1 155 E. Front Street (rear) Lititz, PA Phone (717) Fax (717) Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL CONSTRUCTION SPECIFICATIONS AND DETAILS FOR RESIDENTIAL BUILDING SEWER CONNECTIONS A. General Specifications 1. Equipment and Materials a. The use of equipment and materials other than those specified or beyond the scope of these specifications must be approved by Bethel Township Municipal Authority (BTMA) in writing. See Section C for details regarding the waiver process. b. All materials shall be new and pipe shall be legibly and permanently marked in ink with the following minimum information: i. Manufacturer s name or trademark and production code ii. Nominal size (for example, 4") iii. The PVC Cell classification (for example, 12454) iv. The legend SDR-35 PVC Sewer Pipe ASTM D Delivery, Storage and Handling of Equipment and Materials a. Contractor must transport and handle products in accordance with the manufacturer s instructions. b. Contractor must inspect products to ensure they comply with specified requirements and are not damaged. c. Contractor must provide equipment and personnel to handle and store products by methods to prevent soiling, disfigurement, or damage. d. Contractor must store and protect products in accordance with manufacturer s instructions, with seals and labels intact and legible. e. Contractor must protect products from vandalism, contamination by dirt, dust, or water, damage from heat or cold, and damage from direct sunlight.
2 Page 2 3. Minimum Pipe Size: a. Service Line (resident): Four (4) - inch diameter. b. Lateral (Authority): Six (6) - inch diameter. c. In all cases, the Line must be of adequate size to carry projected sewer flows. 4. Pipe Material: Polyvinyl Chloride (PVC) a. Pipe: Type PVC SDR-35, ASTM D3034 b. Fittings: Conforming to the same applicable ASTM Specification requirements for pipe. c. Joints: Push-on with elastomeric gasket, ASTM D3212, and ASTM F477 for gasket specifications. d. Trap: Solvent welded PVC Schedule 40 Pipe and Fittings OR PVC SDR-35 Pipe and Fittings. Trap must have a one (1) piece return. 5. Existing Sewer Line Connection Point: The connection to the existing sewer line shall be made in accordance with the following two (2) selected options: a. Outside of Existing building: Any connections to existing sewer lines outside of the existing building shall be made within two (2) feet of the outside building wall and will also require the use of a Fernco, Inc Series Connector at the existing connection. b. Inside of Existing building: Any connections to existing sewer lines inside of the existing building shall NOT require the use of the Fernco, Inc Series Connector but will allow for the use of an appropriate connection device. 6. Service Line Check Valve: a. Sewer service check valve shall be installed in a horizontal portion of the sewer service line and shall prevent the reverse flow of wastewater into the structure. b. The check valve shall be supplied in a kit from one manufacturer consisting of a valve body, disk, disk seat and upper collar. It shall comply with CSA B181-4, and the plastic materials shall conform to ASTM D1784, cell classification B and NSF 14. c. The check valve shall include an access sleeve that is a pipe opening through which access is gained to the disk or valve seat. The access sleeve shall be cut to length in the field and attached to the socket on the top of the valve body.
3 Page 3 d. A 6-inch PVC Female Adapter (solvent welded to 6-inch PVC access sleeve) and a removable (threaded) 6-inch PVC Cover Plug are required but are not included in the Kit provided by the Authority. Solvent welded Caps or Plugs to the access sleeve are not acceptable. e. The collar, insert pipe and disk assembly shall be designed to fit inside the access sleeve, the removable assembly shall consist of a length of insert pipe permanently attached to the access collar on the top and a disk assembly on the bottom. It is then removed vertically from the access sleeve, the attached disk assembly is also removed allowing above grade repair. The internal lifting device is self-aligning, self-seating and provided with an alignment indicator located with 12 inches of the upper access opening. f. The check valve shall be installed on horizontal sewer service lines with uniform slope. The access sleeve shall terminate above grade and shall have a maximum length of 12 feet. B. Installation and Inspection 1. GENERAL REQUIREMENTS (CONDUCT OF WORK): a. A Sewer Connection Permit MUST be obtained from the Bethel Township Municipal Authority prior to any work being completed on the sanitary sewer connection. No work shall commence without this permit. b. Contractor must exercise caution at all times to protect persons and property in accordance with applicable laws and codes. Contractor is responsible for compliance with the safety provisions of applicable laws and building and construction codes. c. Contractor must take precaution and furnish and maintain all guards, barricades, handrails, lights, and other appurtenances, required by law for the protection of the traveling public and property at or near the property. d. Contractor is responsible to ensure that all equipment, tools, and supplies are operated or handled in such a manner that at no time will they be permitted to contact power, telephone, or other lines. e. Contractor is responsible for the repair of all damages to public or private property resulting from construction operations. Damaged property shall be restored to a condition equal to or better than that which existed prior to construction. If the damage is done to trees or shrubs, the Contractor shall replace with specimens of same type and size. f. Contractor is responsible for locating all existing underground structures and utilities including, but not limited to water, steam, oil, natural gas mains, sanitary and storm sewers, and telephone and electrical conduits, which may be encountered during construction operations.
4 Page 4 g. Contractor is responsible for providing adequate protection against damage to utilities encountered during the course of construction and shall repair, at this own expense, any utilities damaged during the course of construction. h. Contractor is responsible for contacting the Pennsylvania One call System Inc (811) in compliance with the Pennsylvania Utilities Act, Act 287 of 1974, as amended by Act 38 of GENERAL REQUIREMENTS (DESIGN): a. Unless otherwise noted, all designs shall conform to acceptable engineering practice, shall meet the requirements of PA DEP and OSHA and shall conform to the requirements contained herein. b. The Service Line shall have: i. Minimum Cover (at any point along entire length of service line): Three (3) feet typical. ii. Minimum Slope (at any point along entire length): 1% (1/8 per foot) typical. 3. INSTALLATION (TRENCH EXCAVATION): a. Width of Trench: Pipe trenches shall be sufficiently true in alignment to permit the pipe to be laid in the approximate center of the trench. The trench shall be wide enough to provide a free working space on each side of the pipe, the trench width from the trench bottom to a point 12 inches above the top of the outside barrel of the pipe shall not exceed 24 inches (4 8 nominal pipe diameter). b. Pipe Bedding: The trench shall be excavated to a depth of six (6) inches below the outside diameter of the pipe barrel. The resultant subgrade shall be undisturbed or compacted. The bedding shall then be placed as specified below under Backfilling Methods. Bedding shall provide uniform and continuous bearing and support for the pipe at every point between bell holes. c. Unsuitable Subgrade: Where the bottom of the trench at subgrade is found to be unstable, or to include ashes, cinders, any type of refuse, vegetable, or other organic material, or large pieces of fragments of inorganic material, such unsuitable material shall be removed to the width and depth recommended by the BTMA representative. Before the pipe is laid, the subgrade shall be adjusted by backfilling with aggregate material, thoroughly tamped, and the bedding prepared as specified.
5 Page 5 d. Backfilling Methods: i. Pipe Bedding Beneath and to Centerline of Pipe (PennDOT No. 1B or AASHTO No. 8 Stone): All trenches shall be backfilled, from the bottom of the trench to the centerline of the pipe with bedding material (PennDOT No. 1B or AASHTO No. 8 Stone) and compacted by hand tamping to six (6) inches. Bedding material shall be deposited in the trench for its full width on each side of the pipe and fittings simultaneously. ii. Initial Backfill Over Pipe (PennDOT No. 1B or AASHTO No. 8 Stone): From the centerline of the pipe and fittings to a depth of one (1) foot above the top of the pipe, the trench shall be backfilled by hand or by approved mechanical methods with PennDOT No. 1B or AASHTO No. 8 Stone. The Contractor shall use special care in placing this portion of the backfill so as to avoid injuring or moving the pipe. The backfill shall be compacted by hand tamping or other approved mechanical methods. iii. Aggregate Backfill to Restoration Depth (Recommended for Paved, Gravel and areas subject to vehicular traffic): From one (1) foot above the top of the pipe to restoration depth, the trench shall be backfilled by hand or by approved mechanical methods. Consolidation methods using water, such as jetting or puddling, are not permitted. Consolidation shall proceed from the center of the trench to the sides to prevent arching. iv. Excavated (suitable) Backfill Material to Restoration Depth (Recommended for Lawn and Unimproved Areas): From one (1) foot above the top of the pipe to the restoration depth, the trench shall be backfilled by hand or by approved mechanical methods. Consolidation methods using water, such as jetting or puddling, are not permitted. Consolidation shall proceed from the center of the trench to the sides to prevent arching. e. Compacting: Use mechanical tampers, to compact materials in trench backfill operations, to produce a density of backfill at the bottom of each layer of not less than 90 percent of maximum density obtained at optimum moisture content as determined by AASHTO T INSTALLATION (PIPE LAYING): a. Metal Marking Tape shall be placed 12-inches above the pipe for the entire horizontal run.
6 Page 6 b. General: All pipes shall be laid to uniform line and grade, bell ends upgrade, with a firm and even bearing along the barrel of the pipe, close joints and smooth invert. The spigot end of the pipe shall be centered in, shoved tight and secured against the bell of the previously laid pipe. The interior of each pipe shall be cleaned of all excess joint and foreign material before the next pipe is laid. The pipe shall be laid in the backfill materials as specified. Pipe-laying shall commence at the lowest point and proceed upgrade. At the close of each day s work and at such other times when pipe is not being laid, the open end of the pipe shall be protected with a close fitting stopper. c. Pipe Clearance in Rocks: Ledge rock, boulders, and large stones shall be removed to provide a clearance of at least six (6) inches below and on each side of all pipe and fittings for pipes 24 inches in diameter or less. This specified minimum clearance is the minimum clear distance which will be permitted between any part of the pipe or fitting being laid and any part, projection, or point of such rock, boulder, or stone. d. Existing Sewer Line Connection Point: The connection to the existing sewer line shall be made in accordance with the following two (2) selected options: i. Outside of Existing building: Any connections to existing sewer lines outside of the existing building shall be made within two (2) feet of the outside building wall and will also require the use of a Fernco, Inc Series Connector at the existing connection. ii. Inside of Existing building: Any connections to existing sewer lines inside of the existing building shall NOT require the use of the Fernco, Inc Series Connector but will allow for the use of an appropriate connection device. 5. INSPECTION: The Sewer Service Line (outside line) must be inspected by an authorized BTMA representative before covering any trench or connecting the Service Line to the Lateral Line (which is already connected to the Sewer Main Line). The Contractor must give the BTMA representative at least 24 hour notice for a final inspection. a. Each building sewer is required to be tested before the trench is backfilled. The test will require placement of an inflated test ball at both the transition T to the existing sewage discharge and the test T at the transition to the Service Lateral, as well as the cleanout fittings. One of the test balls shall be equipped with air pressure gauge, calibrated to 0.1 lbs/sq. in. and standard air hose connection to pressurize the Building Sewer, and an air release valve.
7 Page 7 b. It may be required to place stone bedding over the pipe at several locations (pipe joints), to avoid separation during the test. Air pressure shall be slowly introduced until there is a uniform gauge pressure of 5.0 psi. A minimum of two (2) minutes must be allowed for equilibrium of the air temperature with the pipe wall. If no loss of pressure is observed, allow test to continue for six (6) minutes. The service line shall be deemed acceptable if this pressure is maintained for six minutes without a drop in pressure of more than 0.5 psi. For service lines in excess of 400 feet in length and/or greater than six feet in depth, the Authority shall set the test pressure in accordance with site conditions. 6. RESTORATION AND CLEANUP: The contractor completing the work shall be responsible for restoration and cleanup following completion of the Building Sewer Connection work, including State Highways, Township streets, alleys and right-of-ways, yards, driveways and all other disturbed areas. 7. OTHER PERMITS & INSPECTIONS: Nothing in these regulations is intended to preclude, forego or supersede permits and inspections as may be required by other agencies should the proposed work require such other permits and inspections. It is the responsibility of the contractor to secure any other necessary permits and inspections as appropriate to the work being completed. 8. INSURANCE: It is the responsibility of the contractor completing the work to ensure his insurance coverage is adequate and appropriate in type and amount for the type of work being completed. Any damage claims as a result of the work completed will be the responsibility of the contractor. C. Waiver Requests The use of equipment, materials and construction methods other than those specified or beyond the scope of these specifications must be approved by Bethel Township Municipal Authority (BTMA) in writing. Waiver requests shall be made in writing and forwarded to the BTMA for consideration prior to any construction is begun on any site seeking waiver approval. APPENDICES ATTACHED Appendix A Acceptable Manufacturers List Appendix B Standard Details
8 Page 8 APPENDIX A Acceptable Manufacturers List 1. Gasketed Joint PVC SDR 35 Pipe: a. Push-on Joint Pipe i. Diamond Plastics Corporation ii. Johns Mansfield (J-M Pipe) Company iii. National Pipe and Plastics, Inc. iv. Approved Equal 2. Gasketed Sewer Pipe Fittings a. GPK Products, Inc. b. Harco c. Approved Equal 3. Flexible Pipe Couplings a. Fernco, Inc Series Connector b. Approved Equal 4. Service Line Check Valve a. Clean Check, Inc. (Rectorseal) b. Approved Equal 5. Protective Sleeve for Cleanout (Frame and Cover) a. East Jordan Iron Works b. Neenah Foundry Company c. Approved Equal 6. Other Materials shall be Reviewed by Authority prior to installation
9 Page 9 APPENDIX B Standard Details INDEX OF STANDARD DETAILS (ATTACHED) 1 (# 21) - Typical Building Sewer Connection Detail 2 (# 23) - Sewer Cleanout in Paved Areas Detail (Protective Sleeve)
10
11
SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE
6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction
SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.
SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION
3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Beacon Hill Sewer District Standard Specifications
Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES
SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS
1001 SOUTH LEECHBURG HILL LEECHBURG, PA 15656 Phone: 724-845-9355 Fax: 724-845-1186 SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS 1. General
SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.
SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings
STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY
STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY Approved and adopted as Official Document Number 800576 this 10th day of December, 1980 Donald R. Boyd, P.E., Director Water
32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.
SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and
SECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials
Town House 11265 Center Highway North Huntingdon, PA 15642
APPENDIX C SPECIFICATIONS FOR THE CONSTRUCTION OF BUILDING LATERAL SANITARY SEWERS DECEMBER 2004, INCLUDING AMENDMENTS ADOPTED ON FEBRUARY 6, 2008 AND APRIL 2, 2008; EFFECTIVE ON MAY 1, 2008 Town House
SECTION 02732 BUILDING SEWERS. B. Connection of building sanitary drainage system to municipal sewers.
SECTION 02732 BUILDING SEWERS PART 1 GENERAL 1.01 SECTION INCLUDES A. Lateral piping, fittings, and accessories. B. Connection of building sanitary drainage system to municipal sewers. 1.02 REGULATORY
ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION
ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS for (PVC) SANITARY SEWER MAIN CONSTRUCTION VI(A).1 General VI(A).2 Materials and Equipment VI(A).3 Installation of Sanitary Sewer Mains VI(A).4 Laying of
CHAPTER 6 - SANITARY SEWER
CHAPTER 6 - SANITARY SEWER 6.1 GENERAL This section covers the requirements for PVC plastic sewer pipe materials and installation in sanitary sewer construction. 6.2 PIPE PVC gravity sewer pipe and fittings
A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.
PART 1 GENERAL 1.1 SCOPE A. This item shall include the work necessary for the installation of storm sewer line construction. B. Reference Section 3800 Trenching and Backfill and the General Conditions,
SANITARY SEWER SPECIFICATIONS
SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,
DIVISION 4300 STORM DRAINAGE
DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES
SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING
SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant
The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11
Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit
SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE
SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE PART 1: GENERAL 1.01 SECTION INCLUDES PVC pressure pipe and fabricated fittings in nominal sizes 4-inches through 12-inches with cast iron pipe equivalent
LS 2540 SEWER LATERALS AND INSPECTION TEES
LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal
Sewage Compliance Form Instructions
CITY OF JOHNSTOWN DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT 401 MAIN STREET ROOM 200 JOHNSTOWN, PA 15901 814-533-2017 FAX 814-539-5816 RENEE K. DALY DIRECTOR Sewage Compliance Form Instructions 1)
Wastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
Section 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
SECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
Section 02702 SEWER PIPE INSTALLATION AND TESTING
PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete
San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS
San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS 854.1 DESCRIPTION: This item shall govern sanitary sewer laterals installed in accordance with these
Customer Procedures and General Information for Sewer Customers
Customer Procedures and General Information for Sewer Customers Helpful Hints for Customers Ordinance Review of District and Customer Responsibility of New and Existing Sewer Lines Material and Manner
SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application.
ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. Article II provides rules governing the allowable connection to the City POTW and the construction and inspection of
SECTION 7- STORM SEWER
SECTION 7- STORM SEWER 7.1. STORM SEWERS.... 7-1 7.2. SUMP DRAINS... 7-3 7.3. CATCH BASINS... 7-3 7.4. MANHOLES... 7-4 7.5. STORM SEWER CALCULATIONS... 7-4 7.6. CULVERTS AND BRIDGES... 7-5 7.7. OPEN CHANNELS...
SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES
SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with
Exhibit A. Rules and Regulations for House Connections and Sewer Extensions
The purpose of this application example is to provide assistance to small and medium sized rural communities in the drafting of documents necessary for the efficient operation of water, wastewater, and
DESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes)
SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes) Maintenance Office Administrative Office Billing Office 530-426-7802 530-426-7800 916-332-4872
EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines
EXHIBIT "A Technical Specifications for Water and Sewer Service Lines Water and Sewer Line Bedding and Backfill: Drawings show cross-section of trench, pipe laid on top of 6" min. bedding material, bedding
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...
Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.
Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer
Sanitary Sewer Mains and Services
Sewer Title Sanitary Sewer Mains and Services STitle Sewer Table of Contents "CORRECTIVE PERIOD & INSPECTION FOR SANITARY SEWERS & SERVICES"... 1 1. TERM OF GUARANTEE... 1 2. CONTRACTOR LICENSE AND PERMITS...
SECTION 9.02 BUILDING SUBSURFACE DRAINS (PERIMETER, ETC.)
CHAPTER 9 SEWER / STORM DRAIN / IRRIGATION LINES SECTION 9.01 GENERAL This section covers the requirements for piping materials and installation of Lehi City sewer, storm drainage and irrigation collection
STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223
STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES PART 1 - GENERAL A. Description This section describes the installation of gravity sewer pipelines fabricated of vitrified
Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe
Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene
550 PIPE CULVERTS, SEWERS AND DRAINS
551.01 550 PIPE CULVERTS, SEWERS AND DRAINS 551 GENERAL 551.01 Description 551.02 Materials 551.03 Excavation 551.04 Protection of Excavation 551.05(a) Bedding for Rigid Pipe 551.05(b) Bedding for Non-Rigid
Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE
1.0 GENERAL 1.1 DESCRIPTION This section addresses the procedures to be employed for pipe bursting existing water/sewer pipelines, as identified on the drawings, and replacing with new Restrained Joint
SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.
SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price
SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
C. Section 014510 TESTING LABORATORY SERVICE.
SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,
SECTION 5: SANITARY SEWER SYSTEM DESIGN
SECTION 5: SANITARY SEWER SYSTEM DESIGN 5.01 GENERAL Sanitary sewer improvements shall be designed to serve the ultimate level of City development as defined in the General Plan and the Wastewater Facilities
SECTION 02401 - SANITARY SEWER PIPE
PART 1 - GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for furnishing and installing sanitary sewer pipe, in accordance with
Specifications for Residential Property Owners Connection to New Public Sewer
Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the
MDWASD 8/1999 SECTION 02315 TRENCHING AND BACKFILLING FOR PIPING SYSTEMS
PART 1 - GENERAL 1.01 WORK INCLUDED SECTION 02315 TRENCHING AND BACKFILLING FOR PIPING SYSTEMS A. The work included under this Section consists of excavating, backfilling and compaction as required for
Section 402. STORM SEWERS
402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide
STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES
CITY OF PETALUMA STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES AUGUST 1999 Revised 10/98 City of Petaluma Petaluma, California STORM DRAIN INSTALLATION DETAIL
INDEX. Sec. No. Items Page Nos.
INDEX Sec. No. Items Page Nos. 1. Types of Pipe............... MSSP- 2 2. Concrete Pipe............... MSSP- 2 thru MSSP-3 3. ABS and PVC Truss Pipe............... MSSP- 3 4. ABS and PVC Solid Wall Pipe...............
SECTION 31 20 00 EARTH MOVING
SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown
SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS
1 SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS TABLE OF CONTENTS I. Introduction II. General Information and Requirements A. Applying for Sewer connection B. Excavation C. Cutting Concrete and Asphalt
The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:
Page 1 of 6 Section 1. PURPOSE This policy is an Engineering checklist of the Local Review Program for sanitary sewer improvement projects by the Bedford Regional Water Authority ( Authority ). Section
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
SECTION 221413 FACILITY STORM DRAINAGE PIPING
SECTION 221413 FACILITY STORM DRAINAGE PIPING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01
SECTION 200: STORM SEWER CONSTRUCTION STANDARDS
SECTION 200: STORM SEWER CONSTRUCTION STANDARDS Page No. Description 200-2 201 GENERAL 200-2 201.1 SPECIFICATIONS 200-2 201.2 CONNECTION TO EXISTING FACILITIES 200-3 202 MATERIALS 200-3 202.1 PIPES 200-4
SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE
SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. This section includes all labor, materials, equipment, and incidentals required and installation of Polyvinyl Chloride
SEWER DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS
CITY OF PETALUMA SEWER DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 500 SERIES JUNE 2000 Revised 10/98 City of Petaluma Petaluma, California SANITARY SEWER INSTALLATION DETAIL
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing
SECTION 33 41 00 REINFORCED CONCRETE PIPE. A. The following is a list of SPECIFICATIONS, which may be related to this section:
SECTION 33 41 00 REINFORCED CONCRETE PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. This section includes construction of reinforced concrete pipe for storm drainage, culverts, and sanitary sewer, including
Close-Out Documents... 9
Water and Sanitary Sewer Service Connection Requirements Service Connection Requirements... 1 Application for Services... 2 Water Meter Application... 2 Wet Tap/Tie-in Connection Requirements... 3 Meter
TECHNICAL SPECIFICATIONS GRAVITY AND PRESSURE SEWER LINE AND MATERIALS
TECHNICAL SPECIFICATIONS GRAVITY AND PRESSURE SEWER LINE AND MATERIALS Scope of Work Work performed under this contract shall consist of furnishing and installing, complete and ready for service, the sewer
City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014
City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 Section Subsection Name Date Modification Division 1 All subsections General Provisions
CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements
16600 Underground Electrical Duct Bank This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications
SECTION 6000 - EXCAVATION, TRENCHING AND BACKFILLING (Pipeline Construction)
SECTION 6000 - EXCAVATION, TRENCHING AND BACKFILLING (Pipeline Construction) 6001 SCOPE. This section covers excavation and trenching work and shall include the necessary clearing, grubbing, and preparation
Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer
Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer The user may choose to adopt part or all of this Model Specification; however, the user should ensure that all parts
San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS
ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by
8.01 STORM SEWERS, CATCH BASIN LEADS, AND EXTENSIONS
8.01 STORM SEWERS, CATCH BASIN LEADS, AND EXTENSIONS 8.01.01 Description This work shall consist of installing lines of storm sewer pipe of the required inside diameter, and the necessary appurtenances,
OAR52 A-1 (September, 1981)
APPENDIX A SEWER PIPELINES (1) MINIMUM REQUIREMENTS FOR SEWER - PIPELINES (a) Capacity: Sewers shall be of such diameter as to pass without overflow, bypass, or back flow onto damageable property of a
Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY
Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY Policy: This policy will replace all previous policies regarding the selection of pipe material for cross drains, drive pipe, drop pipe, storm
SECTION 603 SANITARY SEWER FORCE MAINS
SECTION 603 SANITARY SEWER FORCE MAINS 1. GENERAL Pipelines for sanitary sewer force main systems shall conform to the following specifications and shall be installed at the locations indicated on the
SECTION 724 PIPE CULVERTS
SECTION 724 PIPE CULVERTS 724.1 Description. This work shall consist of providing pipe or pipe arch of the diameter or shape designated, laid upon a firm bed and backfilled as specified. Where appropriate
TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth
TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20
Ultra-Rib PVC Storm Sewer Pipe 8" - 30"
Ultra-Rib PVC Storm Sewer Pipe 8" - 30" Ultra-Rib is a PVC Storm Sewer Pipe That Provides Superior Structural Capabilities Waterworks Products PW Eagle s Ultra-Rib is an open profile PVC gravity-flow storm
Sewer Line Rehabilitation
1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing sanitary sewers using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting
SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL. 1.01 Testing - General
SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL 1.01 Testing - General Testing shall be of the type and frequency described in each section and summarized in Item 1 of this section. In addition to
817 - PIPE CULVERTS, EROSION PIPE, STORM SEWERS, SANITARY SEWERS & END SECTIONS SECTION 817
SECTION 817 PIPE CULVERTS, EROSION PIPE, STORM SEWERS, SANITARY SEWERS AND END SECTIONS 817.1 DESCRIPTION Install the size and type of pipe culvert, erosion pipe, storm sewer, sanitary sewer, end section
September 2012 Brunswick County Engineering Department Revision 1.0. Technical Specification 020.01 GRAVITY SANITARY SEWER SYSTEM
1.0 General Technical Specification 020.01 GRAVITY SANITARY SEWER SYSTEM a) It is the intent of this specification to ensure that all gravity sewer system infrastructure constructed within the service
DESIGN AND CONSTRUCTION STANDARDS FOR SANITARY SEWER
DESIGN AND CONSTRUCTION STANDARDS FOR SANITARY SEWER SECTION 200.0 APPLICABILITY A. If public sewer is located within 250 feet of the proposed dwelling/dwellings, the owner is required to extend and connect
PLUMBING ROUGH IN INSPECTION
This Program is made Possible through the Code Officials Education & Training Fund. Revenue for the Fund comes from Assessments on Building Permits. Please turn down cell phones and put pagers on vibrate.
900 SEWERAGE WORK ITEM 901 - PIPE SEWERS COMPLETE IN PLACE
900 SEWERAGE WORK ITEM 901 - PIPE SEWERS COMPLETE IN PLACE 901.01 Description 901.02 Materials and Material Handling 901.03 Excavation 901.04 Limit as to Width of Trench 901.05 Unauthorized Excavation
FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation
644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING
SECTION 3 SANITARY SEWER DESIGN
SECTION 3 SANITARY SEWER DESIGN 3.1 GENERAL DESIGN CRITERIA 3.1.1 Requirement for Sanitary Sewer 3.1.2 Design Approval 3.1.3 IEPA Permit Required 3.1.4 Differentiation Between Public and Private Sanitary
FY08 SEWER POINT REPAIRS BID TABULATION
6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "
Gas Meter Clearances and Service Installation Requirements
March 2015 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE s Customer Construction Services 1-888-321-7779 or visit PSE.com/CustomerConstruction
LOGAN TOWNSHIP MUNICIPAL UTILITIES AUTHORITY DESIGN, CONSTRUCTION, INSPECTION AND TESTING MANUAL
LOGAN TOWNSHIP MUNICIPAL UTILITIES AUTHORITY DESIGN, CONSTRUCTION, INSPECTION AND TESTING MANUAL February 2010 LOGAN TOWNSHIP UTILITIES AUTHORITY INSPECTION AND TESTING PROCEDURE TABLE OF CONTENTS SECTION
Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS
Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS TABLE OF CONTENTS I. RULES AND REGULATIONS A. TABLE OF CONTENTS... 2 B. TERMS AND DEFINITIONS... 3 C. DEVELOPER S/CONTRACTOR S RESPONSIBILITIES...
Stormwater/Wetland Pond Construction Inspection Checklist
: Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials
BUILDING SEWER CONNECTION REQUIREMENTS
BUILDING SEWER CONNECTION REQUIREMENTS ANY PERSON DESIRING TO MAKE A NEW OR REVISED SEWER INSTALLATION MUST FIRST MAKE APPLICATION WITH THE NORTHERN GILA COUNT SANITARY DISTRICT FOR A PERMIT BEFORE STARTING