Data Centre Infrastructure Assessment
|
|
|
- Willis Harrison
- 10 years ago
- Views:
Transcription
1 Data Centre Infrastructure Assessment Prepared for: ACME INC SAMPLE REPORT Attention: Mr DC Manager This report represents a generic sample data centre audit for a generic customer by Focus Group Technologies. This report gives an indication of the areas of identification and recommendations that FGT will perform. Date: Tuesday, 2 March 2010 Version: 1.0 Prepared by: Phil Jones The business and project information contained in this document is the property of Focus Group Technologies Pty Ltd, and is supplied without liability for errors or omissions. This information has been prepared for ACME INC who is entitled to use or copy the information only for the purposes for which it is intended, otherwise no other part may be reproduced, used or disclosed except as authorised in writing by Focus Group Technologies Pty Ltd
2 Contents 1 Document Information Executive Summary Observations: Recommendation Summary Physical infrastructure Quality Racking Blanking Panels Monitors within racks Cable Management Power Audit Rack Location Power Analysis Summary Power Analysis Detail Temperature Heat Map Floor View Temperature Heat Map - Rack Power Observations Power Recommendations Cooling UPS Power Environmental Monitoring Subsequent recommendations: About Us Focus Group Technologies Focus Group Technologies Pty Ltd. ACN ABN Page 2
3 1 Document Information Document Author Name: Phil Jones Principal Consultant Focus Group technologies Telephone: Document Review Date Version Description Author Reviewer 1/02/2010 Version 1.0 Initial Draft Phil Jones AAA Document Distribution Name Title Organisation Phil Jones Principal Consultant FGT Mark Polti Sales Executive FGT Mr DC manager Data Centre Facilities Manager ACME Inc Focus Group Technologies Pty Ltd. ACN ABN Page 3
4 2 Executive Summary ACME Inc engaged Focus Group Technologies to undertake a Data Centre Assessment of their current rack infrastructure located at Harbour MSP. The onsite visit by the engineer had the following observation and recommendations: 2.1 Observations: The current installation is of 3 racks within the Global Switch Data Centre. Overall environmental conditions are excellent as provided by the DC Current Power draw is over utilised above available capacity Operating temperature of racked equipment is within range of ASHRAE guidelines Some efficiencies can still be gained via following data centre best practices 2.2 Recommendation Summary Priority High Impact is High. Action must be taken and be addressed immediately Power utilisation of Racks 1 and 2 are above allocated power. This is currently resulting in excess charges from your service provider. This can be achieved by: o Acquiring additional racks adjacent to the current racks and move some devices in to the new racks. i.e..spread the load across more racks o Or moving the current equipment to rack space that provides more power per rack. With at least % more than measured to account for peaks and growth. Priority Medium Action should be taken and be addressed in the next month or so. Implement environmental monitoring Priority Low Action will result in Best Practice and can be addressed in time. Implement blanking panels in the racks Replace the monitor in Rack 3 with a pull out flip-top LCD monitor. Focus Group Technologies is happy to provide CUSTOMER with a quotation to perform any or all of these services. Focus Group Technologies Pty Ltd. ACN ABN Page 4
5 3 Physical infrastructure 3.1 Quality Racking Server rack cabinets are important to your business success because they provide space for vital equipment that is crucial to the survival of your organization. If you select the right server rack, you will keep your equipment cool, your power running, and your downtime minimized. Racks should be a size and quality that allow for the intended equipment and provide room for cable management and airflow. Observation Quality racks are implemented Recommendation Nil 3.2 Blanking Panels Unused vertical space in rack enclosures creates an unrestricted recycling of hot air that causes equipment to heat up unnecessarily. The use of blanking panels can reduce this problem. Observation Blanking Panels are not implemented Recommendation Implement blanking panels in the racks Focus Group Technologies Pty Ltd. ACN ABN Page 5
6 3.3 Monitors within racks Monitors on shelves create an open space that permits hot exhaust air to return to equipment air intake resulting in overheating. This is a similar effect to not having blanking panels. Observation Monitors on shelves are being used Recommendation Replace the monitor in Rack 3 with a pull out flip-top LCD monitor. 3.4 Cable Management Cable management refers to the process of routing and placing cables within a rack environment. Poor cable management can not only lead to damaged cables or increased time to add or change out cables, but can block critical airflow or access. This can lead to inefficiencies in the performance of your equipment or even downtime Bad cable management Good cable management Observation Cable management was observed to be adequate, some improvements could be made to improve airflow and cable identification. Recommendation Improve cable management by routing cables to the side of the servers. Focus Group Technologies Pty Ltd. ACN ABN Page 6
7 4 Power 4.1 Redundancy of Power to Racks Power to the rack should be provided by dual sources to dual Power Distribution Units (PDUs). Redundant PDUs ensure uptime in the event of issue or failure in the power source, PDU or cabling. Observation Redundant PDUs were implemented. Recommendation Nil 4.2 Redundancy of Power in servers In addition to redundant connections to the individual devices, redundant power supplies should be implemented. Where redundant power supplies do not exist in the device, an Automatic Transfer Switch (ATS) can assist. The ATS is a dual input, rack-mountable power distribution unit (PDU) with a built in automatic transfer switch. The Micro Smart Switch is capable of receiving power from two independent AC power sources and utilises a built-in automatic AC transfer switch to quickly switch between them. This provides AC power line redundancy to critical computer or communications equipment in a rack environment. Observation ATS have not been implemented Recommendation Implement ATS technology for single power supply devices. Focus Group Technologies Pty Ltd. ACN ABN Page 7
8 4.3 Audit of Power Usage ACME Inc engaged Focus Group Technologies to undertake a power audit of their current rack infrastructure located at Harbour MSP. The purpose of this audit is to perform device level analysis of the power consumption so as to determine which devices are consuming what power. In addition, temperature measurements of the rack and surrounding areas were taken. Method As downtime could not occur, out of band external power monitoring was selected as the method of monitoring the power consumption. External monitoring in this case was conducted via a handheld clamp meter on each individual device Accuracy In band monitoring techniques (such as intelligent PDUs, in line power meters) are the most accurate form of measurement, but requires that the equipment is already installed or downtime occurs to place them in the power path. External monitoring in this case was conducted via a handheld clamp meter. The clamp meter has a resolution of 0.1 AMP with a ± 5% error rate. Individual devices or servers were measured at a point in time and those measurements added to provide a rack total. While the total power usage measured per rack will be accurate to within a few amps, more importantly the relative power usage of the devices will be comparable and valuable. The data recorded was a series of point in time measurements of a 2 hour period. As such the data does not represent a maximum or average power utilisation, rather the draw as measured. Focus Group Technologies Pty Ltd. ACN ABN Page 8
9 6 Power Analysis Summary Location: Date and Time: Performed by: DC Smith St Monday 1 st March 10am -12pm Phil Jones/FGT Rack Number: 1 Total Power (Amps): 13.2A Total Power (Watts): Available Amps (Both PDUS): 3168 watts 32A Utilisation of PDU: (must be < 50%) 41.25% Utilisation of PDU in the event of single PDU failure: (must be < 100%) 82.5% Rack Number: 2 Total Power (Amps): 7.6A Total Power (Watts): Available Amps (Both PDUS): 1824 watts 32A Utilisation of PDU: (must be < 50%) 23.75% Utilisation of PDU in the event of single PDU failure: (must be < 100%) 47.5% Rack Number: 3 Total Power (Amps): 4.0A Total Power (Watts): Available Amps (Both PDUS): 960 watts 32A Utilisation of PDU: (must be < 50%) 12.5% Utilisation of PDU in the event of single PDU failure: (must be < 100%) 25.0% Focus Group Technologies Pty Ltd. ACN ABN Page 9
10 7 Power Analysis Detail
11 8 Rack Location The diagram below shows the rack locations and orientation within the data centre.
12 9 Temperature Heat Map Floor View This heat map shows the surface temperature of the data centre floor around the racks. The monitored temperature is between 16.4ºC at the front to 21ºC at the rear. Focus Group Technologies Pty Ltd. ACN ABN Page 12
13 10 Temperature Heat Map - Rack Rack Front View ` This heat map shows the surface temperature of the front of the racks. The monitored temperature is between 15.4ºC at the bottom to 26.2ºC at the top left (west) Focus Group Technologies Pty Ltd. ACN ABN Page 13
14 Rack Front View This heat map shows the surface temperature of the rear of the racks. The monitored temperature is between 18.6ºC at the bottom to 32.0ºC at the top right (west) Focus Group Technologies Pty Ltd. ACN ABN Page 14
15 11 Power Observations It is our understanding that the allocated power per rack is 1600Watts. The table below shows the relative power usage versus allocated: Rack Power Usage (W) Allocated (W) % difference % % % Total % Clearly Racks 1 and 2 are over utilised from a power draw perspective, while rack 3 is well within limits. As shown in the analysis detail, no particular single device appears to be a major contributor to the power usage, rather the number and density of the devices. Rack 1 is over drawing the power allocation due to: More devices than the other racks Larger number of high power draw devices (e.g. storage, v245s) The power draw of these racks is well within current industry norms (usually 16 or 32 amps per rack). A concentration of high power draw equipment also results in temperature hot spots. For example, greater power draw in rack 1 results in a hot spot near the top of the rear of rack 1. This also results in a slightly higher temperature at the front of rack 1(26.2ºC) from hotter air circulating to the front and not being sufficiently cooled. Focus Group Technologies Pty Ltd. ACN ABN Page 15
16 12 Power Recommendations As mentioned in the observations no particular single device appears to be a major contributor to the power usage, rather the number and density of the devices. Additionally the total power usage is 124% over the total allocated; as such redistribution within the 3 racks would not solve the current problem. As such the recommendations are as follows: (in no particular order) Acquire additional racks adjacent to the current rack/s and move some devices in to the new racks. i.e..spread the load across more rack/s Move the current equipment to rack space that provides more power per rack. With at least % more than measured to account for peaks and growth. With either situation, we recommend that the 3 (or more) racks are evenly distributed for power load so as to even out temperature variations. Focus Group Technologies Pty Ltd. ACN ABN Page 16
17 13 Cooling Cooling capability is provided by the service provider and as such the infrastructure was not assessed in this document. 14 UPS Power UPS capability is provided by the service provider and as such the infrastructure was not assessed in this document. Focus Group Technologies Pty Ltd. ACN ABN Page 17
18 15 Environmental Monitoring Environmental Monitoring and control is crucial to the smooth running of your data centre. To maximise system reliability you should aim for a stable environment free from wild fluctuations. The key areas of concern are: Temperature Humidity Wetness (optional) Airflow (optional) Observation: Environmental monitoring is currently not implementation Recommendation: Implement an environmental monitoring system that provides alerting and historical reporting. Focus Group Technologies Pty Ltd. ACN ABN Page 18
19 16 Subsequent recommendations: Lastly, if the type of data prepared from this report is beneficial to you in the longer term, we would recommend that Intelligent PDUs or inline power meters be investigated to provide more accurate and detailed information. Intelligent PDUs will allow you to have features such as: Outlet-Level Current/Voltage/Power Metering with Threshold/Alert Capabilities Long term reporting and trending of power usage Capability to Remotely Switch Outlets Through On-Board Web Electronic Overcurrent Protection Sequential Startup Internal Temperature Sensor and Two Optional External Sensors A move or redistribution of racks equipment would be an ideal time to implement such technology. Focus Group Technologies Pty Ltd. ACN ABN Page 19
20 17 About Us 17.1 Focus Group Technologies Focus Group Technologies is a specialist data centre management solution provider combining best of breed technology with experienced design, consulting and implementation skills. Here at Focus Group Technologies we like to do things a little different from your typical reseller or systems integrator. Our business is based upon the following guiding principles: Focus Hence our name. We WILL focus on what we do and nothing else. This means we are good at what we do. If we are not the experts we are not going to try and sell you that solution. Sustainability Is vital in all our dealings and relationships with our vendors, business partners and you, our customer. FGT is here for the long haul. Sustainability guarantees we will be here to support your business now and into the future. Website: Focus Group Technologies Pty Ltd. ACN ABN Page 20
Server Room Thermal Assessment
PREPARED FOR CUSTOMER Server Room Thermal Assessment Analysis of Server Room COMMERCIAL IN CONFIDENCE MAY 2011 Contents 1 Document Information... 3 2 Executive Summary... 4 2.1 Recommendation Summary...
Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009
Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009 Agenda Overview - Network Critical Physical Infrastructure Cooling issues in the Server Room
Power and Cooling for Ultra-High Density Racks and Blade Servers
Power and Cooling for Ultra-High Density Racks and Blade Servers White Paper #46 Introduction The Problem Average rack in a typical data center is under 2 kw Dense deployment of blade servers (10-20 kw
Power Distribution Considerations for Data Center Racks
Power Distribution Considerations for Data Center Racks Power Distribution Considerations for Data Center Racks Table of Contents 3 Overview 4 At what voltage do you run all the IT equipment? 4 What electrical
Improve competiveness of IDC and enterprise data centers with DCIM
Improve competiveness of IDC and enterprise data centers with DCIM This paper studies the implementation of modern DCIM systems for data centers to improve operational competitiveness with ATEN's DCIM
Introducing Computational Fluid Dynamics Virtual Facility 6SigmaDC
IT Infrastructure Services Ltd Holborn Gate, 330 High Holborn, London, WC1V 7QT Telephone: +44 (0)20 7849 6848 Fax: +44 (0)20 7203 6701 Email: [email protected] www.itisltd.com Introducing Computational
Improving Rack Cooling Performance Using Airflow Management Blanking Panels
Improving Rack Cooling Performance Using Airflow Management Blanking Panels By Neil Rasmussen White Paper #44 Revision 3 Executive Summary Unused vertical space in open frame racks and rack enclosures
Selecting Rack-Mount Power Distribution Units For High-Efficiency Data Centers
C P I P O W E R M A N A G E M E N T WHITE PAPER Selecting Rack-Mount Power Distribution Units For High-Efficiency Data Centers By Anderson Hungria Sr. Product Manager of Power, Electronics & Software Published
Choosing Close-Coupled IT Cooling Solutions
W H I T E P A P E R Choosing Close-Coupled IT Cooling Solutions Smart Strategies for Small to Mid-Size Data Centers Executive Summary As high-density IT equipment becomes the new normal, the amount of
(Examples of various colocation sites)
Overview The largest factor involved in maintaining business servers today are the fixed costs associated with data centers. The Colocation Environment is an outsourcing model whereby a colocation company
Improving Rack Cooling Performance Using Airflow Management Blanking Panels
Improving Rack Cooling Performance Using Airflow Management Blanking Panels White Paper 44 Revision 4 by Neil Rasmussen > Executive summary Unused vertical space in open frame racks and rack enclosures
Airflow Simulation Solves Data Centre Cooling Problem
Airflow Simulation Solves Data Centre Cooling Problem The owner s initial design for a data centre in China utilized 40 equipment racks filled with blade servers spread out in three rows along the length
Data Center Rack Systems Key to Business-Critical Continuity. A White Paper from the Experts in Business-Critical Continuity TM
Data Center Rack Systems Key to Business-Critical Continuity A White Paper from the Experts in Business-Critical Continuity TM Executive Summary At one time, data center rack enclosures and related equipment
Re Engineering to a "Green" Data Center, with Measurable ROI
Re Engineering to a "Green" Data Center, with Measurable ROI Alan Mamane CEO and Founder Agenda Data Center Energy Trends Benchmarking Efficiency Systematic Approach to Improve Energy Efficiency Best Practices
Data Center Power Distribution at the Cabinet Level: The top 12 questions you need to ask to improve data center energy effciency
Data Center Power Distribution at the Cabinet Level: The top 12 questions you need to ask to improve data center energy effciency White Paper STI-100-010 November 2013 HEADQUARTERS - NORTH AMERICA Server
8 Intelligent PDUs. Intelligent Power Distribution Units for Data Centers
BRC_PDU_US_B_BRC_IcePack 4/30/13 11:31 AM Page 2 8 Intelligent PDUs Intelligent Power Distribution Units for Data Centers Intelligent Power Distribution Units Siemon s line of intelligent PDUs provide
Mejora la Eficiencia Operativa en Centros de Datos
Mejora la Eficiencia Operativa en Centros de Datos Marco Antonio Damián Data Center Specialist Panduit Data Center Operational Efficiency Operational Efficiency is done through: Cabinets and racks Cable
2006 APC corporation. Cooling Solutions and Selling Strategies for Wiring Closets and Small IT Rooms
Cooling Solutions and Selling Strategies for Wiring Closets and Small IT Rooms Agenda Review of cooling challenge and strategies Solutions to deal with wiring closet cooling Opportunity and value Power
Benefits of. Air Flow Management. Data Center
Benefits of Passive Air Flow Management in the Data Center Learning Objectives At the end of this program, participants will be able to: Readily identify if opportunities i where networking equipment
Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings
WHITE PAPER Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings By Lars Strong, P.E., Upsite Technologies, Inc. Kenneth G. Brill, Upsite Technologies, Inc. 505.798.0200
Server Technology, Inc.
Server Technology, Inc. Power Efficiency Gains by Deploying 415 VAC Power Distribution in North American Data Centers White Paper STI-100-008 2009-April-07 Headquarters Server Technology, Inc. 1040 Sandhill
Small Data / Telecommunications Room on Slab Floor
Small Data / Telecommunications Room on Slab Floor Small Data / Telecommunications Room on Slab Floor During a warm summer period in 2008, Great Lakes experienced a network outage due to a switch failure
How To Improve Energy Efficiency In A Data Center
Google s Green Data Centers: Network POP Case Study Table of Contents Introduction... 2 Best practices: Measuring. performance, optimizing air flow,. and turning up the thermostat... 2...Best Practice
Cooling a hot issue? MINKELS COLD CORRIDOR TM SOLUTION
Cooling a hot issue? MINKELS COLD CORRIDOR TM SOLUTION The heat load in data centers is increasing rapidly, the adaptation of a cooling strategy is often necessary. Many data centers and server rooms use
Thermal Monitoring Best Practices Benefits gained through proper deployment and utilizing sensors that work with evolving monitoring systems
NER Data Corporation White Paper Thermal Monitoring Best Practices Benefits gained through proper deployment and utilizing sensors that work with evolving monitoring systems Introduction Data centers are
Considerations for a Highly Available Intelligent Rack Power Distribution Unit. A White Paper on Availability
Considerations for a Highly Available Intelligent Rack Power Distribution Unit A White Paper on Availability Introduction Data centers are currently undergoing a period of great change. Data center managers
Dealing with Thermal Issues in Data Center Universal Aisle Containment
Dealing with Thermal Issues in Data Center Universal Aisle Containment Daniele Tordin BICSI RCDD Technical System Engineer - Panduit Europe [email protected] AGENDA Business Drivers Challenges
Measuring Power in your Data Center: The Roadmap to your PUE and Carbon Footprint
Measuring Power in your Data Center: The Roadmap to your PUE and Carbon Footprint Energy usage in the data center Electricity Transformer/ UPS Air 10% Movement 12% Cooling 25% Lighting, etc. 3% IT Equipment
How to Meet 24 by Forever Cooling Demands of your Data Center
W h i t e P a p e r How to Meet 24 by Forever Cooling Demands of your Data Center Three critical aspects that are important to the operation of computer facilities are matching IT expectations with the
Data Centre Energy Efficiency Operating for Optimisation Robert M Pe / Sept. 20, 2012 National Energy Efficiency Conference Singapore
Data Centre Energy Efficiency Operating for Optimisation Robert M Pe / Sept. 20, 2012 National Energy Efficiency Conference Singapore Introduction Agenda Introduction Overview of Data Centres DC Operational
Supporting Cisco Switches In Hot Aisle/Cold Aisle Data Centers
CABINETS: ENCLOSED THERMAL MOUNTING MANAGEMENT SYSTEMS WHITE PAPER Supporting Cisco Switches In Hot Aisle/Cold Aisle Data Centers 800-834-4969 [email protected] www.chatsworth.com All products
How To Run A Data Center Efficiently
A White Paper from the Experts in Business-Critical Continuity TM Data Center Cooling Assessments What They Can Do for You Executive Summary Managing data centers and IT facilities is becoming increasingly
APC APPLICATION NOTE #112
#112 Best Practices for Deploying the InfraStruXure InRow SC By David Roden Abstract The InfraStruXure InRow SC (ACSC100 and ACSC101) is a self-contained air conditioner for server rooms and wiring closets.
Managing Cooling Capacity & Redundancy In Data Centers Today
Managing Cooling Capacity & Redundancy In Data Centers Today About AdaptivCOOL 15+ Years Thermal & Airflow Expertise Global Presence U.S., India, Japan, China Standards & Compliances: ISO 9001:2008 RoHS
Application Briefs: Remote Office Environment
Overview Remote offices are a definite sign of growth, but it can constitute an immense challenge from an IT infrastructure standpoint. Remote offices may include a wide variety of wiring closets and small
Thermal Optimisation in the Data Centre
Thermal Optimisation in the Data Centre Best Practices for achieving optimal cooling performance and significant energy savings in your data centre 1. Thermal analysis 2. Cold-Aisle-Containment 3. Seal
Power Distribution Units (PDUs): Power monitoring and environmental monitoring to improve uptime and capacity planning
Power Distribution Units (PDUs): Power monitoring and environmental monitoring to improve uptime and capacity planning 2009, Raritan Inc. Overview Corporate America is more dependent than ever on computing
Implement Data Center Energy Saving Management with Green Data Center Environment and Energy Performance Indicators
Implement Data Center Energy Saving Management with Green Data Center Environment and Energy Performance Indicators Awareness of environmental protection issues, has many industry types focusing and pursuing
Top 12 Questions to Consider When Choosing UPS Systems for Network/Server Applications
W H I T E P A P E R Top 12 Questions to Consider When Choosing UPS Systems for Network/Server Applications Executive Summary One of the fundamental decisions in the design of data centers, server rooms
DATA CENTER SOLUTIONS
DATA CENTER SOLUTIONS Nobody Makes Better Data Center Equipment Maximize availability, manageability and efficiency with cost-effective solutions from a dependable partner. Provide reliable, efficient
Reducing Room-Level Bypass Airflow Creates Opportunities to Improve Cooling Capacity and Operating Costs
WHITE PAPER Reducing Room-Level Bypass Airflow Creates Opportunities to Improve Cooling Capacity and Operating Costs By Lars Strong, P.E., Upsite Technologies, Inc. 505.798.000 upsite.com Reducing Room-Level
7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America
7 Best Practices for Increasing Efficiency, Availability and Capacity XXXX XXXXXXXX Liebert North America Emerson Network Power: The global leader in enabling Business-Critical Continuity Automatic Transfer
Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency
A White Paper from the Experts in Business-Critical Continuity TM Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency Executive Summary Energy efficiency
Energy Efficiency Opportunities in Federal High Performance Computing Data Centers
Energy Efficiency Opportunities in Federal High Performance Computing Data Centers Prepared for the U.S. Department of Energy Federal Energy Management Program By Lawrence Berkeley National Laboratory
Ten Steps to Solving Cooling Problems Caused by High- Density Server Deployment
Ten Steps to Solving Cooling Problems Caused by High- Density Server Deployment By Peter Hannaford White Paper #42 Revision 1 Executive Summary High-density servers present a significant cooling challenge.
Optimum Climate Control For Datacenter - Case Study. T. Prabu March 17 th 2009
Optimum Climate Control For Datacenter - Case Study T. Prabu March 17 th 2009 Agenda 2 About EDEC (Emerson) Facility Data Center Details Design Considerations & Challenges Layout Design CFD Analysis Of
Data Center Infrastructure Management (DCIM) Demystified
software is quickly becoming the core engine of data center operations. Only 5 years ago, manual spreadsheets, sometimes supplemented with Visio diagrams, were accepted as the default tools for data center
SmartDesign Intelligent, Integrated Infrastructure For The Data Center. Solutions For Business-Critical Continuity
SmartDesign Intelligent, Integrated Infrastructure For The Data Center Solutions For Business-Critical Continuity Prepare Your Data Center For What s Next Efficiency. Availability. Capacity. Control. One
RELIABLE AND FLEXIBLE POWER FOR YOUR DATA CENTRE
RELIABLE AND FLEXIBLE POWER FOR YOUR DATA CENTRE Highly efficient solutions for power distribution, management and monitoring POWER DISTRIBUTION WIRE-FREE MONITORING LEAK DETECTION Daxten provides comprehensive
Environmental Data Center Management and Monitoring
2013 Raritan Inc. Table of Contents Introduction Page 3 Sensor Design Considerations Page 3 Temperature and Humidity Sensors Page 4 Airflow Sensor Page 6 Differential Air Pressure Sensor Page 6 Water Sensor
Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings
WHITE PAPER Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings By Kenneth G. Brill, Upsite Technologies, Inc. Lars Strong, P.E., Upsite Technologies, Inc. 505.798.0200
Cooling Audit for Identifying Potential Cooling Problems in Data Centers
Cooling Audit for Identifying Potential Cooling Problems in Data Centers By Kevin Dunlap White Paper #40 Revision 2 Executive Summary The compaction of information technology equipment and simultaneous
Power Management Strategies for High-Density IT Facilities and Systems. A White Paper from the Experts in Business-Critical Continuity TM
Power Management Strategies for High-Density IT Facilities and Systems A White Paper from the Experts in Business-Critical Continuity TM Executive Summary Increases in data center density and diversity
How green is your data center?
Siemens Answers: Sustainable Future How green is your data center? Istanbul June 01, 2010 Agenda 1 Solution 2 Siemens Data Center Approach 2 Designing with multiple power density zones can reduce energy
Data Center Infrastructure Management: ERP for the Data Center Manager
Data Center Infrastructure Management: ERP for the Data Center Manager 1 2 Topics What s DCIM & the ERP Analogy Why DCIM How DCIM Works How DCIM Helps 3 DCIM by Definition DCIM is a system that collects
HIGHLY EFFICIENT COOLING FOR YOUR DATA CENTRE
HIGHLY EFFICIENT COOLING FOR YOUR DATA CENTRE Best practices for airflow management and cooling optimisation AIRFLOW MANAGEMENT COLD AND HOT AISLE CONTAINMENT DC ASSESSMENT SERVICES Achieving true 24/7/365
Greening Commercial Data Centres
Greening Commercial Data Centres Fresh air cooling giving a PUE of 1.2 in a colocation environment Greater efficiency and greater resilience Adjustable Overhead Supply allows variation in rack cooling
5 Reasons. Environment Sensors are used in all Modern Data Centers
5 Reasons Environment Sensors are used in all Modern Data Centers TABLE OF CONTENTS 5 Reasons Environmental Sensors are used in all Modern Data Centers Save on Cooling by Confidently Raising Data Center
Server Technology, Inc.
Server Technology, Inc. Cabinet Power Monitoring, Management & Control Within the Data Center White Paper STI-100-011 2010-Sept-27 by Calvin Nicholson, Senior Director Software and Strategic Alliances,
DATA CENTER RACK SYSTEMS: KEY CONSIDERATIONS IN TODAY S HIGH-DENSITY ENVIRONMENTS WHITEPAPER
DATA CENTER RACK SYSTEMS: KEY CONSIDERATIONS IN TODAY S HIGH-DENSITY ENVIRONMENTS WHITEPAPER EXECUTIVE SUMMARY Data center racks were once viewed as simple platforms in which to neatly stack equipment.
Racks & Enclosures. Deliver. Design. Define. Three simple words that clearly describe how we approach a Data Center project.
Three simple words that clearly describe how we approach a Data Center project. Eclipse Racks & Enclosures DELIVERING THE RIGHT INFRASTRUCTURE FOR YOUR MISSION-CRITICAL NEEDS SERVER RACKS & NETWORKING
Great Lakes Data Room Case Study
Great Lakes Data Room Case Study WeRackYourWorld.com Problem: During a warm summer period in 2008, Great Lakes experienced a network outage due to a switch failure in the network enclosure. After an equipment
Colocation and Cloud Hosting Solutions. Build a strong and efficient physical infrastructure that delivers service reliability and profitability
Colocation and Cloud Hosting Solutions Build a strong and efficient physical infrastructure that delivers service reliability and profitability 2 Dependability and Deployment Speed that Improves Your Bottom
The Benefits of Supply Air Temperature Control in the Data Centre
Executive Summary: Controlling the temperature in a data centre is critical to achieving maximum uptime and efficiency, but is it being controlled in the correct place? Whilst data centre layouts have
Modularized and Multi-Functional Power Distribution for Cabinets 3.01
Modularized and Multi-Functional Power Distribution for Cabinets 3.01 1 1 Intelligent Data Center Solutions for Networks of the Future Hexatronic offers reliable, high quality data center solutions designed
RACKMOUNT SOLUTIONS. 1/7/2013 AcoustiQuiet /UCoustic User Guide. The AcoustiQuiet /UCoustic User Guide provides useful
RACKMOUNT SOLUTIONS 1/7/2013 AcoustiQuiet /UCoustic User Guide The AcoustiQuiet /UCoustic User Guide provides useful hints, tips and advice to help maximize the thermal and acoustic properties of the cabinets.
Energy Management Solutions
Energy Management Solutions Introducing the world s most innovative intelligent Power Distribution Units (ipdus) designed to simplify rack energy and environmental management of your data center. Enlogic
Managing Data Centre Heat Issues
Managing Data Centre Heat Issues Victor Banuelos Field Applications Engineer Chatsworth Products, Inc. 2010 Managing Data Centre Heat Issues Thermal trends in the data centre Hot Aisle / Cold Aisle design
Australian Government Data Centre Strategy 2010-2025
Australian Government Data Centre Strategy 2010-2025 Better Practice Guide: Data Centre Power June 2013 17/06/2013 4:12 PM 17/06/2013 4:12 PM Contents Contents 2 1. Introduction 3 Scope 3 Policy Framework
Data Center Cooling: Fend Off The Phantom Meltdown Of Mass Destruction. 670 Deer Road n Cherry Hill, NJ 08034 n 877.429.7225 n
Data Center Cooling: Fend Off The Phantom Meltdown Of Mass Destruction How To Preserve Your Servers And Prevent Overheating Your high-performance, multiprocessor servers are working hard, computing tons
Green Data Centre Design
Green Data Centre Design A Holistic Approach Stantec Consulting Ltd. Aleks Milojkovic, P.Eng., RCDD, LEED AP Tommy Chiu, EIT, RCDD, LEED AP STANDARDS ENERGY EQUIPMENT MATERIALS EXAMPLES CONCLUSION STANDARDS
AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY
AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY The Aegis Services Power and Assessment Service provides an assessment and analysis of your data center facility and critical physical
Access Server Rack Cabinet Compatibility Guide
Access Server Rack Cabinet Compatibility Guide A Guide to the Selection and Evaluation of Access Server Rack Cabinets for Compatibility and Use with Third Party Server Chassis Kalkenstraat 91-93 B-8800
Energy Efficiency Best Practice Guide Data Centre and IT Facilities
2 Energy Efficiency Best Practice Guide Data Centre and IT Facilities Best Practice Guide Pumping Systems Contents Medium-sized data centres energy efficiency 3 1 Introduction 4 2 The business benefits
AIR-SITE GROUP. White Paper. Green Equipment Room Practices
AIR-SITE GROUP White Paper Green Equipment Room Practices www.air-site.com Common practices to build a green equipment room 1 Introduction Air-Site (www.air-site.com) is a leading international provider
Free Cooling in Data Centers. John Speck, RCDD, DCDC JFC Solutions
Free Cooling in Data Centers John Speck, RCDD, DCDC JFC Solutions Why this topic Many data center projects or retrofits do not have a comprehensive analyses of systems power consumption completed in the
Data Center Power Distribution and Capacity Planning:
Data Center Power Distribution and Capacity Planning: Understanding what you know and don t know about power usage in your data center 2009, Raritan Inc. About This Series Raritan, a leading provider of
Power Distribution in Data Centers: STARLINE Track Busway, PX ipdus and Power IQ
Power Distribution in Data Centers: STARLINE Track Busway, PX ipdus and Power IQ 2011 Raritan Inc. Overview Data center managers are faced with increasingly challenging demands: supplying additional computing
How to Maximize Data Center Efficiencies with Rack Level Power Distribution and Monitoring
How to Maximize Data Center Efficiencies with Rack Level Power Distribution and Monitoring Brian Rehnke e-pdu Business Development Manager November, 2011 The Problems Energy Usage in most data centers
Energy Efficiency and Availability Management in Consolidated Data Centers
Energy Efficiency and Availability Management in Consolidated Data Centers Abstract The Federal Data Center Consolidation Initiative (FDCCI) was driven by the recognition that growth in the number of Federal
vcloud SERVICE Virtual Tech in partnership with Equinix - vcloud Service
vcloud SERVICES vcloud SERVICE Virtual Tech offers competitive pricing on vcloud hosted services at our world class Tier 4 data centre facility fully equipped with redundant power, cooling, internet connectivity
Cabinets 101: Configuring A Network Or Server Cabinet
Cabinets 101: Configuring A Network Or Server Cabinet North, South and Central America White Paper May 2012 www.commscope.com Contents Background Information 3 What is a network or server cabinet? 3 What
ADC-APC Integrated Cisco Data Center Solutions
Advanced Infrastructure Solution for Cisco Data Center 3.0 Ordering Guide ADC-APC Integrated Cisco Data Center Solutions The evolution of data centers is happening before our eyes. This is due to the
Ten Steps to Increasing Data Center Efficiency and Availability through Infrastructure Monitoring
Ten Steps to Increasing Data Center Efficiency and Availability through Infrastructure Monitoring A White Paper from the Experts in Business-Critical Continuity Summary The first decade of the 21st century
GUIDE TO ICT SERVER ROOM ENERGY EFFICIENCY. Public Sector ICT Special Working Group
GUIDE TO ICT SERVER ROOM ENERGY EFFICIENCY Public Sector ICT Special Working Group SERVER ROOM ENERGY EFFICIENCY This guide is one of a suite of documents that aims to provide guidance on ICT energy efficiency.
Office of the Government Chief Information Officer. Green Data Centre Practices
Office of the Government Chief Information Officer Green Data Centre Practices Version : 2.0 April 2013 The Government of the Hong Kong Special Administrative Region The contents of this document remain
Power and Cooling Guidelines for Deploying IT in Colocation Data Centers
Power and Cooling Guidelines for Deploying IT in Colocation Data Centers White Paper 173 Revision 0 by Paul Lin and Victor Avelar Executive summary Some prospective colocation data center tenants view
CenterMind P+ Intelligent Power Management for your Data Center
CenterMind P+ Intelligent Power Management for your Data Center Intelligent Power Management for your Data Center monitor and manage your data center power consumption and connectivity efficiently The
Sealing Gaps Under IT Racks: CFD Analysis Reveals Significant Savings Potential
TECHNICAL REPORT Sealing Gaps Under IT Racks: CFD Analysis Reveals Significant Savings Potential By Lars Strong, P.E., Upsite Technologies, Inc. Bruce Long, Upsite Technologies, Inc. +1.888.982.7800 upsite.com
CANNON T4 MINI / MICRO DATA CENTRE SYSTEMS
CANNON T4 MINI / MICRO DATA CENTRE SYSTEMS Air / Water / DX Cooled Cabinet Solutions Mini Data Centre All in One Solution: Where there is a requirement for standalone computing and communications, or highly
Data Center Cooling. 1-800-693-0351 www.dpstele.com. A guide from: Your partners in UPS Monitoring Systems
Data Center Cooling A guide from: Your partners in UPS Monitoring Systems The air in your server room, especially nearest the processors in your equipment, will rise to dangerous temperatures quickly if
In Row Cooling Options for High Density IT Applications
In Row Cooling Options for High Density IT Applications By Ramzi Y. Namek, PE, LEED AP, BD+C; Director of Engineering 1 Users wishing to deploy high density IT racks have several In Row Cooling solutions
Intelligent Power Distribution in the Data Center
Rack Power Intelligent Power Distribution in the Data Center Agenda Data Centre Power UPS Power Distribution Rack Mount PDU s UPS Power problems Configuration Capacity Power Distribution Types of Distribution