Sanitary Sewer Mains and Services

Size: px
Start display at page:

Download "Sanitary Sewer Mains and Services"

Transcription

1 Sewer Title Sanitary Sewer Mains and Services STitle

2 Sewer Table of Contents "CORRECTIVE PERIOD & INSPECTION FOR SANITARY SEWERS & SERVICES" TERM OF GUARANTEE CONTRACTOR LICENSE AND PERMITS INSPECTION OF SANITARY SEWER MAINS & SERVICES ELEVATION DATUM PROJECT DESIGN CHANGES CERTIFICATE OF SUBSTANTIAL COMPLETION... 2 "MATERIAL SPECIFICATIONS FOR SANITARY SEWERS & SERVICES" SCOPE OF WORK MATERIAL INSPECTION MATERIAL HANDLING & STORAGE AGGREGATE MATERIALS WATER/SEWER TAPPING FEES POLYVINYL CHLORIDE (PVC) PIPE, SDR 35 (4"-48 ) POLYVINYL CHLORIDE (PVC) PIPE, SDR 26 (4"-48 ) POLYVINYL CHLORIDE (PVC) PIPE & FITTINGS, DR 25 or Class 100 (4"-12 ) DUCTILE-IRON PIPE (DIP) MANHOLE PIPE TO WALL PENETRATION SEALS ON EXISTING MANHOLES "CONSTRUCTION SPECIFICATIONS FOR SANITARY SEWERS & SERVICES" ALIGNMENT AND GRADE UNDERGROUND INTERFERENCE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES WATER MAIN AND SANITARY SEWER MAIN SEPARATION JOB SITE AND WORK AREA CLEANUP CASING PIPE UNDER HIGHWAYS, RAILROADS, ETC DEWATERING ABANDONED SANITARY SEWER MAIN AND MANHOLES TRENCH CONSTRUCTION PIPE INSTALLATION JOINT ASSEMBLY BACKFILLING FITTING INSTALLATION SANITARY SEWER SERVICES (4"-6 ) SANITARY SEWER MAIN TESTING AND INSPECTION TELEVISED INSPECTION OF SANITARY SEWER MAIN GRAVITY SANITARY SEWER MAIN AIR TEST SANITARY SEWER FORCEMAIN HYDROSTATIC PRESSURE TESTING INFILTRATION TESTING SANITARY SEWER MAIN EXFILTRATION TESTING SANITARY SEWER MAIN DEFLECTION TESTING SANITARY SEWER MAIN MANHOLE TESTS SEWER INSTALLATION DETAILS... SDetails-1 to 11 STable

3 "CORRECTIVE PERIOD & INSPECTION FOR SANITARY SEWERS & SERVICES" 1. TERM OF GUARANTEE a. Corrective Period: The corrective period shall cover the contract as to workmanship and materials for a period of five (5) years in compliance with the City of Brookings ordinance "Excavating & Backfilling on Public Right-of-Way". The corrective period of five (5) years shall commence from the BMU determined Substantial Completion date. b. Responsibility: The Contractor shall be held responsible for workmanship, materials, settling trenches or any other deficiencies in the sewer main system during the corrective period. The Contractor shall repair and/or replace all deficiencies in the sewer system during the five (5) year corrective period at no cost to the Owner. Any surface restoration costs incurred because of the repairing and/or replacing of deficiencies in the sewer system shall be borne by the Contractor. 2. CONTRACTOR LICENSE AND PERMITS a. License: The Contractor shall be required to have any required licenses (sewer and water installation Contractor license or sewer and water installer license) for water/sewer installation or water/sewer repairing as stated in the South Dakota State Plumbing Code. b. Excavation Permit: The Contractor shall obtain an excavation permit issued at no charge from the Brookings City Engineering Office (520 Third Street) before any water/sewer installation or water/sewer repairing will be allowed. c. Dewatering Permit: The Contractor shall obtain any dewatering permits required from local, state or federal agencies. The Contractor shall submit a copy of the dewatering permit to BMU prior to dewatering. The discharge area must be prior approved by the Engineer before initiating the dewatering. 3. INSPECTION OF SANITARY SEWER MAINS & SERVICES a. Engineer Inspection: The Engineer or Engineers Representative shall have access at all times to all parts of the job and the Contractor must furnish all such facilities and materials which are necessary to make whatever tests and inspections that are deemed necessary. The Engineer reserves the right to inspect and/or reject any part of, or all unsatisfactory work performed by the Contractor. Rejected or unapproved work shall not be paid for. 4. ELEVATION DATUM a. Elevation Datum: The Project Designer shall utilize only a City Engineer approved NAVD 88 datum for elevation reference. The Project Designer shall bring elevation control to the project site, preferably a nearby fire hydrant. All elevations established on hydrants shall be on top of the O on open (facing nozzle) with a tolerance of 0.03 or less. The City Engineer approved NAVD 88 datum and all project site elevation controls are to be noted on the plan sheets. 5. PROJECT DESIGN CHANGES a. Project Design Changes: If the Owner or the Owners Designer make any project design changes after the sewer main, sewer apparatus or sewer services have been purchased or installed, the location or elevation changes required for the sewer main, sewer apparatus or sewer services shall be at the Owners expense. -1 of 27

4 6. CERTIFICATE OF SUBSTANTIAL COMPLETION DATE OF ISSUANCE: OWNER: CONTRACTOR: Project: BMU Project No: Contract Dated: Brookings Municipal Utilities BMU Work Order No: (applicable only to BMU funded projects) This Certificate of Substantial Completion applies to all Work under the Contract Documents or to the following specified parts thereof: To: And To: Brookings Municipal Utilities OWNER CONTRACTOR The Work to which this Certificate applies has been inspected by authorized Representatives of OWNER and the CONTRACTOR, and that Work is hereby declared to be substantially complete in accordance with the Contract Documents on: BMU Determined Substantial Completion Date Five (5) Years Corrective Period in Years Corrective Period Expiration Date -2 of 27

5 The CONTRACTOR accepts this Certificate of Substantial Completion and accepts corrective period responsibilities. Date: (Contractor) (Company Name) Date: (Project Superintendent) Brookings Municipal Utilities (Company Name) Date: (Utility Operations Manager) Brookings Municipal Utilities (Company Name) SUBSTANTIAL COMPLETION APPROVED Date: (Executive Vice President & General Manager) Brookings Municipal Utilities (Company Name) -3 of 27

6 "MATERIAL SPECIFICATIONS FOR SANITARY SEWERS & SERVICES" 7. SCOPE OF WORK The Contractor shall furnish all materials (except for Utility furnished materials), equipment and labor necessary to install sewer main as per plans and specifications. It is the intent of these specifications to install a complete sewer system; and the Contractor shall furnish everything necessary to do this, whether or not all items are specifically called for in these plans and/or specifications. 8. MATERIAL INSPECTION a. Material Inspection: All pipe and appurtenances are subject to inspection by the Engineer. Material found to be defective due to manufacture or damage in shipment shall be rejected and removed from the job site. b. Material Testing: The Engineer may perform tests to ensure conformance with the sewer standard. In case of failure of the pipe or appurtenance to comply with such specifications, responsibility for replacement of the defective materials becomes that of the Contractor or Manufacturer, even if piping and appurtenance has already been installed. 9. MATERIAL HANDLING & STORAGE a. Material Handling: All pipe, fittings, and accessories shall be loaded and unloaded by a means to prevent shock or damage. Under no circumstances shall such material be dropped. b. Material Storage: Materials, if stored, shall be kept safe from damage. The interior of all pipe, fittings, and other appurtenances shall be kept free from dirt or foreign matter at all times. c. Pipe: Piping shall not be stacked higher than Manufacturers recommendations according to size. The bottom tier of piping shall be kept off the ground on timbers, rails, or concrete. Pipe in tiers shall be alternated: bell, plain end; plain end, bell. At least two rows of timbers shall be placed between tiers, and chocks shall be affixed to each timber in order to prevent movement. The timbers shall be large enough to prevent contact between the pipes in adjacent tiers. d. Gaskets: Gaskets for push-on joints shall be stored in a cool location, out of direct sunlight. Gaskets shall not come in contact with petroleum products. Gaskets shall be used on a first-in, first-out basis. 10. AGGREGATE MATERIALS a. Trench Stabilization Material (#4 Ballast or 1½ x ¾ Rock): The Contractor shall be required to use a trench stabilization material, as directed by the Engineer, if the sub-grade is deemed unstable. The stabilization material, unless otherwise directed, shall conform to the following sieve analysis: #4 Ballast Percentage by weight sieve size passing through sieve 2 ½ inch 100% 2 inch 90% to 100% 1 ½ inch 50% to 80% 1 inch 10% to 35% ¾ inch 0% to 10% ½ inch 0% to 5% -4 of 27

7 1 ½ x ¾ Rock Percentage by weight sieve size passing through sieve 2 inch 100% 1 ½ inch 50% to 100% 1 inch 5% to 55% ¾ inch 0% to 15% a. Pipe Bedding Material (3/8 x 1/8 Pearock): The Contractor shall be required to use the following for pipe bedding. The pipe bedding to use, unless otherwise directed, shall conform to the following sieve analysis: 3/8 x 1/8 Pearock Percentage by weight sieve size passing through sieve 3/8 inch 95% to 100% #4 10% to 90% #8 0% to 30% #40 0% to 4% b. Road Topping or Trench Replacement Material (3/4 Crushed Gravel): Trench replacement in developed streets, or if there is a deficiency due to a rejection of a part thereof, shall be 3/4 crushed gravel with a soil mortar or binder, unless otherwise directed. The crushed gravel shall conform to the South Dakota Department of Transportation Specifications, Section 882 Aggregates for Granular Bases and Surfacing. The 3/4 crushed gravel, unless otherwise directed, shall conform to the following sieve analysis: 3/4 Crushed Gravel Percentage by weight sieve size passing through sieve 1 inch 100% ¾ inch 80% to 100% ½ inch 68% to 91% #4 46% to 70% #8 34% to 58% #40 13% to 35% #200 3% to 12% 11. WATER/SEWER TAPPING FEES a. Water Tapping Fees & Corporations: After the Contractor pays the water tapping fee, the city shall furnish & install all corporations with saddle up to and including 2" corporations. A water service 2" or larger shall require prior Utility approval. 1 water tapping fee: $ /2 water tapping fee: $ water tapping fee: $ b. Curb Stops: All curb stops with 4 PVC sidewalk casings shall be furnished and installed by the Contractor. 4 PVC curb stop casing shall be ASTM D3034, and shall have an SDR 35 rating, and shall be cut longer than the sidewalk thickness. (Copper rolls over 1 are 60 lengths, 100 lengths take +/-10 weeks to get, no splices allowed) c. Sewer Tapping Fees: After the Contractor pays the sewer tapping fee, the city shall furnish & install inserta tees or saddles for making sewer taps. If the Contractor installs an in-line wye, inserta tee, or a saddle, then a tapping fee would not be required. 4 & 6 sewer tapping fee: $ of 27

8 12. POLYVINYL CHLORIDE (PVC) PIPE, SDR 35 (4"-48 ) a. PVC Sewer Pipe: 4"-15" PVC sewer pipe shall conform to the latest revision of ASTM D PVC & larger shall conform to the latest revision of F-679. Schedule 40 PVC shall be required for sewer services where the water service is in the same trench and the water service is not shelved above the sewer service, see sewer details. b. PVC Sewer Pipe Joints: PVC sewer pipe shall have rubber-gasket joints conforming to the latest revision of ASTM D3212 & ASTM F-477. c. PVC Sewer Pipe Couplers: PVC sewer pipe couplers shall be strong back or no-sheer type, or an approved equal. 13. POLYVINYL CHLORIDE (PVC) PIPE, SDR 26 (4"-48 ) (for service risers, directional boring, hole hogging and main depths exceeding 20' of cover) a. PVC Sewer Pipe: 4"-15" PVC sewer pipe shall conform to the latest revision of ASTM D PVC & larger shall conform to the latest revision of F-679. b. PVC Sewer Service Risers: Sewer service risers are to be prior approved by the Owner and/or the Engineer. Sewer service risers shall be required when the sewer main invert is 14-0 or more to the proposed road grade. Elevations for an approved sewer service riser shall be determined by the Engineer and/or the Owner. 4"-6" PVC sewer service risers shall conform to the latest revision of ASTM D3034. The in-line wye shall be required to have the same SDR rating as the sewer main, but the sewer service riser shall be required to be SDR 26 until the sewer service is 5 (min) onto virgin ground. After the sewer service is installed 5 (min) onto virgin ground, the sewer service may revert to ASTM D3034 with an SDR 35 rating, unless otherwise specified. Rock ballast may be required from the center of the carrier sewer main up to where the sewer service riser is anchored to the virgin soil. This is to ensure the sewer service shall be stable when backfilling. c. PVC Sewer Services via Directional Boring or Hole Hogging: Sewer services installed via directional boring or hole hogging are to be prior approved by the Owner and/or the Engineer. Directional boring or hole hogging for a sewer service line will not be allowed for sewer services with grades less than 2.00%. 4"-6" PVC sewer services installed via directional boring or hole hogging shall conform to the latest revision of ASTM D3034. Such shall be from one end of the directional bore or hole hog to the other end of the directional bore or hole hog. On either side of the directional bore or hole hog the sewer service may be reverted to ASTM D3034 with an SDR 35 rating, unless otherwise specified. d. PVC Sewer Pipe Joints: PVC sewer pipe shall have rubber-gasket joints conforming to the latest revision of ASTM D3212 & ASTM F-477. e. PVC Sewer Pipe Couplers: PVC sewer pipe couplers shall be strong back or no-sheer type, or an approved equal. 14. POLYVINYL CHLORIDE (PVC) PIPE & FITTINGS, DR 25 (4"-12 ) (water main pipe used for sewer forcemain) a. PVC Water Pipe: PVC pipe and fittings shall conform to the latest revision of the AWWA C900 (4"-12") standard or the latest revision of the AWWA C905 (14"- 36") standard. PVC pipe and fittings shall have a Cast Iron Pipe (CIP) outside diameter. b. PVC Fittings: PVC fittings shall be polyvinyl chloride (PVC) pressure fittings and shall conform to the ANSI/AWWA C907 (4-8 ) standard. PVC fittings shall have a Cast Iron Pipe (CIP) outside diameter. -6 of 27

9 c. DIP Fittings: DIP fittings shall be push-on joint or mechanical joint fittings and shall conform to the latest revision of the ANSI/AWWA C110/A21.10 (3"-48") standard or the latest revision of the ANSI/AWWA C153/A21.53 (3"-24" & ) standard for compact fittings. DIP fittings shall have a Cast Iron Pipe (CIP) outside diameter. DIP & fittings shall be cement lined conforming to the latest revision of the ANSI/AWWA C104/A21.4 standard. Rubber-gasket joints for DIP & fittings shall conform to the latest revision of the ANSI/AWWA C111/A21.11 standard. d. PVC Water Pipe Joints: PVC pipe and PVC fittings shall have rubber-gasket joints which conform to the latest revision of the ANSI/AWWA C111/A21.11 standard. e. Valves & Valve Boxes: Valves, gaskets and bolts, valve box adaptors, and valve boxes with metallic inserts which have a cast iron drop cover will be furnished by the city and installed by the Contractor. 15. DUCTILE-IRON PIPE (DIP) (for elevated sewer stubs on drop manholes) a. Ductile-Iron Pipe (DIP): The DIP, push-on joint or mechanical joint, shall conform to the latest version of the ANSI/AWWA C151/A21.51 (3"-64") standard. DIP and fittings shall have a minimum Pressure Class of 150. b. DIP Fittings: Fittings shall be ductile-iron push-on joint or mechanical joint fittings and shall conform to the ANSI/AWWA C110/A21.10 (3"-48") standard or the ANSI/AWWA C153/A21.53 (3"-24" & ) standard for compact fittings. Fittings shall have a minimum Pressure Class of 150. c. Cement-Mortar Lining for Ductile-Iron Pipe and Fittings for Water: DIP & fittings shall be cement lined conforming to the latest version of the ANSI/AWWA C104/A21.4 standard. d. Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings: Rubber-gasket joints for DIP & fittings shall conform to the latest version of the ANSI/AWWA C111/A21.11 standard. 16. MANHOLE a. Precast Concrete Manhole Specifications: Precast concrete manholes shall conform to the latest revision of ASTM C478. All manholes for new construction to be monolithically poured structures. Upon request from the Engineer, the Contractor and/or supplier shall supply the Engineer with a test report from an independent testing laboratory showing compliance with the ASTM C478 standard. All manholes shall be constructed without steps or ladders. Manholes are to be constructed according to the dimensions shown on the plan sheets or from staking sheets provided by the Engineer. The Contractor shall provide shop drawings of the manhole details from his vendor for Utility records, not for approval. This shall be done prior to the construction of the manholes. b. Standard Manhole: Standard manholes shall have an inside diameter of 48" unless otherwise stated in the plans and/or specifications. c. Distances between Manholes: Distances between manholes shall be determined by the Engineer (BMU equipment can jet clean up to 550 in length) with manhole locations in the centerline of future lateral right-of-ways where applicable. d. Outside Drop Manholes: Outside drop manholes are not allowed, if a drop is required see Inside Drop Manholes. -7 of 27

10 e. Inside Drop Manholes: Manholes with inside drops shall be required if the drop exceeds 2.00' between the highest inlet invert and 80% of the inside diameter of the pipe added to the invert of the bottom carrier pipe. Inside drop manholes shall have an inside diameter of 48" unless otherwise stated in the plans and/or specifications. All inside drops shall be a Reliner by Duran Inc. inside drop system, or an approved equal. The A size drop bowl has a 12 wide receptor bowl with a 4 or 6 outlet. The 4 bowl outlet will service a 6 sewer main and the 6 bowl outlet will service an 8 sewer main. The B size drop bowl has an 18 wide receptor bowl with an 8 or 10 outlet. The 8 bowl outlet will service a 10 sewer main and the 10 bowl outlet will service a 12 sewer main. For larger than 10 sewer main drops consult with the Engineer. The bowl shall be fastened securely with 304 stainless steel fasteners. The sewer main inlet shall protrude through the manhole to the edge of the drop in the bowl, where the Contractor shall make a 1 ¼ long degree v-notch in the bottom of the sewer main inlet. The PVC drop section shall be secured to the barrel section with Reliner brand 304 stainless steel adjustable clamping, or an approved equal. Clamps shall be required 6 maximum from the bottom 45 degree solvent weld elbow and 6 maximum from the drop bowl, with 4-0 maximum spacing between clamps. A 45 degree bend shall be installed on the bottom of the drop to direct the flow towards the channel. The 304 stainless steel fasteners shall not be allowed to penetrate the precast manhole section. Ductile-iron piping shall be required for all elevated sewer stubouts from the manhole to 5' (min) into virgin soil. f. Eccentric Cone Section: The upper precast cone section of the manhole shall be eccentric (offset) and shall have a 24" minimum to a 27" (preferred) maximum diameter opening at the top unless otherwise stated in the plans and/or specifications. The opening (flat side) of the eccentric cone section shall be positioned over the outflow side of the carrier pipe unless otherwise stated or directed. g. Joint Sealant: A flexible butyl rubber joint sealant shall be used between manhole sections and concrete adjusting rings for creating a water tight sealant. Ramnek, Kentseal, Conseal or other approved flexible butyl rubber joint sealant shall be used. Rubber gaskets and joints meeting the requirements of ASTM C443, C361 and the Bureau of Reclamation R-4 specifications shall also be accepted for manhole joints. h. Pipe Stubouts from Manhole: All sewer main stubouts shall be 13 (one length of pipe), unless otherwise directed, and shall be considered part of the manhole construction. i. Resilient Connectors: Resilient connectors between precast concrete manholes and sewer main pipe shall conform to the latest revision of ASTM C923, providing a watertight connection. j. Manhole Piping & Resilient Connector Elevations: All manholes accommodating PVC sewer mains larger than 8" in diameter shall be pushed through the manhole and through the opposite resilient connector when applicable. If the opposite resilient connector is to high to achieve this, then the PVC piping shall be pushed through the manhole to the opposite wall of the manhole. The same shall apply to manholes with PVC sewer mains 8" in diameter unless the lateral sewer main inverts are lower than 80% of the inside diameter of the carrier pipe added to the invert of the carrier pipe. In this case pushing the pipe through the manhole will not be required. When a manhole accommodates two different sized sewer pipes, the 80% flow depth elevation of the smaller sewer pipe shall match or exceed (be higher than) the 80% flow depth elevation of the larger sewer pipe. -8 of 27

11 k. Pipe Cradle: Manholes which have pipe cradles must have prior Utility approval before installation. Manholes which have pipe cradles for installation over existing sewer pipe shall adhere to the following specifications for the forming of the flow channels, installation of reinforcing bars and concrete grouting of the pipe cradles. The Contractor shall set the manhole base section on concrete blocks or an approved equal before the pouring of the concrete flooring and/or footing. The concrete flooring and/or footing shall be a minimum of 6" thick and must be allowed to flow a minimum of 6" past the outside of the manhole base section. Manhole flow channels are then to be formed in the flooring as stated in "Flow Channel". l. Flow Channel: Manholes with preformed flow channels must be prior approved before installation. Preformed flow channels must be constructed to allow BMU equipment, such as the TV camera and vacuum/jetting machine nozzle, easy access into the flow channel or the manhole shall not be allowed to be installed. Manhole flow channels are to be formed with concrete to create channels for sewer flow in the bottom of all manholes. Manhole channels are not to be formed until all the piping is installed into the manhole. Manhole flow channels shall be shaped as the same manner as the bottom half of the pipe entering the manhole. Where laterals enter the main flow line a gradual change in direction toward the flow is to be formed. Flow channels shall be formed for all future flow line locations as shown on plan sheets or staking sheets. All concrete on inside of manhole is to have a glass smooth finish. Wherever PVC piping protrudes into or through a manhole, the Contractor shall cut the top 40% of the piping in the manhole off and grout to the top of the piping. m. Concrete: Concrete used for manhole channels, manhole bases, pipe cradles, grouting or other structures shall be non-shrinking and consist of one part standard Portland Cement Type I, 2 1/2 parts clean washed sand and 3 parts crushed rock and gravel, free from foreign materials. The minimum design strength of the concrete mixture shall be 3,000 psi. n. Reinforcing Bars: Sizing, installation and location of reinforcing bars shall be determined by the Engineer or as per plans and/or specifications. The Engineer may require reinforcing bars in manhole bases, pipe cradles or other structures if the situation warrants. Reinforcing bars shall be structural grade, manufactured by the open hearth process from new billets. All bars shall be deformed. o. Adjustment Ring(s): Adjustment ring(s) shall have an inside diameter of 27, and shall be either precast concrete or high density polyethylene (HDPE) and must withstand HS 20 loads. The preferred adjustment ring height shall be 4 per manhole, with a maximum height of 12" of adjustment rings. Adjustment rings shall be 4 wherever possible to keep the number of adjustment joints at a minimum. Concrete adjusting ring(s) shall either be grouted together or adhered together using the afore mentioned joint sealant. HPDE adjusting ring(s) shall be adhered together using an approved sealant and installed according to the Manufacturers installation instructions. p. Sewer Main Stubouts in Manholes: All sewer main stubouts which are 13 (one length of pipe) or less shall be considered a portion of the manhole installation. -9 of 27

12 q. Frames & Lids: Cast iron manhole frames & lids shall meet Highway 20 (min) load specifications and shall be set to the grade of the street and/or grades provided. Cast iron manhole frames & lids shall be made of gray iron conforming to ASTM Designation A48 for Class 30 (min) Iron. Frames & lids shall be a 7" high Deeter 1260 with solid lid & (2) 1 open lift holes or a 7 high East Jordan Ironworks 1205 with solid lid & (2) 1 open lift holes or a Municipal Castings frame with a 301-A solid lid & (2) 1 open lift holes, or a 7" high Neenah Foundry R-1733 with solid lid & (2) 1 open lift holes. "SEWER" (preferred) or SANITARY SEWER shall be stamped on all lids. Frames & lids shall be cleaned and have machined bearing surfaces. 17. PIPE TO WALL PENETRATION SEALS ON EXISTING MANHOLES a. Penetrations on Existing Manholes: When pipe penetrations are required to be made to an existing manhole, the manhole shall be required to be completely watertight after the pipe penetration has been completed. The method for penetrating the manhole shall be done by one of the following methods: i. core-drilling the manhole wall and using a (316) stainless steel Link-Seal, or an approved equal, for the seal between the pipe and the manhole wall. All bolts and nuts shall be encased in grout to protect them from the harsh environment. ii. core-drilling the manhole wall and professionally installing a resilient connector (boot) for a seal between the pipe and the manhole wall. The resilient connector shall conform to the latest revision of ASTM C923, providing a watertight connection. b. Core-Drill: Core-drilling shall be professionally done to provide a smooth, circular cut through the manhole wall, and through the grout on the inside of the manhole if required. The cut must be smooth with no irregularities. The diameter of the core-drill shall be as recommended by the Manufacturer of the pipe to wall seal. -10 of 27

13 "CONSTRUCTION SPECIFICATIONS FOR SANITARY SEWERS & SERVICES" 18. ALIGNMENT AND GRADE The Engineer shall furnish all the necessary alignment and grade stakes or other necessary control for installing the sewer main and manholes at the required locations. It is the responsibility of the Contractor to protect these grade stakes, and any replacement of these grade stakes shall be at the expense of the Contractor. The Contractor shall carry alignment and grade into the trench by means of a laser beam system and a level & level rod. The Contractor shall double check the laser beam grade from the grade stakes provided by the Engineer. At no time shall the Contractor change the grade without the approval of the Engineer. If underground interferences are encountered at the assigned grade, the Contractor shall notify the Engineer and wait until a revised grade has been determined for the sewer main. 19. UNDERGROUND INTERFERENCE The location of underground public or private utilities may be shown on the plan sheets, as reported by the various utility companies and the Engineer, but this does not relieve the Contractor of the responsibility of determining the accuracy or completeness of these said locations. The Contractor shall determine the location of all underground ducts, conduits, pipes, cables or structures which will be affected by his excavation, and shall take steps necessary to support, protect, remove or relocate the said structures by any means suitable to the Owner and/or Engineer. The Contractor shall be responsible for notifying the various utility companies if his work will expose, affect or endanger any existing utility. The Contractor shall not begin construction until all utility companies have been contacted and their respective underground utilities have been located. In any instances arise where utility or structure relocation or reconstruction is impracticable, a deviation from alignment and grade may be requested by the Engineer. All cost of investigation and any necessary protection, support, removal or relocation of said structures shall be included in the contract bid price for laying pipe. The Contractor shall notify the SD 1-Call Notification Center at and the Brookings Municipal Utilities at for scheduling locates. 20. MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES The Contractor shall barricade & maintain traffic control according to the Manual on "Uniform Traffic Control Devices" for streets & highways whenever it is applicable. The Federal Highway Administrator approves this manual as the National Standard. -11 of 27

14 21. WATER MAIN AND SANITARY SEWER MAIN SEPARATION a. Horizontal Pipe Separation: Sanitary sewer mains shall be laid at least 10 feet horizontally from any existing or proposed water main. The distance shall be measured edge to edge. In cases where it is not practical to maintain a 10 foot pipe separation, the Department may allow deviation on a case-by-case basis, if supported by data from the Design Engineer. Such deviation may allow installation of the sanitary sewer main closer to a water main, provided that the water main is in a separate trench or on an undisturbed earth shelf located on one side of the sanitary sewer main and at an elevation so the bottom of the water main is at least 18 inches above the top of the sanitary sewer main. If it is impossible to obtain proper horizontal separation as described above, both the water main and sanitary sewer main shall be constructed of slipon or mechanical joint pipe complying with public water supply design standards of the Department and be pressure rated to 150 psi. b. Vertical Pipe Separation: i. Sanitary Sewer Mains Crossing Under Water Mains The sanitary sewer main shall be laid to provide a minimum of 18 from the top of the sanitary sewer main to the bottom of the water main. The crossing shall be arranged so the sanitary sewer joints will be equidistant and as far as possible from the water main. 1. In the event 18 of pipe separation cannot be maintained, adhere to one of the following: a. The Contractor may replace the sanitary sewer main piping with a 20 pipe section of BMU acceptable water main pipe (C900 with rubber end seals or Schedule 40 PVC with PVC couplers) pressure rated at 150 psi, 10 feet on each side of the water main, OR: b. Install an encasement pipe around the water main or sanitary sewer main. The encasement pipe shall be 20 minimum in length, centered where the pipes intersect, and sealed at both ends. ii. Sanitary Sewer Mains Crossing Over Water Mains: 1. Pipe separation of 18 or greater shall be maintained, and the Contractor shall adhere to one of the following: a. The Contractor may replace the sanitary sewer main piping with a 20 pipe section of BMU acceptable water main pipe (C900 with rubber end seals or Schedule 40 PVC with PVC couplers) pressure rated at 150 psi, 10 feet on each side of the water main, OR: b. Install an encasement pipe around the water main or sanitary sewer main. The encasement pipe shall be 20 minimum in length, centered where the pipes intersect, and sealed at both ends. c. Storm Sewer Crossing: i. A reinforced concrete pipe (RCP) storm sewer pipe may cross below a water main with a separation of less than 18 inches or at any height above a water main provided the joints on the RCP within 10 feet of either side of the water main are assembled with either: 1. A gasket that conforms to ASTM C443 specifications (generally available for round RCP pipe up to 72 inches), OR: 2. A watertight sealant meeting ASTM C990, AASHTO M 198, and Federal Specification #SS-S-210-A. -12 of 27

15 22. JOB SITE AND WORK AREA CLEANUP The Contractor shall perform the work in a good workmanlike manner or to the satisfaction of the Owner/BMU. The Contractor is to clean up the job site, work area, public and private roads each day prior to leaving the project area. If the Contractor tracks mud, clay, aggregates, debris, etc., onto public roads, public right-of-ways, private roads, etc., all cleanup required shall be at the Contractors expense. It is up to the Contractor to provide whatever tracking control methods are necessary before accessing public and private roads with construction equipment. The Contractor can prevent tracking of soils and sediments onto public and private roads by constructing temporary graveled access roads and parking areas as needed at the construction site. 23. CASING PIPE UNDER HIGHWAYS, RAILROADS, ETC. 24. DEWATERING When casing pipe is specified for highway, railroad or any other crossings, the project shall be completed in accordance with applicable federal, state, and local regulations. The casing pipe shall be large enough to accommodate casing spacers on the carrier pipe to ensure the correct grade is established, proper centering within the casing pipe and to prevent damage during the installation. Ample amount of casing spacers shall be supplied to sustain a full carrier pipe. Care must be exercised in order to avoid any pvc to metal or metal to metal contact. In order to avoid the transfer of earth and live loads to the carrier pipe, the space between the carrier pipe and the casing pipe shall not be filled. The casing spacers shall be sized to allow 1/2 to 1 maximum of tolerance between the casing spacer runner and the casing inside diameter, this shall minimize the misalignment of the carrier pipe from the water table floating the pipe. a. Dry Trench: The trench is to be completely dry for pipe installation. b. Dewatering Methods: It is up to the Contractor to investigate soil conditions to determine what dewatering methods shall be required. Prior approval from the Engineer is required before boring soil samples. The discharge area must be prior approved by the Engineer before initiating the dewatering. Any dewatering permits required from local, state or federal agencies must be obtained by the Contractor. When this item is included in the Bid Form as a separate bid item, this item shall be included in the overall competitive bid. This item is to inform the Contractor that dewatering may be necessary and it is up to the Contractor to determine what dewatering methods are deemed necessary. If there is no separate bid item for dewatering, trench-dewatering shall be part of the trench excavation and pipe installation bid items. c. Pearock for the Dewatering Wells: The pearock required for the dewatering wells may be included in the bid item Pipe Bedding. 25. ABANDONED SANITARY SEWER MAIN AND MANHOLES a. Abandoned Sewer Main and Manholes: Abandoned sewer mains, sewer services and manholes in the common trench area of the replacement sewer main or sewer service shall be removed and disposed of by the Contractor. No open pipes shall be allowed on abandoned sewer mains or sewer services, all open pipes shall be concrete capped to prevent soil & water migration into the abandoned pipe. -13 of 27

16 26. TRENCH CONSTRUCTION a. Open Cut Trench: All sewer mains shall be installed in open cut trenches. The Engineer may permit short tunneling if deemed necessary. b. Protection of Workers: Contractor shall be in conformance with all federal and state regulations for the protection of the workers. c. Alignment & Grade: All trenches shall be excavated on alignment and grades furnished by the Engineer, see "Alignment & Grade". The Contractor shall provide a laser beam system and a level & level rod for maintaining alignment and grades. d. Trench-Dewatering: The trench is to be completely dry for pipe installation. Discharge from any trench-dewatering pumps shall be conducted to natural drainage channels, storm sewers, or as directed by applicable regulatory agencies. Unless otherwise specified, trench-dewatering shall be part of the trench excavation and pipe installation. e. Excavated Material: Excavated material shall be placed in a manner that will not obstruct the work nor endanger the workers or the public, or obstruct sidewalks, driveways, roadways, or other structures. Placement of excavated material shall be done in compliance with federal, state and local regulations. f. Salvage Gravel: Prior to beginning any excavation on graveled streets, the Contractor shall salvage all existing salvageable gravel and the same shall be relayed, shaped and graded into place upon completion of project. The Contractor is to avoid any mixing of clay or other foreign materials with the gravel. If the Contractor does not salvage the existing gravel, the Contractor shall be responsible for replacement of the wasted gravel at the Contractors expense. g. Street Surface Removal: Removal of asphalt, concrete, or other street surfacing shall be part of the trench excavation. Methods such as sawing, cutting, knifing, drilling or chipping shall be used to ensure the breakage of pavement along straight lines. The amount removed shall depend on the width of trench required for the installation of the pipe and the dimensions of the area into which wyes, manholes, specials or other structures will be installed. The dimensions of pavement removed shall not exceed the dimensions of the opening required for installation of pipe, wyes, manholes, specials, and other structures by more than 8" in any direction, unless safety issues or safety equipment warrant more room. All extra width excavations are to be prior approved by the Engineer. h. Trench Width: The width of the trench for the pipe shall be the same as that afforded by the single-pass capabilities of normal available excavating equipment, and shall be ample to permit the pipe to be laid and joined properly and to allow the backfill to be placed as specified. The desired trench widths are 6" to 8" maximum on each side of the pipe for pipe sizes up to 33". For pipe larger than 33" the trench width should be the diameter of the pipe plus 24". Trenches shall be of such extra width, when required, to permit the placement of timber supports, sheeting, bracing, and appurtenances as required for safety requirements. All extra width excavations are to be prior approved by the Engineer. i. Holes for Bells: Holes for the bells shall be provided at each joint, but shall be no larger than necessary to allow joint assembly and to ensure that the pipe barrel will lie flat on the trench bottom. Push-on type joints require only minimum depressions for bell holes. -14 of 27

17 j. Rock Excavation: When excavation of rock in encountered, all rock shall be removed to provide a clearance below and on each side of all pipe, valves, and fittings of at least 6" for pipe sizes 24" or smaller and 9" for pipe sizes larger than 24". When excavation is completed, a layer of appropriate backfill material shall be placed on the bottom of the trench to the previously mentioned depths, leveled, and tamped. These clearances and bedding procedures shall also be observed for pieces of concrete or masonry and other debris or subterranean structures, such as masonry walls, piers, or foundations that may be encountered during excavation. This installation procedure shall also be followed when gravel formations containing loose boulders greater than approximately 8" in diameter are encountered. In all cases, the specified clearances shall be maintained between the bottom of all pipe and appurtenances and any part, projection, or point of rock, boulder, or stone of sufficient size and placement that, in the opinion of the Engineer, could cause a fulcrum point or point load. k. Crossing over Existing Trench: Should the trench pass over another sewer main or other previous excavation, the trench bottom shall be sufficiently compacted to provide support equal to that of the native soil or to conform to other regulatory requirements in a manner that will prevent damage to the existing installation. l. Private Property Protection: Trees, shrubs, sidewalks, fences, and all other property and surface structures shall be protected during construction, unless their removal is shown in the plans and specifications or approved by the Engineer. Any cutting of tree roots or branches shall be done only as approved by the Engineer. m. Utility & Structure Support/Protection: Temporary support, adequate protection, and maintenance of all underground and surface structures, drains, sewers, and other obstructions encountered in the progress of the work shall be provided in accordance with specifications or applicable regulations. n. Property Restoration: All properties that have been disturbed shall be restored as nearly as practical to their original condition. o. Unsuitable Subgrade: When the subgrade is found to include ashes, cinders, refuse, organic material, or other unsuitable material, such material shall be removed to a minimum of at least 6" below the bottom of the pipe or to the depth required by the Engineer. The removed material shall be replaced, under the direction of the Engineer, with clean, stable backfill material, such as 3/8 x 1/8 pearock or 1½ x ¾ rock, unless otherwise directed. The bedding shall be consolidated and leveled so that the pipe will lie flat on the trench bottom. When the bottom of the trench or the subgrade is found to consist of material that is unstable to such a degree that, in the judgment of the Engineer, it cannot be removed, a foundation for the pipe and/or appurtenance shall be constructed using pilings, treated timber, concrete, or other materials, at the direction of the Engineer. p. Roadway & Site Cleanup: Contractor shall leave all work sites clear of excess debris at the end of each working day. Excess debris would include clay, black dirt, gravel, pea rock, construction materials, equipment, and etc. -15 of 27

18 q. Traffic-Control: Appropriate traffic-control devices shall be provided in accordance with federal, state, and local regulations to regulate, warn, and guide vehicular and pedestrian traffic at the work site. Barricades and signing shall be in conformance with the Manual of Uniform Traffic Control Devices. A guide to be used for signing is "Work Area Traffic Control Manual" published by the city of Sioux Falls and available through their Traffic Engineer, or Part VI, "Traffic Controls for Street and Highway Construction and Maintenance Operations" from the Manual of Uniform Traffic Control Devices, which is available from the Superintendent of Documents, US Government Printing Office, Washington, D.C The Contractor shall provide the appropriate signs, fencing and barricades surrounding the trench areas for vehicular and pedestrian protection. No street shall be closed unless written permission is obtained from the City Engineer or his designee. Permission to close a street shall be requested at the time an excavation permit is obtained. 27. PIPE INSTALLATION a. Material Handling & Examination: Proper implements, tools, and facilities shall be provided and used for the safe and convenient performance of the work. All pipe, wyes, tees, or specials shall be lowered carefully into the trench by means of a derrick, ropes, or other suitable tools or equipment, in such a manner as to prevent damage to sewer main materials, protective coatings and linings. Under no circumstances shall sewer main materials be dropped or dumped into the trench. Where practical, the trench should be dewatered prior to installation of the pipe. All pipe, in-line wyes, in-line tees, saddles and other appurtenances shall be examined carefully for damage and other defects immediately before installation. Defective materials shall be replaced or marked and held for inspection by the Engineer, who may prescribe corrective repairs or reject the materials. All lumps, blisters, and excess coating shall be removed from the socket and plain ends of each pipe, and the outside of the plain end and the inside of the bell shall be wiped clean and dry and be free from dirt, sand, grit, or any foreign materials before the pipe is laid. Foreign material shall be prevented from entering the pipe while it is being placed in the trench. No debris, tools, clothing, or other materials shall be placed in the pipe at any time. b. Alignment & Grade: As each length of pipe is placed in the trench, the joint shall be assembled and the pipe brought to the correct alignment and grade. Alignment & grade shall be determined with the aid of a laser beam machine. The Contractor, with the use of a level and level rod, is to double check the laser beam alignment & grades against the grade stakes provided by the Engineer. The pipe shall be secured in place with approved backfill material. All pipe shall be laid upgrade with the spigot ends of the pipe pointing in the direction of the flow. c. Minimum Cover for Sewer Pipe: The minimum cover allowed over a sewer main is 4.00, and this may not be allowed if the Engineer deems that the cover material will allow additional freezing depth or the sewage flows are minimal to allow freezing. Any sewer main with less than 5.00 of cover shall require the Engineers approval prior to installation. -16 of 27

19 d. Watertight Plug: At no time shall ground water, rain water, etc., be allowed into the sanitary sewer system. At times when pipe-laying is not in progress, the open ends of pipe shall be closed by a watertight plug or other means approved by the Engineer. When practical, the plug shall remain in place until the trench is pumped completely dry. Care must be taken to prevent pipe flotation, should the trench fill with water. e. Pipe Installation: Pipe installation shall conform to the Manufacturers recommended methods. 28. JOINT ASSEMBLY a. Concrete Pipe Joint Deflection: No deflection is allowed in any concrete piping for sewer mains. All deflections are to be made at the manholes. b. PVC Pipe Joint Deflection: Prior approval is required from the Engineer before any horizontal deflection is allowed in sewer mains. When it is necessary to deflect sewer pipe from a straight line in the horizontal plane, the amount of joint deflection shall not exceed 80% of the maximum deflection allowed by the pipe Manufacturer. c. Cutting Pipe: Cutting pipe for insertion of wyes, tees, manholes, etc. shall be done in conformance with all safety recommendations of the Manufacturer of the cutting equipment. Cutting shall be done in a safe, workmanlike manner without creating damage to the pipe. Cut ends and rough edges shall be ground smooth, and for push-on joint connections the cut end shall be beveled by methods recommended by the Manufacturer and approved by the Engineer. 29. BACKFILLING a. Backfill: Backfill shall also be accomplished in accordance with the specified laying conditions as described under the pipe installations section. b. Backfill Material: The Contractor shall use previously excavated soil for trench backfill above the pipe bedding to maintain continuity of the soil type across the roadway section. All backfill material shall be free from debris, cinders, ashes, refuse, vegetable or organic material, boulders, rocks or stones, frozen soil, or other material that, in the opinion of the Engineer, is unsuitable. Backfill material shall not be installed in any trench which has standing water in the trench. Backfill material from four inches (4") below the bottom of the pipe to six inches (6") above the top of the pipe shall be 3/8 x1/8 pearock, unless otherwise specified. Stones larger than 3 in diameter shall not be placed within two feet (2 ) from the top of the pipe. From two feet (2 ) from the top of the pipe to the subgrade of the pavement, material containing stones up to 8" in their greatest dimension may be used, unless otherwise specified. When the type of backfill material is not indicated on the plans or is not specified, the excavated material may be used, provided that such material consists of loam, clay, sand, gravel, or other materials that, in the opinion of the Engineer, are suitable for backfilling. If excavated material is indicated on the drawings or specified for backfill, and there is a deficiency due to a rejection of a part thereof, the required amount of Engineer approved material shall be provided by the Contractor. The Engineer shall compensate the Contractor for the replacement of the rejected backfill material under the appropriate bid item in the bid form. The Contractor shall be responsible for the removal and disposal of all rejected materials. -17 of 27

20 For purposes of definition: (a) sand is material graded from fine to coarse, containing less than 10 percent, by weight, of loam and clay that passes a 3/4" sieve with no more than 5 percent, by weight, remaining on a no. 4 sieve; (b) gravel is a reasonably uniform combination, containing no boulders or stones larger than 2" and not containing excessive amounts of clay and loam; (c) crushed stone is limestone or dolomite ledge-rock material that all passes a 1/2" sieve with no more that 25 percent passing a no. 100 sieve. c. Backfill Compaction: Backfill in existing or future street locations shall be compacted in no more than two foot (2') lifts. The minimum allowable compaction shall be 95% of maximum dry density as determined by the latest version of ASTM D698 (Standard Proctor). If backfill soil moisture content is greater that the optimum moisture range that will allow the Contractor to meet the density requirements with a reasonable level of effort, the Contractor shall air dry the soil outside the trench to achieve the desired moisture range prior to backfill and compaction. If backfill soil moisture content is less than the optimum moisture range that will allow the Contractor to meet the density requirements with a reasonable level of effort, the Contractor shall add and mix water to the soil to achieve the desired moisture range for compaction. The Engineer may choose to hire a reputable firm to take random compaction tests of the backfilled trench material. If any of these tests indicate that the material has not been compacted to the required density, the Contractor shall recompact the backfill material at no additional cost to the Owner. At all locations which the compaction tests have failed, an additional compaction test shall be conducted after recompacting the trench at the Contractors expense. When special backfill compaction procedures are required, they shall be accomplished in accordance with project specifications of applicable federal, state or local regulations. d. Backfilling with Pipe Joints Accessible: Newly installed pipelines are normally tested after backfilling. When unusual conditions require that leakage testing be accomplished before completion of backfilling or with pipe joints accessible for examination, sufficient backfill material shall be placed over the pipe barrel between the joints to prevent movement, and due consideration shall be given to restraining thrust forces during the testing. In particular, restrained-joint systems which derive their stability from the interaction of the pipe and soil, should be backfilled prior to testing. 30. FITTING INSTALLATION a. Fitting Inspection: Prior to installation, in-line wyes, in-line tees, saddles, and other specialties shall be inspected by the Contractor for handling damage and cracks. Defective materials shall be held for inspection by the Engineer and/or replaced at no extra cost to the Owner. b. Fitting Installation: In-line wyes, in-line tees, saddles, and other specialties shall be joined to the pipe in the manner specified in the pipe installation section for cleaning, laying and joining pipe. All in-line wyes, in-line tees, or saddles which are not being extended immediately are to be glued and capped with a preformed watertight cap or watertight plug. The locations for all in-line wyes, in-line tees, or saddles which are not being extended immediately are to be recorded by the Contractor and turned over to the Engineer. -18 of 27

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified. Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

More information

Section 2100-Trenching and Tunneling

Section 2100-Trenching and Tunneling SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial

More information

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, Storm Drain Installation, of these Standard Provisions. SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and

More information

ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION

ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS for (PVC) SANITARY SEWER MAIN CONSTRUCTION VI(A).1 General VI(A).2 Materials and Equipment VI(A).3 Installation of Sanitary Sewer Mains VI(A).4 Laying of

More information

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE 6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction

More information

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains

More information

Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL

Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL 155 E. Front Street (rear) Lititz, PA 17543 Phone (717) 625-1930 Fax (717) 625-1931 Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL CONSTRUCTION SPECIFICATIONS AND DETAILS

More information

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors. SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials. PART 1 GENERAL 1.1 SCOPE A. This item shall include the work necessary for the installation of storm sewer line construction. B. Reference Section 3800 Trenching and Backfill and the General Conditions,

More information

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing

More information

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees. The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:

More information

SANITARY SEWER SPECIFICATIONS

SANITARY SEWER SPECIFICATIONS SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,

More information

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions. SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY Approved and adopted as Official Document Number 800576 this 10th day of December, 1980 Donald R. Boyd, P.E., Director Water

More information

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent

More information

STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223

STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223 STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES PART 1 - GENERAL A. Description This section describes the installation of gravity sewer pipelines fabricated of vitrified

More information

SECTION 9.02 BUILDING SUBSURFACE DRAINS (PERIMETER, ETC.)

SECTION 9.02 BUILDING SUBSURFACE DRAINS (PERIMETER, ETC.) CHAPTER 9 SEWER / STORM DRAIN / IRRIGATION LINES SECTION 9.01 GENERAL This section covers the requirements for piping materials and installation of Lehi City sewer, storm drainage and irrigation collection

More information

CHAPTER 6 - SANITARY SEWER

CHAPTER 6 - SANITARY SEWER CHAPTER 6 - SANITARY SEWER 6.1 GENERAL This section covers the requirements for PVC plastic sewer pipe materials and installation in sanitary sewer construction. 6.2 PIPE PVC gravity sewer pipe and fittings

More information

SECTION 02732 BUILDING SEWERS. B. Connection of building sanitary drainage system to municipal sewers.

SECTION 02732 BUILDING SEWERS. B. Connection of building sanitary drainage system to municipal sewers. SECTION 02732 BUILDING SEWERS PART 1 GENERAL 1.01 SECTION INCLUDES A. Lateral piping, fittings, and accessories. B. Connection of building sanitary drainage system to municipal sewers. 1.02 REGULATORY

More information

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

EXHIBIT A. Technical Specifications for Water and Sewer Service Lines EXHIBIT "A Technical Specifications for Water and Sewer Service Lines Water and Sewer Line Bedding and Backfill: Drawings show cross-section of trench, pipe laid on top of 6" min. bedding material, bedding

More information

Section 02702 SEWER PIPE INSTALLATION AND TESTING

Section 02702 SEWER PIPE INSTALLATION AND TESTING PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS TABLE OF CONTENTS 2.18 CONCRETE AND/OR CORRUGATED STEEL STORM SEWER... 1 2.18.1 GENERAL... 1 2.18.2 MATERIALS... 1 2.18.2.1 Storm Sewer Pipe... 1 2.18.2.2 Cement Mortar... 1 2.18.2.3 Granular Materials...

More information

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials

More information

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11 Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;

More information

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or

More information

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines: Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections

More information

SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE

SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE PART 1: GENERAL 1.01 SECTION INCLUDES PVC pressure pipe and fabricated fittings in nominal sizes 4-inches through 12-inches with cast iron pipe equivalent

More information

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions The purpose of this application example is to provide assistance to small and medium sized rural communities in the drafting of documents necessary for the efficient operation of water, wastewater, and

More information

Beacon Hill Sewer District Standard Specifications

Beacon Hill Sewer District Standard Specifications Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions

More information

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing

More information

DIVISION 4300 STORM DRAINAGE

DIVISION 4300 STORM DRAINAGE DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES

More information

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application.

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. Article II provides rules governing the allowable connection to the City POTW and the construction and inspection of

More information

TECHNICAL SPECIFICATIONS GRAVITY AND PRESSURE SEWER LINE AND MATERIALS

TECHNICAL SPECIFICATIONS GRAVITY AND PRESSURE SEWER LINE AND MATERIALS TECHNICAL SPECIFICATIONS GRAVITY AND PRESSURE SEWER LINE AND MATERIALS Scope of Work Work performed under this contract shall consist of furnishing and installing, complete and ready for service, the sewer

More information

STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200

STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200 STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES PART 1 - GENERAL A. Description This section includes materials, testing, and installation of precast concrete

More information

SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES

SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with

More information

SECTION 200: STORM SEWER CONSTRUCTION STANDARDS

SECTION 200: STORM SEWER CONSTRUCTION STANDARDS SECTION 200: STORM SEWER CONSTRUCTION STANDARDS Page No. Description 200-2 201 GENERAL 200-2 201.1 SPECIFICATIONS 200-2 201.2 CONNECTION TO EXISTING FACILITIES 200-3 202 MATERIALS 200-3 202.1 PIPES 200-4

More information

The Manitoba Water Services Board SECTION 027030 Standard Construction Specifications September 2013 Page 1 of 21

The Manitoba Water Services Board SECTION 027030 Standard Construction Specifications September 2013 Page 1 of 21 September 2013 Page 1 of 21 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the construction of sewers including: the supply and installation of pipe, saddles, tees,

More information

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection

More information

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS TABLE OF CONTENTS I. RULES AND REGULATIONS A. TABLE OF CONTENTS... 2 B. TERMS AND DEFINITIONS... 3 C. DEVELOPER S/CONTRACTOR S RESPONSIBILITIES...

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located

More information

LS 2540 SEWER LATERALS AND INSPECTION TEES

LS 2540 SEWER LATERALS AND INSPECTION TEES LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS 854.1 DESCRIPTION: This item shall govern sanitary sewer laterals installed in accordance with these

More information

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS 1001 SOUTH LEECHBURG HILL LEECHBURG, PA 15656 Phone: 724-845-9355 Fax: 724-845-1186 SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS 1. General

More information

STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES

STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES CITY OF PETALUMA STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES AUGUST 1999 Revised 10/98 City of Petaluma Petaluma, California STORM DRAIN INSTALLATION DETAIL

More information

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe. SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price

More information

SECTION 7- STORM SEWER

SECTION 7- STORM SEWER SECTION 7- STORM SEWER 7.1. STORM SEWERS.... 7-1 7.2. SUMP DRAINS... 7-3 7.3. CATCH BASINS... 7-3 7.4. MANHOLES... 7-4 7.5. STORM SEWER CALCULATIONS... 7-4 7.6. CULVERTS AND BRIDGES... 7-5 7.7. OPEN CHANNELS...

More information

Close-Out Documents... 9

Close-Out Documents... 9 Water and Sanitary Sewer Service Connection Requirements Service Connection Requirements... 1 Application for Services... 2 Water Meter Application... 2 Wet Tap/Tie-in Connection Requirements... 3 Meter

More information

SECTION 33 41 00 REINFORCED CONCRETE PIPE. A. The following is a list of SPECIFICATIONS, which may be related to this section:

SECTION 33 41 00 REINFORCED CONCRETE PIPE. A. The following is a list of SPECIFICATIONS, which may be related to this section: SECTION 33 41 00 REINFORCED CONCRETE PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. This section includes construction of reinforced concrete pipe for storm drainage, culverts, and sanitary sewer, including

More information

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General General All sanitary sewers, manholes and force mains shall be acceptance tested, as hereinafter specified in the presence of a City representative. Acceptance testing shall be performed after backfilling

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by

More information

SECTION 02401 - SANITARY SEWER PIPE

SECTION 02401 - SANITARY SEWER PIPE PART 1 - GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for furnishing and installing sanitary sewer pipe, in accordance with

More information

550 PIPE CULVERTS, SEWERS AND DRAINS

550 PIPE CULVERTS, SEWERS AND DRAINS 551.01 550 PIPE CULVERTS, SEWERS AND DRAINS 551 GENERAL 551.01 Description 551.02 Materials 551.03 Excavation 551.04 Protection of Excavation 551.05(a) Bedding for Rigid Pipe 551.05(b) Bedding for Non-Rigid

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

CW 2130 - GRAVITY SEWERS TABLE OF CONTENTS

CW 2130 - GRAVITY SEWERS TABLE OF CONTENTS August 2010 CW 2130 - GRAVITY SEWERS TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications... 1 1.4 Referenced Standard Details...

More information

SECTION 31 20 00 EARTH MOVING

SECTION 31 20 00 EARTH MOVING SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to

More information

SECTION 724 PIPE CULVERTS

SECTION 724 PIPE CULVERTS SECTION 724 PIPE CULVERTS 724.1 Description. This work shall consist of providing pipe or pipe arch of the diameter or shape designated, laid upon a firm bed and backfilled as specified. Where appropriate

More information

MDWASD 8/1999 SECTION 02315 TRENCHING AND BACKFILLING FOR PIPING SYSTEMS

MDWASD 8/1999 SECTION 02315 TRENCHING AND BACKFILLING FOR PIPING SYSTEMS PART 1 - GENERAL 1.01 WORK INCLUDED SECTION 02315 TRENCHING AND BACKFILLING FOR PIPING SYSTEMS A. The work included under this Section consists of excavating, backfilling and compaction as required for

More information

Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer

Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer The user may choose to adopt part or all of this Model Specification; however, the user should ensure that all parts

More information

CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST

CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST NOTE: The following list shall only be used as a guide and shall not be used in lieu of the specifications found in the CITY OF ANN ARBOR PUBLIC

More information

FY08 SEWER POINT REPAIRS BID TABULATION

FY08 SEWER POINT REPAIRS BID TABULATION 6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "

More information

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines

More information

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer

More information

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20

More information

Section 402. STORM SEWERS

Section 402. STORM SEWERS 402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide

More information

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...

More information

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

September 2012 Brunswick County Engineering Department Revision 1.0. Technical Specification 020.01 GRAVITY SANITARY SEWER SYSTEM

September 2012 Brunswick County Engineering Department Revision 1.0. Technical Specification 020.01 GRAVITY SANITARY SEWER SYSTEM 1.0 General Technical Specification 020.01 GRAVITY SANITARY SEWER SYSTEM a) It is the intent of this specification to ensure that all gravity sewer system infrastructure constructed within the service

More information

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements 16600 Underground Electrical Duct Bank This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications

More information

SECTION 9. All sewer laterals shall tie into the sewer main lines unless approved by the City Engineer.

SECTION 9. All sewer laterals shall tie into the sewer main lines unless approved by the City Engineer. SECTION 9 SEWER/DRAINAGE LINES 9.1 GENERAL This section covers the requirements for piping materials and installation in the Cedar Hills City sewer and drainage collection system. All materials and workmanship

More information

SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL. 1.01 Testing - General

SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL. 1.01 Testing - General SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL 1.01 Testing - General Testing shall be of the type and frequency described in each section and summarized in Item 1 of this section. In addition to

More information

900 SEWERAGE WORK ITEM 901 - PIPE SEWERS COMPLETE IN PLACE

900 SEWERAGE WORK ITEM 901 - PIPE SEWERS COMPLETE IN PLACE 900 SEWERAGE WORK ITEM 901 - PIPE SEWERS COMPLETE IN PLACE 901.01 Description 901.02 Materials and Material Handling 901.03 Excavation 901.04 Limit as to Width of Trench 901.05 Unauthorized Excavation

More information

SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL

SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL PART 1 - GENERAL 1.1 WORK INCLUDED IN THIS SECTION A. The WORK of this Section includes the repair, demolition, and disposal of asbestos

More information

SECTION 603 SANITARY SEWER FORCE MAINS

SECTION 603 SANITARY SEWER FORCE MAINS SECTION 603 SANITARY SEWER FORCE MAINS 1. GENERAL Pipelines for sanitary sewer force main systems shall conform to the following specifications and shall be installed at the locations indicated on the

More information

Specifications for Residential Property Owners Connection to New Public Sewer

Specifications for Residential Property Owners Connection to New Public Sewer Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the

More information

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 Section Subsection Name Date Modification Division 1 All subsections General Provisions

More information

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of

More information

CONSTRUCTION PERMIT REQUIREMENTS

CONSTRUCTION PERMIT REQUIREMENTS CONSTRUCTION PERMIT REQUIREMENTS Any work to be done in the City right-of-way (ROW), in a utility easement, and certain work on private property, requires an Engineering Inspection Permit from the Department

More information

SECTION 03400 PRECAST CONCRETE STRUCTURES

SECTION 03400 PRECAST CONCRETE STRUCTURES PART 1 GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, and equipment required to install precast concrete manholes, sanitary leaching rings, pump station, valve chamber, structures, frames,

More information

Town House 11265 Center Highway North Huntingdon, PA 15642

Town House 11265 Center Highway North Huntingdon, PA 15642 APPENDIX C SPECIFICATIONS FOR THE CONSTRUCTION OF BUILDING LATERAL SANITARY SEWERS DECEMBER 2004, INCLUDING AMENDMENTS ADOPTED ON FEBRUARY 6, 2008 AND APRIL 2, 2008; EFFECTIVE ON MAY 1, 2008 Town House

More information

SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS

SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS PART 1: GENERAL 1.01 COORDINATION OF WORK Connection to existing pipelines may require shutdown of AW facilities. Closely coordinate construction work

More information

Section C-1 Pipes and Fittings

Section C-1 Pipes and Fittings Section C-1 Pipes and Fittings C1.00 Work Included The work under this Division of the Specifications shall include all labor, materials, and equipment necessary to furnish and install all piping, pipelines,

More information

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

1.3.2 Method of construction and restoration of existing water service connections. This shall include: 1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting

More information

C. Section 014510 TESTING LABORATORY SERVICE.

C. Section 014510 TESTING LABORATORY SERVICE. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

TABLE OF CONTENTS DETAILED SPECIFICATIONS SANITARY SEWER

TABLE OF CONTENTS DETAILED SPECIFICATIONS SANITARY SEWER TABLE OF CONTENTS DETAILED SPECIFICATIONS SANITARY SEWER SECTION I GENERAL...1 SECTION II PAYMENTS...1 SECTION III - GENERAL REQUIREMENTS FOR ALL SEWER PIPE INSPECTION...1 SECTION IV - SEWER PIPE MATERIALS...2

More information

CITY ENGINEERS ASSOCIATION OF MINNESOTA

CITY ENGINEERS ASSOCIATION OF MINNESOTA CITY ENGINEERS ASSOCIATION OF MINNESOTA STANDARD SPECIFICATIONS 2600 Trench Excavation and Backfill/Surface Restoration 2611 Water Main and Service Line Installation 2621 Sanitary Sewer and Storm Sewer

More information

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown

More information

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm: Page 1 of 6 Section 1. PURPOSE This policy is an Engineering checklist of the Local Review Program for sanitary sewer improvement projects by the Bedford Regional Water Authority ( Authority ). Section

More information

INSTALLATION OF INSITUFORM LINER

INSTALLATION OF INSITUFORM LINER PART 1 GENERAL 1.1 SCOPE: A. This item shall include all work and materials to install, insert a flexible polyester felt liner saturated with a thermo-setting resin into the existing sewer line for rehabilitation

More information

STANDARD SPECIFICATIONS FOR STORM SEWER CONSTRUCTION CITY OF PLYMOUTH, MINNESOTA

STANDARD SPECIFICATIONS FOR STORM SEWER CONSTRUCTION CITY OF PLYMOUTH, MINNESOTA STANDARD SPECIFICATIONS FOR STORM SEWER CONSTRUCTION CITY OF PLYMOUTH, MINNESOTA MARCH 2014 ENGINEERING DIVISION 3400 PLYMOUTH BLVD. PLYMOUTH, MN USA 55447-1482 TELEPHONE (763) 509-5500 Doran M. Cote,

More information

SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS

SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS PART 1: GENERAL 1.01 SECTION INCLUDES A. Abandonment in place, by cutting and capping, of existing sewers, junction structures, manholes, service lines, and

More information

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS 1 SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS TABLE OF CONTENTS I. Introduction II. General Information and Requirements A. Applying for Sewer connection B. Excavation C. Cutting Concrete and Asphalt

More information