Datacenter Site Selection Checklist
|
|
|
- Cody Jared Henderson
- 10 years ago
- Views:
Transcription
1 Checklist Use this checklist to aid in the process of selecting a new site for the data center. When visiting potential building sites, print the checklist off and take it along to record impressions and comments on the building and/or its location. Fill in Table 1 with the sites details on location, ownership, and size. To use Table 2, check off the appropriate columns for each item as they are assessed. Columns are recorded using the following: } the site fully conforms. } Partial conformity. NOTE: If a partial conformity exists, an explanation describing the partial conformity along with planned actions to remediate should be entered in the comments field. } Does not conform. NOTE: If a non-conformity exists describe the non-conformity and if any action to remediate is planned. Also note where no remediation is possible. } t applicable Table 1. Site Details Site Address: Location Type: (i.e. Urban, Suburban, Industrial complex) Is it in an existing building or a new building? Floor Number Leased or owned? Floor space (square feet):
2 Table 2. Building Site Selection Checklist 1.0 Are there low risks from environmental threats such as: Aircraft traffic? 1.1 Earthquakes? 1.2 Floods? 1.3 Hurricanes or tornados? 1.4 Heavy ice or snow? 1.5 Nearby hazardous industry? 1.6 Does the location have a high crime rate? 2.0 Are there secure utility service entries? 3.0 Does the site have the ability to limit or restrict physical access to the data center? 4.0 Is hard water a potential problem? 5.0 Are multiple-grid commercial power services available? 6.0 Are there data/voice communications nearby and capable of supporting requirements? 7.0 Is there public transportation available nearby? 8.0 Is there adequate parking available? 9.0 Is the parking area physically separated from the building by barriers? 10.0 Is the labor market adequate to support requirements?
3 11.0 Is the loading dock access at truck bed height? 12.0 Are there ramps for loading dock? 13.0 Is there local ordinance restricting truck/delivery traffic? 14.0 Is loading dock and staging area secure and segregated from sensitive areas? 15.0 Can elevators, ramps, doors, and other passageways accommodate large equipment? 16.0 Is the stand-by generator physically isolated and secured? 17.0 Is the UPS (batteries) located in a separate, secured, and ventilated area? 18.0 Is special floor loading required for UPS, generators, cooling or other heavy equipment? 19.0 Can the computer room(s) be made air-tight if a gaseous fire suppression agent is to be used? 20.0 Computer room(s): Positive drainage of area under raised floor? 21.0 Computer room(s): Positive check valve to prevent sewer gases or other drain backup? 22.0 external windows in computer room(s)? 23.0 If there are internal windows are they shatterproof and secure?
4 24.0 Raised floor does not require ramps for access (e.g., sunken floor design) Are water lines under computer room floor only used for cooling equipment? 26.0 Is the flooring surface able to withstand freight handling equipment without damage? 27.0 Are equipment staging areas secure, conditioned, and physically separated from computer room(s)? 28.0 Is there no evidence of power outages to the facility? If evidence of outages exists describe frequency and durations Does power to the facility appear clean? Is there visual evidence of light flicker, or the existence of motors and other industrial equipment on the site? 30.0 Is there a record of the electrical utility s performance data (interruptions)? 31.0 Does the site have power metering and monitoring solutions? 32.0 Is computer room(s) supplied by separate power feed? 33.0 Does the facility have isolated equipment grounding in place? 34.0 Is the facility protected from transient ground faults and lighting?
5 Is there a secure, building code compliant fuel storage area for generators? 36.0 Does adequate hot water supply exist for humidifiers servicing the data center? 37.0 Is external cooling equipment (chillers, pumps, towers) able to be secured and made accessible only by authorized personnel? 38.0 Is there room for expansion? The content you have downloaded has been produced with thoughtful, original research efforts by Netmagic. Please do not duplicate or misuse it. You may quote portions of our research in your own material provided you include a proper attribution to this original source. You are free to share this content on the web with friends and colleagues Pvt. Ltd. All rights reserved.
Datacenter Assessment
The Netmagic team has compiled this Checklist to help you evaluate, compare and select datacenter facilities to meet your hosting, business continuity and disaster recovery needs. Based on industry best
Basement Flooding: Preventing Future Damage
Basement Flooding: Preventing Future Damage 1 Mitigation Mitigation is Measures taken now to reduce losses in the future. 2 Protecting Your Property Staying Above Water There are many low-cost options
Data Center Due Diligence List
Data Center Due Diligence List Name and address of site facility Date constructed Building owner/date purchased by current owner Name of previous owner Adjacent Property Descriptions North South East West
North Carolina State University Emergency Facilities Closure Checklist- Part I
North Carolina State University Emergency Facilities Closure Checklist- Part I Unplanned or spontaneous events often disrupt daily operations on campus. In the event that an incident may interrupt your
Scalable. Affordable. Flexible. Fast.
Modular Data Center Solutions Scalable. Affordable. Flexible. Fast. Build the data center you need today with the flexibility to meet tomorrow s challenges The only constant in business is change. Fluctuations
Appendix B. Property Owner Questionnaire
Appendix B Property Owner Questionnaire WEST WINDSOR TOWNSHIP DEPARTMENT OF COMMUNITY DEVELOPMENT PROPERTY QUESTIONNAIRE DIVISION OF ENGINEERING As someone who owns and lives and/or works on a property
Flood Risk Considerations
CHECKLIST FOR MITIGATING OR AVOIDING FLOOD DAMAGE It may not seem the case, but individuals are not powerless in influencing their potential exposure to catastrophes, such as floods. Property owners have
Energy-efficient data center achieves 2N reliability; MTU Onsite Energy generator sets provide critical backup
Press Release Contact: Gary Mason Tognum America Inc. Phone: +1 248 560 8480 E-mail: [email protected] Agency contact: Robert E. Sheldon, APR Creative Communications Consultants, Inc. Phone: +1 210
AVAILABLE WORLD CLASS AIRCRAFT MANUFACTURING & MAINTENANCE COMPLEX. 46,000 + to 1,200,000 + SF Available
exclusively marketed by AVAILABLE WORLD CLASS AIRCRAFT MANUFACTURING & MAINTENANCE COMPLEX 46,000 + to 1,200,000 + SF Available Aircraft Hangar, Maintenance Facilities and Support Office on USAF Base Tarmac
Element D Services Plumbing
Medical Vacuum and Gas PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses medical vacuum, waste anesthetic gas disposal, compressed air, oxygen, nitrous oxide, nitrogen and carbon dioxide systems.
Work Practice: Wastewater Collection System Maintenance Plan Potential Safety Hazards
Potential Safety Hazards Required items Potential PPE None Additional References - Collection System Related Work Practices & Forms Jet Truck Cleaning Work Practice (Do not drive on peoples driveway) CDL
AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ)
AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ) Site Biography Market Area: Phoenix, Mesa, Tempe, Chandler, Scottsdale, AZ Location: Mesa, AZ 85201 Address: 1301 University Blvd.
Contents Error! Bookmark not defined. Error! Bookmark not defined. Error! Bookmark not defined.
We Do It Better. Contents Introduction...3 Service and Support...3 Data Center Details...4 Security...4 Location...4 Power...4 Humidification...5 AC...5 Cooling...6 Datacenter Features...6 SAS 70...6 PCI
WHITE PLAINS PLUMBING CODE PART 1. GENERAL REQUIREMENTS
WHITE PLAINS PLUMBING CODE PART 1. GENERAL REQUIREMENTS a. New Plumbing and Gas Piping Systems. This code in conjunction with the Plumbing and Fuel Gas Codes of the State of New York shall apply to plumbing
EOC Assessment Checklist
EOC Assessment Checklist INTRODUCTION The following checklist will assist State and local governments in performing the initial assessment of the hazards, vulnerabilities, and resultant risk to their existing
ELECTRICAL EMERGENCY SYSTEM PLAN REVIEW OVERVIEW OF CODE REQUIREMENTS
ELECTRICAL EMERGENCY SYSTEM PLAN REVIEW What to Look for during Plan Review OVERVIEW OF CODE REQUIREMENTS First determine the type of emergency power system; is the system designed for Emergency or Legally
AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL)
AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL) Site Biography Market Area: Chicago, IL Location: Lisle, IL 60532 Address: 4513 Western Avenue CLLI,POP, NPA/NXX Code: LSLEILAA, EQLAILAA
Facilities Maintenance Standards rev 9-1-2015
Facilities Maintenance Standards rev 9-1-2015 Purpose The purpose of these standards is to outline the minimum requirements for maintaining state owned facilities and infrastructures in a manner that will
good to know... SEWER BACKUP A guide to protecting your home
good to know... SEWER BACKUP A guide to protecting your home Maximize your insurance coverage Installing specific loss mitigation devices will maximize the coverage limit that is available to you on your
How To Visit An Internet Data Center
AT&T Internet Data Center Site Specification Atlanta Area (Lithia Springs, GA) Site Biography Market Area: Atlanta and surrounding areas (Georgia, Alabama, Tennessee, Florida, North and South Carolina
Building Permit Application
Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: PHONE: PHONE: ARCHITECT/ENGINEER
Flood Checklist ACTION TO BE TAKEN BEFORE THE FLOOD SEASON
Flood Checklist The following may serve as a checklist when preparing for a flood. This checklist should be tailored to processes/operations, flood protection equipment and flood potentials at your specific
Data center outages impact, causes, costs, and how to mitigate
Data center outages impact, causes, costs, and how to mitigate Data centers sometimes fail. You can build in safeguards and fail safe mechanisms and redundancy through backup systems but like all engineered
Current as of 11/10/08 1 of 1
BEST PRACTICES STANDARDS FOR SCHOOLS UNDER CONSTRUCTION OR BEING PLANNED FOR CONSTRUCTION I. Site Layout A. School buildings shall be provided with a securable perimeter. A securable perimeter means that
Does Part of My Basement Floor Have to Be Removed to Install. Where Does the Water from the Sump Pump Go?...Page 5
PROTECTIVE PLUMBING - WHAT IS IT? TABLE OF CONTENTS Protective Plumbing What is it?...page 1 What is Foundation Drainage?...Page 2 What is a Sump Pumping System?...Page 4 Does Part of My Basement Floor
19 Site Location, Design and Attributes. Site Location, Design and Attributes
1 Site Location, Design and Attributes The Primary Data Center shall be physically located on Oahu, Hawaii. 2 Site Location, Design and Attributes The Primary Data Center shall be located at least 1 mile
Walking and Working Surface Checklist:
Walking and Working Surfaces Purpose: This information is presented to improve the level of safety in our operations, and to inform you that we will comply with the OSHA Standard 29 CFR 1910.23. Responsibility:
Data Realty Colocation Data Center Ignition Park, South Bend, IN. Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures
Data Realty Colocation Data Center Ignition Park, South Bend, IN Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures Project Overview Data Realty is a data center service provider for middle
Flood Events Preparedness, Remediation and Restoration. Rev 3 Dec 2014
Flood Events Preparedness, Remediation and Restoration Rev 3 Dec 2014 Impacts PART 1 - IMPACTS 2013 Brookfield Johnson Controls January 30, 2015 2 Impacts 2013 Brookfield Johnson Controls January 30, 2015
COVERAGE ENHANCEMENT ENDORSEMENT
BUSINESSOWNERS THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. COVERAGE ENHANCEMENT ENDORSEMENT This endorsement modifies insurance provided under the following: (THIS FORM MUST BE ACCOMPANIED
Subject: County of Los Angeles Data Center Space Requirement
Subject: County of Los Angeles Data Center Space Requirement The County of Los Angeles, Chief Executive Office, Real Estate Division (CEO-RED) is issuing this Property Search for the purchase of a vacant,
Standard Operating Procedures for Flood Preparation and Response
Standard Operating Procedures for Flood Preparation and Response General Discussion Hurricanes, tropical storms and intense thunderstorms support a conclusion that more severe flooding conditions than
OPERATOR - FACILITY ADDRESS - DATE
. Facility Criteria (RFP).0 Location Characteristics Criteria Requirements 1 Ownership and Management: Please identify the owner(s) and managers of the property and indicate if there is on-site management.
Columbus State Community College MASTER PLANNING
Columbus State Community College MASTER PLANNING Current State Facilities and Utilities Assessment November 2011 Columbus State Community College MASTER PLANNING EXISTING UTILITIES AND FACILITIES ASSESSMENT
Security+ Guide to Network Security Fundamentals, Fourth Edition. Chapter 13 Business Continuity
Security+ Guide to Network Security Fundamentals, Fourth Edition Chapter 13 Business Continuity Objectives Define environmental controls Describe the components of redundancy planning List disaster recovery
INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction
ACE GLOBAL RISK ENGINEERING INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE Introduction The most common cause of flooding is due to established water storage areas (natural and man-made)
MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION
MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION Fire Pump Plan Review 2009 International Fire Code and NFPA 20 Date of Review / / BLD201 - Project Address: Project Name: Contractor s Business
1301 Fannin. Houston Data Center & Office Facility
1301 Fannin & Office Facility 1301 FANNIN Building Features Building Location Building Typical Floor plans Systems Infrastructure Amenities BUILDING FEATURES YEAR BUILT/RENOVATED: 1984/2009 TOTAL LEASE
Storm Ready. 3 Gulf Power Ready for the storm. 4 Be prepared, be safe. 5 Getting the lights back on. 6 Damage to your home s service connection
Storm Ready Prep and Safety Power Restoration Your Service Connection Generator Safety Power Outage Map Stay Connected with Gulf Power Storm Ready 3 Gulf Power Ready for the storm 4 Be prepared, be safe
AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA)
AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA) Site Biography Market Area: San Diego, CA Location: San Diego, CA 92121 Address: 5732 Pacific Center Blvd CLLI,POP, NPA/NXX Code:
South Asia s First Uptime Institute Certified TIER-IV IDC in Mumbai delivering 99.999% guaranteed uptime
South Asia s First Uptime Institute Certified TIER-IV IDC in Mumbai delivering 99.999% guaranteed uptime GPX India Pvt Ltd The Leader In Carrier Neutral TIER IV IDC s In Emerging Markets Incorporated in
Challenges of Building Highly Efficient and Available Data Centres in City Centres. Vello Ehvert, P.Eng, LEED A.P President, Ehvert Engineering
Challenges of Building Highly Efficient and Available Data Centres in City Centres Vello Ehvert, P.Eng, LEED A.P President, Ehvert Engineering Vs. Industry Challenges Possible Solutions Overview High demand
Section 9 Major Urban Fire
Section 9 Major Urban Fire Table of Contents WHY MAJOR URBAN FIRES ARE A THREAT...9-2 HAZARD PROFILE...9-3 HISTORY OF MAJOR URBAN FIRES...9-4 POTENTIAL DAMAGES AND LOSSES...9-5 MAJOR URBAN FIRE MITIGATION
Maintaining Fire Protection Systems
Maintaining Fire Protection Systems Fire continues to be a major threat to your business and your personal safety. Each year several thousand people are injured or killed by fires and billions of dollars
BASEMENT FLOODING. Prevention Guide for. Homeowners
BASEMENT FLOODING Prevention Guide for Homeowners 1 Did You Know? Floods are the most common hazards in Canada. Water damage is a common cause of loss for homeowner insurance. A heavy rainfall can result
SECTION THREE CONSTRUCTION CODES
SECTION THREE CONSTRUCTION CODES CHAPTER 36: Construction Codes in Michigan Purpose and Applicability of Regulations Manufacturing facilities and other businesses must be designed according to code in
All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.
2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other
contractors, etc. and establish relationships with lease and rental companies.
The following may serve as a checklist when preparing for a Tropical Storm or Hurricane. Although Tornadoes usually provide little advance warning, locations subject to Tornadoes may apply much of the
AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA)
AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA) Site Biography Market Area: Washington, DC Area Location: Ashburn, VA 20147-6011 Address: All deliveries should be sent to
Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal
Ontario Fire Code SECTION 5.13 DIP TANKS Illustrated Commentary Office of the Ontario Fire Marshal Dip Tanks Illustrated Commentary 1 5.13.1. Location 5.13.1.1. Dip tank operations involving flammable
MISSION CRITICAL FACILITIES DESIGN UPS BATTERY ROOM ENVIRONMENT CRITICAL DESIGN CONSIDERATIONS
MISSION CRITICAL FACILITIES DESIGN UPS BATTERY ROOM ENVIRONMENT CRITICAL DESIGN CONSIDERATIONS Allen Wood Vice President Data Center Division Engineering Design Group INTRODUCTION It can be very effectively
Oracle Maps Cloud Service Enterprise Hosting and Delivery Policies Effective Date: October 1, 2015 Version 1.0
Oracle Maps Cloud Service Enterprise Hosting and Delivery Policies Effective Date: October 1, 2015 Version 1.0 Unless otherwise stated, these Oracle Maps Cloud Service Enterprise Hosting and Delivery Policies
Disaster Recovery Best Practices & Lessons Learned
Disaster Recovery Best Practices & Lessons Learned Paul Sullivan, VP & General Manager Agility Recovery For Audio: (1) Listen through PC speakers, OR (2) Dial 609 318 0024 and use access code 342 984 630
A cure for water damage in real estate
A cure for water damage in real estate Presented for BC Non-Profit Housing Association by Jeff Shearman, Zurich Services Corporation 2010 Zurich Canada Focused on our customer Reduce overall risk by reducing:
WATER SUPPLY SYSTEMS FOR 150/5220-4B AAS-100 AIRCRAFT FIRE AND RESCUE PROTECTION
WATER SUPPLY SYSTEMS FOR 150/5220-4B AAS-100 AIRCRAFT FIRE AND RESCUE PROTECTION 1. PURPOSE. This Advisory Circular (AC) provides guidance for the selection of a water source and standards for the design
Data Centres A complete solution to noise control and acoustic packages
Data Centres A complete solution to noise control and acoustic packages Introduction World class noise control. Expertise you can trust. IAC Acoustics is world-renowned for providing cost effective solutions
FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST
FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST Date of Inspection: Conducted by: Location: Reviewed by: Date of Review: Comments or additional corrective action taken as a result
VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES
VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES SEWER BACK-UP POLICY General Sewer back-ups are an unfortunate, but common problem in older communities. A sewer back-up can create a health or
21.1 Functions, Basic Configuration, and Interfaces
21 (6.2.M) Site Services Building 21.1 Functions, Basic Configuration, and Interfaces 21.1.1 Functions The primary functions performed by the site services building are to house, support, provide a suitable
HVAC Checklist - Long Form
HVAC Checklist - Long Form Page 1 of 14 Appendix B discusses HVAC system components in relation to indoor air quality. utside Air Intake Location pen during occupied hours? Unobstructed? Standing water,
Disaster Ready. By: Katie Tucker, Sales Representative, Rolyn Companies, Inc
By: Katie Tucker, Sales Representative, Rolyn Companies, Inc Are you and your facility disaster ready? As reported by the Red Cross, as many as 40 percent of small businesses do not reopen after a major
Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone: 0041 22 77 66 051 [email protected]
CARDOK CARLIFT Fast access to underground garages Fast, Silent, Discreet, Design, High-Tech Installation to replace an access ramp on private property Dimensions: (Built to measure, all dimensions can
Home Repair/ Minor Modification and Pest Control Specifications 2015
Home Repair/ Minor Modification and Pest Control Specifications 2015 SourcePoint Home Repair/ Minor Modification and Pest Control Specifications 1.0 Definition Minor home modification, maintenance and
ALBERTA FIRE CODE SAFETY EQUIPMENT MAINTENANCE REQUIREMENTS
ALBERTA FIRE CODE SAFETY EQUIPMENT MAINTENANCE REQUIREMENTS In this document are the fire safety equipment maintenance requirements that are found in Division B of the Alberta Fire Code (AFC 2006) for
Child Care Emergency Preparedness Training. Participant Manual
Child Care Emergency Preparedness Training Participant Manual Contents Introduction.... 5 Description.... 6 Goal.... 6 Objectives.... 6 Audience... 7 Prerequisite.... 7 Accompanying Materials...........................................................
Chapter 5: Property Protection
Chapter 5: Property Protection Property protection measures are used to protect property that is in danger from damage caused by natural hazards. Property owners are responsible for implementing protective
County of San Diego, Planning & Development Services SECOND DWELLING UNIT
County of San Diego, Planning & Development Services ZONING DIVISION The Zoning Ordinance, Section 6156.x, allows the addition of a second dwelling unit to those properties zoned to allow the Family Residential
Planned, Limited Notice and Emergency Outage Guidelines
Applies to: All Facilities Management Employees GUIDELINES: Issued: April 22, 2014 Revised: February 24, 2015 Author: Communications Coordinator PURPOSE: The purpose of these guidelines is to define roles
Reducing Flood Risk to Residential Buildings That Cannot Be Elevated
Reducing Flood Risk to Residential Buildings That Cannot Be Elevated FEMA P-1037 / September 2015 Elevated utility readable from standing height ~6.5' above grade Basement infill with gravel Approximate
Jefferson Parish Department of Water Emergency Plan
1. Overview Jefferson Parish Department of Water Emergency Plan 1.1. Purpose The purpose of this document is to establish procedures for the Department of Water during natural disasters or terrorist acts.
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) 1. In addition to the information scheduled below, the pre-tender designer is responsible for: (i)
Disaster Preparedness: Are You Ready? District of Columbia Homeland Security and Emergency Management Agency
State Department Office of Foreign Missions Annual Emergency Preparedness Seminar For Embassy Personnel Disaster Preparedness: Are You Ready? District of Columbia Homeland Security and Emergency Management
Factory owners must ensure the boiler is:
Factory owners must ensure the boiler is: * Registered with the Boilers and Pressure Vessels Division, Labour Department * Examined by an appointed examiner and has a valid certificate of fitness * Supervised
1. Site plans assist the Fire Department to determine where a potential spill can be contained. The detailed site plan shall include the following:
Secondary Containment, Spill Control and Drainage Guidelines for Hazardous Materials per 2010 CFC PURPOSE The intent of this guideline is to provide the requirements for the design and construction of
LEVEL 3 DATA CENTER SERVICES IN OMAHA, NEBRASKA HIGH AVAILABILITY ENTERPRISE COMPUTING BUSINESS DEMANDS IT. LEVEL 3 DELIVERS IT.
LEVEL 3 DATA CENTER SERVICES IN OMAHA, NEBRASKA HIGH AVAILABILITY ENTERPRISE COMPUTING BUSINESS DEMANDS IT. LEVEL 3 DELIVERS IT. THE SCALE TO SUPPORT GLOBAL ENTERPRISE IT Designed and equipped to meet
Selecting a Hosting Provider 7 Criteria that MUST Be Evaluated
Selecting a Hosting Provider 7 Criteria that MUST Be Evaluated A white paper presented by Enterprise Hosting What Every IT Executive and CEO Needs to Know Enterprise Hosting http://www.enterprisehostinginc.com
The State Fire Marshal's Office and the VDH/Office of Licensure and Certification. Generator Testing in Nursing Facilities
Generator Testing in Nursing Facilities Introduction Recent emergencies and natural disasters have emphasized the need to ensure that nursing facilities have an adequate EPSS in place should the loss of
Building a Tier 4 Data Center on a Tier 1 Budget
Building a Tier 4 Data Center on a Tier 1 Budget A Walk Through of TIA-942 Peter P. Charland III, RCDD/NTS/WD, CET RTKL Associates Inc. March 27, 2008 BICSI South Central Region Meeting Denver, CO TIA-942
RESIDENTIAL HEATING OIL SERVICE CONTRACT ANNUAL COST $276.00
RESIDENTIAL HEATING OIL SERVICE CONTRACT This service contract covers all routine service and maintenance of your residential oil fired furnace or boiler. In addition this contract covers all service calls
EXETER TOWNSHIP DRY OR WET CHEMICAL FIRE SUPPRESSION SYSTEMS
DRY OR WET CHEMICAL FIRE SUPPRESSION SYSTEMS POLICY STATEMENT This policy applies to NEW Dry or Wet chemical fire suppression systems. The Authority Having Jurisdiction will not waive major criteria in
CONTROL OF LEGIONELLA AUDIT PROFORMA
CONTROL OF LEGIONELLA AUDIT PROFORMA This document is an audit sheet designed to assist persons in control of cooling systems which incorporate cooling towers or evaporative condensers, to assess their
Upgrading the PRS datacentres: space requirement. S. S. Mathur, GM-IT, CRIS
Upgrading the PRS datacentres: space requirement S. S. Mathur, GM-IT, CRIS PRS / UTS scenario: then and now Year 2000 PRS: 600 locations UTS: 0 locations Year 2008 PRS 1600 locations E-ticketing Passengers
Chapter 4 Natural Hazards and Emergency Management
Chapter 4 Natural Hazards and Emergency Management Chapter 4 Natural Hazards and Emergency Management 1.0 NATURAL HAZARDS Littleton has a relatively low risk from natural hazards. The most likely natural
SEWER BACKUP PREVENTION PROGRAM
SEWER BACKUP PREVENTION PROGRAM PROGRAM DESCRIPTION The Village will provide partial funding for a Village approved overhead sewer, backflow prevention device and/or related equipment to single-family
Power Problems? Let Us Know!
Power Problems? Let Us Know! Power Problems? Contact Us! by phone: 1-800-75-CONED, 1-800-752-6633 through the Web: www.coned.com If you have power problems, please contact us right away Con Edison is committed
Control filling, grading, dredging, and other development which may increase erosion or flood damage; and
ARTICLE 16. FLOOD DAMAGE PREVENTION Section 16-1: Findings of Fact The flood hazard areas of the Town of Lillington are subject to periodic inundation which results in loss of life and property, health
CASS COUNTY COMMISSION POLICY MANUAL 38.07 ADOPTED DATE: FEBRUARY 2, 1998 PAGE 1 OF 9
CASS COUNTY COMMISSION POLICY MANUAL 38.07 SUBJECT: ORDINANCE #1998-2 (FLOOD DAMAGE PREVENTION) ADOPTED DATE: FEBRUARY 2, 1998 PAGE 1 OF 9 NORTH DAKOTA COUNTY OF CASS ORDINANCE #1998-2 Be it ordained and
Emergency Plan. This emergency plan provides a format of data essential in an emergency situation.
Emergency Plan A. Introduction This emergency plan provides a format of data essential in an emergency situation. B. Definition of Emergency Incident An emergency condition exists when we determine that
AT&T Internet Data Center Site Specification Dallas Area (Allen, Tx)
AT&T Internet Data Center Site Specification Dallas Area (Allen, Tx) Site Biography Market Area: Dallas and Fort Worth Areas of Texas Location: Allen, Tx 75013 Address: 900 Ventura Drive CLLI, POP, NPA/NXX
DRAFT Guidelines for Manually Diverting Outdoor Wastewater to the Sanitary Sewer
Only RAIN down the Storm Drain... DRAFT Guidelines for Manually Diverting Outdoor Wastewater to the Sanitary Sewer This publication applies to you if: You generate wastewater outdoors, and The wastewater
FIRE ALARM /FIRE PROTECTION OUTAGE/IMPAIRMENT RESPONSE GUIDELINE
Page 1 of 10 FIRE ALARM /FIRE PROTECTION OUTAGE/IMPAIRMENT RESPONSE GUIDELINE SYSTEM TESTING 1. Testing of the Fire Alarm and Fire Protection Systems 1.1. The Building Engineer, Electrician, Plumber (or
Power Quality. Uninterruptible Power Supply
Quality Uninterruptible Supply In the electrical system environment, power disturbances will occur. These can be caused by faults on the distribution system, the operation of nearby equipment, lightning
Challenges. Estimated Damages from 100-Year Flood
Suffield Suffield is a rural community located along the Massachusetts border. It encompasses about 42.2 square miles and has a population of about 15,735. Suffield s terrain rises from an elevation of
Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,
4658.4500 PLUMBING SYSTEMS; NEW CONSTRUCTION. Subpart 1. Installation. All plumbing systems must be installed and tested according to this chapter and chapter 4715, the Minnesota Plumbing Code. Subp. 2.