1 s A23 CHEQUERS ROUNDABOUT, HORLEY: PREDESTRIAN AND CYCLING CROSSING IMPROVEMENTS SURREY COUNTY COUNCIL S LOCAL COMMITTEE FOR REIGATE AND BANSTEAD 12 JANUARY 2004 KEY ISSUE To consider the conclusions of a feasibility study into the movement of pedestrians and cyclists around the A23/Chequers roundabout in Horley and to the preliminary design of a recommended preferred improvement scheme. SUMMARY In 2001, as a result of an approved planning application process, the petrol garage site on the centre island of the A23/Chequers roundabout was redeveloped with improved and extended retail facilities. This resulted in higher numbers of pedestrians and cyclists moving around the junction with inherent safety concerns. The junction is a major strategic part of the highway network with high traffic flows and currently no controlled provision for assisting pedestrians and cyclists in their crossing needs. Following previous approvals of this Committee a feasibility study has been undertaken in respect of the safe crossing needs of pedestrians and cyclists and this report summarises that study and presents a recommended improvement option for future progression through the local scheme programme. OFFICER RECOMMENDATIONS The Committee is asked to agree 1. To approve the preliminary design of the improvement scheme detailed in ANNEX P, Drg No 45406/ To approve, as phase 1 of this improvement proposal, the completion of the detailed design of the crossing facility of the A23 Bonehurst Road during the current financial year and construction during the 2004/05 financial year, subject to future finance approval from this committee. 3. To approve the detailed design and construction of the remaining aspects of this improvement as a phased project subject to future finance approval from this committee. 43
2 1 INTRODUCTION & BACKGROUND 1.1 In 2001, as a result of an approved planning application process, the petrol garage site on the centre island of the A23/Chequers roundabout was redeveloped with improved and extended retail facilities. This resulted in higher numbers of pedestrians and cyclists moving around the junction which currently has no controlled facilities to assist such vulnerable road users in their crossing needs. 1.2 These safety concerns led in October 2001 to the Local Joint Transport Committee including within its future transportation project programme a project to investigate crossing safety improvements around the junction. 1.3 At the 1 st April 2003 meeting of this Local Committee funds were allocated to allow a crossing safety study of the junction to be completed which sought to investigate and propose improvement options. This report summarises that study and details the recommended preferred improvement option for future implementation. 1.4 The 1 st April 2003 committee approvals allocated sufficient funds to allow one element of the preferred improvement option to be taken through the detailed design stage during the current financial year with target construction anticipated, (subject to funding), during the 2004/05 financial year. The remaining aspects of the project could then be phased for progression as and when future funding allows. 2. STUDY SUMMARY 2.1 Objectives The objective of the study was to consider: Road traffic accident trends. Pedestrian and cyclists movements and needs. Crossing improvement options and costs. Consistency with other local highway improvements associated with development proposals (Horley Master Plan and FastWay) 2.2 Pedestrian/Cyclist Accident Data Five-year accident data has been reviewed and those accidents involving pedestrians and cyclists at this junction are detailed in table below: Table 2.2.2: junction ped & cyclist accidents (end of Aug) YEAR CASUALTY SEVERITY LOCATION 1999 Male age 15 PED Slight A23/Ladbroke Road 1999 Male age 52 CYCLE Slight A23/Horley Row 1999 Male age 36 CYCLE Slight A23 sthwest arm of junct 2000 Male age 32 CYCLE Slight A23 sthwest arm of junct 2001 Male age 14 CYCLE Slight A23 sthwest arm of junct 2001 Female age 14 PED Slight A23 sthwest arm of junct 2002 Male age 71 CYCLE Slight A23 sthwest arm of junct 44
3 2.3 Pedestrian and cyclists movement survey In December 2002 pedestrian and cyclist surveys were undertaken during the morning (08:00 09:15) and evening (14:45 16:00) school peak periods. The results are detailed in Annex O and can be summarised as follows: Pedestrian movement is generally concentrated around the four entry arms of the junction with the highest numbers being recorded across the Horley Row arm. This location has the greatest numbers of both adults and children crossing. High child pedestrian movement is also recorded at the A23 south-western arm of the junction. Both adult and child pedestrian movement is also significant at the A23/Ladbroke Road and Balcombe Road south-eastern arms of the junction. Pedestrian movement into the centre island of the junction is predominately recorded across the western and eastern sides of the main gyratory system. Cyclist movements are principally recorded across the A23/Ladbroke Road and Horley Row arms of the junction. 2.4 Improvement Proposals (for recommended option see Annex P) The pattern of pedestrian and cyclist movements was considered in conjunction with the accident history and options for improving crossing safety developed There are clear strong pedestrian crossing desire lines at the four arms of the junction with cyclists needs identified principally at the A23/Ladbroke Road and Horley Row arms but also at the A23 south-western arm when the accident data is considered. The appropriate controlled crossing facility for both pedestrians and cyclists is a Toucan (Two can) crossing Where crossing demand is principally pedestrian only, i.e. the Balcombe Road south eastern arm of the junction, it is felt that a Puffin crossing is the most appropriate provision a puffin crossing is signal controlled for pedestrians only, the red and green man lights are located where the pushbutton control is normally found and the crossing detects the presence of pedestrians on the crossing and adjusts timings accordingly so that traffic delays are minimised Safety of pedestrian movement into the centre island is more difficult to resolve since new signal crossings at the demand locations east and west on the main gyratory system, (see Annex O) would require stoppage of the full A23 flows when a pedestrian demand is registered with inherent congestion problems. There are also difficult issues relating to vehicular accesses into the centre island that provide conflict with potential crossing locations. It is therefore felt appropriate to recommend new Puffin crossings into the centre island from the splitter traffic islands on the south-eastern and south-western arms of the junction with future design 45
4 work to consider appropriate methods of encouraging pedestrians to use these locations The use of zebra crossing facilities as an alternative was considered but is felt to be inappropriate at this site. This is due to the need to cater for cyclists as well as pedestrians (only a Toucan crossing makes that provision) and where high flows of vehicles manoeuvring into lanes at all points of the junction conflict with large numbers of pedestrians a more visual and authoritative method of crossing control for both drivers and crossing users safety is appropriate. 2.5 Consistency with other local highway improvements associated with development proposals (Horley Master Plan and FastWay) The safety study of this junction took due regard of the on-going highway needs and improvement discussions resulting from the Horley Master Plan and FastWay projects. Additional residential housing is being proposed in the vicinity of this junction as a result of the Horley Master Plan process and the pedestrian and cyclist crossing facilities proposed would be consistent with the wider walking and cycling links being considered through that process. The FastWay quality bus project will establish additional stop facilities in the Horley area and the crossing proposals would help to serve public access to these bus stops and help support the viability of the FastWay project. 3 FINANCIAL IMPLICATIONS 3.1 At the 1 st April 2003 meeting of this Local Committee approval was given to a sum of 15,000 within the current financial years budget to fund this safety study together with the detailed design of a remote new zebra crossing facility midway along Horley Row (currently on-going with construction to be coordinated with a highway resurfacing project during 2004 agreements previously given by this committee). 3.2 Within the 15,000 was also a provision to allow some detailed design work to progress for the Chequers roundabout proposals. It is felt that the proposed Toucan crossing of the A23/Ladbroke Road arm of the junction should be recommended for detailed design progression at this stage since it provides a safe crossing for high numbers of both pedestrians and cyclists, is key to the development of east/west cycle routes through the Horley area and provides a strong single east/west link connecting the two sides of the community consistent with the Horley Master Plan and FastWay proposals. The remaining elements of the junction improvement could then be phased over time, which would allow external financing options to be explored as opportunities arise. 3.3 Within the 2003 Local Transportation Plan Theme Bid submission for the Reigate & Banstead Borough a sum of 50,000 for constructing the A23/Ladbroke Road Toucan crossing has been suggested for the 2004/05 financial year with subsequent years showing indicative design and construction costs to allow a phased completion of the project over a number of years. 46
5 4 ENVIRONMENTAL IMPLICATIONS 4.1 The recommended new crossings would require additional items of street furniture i.e. signal poles and heads, street lighting upgrade, pedestrian guardrailing as appropriate, tactile paving etc. 4.2 The crossing facilities would operate as and when pedestrian demands are registered and at those times traffic delay would result whilst the green man cycle operates to allow a safe crossing period. 5 CONSULTATION 5.1 A summary of the consultee responses is included in Annex Q. 6 CONCLUSIONS AND REASONS FOR RECOMMENDATIONS a. Since the extended retail development of the service station on the centre island of the Chequers roundabout increased pedestrian and cycling activity occurs around the junction. This has further highlighted crossing safety concerns which the recommended proposals of this report will help to resolve. b. It is considered that the proposals support local transportation objectives, namely: Safe Routes to Schools Improved road safety and accident reduction Improved pedestrian accessibility Improved Cycling provision Access to public transport facilities 6.3 The phased progression of the proposals will allow short-term benefit across the A23/Ladbroke Road together with the opportunity to ensure that future phases are fully consistent with the development of on-going discussions relating to the Horley Master Plan and FastWay projects. Report by: Local Transportation Director LEAD/CONTACT OFFICER: David Allen, Principal Engineer (improvements) TELEPHONE NUMBER: BACKGROUND PAPERS: Safety & Preliminary Design Report 2003 Version No: 2 Date: Time: Initials: DMA No Annexes: 3 47
Construction Traffic Management Plan
Introduction This (CTMP) has been prepared in order to discharge Condition 20 of planning permission ref 07/02879/EFUL for the enabling site works associated with the wider Bath Western Riverside development.
More informationGoals & Objectives. Chapter 9. Transportation
Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system
More informationRUNNYMEDE LOCAL AREA TRANSPORTATION PROGRAMME PROGRESS FOR 2003/04 2004/05 AND BID FOR 2005/06 TO 2010/11
S RUNNYMEDE LOCAL AREA TRANSPORTATION PROGRAMME PROGRESS FOR 2003/04 2004/05 AND BID FOR 2005/06 TO 2010/11 22 nd OCTOBER 2004 KEY ISSUES The Transportation Select Committee has asked all local transportation
More informationMajor Improvement Schemes in Basingstoke
Major Improvement Schemes in Basingstoke 1. Welcome Welcome to this exhibition, which provides information about the planned highway improvements being delivered in Basingstoke from 2015 2018. A30 Winchester
More informationCouncil Objective: Improve road network and influence improvements in public transport. Quarter 2 Progress Report 2015-16
Council Objective: Improve road network and influence improvements in public transport Quarter 2 Progress Report 2015-16 If you need this information in another language or format, please contact us to
More informationDEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008
DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008 INTRODUCTION The Department of Transport s Business Plan for the 2007/08 financial year stated the following: Government Aim: Quality Environment
More informationEconomy, Transport and Environment Department. Traffic Management Policy & Guidance
Economy, Transport and Environment Department Traffic Management Policy & Guidance January 2014 Contents Part 1- Introduction to Traffic Management Traffic Management Strategy Legislation and the Legal
More informationChild Road Safety Audit for South Gloucestershire 2009-2011
Child Road Safety Audit for South Gloucestershire 9 - August 9 Contents Page Foreword Executive Summary. Introduction. Review of the Action Plan. Summary of Casualty Statistics 9. Child Casualty Trends.
More informationMajor and Minor Schemes
1 Major and Minor Schemes Peterborough City Council has identified a number of proposals for major transport schemes over the next five year period that will support the planned housing and employment
More informationHighway Network Management Plan 2008 to 2017
Herefordshire Council Environment Directorate Highway Network Management Plan 2008 to 2017 Michael Hainge Director of Environment Brockington, Hafod Road, Hereford March 2008 1 Table of Contents 1 Executive
More information1. The consultation seeks views on the vision, targets and measures for improving road safety in Great Britain for the period beyond 2010.
Executive Summary 1. The consultation seeks views on the vision, targets and measures for improving road safety in Great Britain for the period beyond 2010. 2. We have made good progress in reducing road
More informationPART 3 TD 50/04 THE GEOMETRIC LAYOUT OF SIGNAL- CONTROLLED JUNCTIONS AND SIGNALISED ROUNDABOUTS SUMMARY
DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 6 SECTION 2 ROAD GEOMETRY JUNCTIONS PART 3 TD 50/04 THE GEOMETRIC LAYOUT OF SIGNAL- CONTROLLED JUNCTIONS AND SIGNALISED ROUNDABOUTS SUMMARY This document sets
More informationTRANSPORT ASSESSMENT GUIDANCE
TRANSPORT ASSESSMENT GUIDANCE Contents 1 INTRODUCTION...1 Purpose of the Guidance...1 Policy Context...1 Who Should Read This Document?...2 Structure of Guidance...3 2 ASSESSMENT PRINCIPLES AND PROCESS...4
More informationCOPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited
COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT COPCUT RISE November 2010 Prepared by Capita Lovejoy on behalf of William Davis Limited Copcut Rise Land north of Copcut Lane, Droitwich Spa: Consultation
More informationRAEBURN GARAGE, 118 RAEBURN AVENUE, SURBITON
RAEBURN GARAGE, 118 RAEBURN AVENUE, SURBITON DELIVERY AND SERVICING PLAN August 2015 Introduction This Delivery and Servicing Plan (DSP) has been prepared in relation to the proposed redevelopment of Raeburn
More informationOVERVIEW PROJECT SUMMARY
OVERVIEW Cesar Chavez showcases how to successfully redesign a primary arterial route into a neighborhood destination, improving modal share, water sensitive design, biodiversity and safety whilst maintaining
More informationUNEP recommendations to KURA on Improving Safety and Reducing Congestion on UN Avenue (7 October 2009; revised 23 November 2009)
UNEP recommendations to KURA on Improving Safety and Reducing Congestion on UN Avenue (7 October 2009; revised 23 November 2009) UN Avenue extends for 2 km between Limuru Road and Ruaka Road (Runda Roundabout).
More informationREPORT FOR: Traffic and Road Safety Advisory Panel
REPORT FOR: Traffic and Road Safety Advisory Panel Date of Meeting: 3 October 2012 Subject: INFORMATION REPORT - NETWORK MANAGEMENT DUTY 2011/12 Responsible Officer: John Edwards - Interim Corporate Director,
More informationTrends and issues Lake Te Koutu walkway, Cambridge
27 Trends and issues Lake Te Koutu walkway, Cambridge 3 Trends 3.1 Journey to work Over the past two to three decades there has been a significant increase in private vehicle ownership and usage and a
More informationSignificant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk
December 2014 FACT SHEET: TRANSPORT AND INFRASTRUCTURE Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk The Gold Coast Integrated Resort
More informationchapter 3 basic driving skills
chapter 3 basic driving skills When curving to the left, keep the front wheels close to the right edge of the lane to keep your driver s side rear wheels out of the next lane of traffic. Curve ahead slow
More informationBedford s Network Management Strategy (2011 2021) November 2010
Bedford s Network Management Strategy (2011 2021) November 2010 Page 1 of 13 1. Introduction 1.1. The Bedford Borough Council Network Management Strategy has been developed to support local and national
More information1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site.
1 Welcome Thank you for taking the time to attend this public exhibition of our proposals for residential development on Land at Daws Farm, Back Road, Writtle (site shown opposite). The exhibition comprises
More informationNearly 38,000 vehicles cross the Shinnecock Canal on Sunrise Highway (NYS Route 27) daily, during peak summer months.
2. Traffic Characteristics Traffic volumes have increased in concert with population growth in the Towns of Southampton and East Hampton. The New York State Department of Transportation (NYSDOT) maintains
More informationBusiness Life Insurance Procurement Plans - County Level Planning
Signs & Street Furniture Lifecycle Management Plan Contents: 13.1 Introduction 13.2 Inventory 13.3 Condition Assessment 13.4 Service Standards (Maintenance Management) 13.5 Performance Monitoring 13.6
More informationCentral London ongestion charging
Transport for London Central London ongestion charging Impacts monitoring Fourth Annual Report, June 2006 Overview MAYOR OF LONDON Transport for London 2006 All rights reserved. Reproduction permitted
More informationSUMMARY OF CORRECTION TA 85/01 Volume 6, Section 1, Part 3 GUIDANCE ON MINOR IMPROVEMENT TO EXISTING ROADS
DESIGN MANUAL FOR ROADS AND BRIDGES SUMMARY OF CORRECTION TA 85/01 Volume 6, Section 1, Part 3 GUIDANCE ON MINOR IMPROVEMENT TO EXISTING ROADS In May 2002, you received instructions to replace pages 5/1
More informationStage 2 A660 Otley Rd Cycling Study
Stage 2 A660 Otley Rd Cycling Study Cycle Audit Final Report October 2008 Page 1 of 19 Contents Page 1.0 Introduction 4 2.0 The Benefits of Increasing Cycling 4 3.0 Methodology 5 3.0 Background - Site
More information6 Streetscape character 6.1
6 6.1 6 Streetscape character Introduction Transport interchanges The TLRN is the strategic road network for London and varies in character across the capital. The variation of the land use across London
More informationMulti-Modal Corridor Degree of Complexity: High Cost/Benefit: High
Multi-Modal Corridor Degree of Complexity: Cost/Benefit: Maintain the same level of service for Ensures continuous flow through the Might impact other transportation Consider road diet and/or different
More informationClaim notification form
Before filling in this form you are encouraged to seek independent legal advice. Date sent / / Claim notification form Low value personal injury claims in road traffic accidents( 1,000-10,000) Are you
More informationNORTH EAST Regional Road Safety Resource
NORTH EAST Regional Road Safety Resource Project Report: 1. Regional Overview of Pedal Cycle Accidents 2005 2007. Produced May 2008. Natalie Goodman Project is supported by the Department of Transport.
More informationLawson Outline Plan External Traffic Analysis Working Paper
Total Lawson Development ACTPLA 16 January 2009 Document No.: Prepared for ACTPLA Prepared by Maunsell Australia Pty Ltd Level 2, 60 Marcus Clarke Street, Canberra ACT 2600, Australia T +61 2 6201 3000
More informationHIGHWAY DESIGN REPORT. Appendix 4. Proposed Design Principles for City Passings
HIGHWAY DESIGN REPORT Appendix 4 Proposed Design Principles for City Passings June 2000 Contents Page 1 Introduction 2 1.1 Purpose 2 1.2 Definition of city passing 2 1.3 Safety Problems 2 1.4 Planning
More informationDevelopment Layout Design
Development Layout Design General Design Considerations for Adoptable Highways Version 1 June 2012 Transportation, Waste and Environment Service Issue and Revisions Record Revision Date Originator Purpose
More informationReported Road Casualties Great Britain: 2013 Annual Report
Reported Road Casualties Great Britain: 2013 Annual Report Focus on pedal cyclists Key findings The key findings from this article include: Pedal cyclist deaths have seen a long-term fall, but have fluctuated
More informationRoads Task Force - Technical Note 10 What is the capacity of the road network for private motorised traffic and how has this changed over time?
Roads Task Force - Technical Note 10 What is the capacity of the road network for private motorised traffic and how has this changed over time? Introduction This paper forms one of a series of thematic
More informationOnce an assessment has been made, the decision on whether the scheme will be put forward to the Panels will be reported to you.
New TRO Requests Introduction and Application Form Essex Highways has delegated on-street parking, including lines, signs and restrictions, to the North Essex Parking Partnership (NEPP) in the North of
More informationPrinciples of Traffic Management on sites / road network
IOSH Ireland, Construction Specialist Section Springfield Hotel, Leixlip, County Kildare. 25 March 2015 Principles of Traffic Management on sites / road network Padraig Watters, Chartered Engineer This
More informationRoute Optimisation / Traffic Signals Efficiency
Route Optimisation / Traffic Signals Efficiency Glossary Auckland Council Advanced Real-time Traffic Information System Auckland Transport Closed Circuit Television (Traffic cameras) Full Time Equivalent
More informationRural Road Safety Policy in Korea: Lesson Learned
Regional Seminar on Safe, Climate Adaptive and Disaster Resilient Transport for Sustainable Development Nov. 17 th, Seoul Rural Road Safety Policy in Korea: Lesson Learned Sangjin HAN Korea Transport Institute
More informationKey Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.
Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is
More informationENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES
How to Get Started ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES Design Elements Selecting appropriate design treatments for school neighborhoods creates environments that address the needs of all
More informationWalkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps
More informationEnvironment Committee 11 January 2016
Environment Committee 11 January 2016 Title Whole Life Costing of Footway Maintenance Treatments and Scheme Prioritisation Report of Wards Status Urgent Key Enclosures Commissioning Director, Environment
More informationGuildford Station Regeneration
Welcome Thank you for taking the time to view our proposals for the redevelopment of Guildford station. We have now submitted a planning application and would like to hear what you think of our plans.
More informationClaim notification form
Before filling in this form you are encouraged to seek independent legal advice. Date sent / / Claim notification form Low value personal injury claims in road traffic accidents( 1,000-10,000) Are you
More informationSection 6 Traffic Analysis
Section 6 Traffic Analysis Traffic Operations of the Preferred Network Alternative After the Preferred Network was identified and confirmed by local policy makers and area residents, detailed traffic analysis
More informationLOCAL TRANSPORT PLAN M E R S E Y S I D E
Delivering the LTP in Knowsley LTP IMPLEMENTATION PLAN 2011-2015 1. Introduction 3 2. Financial Environment and Funding 3 3. Local Transport Plan Strategic Priorities & Linkages 6 4. Scheme selection and
More informationHighway Infrastructure Asset Management Strategy
Highway Infrastructure Asset Management Strategy City Development Highways and Transportation Highways Asset Management Page i Asset Management Strategic Documents Contents Page Foreword 4. 1 Introduction)...)))))))))))))))))))))))...
More informationJoined-Up Cycling. Cycle Links for Horsham Town Centre
Joined-Up Cycling Cycle Links for Horsham Town Centre 1 4 3 6 2 5 Proposals to improve cycle access to the town at the Albion Way/Bishopric junction and join up some of the fragmented cycle routes in the
More informationMadras College Site Traffic Management Plan (South Street) August 2015
Madras College Site Traffic Management Plan (South Street) August 2015 South Street, St. Andrews, KY16 9EJ Kilrymont Road, St. Andrews, KY16 8DE Telephone (01334) 659402 Telephone (01334) 659401 Email
More informationEAST AYRSHIRE COUNCIL CABINET 7 MARCH 2012 TRAFFIC, TRANSPORTATION AND ROAD SAFETY PROGRAMMES 2012-13
EAST AYRSHIRE COUNCIL CABINET 7 MARCH 2012 TRAFFIC, TRANSPORTATION AND ROAD SAFETY PROGRAMMES 2012-13 Report by Depute Chief Executive/Executive Director of Neighbourhood Services 1. PURPOSE OF REPORT
More informationDeaths/injuries in motor vehicle crashes per million hours spent travelling, July 2008 June 2012 (All ages) Mode of travel
Cyclists CRASH STATISTICS FOR THE YEAR ENDED 31 DECEMBER 212 Prepared by the Ministry of Transport CRASH FACTSHEET November 213 Cyclists have a number of risk factors that do not affect car drivers. The
More information05 AREA/SITE SPECIFIC GUIDELINES
05 AREA/SITE SPECIFIC GUIDELINES Site 1 - Glass Yard The leisure centre that is currently located on this site should move to a more central location in the town centre close to the existing public squares.
More informationClaim notification form (Form RTA1)
Date sent / / Claim notification form (Form RTA1) Low value personal injury claims in road traffic accidents( 1,000-10,000) Before filling in this form you are encouraged to seek independent legal advice.
More informationWhy build the Silvertown Tunnel?
Why build the Silvertown Tunnel? Over the last 30 years east London has changed with the redevelopment of former industrial areas into major commercial and residential districts. The development of Canary
More informationCycle Strategy 2006 2011
Cycle Strategy 2006 2011 TABLE OF CONTENTS 1 INTRODUCTION... 1 2 POLICY BACKGROUND... 2 3 BACKGROUND... 6 4 MAIN OBJECTIVES... 8 5 TARGETS... 9 6 THE CYCLE NETWORK... 10 7 CONCLUSION... 13 Appendix A:
More informationLeigh Park Area Safety Scheme, Havant, Hampshire
Traffic Advisory Leaflet 2/99 April 1999 Leigh Park Area Safety Scheme, Havant, Hampshire The scheme The Leigh Park Area Safety Scheme includes the area in the Leigh Park Estate bounded by Middle Park
More informationReported road accidents involving young car drivers: Great Britain 2011
Reported road accidents involving young car drivers: Great Britain 211 Road Accident Statistics Factsheet No. 1 August 212 Introduction This factsheet presents summary information relating to the casualties
More informationSite Layout & Traffic Plan
Location Site address: Norbury Manor Business Enterprise College, Kensington Avenue, Thornton Heath, Croydon CR7 8BT. The new block will be constructed on the existing hard play area. The construction
More informationPedestrian Safety in Strip Shopping Centres
Pedestrian Safety in Strip Shopping Centres Author BE MTraffic MTransport MITE MIEAust CPEng Manager Transportation, Tasmania GHD Pty Ltd 2 Salamanca Square Hobart TAS 7000 Keith.midson@ghd.com.au +61
More informationTaylor Wimpey UK Ltd. December 2007
Taylor Wimpey UK Ltd December 2007 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft For Planning Date 3 August 2007 20 December 2007 Prepared by D Gooding P Barton Signature Checked
More informationSite Traffic Management Plan
Masterton Primary School Aberdour Road Dunfermline Fife KY11 8HY Telephone: 01383 602455 Email: masterton.enquiries@fife.gov.uk Head Teacher: Mr Stephen Humphries Site Traffic Management Plan Date December
More informationAlternatives and Design Evolution: Planning Application 1 - RBKC
3 Alternatives and Design Evolution: Planning Application 1 - RBKC Design Freeze Draft One (January 2011) Figure 3-19 3.82 The design freeze draft one was a point in time in the evolution of the Masterplan
More informationTier 1 Strategies. WV Route 14 Corridor Management Plan
1.1 1.2 1.3 1.4 Signal timing optimization system improvements. Improve geometry traffic control at high crash intersections. Construct intersection capacity improvement projects. Widen longer sections
More informationLAND SOUTH OF BUTLER S GREEN ROAD, HAYWARDS HEATH TRANSPORT ASSESSMENT
LAND SOUTH OF BUTLER S GREEN ROAD, HAYWARDS HEATH TRANSPORT ASSESSMENT JULY 2011 LAND SOUTH OF BUTLER S GREEN ROAD, HAYWARDS HEATH TRANSPORT ASSESSMENT PREPARED FOR W.T LAMB HOLDINGS LTD FMW CONSULTANCY
More informationConstruction Management Plan (CMP) Application
About this form Principal Contractor (Applicant) Applicant Details (Person lodging application and main contact for CMP) DA and Site Details Development Consent for Works you are carrying out Construction
More information1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application):
Transportation Assessment and Management Study Guidelines for Consultants INTRODUCTION This document is intended to provide guidelines for transportation consultants who produce Transportation reports
More informationTRAFFIC POLICY NOTE DTP 34/05 LOCAL SPEED LIMITS. Policy. Preamble. Devon Local Transport Plan Objectives. Revisions
TRAFFIC POLICY NOTE LOCAL SPEED LIMITS DTP 34/05 Policy To work in partnership with local communities and in consultation with the police to: Provide 30 mph speed limits in communities Provide 20mph speed
More information7 Guiding delivery - next steps: efficient transport network management
7 Guiding delivery - next steps: efficient transport network management Council Plan priorities 2011-2014: making places easier to reach; a resilient economy Making the best use of existing roads for the
More informationPedal cyclist collisions and casualties in Greater London
Transport for London Surface Transport Factsheet Better Routes and Places Directorate Topic Factsheet 211-1 September 211 Pedal cyclist collisions and casualties in Greater London This factsheet looks
More informationDowntown Tampa Transportation Vision
Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org
More informationHow To Develop A Balanced Transport System In Devon
Devon Structure Plan First Review - 1995 to 2011 7 Transportation (T Policies) Explanatory Memorandum (September 1999) (Policies and Proposals adopted February 1999) 7. TRANSPORTATION 7.1 Transportation
More informationTRANSPORTATION ACORNS PROJECTS LIMITED. 124 High Street, Eton, Berkshire Proposed Retail and Residential Development Stage 1 Road Safety Audit
ACORNS PROJECTS LIMITED TRANSPORTATION 124 High Street, Eton, Berkshire For ADL Transportation Limited Prepared by Acorns Projects Limited Safety Traffic Project Management & Highway Engineering Consultants
More informationAdvantages and Disadvantages of One Way Streets October 30, 2007
Advantages and Disadvantages of One Way Streets October 30, 2007 0 P age Background As the revitalization of the Central Waterfront area moves forward, one issue that might need closer analysis is the
More informationFoulford Primary School Site Traffic Management Plan. December 2012 (Review date October 2013)
Foulford Primary School Leuchatsbeath Drive Cowdenbeath Fife KY4 9SN Foulford Primary School Site Traffic Management Plan December 2012 (Review date October 2013) Site Traffic Management Plan Foulford
More informationExecutive Summary. Transportation Needs CHAPTER. Existing Conditions
CHAPTER 1 Executive Summary The City of Forest Grove Transportation System Plan (TSP) was updated to keep it consistent with recent growth trends in the city and other transportation planning efforts in
More informationDEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY
DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY 1.0 Introduction and Purpose 1.1 Clackmannanshire Council is seeking to dispose of a site at Alloa Road, Tullibody for redevelopment. The site extends
More informationThe Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603. Framework Residential Travel Plan
The Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603 Framework Residential Travel Plan September 2013 CONTROL SHEET CLIENT: PROJECT TITLE: REPORT TITLE: THE
More information770 TH Tseung Kwan O Development, Phase II, Grade Separated Interchange T1/P1/P2
770 TH Tseung Kwan O Development, Phase II, Grade Separated Interchange T1/P1/P2 Introduction The T1/P1/P2 junction is situated, north of Tseung Kwan O (TKO) Town Centre, at the junction of TKO Tunnel
More informationM8 M73 M74 Motorway Improvements Project
M8 M73 M74 Motorway Improvements Project October 2013 Introduction This major transport infrastructure project will complete and upgrade the M8 and key sections of the M73 and M74 to finalise the motorway
More informationLT McGuinness Site 10 Development, Wellington Waterfront. Construction Traffic Management Plan. 7 October 2014
LT McGuinness Site 10 Development, Wellington Waterfront Construction Traffic Management Plan 7 October 2014 TDG Ref: 12950 141007 ltm ctmp final report.docx LT McGuinness Site 10 Development, Wellington
More informationCycle Network Modelling A new evidence-based approach to the creation of cycling strategy
Cycle Network Modelling A new evidence-based approach to the creation of cycling strategy A The Business Cycle, London, mapping of commuter cycle routes and hotspots, 2000. A It is refreshing to see an
More informationClaim notification form (RTA1) Low value personal injury claims in road traffic accidents ( 1,000-25,000)
Date sent / / Claim notification form (RTA1) Low value personal injury claims in road traffic accidents ( 1,000-25,000) Before filling in this form you are encouraged to seek independent legal advice.
More informationMeasuring the Street:
Measuring the Street: New Metrics for 21st Century Streets 1 Measuring the Street: New Metrics for 21st Century Streets New York City s streets are constantly called on to the meet new and varied needs
More informationAlternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011
Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 CCRPC staff has developed a draft methodology described below and detailed in the attached pages for
More informationLincoln Downtown Master Plan Update
Lincoln Downtown Master Plan Update Table of Contents Executive Summary........................................... 1 Complete Streets Framework.................................... 3 Promenade Creating
More informationCorridor Goals and Objectives
Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty
More informationROAD SAFETY GUIDELINES FOR TAH ROAD INFRASTRUCTURE SAFETY MANAGEMENT
I. GENERAL ROAD SAFETY GUIDELINES FOR TAH ROAD INFRASTRUCTURE SAFETY MANAGEMENT ANNEX III B i. The setting up and implementing of appropriate management procedures is an essential tool for improving the
More informationTransportation Management Plan Template
DATE: TO: FROM: SUBJECT: Date Name Position Transportation Service Center Name Position Transportation Service Center Transportation Management Plan Job Number(s) Control Section(s) Route Details County
More informationNORWICH CITY COUNCIL. Report for Resolution
NORWICH CITY COUNCIL Report for Resolution Report To Report of Subject Norwich Highways Agency Committee 11 November 2004 Director of Development Lakenham TAP Responses to the advertisement of waiting
More informationTRAFFIC MANAGEMENT PLAN
CLIENT: LONDON UNDERGROUND LIMITED CONTRACT REF: TLL 7917 NORTHERN LINE EXTENSION MAIN WORKS CONTRACT TRAFFIC MANAGEMENT PLAN Issue and Revision Control Distribution and revision control is managed through
More informationPromote sustainable development and energy conservation. Facilitate the operation and use of public transport.
Sedgefield Borough Local Plan Page 1 TRANSPORT Plan Strategy The transport policies of the Local Plan are concerned with how people move about in connection with their work, shopping, educational and leisure
More informationSpeed Limit Policy Isle of Wight Council
APPENDIX C - 59 Speed Limit Policy Isle of Wight Council June 2009 Contents Section 1 Introduction 1.1 Links with the Local Transport Plan Section 2 Speed Limits on Urban Roads and Residential Areas 2.1
More informationEngagement with the community will be in accordance with Council s Community Participation Policy.
CLARENCE CITY COUNCIL ASSET MANAGEMENT 7 DEC 2015 86 11.5 ASSET MANAGEMENT 11.5.1 CLARENCE STREET SAFETY ASSESSMENT PROJECT (File No 04-03-01) EXECUTIVE SUMMARY PURPOSE The purpose of this report is to
More informationRoad Safety Authority Provisional Review of Road Crashes 2013
A review of 2013 fatal collision statistics December 31 st 2013 The following report summarises the main trends that have emerged in 2013. This has been prepared by the Road Safety Authority following
More informationEDIN BVRGH + DM Guideline: Transport Requirements - Developer Contributions Guideline. Item no. Planning Committee 4 October 2007. 1 Purpose of report
~ ~ ~~ ~ ~ ~~ EDIN BVRGH + THE CITY OF EDINBURGH COUNCIL Item no 17 Report no PC/034/07-08/CD DM Guideline: Transport Requirements - Developer Contributions Guideline Planning Committee 4 October 2007
More informationPass Plus evaluation 06224 April 2009
Pass Plus evaluation 06224 April 2009 CONFIDENTIALITY Please note that the copyright in the attached report is owned by TfL and the provision of information under Freedom of Information Act does not give
More informationGuidance on the use of tactile paving surfaces
Guidance on the use of tactile paving surfaces Contents Introduction...3 Mobility Of Visually Impaired People...3 Mobility techniques...3 Key design principles...4 The use of tactile information...4 Using
More information