the new highway project, and travel times throughout the system, the next steps in this study are to: 1) identify deficiencies and potential issues at selected intersections around Bennington and, 2) develop short-term mitigation measures at these location to address the potentially adverse effects resulting from the opening of the Western Segment. 5.1 INTERSECTION SELECTION In the 1 report, Traffic Study for the Greater Bennington Area, Clough, Harbour and Associates identified twenty intersections for analysis under existing and build conditions. The scope of this current study allows for the further investigation and development of interim mitigation measures for six of these intersections and related road segments (Table 3 and Figure 5). Table 3: Intersections Identified for Further Analysis VT Route / US Route VT Route / Safford St. / Stewarts VT Route / Branch St. US Route / VT Route A / Kocher Dr. US Route / County St. Kocher Dr. / N. Branch St. / Park St. Ext.

12 August 2003 page Figure 5: Intersections Selected for Evaluation The six intersections were selected based on their location within the roadway network and potential for impact when the Western Segment opens, their current and projected Levels of Service, and their accident history. Table 4 shows the criteria used to select the six critical intersections. Table 4: Critical Intersection Criteria 2020 LOS^ Intersection No-Build Build-1^^ Accident Rate* Signalized VT Route / US Route F F Y VT Route / Safford St. / Stewarts F F 0.85 Y VT Route / Branch St. F F 0.5 Y US Route / VT Route A / Kocher Dr. D C 1.40 Y US Route / County St. F F Y Kocher Dr. / N. Branch St. / Park St. Ext. E E Y ^ 2020 LOS results based on, Traffic Study for the Greater Bennington Area, Clough, Harbour and Associates, 1. ^^ Build-1 refers to traffic conditions after completion of the western segment * Accident Rate = Total Accidents/Million Entry Vehicles Annually (12-16)

13 August 2003 page ANALYSIS OF RECOMMENDATIONS The eventual completion of all three phases of VT 2 will likely lead to significant decreases in through car and truck trips in downtown Bennington and adjacent neighborhoods. However, as discussed above, the opening of the Western Segment will cause some re-routing of traffic through and within town. As the period between the completion of the Western Segment and the completion of subsequent phases will only be temporary, it is reasonable to consider short-term, relatively inexpensive mitigation measures to address any possible adverse conditions. The 1 Clough, Harbour and Associates report, Traffic Study for the Greater Bennington Area, identifies potential mitigation measures for many of the signalized and unsignalized intersections in town, including the six critical intersections identified in this report. We tested these recommendations to determine their net effect on the intersection and their relative feasibility. If applicable, we modeled the change in intersection operations using HCS 2000 software based on the modeled Build-1 1 volumes and current signal timings. Otherwise, qualitative impacts were noted. Table 5 shows the results of this analysis. 1 Build-1 refers to the scenario in which the Western Segment is open to traffic.

14 August 2003 page 11 Table 5: Analysis of Previous Recommendations Intersection CHA Recommendation Result/Impacts - Will eliminate "all-stop" for pedestrian phase. Reduced VT / US - Run pedestrian phases w/ adjacent street traffic pedestrian safety resulting from right-turning vehicles. Reduction in cycle length and overal vehicle delays. - Add protected/permissive left turns on all approaches Reduction in total delays - particularly for westbound and southbound approaches. Protected/permissive signage should be clearly marked. Incorporate in RSG Recommendations? VT / Safford St. / Stewarts - Add EB & SB left turn lane - Reduction in overall delay. May result in increase in total cycle length depending on timing chosen. - Coordinate w/ Branch St. and Beech St. Signals - Promotes more efficient "platooning" of vehicles VT / Branch St. - Add EB left turn lane - Turning volumes and available right of way warrant left turn lane. Reduction in overall delay as vehicles do not queue behind left turning vehicles. - Add SB left turn lane - Insufficient right of way for left turn lane on this approach. - Coordinate w/ Safford St. and Beech St. Signals - Promotes more efficient "platooning" of vehicles US / VT A / Kocher Dr. - Include in Northside Drive Time-Based Signal Coordination Plan - Signal coordination plan promotes more efficient movements for local and through trips. US / County St. - Add WB & SB left turn lane - Turning volumes and available right of way warrant left turn lanes. Reduction in overall delay as vehicles do not queue behind left turning vehicles. - Add EB & NB left turn lane - Turning volumes do not warrant a left turn lane for these approaches. - Add protected/permitted phasing on North/South approaches - Add to SB left turn lane. Increased left turn capacity and reduction in overall delay. Protected/permissive signage should be clearly marked. Kocher Dr/N. Branch St/Park St - Add EB left turn lane - Turning volumes appear to warrant a right turn lane for this approach. Reduction in overall delay as vehicles do not queue behind left turning vehicles. - Add NB protected/permitted left turn - Turning volumes and available right of way permit left turn lane. Reduction in overall delay as vehicles do not queue behind left turning vehicles. Based on the applicability and feasibility of the previous recommendations, field observations, and prior experience, RSG developed a detailed listing of recommendations to address the changes in traffic flow resulting from opening of the Western Segment. These recommendations are described in more detail in the next section. 5.3 INTERSECTION SUMMARY SHEETS The following pages contain intersection summary sheets identifying intersection geometry, traffic control, site observations, and recommended mitigation measures for each of the six identified intersections.

15 August 2003 page 12 Table 6: VT / US Intersection Data SITE OBSERVATIONS RECOMMENDATIONS (Referenced on Graphic) General Observations High through and left-turn volumes from all approaches, combined with narrow lane geometry results in poor intersection Level of Service. Long cycle length (110 seconds). Frequent pedestrian calls result in even longer cycle lengths (up to 145 seconds). Intersection Geometry Eastbound (VT ) left turn lane not striped (or striping faded). Too narrow for tractor-trailers to pass on right. Northbound and Southbound left turn lanes are set far back to allow for truck turning movements Traffic Control No vehicle detectors Signal Timing o North/South Through/Right: 33 seconds green time o North/South Left: 10 seconds green time o East/West Through/Right: 34 seconds green time o East/West Left: 10 seconds green time o Exclusive pedestrian phase: walk = 8 sec., flashing don t walk = sec o Yellow time = 4 seconds o All red time = 2 seconds 1. Add detectors to all left turn approaches. Upgrade and re-time signal to provide protected/permissive left turn phasing on all approaches. Protected/permissive signage should be clearly located. 2. If detectors added, set-up timing plan for proper green time extensions for all approaches 3. Implement variable signal timing plans (e.g. AM peak, PM peak, Mid-day, Weekend, Off peak, Seasonal) 4. Run pedestrian signal phases with adjacent street traffic. 5. Re-align and re-stripe western leg of intersection to create a 10 eastbound through/right turn lane, 10 eastbound left turn lane, and 22 westbound receiving lane. May result in loss of parking along VT. Examine new striping plan for proper truck turning radii. 6. On street-level traffic signals, retrofit green balls with green up arrows to avoid confusion for left-turning vehicles.. Re-stripe westbound left turn lane stop bar further east to allow for wider turning radius for southbound left-turning trucks. Will result in loss of westbound left turn queue capacity Design Hour Traffic Volumes with Western Segment * US VT US VT NOTES: Not to Scale Selected Recommendations Shown in Red 1 * Source, "Traffic Study and Analysis for the Greater Bennington Area, Clough, Harbour & Assoc., 1

16 August 2003 page 13 Table : US / County Street Intersection Data SITE OBSERVATIONS RECOMMENDATIONS (Referenced on Graphic) General Observations Highest left turn demands from southbound approach and westbound approach. Older electro-mechanical Econolite traffic signal controller. Intersection Geometry Southbound approach just wide enough for through car to pass stopped left turning car. Not currently striped for left turn lane. Traffic Control No vehicle detectors No pedestrian signals Signal Timing o North/South: 25 seconds green time o East/West: 25 seconds green time o Yellow time = 4 seconds o All red time = 0 seconds 1. Add minimum of 2 second all red time to each phase change. 2. Upgrade electro-mechanical signal controller with digital controller. 3. Implement variable signal timing plans (e.g. AM peak, PM peak, Midday, Weekend, Off peak, Seasonal) 4. Re-align and re-stripe all four intersection approaches to create a left turn lane and through/right turn lane. Examine new striping plan for proper truck turning radii. 5. If left turns added, add vehicle detectors to left turn approaches. Upgrade and re-time signal to provide protected/permissive left turn phasing at these approaches. Protected/permissive signage should be clearly located. 6. To deter cut-through truck traffic, post truck restrictions (local 3 deliveries only) on eastern leg of intersection, along County Street Design Hour Traffic Volumes with Western Segment * 6 US County St US County St. 5 * Source, "Traffic Study and Analysis for the Greater Bennington Area, Clough, Harbour & Assoc., 1 NOTES: Not to Scale Selected Recommendations Shown in Red

17 August 2003 page 14 Table 8: US / VT A / Kocher Drive Intersection Data SITE OBSERVATIONS General Observations Traffic signals blocked by roadway sign mast arms that precede signal. Intersection Geometry No pedestrian amenities provided. Traffic Control Vehicle detectors at all approaches Older model signal controller: Econolite KMC 8000 Signal maintained by VTrans. Signal Timing (Actuated with time of day phasing) o North/South Through/Right: Off peak: 10 seconds maximum green time, Peak: 40 seconds maximum green time o North/South Left: Off peak: 11 seconds maximum green time, Peak: 25 seconds maximum green time o East/West Through/Right: Off peak: 16 seconds maximum green time, Peak: 40 seconds maximum green time o East/West Left: Off peak: 1 seconds maximum green time, Peak: 40 seconds maximum green time o Yellow time = 4 seconds o All red time = 2 seconds RECOMMENDATIONS (Referenced on Graphic) 1. Examine visibility of traffic signals for southbound approaching vehicles. Possibly relocate sign mast arm preceding signal. 2. The signal timing plan is set-up with two maximum cycle lengths by time of day. During off peak periods, the cycle length may extend up to 80 seconds. During peak periods, however, the cycle length can be extended up to 16 seconds. This relatively long cycle length should be reviewed for efficiency in light of current and proposed traffic volumes and signal coordination plans along Northside Drive 3. Install additional vehicle detectors that can sense the length of queue to optimize allotment of green time extension. 4. Monitor effects of VTrans Kocher Drive and Benmont Avenue project and adjust signal timings as necessary to compensate for opening of Western Segment. This project will involve the installation of a newer signal controller which should be coordinated with the current coordination plan on Northside Drive. 5. To deter cut-through truck traffic, post truck restrictions (local deliveries only) on eastern leg of intersection, along Kocher Drive east of plaza entrance. 6. Consider provision of pedestrian facilities such as a crosswalk/pedestrian signals or overpass/tunnel to connect retail, commercial, and institutional uses on east and west side of US Design Hour Traffic Volumes with Western Segment * US VT A US Kocher Dr. NOTES: Not to Scale Selected Recommendations Shown in Red * Source, "Traffic Study and Analysis for the Greater Bennington Area, Clough, Harbour & Assoc., 1

18 August 2003 page 15 Table : Kocher Drive / North Branch Street / Park Street Intersection Data SITE OBSERVATIONS RECOMMENDATIONS (Referenced on Graphic) General Observations High northbound left-turning volumes and eastbound rightturning volumes suggest Kocher Drive to Park Street popular route. No pedestrian facilities present. Peak in traffic volumes in morning and mid-afternoon from school-related trips. Intersection Geometry Presence of Furnace Brook and bridge along southern leg of intersection limits potential for widening and/or re-alignments for Park Street approach. Traffic Control No vehicle detectors No pedestrian signals Signal Timing o North/South: 33 seconds green time o East/West: 33 seconds green time o Yellow time = 3 seconds o All red time = 3 seconds 1. Implement variable signal timing plans (e.g. AM peak, PM peak, Mid-day, Weekend, Off peak, Seasonal) 2. Re-align and re-stripe all four intersection approaches to create a left turn lane and through/right turn lane. Examine new striping plan for proper truck turning radii. 3. If left turn lanes and vehicle detectors added, upgrade and re-time signal to include protected/permitted left turn phases. 4. A roundabout may be appropriate for this intersection. Demands from approaches vary throughout the day (school, work shifts, commutes, etc). Potential right-of-way restrictions of fire hydrant at northwest corner and Furnace Brook adjacent to the south. 5. Add pedestrian facilities (sidewalks, crosswalks, and pedestrian signals) along northern and eastern sides to connect residential and institutional uses to the south and east with retail, commercial, and institutional uses along Kocher Drive and Northside Drive Design Hour Traffic Volumes with Western Segment * East Rd Kocher Dr Park Street * Source, "Traffic Study and Analysis for the Greater Bennington Area, Clough, Harbour & Assoc., 1 N. Branch St. NOTES: Not to Scale Selected Recommendations Shown in Red

19 August 2003 page 16 Table 10: VT / Branch Street Intersection Data SITE OBSERVATIONS RECOMMENDATIONS (Referenced on Graphic) General Observations Westbound trucks occasionally veer into eastbound lane to avoid cars parked in front of corner store. Corner store at southwest corner generates relatively high level of pedestrian and parking activity along VT and South Branch Street. No Thru Trucks sign posted on entry to North Branch Street Intersection Geometry Northern leg of intersection right-of-way constrained by houses on both sides of road. Eastbound through cars currently passing left turning vehicles on right. Eastbound approach is currently striped as one lane. Traffic Control No vehicle detectors No pedestrian signal Econolite signal controller Flashing red strobe on east facing red ball Signal Timing o North/South: 25 seconds green time o East/West: 35 seconds green time o Yellow time = 4 seconds o All red time = 3 seconds 2000 Design Hour Traffic Volumes with Western Segment * 1. Add vehicle detectors to North and South Branch Street approaches to optimize green time allotment. 2. Implement variable signal timing plans (e.g. AM peak, PM peak, Mid-day, Weekend, Off peak, Seasonal) 3. Re-align and re-stripe western leg of intersection to create a 10 eastbound left turn lane, 10 eastbound through lane, and 12 westbound receiving lane. Examine new striping plan for proper widths and truck turning radii. Post Roadway Narrows sign for eastbound approaching vehicles. 4. If eastbound left turn lane and vehicle detectors added, re-time signal to include actuation. With a signal controller upgrade, retime controller to allow for protected-permitted phasing. 5. Due to high pedestrian volume in the area, stripe crosswalk across South Branch Street approach and add pedestrian signals for all directions with crosswalks. 6. Coordinate with Beech Street and Safford Street signals to establish signal progression through this corridor.. Re-stripe parking spaces along VT west of Branch Street. Currently unclear where parking/no parking zones begin and end N. Branch St VT S. Branch St. VT NOTES: Not to Scale Selected Recommendations Shown in Red * Source, "Traffic Study and Analysis for the Greater Bennington Area, Clough, Harbour & Assoc., 1

20 August 2003 page 1 Table 11: VT / Safford Street Intersection Data SITE OBSERVATIONS RECOMMENDATIONS (Referenced on Graphic) General Observations Safford Street and Stewarts entrance not aligned, resulting in difficult/awkward left turns out of Stewarts. Potential conflict between left turns out of Stewarts and left turn/through vehicles from Safford Street. Intersection Geometry Right of way on both sides of Safford Street constrained by homes. Crosswalks at northern and western intersection approaches. Traffic Control No vehicle detectors Electro-mechanical signal controller No pedestrian signals Signal Timing o North/South: 20 seconds green time o East/West: 34 seconds green time o Yellow time = 3 seconds o All red time = 0 seconds 2000 Design Hour Traffic Volumes with Western Segment * VT Safford St VT 1. Add minimum of 2 second all red time to each phase 2. Increase yellow time from 3 seconds to 4 seconds for safety and consistency. 3. Upgrade electro-mechanical signal controller with digital controller. 4. Add detectors on Safford Street and left turn lanes (if added) to detect demand for movement and provide optimized green time allotment. 5. Implement variable signal timing plans (e.g. AM peak, PM peak, Mid-day, Weekend, Off peak, Seasonal) 6. Re-align and re-stripe northern leg of intersection to create a 10 southbound right turn lane, 10 through/left turn lane, and 12 northbound receiving lane. Examine new striping plan for proper widths and truck turning radii.. Re-align and re-stripe western leg of intersection to create a 12 eastbound left turn lane, 12 through lane, and 16 westbound through lane. 8. If northern leg not re-aligned for new turn lane, consider re-painting double yellow line to delineate roadway centerline.. Coordinate with Beech Street and Branch Street signals to establish signal progression through this corridor. 10. Restrict left turn exits from eastern Stewart s driveway to avoid potential conflicts with eastbound VT vehicles. 11. Due to high pedestrian volume in the area, add pedestrian signals at designated crossings. 12. To deter cut-through truck traffic, post truck restrictions (local deliveries only) on northern leg of intersection, along Safford Street Stewarts * Source, "Traffic Study and Analysis for the Greater Bennington Area, Clough, Harbour & Assoc., 1 NOTES: Not to Scale Selected Recommendations Shown in Red

21 August 2003 page ADDITIONAL RECOMMENDATIONS A number of the intersection mitigation measures identified in the previous section involved adding vehicle detection, re-timing of the signals, and/or re-striping to provide additional turn lanes. These relatively low-cost, easy to implement measures have the potential to significantly increase capacity at the identified intersection. While this may be desirable to ensure smooth traffic flow, it may not be desirable to increase the capacity on local roads particularly those identified in the neighborhoods northeast of downtown. These recommendations should be examined within a broader policy context about whether traffic capacity at intersections adjacent to these neighborhoods should undergo improvements. One alternative may be to implement those measures that facilitate movement on the major roads (i.e. VT, US ) while discouraging trips on the local streets. This can be accomplished in a number of ways including signal timing and signal phasing plans. One potential application occurs at the Park Street / County Street intersection. The signalized intersection currently operates on a fixed timing plan with no detectors. The current operation is not optimized and greater efficiency can be achieved by adding detectors, re-timing the signal, and/or instituting time-of-day phasing plans. However, if the Town wants to discourage additional traffic from utilizing the local roads through the neighborhoods northeast of downtown, then the signal should be left as it is to create additional delay for the cut-through trips. Additionally, a number of the identified mitigation measures recommend signal timing adjustments. To maintain efficient traffic flows throughout Bennington, it is recommended that the Town develop a policy to review the signal timing plans at all signalized intersection at least once every three years to ensure that the signals are operating optimally in response to any changes in volumes and/or land use. 6.0 TRUCK ROUTING The opening of the Western Segment will have an impact on through passenger car and truck trips. As mentioned previously, the main beneficiaries from the opening of the first phase of VT 2 are those trips traveling to and from the north and west. It is likely that a significant majority of the north/west traveling trucks currently utilizing downtown streets will use VT 2 once it opens. This will result in a decrease in the number of truck trips downtown, including a reduction in turning movements at the US / VT intersection. For trucks headed east/west, it is likely that the majority will follow posted directional signage and remain on VT through Bennington. 1 However, it is conceivable that some east/west through 1 Since both entry points to VT 2 along State-maintained roads, certain signage restrictions are applied by the Federal Highway Administration, including a restriction on posting of any truck routing signs at these points. The Town of Bennington is, however, able to post truck route and restriction signs along town roads at their own discretion.

22 August 2003 page 1 trucks may choose to use VT 2 to take advantage of the higher speeds and to avoid some downtown signals and the tight turns on VT in Old Bennington. As the travel time analysis has shown (Section 4) the VT 2 alternate routes can provide slightly faster travel times than VT. However, the potential for a two to three minute travel time savings using VT 2 may not be significant to a truck driver within the scope of a much longer haul. A more important determinant for the truck routes will likely be posted signage and ease of travel. For those eastbound trucks (e.g. headed to Wilmington, Brattleboro, etc.) choosing to use VT 2, they are presented with a number of routes to return to VT east once they reach the eastern terminus of VT 2 at US. An obvious return route would be along the current truck route - US to VT. There are also a number of other routes along the local street network through the northeast neighborhoods. The town may deem it undesirable to have re-routed trucks utilize these local roads during the interim period. If so, the town should consider posting truck restriction signs at key entry points (e.g. Kocher Drive, County Street, and Safford Street) to eliminate through truck trips. 6.1 CURRENT TRUCK ROUTE AND RESTRICTIONS The current designated truck route through Bennington is along US and VT though town although no signage is posted to this effect. To avoid the VT / US intersection, many trucks utilize Depot Street and Benmont Avenue to get between VT and US. A truck restriction is posted on the segment of North Branch Street between VT and Gage Street because of the narrow lane geometry. No other truck restrictions are posted in town. Questions have been raised in the past about the structural integrity of the Brooklyn Bridge on North Branch Street to carry the load of heavy truck traffic. Figure 6 shows the most recent truck volume percentages on selected roads in Bennington. As the table shows, US, VT, Benmont Avenue, Kocher Drive, and Depot Street all carry high percentages of truck traffic as a percentage of their average daily volumes.

23 August 2003 page 20 Figure 6: Truck Volumes as a Percentage of AADT 1 AADT Trucks Count Year US (North Street) 11,400.5% 2002 VT (Main Street), % 2002 Benmont Avenue 12, % 2001 Kocher Drive 11, % 2001 Depot Street, % 2001 Gage Street 2, % 2001 N Branch Street 3, % PROPOSED TRUCK MITIGATION RECOMMENDATIONS With the Western Segment open to traffic and the signage in place at the NY / VT 2 split directing through east-west vehicles to use VT, it is anticipated that only a small percentage of the east-west through trucks will end up using VT 2 and then seeking routes to rejoin VT. To minimize the potential impacts of these re-routed trucks, the Town of Bennington may choose to implement the following recommendations: For eastbound through trucks on NY headed to VT east, most will follow the posted directional signage and remain on VT through Bennington. However, for those choosing to use VT 2, designate and sign a truck route from the eastern terminus of VT 2 along US south to Depot Street south to VT east. This route will help to remove southbound left-turning trucks from the US /VT intersection (Figure ). An example route signage option is shown below. Figure : Example Truck Route Sign For westbound though trucks on VT headed to NY west, post signage near the US /VT intersection notifying drivers of the following: o Best Truck Route to New York: Straight on VT West o Best Truck Route to Manchester/Rutland: Right on US North 1 Based on results of 2001 Automatic Vehicle Classification Report, VTrans, 2002.

24 August 2003 page 21 It is advisable to remove northbound trucks from Depot Street as they are currently forced to make a left turn at the unsignalized US -Depot Street intersection. This movement can potentially result in long delays and unsafe conditions. The recommended alternative for these trucks is along US north (Figure ). Figure 8 shows examples of truck restriction signage for posting along Depot Street north. Figure 8: Example Truck Restriction Signs Figure : Proposed Truck Routes To limit the potential for current and re-routed truck traffic from using the local road network in the neighborhood northeast of downtown, the Town may consider posting truck restrictions or weight restrictions (Figure 8) at the following key entry points: 1) Kocher Drive east of US, 2) County Street east of US, 3) Safford Street north of VT. The signage should be chosen and placed accordingly to not interfere with local delivery and commercial activity in this area.

25 August 2003 page 22.0 CONCLUSIONS The opening of the Western Segment of VT 2 in the fall of 2004 is likely to have a significant impact on traffic, especially through trips, in and around the Town of Bennington. Based on our review of previous traffic studies and model results, site observations, the proposed signage plan at the NY / VT 2 split, and discussions with local and state officials, it is likely that the opening of the Western Segment will result in generally lower traffic volumes through downtown Bennington. However, the potential for re-routing of traffic resulting from this segment s opening may result in adverse traffic impacts at certain locations throughout town, specifically the neighborhoods to the north and east of downtown Bennington. The primary goal of this report was to build an understanding of the traffic impacts of the Western Segments opening and develop a suite of short-term, low-cost recommendations to address any potentially adverse impacts from re-routed traffic during the interim period. A travel time analysis was conducted to determine estimated travel times along various routes through and around Bennington. The results of this survey show that the selected routes utilizing VT 2 would be between two and three minutes shorter than the current VT route west to east through town. While this may be a significant time savings for local trips, longer, through trips will likely follow posted signage, particularly if they are not familiar with the area. In addition to the specific intersection recommendations detailed in Section 5.0, the following general intersection recommendations are carried forward: Of the six intersections investigated in this report, only the US / Kocher Drive intersection has vehicle detectors in place. Vehicle detectors provide a relatively low cost 1 solution to significantly increase the operational efficiency of these intersections. Two of the identified intersections (VT / Safford Street and US / County Street) are currently operating with no all-red time. These intersections are also both operating with an older, electro-mechanical signal controller. Operation without an all-red time can lead to potentially unsafe conditions and may lead to litigation against the Town in the event of an accident attributable to the signal. It is recommended that the Town upgrade these signal controllers and add a 2 second all-red time to all phases. The observed signal timings at all six identified intersections could benefit from revised timing plans to account for current traffic volumes and time-of-day. To maintain efficient traffic flows throughout Bennington, it is recommended that the Town develop a policy to review the signal timing plans at least once every three years to ensure that the signals are operating optimally in response to any changes in volumes and/or land use. 1 Cost estimate for adding detectors at a simple four-leg intersection is approximately $5,000 (In-pavement loop - $00/ loop, 4- channel interface panel - $0, Detector connecting cable - $85/loop, Detector amplifier - $225 each). These figures are estimates and may vary widely based on the specific conditions and existing technology at any given intersection.

26 August 2003 page 23 It is anticipated that through trucks will follow the posted signage and remain on the designated routes. The Town may want to consider formally posting truck route signs for trucks traveling between the US /VT intersection and VT 2. It is recommended that the northbound truck route between these points follow US the entire length, while the southbound route be directed along US to Depot Street to VT east. To deter through trucks from utilizing any of the local roads in the neighborhoods to the north and east of downtown, the Town may choose to post truck restrictions at the following key entry points: 1) Kocher Drive east of US, 2) County Street east of US, 3) Safford Street north of VT. The signage should be chosen and placed accordingly to not interfere with local delivery and commercial activity in this area.

27 APPENDIX A VTRANS TRAFFIC COUNT DATA

28 APPENDIX B TRAVEL TIME DATA AND CALCULATIONS

29 APPENDIX B - Travel Time Data and Calculations Direction Route Description E/W W/E N/S S/N Time (min) Time (sec) Distance (mi) Average Speed 1 Bypass to Branch (via ) x x x Kocher/ to Branch (via Branch) x x Kocher/ to Branch (via /) x x Kocher/ to Branch (via Kocher/Park/County/Branch) x x Kocher/ to Branch (via /County/Branch) x x Kocher/ to Branch (via Kocher/Park/County/Safford/) 0.0 x Kocher/ to Branch (via /County/Safford/) x Bypass split to US Ramps 4. mi Estimated Speed 55 mph Bypass Time = 5.35 minutes US Ramps to / Kocher Intersection 1.05 mi Estimated Speed 45 mph Bypass Time = 1.40 minutes Control Delay at / Kocher Intersection (assume LOS B/C) = 20 seconds 0.33 minutes Total Bypass Time:.08 minutes Total Bypass Distance = 5.5 miles

30 APPENDIX C TRAVEL TIME MAPS AND DATA

31 Safford St 6A A Corridor #1 Distance: 6.0 miles Average Travel Time: 12.6 minutes Average Speed: 2 mph < From Bypass Spilt Park Street County Street N. Branch Street Miles VT & Branch St.

32 Safford St 6A A < From Bypass Spilt Corridor #2 Distance: 6. miles Average Travel Time: 10. minutes Average Speed: 3 mph Kocher Drive Park Street County Street N. Branch Street Miles VT & Branch St.

33 Safford St 6A A < From Bypass Spilt Corridor #3 Distance: 6. miles Average Travel Time: 14.4 minutes Average Speed: 2 mph Kocher Drive Park Street County Street N. Branch Street Miles VT & Branch St.

34 Safford St 6A A < From Bypass Spilt Corridor #4 Distance: 6. miles Average Travel Time: 11.2 minutes Average Speed: 36 mph Kocher Drive Park Street County Street N. Branch Street Miles VT & Branch St.

35 Safford St 6A A < From Bypass Spilt Corridor #5 Distance: 6. miles Average Travel Time: 11.4 minutes Average Speed: 35 mph Kocher Drive Park Street County Street N. Branch Street Miles VT & Branch St.

36 Safford St 6A A < From Bypass Spilt Corridor #6 Distance: 6. miles Average Travel Time: 11.6 minutes Average Speed: 35 mph Kocher Drive Park Street County Street N. Branch Street Miles VT & Branch St.

37 Safford St 6A A < From Bypass Spilt Corridor # Distance: 6.8 miles Average Travel Time: 12.4 minutes Average Speed: 33 mph Kocher Drive Park Street County Street N. Branch Street Miles VT & Branch St.

38 APPENDIX D BENNINGTON TRAFFIC MODEL TRAFFIC VOLUMES 1 1 Based on Traffic Study and Analysis for the Greater Bennington Area, Clough, Harbour, & Associates, 1.

9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015

9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Kunzman Associates, Inc. 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Prepared by: Bryan Crawford Carl Ballard,

More information

Disputed Red Light Accidents: A Primer on Signal Control. Jon B. Landerville, MSME, PE Edward C. Fatzinger, MSME, PE Philip S.

Disputed Red Light Accidents: A Primer on Signal Control. Jon B. Landerville, MSME, PE Edward C. Fatzinger, MSME, PE Philip S. Disputed Red Light Accidents: A Primer on Signal Control Jon B. Landerville, MSME, PE Edward C. Fatzinger, MSME, PE Philip S. Wang, MSME Intersection Accident Statistics Intersection accidents occur on

More information

North Avenue Corridor Study. Advisory Committee Meeting #5 June 11, 2014

North Avenue Corridor Study. Advisory Committee Meeting #5 June 11, 2014 North Avenue Corridor Study Advisory Committee Meeting #5 June 11, 2014 Agenda Welcome and introductions Concept refinement and evaluation: Public meeting and web survey General cross-section concepts

More information

The partnership has selected three intersections where enforcement, education, and engineering initiatives are being implemented to improve safety:

The partnership has selected three intersections where enforcement, education, and engineering initiatives are being implemented to improve safety: Hamilton-Finn Suite 310 Tel. (403) 207-6000 Road Safety 3016 5th Avenue N.E. Fax. (403) 273-3440 Consultants Ltd. Calgary, Alberta dawatt.dawatt.com www.hamiltonfinn.ca January 19, 2005 Mr. Don Szarko,

More information

Accident Analysis of Sheridan Road between Isabella Street and South Boulevard

Accident Analysis of Sheridan Road between Isabella Street and South Boulevard Accident Analysis of Sheridan Road between Isabella Street and South Boulevard Prepared for TranSystems Corporation for the City of Evanston Submitted by Regina Webster & Associates, Inc. Date: 08/15/2008

More information

Goals & Objectives. Chapter 9. Transportation

Goals & Objectives. Chapter 9. Transportation Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system

More information

First Transit Contra Flow Lane in Downtown San Francisco

First Transit Contra Flow Lane in Downtown San Francisco Introduction First Transit Contra Flow Lane in Downtown San Francisco Javad Mirabdal, Bond Yee Traffic congestion places a tremendous burden on transit vehicles in cities worldwide. San Francisco, located

More information

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s. Proposed Truck Climbing Lane Route 7 Westbound Between West Market Street and Route 9 UPC# 58599, Project # 6007-053-133, P101 Date of Meeting: August 24, 2010 Time: 6:00PM to 8:00PM Location: Rust Library

More information

WYDOT Quick Facts TRAFFIC SIGNALS

WYDOT Quick Facts TRAFFIC SIGNALS TRAFFIC SIGNALS WYDOT Quick Facts 2 Advantages of traffic signals WYDOT Quick Facts Traffic signals control vehicle and pedestrian traffic by assigning priorities to various traffic movements to influence

More information

How To Improve Safety

How To Improve Safety Collision Diagrams Collision diagrams are used to display and identify similar accident patterns. They provide information on the type and number of accidents; including conditions such as time of day,

More information

FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005

FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005 FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005 Background: It is in the national interest to maintain the Interstate System to provide the highest level of

More information

Is Encouraging More Bike Ridership On El Camino Real A Good Idea?

Is Encouraging More Bike Ridership On El Camino Real A Good Idea? Is Encouraging More Bike Ridership On El Camino Real A Good Idea? In the above illustration there is a shared right turn lane on southbound El Camino Real at the intersection with Santa Cruz Avenue. Turning

More information

TABLE OF CONTENTS TABLES FIGURES

TABLE OF CONTENTS TABLES FIGURES TABLE OF CONTENTS Introduction...1 1. On-Site Stacking...2 2. Number of School Driveways...2 3. School Driveway Standards...3 3A. Driveway Spacing...3 3B. Driveway Location...4 3C. Driveway Lane Widths

More information

Mobility Management Plan Study of the Busch Boulevard Corridor

Mobility Management Plan Study of the Busch Boulevard Corridor Mobility Management Plan Study of the Busch Boulevard Corridor March 2000 Hillsborough County Metropolitan Planning Organization 601 E. Kennedy, 18th Floor Tampa, Florida 33602-5117 813/272-5940 FAX NO:

More information

Measuring the Street:

Measuring the Street: Measuring the Street: New Metrics for 21st Century Streets 1 Measuring the Street: New Metrics for 21st Century Streets New York City s streets are constantly called on to the meet new and varied needs

More information

1500 Hamilton Avenue Primrose Daycare Center Project

1500 Hamilton Avenue Primrose Daycare Center Project 15 Hamilton Avenue Primrose Daycare Center Project Traffic Impact Analysis Prepared for: Denise Duffy & Associates, Inc. January 16, 215 Hexagon Transportation Consultants, Inc. Hexagon Office: 111 W.

More information

Median Bus Lane Design in Vancouver, BC: The #98 B-Line

Median Bus Lane Design in Vancouver, BC: The #98 B-Line Li 1 Median Bus Lane Design in Vancouver, BC: The #98 B-Line Simon Li, P.Eng. PTOE Acting Program Manager, Road and Bridge Projects TransLink (Greater Vancouver Transportation Authority) 1600 4720 Kingsway

More information

Nearly 38,000 vehicles cross the Shinnecock Canal on Sunrise Highway (NYS Route 27) daily, during peak summer months.

Nearly 38,000 vehicles cross the Shinnecock Canal on Sunrise Highway (NYS Route 27) daily, during peak summer months. 2. Traffic Characteristics Traffic volumes have increased in concert with population growth in the Towns of Southampton and East Hampton. The New York State Department of Transportation (NYSDOT) maintains

More information

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL

Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Chapter Forty-seven RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Illinois RURAL TWO-LANE/MULTILANE STATE HIGHWAYS December 2009 2 Illinois

More information

VERMONT TRAFFIC MONITORING STANDARDS

VERMONT TRAFFIC MONITORING STANDARDS VERMONT TRAFFIC MONITORING STANDARDS FOR CONTRACTUAL AGREEMENTS Vermont Agency of Transportation Traffic Research January 2001 Introduction This document presents the traffic monitoring standards in effect

More information

Temporary Traffic Control for Building and Maintaining Single and Multi-Lane Roundabouts

Temporary Traffic Control for Building and Maintaining Single and Multi-Lane Roundabouts Purpose and Background Temporary Traffic Control for Building and Maintaining Single and Multi-Lane Roundabouts Although roundabouts have recently gained popularity and use in the United States, minimal

More information

Executive Summary. Transportation Needs CHAPTER. Existing Conditions

Executive Summary. Transportation Needs CHAPTER. Existing Conditions CHAPTER 1 Executive Summary The City of Forest Grove Transportation System Plan (TSP) was updated to keep it consistent with recent growth trends in the city and other transportation planning efforts in

More information

Downtown Louisville Two-Way Street Study

Downtown Louisville Two-Way Street Study Final Draft Report Downtown Louisville Two-Way Street Study Submitted to Downtown Development Corporation Submitted by ENTRAN, PLC Submitted October 2009 Table of Contents Introduction Study Purpose...1

More information

Stone Way N Rechannelization: Before and After Study. N 34th Street to N 50th Street

Stone Way N Rechannelization: Before and After Study. N 34th Street to N 50th Street City of Seattle Department of Transportation Stone Way N Rechannelization: Before and After Study N 34th Street to N 50th Street May, 2010 INTRODUCTION Population density in Seattle is increasing within

More information

MEMORANDUM. Robert Nichols, Acting Corridor Design Manager Northgate Link Extension

MEMORANDUM. Robert Nichols, Acting Corridor Design Manager Northgate Link Extension MEMORANDUM DATE: September 23, 2014 TO: Robert Nichols, Acting Corridor Design Manager Northgate Link Extension FROM: SUBJECT: COPIES: Katherine Casseday, PE, PTOE, Casseday Consulting Tony Lo, PE, Parsons

More information

BEFORE-AND-AFTER STUDY OF THE EFFECTIVENESS OF RECTANGULAR RAPID-FLASHING BEACONS USED WITH SCHOOL SIGN IN GARLAND, TEXAS

BEFORE-AND-AFTER STUDY OF THE EFFECTIVENESS OF RECTANGULAR RAPID-FLASHING BEACONS USED WITH SCHOOL SIGN IN GARLAND, TEXAS BEFORE-AND-AFTER STUDY OF THE EFFECTIVENESS OF RECTANGULAR RAPID-FLASHING BEACONS USED WITH SCHOOL SIGN IN GARLAND, TEXAS Marcus A. Brewer (corresponding author) Associate Research Engineer Texas Transportation

More information

Brooklyn 43 SAFE STREETS NYC

Brooklyn 43 SAFE STREETS NYC Brooklyn 43 SAFE STREETS NYC Grand Army Plaza Description Grand Army Plaza is a complex traffic circle where Flatbush and Vanderbilt Avenues, Eastern Parkway, Union Street and the Prospect Park Drive converge.

More information

Lawson Outline Plan External Traffic Analysis Working Paper

Lawson Outline Plan External Traffic Analysis Working Paper Total Lawson Development ACTPLA 16 January 2009 Document No.: Prepared for ACTPLA Prepared by Maunsell Australia Pty Ltd Level 2, 60 Marcus Clarke Street, Canberra ACT 2600, Australia T +61 2 6201 3000

More information

Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps

More information

Route Development Plan

Route Development Plan WSDOT Northwest Washington Division, Planning and Policy Office Route Development Plan State Route 99 North/Aurora Avenue North From the North end of the Battery Street Tunnel (Mile Post 32.44) to N. 145th

More information

Section 6 Traffic Analysis

Section 6 Traffic Analysis Section 6 Traffic Analysis Traffic Operations of the Preferred Network Alternative After the Preferred Network was identified and confirmed by local policy makers and area residents, detailed traffic analysis

More information

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES How to Get Started ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES Design Elements Selecting appropriate design treatments for school neighborhoods creates environments that address the needs of all

More information

Transportation Management Plan Template

Transportation Management Plan Template DATE: TO: FROM: SUBJECT: Date Name Position Transportation Service Center Name Position Transportation Service Center Transportation Management Plan Job Number(s) Control Section(s) Route Details County

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Introduction This (CTMP) has been prepared in order to discharge Condition 20 of planning permission ref 07/02879/EFUL for the enabling site works associated with the wider Bath Western Riverside development.

More information

TH 23 Access Management Study Richmond to Paynesville

TH 23 Access Management Study Richmond to Paynesville TH 23 Access Management Study Richmond to Paynesville Prepared For: Minnesota Department of Transportation District 8 Prepared By: Short Elliott Hendrickson Inc. July 2015 Table of Contents I. Introduction...

More information

SR-18 Corridor Improvements in Wood County

SR-18 Corridor Improvements in Wood County Public Meeting Information Package SR- Corridor Improvements in Wood County Thursday, May 19, 2011 10:00 a.m. to 1:00 p.m. Meeting Location: Hancock-Wood Electric Cooperative Building 1399 Business Park

More information

Improving Access in Florida International University Biscayne Bay Campus Executive Summary

Improving Access in Florida International University Biscayne Bay Campus Executive Summary EXECUTIVE SUMMARY Improving Access in Florida International University Biscayne Bay Campus Executive Summary Prepared for: Miami-Dade County Metropolitan Planning Organization (Miami-Dade MPO) Prepared

More information

ENGINEERING REPORT. College Street: Interstate 85 to Donahue Drive Traffic Signal System Feasibility Study Auburn, Alabama

ENGINEERING REPORT. College Street: Interstate 85 to Donahue Drive Traffic Signal System Feasibility Study Auburn, Alabama ENGINEERING REPORT College Street: Interstate 85 to Donahue Drive Traffic Signal System Feasibility Study Auburn, Alabama Prepared for: The City of Auburn Prepared by: 3644 Vann Road Suite 100 Birmingham,

More information

Traffic Impact Study for the 3817-45 North Broadway Mixed-Use Development Chicago, Illinois. Prepared by

Traffic Impact Study for the 3817-45 North Broadway Mixed-Use Development Chicago, Illinois. Prepared by Traffic Impact Study for the Chicago, Illinois repared by March 30, 2015 1. Introduction This report summarizes the methodologies, results and findings of a traffic impact study conducted by Kenig, Lindgren,

More information

PREFERRED ALTERNATIVE RECOMMENDATION FOR THE COLLEGE AVENUE SAFETY ENHANCEMENT (CASE) PROJECT COLUMBIA, MISSOURI

PREFERRED ALTERNATIVE RECOMMENDATION FOR THE COLLEGE AVENUE SAFETY ENHANCEMENT (CASE) PROJECT COLUMBIA, MISSOURI PREFERRED ALTERNATIVE RECOMMENDATION FOR THE COLLEGE AVENUE SAFETY ENHANCEMENT (CASE) PROJECT COLUMBIA, MISSOURI Prepared For: Columbia Public Works 701 East Broadway Columbia, Missouri Prepared By: Engineering

More information

Elwood and Joliet, Illinois. June 2015. Village of Elwood. Prepared for:

Elwood and Joliet, Illinois. June 2015. Village of Elwood. Prepared for: Truck Routing Study Elwood and Joliet, Illinois June 2015 Prepared for: Village of Elwood INTRODUCTION Kimley-Horn and Associates, Inc. (Kimley-Horn) was retained by the Village of Elwood to evaluate the

More information

3 Tappan Zee Bridge Rehabilitation Options

3 Tappan Zee Bridge Rehabilitation Options 3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:

More information

Advantages and Disadvantages of One Way Streets October 30, 2007

Advantages and Disadvantages of One Way Streets October 30, 2007 Advantages and Disadvantages of One Way Streets October 30, 2007 0 P age Background As the revitalization of the Central Waterfront area moves forward, one issue that might need closer analysis is the

More information

How To Design A Crash Investigation Site

How To Design A Crash Investigation Site CHAPTER 7 CRASH INVESTIGATION SITES December, 2000 7. Crash Investigation Sites (CIS) 7.1. Introduction and Usage The idea of "crash investigation sites" or areas outside of the freeway mainline where

More information

0.0 Curb Radii Guidelines Version 1.0.2

0.0 Curb Radii Guidelines Version 1.0.2 Background In early 2014, Transportation Services initiated a review of the Division's design guidelines and standards to move our organization in a direction consistent with the transportation departments

More information

CAPACITY AND LEVEL-OF-SERVICE CONCEPTS

CAPACITY AND LEVEL-OF-SERVICE CONCEPTS CHAPTER 2 CAPACITY AND LEVEL-OF-SERVICE CONCEPTS CONTENTS I. INTRODUCTION...2-1 II. CAPACITY...2-2 III. DEMAND...2-2 IV. QUALITY AND LEVELS OF SERVICE...2-2 Service Flow Rates...2-3 Performance Measures...2-3

More information

City of Kamloops Notre Dame Corridor Access Plan

City of Kamloops Notre Dame Corridor Access Plan FINAL REPORT This report is prepared for the sole use of ICBC. No representations of any kind are made by Urban Systems Ltd. or its employees to any party with whom Urban Systems Ltd. does not have a contract.

More information

TRAFFIC IMPACT ANALYSIS (TIA)

TRAFFIC IMPACT ANALYSIS (TIA) GUIDELINES FOR TRAFFIC IMPACT ANALYSIS (TIA) FOR REZONING APPLICATIONS AND OTHER DEVELOPMENT APPROVALS REQUIRING TRANSPORTATION IMPACT ANALYSIS IN SUMTER COUNTY, FLORIDA July 17, 2007 PURPOSE AND APPLICABILITY

More information

Maryland Invests $845 Million in New Highway and Bridge Projects

Maryland Invests $845 Million in New Highway and Bridge Projects Maryland Invests $845 Million in New Highway and Bridge Projects Completing Widening of MD 404 Talbot And Caroline Counties Top Regional Priority Queen Anne s, Talbot, and Caroline Counties Widening MD

More information

Transport Construction Authority Report for Auburn Stabling Project. Traffic Impact Assessment

Transport Construction Authority Report for Auburn Stabling Project. Traffic Impact Assessment Transport Construction Authority Report for Auburn Stabling Project November 2010 Contents 1. Introduction 1 2. Existing Conditions 2 2.1 Site Description 2 2.2 Existing Operations 4 2.3 Existing Road

More information

Sir Francis Drake Boulevard Rehabilitation Project Bicyclist and Pedestrian Intercept Interviews Report

Sir Francis Drake Boulevard Rehabilitation Project Bicyclist and Pedestrian Intercept Interviews Report Sir Francis Drake Boulevard Rehabilitation Project Bicyclist and Pedestrian Intercept Interviews Report Sir Francis Drake Boulevard Rehabilitation Project Bicyclist and Pedestrian Intercept Interviews

More information

8+ %!0"% 8+1!%"'$%,$"$

8+ %!0% 8+1!%'$%,$$ 8+ 8+ %!0"% The next step in developing recommendations for improvements to Grand Avenue was to identify, develop and evaluate alternatives to address the issues and needs identified in the previous chapter.

More information

DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST

DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST State of California Business, Transportation and Housing Agency DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST District / EA: District 3/ EA 03-3E380 Date Prepared: 1/10/2013 Prepared By: Robert Himes Stage

More information

Near Westside Neighborhood and University Avenue Corridor Transportation Study. Public Workshop #2. September 12 and 23, 2013

Near Westside Neighborhood and University Avenue Corridor Transportation Study. Public Workshop #2. September 12 and 23, 2013 Near Westside Neighborhood and University Avenue Corridor Transportation Study Public Workshop #2 September 12 and 23, 2013 Presentation Outline: Brief Review of Study Scope, Background, and Current Conditions

More information

PROGRAM FOR ARTERIAL SYSTEM SYNCHRONIZATION (PASS) STANDARD SCOPE OF WORK, SCHEDULE AND BUDGET

PROGRAM FOR ARTERIAL SYSTEM SYNCHRONIZATION (PASS) STANDARD SCOPE OF WORK, SCHEDULE AND BUDGET PROGRAM FOR ARTERIAL SYSTEM SYNCHRONIZATION (PASS) STANDARD SCOPE OF WORK, SCHEDULE AND BUDGET The purpose of the Program for Arterial System Synchronization (PASS) is to provide technical and financial

More information

Transportation Policy and Design Strategies. Freight Intensive. Level of Freight Presence

Transportation Policy and Design Strategies. Freight Intensive. Level of Freight Presence Appendix G Transportation Policy and Design Strategies CONTEXT SENSITIVE SOLUTIONS To address the need to describe freight systems which account for the population distress which may result, an analysis

More information

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 CCRPC staff has developed a draft methodology described below and detailed in the attached pages for

More information

Document Name: Driving Skills. Purpose: To outline necessary driving skills required to maximize driving safety.

Document Name: Driving Skills. Purpose: To outline necessary driving skills required to maximize driving safety. Document Name: Driving Skills Date Created: 8 October 2013 Date Reviewed: 4 February 2014 Date Approved: 29 July 2015 Purpose: To outline necessary driving skills required to maximize driving safety. Overview:

More information

A23 CHEQUERS ROUNDABOUT, HORLEY: PREDESTRIAN AND CYCLING CROSSING IMPROVEMENTS

A23 CHEQUERS ROUNDABOUT, HORLEY: PREDESTRIAN AND CYCLING CROSSING IMPROVEMENTS s A23 CHEQUERS ROUNDABOUT, HORLEY: PREDESTRIAN AND CYCLING CROSSING IMPROVEMENTS SURREY COUNTY COUNCIL S LOCAL COMMITTEE FOR REIGATE AND BANSTEAD 12 JANUARY 2004 KEY ISSUE To consider the conclusions of

More information

E. Summary of Existing Traffic Characteristics (Primary Focus Highways)

E. Summary of Existing Traffic Characteristics (Primary Focus Highways) E. Summary of Existing Traffic Characteristics (Primary Focus Highways) Average daily traffic (ADT) varies between 2,700 and 13,100 vehicles. Heavy truck volumes vary between 270 and 2,077 vehicles per

More information

HIGHWAY DESIGN REPORT. Appendix 4. Proposed Design Principles for City Passings

HIGHWAY DESIGN REPORT. Appendix 4. Proposed Design Principles for City Passings HIGHWAY DESIGN REPORT Appendix 4 Proposed Design Principles for City Passings June 2000 Contents Page 1 Introduction 2 1.1 Purpose 2 1.2 Definition of city passing 2 1.3 Safety Problems 2 1.4 Planning

More information

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line

More information

Alternatives Design Report. Draft

Alternatives Design Report. Draft Draft 3/4/2014 TABLE OF CONTENTS I Introduction... 1 A. HISTORY... 1 B. PROJECT BACKGROUND... 1 II. ALTERNATIVES DEVELOPMENT... 8 A. ALTERNATE 1 NO BUILD... 8 B. ALTERNATE 2 IMPROVE ROADWAY ON EXISTING

More information

Roadway Congestion 139,600 135,300 134,700 NA 4,300 4,900. Table 7-2 Transportation Criteria - Roadway Congestion (2035)

Roadway Congestion 139,600 135,300 134,700 NA 4,300 4,900. Table 7-2 Transportation Criteria - Roadway Congestion (2035) 7 Transportation Criteria 7.1 Introduction A goal of this project is to improve mobility in the corridor. To that end, all the major Project alternatives identified at this point in the study include significant

More information

Ne w J e r s e y Tr a f f i c Co n g e s t i o n :

Ne w J e r s e y Tr a f f i c Co n g e s t i o n : Ne w J e r s e y Tr a f f i c Co n g e s t i o n : A Growing Crisis January 2008 Cover photo : Route 3, Passaic County introduction A rising tide of traffic congestion threatens to increase roadway gridlock,

More information

REHABILITATION PACKAGE 1-a

REHABILITATION PACKAGE 1-a 1-a WINONA BRIDGE (BRIDGE 5900) REHABILITATION PACKAGE 1-a Rehab option 1-a is a rehabilitation package whereby all spans of the existing structure would be rehabilitated to the degree feasible and strengthened

More information

Lincoln Downtown Master Plan Update

Lincoln Downtown Master Plan Update Lincoln Downtown Master Plan Update Table of Contents Executive Summary........................................... 1 Complete Streets Framework.................................... 3 Promenade Creating

More information

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application):

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application): Transportation Assessment and Management Study Guidelines for Consultants INTRODUCTION This document is intended to provide guidelines for transportation consultants who produce Transportation reports

More information

California Crossing Guard Training: Online Course Part 2

California Crossing Guard Training: Online Course Part 2 California Crossing Guard Training: Online Course Part 2 Prepared by the Safe Routes to School Technical Assistance Resource Center The Safe Routes to School Technical Assistance Resource Center is a program

More information

CHAPTERTWO. Alternatives 2.1 ALTERNATIVES DEVELOPMENT PROCESS

CHAPTERTWO. Alternatives 2.1 ALTERNATIVES DEVELOPMENT PROCESS 2. Section 2 TWO CHAPTERTWO 2.1 ALTERNATIVES DEVELOPMENT PROCESS This EIS has been prepared in compliance with the Council on Environmental Quality (CEQ) regulations for implementing NEPA (40 CFR 1500-1508).

More information

INDOT 2000-2025 Long Range Plan

INDOT 2000-2025 Long Range Plan Chapter 9 INDOT 2000-2025 Long Range Plan Highway Needs Analysis Overview The statewide transportation planning process provides for the identification of highway needs through a comprehensive process

More information

CHAPTER 2B. REGULATORY SIGNS

CHAPTER 2B. REGULATORY SIGNS December 2000 Page 2B-1 CHAPTER 2B. REGULATORY SIGNS Section 2B.01 Application of Regulatory Signs Regulatory signs shall be used to inform road users of selected traffic laws or regulations and indicate

More information

ADA POST INSPECTION CHECKLIST. Job No. Route County Location

ADA POST INSPECTION CHECKLIST. Job No. Route County Location ADA POST INSPECTION CHECKLIST Job No. Route County Location SIDEWALKS All sidewalks constructed within the project limits are ADA compliant. Sidewalks are 5 or greater in width. Exception, existing sidewalks

More information

Crash Analysis. Identify/Prioritize. Gather Data. Analyze Crashes and Identify Improvements. Review Funding Options. Implement Improvements

Crash Analysis. Identify/Prioritize. Gather Data. Analyze Crashes and Identify Improvements. Review Funding Options. Implement Improvements Crash Analysis Identify/Prioritize 1. Find high crash areas 2. Review citizen input 3. Access City/County Safety Improvement Candidate Locations Gather Data 1. Use DOT-provided crash analysis programs

More information

Traffic Volume Counts

Traffic Volume Counts Traffic Volume Counts Prepare 1. Communicate with other staff/departments 2. Review historical data trends 3. Review citizen input 4. Request traffic control Select Location 1. Select the proper location

More information

KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs

KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs KENTUCKY TRANSPORTATION CABINET Department of Rural and Municipal Aid Office of Local Programs Office of Local Programs Transportation Enhancements Safe Routes to School Congestion Mitigation and Air Quality

More information

Energy and. Resources

Energy and. Resources Tasmaniann Government 20122 Submission to Nation Buildin g 2 Program Domain Highway Planning (Part of Brooker Highway Upgrades submission to Infrastructure Australia) September 2012 Department of Infrastructure,

More information

Transit Service Assessment

Transit Service Assessment Technical Memorandum #1 Transit Service Assessment June 213 Table of Contents 1. Existing Service Summary... 1 1.1 Service Overview... 1 1.2 Service Characteristics... 1 2. Ridership and Productivity...

More information

CHAPTER 13. Transportation Systems Management & Operations

CHAPTER 13. Transportation Systems Management & Operations CHAPTER 13 TABLE OF CONTENTS Overview / Summary... 1 Introduction... 2 System Management Strategies used in the ROCOG area... 2 Key Management Strategies / Access Management... 12 Implementation Directions

More information

Overview... Bus Options... Carpooling, Biking or Walking to School... Driving to Campus: The Loop... The Queue: Managing Lincoln Ave Traffic...

Overview... Bus Options... Carpooling, Biking or Walking to School... Driving to Campus: The Loop... The Queue: Managing Lincoln Ave Traffic... Overview... Bus Options... Carpooling, Biking or Walking to School... Driving to Campus: The Loop... The Queue: Managing Lincoln Ave Traffic... 2 3 4 5 6 What is the Queue?... 7 How the Queue and Loop

More information

Ohio Department of Transportation

Ohio Department of Transportation Ohio Department of Transportation Office of Technical Services Ohio Certified Traffic Manual June 2007 Prepared By: Ohio Certified Traffic Manual Table of Contents Chapter 1 Introduction...1 1.1 Purpose

More information

Highway 138 Corridor Solutions Study Roseburg, Oregon. Technical Memorandum #4: Concept Development and Screening DRAFT

Highway 138 Corridor Solutions Study Roseburg, Oregon. Technical Memorandum #4: Concept Development and Screening DRAFT Highway 138 Corridor Solutions Study Roseburg, Oregon Technical Memorandum #4: DRAFT Prepared for Oregon Department of Transportation, Region 3 3500 NW Stewart Parkway Roseburg, Oregon 97470 Prepared by

More information

Surface Transportation Program (STP)

Surface Transportation Program (STP) Project Name: Project Sponsor: FEDERAL FUNDS PROJECT APPLICATION TRANSPORTATION IMPROVEMENT PROGRAM 2008-2013 SALT LAKE and OGDEN/ LAYTON URBAN AREAS Surface Transportation Program (STP) Urban Surface

More information

Aerial View E Looking West

Aerial View E Looking West Figure 3-9 Aerial View E Looking West 3-19 Urban Design Figure 3-10 Aerial View F Looking North West 3-20 Urban Design Figure 3-11 Skyline and Massachusetts Avenue Gateway 3-21 Urban Design 4.0 TRANSPORTATION

More information

Downtown Tampa Transportation Vision

Downtown Tampa Transportation Vision Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org

More information

Section ALTERNATIVES. 3. Alternatives

Section ALTERNATIVES. 3. Alternatives Section 3 ALTERNATIVES 3. Alternatives 3.0 Alternatives The Springfield Rail Improvements Project Build Alternatives would utilize different routes. The No Build Alternative includes the continuation of

More information

Safety Engineering Policy Memorandum

Safety Engineering Policy Memorandum Safety Engineering Policy Memorandum SAFETY 2-13 Automated Traffic Law Enforcement Systems: Red Light Running (RLR) Camera Enforcement Systems and Automated Railroad Grade Crossing (RGC) Enforcement Systems

More information

Transportation Component

Transportation Component Final Report Transportation Component Institutional Master Plan Brown University Prepared for Brown University Providence, Rhode Island Prepared by /Vanasse Hangen Brustlin, Inc. Transportation, Land Development,

More information

Western Boulevard (NC 53) Corridor Study

Western Boulevard (NC 53) Corridor Study Western Boulevard (NC 53) Corridor Study, North Carolina PREPARED FOR Jacksonville Urban Area MPO PREPARED BY January 26, 2015 Final Report Acknowledgements Oversight Team / Jacksonville Urban Area MPO

More information

Multi-Modal Corridor Degree of Complexity: High Cost/Benefit: High

Multi-Modal Corridor Degree of Complexity: High Cost/Benefit: High Multi-Modal Corridor Degree of Complexity: Cost/Benefit: Maintain the same level of service for Ensures continuous flow through the Might impact other transportation Consider road diet and/or different

More information

New Jersey SRTS Travel Plan Guide

New Jersey SRTS Travel Plan Guide New Jersey SRTS Travel Plan Guide Prepared For: Funded By: Prepared By: New Jersey Department of Transportation Federal Highway Administration Alan M. Voorhees Transportation Center Edward J. Bloustein

More information

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan. 3 Financial Plan The purpose of the financial plan is to identify funding options that would be likely sources of money to advance recommendations made by this study. The Capitol Region Transportation

More information

Draft Transportation Management Plan for Via Verdi Repair Project

Draft Transportation Management Plan for Via Verdi Repair Project for Via Verdi Repair Project prepared for City of Richmond This report was prepared by: This report was reviewed by: Ryan McClain, P.E. Fehr & Peers TABLE OF CONTENTS 1.0 INTRODUCTION & PROJECT DESCRIPTION...

More information

FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST

FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST August 2003 Background: The Federal Highway Administration (FHWA) has retained all approval rights to the control

More information

Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions

Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions Evanston Main Street Station TOD Plan and Study Appendix A.1: Station Area Existing Conditions EvanstonMainStreetStation TODPlanandStudy A 1 AppendixA.1: ExistingConditions Table of Contents Station Locations

More information

Corridor Goals and Objectives

Corridor Goals and Objectives Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty

More information

Investigation of Red Light Running Factors

Investigation of Red Light Running Factors Investigation of Red Light Running Factors Final Report July 2004 Prepared for: Southeast Transportation Center The University of Tennessee Knoxville, Tennessee Prepared by: Scott S. Washburn Assistant

More information

Table of Contents. Traffic Control Devices (Signs, Channelizing Devices, Lighting Devices, Pavement Markings) 2-7

Table of Contents. Traffic Control Devices (Signs, Channelizing Devices, Lighting Devices, Pavement Markings) 2-7 1 Table of Contents Introduction 2 Traffic Control Devices (Signs, Channelizing Devices, Lighting Devices, Pavement Markings) 2-7 Five Parts of a Traffic Control Zone 8 Buffer Space Guidance 9 Taper Length

More information