AGENDA ITEM EXECUTIVE SUMMARY
|
|
|
- Charity Sullivan
- 10 years ago
- Views:
Transcription
1 AGENDA ITEM EXECUTIVE SUMMARY Title: Presenter: Recommendation to Award the Bid for Storm Sewer Point Repair Services to J&S Construction Sewer & Water AJ Reineking Please check appropriate box: Government Operations X Government Services Planning & Development Public Hearing City Council Estimated Cost: Hourly Rates in the Submitted Bid amount (Not to exceed $155,000.00) If NO, please explain how item will be funded: Budgeted: YES X NO Executive Summary: On June 25, 2015, the City of St. Charles opened bids for an hourly rate contract for storm sewer point repair services. J&S Construction of Oswego, IL provided the lowest responsive, responsible bid. The City is currently under contract with Visu-Sewer for cleaning and televising services for storm sewers in Zone 5 of the City (bordered by Prairie St. to the North, 14 th St. to the West, Gray St. to the South and Rt. 31 to the East). Once that program is complete, Visu-Sewer will provide the City with a report detailing the condition and maintenance needs of the sewer. Rather than having contractors provide quotes for each individual repair, a bid was created to address all repairs on a Time & Materials basis. Having one contractor established for this work will save time gathering quotes and will ensure competitive pricing. Staff will work closely with J&S Construction to ensure that all repairs are made properly and efficiently. Attachments: (please list) Bid Tabulation Bid Specifications J&S Construction Bid Response Recommendation / Suggested Action (briefly explain): Recommendation to award the bid for Storm Sewer Point Repair Services to J&S Construction Water & Sewer in the submitted bid rates, not to exceed $155, For office use only: Agenda Item Number: 4.c
2 Storm Sewer Point Repair Contractor St. Charles Public Works Department is seeking a point repair contractor to perform repairs to the City s storm sewer system throughout the duration of the 2015/2016 fiscal year, ending April 30, This work will be contracted on a time and materials basis. Proposals for Point Repair Contractor, as described in the accompanying technical scope, shall be received before 10:00a.m, Thursday, June 25, 2015 at the City of St. Charles City Hall, Two East Main Street, St. Charles, IL 60174, Council Chambers, Attention: Purchasing. Proposals will be read aloud at this time. Any proposal received subsequent to the time specified will be promptly returned to the Contractor unopened. Proposals shall be in a sealed envelope labeled with Sealed Bid Storm Sewer Point Repair Contractor. Any questions shall be submitted to AJ Reineking via to the following addresses: [email protected] Upon receipt of questions prior to June 17, 2015, the Contractor shall receive a reply acknowledging the receipt of the question. Response to the question shall be as soon as practical. Should the question result in a clarification that requires addenda, such addenda will be issued via website update as soon as practical. Questions submitted after 3PM, June 17, 2015 shall not be acknowledged or answered. Contractors shall take all necessary steps to propose questions prior to June 17. City reserves the right to extend the due date. Should an extension be necessary, communication of such shall be ed to all registered Contractors. Scope: The work shall be performed on storm sewers throughout the City, in areas identified by staff or through the City s contracted cleaning and televising program. The cleaning and televising program will focus primarily on Zone 4 of the City s storm sewer system, which is bound roughly by IL Route 64 to the North, the Fox River to the East, Prairie Street to the South, and Randall Road to the West. Storm sewers in this area lie under pavement as well as in utility easements. All work performed shall be in compliance with the City s design and inspection policy manual for storm sewers, an excerpt of which is provided herein these specifications.
3 General Conditions Contractor should have experience with underground infrastructure work, with storm sewer repair work seen as a bonus. The work schedule shall be coordinated by the City and the successful bidder. All work shall be completed an invoiced by April 30, The Contractor may not start work before 7AM weekdays, and must be completed for the day by 3PM weekdays. Additional hours must be approved in advance to coordinate inspection. Note that the contractor may be restricted with respect to work hours each day depending on special events in the area and weather. Weekend hours must be approved by the City in advanced, and generally will not be permitted. Once the work starts on a site, the City expects, within reason, the work to proceed without delay to completion. The Contractor shall provide a Safety Officer contact for the City Inspector to address any safety related concerns that arise on the job. The Safety Officer shall have the ability to respond and address the concern in a timely fashion. Job show up. The City Public Works facility, upon request, can be used for a job show up location. Utility trucks and private cars can be parked within our fenced in yard. The City reserves the right to revoke this privilege. The yard is open weekdays from 6AM to 5:30PM and locked at all other times. Contractor is required to abide by the Illinois Prevailing Wage Act and must submit certified payroll records with all pay requests. Pay request without certified payroll will not be processed by the City Accounts Payable Dept. Technical Specifications & Requirements A: Design Requirements: 1) Catch Basins: Catch basins shall consist of four (4) foot minimum interior diameter reinforced concrete structures with a 3 sump (refer to restrictor structure detail). 2) Cover Depth: All storm sewer and sump lines must have a minimum cover of two (2) feet. 3) Disconnection of Existing Services: Where necessary for the purposes of completing a repair, existing services shall be disconnected by means of cutting out existing wye or tee and replacing with a straight piece of equal size pipe and making the final connection with nonshear mission couplings. Disconnection of all services must be performed prior to the demolition of an existing structure.
4 4) Flared End Sections: All flared end sections greater than or equal to 12 inches, which will receive or discharge storm water, shall have a removable grate system to prevent entry. This grate system shall be made from steel stock that is hot-dipped galvanized after fabrication. 5) Connecting to an Existing Sewer: When connecting to an existing sewer main by means other than an existing Y, T, or an existing manhole, one of the following methods shall be used: a. Using pipe cutter, neatly and accurately cut out desired length of pipe for insertion of proper fittings. Use band-seal couplings or similar couplings, and shear rings and clamps to fasten the inserted fittings and hold it firmly in place. Mission couplings shall have the length of boot approximately equal to the pipe diameter. Follow manufacturer s recommendations for the installation. No cut-in connection, made by breaking or cutting a hole in the main and inserting the spigot end of an ordinary sewer pipe shall be permitted. b. Circular, saw-cut of sewer main with proper tools ( Shewer-tap machine or similar) and proper installation of hub- Y saddle or hub- T saddle, in accordance with manufacturer s recommendations. This method shall only be allowed for pipe sizes over 12 inches in diameter. All must be encased in concrete flowable fill. 6) Frame & Grate: Frames and grates shall be provided as appropriate for the structure location (i.e.: depressed curb, barrier curb, overflow route, rear yard...). All grates to be located near a paved surface shall be bicycle safe. Calculations may be required to demonstrate that the proposed grates allow for an inflow that does not exceed the design capacity for the downstream pipe (refer to standard details). 7) Inlets: Inlets shall consist of a two (2) foot minimum interior diameter reinforced concrete structure. Inlets shall be placed at the sag of vertical curves in roadways, at low points in parking areas, and at other locations as necessary to minimize stormwater ponding and/or flow across roadways or intersections. Storm sewer inlets shall be placed not more than 500 apart in pavement and shall not exceed 250 in grassy areas. 8) Release Structure / Restrictor: The release structure shall be of a weir wall orifice design (refer to overflow weir structure detail) or as approved by the City of St. Charles. 9) Separation Requirements: A minimum ten (10) foot horizontal separation shall be established between the sewer and any proposed or existing water distribution facility, or the invert of the water main shall lie a minimum of 18 above the top of the sewer pipe. Where neither of the above conditions can be met, the water main shall be encased for the duration of the horizontal conflict (10 on each side of a perpendicular conflict), or the sewer shall be constructed of water main quality materials the duration of the conflict (10 on each side of a perpendicular conflict).
5 10) Sewer Pipe, Minimum Size: Public sewer shall have a minimum diameter of 10 for the first run of pipe, 12 minimum for all other. Replacement sizing for all point repairs should be consistent with the size of the section removed. 11) Slope: Slope shall be adequate to provide a minimum flow velocity of 3 fps and maximum acceptable velocity is 10 fps. 12) Structure Sizing: Manholes and catch basins shall have a minimum inside diameter of four (4) feet for sewer pipe 18 or less in diameter, five (5) feet for sewer pipe 21 to 48 in diameter. Pipes larger than 48 in diameter will require a special design (refer to standard manhole and catch basin details) 13) Structure Spacing: Manholes / Catch basins shall be provided at: 400 minimum intervals. Change in pipe diameter. Change in pipe material. Change in vertical alignment. Change in horizontal alignment. 14) Sump Lines: Domestic sump services shall be constructed of PVC SDR 26 with a minimum diameter of 4. All domestic services shall connect to the public sewer by removing a section of main and installing a new wye fitting for pipes less than 15 in diameter, Kor- N-Tee Boots for pipes 15 and larger, or at a structure (refer to connection detail). 15) Trench Backfill: All utility and service trenches within (3) feet of paved surfaces, or at a distance specified by the Engineer, shall be backfilled with CA-7 (Virgin Crushed Limestone). In other unpaved locations, CA-7 material shall be used within 12 of the pipe on all sides, and the excavated material may be replaced in the hole from that point. All Backfill material shall be properly compacted unless otherwise directed by the appropriate City staff. Backfill under existing pavements, where an open cut of the pavement has been approved, shall be Flowable Fill that meets the IDOT standards of Controlled Low Strength Material (CLSM) Mixture #1. No fly ash will be permitted in this mix (refer to City pipe trench detail). 16) Underdrains: Underdrains will be required under curbs at the bottom of all roadway sags. Underdrains shall extend 50 feet on each side of the inlet. Underdrains shall be perforated polyethylene pipe. The underdrain shall be encased in gravel trench with no fines, and a geotextile fabric shall be used to limit sedimentation in the pipe (refer to standard Pipe Underdrain detail). Where an underdrain is removed for a point repair, it shall be restored to its original condition and function. 17) Culverts: Culvert pipe designs shall be in accordance with the Illinois Department of Transportation Standard Specification for road and Bridge Construction latest edition. Publicly owned culver pipes shall be PVC for pipes less than 15 in diameter or RCP for pipes equal to 15 or larger in diameter.
6 B: Materials: 1) Casing: Where water main protection is required, encasement shall consist of PVC SDR 26, or steel casing with Cascade type CCR-STD spacers or approved equal. 2) Frame & Grate: Curb Inlet/C.B.: High back: Neenah R-3281-A or R Depressed: Neenah R-3506-A2 C.B., behind the curb type : Neenah R-3305 Neenah R 1713 (Refer to Lid Detail) C.B./M.H., Type D : Grate: Neenah R 1713 (Refer to Lid Detail) Frame: Neenah R-1713 C.B., beehive type : Neenah R-4340-B 3) Manhole: Manholes shall be reinforced concrete with steps provided 16 on-center. All manholes shall have a minimum inside diameter which conform to the following: 18 storm sewer and smaller - four (4) foot inside diameter 21 to 48 storm sewer - five (5) foot inside diameter Larger than 48 storm sewer - special design required 4) Sewer Pipe, Materials: Main line storm sewer shall be constructed of one of the following: a. Pre-cast reinforced concrete pipe, with O-ring joints; b. PVC pipe, rigid, (Min. SDR 26, push-on gasket joints); c. All joints shall conform to ANSI for ductile iron pipe. d. Ductile iron pipe, (Class 52), minimum; e. HDPE pipe, (Rigid with corrugated exterior and smooth interior meeting AASHTO M-294, Type S. Pipe sections shall be joined with PVC double bell couplers installed on the pipe with O-ring gaskets. Ex-filtration standards shall meet or exceed that of PVC SDR 26 with push-on-joints.) FOR PRIVATE USE ONLY. NOT TO BE USED WITHIN PUBLIC RIGHT-OF-WAY OR FOR PUBLICY OWNED AND MAINTAINED STORM SEWER f. The type of pipe material will be dependent upon the depth of bury, soil conditions, and pipe criteria, and as approved by the City of St. Charles. g. For RCP/CSP pipe, lifting holes shall not be allowed on pipes less than 84 in diameter. h. All storm sewer smaller than 15-inches in diameter that will be publicly owned and maintained shall be PVC pipe, rigid, (Min. SDR 26, push-on gasket joints). 5) Flared End Section: Flared end sections and subsequent riprap material shall be designed and specified per the Illinois Department of Transportation Standard Specification for Road
7 and Bridge Construction latest edition. Flared end sections shall be constructed of a concrete material only or approved by the appropriate Engineering Division. C: Traffic Control: The Contractor is responsible for all traffic control and protection. Work in IDOT ROW requires traffic control and protection measures that meet IDOT standards for such. A City inspector will be making spot checks and any deficiencies must be addressed immediately. The City will secure an IDOT permit for any work on state roadways; however, the Contractor is responsible for reviewing the jobsite and quantifying the need for flaggers. D: Erosion Control: The Contractor shall be responsible to establish silt screens on the downstream end of any dewatering discharge. D: Restoration: 1) Non-Paved Surfaces: In the parkway and other non-paved surfaces, a minimum of 4 of topsoil must be used for all landscaped restoration areas. Contractor is responsible for leveling and seeding all parkway excavations and installing erosion blankets. 2) Paved Surfaces: Excavations in the pavement shall be backfilled with the above specified materials up to existing surface depth. All existing pavement depths must be matched with like surface material, or asphalt may be used to complete depth of existing surface material. Asphalt lifts must be completed at 2 intervals. 3) Temporary Restoration: No excavations may be left open overnight or after the contractor has left the site. On paved surfaces, cold patch or plating is required as a temporary surface prior to completion of final surface on all arterial roadways and for all surfaces that will not see final surface material for more than 24 hours. 4) Restoration of Private Property: The Contractor shall notify the City prior to removal of any or part of a driveway apron or sidewalk section. These areas are not to be marked as part of the initial excavation. Respect for resident and business property is very important. Where specialized equipment could be utilized to minimize private property damage, Contractor should consider such. Contractor shall make the City aware of any work on private property that may damage trees, landscaping, fences, sheds, or other property prior to starting work. Any abnormal damage, as deemed by the City Inspector, shall be the responsibility of the Contractor, without any additional payment by the City. The amount of forecast damage identified by the Contractor and communicated to/approved by the City, requiring advanced restoration,
8 shall be added to the evaluated price. To the extent that private property damage can be minimized, it is in the Contractor s best interest. Any driveways or sidewalks in the construction zone should be photographed by the Contractor prior to work starting to defend against resident claims that Contractor work cracked or damaged such. Contractor shall be responsible for defending and satisfying any claims for driveway or sidewalk damage. Pending resident claims against the Contractor could delay final invoice processing.
9 Loaded Crew Rate Pricing Request The City is requesting contractors provide loaded hourly crew rates for storm sewer repair work, including emergency repairs. For unplanned overtime work, the contractor needs to be prepared to work the amount of time that the City needs the crew for, which may be a short period, or may be an extended period. For emergency restoration work, the City expects the contractor to have the requested crews on site within 24 hours of notification. Straight Time Hourly Rates Please provide a loaded crew rate on a time and materials basis for a standard crew with standard equipment (1 operator, 2 laborers, excavator, skid steer), assuming no flagging required. $ per crew hour without flaggers Please provide a loaded crew rate on a time and materials basis for a standard crew with standard equipment (1 operator, 2 laborers, excavator, skid steer), including two flaggers in the event that the job is on a street where a lane is blocked. $ per crew hour with flaggers Additional work Overtime at time and a half hourly rates The City may choose to hire the Contractor on a time and material basis for additional projects. Please provide a loaded crew rate for a standard overhead crew with standard equipment (as described above), assuming no flagging required, for overtime. $ per crew hour without flaggers The City may choose to hire the Contractor on a time and material basis for additional projects. Please provide a loaded crew rate for a standard overhead crew with standard equipment (as described above), including two flaggers in the event that the job is on a street where a lane is blocked, for overtime.
10 $ per crew hour with flaggers Price Markup Being a time and materials contract, the contractor is requested to provide a material markup percentage for all consumable products (pipe sections, clamps, etc.) expended during the course of the work. Tools and equipment that break or malfunction during the course of work for the City do not qualify for reimbursement under this section. Materials Markup Percentage % Upon request, the Contractor must provide a receipt of the charged materials to verify markup pricing. In such cases, the City will not issue payment until the requested receipts are furnished. Additional Clarifications Feel free to provide additional pricing details or breakouts, or cost per hour for specialized equipment that Contractor could foresee needing or that was not covered in previous sections. Such would streamline the administration of the contract and reduce the likelihood of conflict. Contractor should provide basic definitions of what constitutes overtime, if such is applicable. If no detail is provided, the definitions for overtime work will follow the City of St. Charles Teamsters Local 330 contract in effect at the time of the work.
11 BID: STORM SEWER POINT REPAIR # BIDDER STRAIGHT TIME HOURLY RATES $ Per crew hour without flaggers $ Per crew hour with flaggers ADDITIONAL WORK OVERTIME & EMERGENCY HOURLY RATES J&S Construction Sewer & Water, P. O. Box 760, Oswego, IL Stark & Son Trenching, Inc., 45W826 Rohrsen Rd., Hampshire, IL Archon Construction Co., Inc., 563 S. Rt. 53, Addison, IL Campton Construction, Inc., 825 Hicks Dr., Elburn, IL Mauro Sewer P&M Sewer & Water, Inc., 49W755 Peterson Rd., Maple Park, IL S&K Excavating $ $ $ No bid No bid No bid No bid $ $ $ No bid No bid No bid No bid $ Per crew hour without flaggers $ $ $ No bid No bid No bid No bid $ Per crew hour with flaggers $ $ $1, No bid No bid No bid No bid MATERIALS PRICE MARKUP PERCENTAGE 15% 10% 15% No bid No bid No bid No bid ADDITIONAL CLARIFICATIONS Beyond simple rd.closures,rentals Markup 5.% $160./hr.Semi trk.w/dump Trlr.;125./hr.6- Whl.dump trk. Double time; Overtime(1.5 rate)sat.or Beyond 8 hrs.workg.day Attn.: Mr. Mark Reuland Attn.: Mr. Mike Stark Attn.: Ms. Margaret M. Vizdal Attn.: Mr. Mark Peterson Attn.: Mr. Carmi Lullo Attn.: Mr. Sean Casey Attn.: Jessica RBW:cjb Bid Recap Sheets/StmSewrPtRepair Bid
12
13
14
15
16
17
18
CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1
CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm
SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
Section 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES
SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant
SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.
SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price
SECTION 200: STORM SEWER CONSTRUCTION STANDARDS
SECTION 200: STORM SEWER CONSTRUCTION STANDARDS Page No. Description 200-2 201 GENERAL 200-2 201.1 SPECIFICATIONS 200-2 201.2 CONNECTION TO EXISTING FACILITIES 200-3 202 MATERIALS 200-3 202.1 PIPES 200-4
SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING
SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent
SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or
SECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.
SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION
FY08 SEWER POINT REPAIRS BID TABULATION
6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "
CHAPTER 5. Storm Sewer
CHAPTER 5 Storm Sewer A. Introduction All proposed developments shall have a properly designed and constructed storm water conveyance system. This chapter deals only with the conveyance system. Storm water
City of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
SECTION 7- STORM SEWER
SECTION 7- STORM SEWER 7.1. STORM SEWERS.... 7-1 7.2. SUMP DRAINS... 7-3 7.3. CATCH BASINS... 7-3 7.4. MANHOLES... 7-4 7.5. STORM SEWER CALCULATIONS... 7-4 7.6. CULVERTS AND BRIDGES... 7-5 7.7. OPEN CHANNELS...
SECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
DESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation
644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
LS 2540 SEWER LATERALS AND INSPECTION TEES
LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal
SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.
SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings
SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE
6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials
Close-Out Documents... 9
Water and Sanitary Sewer Service Connection Requirements Service Connection Requirements... 1 Application for Services... 2 Water Meter Application... 2 Wet Tap/Tie-in Connection Requirements... 3 Meter
Section 402. STORM SEWERS
402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide
SANITARY SEWER SPECIFICATIONS
SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,
INDEX STORM DRAINAGE PRE-APPROVED NOTES, DESIGN CRITERIA, & PLANS
INDEX STORM DRAINAGE POLICIES D-1 NOT USED D-2 Small Project Drainage Review Requirements D-3 Targeted and Full Drainage Review Requirements D-4 Prohibited and Allowed Discharges to the Storm Drainage
PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0
DIVISION 4300 STORM DRAINAGE
DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES
STANDARD SPECIFICATIONS FOR STORM SEWER CONSTRUCTION CITY OF PLYMOUTH, MINNESOTA
STANDARD SPECIFICATIONS FOR STORM SEWER CONSTRUCTION CITY OF PLYMOUTH, MINNESOTA MARCH 2014 ENGINEERING DIVISION 3400 PLYMOUTH BLVD. PLYMOUTH, MN USA 55447-1482 TELEPHONE (763) 509-5500 Doran M. Cote,
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit
32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.
SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial
CONSTRUCTION PERMIT REQUIREMENTS
CONSTRUCTION PERMIT REQUIREMENTS Any work to be done in the City right-of-way (ROW), in a utility easement, and certain work on private property, requires an Engineering Inspection Permit from the Department
3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
SECTION 108 - INLETS 108.1 INLET LOCATIONS
Greene County Design Standards -Adopted April 5, 1999 SECTION 108 - INLETS SECTION 108 - INLETS 108.1 INLET LOCATIONS 108.2 INLET INTERCEPTION CAPACITIES 108.2.1 Clogging Factors 108.3 INTERCEPTION AND
550 PIPE CULVERTS, SEWERS AND DRAINS
551.01 550 PIPE CULVERTS, SEWERS AND DRAINS 551 GENERAL 551.01 Description 551.02 Materials 551.03 Excavation 551.04 Protection of Excavation 551.05(a) Bedding for Rigid Pipe 551.05(b) Bedding for Non-Rigid
SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS
1001 SOUTH LEECHBURG HILL LEECHBURG, PA 15656 Phone: 724-845-9355 Fax: 724-845-1186 SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS 1. General
SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014
City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 Section Subsection Name Date Modification Division 1 All subsections General Provisions
TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth
TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20
EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines
EXHIBIT "A Technical Specifications for Water and Sewer Service Lines Water and Sewer Line Bedding and Backfill: Drawings show cross-section of trench, pipe laid on top of 6" min. bedding material, bedding
STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223
STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES PART 1 - GENERAL A. Description This section describes the installation of gravity sewer pipelines fabricated of vitrified
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
Beacon Hill Sewer District Standard Specifications
Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions
The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:
Page 1 of 6 Section 1. PURPOSE This policy is an Engineering checklist of the Local Review Program for sanitary sewer improvement projects by the Bedford Regional Water Authority ( Authority ). Section
The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION
ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS for (PVC) SANITARY SEWER MAIN CONSTRUCTION VI(A).1 General VI(A).2 Materials and Equipment VI(A).3 Installation of Sanitary Sewer Mains VI(A).4 Laying of
SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2016
SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2016 102.5 Bid Deposits The City of Madison bid deposit form is required for all bids unless a Biennial Bid Bond is on file or check deposit is used.
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 400 SEWER AND WATER CONSTRUCTION
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 400 SEWER AND WATER CONSTRUCTION Section Number Title 401 GENERAL 402 AMENDMENTS TO WSWS PART I - GENERAL CONDITIONS
STANDARD SPECIFICATIONS & CONSTRUCTION DETAILS MANUAL SECTION 5 - STORM DRAINAGE. 5.01 Design
SECTION 5 - STORM DRAINAGE 5.01 Design Storm drainage facilities shall be designed in accordance with the goals and guidelines set forth in the Unified Development Ordinance. The goal shall be to collect
Storm Drain Inlet Protection - IP
Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior
Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.
4.5-p DRAIN INLET PROTECTION Alternative Names: DI protection, Drop Inlet Protection DESCRIPTION Storm drain inlet (DI) protection slows and ponds stormwater, and filters sediment and debris before it
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing
CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST
CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST NOTE: The following list shall only be used as a guide and shall not be used in lieu of the specifications found in the CITY OF ANN ARBOR PUBLIC
Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY
Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY Policy: This policy will replace all previous policies regarding the selection of pipe material for cross drains, drive pipe, drop pipe, storm
SECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
CW 2130 - GRAVITY SEWERS TABLE OF CONTENTS
August 2010 CW 2130 - GRAVITY SEWERS TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications... 1 1.4 Referenced Standard Details...
Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL
155 E. Front Street (rear) Lititz, PA 17543 Phone (717) 625-1930 Fax (717) 625-1931 Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL CONSTRUCTION SPECIFICATIONS AND DETAILS
Table 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
volume of concrete occupied by the drain pipe in a cast-in-place structure or structure extension.
715.01 430 volume of concrete occupied by the drain pipe in a cast-in-place structure or structure extension. No additional payment will be made for the repair or replacement of existing concrete damaged
WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued)
BIDDER'S PROPOSAL (continued) Item Estimated No. Description Quantity Unit Unit Cost Total Cost BASE BID 1 Traffic Control 1 LS $ $ 2 Construction Area Signs 1 LS $ $ 3 Excavation Safety 1 LS $ $ 4 Reset
Fabricated Drainage Products
Fabricated Drainage Products Complete Drainage System Inline Drains are used At the beginning of a drain line Add a new water inlet to an existing drain line using a riser pipe and tee HARCO Surface Drainage
Storm Sewer Trenchless Upgrade Alternatives and Recommendations
Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for
SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES
SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with
Section 02702 SEWER PIPE INSTALLATION AND TESTING
PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete
San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS
ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located
SECTION 9.02 BUILDING SUBSURFACE DRAINS (PERIMETER, ETC.)
CHAPTER 9 SEWER / STORM DRAIN / IRRIGATION LINES SECTION 9.01 GENERAL This section covers the requirements for piping materials and installation of Lehi City sewer, storm drainage and irrigation collection
City of Balch Springs, Texas. Request for Proposal (RFP 2016-2-15) Pipe Bursting Sewer Line Replacement
City of Balch Springs, Texas Request for Proposal (RFP 2016-2-15) Pipe Bursting Sewer Line Replacement Balch Springs is a city in Dallas County, Texas, United States. It is a suburb of Dallas and part
CHAPTER 6 - SANITARY SEWER
CHAPTER 6 - SANITARY SEWER 6.1 GENERAL This section covers the requirements for PVC plastic sewer pipe materials and installation in sanitary sewer construction. 6.2 PIPE PVC gravity sewer pipe and fittings
X Planning X Quality X Maintenance & Operations
Delaware Department of Transportation Division of Transportation Solutions Design Guidance Memorandum Memorandum Number 1-20 Revised 1. Road Design Manual 2. Bridge Design Manual 3. Utilities Design Manual
SECTION 6A STORM DRAIN DESIGN Mar. 2002 S E C T I O N 6A STORM DRAIN - DESIGN
S E C T I O N 6A STORM DRAIN - DESIGN 6A.l Scope 6A.2 Storm Water Quantity 6A.3 Storm Drain Hydraulics 6A.4 Depths 6A.5 Locations 6A.6 Curved Storm Drains 6A.7 Manholes 6A.8 Catch basins 6A.9 Storm Drain
Town House 11265 Center Highway North Huntingdon, PA 15642
APPENDIX C SPECIFICATIONS FOR THE CONSTRUCTION OF BUILDING LATERAL SANITARY SEWERS DECEMBER 2004, INCLUDING AMENDMENTS ADOPTED ON FEBRUARY 6, 2008 AND APRIL 2, 2008; EFFECTIVE ON MAY 1, 2008 Town House
SECTION G SEWERS (STORM, SANITARY AND FDC)
G-1 GENERAL SECTION G SEWERS (STORM, SANITARY AND FDC) The Consulting Engineer is to monitor all specified pipe and granular materials, pipe slopes and run lengths and ensure the outlined criteria below
Permit No. Permit Fee: $295.00. Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: E-mail Address:
City of Woodland Park Internet Service Provider (IPS) Permit for Installation of Telecommunication Infrastructure within City Owned Rights-of-Way (up to five locations per single permit) Permit No. Permit
Local Road Assessment and Improvement Drainage Manual
Local Road Assessment and Improvement Drainage Manual Donald Walker, T.I.C. Director, author Lynn Entine, Entine & Associates, editor Susan Kummer, Artifax, design Transportation Information Center University
Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18
Schedule H to Bylaw 7452, Subdivision Bylaw Page 18 3.4 Sanitary Sewers 3.4.1 Materials 3.4.1.1 The class and type of pipe and fittings, together with required class of bedding and trench widths, shall
Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
SECTION 33 41 00 REINFORCED CONCRETE PIPE. A. The following is a list of SPECIFICATIONS, which may be related to this section:
SECTION 33 41 00 REINFORCED CONCRETE PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. This section includes construction of reinforced concrete pipe for storm drainage, culverts, and sanitary sewer, including
Wastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
Photographs: Acceptable, Unacceptable, and Unacceptably Repaired Precast Concrete Products
Photographs: Acceptable, Unacceptable, and Unacceptably Repaired Precast Concrete Products A Visual Aid For: Bureau of Materials and Physical Research s (BMPR) Policy Memorandum, Quality Control/Quality
STORM DRAINS CHAPTER 7
CHAPTER 7 Chapter 7 - Storm Drains A storm drain is a drainage system that conveys water or stormwater, consisting of two or more pipes in a series connected by one or more structures. Storm drains collect
Unit Price Averages Reports
Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation
Outlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
Specifications for Residential Property Owners Connection to New Public Sewer
Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the
ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application.
ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. Article II provides rules governing the allowable connection to the City POTW and the construction and inspection of
SECTION 02401 - SANITARY SEWER PIPE
PART 1 - GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for furnishing and installing sanitary sewer pipe, in accordance with
Sanitary Sewer Mains and Services
Sewer Title Sanitary Sewer Mains and Services STitle Sewer Table of Contents "CORRECTIVE PERIOD & INSPECTION FOR SANITARY SEWERS & SERVICES"... 1 1. TERM OF GUARANTEE... 1 2. CONTRACTOR LICENSE AND PERMITS...
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection
SECTION 16402 UNDERGROUND ELECTRIC SERVICE
SECTION 16402 UNDERGROUND ELECTRIC SERVICE PART 1 GENERAL 1.1 SUMMARY A. Description of System 1. Furnish all labor, materials, and equipment for below grade work external to buildings as required, and
ITD Pipe Materials Selection & Specification Procedures. July 2011
ITD Pipe Materials Selection & Specification Procedures July 2011 INTRODUCTION: This technical memorandum is written as a guide to the selection of compliant pipe materials and the elimination of non-compliant
City of West Linn Public Works Standard Construction Specifications. Table of Contents
City of West Linn Public Works Standard Construction Specifications Table of Contents DIVISION SIX STORM DRAIN TECHNICAL REQUIREMENTS... 1 601 PIPE AND FITTINGS... 1 601.01 Description...1 601.02 Materials...1
City of La Quinta Public Works Department - Storm Drain Plan Review Checklist
Tract or Parcel Project Name PCN Checked By Date City of La Quinta Public Works Department - Storm Drain Plan Review Checklist SUBMITTAL REQUIREMENTS Approved Tentative Tract Map Conditions of Approval
San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS
San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS 854.1 DESCRIPTION: This item shall govern sanitary sewer laterals installed in accordance with these
Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
Stormwater/Wetland Pond Construction Inspection Checklist
: Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials
SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT
SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT The following are minimum requirements for installation of conventional trench sewage disposal systems in St. Mary s County,
SECTION 3 SANITARY SEWER DESIGN
SECTION 3 SANITARY SEWER DESIGN 3.1 GENERAL DESIGN CRITERIA 3.1.1 Requirement for Sanitary Sewer 3.1.2 Design Approval 3.1.3 IEPA Permit Required 3.1.4 Differentiation Between Public and Private Sanitary
APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.
Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of