1 AT&T Internet Data Center Site Specification Dallas Area (Allen, Tx) Site Biography Market Area: Dallas and Fort Worth Areas of Texas Location: Allen, Tx Address: 900 Ventura Drive CLLI, POP, NPA/NXX Code: ALLNTXGM, DLLSTXTL, 972/390 History of Facility: AT&T Facility built to AT&T Internet Data Center and Industry IDC standards. This facility is part of Millennium high technology park in Allen, TX. Center Amenities: Customer Conference Rooms Audio/Visually equipped conference room Customer individual work spaces Customer Lounge Facilities with television Vending machine area Restrooms Customer Briefing/Visit Request: If you would like to schedule a Domestic IDC Tour, click here to use the scheduler If you are not a Certified Tour Manager and would like to schedule a visit to a Domestic IDC, please contact your local Enterprise Hosting Specialist. For the Corporate Briefing Center in Bedminster, NJ, use the BriefingEdge Online Visit Scheduling System Gross Sq. Ft.: 115,000. Total Net Square Feet: 74,212 SAS70: This site undergoes annual SAS70 Type 2 auditing. Network Internet (Back-end) IP Capacity: Minimum of Two (2) 10 Gigabit Ethernet WAN uplinks to the AT&T IP Network Redundancy: Administrative (Back-end) Connectivity: Redundant and path-diverse entrances and exits. Dual access routers connect the Internet Data Center to the AT&T IP Network via multiple network access points. Access the AT&T Back-End Connectivity Guide for options 1
2 Architectural Section Building Raised Floor Specifications: Equipment areas have accessible raised computer floors, with anti-static properties. The allowable structural floor loading on the raised floor is 300 pounds per square foot. The raised floor height is 32 inches. Loading and Receiving Dock: Power Watts / Square Foot: Commercial Power: Standby Generator Systems: Uninterruptible Power Supply: Grounding Architecture: Commercial Power Contingency Arrangements: Environmental Controls HVAC Distribution: HVAC System: HVAC Contingency Arrangements: Fire Suppression: Loading dock facilities are available. Onsite security personnel monitor access to the loading dock. Customer shipments to the IDC require customer site ID # on all shipping labels. 150 w/sf billable space The Internet Data Center has one (1) commercial power service feed for this building. There are eight (8) Caterpillar diesel generators providing standby power to the Internet Data Center. This represents an N+2 configuration. Five (5) underground fuel tanks store 70,000 gallons of diesel on-site. There are six (6) Liebert UPS systems, each with four (4)- 600kW/750kVA modules. Power is supplied to the UPS systems through commercial power feeders and standby generators. The UPS system is designed to support the full load for 15 minutes via its internal battery plant. This represents a 2N configuration. This facility has an enhanced grounding system. Perimeter ground ring is tied into driven ground rods. The UPS systems, equipment cabinets, racks and associated metal parts are tied into the ground ring. In case of a commercial power failure, the standby generators provide power to the Internet Data Center within one minute of a power outage. The one-minute gap is covered by the UPS battery system. During an extended commercial power outage, the diesel generators, using the fuel stored on site, can provide power for 72-hours. The building has five (5) 600-ton chillers. The raised floor, which is used as an air plenum, delivers conditioned air to the equipment cabinets/racks. The data center space is conditioned with floor mounted, chilled water type, down flow Computer Room Air Conditioning (CRAC) units. The CRAC units are rated at 29 tons each. CRACs are installed in a 7+1 arrangement. The CRAC units deliver conditioned air at under the raised floor. Air is distributed in the data center spaces from under the raised floor, with return air circulating back to the CRAC units through the room to return grills located at the top of the units. The quantity and distribution of CRAC units represents redundancy in capacity, distribution and location across the raised floor area. CRAC units deliver conditioned air at 55 F to maintain a room temperature of 72 F. HVAC is designed with fault tolerance. If a chiller fails, a standby chiller can carry the load continuously. Operations can choose to operate all (or some of the) CRAC units, which share the cooling needs evenly operating at less than full capacity. If a CRAC unit fails, heat load is redistributed automatically. The Internet Data Center uses a pre-action dry pipe fire suppression system supported by a state-ofthe-art VESDA smoke detection and alarm system. The VESDA system is considered 100 times more sensitive than conventional, passive fire detection systems. Conventional smoke detectors are also utilized and are grouped into zones. When one or more detectors in different zones detect smoke, the fire alarm panel opens the deluge valve to fill the sprinkler piping with water. In case of an actual fire, the seal on the sprinkler heads will melt and discharge water on the affected area. Water will not be discharged in unaffected areas. For more information on the VESDA system, please visit 2
3 Architectural Section - continued Security Building Access: Security staffing 24x7, closed-circuit monitors, secure-card key access, biometrics scanners, mantrap, and alarmed doors. Guards maintain access to the loading dock and access requires a card key. Security personnel also monitor the building. Equipment Cages: AT&T maintains a current list of authorized personnel. AT&T maintains all keys for cabinets and cages in a lock box on-site. Customers must open a ticket before appearing at the Internet Data Center and then pass biometrics scan and be escorted to floor. Site Monitoring: 24x7 monitoring is performed on site and remotely. Shipping & Receiving: No unidentified packages will be accepted. Onsite security personnel monitor access to the loading dock. Customer shipments to the IDC require customer site ID # on all shipping labels. Operations Staffing: Internet Data Center technicians and building engineers are available 24x7. Remote Hands: Available 24x7. See AT&T Enterprise Hosting Service Guide for details. Risk Assessment General Information Setting: 8 acre site is located at 900 Venture Drive near Highway 75 and McDermott north of the DFW Telecom Corridor. Data Center is located in new office/warehouse facilities in a hi-tech industrial business park. Site Description: The site is located in Seismic Zone 1. The site is situated on the outcrop of the Austin Formation of the Cretaceous Age. In full section the Austin is over 700 feet thick. The site is several hundred miles from any major active faults. Soils: Dark brown to gray clays, 2-5 foot deep. Groundwater: No seepage was found in any of the 32 ft depth borings. Seasonal seepage can occur above the limestone. Quantities are normally low. Building Description: Single story tilt-wall concrete structure with structural steel columns and roof joists Building is 575 x 220 in plan. Building was constructed in Floors designed for live load of 175 psf, typical. Battery Rooms are designed for a live load of 300psf. Earthquakes: Hazard Assessment Ground Shaking Hazard: Low Soil Liquefaction Hazard: Low Soil Compaction Hazard: Low Fault Rupture Hazard: Low Tsunami Hazard: Low Landslide Hazard: Low 3
4 Risk Assessment - continued Building Risk Assessment: Limited potential for steel frame connection damage Building movement could damage non-structural partitions No life safety hazards identified Post-earthquake damage repair may have limited effect on continued operations. Equipment Risk Assessment Equipment Anchorage Description Risk Assessment Data Center Racks Anchored to raised floor system stringers per AT&T Design Low Overhead Auxiliary Framing Suspended racking braced per AT&T Standards Low Raised Access Flooring Stringer system. Glue down pedestals Low CRAC Units Anchored to concrete slab via stands Low PDUs Sitting on raised access floor Low UPS Anchored to concrete slab Low Switchgear Anchored to concrete slab Low Electrical conduits Braced per AT&T Standards Low Chillers Anchored to floor slab in Central Plant Low Chilled Water Piping Braced per AT&T Standards Low Generators Anchored to concrete foundation per AT&T Standards Low Cooling Towers Anchored to steel framework Low Regional Disaster Effects on Site Loss of Power: Power supplied by single independent grid. (Additional grid onsite within 50 yards of center) Standby generators can maintain power supply 72 hour diesel fuel storage on site Loss of Water: 34,000 gallons of make-up water currently stored at site. Remote fill available for tanker truck refill in the event of loss of water to site Network Connectivity: See above network description Summary: Site is in general well prepared to resist the effects of an earthquake. 4
5 Risk Assessment - continued WINDSTORMS Hazard Assessment: UBC Design Wind Speed: 70 mph UBC Exposure Category: B Building Risk Assessment: Buildings are assessed to have a low risk for wind loading. Equipment Risk Assessment: Interior equipment is adequately protected against the effects of a windstorm. Exterior equipment is adequately anchored to resist the effects of a windstorm. Regional Disaster Effects on Site Loss of Power: Network Connectivity Summary: Site is in general well prepared to resist the effects of a windstorm. FLOODING Hazard Assessment: Site is not located in a flood plain Flooding is not considered to be a significant hazard for this site. MAN-MADE HAZARDS Crime Outside equipment yard is fenced At present, site has security guard coverage 24 hours a day, 7 days a week, year-round. Security system monitors property, gates, and primary doors. Controlled entry into data centers via biometric controls Considered to be a low risk Exposed exterior walls of Data Center are primarily 8 thick concrete. Pre-existing punched openings and storefronts are covered with metal panels. 5
How To Visit An Internet Data Center
AT&T Internet Data Center Site Specification Atlanta Area (Lithia Springs, GA) Site Biography Market Area: Atlanta and surrounding areas (Georgia, Alabama, Tennessee, Florida, North and South Carolina
AT&T Internet Data Center Site Specification New York III (Secaucus, NJ)
AT&T Internet Data Center Site Specification New York III (Secaucus, NJ) Site Biography Market Area: New York City, New Jersey, Upstate NY and Lower Connecticut Location: Secaucus, NJ 07094 Address: 15
AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL)
AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL) Site Biography Market Area: Chicago, IL Location: Lisle, IL 60532 Address: 4513 Western Avenue CLLI,POP, NPA/NXX Code: LSLEILAA, EQLAILAA
AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ)
AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ) Site Biography Market Area: Phoenix, Mesa, Tempe, Chandler, Scottsdale, AZ Location: Mesa, AZ 85201 Address: 1301 University Blvd.
AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA)
AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA) Site Biography Market Area: San Diego, CA Location: San Diego, CA 92121 Address: 5732 Pacific Center Blvd CLLI,POP, NPA/NXX Code:
AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA)
AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA) Site Biography Market Area: Washington, DC Area Location: Ashburn, VA 20147-6011 Address: All deliveries should be sent to
100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G
100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G The Opportunity Jones Lang LaSalle, Inc. (the Broker ) is please to offer the fee simple interest in 100 Locust Avenue (the
N O W A V A I L A B L E
N O W A V A I L A B L E 5 0, 0 0 0 S F P O W E R E D S H E L L D A T A C E N T E R I I Data Center Park Catawba County, North Carolina S P E C I F I C A T I O N S Contact Doug Hollidge for more information
19 Site Location, Design and Attributes. Site Location, Design and Attributes
1 Site Location, Design and Attributes The Primary Data Center shall be physically located on Oahu, Hawaii. 2 Site Location, Design and Attributes The Primary Data Center shall be located at least 1 mile
X-tier Data Facility. Prepared by X-tier SAE Corporation
X-tier Data Facility Company Profile X-tier Corporation X-tier is based in Leawood, Kansas. X-tier provides business agnostic, security hardened, custom and turnkey Cloudbased software systems, services,
Data Centre Barrie, Ontario
COGECO DATA SERVICES DATA CENTRE Data Centre Barrie, Ontario Cogeco Data Services offers flexible, secure, connected and fully managed ICT solutions at its Flagship Data Centre in Barrie, Ontario Data
NeuStar Ultra Services Physical Security Overview
NeuStar Ultra Services Physical Security Overview Mission-critical network operations must have the highest standards of quality, security and reliability. NeuStar Ultra Services currently locates its
LEVEL 3 DATA CENTER SERVICES IN OMAHA, NEBRASKA HIGH AVAILABILITY ENTERPRISE COMPUTING BUSINESS DEMANDS IT. LEVEL 3 DELIVERS IT.
LEVEL 3 DATA CENTER SERVICES IN OMAHA, NEBRASKA HIGH AVAILABILITY ENTERPRISE COMPUTING BUSINESS DEMANDS IT. LEVEL 3 DELIVERS IT. THE SCALE TO SUPPORT GLOBAL ENTERPRISE IT Designed and equipped to meet
vcloud SERVICE Virtual Tech in partnership with Equinix - vcloud Service
vcloud SERVICES vcloud SERVICE Virtual Tech offers competitive pricing on vcloud hosted services at our world class Tier 4 data centre facility fully equipped with redundant power, cooling, internet connectivity
OPERATOR - FACILITY ADDRESS - DATE
. Facility Criteria (RFP).0 Location Characteristics Criteria Requirements 1 Ownership and Management: Please identify the owner(s) and managers of the property and indicate if there is on-site management.
san francisco//usa data center specifications tel: +61 2 9948 8888 fax: +61 2 9948 1111 internet + intellectual property + intelligence
internet + intellectual property + intelligence We thank you for the opportunity to work with you regarding your colocation needs in San Francisco, USA. We can colocate standard rack-mountable servers
NORTHERN VIRGINIA ONE (NoVa) DATA CENTER OVERVIEW
VAZATA 9651 Hornbaker Road Manassas, VA 20109 VAZATA.COM VAZATA's NoVa One data center located at 9651 Hornbaker Road in Manassas, Virginia is engineered from the ground up to deliver highly reliable and
VOLICO. Colocation Hosting. Enterprise Hosting Solutions. 888 865 4261 [email protected] www.volico.com
888 865 4261 [email protected] www.volico.com Performance, reliability, and the peace of mind your business deserves Colocation Overview A Reliable and Secure Home Your Data Can Trust! Discover how Volico
Location. Central Business District. Ataturk Airport IFC. Sabiha Gökçen Airport
Welcome Zenium Istanbul One provides 12,000 square metres of high specification technical space across three purpose-built data centers. It is Turkey s first wholesale data center offering; the data halls
Experience Matters...
Experience Matters... Travelport Data Center offers confidence and space to meet your demanding IT needs Transwestern presents the Travelport Data Center in Denver, Colorado totaling 267,000 SF with 121,600
Chicago 1 (CHI-1) Data Center
215 W. Ohio St. 5th Floor Chicago, IL 60564 Call Us Toll-Free 1 (866) 817-2811 Follow Us @SingleHop Like Us facebook.com/singlehop Chicago 1 (CHI-1) Data Center Enterprise-Class, Downtown Chicago Facility
Safeguard your critical IT assets in a highly secure, fully redundant, environmentally-conditioned and constantly monitored hosting space to receive
Co-Location Services Safeguard your critical IT assets in a highly secure, fully redundant, environmentally-conditioned and constantly monitored hosting space to receive optimum performance 24x7. SERVICE
Data Center Due Diligence List
Data Center Due Diligence List Name and address of site facility Date constructed Building owner/date purchased by current owner Name of previous owner Adjacent Property Descriptions North South East West
CyrusOne Global Data Center Solutions
CyrusOne Global Data Center Solutions 1649 W Frankford Road, Carrollton, TX 75007 + Leader in Global Data Center Colocation Built for tomorrow. Ready today. CyrusOne has quickly emerged as a global leader
LEVEL 3 DATA CENTER ASSESSMENT
Nationwide Services Corporate Headquarters 410 Forest Street Marlborough, MA 01752 USA Tel: 800-342-5332 Fax: 508-303-0579 www.eecnet.com LEVEL 3 DATA CENTER ASSESSMENT Submitted by: Electronic Environments
Data Center CH1. Elk Grove Village, IL
Data Center CH1 Elk Grove Village, IL powerful/ efficient /reliable solutions > Data Center CH1 ABOUT DUPONT FABROS TECHOLOGY (DFT) DFT is a leading owner, developer, operator and manager of wholesale
Current as of 11/10/08 1 of 1
BEST PRACTICES STANDARDS FOR SCHOOLS UNDER CONSTRUCTION OR BEING PLANNED FOR CONSTRUCTION I. Site Layout A. School buildings shall be provided with a securable perimeter. A securable perimeter means that
DATA CENTERS. VAZATA Headquarters: 6900 Dallas Parkway, Suite 800 Plano, TX 75024 VAZATA.COM
DATA CENTERS VAZATA Headquarters: 6900 Dallas Parkway, Suite 800 Plano, TX 75024 VAZATA.COM OVERVIEW VAZATA's NoVa One data center located at 9651 Hornbaker Road in Manassas, Virginia is engineered from
How To Write An Infrastructural Standard For Data Center Infrastructure
Infrastructure Standard for Data Centers ANSI/CSA/EIA/TIA-942 (PN-3-0092) Introduction When approved, the standard will be: ANSI/CSA/EIA/TIA-942 Telecommunications Infrastructure Standard for Data Centers
Assessment of Existing Data Centers for Critical Facilities Round Table Group
Assessment of Existing Data Centers for Critical Facilities Round Table Group Chuck Shalley, P.E. Consulting Electrical Engineers BACKGROUND INFORMATION ASSIGNMENT Data Center Criteria Type Raised Floor
COMMODITIZING THE DATA CENTER MARKET
COMMODITIZING THE DATA CENTER MARKET Site Summary The building at 1360 Kifer Road has approximately 94,500 SF of server and support space and is currently divided into two independent data center areas.
Strategic Data Centre Site Profiles. Data Centre Co-Location London East
Strategic Data Centre Site Profiles Data Centre Co-Location London East Document details Version: 1 Last Updated: 12/07/2013 Version 1.0 Page 1 of 5 Contents 1. LONDON EAST...3 1.1 LOCATION...3 1.2 TECHNICAL
Tier IV Enterprise - Class Data Center
Tier IV Enterprise - Class Data Center Colocation Cloud Hosting Broward Data Center Datasheet Managed Hosting Dedicated Servers www.volico.com Site Specification Security Site Specification Floor Space
Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.
AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled
South Asia s First Uptime Institute Certified TIER-IV IDC in Mumbai delivering 99.999% guaranteed uptime
South Asia s First Uptime Institute Certified TIER-IV IDC in Mumbai delivering 99.999% guaranteed uptime GPX India Pvt Ltd The Leader In Carrier Neutral TIER IV IDC s In Emerging Markets Incorporated in
Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.
AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled
Powering the Cloud Desktop: OS33 Data Centers
OS33 Data Centers [email protected] (866) 796-0310 www.os33.com It is hard to overstate the importance of security and uptime, which is why we obsess over making sure that your corporate information assets
Establishment of State s Second Data Center. Business Continuity and Disaster Recovery. North Carolina. Office of Information Technology Services
Establishment of State s Second Data Center North Carolina Office of Information Technology Services National Association of State Chief Information Officers 2008 Recognition Awards Nomination June 2,
About Injazat. Enterprise Cloud Services. Premier Data Center. IT Outsourcing. Learning and Development Services. Enterprise Application Services
About Injazat Injazat Data Systems is an industry-recognized market leader in the region for Information Technology Outsourcing, Cloud and Data Center Managed Services delivered from the region s 1st Tier
IBM Twin Data Center Complex Ehningen Peter John IBM BS [email protected]. 2011 IBM Corporation
IBM Twin Data Center Complex Ehningen Peter John IBM BS [email protected] Overview Profile IBM owned facility 6447 m² IT-Space Infrastructure concurrent maintainable (Tier Level 3) Feed-ins of Power
CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0.
Innovation Park Charlotte. NC 28262 DRAFT V0.1 Page 2 CyberFortress Data Center at Innovation Park BECO South purchased Innovation Park in March 2010 and immediately launched a dramatic top-to-bottom $30M
SYSTRUST CERTIFICATION REPORT FOR COLLOCATION AND DATA CENTER HOSTING SERVICES FOR THE PERIOD FROM JANUARY 1, 2013 TO DECEMBER 31, 2013
SYSTRUST CERTIFICATION REPORT FOR COLLOCATION AND DATA CENTER HOSTING SERVICES FOR THE PERIOD FROM JANUARY 1, 2013 TO DECEMBER 31, 2013 TABLE OF CONTENTS SECTION I: INDEPENDENT PRACTITIONERS TRUST SERVICES
Contents Error! Bookmark not defined. Error! Bookmark not defined. Error! Bookmark not defined.
We Do It Better. Contents Introduction...3 Service and Support...3 Data Center Details...4 Security...4 Location...4 Power...4 Humidification...5 AC...5 Cooling...6 Datacenter Features...6 SAS 70...6 PCI
Data Center Infrastructure & Managed Services Outline
Data Center Infrastructure & Managed Services Outline The 360 Technology Center Solutions Data Center is located in Lombard, IL, USA. We are 20 minutes outside of downtown Chicago. The 360TCS staff consists
NY-1 DATACENTER AT A GLANCE. NY-1 is a Tier III-rated, SAS SSAE16 and HIPAA-certified data center
NY-1 1.866.WEBAIR.1 WWW.NY1.WEBAIR.COM NY-1 LONG ISLAND S MOST SECURE, FULLY-REDUNDANT DATA CENTER ENTERPRISE COLOCATION, PRIVATE AND HYBRID CLOUD SOLUTIONS, AND MANAGED SERVICES. DATACENTER Enjoy the
Data Center Overview Document
Overview NetSource is a Chicago area (Naperville) hosting company that owns and operates its own world class datacenter. The initial datacenter buildout was put into operation in 2007 and expanded in 2013.
Data Center Presentation
Data Center Presentation The NetSource Datacenter. Agenda General Layout of Data Center Policies and Procedures Designed to Latest Standards High Performance High Reliability High Security Design Details
HealthcareBookings.com Security Set Up
HealthcareBookings.com Security Set Up Introduction... 2 Overview of the process for using HealthcareBookings.com... 2 Professionals... 2 Patients... 3 Passwords... 4 Hosting Security... 4 Overview of
colocation. perfected.
colocation. perfected. colocation perfected The expert team of COLO@ have the talent, tools, and facilities to power your operation all day, every day. Since 2008, COLO@ has been providing the critical
ISOMEDIA COLOCATION WWW.ISOMEDIA.COM/COLOCATION
ISOMEDIA COLOCATION WWW.ISOMEDIA.COM/COLOCATION Your business needs a robust infrastructure that is secure, cost effective and reliable in order to remain competitive in today s market. ISOMEDIA s colocation
Subject: County of Los Angeles Data Center Space Requirement
Subject: County of Los Angeles Data Center Space Requirement The County of Los Angeles, Chief Executive Office, Real Estate Division (CEO-RED) is issuing this Property Search for the purchase of a vacant,
SECTION 8 Industrial Facilities Field Investigation
SECTION 8 Industrial Facilities Field Investigation Types of Data to Be Collected and Recorded Warehouses, manufacturing facilities, energy-producing facilities, and factories should be inspected for performance
South Asia s First Uptime Institute Certified TIER- IV IDC in Mumbai delivering 99.999% uptime
South Asia s First Uptime Institute Certified TIER- IV IDC in Mumbai delivering 99.999% uptime GPX India Pvt Ltd The Leader In Carrier Neutral TIER IV IDC s In Emerging Markets Incorporated in August 2002,
Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.
AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled
Earthquakes and Data Centers
7x24 Exchange Fall Symposium September 11, 2013 Hilton Bellevue Andrew W. Taylor, Ph.D., S.E., FACI Earthquake Hazards 2 September 11, 2013 1 Cascadia Earthquake Sources Figure Credit: Craig Weaver, Pacific
DATACENTER COLOCATION. Flexible, Secure and Connected
DATACENTER COLOCATION Flexible, Secure and Connected Flexible Solutions for Your Requirements Contents Your Goals 2 Compound and Buildings 4 Security 6 Infrastructure 8 Free Choice 10 Good Reasons 12 Our
DATA CENTERS. VAZATA Headquarters: 6900 Dallas Parkway, Suite 800 Plano, TX 75024 VAZATA.COM
DATA CENTERS VAZATA Headquarters: 6900 Dallas Parkway, Suite 800 Plano, TX 75024 VAZATA.COM DAL II MARSH LANE CARROLLTON TX OVERVIEW VAZATA s Dallas Data Center II (Dal II) is located at 2440 Marsh Lane
colocation. perfected. Overview
colocation. perfected. Overview Welcome to COLO@ colocation perfected our network The expert team of COLO@ have the talent, tools, and facilities to power your operation all day, every day. Since 2008,
Data Centre Infrastructure
Data Centre Infrastructure LONDON DATA CENTRE Our data centre is located within the heart of Europe s centre of global finance London s Square Mile. The centre offers a combined net capacity of 1,520 m²
VOLICO. Colocation Checklist. Key Data Center Evaluation Criteria
VOLICO Enterprise Hosting Solutions Colocation Checklist Key Data Center Evaluation Criteria Not all data centers are created equal. You need to know what to look for. Are they equipped with up-to-date
Strategic Data Centre Site Profiles Data Centre Co-Location London North
Strategic Data Centre Site Profiles Data Centre Co-Location London North Document details Version: 1 Last Updated: 12/07/2013 Version 1.0 Page 1 of 6 Contents 1. LONDON NORTH...3 1.1 LOCATION...3 1.2 TECHNICAL
Network Router Monitoring & Management Services
Network Router Monitoring & Management Services Get different parameters of routers monitored and managed, and protect your business from planned and unplanned downtime. SERVICE DEFINITION: NETWORK ROUTER
Santa Clara, CA 95054
Leading-Edge Datacenter Facility Silicon Valley GENERAL In excess of 41,000 sq. ft. of raised floor 9 MVA of utility power into facility Purpose built Green Datacenter Sutton Roley Lic. 00793235 (408)
LEVEL 3 DATA CENTER SERVICES IN SAN FRANCISCO HOUSE POWER-INTENSIVE APPLICATIONS AND SUPPORT BUSINESS CONTINUITY
LEVEL 3 DATA CENTER SERVICES IN SAN FRANCISCO HOUSE POWER-INTENSIVE APPLICATIONS AND SUPPORT BUSINESS CONTINUITY THE SCALE TO SUPPORT GLOBAL ENTERPRISE IT THE SCALE TO SUPPORT FLEXIBLE ENTERPRISE IT It
Web Hosting Features
Web Hosting Features Included with all website production packages Our web-hosting facilities are geared towards serving those clients whos websites we have created. To ensure maximum performance and flexibility
House your data in a building constructed for only one express purpose protect the information inside. Twin Cities East Data
Protection is Central. Twin Cities East Data Center House your data in a building constructed for only one express purpose protect the information inside. Twin Cities East Data Center is nothing less than
NY2 21 CRITICAL MEGAWATTS 280,000 SQUARE FEET WWW.CORESITE.COM
CLOUD-ENABLED DATA CENTER 21 CRITICAL MEGAWATTS 280,000 SQUARE FEET WWW.CORESITE.COM NEW YORK CAMPUS The optimal location to propel your business SYMS WAY EMERSON LN EQ SECAUCUS HARTZ WAY SECAUCUS RD AMERICAN
SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)
SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME) Construction Criteria The unit costs for ADP Mainframe space types are based on the construction quality and design features in the following
Site Preparation Management Co., Ltd. March 1st 2013 By Nara Nonnapha, ATD UPTIME
Site Preparation Management Co., Ltd. March 1st 2013 By Nara Nonnapha, ATD UPTIME 2 AGENDA SESSION -1 What is Data Center? SESSION -2 Equipment and Components SESSION -3 Standard in designing Data Center
Datacenter Assessment
The Netmagic team has compiled this Checklist to help you evaluate, compare and select datacenter facilities to meet your hosting, business continuity and disaster recovery needs. Based on industry best
DATA CENTERS. VAZATA Headquarters: 6900 Dallas Parkway, Suite 800 Plano, TX 75024 VAZATA.COM
DATA CENTERS VAZATA Headquarters: 6900 Dallas Parkway, Suite 800 Plano, TX 75024 VAZATA.COM DAL I MIDWAY ROAD CARROLLTON TX OVERVIEW 4025 Midway Road is a full service, enterprise-class data center colocation
Our Hosting Infrastructure. An introduction to our Platform, Data Centres and Data Security. www.in-tuition.net
Our Hosting Infrastructure An introduction to our Platform, Data Centres and Data Security www.in-tuition.net UK Infrastructure Infrastructure Overview Intuition Networks has provided managed Internet
Wholesale Data Center Suites Available Now
Wholesale Data Center Suites Available Now FROM 2,500 to 100,000 Sq Ft A secure, fortified Mission Critical data center facility located in Innovation Park, Charlotte, NC Scalable data center suites available
1301 Fannin. Houston Data Center & Office Facility
1301 Fannin & Office Facility 1301 FANNIN Building Features Building Location Building Typical Floor plans Systems Infrastructure Amenities BUILDING FEATURES YEAR BUILT/RENOVATED: 1984/2009 TOTAL LEASE
AFTER THE BIG ONE, WILL CRITICAL COUNTY SERVICES SURVIVE?
AFTER THE BIG ONE, WILL CRITICAL COUNTY SERVICES SURVIVE? SUMMARY There is a 67% probability that Southern California will be hit by a magnitude 6.7 or larger earthquake in the next 30 years according
TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST
TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST In order to provide a comprehensive plan review in a timely manner, and to insure the design and installation of fire alarm systems
Building a Tier 4 Data Center on a Tier 1 Budget
Building a Tier 4 Data Center on a Tier 1 Budget A Walk Through of TIA-942 Peter P. Charland III, RCDD/NTS/WD, CET RTKL Associates Inc. March 27, 2008 BICSI South Central Region Meeting Denver, CO TIA-942
Frankfurt Data Centre Overview
Technical Services Briefing Document Frankfurt Data Centre Overview Version 2.1 Contents Introduction... 3 TelecityGroup Data Centre in Frankfurt... 4 Data Centre Characteristics... 4 Technologies in Use
Development Services City of Lawrence, KS
Development Services City of Lawrence, KS Building Planning Table R301.2 (1) Climatic & Geographic Design Criteria Building Planning The design criteria for wind speed increased from 90 MPH to 115 MPH.
Data Center:Build-to-Suit
Data Center:Build-to-Suit A fortified 100,000 SqFt mission critical build-to-suit constructed on a secured 5 acre parcel at Innovation Park Charlotte, NC On-Site 120MW Substation Sourced from Two Independent
OVERVIEW. Key Attributes
OVERVIEW Welcome to 3000 Skyline Dallas, a purpose-built, powered shell for data centers designed, developed and engineered to accommodate today s technology and tomorrow s growth. 3000 Skyline provides
General Fire Code Requirements Within Commercial Tenant Spaces
FIRE DEPARTMENT in cooperation with Scope: General Fire Code Requirements Within Commercial Tenant Spaces This handout is designed to assist owners, architects, contractors and others in understanding
Fire Pump Plan Review March 2010
Fire Pump Plan Review March 2010 Date of Review: / / Permit Number: Business/Building Name: Address of Project: Designer Name: Designer s Phone: Contractor: Contractor s Phone: Occupancy Classification:
singapore//singapore data center specifications tel: +61 2 9948 8888 fax: +61 2 9948 1111 internet + intellectual property + intelligence
internet + intellectual property + intelligence We thank you for the opportunity to work with you regarding your colocation needs in Singapore. We can colocate standard rack-mountable servers or other
Commercial Building Valuation Report
INSURED University of Houston - Victoria Effective Date: Expiration Date: Cost as of: 09/2010 BUILDING 1 217 - University Center 77901 Location Adjustments Climatic Region: High Wind Region: Seismic Zone:
ASX Australian Liquidity Centre. ASXCoLo
ASX Australian Liquidity Centre ASXCoLo Australian Liquidity Centre Location The ASX Australian Liquidity Centre is located at: Gore Hill Business Park 219-247 Pacific Highway Artarmon. NSW, 2064 The location
PROJECT SUMMARY. Scope of work details: (If phased construction, please see plan submittal guidelines.)
APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL FIRE RESTORATION PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of
Facilities Maintenance Standards rev 9-1-2015
Facilities Maintenance Standards rev 9-1-2015 Purpose The purpose of these standards is to outline the minimum requirements for maintaining state owned facilities and infrastructures in a manner that will
Building Code Clarifications - 7. Fire Resistance
Building Code Clarifications - 7. Fire Resistance 7.1 (15-12-030) Use of combustibles in Type III construction roof assemblies Code Section (15-12-030) Use of Combustibles was revised on May 17, 2000,