Flood Events Preparedness, Remediation and Restoration. Rev 3 Dec 2014
|
|
|
- Collin Lester
- 10 years ago
- Views:
Transcription
1 Flood Events Preparedness, Remediation and Restoration Rev 3 Dec 2014
2 Impacts PART 1 - IMPACTS 2013 Brookfield Johnson Controls January 30,
3 Impacts 2013 Brookfield Johnson Controls January 30,
4 Heavy Rain / Flood Potential Impacts Roof Damage / Roof Leaks Clogged Roof Drains Floor drains backing up / water contaminated with sediment and sewage Flooded parking lots Flooded basements Water penetration under doorways (flush with parking lot) Damaged carpet Water penetration into drywall (will absorb 2 feet from floor) Potential for mould growth Flooded storage tanks & associated environmental spills Electrical hazards Electrical damage Temporary loss of utility service Damage to site electrical services Communication failures (depending on location of service) Loss of Security / FLSS monitoring Damage to physical assets in basement areas Damaged Powered Industrial Vehicles & Charging Stations Consideration for staff safety (stuck at the building, commuting or responding) Closed Roads / Disruptions to mass transit: shift change, etc. Spoilage for perishables / consumer products 2013 Brookfield Johnson Controls January 30,
5 Impacts 2013 Brookfield Johnson Controls January 30,
6 Impacts 2013 Brookfield Johnson Controls January 30,
7 BJCC Potentially Impacted Client Properties Flood Potentially Impacted Sites Client Property Count FI FI Telco 1 12 Telco 2 6 Industrial 32 Commercial 35 Total Brookfield Johnson Controls January 30,
8 Response Part 2 Response 2013 Brookfield Johnson Controls January 30,
9 BJCC Activation & Response Media Scan of rising water levels Client support requests to Ops Centre Escalation to Facility Managers Activation of CMT Deployment of Security, Janitorial and Mobile Tech Resources to investigate and assist. Account BCP Support Plans activated: Teams Engage with Clients on priorities BJCC and Client Response Assets mobilized & deployed in advance of rising flood waters 2013 Brookfield Johnson Controls January 30,
10 BJCC Mobilization of Resources 2013 Brookfield Johnson Controls January 30,
11 FirstOnSite Mobilization FirstOnSite Restoration receives weather update and notification from BJCC Catastrophic Large Loss Team is activated. (Nashville/Toronto) Account manager is dispatched to BJCC designated Emergency Command Centre to provide communication and prioritization response from the FOS Catastrophic Large Loss Team. FOS activates it s Emergency Command Centre (Mississauga), prioritizes all FOS prep clients. FOS branches in Southern Ont. are notified and are instructed to dispatch crews (project managers, crews, Health& Safety personal, flood equipment, PP Equipment etc..) to FOS Mississauga office. All N.A. FOS branches placed on standby and start to mobilize. FOS environmental vendors notified- will require testing re: category 3 Black Water contamination/ due to backup sewage drains. Procurement dept. notifies rental companies and implements first right of refusal agreements, i.e. lodging, pump trucks, generators, flood tubes etc.. Notification with rental companies N.A. wide Brookfield Johnson Controls January 30,
12 FirstOnSite Response FirstOnSite Restoration account manager assigned to BJCC provides response priortity assignments to the FOS emergency command centre. Within the first 2 hours of FOS mobilization the first local/regional crews start arriving to effected BJCC properties with equipment. FOS procurement secures additional resources i.e. rental/supply companies(materials, generators, pump trucks, labour). Sub trades placed on stand by. FOS has 8,000 subcontractors/trades across Canada. Large Loss Team will be assigned to priority damaged properties and PREP locations. (BJCC sites that FOS project managers have toured and recorded property data i.e. floor drains, shut off valves, S/R, security, etc.) FOS branches across Canada supply equipment sent by transport truck to Mississauga office for deployment. Project managers are also being flown in to Toronto from across Canada and U.S. (12 to 24 hrs.) 2013 Brookfield Johnson Controls January 30,
13 FirstOnSite FAQ - Equipment What type and how much equipment does FirstOnSite Restoration have? Air Movers Air Scrubbers Dehu s Dessicant DryIce Hydroxyl Machines Odour Control Ozone Machines Power panels Specialty Drying Vacuums Water Extractors AB ATL BC MB N. ON QC SK S. ON
14 FirstOnSite Emergency Services Water Damage 70% of property damage involves water Mould growth can start in 48 hours Engage Trained & IIRC certified staff and specialized equipment Thermographic cameras Moisture meters Dessicant Dryers Truck Mount Extraction Systems Trailer mount dryers In wall drying equipment Air Movers, Dehumidifiers, pumps and portable water extractors
15 BJCC Deployment of Assets 1. Secure Fuel Supply for Emergency Generators / Anticipation of Utility Interruption 2. Airlift flood tubes from base sites. Deploy to threatened critical Infrastructure sites 3. Mobile Technical Responders: Investigate and Report Isolate & Make Safe Reduce impact by moving high value assets to higher levels Transport and set up spill barriers / sandbags Deploy pumps and generators. 4. Security Partners Secure client properties Investigate and Report Access to Evac Zones 2013 Brookfield Johnson Controls January 30,
16 Safeguarding Human Resources January 30, Brookfield Johnson Controls 16
17 Risk Mitigation Part 3 Mitigating the Risk 2013 Brookfield Johnson Controls January 30,
18 MITIGATION BY THE NUMBERS Studies show every $1 spent on disaster mitigation saves $4 in community disaster recovery expenses. (PropertyCasualty360) Forty percent of businesses do not reopen after a disaster and another 25 percent fail within one year according to the Federal Emergency Management Agency (FEMA). Up to 40% of businesses affected by a natural or human-caused disaster never reopen. (Source: Insurance Information Institute) According to the US-based Strategic Research Institute, Companies that aren t able to resume operations within 10 days of a disaster are not likely to survive. 24% of companies said they have experienced a full data disaster (Forrester) Average cost of downtime for a midsize company is $70,000 per hour (Gartner) In the past two years, Over 50 percent of businesses experienced an unforeseen interruption, and the vast majority (81%) of these interruptions caused the business to be closed one or more days. 1 (2009 Disaster Recovery and Business Continuity Survey) 80 percent of businesses suffering a major disaster go out of business in three years, while 40 percent of businesses that experience a critical IT failure go out of business within one year. In the case of suffering a fire, 44 percent of enterprises fail to reopen and 33 percent of these failed to survive beyond 3 years. ( Hidden Threats to Enterprise)
19 Prioritizing Response & Recovery Sequence? Priority Protect VS. Priority Recover Client Business Impact Assessment Client Communication & Collaboration 2013 Brookfield Johnson Controls January 30,
20 Planning & Response Toronto : Simultaneous response to Internal and multiple client disruptions. Power Outages Water Damage Communication Disruption 2013 Brookfield Johnson Controls January 30,
21 Operational Redundancy Kamloops Toronto Shift call volume to Kamloops Operations Centre (Ability to Shift call volume in both directions) 2013 Brookfield Johnson Controls January 30,
22 Team Member Impacts Outside Impacts Securing Temporary Accommodation Family Obligations Community Social Responsibility Fatigue Mitigation Cross Regional Support Virtual EOC Establishing Rotational Shifts EAP Services 2013 Brookfield Johnson Controls January 30,
23 Recovery Competition for Resources Construction Materials Pumper Trucks General Contractors Remediation Specialists Temporary Space Construction Site Amenities 2013 Brookfield Johnson Controls January 30,
24 FirstOnSite Crisis Response Considerations - Mould only needs hours to grow causing significant health hazard - Consider emergency access in disaster areas (red zone) during crisis events / structural engineers will be afforded access into secured area. - Your service provider should be prepared to provide Safety training and certification on the ground if required for non-certified or out of province workers. - Your service provider should provide an emergency assessment team to provide early assessment of damage on the ground and coordinate response efforts with your own resources (as FOS does for BJCC) - Completion of an Initial Site Report (ISR) to start the claims process - Prioritize the Work
25 FirstOnSite Crisis Response Considerations Select a partner with the capacity and ability to meet your needs. FOS mobilized 800 personnel for Calgary floods / Slave Lake mobilized 200 personnel, and constructed a 10 acre dedicated command center. Rapid Mobilization of Catastrophe & Large Loss teams Rapid mobilization of capacity personnel and equipment Mobilization of specialized support teams: H&S, Admin & Reporting, Command team PREP clients get Priority Response Alberta Flooding, 2013 Vancouver Riots 2011 Goderich Tornado, 2011 Slave Lake Fire, 2011
EMERGENCY PREPAREDNESS PLAN Business Continuity Plan
EMERGENCY PREPAREDNESS PLAN Business Continuity Plan GIS Bankers Insurance Group Powered by DISASTER PREPAREDNESS Implementation Small Business Guide to Business Continuity Planning Surviving a Catastrophic
Disaster Ready. By: Katie Tucker, Sales Representative, Rolyn Companies, Inc
By: Katie Tucker, Sales Representative, Rolyn Companies, Inc Are you and your facility disaster ready? As reported by the Red Cross, as many as 40 percent of small businesses do not reopen after a major
later damage - Loss ControL
later damage - Loss ControL axisinsurance.ca Table of Contents EXECUTIVE SUMMARY... 1 FACILITY SYSTEMS WATER DAMAGE... 2 Frozen Pipes.....................................................................................
Clinic Business Continuity Plan Guidelines
Clinic Business Continuity Plan Guidelines Emergency notification contacts: Primary Role Name Address Home phone Mobile/Cell phone Business Continuity Plan Coordinator QSP Business Continuity Plan Coordinator
A cure for water damage in real estate
A cure for water damage in real estate Presented for BC Non-Profit Housing Association by Jeff Shearman, Zurich Services Corporation 2010 Zurich Canada Focused on our customer Reduce overall risk by reducing:
Emergency Response Program
Emergency Response Program Table of Contents Introduction...3 Fast Facts: Why Lost Time Can Lead To A Lost Business...4 The Emergency Response Priority Program An Overview...5 Fast Facts: Six Reasons Immediate
NAIT Guidelines. Implementation Date: February 15, 2011 Replaces: July 1, 2008. Table of Contents. Section Description Page
Recommended by Emergency Preparedness Committee: January 26, 2011 Recommended by President s Council: February 11, 2011 Approved by Executive Committee: February 14, 2011 NAIT Guidelines CS1.1 Emergency
Clean Water: Supply side potable water, not wastewater. Gray Water/Sewage: Wastewater originating from a drain (sink, toilet, urinal).
Procedures for Emergency Responses to Flooding and Building Water Intrusion PURPOSE: To establish uniform, sanitary, and systematic procedures for responding to flooding and water intrusion emergencies.
University of Victoria EMERGENCY RESPONSE PLAN
University of Victoria EMERGENCY RESPONSE PLAN 2013 Table of Contents PLAN FUNDAMENTALS... 2 PURPOSE... 2 PRIORITIES... 2 PLAN SCOPE... 2 AUTHORITY... 2 RESPONSE LEVELS... 2 BEFORE AN EMERGENCY... 3 DURING
Business Continuity Planning. Donna Curran, Director Audit and Risk Management February, 2014
Business Continuity Planning Donna Curran, Director Audit and Risk Management February, 2014 Agenda Business Continuity Defined The Importance of a Plan Determining the Costs Business Impact Analysis MTO,
Implementation Date: May 5, 2009. Table of Contents. Section Description Page. 1.0 Description 1. 2.0 Initial Response 2
Recommended by Emergency Preparedness Committee: April 21, 2009 Recommended by President s Council: May 1, 2009 Approved by Executive Committee: May 5, 2009 NAIT Procedures CS1.2.6 Flood Implementation
SCADA Business Continuity and Disaster Recovery. Presented By: William Biehl, P.E. 913-601-0104 (mobile) [email protected]
SCADA Business Continuity and Disaster Recovery Presented By: William Biehl, P.E. 913-601-0104 (mobile) [email protected] Business Continuity Planning, a Sound Process A Business Continuity Plan: "A
The Local Government Purchasing Cooperative
1 Structural Cleaning and Restoration Xactimate Prices Used for All Types of Disasters.Stuctural Cleaning and Restoration prices will be used from Xactimate Price Lists (Texas and New Mexico)Fire, Pos
Clinic Business Continuity Plan Guidelines
Clinic Business Continuity Plan Guidelines Published: January 2015 Table of Contents Emergency Notification Contacts Primary... 2 Emergency Notification Contacts Backups (in case primary is unavailable)...
Jefferson Parish Department of Water Emergency Plan
1. Overview Jefferson Parish Department of Water Emergency Plan 1.1. Purpose The purpose of this document is to establish procedures for the Department of Water during natural disasters or terrorist acts.
How To Write A Flood Emergency Response Plan For Texamona University
Title: TTUHSC-El Paso Campus Flood Emergency Response Plan (FERP) Policy Number: 10.12 Regulation: Reference: Original Approval Date: Revised Date: Next Review Date: 09-09-2011 01-23-2013 01/2014 Policy
Factor Restoration. simplifying IT
Factor Restoration Photo courtesy: Ralf_H, flick- simplifying IT Flood & Water Damage Mould Remediation & Dehumidification Fire & Smoke Damage Wind & Storm Damage Sewer Back-up Vandalism Flood & Water
Response, Reliability and Results. for Managed Property
Response, Reliability and Results for Managed Property Contents Response, Reliability and Results 1 Profit from your property 2 Property Performance Services 3 Energy assessments - beyond compliance 4
Guideline - Business Continuity Plan
Guideline - Business Continuity Plan 1. Introduction: The Business Continuity Plan is a component of the Risk and Business Management suite. This suite includes: Risk Management including risk registers
White Paper AN INTRODUCTION TO BUSINESS CONTINUITY PLANNING AND SOLUTIONS FOR IT AND TELECOM DECISION MAKERS. Executive Summary
AN INTRODUCTION TO BUSINESS CONTINUITY PLANNING AND SOLUTIONS FOR IT AND TELECOM DECISION MAKERS Executive Summary Today s businesses rely heavily on voice communication systems and data networks to such
Home Repair After a Hurricane Disaster
FACILITATOR GUIDE ACTIVITY: COMING HOME AFTER A DISASTER Purpose: The purpose of this activity is to educate individuals and families about what to consider after their home has been damaged after a disaster
VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES
VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES SEWER BACK-UP POLICY General Sewer back-ups are an unfortunate, but common problem in older communities. A sewer back-up can create a health or
How to Prevent Liquid Damage Property Losses
1. The leading cause of property losses is from liquid damage. A review of Zurich North America claims data highlights the problem. 2. Water damage originates from a number of sources: Domestic water lines
Restoration Services Company
Restoration Services Company Mold Damage Mold is found naturally in all buildings and can grow anyplace there are elevated moisture levels. Left untreated, mold can quickly multiply and grow to dangerous
Verizon, 911 Service and the June 29, 2012, Derecho
Verizon, 911 Service and the June 29, 2012, Derecho August 13, 2012 Verizon, 911 Service, and the June 29, 2012 Derecho Late in the evening of Friday June 29, 2012, a severe storm hit the Mid-Atlantic
11 Common Disaster Planning Mistakes
11 Common Disaster Planning Mistakes The world is full of risk. Floods, fires, hurricanes, thefts, IT system failures and blackouts are just a few of the incredibly damaging disasters that can and do strike
Restoring your Property: How to be prepared for Rapid Response to Flood Damage
Restoring your Property: How to be prepared for Rapid Response to Flood Damage After a flood, the restoration process can be long and complex, particularly for large commercial properties. Failure to apply
WATER DAMAGE RECOVERY G U I D E
WATER DAMAGE RECOVERY GUIDE YOU CAN TRUST T TEAM RAPID 14 TH YEAR IN BUSINESS 5 YEAR WARRANTY! CERTIFIED TECHNICIANS INSURANCE COMPANY RECOMMENDED A + RATING PAYMENT PLANS! Thank You for choosing Team
Flood Checklist ACTION TO BE TAKEN BEFORE THE FLOOD SEASON
Flood Checklist The following may serve as a checklist when preparing for a flood. This checklist should be tailored to processes/operations, flood protection equipment and flood potentials at your specific
A trusted partner to insurance adjusters. Fast, accurate, claims solutions 24 hours a day, 365 days a year.
A trusted partner to insurance adjusters. Advance Catastrophe Technologies (ACT) was established to service the needs of your clients. ACT also focuses on the needs of the insurance professionals who help
Water Damage & Catastrophic Water Loss
Water Damage & Catastrophic Water Loss IS YOUR FACILITY PREPARED? CASE STUDY East Texas General Hospital September 6, 2010: 0400 HRS 3 Inch pressurized fire suppression line burst on the second floor
24/7 Emergency Response Cleaning Services Reconstruction. DISASTERS HAPPEN. We take care of them all.
24/7 Emergency Response Cleaning Services Reconstruction DISASTERS HAPPEN. We take care of them all. Proven Top-Notch Professional Restoration Services for OVER 27 YEARS. First Restoration Services is
DISASTER RESPONSE: MANAGING THE ENVIRONMENTAL RISKS. By Frank Westfall and Robert Winterburn
DISASTER RESPONSE: MANAGING THE ENVIRONMENTAL RISKS By Frank Westfall and Robert Winterburn DISASTER RESPONSE: MANAGING THE ENVIRONMENTAL RISKS Frank Westfall and Robert Winterburn April 2015 Whether it
APPENDIX III: EMERGENCY SUPPORT FUNCTION 3 - PUBLIC WORKS AND ENGINEERING
APPENDIX III: EMERGENCY SUPPORT FUNCTION 3 - PUBLIC WORKS AND ENGINEERING PRIMARY AGENCY: Department of Transportation SUPPORT AGENCIES: Water Management Districts, Department of Agriculture & Consumer
Business continuity plan
Business continuity plan CONTENTS INTRODUCTION 2 - Scope - Components BUSINESS IMPACT ANALYSIS 3 - Business Affairs - Information Technology RISK ASSESSMENT 5 - Broad Categories of Hazards - Hazard Table
Emergency Management is responsible for coordinating the City of Houston s preparation for and response to emergency situations.
CITY OF HOUSTON Office of Emergency Management October 2004 Emergency Management is responsible for coordinating the City of Houston s preparation for and response to emergency situations. Houston is exposed
Crisis Management Plan
St. Louis Community College Crisis Management Plan February 2004 TABLE OF CONTENTS Definitions I-IV I. Purpose 1 II. Crisis Management Team 1 A) Members 1 B) Campus Site Plans 2 C) Duties and Responsibilities
OREGON STATE UNIVERSITY MASTER EMERGENCY MANAGEMENT PLAN
OREGON STATE UNIVERSITY MASTER EMERGENCY MANAGEMENT PLAN Last Edit 2/8/2011 OVERVIEW This document provides a management framework for responding to incidents that may threaten the health and safety of
Table of Contents ESF-12-1 034-00-13
Table of Contents Primary Coordinating Agency... 2 Local Supporting Agencies... 2 State, Regional, and Federal Agencies and Organizations... 2 Purpose... 3 Situations and Assumptions... 4 Direction and
Business Continuity and Disaster Planning
WHITE PAPER Business Continuity and Disaster Planning A guide to preparing for the unexpected Robert Drewniak Director, Strategic & Advisory Services Disasters are not always the result of high winds and
Business Continuity Management
Business Continuity Management cliftonlarsonallen.com Introductions Brian Pye CliftonLarsonAllen Senior Manager Business Risk Services group 15 years of experience with Business Continuity Megan Moore
Datacenter Site Selection Checklist
Checklist Use this checklist to aid in the process of selecting a new site for the data center. When visiting potential building sites, print the checklist off and take it along to record impressions and
STEP-BY-STEP BUSINESS CONTINUITY AND EMERGENCY PLANNING MAY 27 2015
STEP-BY-STEP BUSINESS CONTINUITY AND EMERGENCY PLANNING MAY 27 2015 AGENDA: Emergency Management Business Continuity Planning Q & A MONTH DAY, YEAR TITLE OF THE PRESENTATION 2 CANADIAN RED CROSS Disaster
contractors, etc. and establish relationships with lease and rental companies.
The following may serve as a checklist when preparing for a Tropical Storm or Hurricane. Although Tornadoes usually provide little advance warning, locations subject to Tornadoes may apply much of the
Table of Contents ESF-3-1 034-00-13
Table of Contents Primary Coordinating Agency... 2 Local Supporting Agencies... 2 State, Regional, and Federal Agencies and Organizations... 3 Purpose... 3 Situations and Assumptions... 4 Direction and
Draft 8/1/05 SYSTEM First Rev. 8/9/05 2 nd Rev. 8/30/05 EMERGENCY OPERATIONS PLAN
Draft 8/1/05 SYSTEM First Rev. 8/9/05 2 nd Rev. 8/30/05 EMERGENCY OPERATIONS PLAN I. INTRODUCTION A. PURPOSE - The University of Hawaii System Emergency Operations Plan (EOP) provides procedures for managing
Emergency Management Planning Criteria for Ambulatory Surgical Centers (State Criteria Form)
Emergency Management Planning Criteria for Ambulatory Surgical Centers (State Criteria Form) FACILITY INFORMATION: FACILITY NAME: FIELD (Company) FAC. TYPE: ASC STATE RULE: 59A-5, F.A.C CONTACT PERSON:
Business Continuity Template
Emergency Management Business Continuity Template The Regional Municipality of Wood Buffalo would like to give credit to the Calgary Emergency Management Agency (CEMA) and the Calgary Chamber of Commerce
Business Continuity Planning (BCP) / Disaster Recovery (DR)
Business Continuity Planning (BCP) / Disaster Recovery (DR) Introduction Interruptions to business functions can result from major natural disasters such as earthquakes, floods, and fires, or from man-made
Hurricane Checklist. It is in the best interest to ensure that our employees are safe and that our properties are secure prior to a hurricane event.
Hurricane Checklist Although most hurricane warnings refer to the time a hurricane will make landfall, the impact from a hurricane can begin to be felt several hours prior to landfall. Landfall is defined
Emergency Operations Plan ANNEX K - UTILITIES RESTORATION ESF #3, #12 I. MNWALK REQUIREMENTS. Item #: 1, 4, 46, 53, 54
ANNEX K - UTILITIES RESTORATION ESF #3, #12 I. MNWALK REQUIREMENTS Item #: 1, 4, 46, 53, 54 II. PURPOSE The purpose of this annex is to describe the organization, operational concepts and responsibilities
UNITED CHURCH OF CHRIST LOCAL CHURCH DISASTER PREPAREDNESS AND RESPONSE PLANNING GUIDELINES
UNITED CHURCH OF CHRIST LOCAL CHURCH DISASTER PREPAREDNESS AND RESPONSE PLANNING GUIDELINES The United Church of Christ local churches may use this plan as a guide when preparing their own disaster plans
Workforce Solutions Business Continuity Plan May 2014
Workforce Solutions Business Continuity Plan May 2014 Contents 1. Purpose... 3 2. Declaration of Emergency... 4 3. Critical Operations... 4 3.1 Communication... 4 3.1.1 Internal Communication During Emergencies...
BASEMENT FLOODING. Prevention Guide for. Homeowners
BASEMENT FLOODING Prevention Guide for Homeowners 1 Did You Know? Floods are the most common hazards in Canada. Water damage is a common cause of loss for homeowner insurance. A heavy rainfall can result
It also provides guidance for rapid alerting and warning to key officials and the general public of a potential or occurring emergency or disaster.
Emergency Support Function #2 Communications ESF Coordinator: Information Technology Department Support Agencies: Tucson Fire Department Parks and Recreation Department Tucson Police Department Tucson
A cure for water damage in Public Sector facilities. Risk Services: Understanding risk across your community
A cure for water damage in Public Sector facilities Risk Services: Understanding risk across your community Focused on helping our customers At Zurich, we are focused on helping customers reduce and mitigate
DIR CONTRACT NO. DIR-TEX-AN-NG-CTSA-010 ATTACHMENT F-3 TO EXHIBIT F BUSINESS CONTINUITY AND DISASTER RECOVERY PLAN FINAL VERSION
This document describes the Business Continuity and Disaster Recovery processes and activities for DIR or customer initiated and Verizon-initiated Business Continuity and Disaster Recovery Requests in
Business Continuity/June floods 2013. Terry Dick, Senior Emergency Management Specialist May 12, 2014
Business Continuity/June floods 2013 Terry Dick, Senior Emergency Management Specialist May 12, 2014 Flood Facts Worst Flood in Alberta s history 32 local state of emergencies declared 28 emergency operation
Building and Maintaining a Business Continuity Program
Building and Maintaining a Business Continuity Program Successful strategies for financial institutions for effective preparation and recovery Table of Contents Introduction...3 This white paper was written
Ohio Supercomputer Center
Ohio Supercomputer Center IT Business Continuity Planning No: Effective: OSC-13 06/02/2009 Issued By: Kevin Wohlever Director of Supercomputer Operations Published By: Ohio Supercomputer Center Original
History of the SPCC Rule
2010 SPCC Training SPCC Rule History of the SPCC Rule The SPCC plan is a document required under the clean water act (CWA) It became effective in 1972 and has changed little in 32 years. The rule was formally
University of Michigan Disaster Recovery / Business Continuity Administrative Information Systems 4/6/2004 1
University of Michigan Disaster Recovery / Business Continuity Administrative Information Systems. 1 Michigan Administrative Information Services (MAIS) MAIS is responsible for the production support of
www.cottoncompanies.com
cotton capabilities 6/1/09 2:44 PM Page 1 Corporate Headquarters 14345 Northwest Freeway Houston, Texas 77040 1.877.511.2962 1.877.511.3093 (fax) 24 HOUR CALL CENTER 1.877.511.2962 www.cottoncompanies.com
MAJOR PLANNING CONSIDERATIONS CHECKLIST
MAJOR PLANNING CONSIDERATIONS CHECKLIST The following checklist is provided as a guide to assure that relevant considerations are identified in the emergency management planning process. Use the blank
Backup Plan Examples. What s Your Backup Plan?
Backup Plan Examples What s Your Backup Plan? A Guide for Developing a Strategic Emergency Power Plan 1 What s Your Backup Plan? Planning for the inevitable power outage can be thought of as a continuum
Business Continuity Planning 101. +1 610 768-4120 (800) 634-2016 www.strohlsystems.com [email protected]
Business Continuity Planning 101 Presentation Overview What is business continuity planning Plan Development Plan Testing Plan Maintenance Future advancements in BCP Question & Answer What is a Disaster?
BCP and DR. P K Patel AGM, MoF
BCP and DR P K Patel AGM, MoF Key difference between BS 25999 and ISO 22301 ISO 22301 puts a much greater emphasis on setting the objectives, monitoring performance and metrics aligning BC to top management
DISASTER PLANNING AND RECOVERY An Ounce of Prevention
DISASTER PLANNING AND RECOVERY An Ounce of Prevention Structural damage from water should be treated immediately, before mould can grow. By Jonathon T. Flatt, Water Loss Specialist, and Nancy Dai, MBA
1-800-980-8003. Government Commercial Residential. CA License #959870 NV License #0077068
1-800-980-8003 Government Commercial Residential CA License #959870 NV License #0077068 Company representative:......... With over 13 years of disaster management experience and more than 10,000 completed
Clark University. Water Outage Preparedness and Response Plan. Revised January 11, 2013
Clark University Water Outage Preparedness and Response Plan Revised January 11, 2013 Contents Introduction... 3 Definitions... 3 Risks Associated with Water Outages... 3 Preparedness... 4 Responses/Action
Oracle Maps Cloud Service Enterprise Hosting and Delivery Policies Effective Date: October 1, 2015 Version 1.0
Oracle Maps Cloud Service Enterprise Hosting and Delivery Policies Effective Date: October 1, 2015 Version 1.0 Unless otherwise stated, these Oracle Maps Cloud Service Enterprise Hosting and Delivery Policies
Learning about an Emergency Management Plan GET READY NOW!
GET READY NOW! This supplemental document was designed to be used in conjunction with the Guide to an Emergency Management Plan (October 2014). It is meant to further support the emergency planning process
Fire Department Guide. Creating and Maintaining Business Continuity Plans (BCP)
Fire Department Guide Creating and Maintaining Business Continuity Plans (BCP) Business Continuity Planning Components Index: Introduction Getting Started Section 1 1. Assign departmental business continuity
City of Buffalo Municipal Electric Utility Energy Emergency Response
City of Buffalo Municipal Electric Utility Energy Emergency Response Table of Contents Page 1. Goals 2 2. Types of Energy Emergencies..3 3. Utility Emergency Operating Plans.4 4. Link to General Reliability/Outage
Table of Contents... 1
... 1 Chapter 1 Introduction... 4 1.1 Executive Summary... 4 1.2 Goals and Objectives... 5 1.3 Senior Management and Board of Directors Responsibilities... 5 1.4 Business Continuity Planning Processes...
Business Continuity White Paper
White Paper January 2011 Introduction In today s demanding business environment, few companies can afford having a key facility or branch location go off-line, or face service interruptions at headquarters.
Like it never even happened.
Thank You for Choosing When fire and water take control of your life, we help you take it back. Our goal is to help make it... Like it never even happened. SERVPRO Franchise System A History of Trust and
Emergency Preparedness Guidelines
DM-PH&SD-P7-TG6 رقم النموذج : I. Introduction This Guideline on supports the national platform for disaster risk reduction. It specifies requirements to enable both the public and private sector to develop
Preparing Your Organization for Disaster. - Preparedness Exercise -
Preparing Your Organization for Disaster - Preparedness Exercise - Emergency Preparedness Solutions, LLC Be proactive and be prepared. Prepared for the Association of Gospel Rescue Missions Northeast District
A cure for water damage in offices and habitational facilities. Risk Services: Understanding risk across your business
A cure for water damage in offices and habitational facilities Risk Services: Understanding risk across your business Focused on helping our customers At Zurich, we are focused on helping customers reduce
Disaster Recovery Plan (DRP) / Business Continuity Plan (BCP)
Preface Computer systems are the core tool of today s business and are vital to every business from the smallest to giant organizations. Money transactions, customer service are just simple examples. Despite
Before. Here is a list of recommended items that will help you in the recovery process:
2 3 floor Recovery Canadian Floods are the most frequent natural disaster in Canada. Happening at any time of the year, floods are most often caused by heavy rainfall or rapid snow melting. Often times,
University of Iowa Main Power Plant 2008 Flood Preparations, Event, & Recovery
University of Iowa Main Power Plant 2008 Flood Preparations, Event, & Recovery Yellow Alert for Mayflower Residence hall Peak at 31.5 feet Power Plant floods from steam tunnel and shuts down 1993 Flood
IT Disaster Recovery Plan Template
HOPONE INTERNET CORP IT Disaster Recovery Plan Template Compliments of: Tim Sexton 1/1/2015 An information technology (IT) disaster recovery (DR) plan provides a structured approach for responding to unplanned
Disaster Recovery Best Practices & Lessons Learned
Disaster Recovery Best Practices & Lessons Learned Paul Sullivan, VP & General Manager Agility Recovery For Audio: (1) Listen through PC speakers, OR (2) Dial 609 318 0024 and use access code 342 984 630
Case Studies. Disaster Recovery Restoration Remediation Decontamination 800.808.1553 www.rolyncompanies.com
Case Studies 800.808.1553 www.rolyncompanies.com Property Type: College Loss Type: Water and Flood Location: Hyattsville, Maryland Once Rolyn received clearance from the insurance adjuster, crews began
Fundamentals of Business Continuity Planning Have a Plan!
Fundamentals of Business Continuity Planning Have a Plan! Michael Kadar, MBCP, CISSP 2008 MK Continuity & Availability LLC [email protected] InfraGard Meeting Walsh College, Novi March 25, 2008