1 Challenges of Building Highly Efficient and Available Data Centres in City Centres Vello Ehvert, P.Eng, LEED A.P President, Ehvert Engineering
2 Vs. Industry Challenges Possible Solutions
3 Overview High demand for data centers close to the population Increased requirement for Mission Critical Facilities in cities This session will focus on: 1) Challenges faced with building data centers. 2) Possible solutions based on real life examples.
4 Agenda 1. Why build data centres in city centres? 2. Industry challenges & possible solutions: 3. Hoisting i. Architectural ii. Electrical iii. Mechanical iv. Fuel Systems v. Fire Suppression vi. Other
5 1. Why Build Data Centres in City Centres? 1. Latency 2. Existing Infrastructure 3. Proximity to Staff
6 Differences Greenfield vs. City Build Standard Data Centre Build Greenfield or Single Story Simple Structural Solution Unlimited space for electrical and mechanical systems No riser issues Easy to hoist equipment Easy to dissipate heat Downtown Data Centre Build Multi story difficult access Structure not rated for industrial use Limited space for electrical and mechanical systems Limited riser capacity Difficult to hoist equipment Insufficient space for heat dissipation
7 I. Architectural Challenges Commercial Buildings are not designed for industrial applications Working in spaces with multiple tenants Transportation of equipment throughout building Security Structural Commercial Buildings are not built to accommodate data centre structural loads Consider Steel and New Materials Reconsider the weight of your equipment Access Limited access to spaces based on available loading dock and elevators Work hour restriction
8 Example A:
9
10 Issue II. Electrical Challenges Solution Generator Location Negotiate for roof space or locate in adjacent building
11 II. Electrical Challenges Issue Limited Incoming Capacity Issue Riser Capacity Issue Environmental Issues Solution Negotiate with Local PUC Solution Use stairwells, Elevator shafts, etc. Solution Perform Environmental Analysis
12 III. Mechanical Challenges Location for Cooling Towers, Chillers and Air Handlers Issue Heat Dissipation Look at Old Chillers that have been replaced Solution Consider Water vs. Air Side Economizers Consider Return to Return solutions
13 Before After
14 IV. Fuel System Challenges Issue: Local Authorities TSSA Welded Riser Tank Size Fire Separation Solution: Consider Variance Application Consider Containment Look at new piping alternatives Size Day tank accordingly Consider drywall, versus block solutions
15
16 V. Fire Suppression Consider existing systems Examine need for inert gas systems Consider recharging costs Look at VESDA options Consider challenges with traditional codes
17 Tools Lighting Modeling and Calculations using Visual Short Circuit Studies and Single Line Design
18 Computational Fluid Dynamic (CFD) Analysis
19 Computational Fluid Dynamic (CFD) Analysis
20 ICE: Computer Modeling
21 3. Hoisting and Structural Challenges Issue: Commercial Buildings are not built to accommodate data centre structural loads Restricting street access of high traffic areas for hoisting of equipment Solution: Consider new materials vs. steel Reconsider weight of your equipment Look at alternative hoisting options
22
23
24 Ehvert Helicopter Promotion Video
25 Thank You! Questions?
26 Vello Ehvert, P.Eng., LEED AP President, Ehvert Engineering 200 Adelaide Street West Suite 201 Toronto, Ontario, M5H 1W7 Tel: Fax: Web:
ENTRY FORM. DVASE 2013 Excellence in Structural Engineering Awards Program
ENTRY FORM DVASE 2013 Excellence in Structural Engineering Awards Program PROJECT CATEGORY (check one): Buildings under $2M Buildings Over $100M Buildings $2M-$10M Other Structures Under $5M Buildings
100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G
100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G The Opportunity Jones Lang LaSalle, Inc. (the Broker ) is please to offer the fee simple interest in 100 Locust Avenue (the
CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0.
Innovation Park Charlotte. NC 28262 DRAFT V0.1 Page 2 CyberFortress Data Center at Innovation Park BECO South purchased Innovation Park in March 2010 and immediately launched a dramatic top-to-bottom $30M
Insourcing vs. Outsourcing. Bart Leung Senior Associate, Ehvert Mission Critical
Insourcing vs. Outsourcing Bart Leung Senior Associate, Ehvert Mission Critical 1 Agenda Ehvert Mission Critical Data Centres Then and Now Power & Cooling Considerations Costs Making the Choice 2 History
Datacenter Site Selection Checklist
Checklist Use this checklist to aid in the process of selecting a new site for the data center. When visiting potential building sites, print the checklist off and take it along to record impressions and
Mechanical Systems Proposal revised
Mechanical Systems Proposal revised Prepared for: Dr. William Bahnfleth, Professor The Pennsylvania State University, Department of Architectural Engineering Prepared by: Chris Nicolais Mechanical Option
san francisco//usa data center specifications tel: +61 2 9948 8888 fax: +61 2 9948 1111 internet + intellectual property + intelligence
internet + intellectual property + intelligence We thank you for the opportunity to work with you regarding your colocation needs in San Francisco, USA. We can colocate standard rack-mountable servers
Data Centre Barrie, Ontario
COGECO DATA SERVICES DATA CENTRE Data Centre Barrie, Ontario Cogeco Data Services offers flexible, secure, connected and fully managed ICT solutions at its Flagship Data Centre in Barrie, Ontario Data
AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA)
AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA) Site Biography Market Area: Washington, DC Area Location: Ashburn, VA 20147-6011 Address: All deliveries should be sent to
Strategic Data Centre Site Profiles Data Centre Co-Location London North
Strategic Data Centre Site Profiles Data Centre Co-Location London North Document details Version: 1 Last Updated: 12/07/2013 Version 1.0 Page 1 of 6 Contents 1. LONDON NORTH...3 1.1 LOCATION...3 1.2 TECHNICAL
Solar Cooling. Methods and Applications. Sargon Ishaya, PE, LEED AP
Solar Cooling Methods and Applications Sargon Ishaya, PE, LEED AP Objectives Describe two practical methods for solar cooling Give air conditioning engineers the confidence to offer customers a mechanical
DATA CENTER ASSESSMENT SERVICES
DATA CENTER ASSESSMENT SERVICES ig2 Group Inc. is a Data Center Science Company which provides solutions that can help organizations automatically optimize their Data Center performance, from assets to
AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL)
AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL) Site Biography Market Area: Chicago, IL Location: Lisle, IL 60532 Address: 4513 Western Avenue CLLI,POP, NPA/NXX Code: LSLEILAA, EQLAILAA
SYSTRUST CERTIFICATION REPORT FOR COLLOCATION AND DATA CENTER HOSTING SERVICES FOR THE PERIOD FROM JANUARY 1, 2013 TO DECEMBER 31, 2013
SYSTRUST CERTIFICATION REPORT FOR COLLOCATION AND DATA CENTER HOSTING SERVICES FOR THE PERIOD FROM JANUARY 1, 2013 TO DECEMBER 31, 2013 TABLE OF CONTENTS SECTION I: INDEPENDENT PRACTITIONERS TRUST SERVICES
POLK STATE COLLEGE CHILLER PLANT EVALUATION WINTER HAVEN, FLORIDA APRIL 2, 2014. C arastro & A ssociates, C&A# 5747
POLK STATE COLLEGE WINTER HAVEN, FLORIDA CHILLER PLANT EVALUATION APRIL 2, 2014 C&A# 5747 C arastro & A ssociates, c o n s u l t i n g e n g i n e e r s inc. 2609 W. De Leon Street, Tampa, Florida 33609
Saint Cloud Business Center
Saint Cloud Business Center 14 7th Avenue North Saint Cloud, MN 56303 For Sale Located on 7th Avenue in the heart of downtown across from the Court House Square. A large professional reception area with
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) 1. In addition to the information scheduled below, the pre-tender designer is responsible for: (i)
Scalable. Affordable. Flexible. Fast.
Modular Data Center Solutions Scalable. Affordable. Flexible. Fast. Build the data center you need today with the flexibility to meet tomorrow s challenges The only constant in business is change. Fluctuations
Fire Alarm Engineering Best Practices. CFAA NCA Technical Seminar 2014
Fire Alarm Engineering Best Practices CFAA NCA Technical Seminar 2014 2 Overview Code Compliance Equipment Selection and Layout Drawings, Specifications Commissioning and Acceptance Miscellaneous Goals
Data Centers in Hong Kong Powering business success
Data Center Data Centers in Hong Kong Powering business success NTT Com Asia DATA CENTERS IN HONG KONG INDUSTRY-LEADING DATA CENTER SERVICES WITH GLOBAL FOOTPRINTS. NTT Communications offers data center
Data Center Build vs. Buy
2014 Data Center Build vs. Buy More information available on our website: /page/whitepapers Data Center Build vs. Buy 2014 When considering colocating your data center, first you must understand your technical
Data Centre Infrastructure
Data Centre Infrastructure LONDON DATA CENTRE Our data centre is located within the heart of Europe s centre of global finance London s Square Mile. The centre offers a combined net capacity of 1,520 m²
Case study; A sustainable Green Data Centre, fact or fiction?
Case study; A sustainable Green Data Centre, fact or fiction? Brian O Hora, BSc MBA MPM Networks & Infrastructure Manager Information Systems Services, Trinity College Dublin 200 Pearse Street Single UPS,
SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP
research journal 2013 / VOL 05.01 www.perkinswill.com SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP ARCHITECTURE AND ENGINEERING OF SUSTAINABLE BUILDINGS Current Trends in Low-Energy HVAC Design
Pacnet Hong Kong CloudSpace2 Technical Specifications. Upholding the Principles of Efficiency and Sustainability in Data Center Design
POWERING A CONNECTED ASIA Pacnet Hong Kong CloudSpace2 Technical Specifications Upholding the Principles of Efficiency and Sustainability in Data Center Design Our purpose-built, 5,000 m 2 Pacnet Hong
4 Alternatives and Design Evolution
4 Introduction 4.1 This Chapter describes the considerations and constraints influencing the siting, layout and massing of the Development. It also describes the main alternatives to the Development that
Building Permit Application
Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: PHONE: PHONE: ARCHITECT/ENGINEER
Topics for Today. Order of Magnitude Mechanical Estimating. Order of Magnitude Estimate Goal. Project Delivery Methods. Questions for Client
Order of Magnitude Mechanical Estimating Justin Apprill, P.E. Topics for Today Estimate Goals A Concept for Accurate Conceptual Estimating HVAC Systems Common System Types and Rules of Thumb Pricing Example
Direct Inspections - Tel: (941) 251-1000 - [email protected] - www.directinspections.com
Date of inspection: Jun 29, 2015 Property s Address: 123 Oak Street Property s City, State, Zip Code: SARASOTA, FL 34237 Type of home: single family Type of construction: masonry Type of foundation: slab
NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004
School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 0004 Time In Last Edited 255 MECHANICAL 205-05-8 09:00AM
NORTHERN VIRGINIA ONE (NoVa) DATA CENTER OVERVIEW
VAZATA 9651 Hornbaker Road Manassas, VA 20109 VAZATA.COM VAZATA's NoVa One data center located at 9651 Hornbaker Road in Manassas, Virginia is engineered from the ground up to deliver highly reliable and
AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ)
AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ) Site Biography Market Area: Phoenix, Mesa, Tempe, Chandler, Scottsdale, AZ Location: Mesa, AZ 85201 Address: 1301 University Blvd.
city of edmonds development information
#B17 city of edmonds development information Commercial Kitchen Hood & Hood Fire Suppression System Permit Submittal Requirements PERMIT REQUIRED: CODES: FEES: A Commercial Kitchen Hood Mechanical Permit
HKEx Hosting Services
HKEx Hosting Services The cover illustrates an ecosystem where HKEx Exchange Participants as well as Technology and Communications providers are able to interact. In addition, HKEx s Next Generation Data
19 Site Location, Design and Attributes. Site Location, Design and Attributes
1 Site Location, Design and Attributes The Primary Data Center shall be physically located on Oahu, Hawaii. 2 Site Location, Design and Attributes The Primary Data Center shall be located at least 1 mile
ENERGY EFFICIENCY EXPERTS. MCW's. Environmental Record. Green Design REDUCING OUR CLIENTS' ENVIRONMENTAL FOOTPRINT
ENERGY EFFICIENCY EXPERTS MCW's Environmental Record Green Design ENERGY EFFICIENCY EXPERTS Green Design The MCW Group of Companies have created the largest block of verified carbon emissions savings of
Experience Matters...
Experience Matters... Travelport Data Center offers confidence and space to meet your demanding IT needs Transwestern presents the Travelport Data Center in Denver, Colorado totaling 267,000 SF with 121,600
How To Design An Hvac Design For A Stick Built Home
LEGALETT HVAC DESIGN FEE SCHEDULE (revised April 17, 2012) Background In the past Legalett has simply supplied warm floors for comfortable living. However, 2012 Building Code changes in Ontario make it
One of the many issues facing cities, towns and campuses throughout. Making Connections in Miami: Cover Story
Cover Story Making Connections in Miami: County improves plants, integrates cooling loops One of the many issues facing cities, towns and campuses throughout North America is the challenge of replacing
ENERGY STAR Data Verification Checklist
ENERGY STAR Data Verification Checklist 86 ENERGY STAR Score 1 Sample Property Primary Function: Office Gross Floor Area (ft²): 200,000 Built: 1980 For Year Ending: 04/30/2013 Date Generated: 06/28/2013
Data Center Infrastructure & Managed Services Outline
Data Center Infrastructure & Managed Services Outline The 360 Technology Center Solutions Data Center is located in Lombard, IL, USA. We are 20 minutes outside of downtown Chicago. The 360TCS staff consists
LEVEL 3 DATA CENTER SERVICES IN OMAHA, NEBRASKA HIGH AVAILABILITY ENTERPRISE COMPUTING BUSINESS DEMANDS IT. LEVEL 3 DELIVERS IT.
LEVEL 3 DATA CENTER SERVICES IN OMAHA, NEBRASKA HIGH AVAILABILITY ENTERPRISE COMPUTING BUSINESS DEMANDS IT. LEVEL 3 DELIVERS IT. THE SCALE TO SUPPORT GLOBAL ENTERPRISE IT Designed and equipped to meet
Contents Error! Bookmark not defined. Error! Bookmark not defined. Error! Bookmark not defined.
We Do It Better. Contents Introduction...3 Service and Support...3 Data Center Details...4 Security...4 Location...4 Power...4 Humidification...5 AC...5 Cooling...6 Datacenter Features...6 SAS 70...6 PCI
POWERING A CONNECTED ASIA. Pacnet Hong Kong CloudSpace1 Technical Specifications. Asia s Pioneering Facility with Direct Subsea Cable Access
POWERING A CONNECTED ASIA Pacnet Hong Kong CloudSpace1 Technical Specifications Asia s Pioneering Facility with Direct Subsea Cable Access Our purpose-built, 300 m 2 Pacnet Hong Kong CloudSpace1 (HKCS1)
COOK PHYSICAL SCIENCE BUILDING RENOVATIONS. Engineering & Architectural Services CONCEPT DESIGN MAY 11, 2012. BVH Project No.
COOK PHYSICAL SCIENCE BUILDING RENOVATIONS Civil Structural Mechanical Electrical Technology Engineering & Architectural Services CONCEPT DESIGN Commissioning 50 Griffin Road South Bloomfield, CT 06002
MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS
MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS 01. SAFETY INSPECTION of service equipment at FPL Power Source 02. Construction GFI power outlets (Temp Pole for Construction) 03. 90 day temporary power
2009 Seattle Energy Code Impacts: See below for a recap of Changes in Envelope performance from 2006 to 2009
2009 Seattle Energy Code Impacts: Building Envelope Impacts: Below is a Summary of Changes that impact building envelope construction planned for 624 Yale. There are several modifications are required
NEW JERSEY CENTER OF EXCELLENCE
Overview NEW JERSEY Page 1 The Plant (CUP) provides electricity via a cogeneration system, chilled water for environmental cooling, steam for heating, and compressed air primarily for HVAC control Serves
Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems
Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems If you're a designer or a BCA, this guidance on the energy efficiency of HVAC systems in commercial buildings may
COLOCATION PROVIDERS:
COLOCATION PROVIDERS: INTRO The benefits of colocation are well documented, and making the business case for going that route is often quite easy for many organizations. Once the decision has been made
Gas Fired Water Heater Installation
Michigan Department of Energy, Labor & Economic Growth Bureau of Construction Codes P.O. Box 30254 Lansing, Michigan 48909 (517) 241-9302 Bureau of Construction Codes Technical Bulletin Publication Number
In the compression-refrigeration loop (air conditioning), which is likely to be warmer? 1. Condenser coil 2. Evaporator coil
In the compression-refrigeration loop (air conditioning), which is likely to be warmer? 1. Condenser coil 2. Evaporator coil Answer: (1) Condenser coil See the video. A.R.E. Building Systems Study Guide
Chicago 1 (CHI-1) Data Center
215 W. Ohio St. 5th Floor Chicago, IL 60564 Call Us Toll-Free 1 (866) 817-2811 Follow Us @SingleHop Like Us facebook.com/singlehop Chicago 1 (CHI-1) Data Center Enterprise-Class, Downtown Chicago Facility
AT&T Internet Data Center Site Specification New York III (Secaucus, NJ)
AT&T Internet Data Center Site Specification New York III (Secaucus, NJ) Site Biography Market Area: New York City, New Jersey, Upstate NY and Lower Connecticut Location: Secaucus, NJ 07094 Address: 15
Anchin Real Estate Services Group
Anchin Real Estate Services Group What is a Capital Expenditure? Marc Wieder, CPA Partner Anchin, Block & Anchin LLP Accountants & Advisors What is a Capital Expenditure? Part 1 The IRS published important
George Brown College REPORT TO NETAC ON HUMAN RESOURCE MATTERS (May 2011) NETAC May 2011 Report from George Brown College - Associate Participant
George Brown College REPORT TO NETAC ON HUMAN RESOURCE MATTERS (May 2011) Contact Persons: John Wills Director, Center for Construction and Engineering Technologies Clint Kissoon (Chair) School of Construction
KIEWIT CM/GC Enabling/Utilities
South Terminal Redevelopment Program KIEWIT CM/GC Enabling/Utilities Contract Value $50 million M/WBE Goal 20 percent Contact John Todd, LEED AP Project Manager 303.930.9046 [email protected] General
COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES
COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES These guidelines are to be used for ALL commercial cooking hoods, ventilation systems and related fire suppression
Data Realty Colocation Data Center Ignition Park, South Bend, IN. Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures
Data Realty Colocation Data Center Ignition Park, South Bend, IN Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures Project Overview Data Realty is a data center service provider for middle
Comprehensive Solutions for Data Centers. Rely on Siemens for maximum uptime, reliability, and efficiency. www.usa.siemens.
Comprehensive Solutions for Data Centers Rely on Siemens for maximum uptime, reliability, and efficiency. www.usa.siemens.com/datacenters Siemens can meet the demands of your mission critical facility.
COMMODITIZING THE DATACENTER. Exploring the Impacts of the Shift to Virtualization and Cloud Computing
COMMODITIZING THE DATACENTER Exploring the Impacts of the Shift to Virtualization and Cloud Computing 3/5/2015 AGENDA Changing Environments What Is The Datacenter Why Do We Use Them Adapting To A Changing
This 5 days training Course focuses on Best Practice Data Centre Design, Operation and Management leading to BICSI credits.
This 5 days training Course focuses on Best Practice Data Centre Design, Operation and Management leading to BICSI credits. DCD, DCOM, DCE DESIGN IMPLEMENTATION BEST PRACTICE OPERATION & MANAGEMENT DATA
Water cooled chiller plant (cp/vs)
Data Center Water cooled chiller plant (cp/vs) Design Envelope File No: 9.573 Date: december 16, 2014 Supersedes: 9.573 Date: november 14, 2014 design envelope s performance improvements are among the
What the OHS Act says about the training responsibilities of constructors, employers, and supervisors
REQUIRED Pull-out chart TRAINING Construction Health and Safety in Ontario The Occupational Health and Safety Act (OHS Act) requires constructors and employers to provide worker training. Specific requirements
DATA CENTERS. VAZATA Headquarters: 6900 Dallas Parkway, Suite 800 Plano, TX 75024 VAZATA.COM
DATA CENTERS VAZATA Headquarters: 6900 Dallas Parkway, Suite 800 Plano, TX 75024 VAZATA.COM OVERVIEW VAZATA's NoVa One data center located at 9651 Hornbaker Road in Manassas, Virginia is engineered from
Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia
Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia Prepared for the U.S. Department of Energy s Federal Energy Management Program
Only a matter of power supply and air conditioning? Joachim Faulhaber TÜV Informationstechnik GmbH
Data Center Availability Only a matter of power supply and air conditioning? Joachim Faulhaber TÜV Informationstechnik GmbH Agenda Security Assessment Uptime Approach Risks and Threats Availability Principles
1475 Peachtree Street NE
UP TO 46,102 RSF FOR LEASE > OFFICE SPACE > MIDTOWN Space Overview > Class A 235,314 RSF office building in the heart of midtown > Built in 1986 and renovated in 2012 > Excellent location with 2-turn access
Venema Advies Nigeria Limited West Africa Data Center Limited. Datacenter Sustainability
Venema Advies Nigeria Limited West Africa Data Center Limited Datacenter Sustainability Lord of War What if I have AIDS? Don't you worry? You worry too much! Why do you worry about something that can kill
Portland s Financial District. Overview FOR SALE RETAIL/OFFICE BUILDING 6-8 CITY CENTER, PORTLAND, MAINE
FOR SALE RETAIL/OFFICE BUILDING Portland s Financial District Overview 6-8 City Center is a well know 4-story retail and office building with a mix of granite and brick architecture and interesting interior
How To Visit An Internet Data Center
AT&T Internet Data Center Site Specification Atlanta Area (Lithia Springs, GA) Site Biography Market Area: Atlanta and surrounding areas (Georgia, Alabama, Tennessee, Florida, North and South Carolina
Location. Central Business District. Ataturk Airport IFC. Sabiha Gökçen Airport
Welcome Zenium Istanbul One provides 12,000 square metres of high specification technical space across three purpose-built data centers. It is Turkey s first wholesale data center offering; the data halls
21.1 Functions, Basic Configuration, and Interfaces
21 (6.2.M) Site Services Building 21.1 Functions, Basic Configuration, and Interfaces 21.1.1 Functions The primary functions performed by the site services building are to house, support, provide a suitable
Strategic Data Centre Site Profiles. Data Centre Co-Location London East
Strategic Data Centre Site Profiles Data Centre Co-Location London East Document details Version: 1 Last Updated: 12/07/2013 Version 1.0 Page 1 of 5 Contents 1. LONDON EAST...3 1.1 LOCATION...3 1.2 TECHNICAL
About Injazat. Enterprise Cloud Services. Premier Data Center. IT Outsourcing. Learning and Development Services. Enterprise Application Services
About Injazat Injazat Data Systems is an industry-recognized market leader in the region for Information Technology Outsourcing, Cloud and Data Center Managed Services delivered from the region s 1st Tier
Data Center CH1. Elk Grove Village, IL
Data Center CH1 Elk Grove Village, IL powerful/ efficient /reliable solutions > Data Center CH1 ABOUT DUPONT FABROS TECHOLOGY (DFT) DFT is a leading owner, developer, operator and manager of wholesale
Building Code Clarifications - 7. Fire Resistance
Building Code Clarifications - 7. Fire Resistance 7.1 (15-12-030) Use of combustibles in Type III construction roof assemblies Code Section (15-12-030) Use of Combustibles was revised on May 17, 2000,
enercase Multi-Family Apartment Building Heating Control System
BUSINESS enercase Multi-Family Apartment Building Heating Control System What s no longer flying out your windows? Wasted heat and energy dollars enercase Multi-Family Apartment Building Heating Control
Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study
Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study Robert C. Burns, AIA, LEED AP Principal Director of Historic Architecture 804. 648. 5040, ext. 1107
MECHANICAL TRADE SCOPE OF WORK GUIDELINES
MECHANICAL TRADE SCOPE OF WORK GUIDELINES OTTAWA REGION 2009 Comprised of Piping Trade, Ventilation (HVAC) Trade, Fire Protection Trade Endorsed by the following organizations Ottawa Construction Association
Location Amenities HVAC Parking Technology Security and Life Safety Elevators Ownership and Management
MA A RR KK EE T T TOWER M R Location Market Tower is centrally located adjacent to Monument Circle in the heart of the Indianapolis Central Business District. Situated within a block of the State Capitol
PAYGO for Data Center -- Modular Infrastructure
PAYGO for Data Center -- Modular Infrastructure Introduction The infrastructure costs for Data Centers are increasing at a significant pace. Construction costs and their environmental impact are also soaring.
Specialty Environment Design Mission Critical Facilities
Brian M. Medina PE Associate Brett M. Griffin PE, LEED AP Vice President Environmental Systems Design, Inc. Mission Critical Facilities Specialty Environment Design Mission Critical Facilities March 25,
How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions
Intel Intelligent Power Management Intel How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions Power and cooling savings through the use of Intel
2.4 Hardcopy submittals shall be provided at adequate size so that all notes are readable.
DESIGN EQUIEMENTS POJECT DELIVEABLES CHECKLISTS GENEAL INFOMATION 1.1 The following is a checklist to be used as a guide for the required deliverables for the Schematic Design phase. 1.2 Schematic Design
Product description NCC Data Center
Product description NCC Data Center Concept General As one of the largest actors in the Nordic construction industry, NCC Construction plays a leading role in shaping the future of our society. After building