SPECIFICATION ARE YOU? 77 SHAFTESBURY SOHO FLOOR TO CEILING HEIGHTS GROUND FLOOR RECEPTION 3,200 MM FIRST FLOOR OFFICE 3,000 MM

Size: px
Start display at page:

Download "SPECIFICATION ARE YOU? 77 SHAFTESBURY SOHO FLOOR TO CEILING HEIGHTS GROUND FLOOR RECEPTION 3,200 MM FIRST FLOOR OFFICE 3,000 MM"

Transcription

1 77SHAFTESBURY.COM

2 FLOOR TO CEILING HEIGHTS GROUND FLOOR RECEPTION 3,200 MM RETAIL 3,200 MM FIRST FLOOR OFFICE 3,000 MM SECOND FLOOR OFFICE 2,600 MM THIRD FLOOR OFFICE 2,600 MM FOURTH FLOOR OFFICE 2,600 MM FIFTH FLOOR OFFICE 2,600 MM SIXTH FLOOR OFFICE 2,600 MM STRUCTURAL LOADINGS OFFICES GENERAL AREA LIVE LOAD 2.75 KN / M 2 PARTITIONS 1.0 KN / M 2 RETAIL GENERAL AREA LIVE LOAD 4.0 KN / M 2 FLOORS, CEILINGS AND SERVICES 0.85 KN / M 2 ROOF PLANT AND PLANT ROOMS LIVE LOAD 2.0 KN / M 2 GENERATORS 4.5 KN / M 2 AMENITIES SHOWERS 5NO. MALE +5NO. FEMALE AT BASEMENT, LEVEL. 1NO. ACCESSIBLE WC +SHOWER AT GROUND FLOOR LEVEL. LOCKERS 66 LOCKERS IN SHOWER / CHANGING ROOMS. 50:50 SPLIT PROVISION TO BCO AND BS BICYCLES 65 TOTAL CYCLE STORAGE SPACES AT GROUND (60) AND BASEMENT LEVEL (5)

3 OFFICE FLOOR SECTION ZONES RAISED FLOOR FIRST TO SIXTH FLOOR 100 MM OVERALL CEILING / LIGHTING ZONE 100 MM MIN OCCUPATIONAL DENSITIES WCs 1 PERSON PER 10 M 2 NIA 50% MALE / 50% FEMALE SPLIT ON EACH OFFICE FLOOR LIFTS AIR CONDITIONING MEANS OF ESCAPE 1 PERSON PER 10 M 2 NIA 1 PERSON PER 10 M 2 NIA 1 PERSON PER 6 M 2 NIA INTERNAL DESIGN CONDITIONS (OFFICES) WINTER 22 C DB + / - 2 C (NO DIRECT HUMIDITY CONTROL) SUMMER 23 C DB + / - 2 C (NO DIRECT HUMIDITY CONTROL) OCCUPANCY LEVELS (FOR FRESH AIR PROVISION) 1 PERSON PER 10M 2 NIA FRESH AIR SUPPLY RATES TOILET VENTILATION RATES 13.2 LITRES PER PERSON (12 LITRES PER PERSON +10% FOR FUTURE MEETING ROOMS) 8 AIR CHANGES PER HOUR SUPPLY 10 AIR CHANGES PER HOUR EXTRACT INTERNAL NOISE DESIGN CRITERIA OFFICE AREAS RECEPTION TOILETS AND STAIRCASE NR38 NR40 NR45 DESIGN COOLING LOADS SMALL POWER 25W / M 2 LIGHTING 8W / M 2 ELECTRICAL SERVICES LIGHTING LEVELS AS CIBSE LG7 (1) OFFICE AREAS 350 LUX MAINTAINED ILLUMINANCE AT 0.75M WORKING PLANE OFFICE AREAS TO BE PROVIDED WITH AIR HANDLING, HIGH FREQUENCY FLUORESCENT LUMINAIRES, AND SUPPLEMENTARY LUMINAIRES TO FOLLOW THE RECOMMENDATIONS OF CIBSE LIGHTING GUIDE LG7 THE TENANT TO PROVIDE SUPPLEMENTARY UPLIGHTING TO ACHIEVE CONFORMANCE / CERTIFICATION AT 400LUX SMALL POWER LOADS OFFICE AREAS 25W / M 2 SIZE RISERS / BUS BARS 100A (MAX) TP&N METERED SUPPLY VIA ARMOURED SUB MAIN CABLE PLANNING GRID 1.5MX1.5M TYPICAL (VARIES AS EXISTING BUILDING FORMAT) COLUMN GRID 4.5M GRID TYPICAL

4 STRUCTURAL FRAME AND FLOORS The main part of the existing building was constructed in with a part at 75 Shaftesbury Avenue newly constructed behind a retained Victorian façade. The structural frame consists of an in-situ reinforced concrete (RC) band beam which supports precast reinforced concrete (PC) floor slabs. Floor levels 1 to 5 are typically formed by 400mm deep x 2,400mm wide in-situ RC beams following the internal central column line with RC edge down stand beams following the perimeter of the atrium and the external building line. The in-situ beams are supported on RC columns of varying shape and size with PC floor slabs, typically 150mm deep, spanning between the in-situ beams. The basement is constructed from a 325mm thick RC retaining wall around the perimeter of the building with 1,200mm and 1,000mm deep RC transfer beams within the car park to carry the atrium columns and provide clear access for vehicle movement. A corbel at the top of the retaining wall provides support to the PC façade panels at ground floor. The slab is formed from a 1,200mm thick RC raft foundation supporting the retaining wall. Lateral stability is provided by the cladding transferring the horizontal wind loads into the in-situ frame and transferred into the existing east and west RC stair cores and the new RC fire fighting lift core. Loads are taken into the 1,200mm deep RC raft foundation and into the ground below, bearing off sands and gravels. New steel column and beams at the centre of the plan form a new atrium, lift and core arrangement on levels 1-5, spanning to the retained mid floor plate beam line with composite deck floor slab infill s. The sixth and roof levels are all new and of similar construction. ROOFING An inverted liquid applied flat roof coating on the new composite deck roof slab, with insulation and concrete paving on pedestals as a ballast finish. New granite paving on pedestal supports over similar inverted flat roof construction to 5th floor west facing office terrace. PPC aluminium louvre screening to roof mounted plant equipment with PPC galvanised steel structure supported off floating pad support system. Mansafe cable and combined fixing points for abseil window cleaning via cantilevered temporary beam rope guides. Standing seam zinc copings, mansard, dormer and cupola roofing with lead gutters. EXTERNAL WALLS AND WINDOWS The retained precast concrete and brickwork façade elements are to be cleaned and refurbished. The internal dry linings are retained and refurbished, with no thermal upgrades to the solid wall elements. New double glazed anodized aluminium framed, thermally broken windows throughout. Low iron solar control, fire and non fire rated glazing to typical façade windows. Low iron solar control plus to inclined sixth floor and atrium roof glazing. Low iron glazing to new atrium windows. EXTERNAL DOORS AND ENTRANCE SCREENS Office main entrance doors are via fully glazed automatic sliding doors with stainless steel plate fittings. Retail entrance doors are via fully glazed pivot hinged doors with stainless steel plate fittings and dline ironmongery. All door systems are set into new double glazed, anodized aluminium thermally broken, framed screens. All the glazing to the screens is low iron with solar control. All door glazing is low iron safety glazing. WINDOW CLEANING STRATEGY The office windows will generally be fixed closed and will be maintained and cleaned externally via abseiling points from roof level. The atrium roof glazing will be cleaned externally by reach and wash from the flat roof. Internally the atrium windows and glazed roof soffit will be cleaned and maintained via a powered hoist system which will raise a temporary gantry from the atrium floor on lifting beams and hoist tracks integrated into the atrium roof structure and rigged from the roof level via access hatches in the atrium side walls. FIRE STRATEGY Compartmentation will be provided separating the different purpose groups in the building; offices shop and commercial, and car parking. Each office floor has access to a minimum of two fire escape staircases with protected lobbies leading to ground level pavement exits. The building elements of structure will be provided with 90minute standard of resistance. An automatic fire detection system will be installed in accordance with BS 5839:Part1:2002. The main west core will be a fire fighting shaft designed and installed in accordance with BS A dry rising main will be provided within the fire fighting shaft, designed and installed in accordance with BS 9990:2006. The fire fighting lobbies will be ventilated by mechanical ventilation system designed in accordance with BS EN , Class B systems. Fire rated glazing is provided to a proportion of the external windows to control fire spread to neighbouring façades. FLOORS Large format limestone floor tiling with inlaid satin stainless steel strip details. Integrated matting is provided in the main reception area, and is provided at the secondary entrance area. Integrated flush satin stainless steel and stone inset floor boxes with small power provision are provided in the reception and atrium floors. WALLS Timber veneered panels with integrated concealed access doors to service and fire cupboards in the main reception area. Recessed satin stainless steel pelmet and skirtings with concealed lighting and ventilation. Anodized aluminium framed safety glass screen, partially dividing the reception desk area and future café facility. The walls flanking the base of the atrium are anodized aluminium framed glazing with concealed back lighting with colour change capability and pre programmable settings. INTERNAL DOORS Timber veneered pivot door leading to back of house office areas and accessible / visitors WC, integrated and concealed in the timber wall paneling. CEILINGS Generally painted plasterboard with recessing fixed down lights with CCTV, fire detection and alarm fittings. The ceiling also incorporates a recessed solid timber battened ceiling with concealed linear LED feature lighting defining the main entrance route to the atrium lift lobby.

5 All concealed linear lighting within the main reception detail has RGB and white colour change capability and pre programmable settings. RECEPTION DESK Designed for two receptionists. It will incorporate flat screen computers capable of monitoring the main entrance door with controls, security CCTV, building services, and emergency systems. The desk has a Corian worktop with inlaid writing grade linoleum surface, satin stainless steel edge details and recessed skirtings with hardwood batten facings with 5Amp allocations for task lighting. The desk is serviced from the basement below with links to the ground floor back of house building managers office. SECURITY GATES Future containment provision for security gates at the entrance line to the atrium lift lobby. FLOORS First to sixth floors inclusively have a fully accessible raised access floor with approx. 100mm total construction from SSL. The floor will comply with PSA medium grade flooring specifications. WALL FINISHES Existing external plastered masonry and party walls are retained and refurbished with new decorations. Core riser access walls are dry lined and decorated with flush fitted outer mdf panels and concealed fire rated inner doors with statutory signage. All new skirtings painted mdf (75x15mm) throughout. CEILING FINISHES Fully accessible demountable metal suspended ceilings, SAS 130 type (600x600mm module). Colour white RAL Perimeter ceiling margins are painted plasterboard British Gypsum Gyproc Casoline MF system, painted white RAL Minimum ceiling/lighting zone is 100mm. LIFTS 3 passenger lifts each of 1000kg 13 persons to travel at 1.6m/sec. with BCO-2010 compliant waiting times of less than 25sec. The lift doors sizes are 800x2,100mm. The passenger lifts are electric motor traction driven with no machine rooms. The car interiors have semi bespoke finishes with timber veneer, stainless steel and mirror wall and ceiling panneling. The ceiling has LED recessed fixed down light and concealed linear lighting. The floor finish is large format limestone tiling to match the lift lobbies, atrium and reception areas. The lift doors are centre opening in a satin stainless steel finish with matching signals and call points. 1no. 800kg 1.6m/s new fire fighting / goods lift is provided with a standard stainless steel functional interior and 900x2,100 door size. A retained hydraulic car lift provides access from Romilly Street down to the basement car park and services area. WCs WCs and accessible WCs have light coloured conglomerate stone tiled floor finishes with skirtings and vanity unit wall paneling to match. Higher level walls and ceilings are in painted plasterboard finish with recess down lights and recessed pelmet supply ventilation. Extract ventilation is via a similar recessed pelmet at the rear of the cubicle ceilings. The cubicle doors are in high gloss laminate. Recessed satin stainless steel shelves are provided above wash basins with integrated paper towel and waste bins, with mirror walls above and at the end walls. Wash basins and WCs are white ceramic with chrome finish sensor taps and automatic soap dispenser. 4 male and 4 female (WC cubicles + wash basins) per office floors at levels 1-5 inclusive. 3 male and 3 female (WC cubicles + wash basins) at 6th floor. 1 unisex accessible WC per office floor. 50:50 split provision to BCO and BS STAIRCASE CORES The in-situ concrete staircases are retained and refinished with new carpet flooring and contrasting stainless steel nosing details with vinyl inserts. Skirtings are painted mdf (75x15mm), walls are skimmed plaster finish. New ceilings are painted plasterboard. New satin stainless steel balustrading and handrails throughout. New lighting includes surface mounted luminaires to walls with downlights with integral emergency battery packs recessed into the ceiling soffits on all landings. DOORS Core doors are fire rated solid core, timber veneered finish with clear glass vision panels and satin stainless steel dline ironmongery. The atrium lift lobby office access doors are fully glazed pivot doors with satin stainless steel plates and dline ironmongery all integrated into a hardwood batten wall. CHANGING AND SHOWER ROOMS Male and female changing rooms have light coloured conglomerate stone tiled floor finish and skirtings. 66 proprietary lockers with additional overhead storage units are in matching high gloss laminate paneling with a satin stainless steel recessed shelf with integrated concealed lighting. 5 male and 5 female fully tiled shower cubicles are accessed via high gloss laminate cubicle door screens. All cubicles have white ceramic low profile shower trays and safety glass screens; flip up seating and fully adjustable shower fittings. Timber benches are provided to open changing room areas. An additional fully accessible WC and shower unit is provided at ground level off the main reception. EXTERNAL WORKS New paving and re-leveling works to the Shaftesbury Avenue main reception frontage to allow for level access provision. CAR PARKING The basement car park is accessed via a retained car lift from Romilly Street, allowing access to 5 car spaces one of which is designated for accessible use CYCLE STORAGE 69 total cycle spaces (65 office + 4 retail) are provided at ground floor level and at basement car park level accessed from the Romilly Street via the secondary office entrance/ car lift. Secured double stack racking is provided to City of Westminster Strategy Policy 40 standards. WASTE AND RECYCLING Eurobin, compactor and cardboard bailer storage area is provided at basement level, accessed from the car park area and car lift with daily local authority pickup. The facility complies with the City of Westminster s latest standards as defined in their waste and recycling storage requirements (March 2009).

6 SANITARY FITTINGS Ceramic WCs, wash basins and low profile shower trays. WC dual flush compact cisterns, wash basin sensor hot and cold mixer taps, and shower supply fittings are fitted with flow restrictors and solenoid valves interfaced with PIRs for leak detection to minimize water wastage. Sanitary pipe work installation to serve all sanitary ware and fittings in the building, including separate tenant s soil and vent pipes and vent pipes for the firemans lift sump pump chamber. ACCESSIBLE FACILITIES Fully accessible WCs are provided in the west toilet core at ground to sixth floor inclusively. An additional accessible WC and shower facility is provided at ground level office back of house area. MAINS WATER SERVICES The existing 54mm diameter metered main cold water service that serves the property, enters the building at basement level via Romilly Street. The existing supply will be retained but the meter will be upgraded to a pulsed output meter in line with BREEAM requirements. Metered tenant s domestic boosted cold water service at 1st to 6th floor. New supplies will be provided to serve the new retail units 1-4 with the tenant making their own arrangements for metered connections. Minimum pressure of water services 1.5bar to draw off point. COLD WATER Incoming cold water main is sized to replenish volume of cold water storage tanks within a 2 hour period with maximum velocity of flow of 1.5m/sec. Peak flow rates to include point demand attributable areas served directly from incoming mains. Cold water GRP storage tank provided at basement level. A boosted cold water distribution system shall serve all sanitary fittings and mechanical services plant requirements. DRINKING WATER SUPPLY Drinking water connections provided at each floor, based upon the tenant split arrangements for future extension by the tenant. Served from boosted cold water service. BOOSTED POTABLE WATER SERVICE The existing incoming mains cold water service will be extended to serve a potable cold water storage tank/booster pump set and Category 5 package tank and pump set. 15 litres/person based on 9 hours storage and 10 sqm net internal area per person. The service will be furnished with an ultra violet purification unit to minimize the risk of legionella and associated harmful bacteria spores. A water conditioner will also be provided to minimize limescale formation within domestic hot and cold systems. Non potable water storage at small volume for wash down and ancillary items. SANITARY PLUMBING Foul and surface water drainage to BS EN and BS EN 752. Foul water flows based on discharge unit method of calculation. Maximum hydraulic depth of flow 0.75m/sec. velocity of flow 0.75m/sec to 1.2m/sec. HOT WATER GENERATION By centralised gas fired unvented heaters. Hot water generation stored at 60 C, hot water service flow 55 C incorporating a secondary return and self regulating trace heating tape. HOT AND COLD WATER PIPE WORK DISTRIBUTION To BS 6700:1997 and IOP loading units method. Maximum velocity of flow restricted to 1.5m/sec within plant rooms and risers, 1.0m/sec within ceiling voids. DRAINAGE SYSTEM The existing combined foul and surface water sewer outfall connection is located within the car park basement slab and discharges into Thames Water utilities sewer network within Romilly Street. The design of the below ground drainage has been revised to connect the newly configured above ground system and routings. Gravity rainwater system from roof and hard standing areas. New insulated rainwater pipes run internally within the building. RETAIL DRAINAGE SYSTEM Drainage for the retail to be provided by below ground drainage connections and above ground capped drainage connections. Tenants trade waste from cooking/food preparation facilities are to be provided as part of the fit out, with suitable grease interceptors prior to connection to the landlord foul drainage system. TENANT CAPPED SERVICES Capped services connection points for future tea point/ kitchenettes are provided at two riser locations at either side of the WC core on each office floor, for the dual tenant split capability. The Romilly Street ground floor retail unit (A3) has been provided with a riser duct (850x850mm) at the east stair core for future kitchen provision. The fire rated extract duct is capped at roof level for future connection; the riser also has provision for future heat rejection pipe runs to space for equipment allocated at roof level. The ground floor retail units (A1/A2) are allocated riser space to install future heat rejection pipe runs to space for equipment allocated at roof level. Capped gas, water and communications connections/ containment are provided to all retail units. SUBSTATIONS The building has two existing UKPN substations (34790 and 36655) located with in the cartilage at basement and ground floor levels, both accessed via the Romilly Street frontage. The substations supply the building with low voltage supply. West substation is the buildings original substation. The East substation was installed to cater for the power demands of a previous key office tenant. SWITCH PANELS AND METERING 3 low voltage supplies to be provided from the existing UKPN substations via cabling from west UKPN substation 34790, to new switch gear and landlords meter located within the new basement switch room. This switch gear will serve the tenant office accommodation with new utility company metering provided within each office demise or at basement level. It is proposed that the retail units on ground floor be provided with a metered LV supplies independent of the office facility. OFFICE UNDER FLOOR POWER Office areas will not be provided with under floor power distribution bus bars. SMALL POWER Office small power is provided at 25W/m 2 (with some capacity for increase subject to redesign of supporting A/C services). Small power installation via wall mounted socket outlets are provided in the main landlord core circulation areas, toilets, staircases, and plant rooms.

7 The reception area small power is to be provided via discrete integrated floor boxes. Cleaners power is via wall mounted sockets/floor boxes to be provided by tenants. Power wiring to the main mechanical services plant and equipment shall be provided including; mechanical services control panels, VRF fan coil units, BMS outstations, roof mounted VRF condensers, supplementary mechanical equipment such as constant volume dampers and refrigerant sensors etc. and control panels. GENERATORS A 180kVA (prime rated) containerised life safety diesel generator is provided at roof level with a minimum power capacity of 120kW/160kWA, for the purpose of providing generator backup to life safety services only for a period of 3 hours in addition to providing support for the Bank of East Asia critical load. The generator will be called to start by mains failure signals from automatic transfer switches installed throughout the system. TENANT CONDENSERS All additional tenants condenser plant must comply with planning permission external noise criteria / conditions. FUTURE TENANT PLANT INSTALLATIONS Space is allocated at roof level north and south of the atrium roof area for future tenant s plant within the roof plant enclosure and also within the vertical services risers. All additional tenants equipment must comply with Planning permission height restriction criteria / conditions. LUMINAIRES The office areas shall be provided with air handling, passive infrared sensors, smoke detectors, where required, emergency battery packs, high frequency fluorescent luminaires to follow the recommendations of CIBSE. LIGHTING GUIDE LG7 The lighting installation shall generally be recessed modular fluorescent luminaires within office areas supplemented with down lights and some LED luminaires. The tenant shall provide supplementary task lighting to achieve full LG7 conformance/ certification. OFFICE LIGHTING The Wila Circlet office area lighting installation shall be controlled to comply with the Building Regulations and incorporate a lighting control system. Lighting control modules shall be installed in the ceiling void and shall provide a varying number of outputs and switched/ dimmable inputs. From the lighting control modules, a number of luminaires shall be served via flexible leads. The lighting control of the office lighting installation shall be PIR movement sensors, astronomical & daylight sensor controlled for the open plan areas. STAIRCASE LIGHTING The two staircases are provided with surface mounted luminaires to walls with down lights with integral emergency battery packs recessed into the ceiling soffits on all landings. RECEPTION AND ATRIUM LIGHTING The reception area shall be provided with a general down light scheme with a decorative / feature lighting scheme with colour change RGB and white lighting and programmable capability. EMERGENCY LIGHTING Emergency lighting will be installed and maintained in accordance with BS 5266: Part 1. SATELLITE DISHES Space shall be provided at roof level to facilitate the installation of future tenant satellite dishes. All additional tenants equipment must comply with planning permission height restriction criteria / conditions. VOICE / DATA COMMUNICATIONS Voice and data provisions are made at the reception desk, lifts, and at the ground level Building Manager s office. At the reception desk and the Building Manager s office the provision shall be for two direct/dedicated telephone lines and broadband connection. The data telecoms cable shall be Cat 5e type. PRIMARY VENTILATION Primary fresh air to the office floors and ground floor areas is provided by supply and extract AHU with rotary heat exchanger located in the basement. Air is ducted from roof level and exhausted into the west side light well at first floor. Supply and extract risers are provided on the north and south sides of the main core to serve the proposed tenant s spaces. Primary fresh air is ducted in the ceiling to the fan coil units and is extracted at the risers. OFFICE TOILET AND CHANGING ROOM VENTILATION The main toilet extract system also serves the basement changing room areas. The office floor WCs extract ventilation is through a riser located in the landlord s core area and exhausted at roof level using run / standby fans. The WC exhaust fan is located on the south side of the roof and ducted across the building to provide adequate separation to the AHU intake to reduce air contamination. Make up air is to be provided from the office spaces via ducted transfer grilles with cross talk attenuation to avoid drawing air from the fire fighting lobby. The basement changing /shower rooms will be extracted via ducted fans located within the ceiling void and exhausted to a ground floor louvre at high level ground floor on the Romilly Street façade. Supply air is provided directly to the space via full fresh air handling unit located in the main basement plant room. BASEMENT VENTILATION Background ventilation and smoke clearance will be provided to basement circulation, refuse and plant areas by a separate system to the car park ventilation. A supply AHU is located at high level in the car park or plant room providing tempered air for background ventilation. High level duty /standby fans in the car park provide extract/smoke clearance, linked to Intake and exhaust louvres at high level ground along Romilly Street. CAR PARK VENTILATION The existing strategy is retained with ducted supplies to ground floor intake/extract louvres located on Romilly Street. Exhaust and smoke clearance is via fan assisted ducts leading to high and low grilles on this façade. CAR PARK SMOKE CLEARANCE A fire rated by-pass duct around the supply AHU operates in the event of a fire. Motorised fire dampers close on the AHU intake and open on the bypass duct to allow for the increased volume of makeup air that is required when the exhaust fans operate in smoke clearance mode. FIRE FIGHTING LOBBY SMOKE CLEARANCE The fire fighting lobbies are mechanically ventilated. By duty/ standby fans located on the roof in the event of a fire. Grilles with motorised fire/smoke dampers are provided on each floor next to the fire-fighting lift that open (only the affected floor) in the event of a fire providing a smoke extract path. An automatic louvre at the top of the local stair case also opens remotely to allow a make up air path to the lobbies.

8 LANDLORD AREA HEATING AND COMFORT COOLING Heating and comfort cooling is provided by a VRF system. Central outdoor units and controller boxes circulate refrigerant to VRF Fan- Coil Units (FCUs), which can operate in heating or cooling mode. VRF systems can simultaneously provide heating and cooling to each of the indoor units on an individual basis. The significant advantage of this system is that heat energy can be transferred from one area of a tenancy to another rather than rejected to atmosphere. The controller boxes (1 or 2 per tenant space) are located within the ceiling void near the VRF pipe work risers. The office comfort cooling capacities are based on a lighting load of 8W/m 2 and a small power load of 25W/m 2. Office floors are served by concealed ducted FCUs located within the ceiling void providing conditioned air to linear slot grilles located along the external and internal perimeter areas. Return air from the offices is via non active sections of the linear grilles and through vents in the light fittings. No additional heating is provided in WC cores. Small electric heaters are provided in the escape staircase. RECEPTION AND ATRIUM HEATING AND COOLING Wall mounted VRF FCUs in the reception area east and west side walls provide heating and cooling. Radiators are integrated into the façades at the base of the atrium with sensor/remote controlled openable vents at atrium high level to avoid overheating. Small electric heaters can be installed below the reception desk if required. FUTURE TENANT KITCHEN / TEA POINTS Capped services are provided in two internal riser areas for future tenant kitchen/tea point provision on the dual split floor tenancy basis. STATUTORY SIGNAGE Bespoke wall mounted statutory signage is provided for the open plan office areas. Tenant directory signage is provided at the main reception desk back wall. The upper lift lobbies can be fitted with integrated but discrete tenant signage in the form of transfers to glass doors or landing balustrading. INTRUDER ALARM SYSTEM An intruder alarm system comprising arming keypad panels, internal sounders, external sounders, dummy sounders, panic alarms, door contacts, passive infra red detectors, and a centralized control panel is provided. This system shall be provided at the primary external entrance/exits including the 6th floor level door in the west stair core providing an alternative escape route from the neighbouring residential building through our building. ACCESS CONTROL SYSTEM A Landlord access control system comprising a PC based central control unit, reader unit (swipe/proximity reader with or without keypad), local control units, door release buttons/units, door contacts, electric locks and monitoring /alarms recording unit has been developed. Wiring containment routes only are provided within the local walls and concealed maglock wiring interfacing with the security systems at each exit door from the office areas to the west cores (2 per typical office floor at levels 1-6 inclusive) to be installed by the landlord. The tenant would install swipe card readers and buttons to exit in accordance with the Landlords head specification. The office lift lobby doors and east staircase core access door will be installed by the Landlord including access to the office back of house area off the main reception. The main office entrance doors can be opened using swipe cards or PIRs with the doors also capable of being locked/ opened remotely from the reception desk. A intercom/call point allows visitors to call the reception desk to gain entry at certain times. FIRE ALARM SYSTEM An automatic fire detection system will be installed in accordance with BS 5839:Part1:2002. The main fire panel is located off the secondary office entrance lobby off Romilly Street with a repeater panel located in a wall panel behind the main reception desk. The fire alarm system shall interface with the mechanical plant and lift installations. The fire alarm system shall be capable of extension to serve tenant fit out requirements. The fire alarm system shall initiate an ALL OUT evacuation upon the receipt of single alarm activation. Interface units are provided for the retail units. Portable fire extinguishers will be installed during the fit out and maintained in accordance with BS5306: Part 3. CCTV SYSTEM A closed circuit television (CCTV) system comprising internal and externally mounted cameras, CCTV monitor control equipment, recording medium for high quality images is provided to the primary façade entrance areas externally and main reception area internally. A CCTV monitoring screen is located at the main reception desk. LIGHTNING PROTECTION SYSTEM A new lightning protection system to BS EN is provided including an air termination network of earthing tapes at roof level with connections to roof top plant equipment or enclosures and routing through the building to general earth mass, via earth electrodes and proprietary inspection pits. ACCESSIBLE WC ALARM SYSTEM All the main office core accessible WCs have emergency pull cords and flashing beacon reassurance lamp/reset unit installed linked to a local lobby sounder/beacon and alarms on the local office floor and in the main reception desk. In the event of an alarm the occupancy indicator door lock can be overridden to open outwards by use of the through latch door stop/latch. ACCESSIBLE REFUGE SYSTEM The refuges are located on the west staircase floor landings on levels 2-6 inclusive with the first floor refuge located in the adjacent accessible WC. The refuges comprise statutory signage and a telephone/intercom panel with power supply unit and battery backup. The system shall comply with BS 5588 Part 8. SYSTEM OVERVIEW An automatic control system complete with a BMS head end terminal and associated graphics package shall be provided to control the mechanical services excluding the VRF system. The system shall consist of distributed motor control panels, each provided with an intelligent outstation. A BMS network shall link the intelligent outstations and the BMS head end terminal. The BMS system shall interface with the refrigerant leak detection system and VRF PC based control system to provide a single alarm/fault reporting point. The BMS system alarms shall be relayed to the reception desk PC where a simple text message will be displayed, indicating a fault/alarm has occurred. The BMS head end terminal shall be located in the ground floor Building Manager s office.

9 SUSTAINABILITY The key aim of the project is to create sustainable, grade A office space with an excellent working environment. The existing façade is to be retained, although aesthetically improved. Services are to be completely replaced with a new energy efficient design and controls. A great deal of focus has been placed on the working environment, as well as the creation of cycle parking and shower facilities. The building is targeted to achieve a BREEAM rating of Very Good under the BREEAM 2008 for Offices Scheme. The building is expected to achieve an EPC B rating. Below are some of the key sustainability measures for the project: Monitor, report and set targets for CO 2 emissions or energy arising from energy consumption, transport, water related to construction activities. Use of principal / main contractor who operates an Environmental Management System (EMS). Energy efficient air source heat recovery heat pumps as part of a VRF (variable refrigerant flow) air conditioning system. This matches the flow rate of refrigerant to the required heating or cooling loads, thereby saving energy and providing more accurate control than the previous VAV (variable air volume) system. The use of heat recovery type units further improves the efficiency of the VRF system by using the byproduct of cooling and heating to transfer energy within the occupied space where it is required. Energy efficient lifts, with a standby mode that automatically switches off lighting and ventilation when the lift is not being used. Energy efficient lighting system with motion sensors and daylight dimmers. High-performance glazing and building fabric insulation from sustainable sources, locally sourced where possible, as well as use of materials with low embodied carbon. Low water use fittings, including low flow taps and sensoractivated urinal flushing. Building management system controls that activate and deactivate water supply, including hot water, according to occupancy. Appropriate energy management measures via energy metering and BMS. It is predicted that the new building design will have 30% lower absolute CO 2 emissions, compared to the existing building, saving 139 tonnes each year and cutting energy costs. This level of performance is achieved with a combination of a high performance facade with sensible amounts of glass, heat recovery on the air handling systems, generously sized ductwork allowing low specific fan power, and efficient variable refrigerant flow (VRF) air conditioning system with heat recovery. METERED WATER The existing metered main cold water service that serves the property enters the building at basement level via Romilly Street. The existing supply will be retained but the meter will be upgraded to a pulsed output meter in line with BREEAM requirements. Metered tenant s domestic boosted cold water service at 1st to 6th floor. New supplies will be provided to serve the new retail units 1-4 with the tenant making their own arrangements for metered connections. Minimum pressure of water services 1.5bar to draw off point. GAS SUPPLY The existing 80mm gas main that serves the property enters the building at basement level via Romilly Street. The existing supply is retained with a new meter fitted. ELECTRICAL SUBSTATIONS The building has two existing UKPN substations (34790 and 36655) located with in the cartilage at basement and ground floor levels, both accessed via the Romilly Street frontage. The substations supply the building with low voltage supply. ELECTRICAL SUPPLIES 3no. low voltage supplies are provided from the existing UKPN substations via cabling from west UKPN substation 34790, to new switch gear located within the new basement switch room. This switch gear will serve the office accommodation with new utility company metering provided within each office demise or at basement level. It is proposed that the retail units on ground floor be provided with a metered LV supplies independent of the office facility. TELECOMMUNICATIONS 100mm telecommunications ducts will be installed and capped off in the basement for the future use by the tenant s telecommunications providers. COMMERCIAL BUILDING The Health and Safety File will be provided in disc form and will incorporate the operating and maintenance manuals and as built general arrangement drawings.

50 St Mary Axe London EC3

50 St Mary Axe London EC3 50 St Mary Axe London EC3 Letting specification 1.Structure and Envelope The main superstructure comprises of a braced steel fame (app 7m span / 90min fire rated) and the elevations are formed from a series

More information

CONDUIT MAYFAIR READY FOR OCCUPATION SPRING 2014 GLINSMANWELLER.CO.UK A DEVELOPMENT BY LONDON PROPERTY PARTNERSHIP LTD

CONDUIT MAYFAIR READY FOR OCCUPATION SPRING 2014 GLINSMANWELLER.CO.UK A DEVELOPMENT BY LONDON PROPERTY PARTNERSHIP LTD 12 CONDUIT S T R E E T MAYFAIR READY FOR OCCUPATION SPRING 2014 020 7495 2728 GLINSMANWELLER.CO.UK A DEVELOPMENT BY LONDON PROPERTY PARTNERSHIP LTD 12 CONDUIT STREET The entire building is undergoing a

More information

PRE-LEASE SURVEY OF THE ENGINEERING SERVICES. XXXX London

PRE-LEASE SURVEY OF THE ENGINEERING SERVICES. XXXX London PRE-LEASE SURVEY OF THE ENGINEERING SERVICES AT London Client: Clients Representative: For the Attention of: Telephone N o Site Address: London Report prepared by: Contact Name: FHP Engineering Services

More information

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses.

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses. The Townhouses Park View Place A A Compass House A T T T Royal Wharf Gardens Endeavour House T A A Thameside House T Sienna House A A A A T Apartments Townhouses River Thames Compass House Compass House

More information

75 Davies Street Mayfair

75 Davies Street Mayfair 75 Davies Street Mayfair 75 Davies Street Mayfair 75 Davies Street offers up to 32,185 sq ft of newly refurbished office space arranged over 3 floors. The building benefits from a new enlarged entrance

More information

EFA PSBP. Natural Ventilation Strategy. Introduction. 1.1 Relevant legislation. 1.1.1 The Building Regulations 2010

EFA PSBP. Natural Ventilation Strategy. Introduction. 1.1 Relevant legislation. 1.1.1 The Building Regulations 2010 EFA PSBP Natural Ventilation Strategy Introduction The Baseline Designs Project will provide scheme design details for a number of Primary and Secondary School Exemplars. For the purposes of setting a

More information

RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002

RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002 RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002 INDEX New Build Flat and Pitched Roofs Rainwater Goods Porches to Existing Buildings / Covered Links etc, Between Buildings Floors /

More information

2 HAREWOOD PLACE MAYFAIR LONDON W1

2 HAREWOOD PLACE MAYFAIR LONDON W1 2 HAREWOOD PLACE MAYFAIR LONDON W1 A MAJOR NEW WEST END OFFICE DEVELOPMENT 2,353-17,994 SQUARE FEET 218-1,672 SQUARE METRES INTRODUC TION 2 Harewood Place, W1, has been comprehensively refurbished and

More information

Turnkey Projects, Conversions, Restorations & Property Management. Marsalforn - Gozo APARTMENT FINISHING EXCLUSIVE PACKAGE

Turnkey Projects, Conversions, Restorations & Property Management. Marsalforn - Gozo APARTMENT FINISHING EXCLUSIVE PACKAGE Turnkey Projects, Conversions, Restorations & Property Management Marsalforn - Gozo APARTMENT FINISHING EXCLUSIVE PACKAGE Reg. Office: Karlu Galea Street, Victoria, Gozo Malta. T. 2155 6600 M. 9943 4391

More information

ST JAMES S ACCOMMODATION STUNNING RECEPTION 3 ST JAMES S SQUARE UNIQUE FLOORPLATES SPECIFICATION THE SPACES CONTACTS

ST JAMES S ACCOMMODATION STUNNING RECEPTION 3 ST JAMES S SQUARE UNIQUE FLOORPLATES SPECIFICATION THE SPACES CONTACTS 1 3 ST JAMES S SQUARE STUNNING RECEPTION UNIQUE FLOORPLATES THE SPACES ACCOMMODATION SPECIFICATION ST JAMES S CONTACTS 2 4 6 8 11 24 26 30 2 3 3 ST JAMES S SQUARE 3 St James s Square is a magnificent development

More information

Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)

Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) 1. In addition to the information scheduled below, the pre-tender designer is responsible for: (i)

More information

FIRE-FIGHTING DESIGN BRIEF REPORT

FIRE-FIGHTING DESIGN BRIEF REPORT P a g e 1 SECTION 04 (Doc.No.A/DBR 001) FIRE-FIGHTING DESIGN BRIEF REPORT P a g e 2 1.0 SCOPE 2.0 STANDARDS AND CODES 3.0 TYPES OF SYSTEM PROPOSED 4.0 FIRE HYDRANT SYSTEM 5.0 AUTOMATIC SPRINKLER SYSTEM

More information

Sports Buildings: budget costs for the Flood Relief Fund

Sports Buildings: budget costs for the Flood Relief Fund Sports Buildings: budget costs for the Flood Relief Fund The list below provides typical costs for flood insurance works, typically required by sports clubs or facilities. The list is not exhaustive but

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

Restaurant & café guide

Restaurant & café guide 'Helping our customers stay in business by reducing risk' NZI Risk Solutions TM About NZI Risk Solutions NZI has extensive experience in providing expert risk management advice to help our commercial customers

More information

SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT. RCC Framed Structure confirming with zone II seismic detailing. Reinforced Cement Concrete

SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT. RCC Framed Structure confirming with zone II seismic detailing. Reinforced Cement Concrete SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT 1. CONSTRUCTION: Foundation Super Structure Internal Walls External Walls Roof Retaining Walls RCC footing RCC Framed Structure confirming with zone II seismic

More information

SCHEDULE OF FINISHES AMBLE RIDGE RETIREMENT VILLAGE

SCHEDULE OF FINISHES AMBLE RIDGE RETIREMENT VILLAGE SCHEDULE OF FINISHES AMBLE RIDGE RETIREMENT VILLAGE SITEWORKS FOUNDATIONS & SURFACE BED Site to be cleared and leveled. Builder s rubble to be carted away. As per Engineer s design, with USB green waterproofing.

More information

CITYVIEW SUMMARY SPECIFICATION

CITYVIEW SUMMARY SPECIFICATION CITYVIEW SUMMARY SPECIFICATION CONTENTS 1. INTRODUCTION 1.1 AREA SCHEDULE 1.2 FLOOR TO CEILING DIMENSIONS 1.3 OCCUPANCY STANDARDS 2. DESIGN CRITERIA 2.1 SHELL AND CORE 2.2 CAT A 2.3 CAT B 2.4 BREEAM 2.5

More information

Balderton Mayfair London W1 Tenants Guide

Balderton Mayfair London W1 Tenants Guide Balderton Mayfair London W1 Tenants Guide Contents 01 Executive Summary 02 Location 03 Floor areas 03.1 Ground Floor 03.2 1st Floor 03.3 2nd 5th Floor 03.4 6th Floor 03.5 7th Floor 03.6 8th Floor 04 Space

More information

PLEASE REFER TO YOUR INDIVIDUAL QUOTE

PLEASE REFER TO YOUR INDIVIDUAL QUOTE STANDARD INCLUSIONS AND EXCLUSIONS SECONDARY DWELLING 16/04/2014 PLEASE REFER TO YOUR INDIVIDUAL QUOTE Inclusions Super Structure: Timber Frames including Roof Trussing and Framing, Internal and External

More information

LONDON BOROUGH OF HACKNEY BUILDING SERVICES ENGINEER REPORT GAS HOUSE, SPRINGFIELD PARK, HACKNEY

LONDON BOROUGH OF HACKNEY BUILDING SERVICES ENGINEER REPORT GAS HOUSE, SPRINGFIELD PARK, HACKNEY LONDON BOROUGH OF HACKNEY BUILDING SERVICES ENGINEER REPORT GAS HOUSE, SPRINGFIELD PARK, HACKNEY 10 TH JUNE 2011 London Borough of Hackney Page 1 of 6 Brief Description of the Proposed Works The existing

More information

B-1 Buildings & Service Maintenance

B-1 Buildings & Service Maintenance B-1 Buildings & Service Maintenance B-1 Buildings & Service Maintenance SAFETY, HEALTH AND ENVIRONMENTAL POLICY: B-1 DATE OF ISSUE: AUGUST 1994. BUILDINGS AND SERVICES MAINTENANCE 1. Introduction It is

More information

Nominal Life Expectancy for Building Components

Nominal Life Expectancy for Building Components Nominal Life Expectancy for Building Components Building System Page A. HVAC 2 B. Elevator/Escalator 6 C. Plumbing 7 D. Roofing 8 E. Electrical 10 F. Fire/Life/Safety/Security System 11 G. Interior Finishes

More information

1 Stratford Place 2 Oxford Street 3 New Bond Street 4 Wigmore Street 5 Grosvenor Street

1 Stratford Place 2 Oxford Street 3 New Bond Street 4 Wigmore Street 5 Grosvenor Street 4 1 2 3 5 1 Stratford Place 2 Oxford Street 3 New Bond Street 4 Wigmore Street 5 Grosvenor Street 1 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 COMMUNICATIONS LOCATION SUMMARY FLOOR

More information

SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY

SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY Construction Criteria The unit costs for (Wet) space types are based on the construction quality and design features in the following table. This

More information

Time to upgrade your facilities?

Time to upgrade your facilities? Time to upgrade your facilities? Elliott Hire is part of Algeco Scotsman, the world leader in the provision of modular buildings, temporary site office accommodation and secure storage. Elliott Hire can

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table

More information

SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)

SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME) SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME) Construction Criteria The unit costs for ADP Mainframe space types are based on the construction quality and design features in the following

More information

www.citiesinspection.com October 5, 2015 Dear Client,

www.citiesinspection.com October 5, 2015 Dear Client, www.citiesinspection.com October 5, 2015 Dear Client, On 9/14/2015, Cities Inspection Service, Inc. completed a building inspection of the property located at 123 Oak Street, Someplace, Minnesota for you.

More information

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development

More information

case studies Safely applied, Environmentally creative and effective engineering solutions

case studies Safely applied, Environmentally creative and effective engineering solutions Safely applied, Environmentally creative and effective engineering solutions T: 02392 435050 @: eng@itdconsultants.co.uk www.itdconsultants.co.uk case studies Churchill House Main Features: A 1.5m refurbishment

More information

HVAC Processes. Lecture 7

HVAC Processes. Lecture 7 HVAC Processes Lecture 7 Targets of Lecture General understanding about HVAC systems: Typical HVAC processes Air handling units, fan coil units, exhaust fans Typical plumbing systems Transfer pumps, sump

More information

LONDON BOROUGH OF BROMLEY STANDARDS FOR HOUSES IN MULTIPLE OCCUPATION (HMO) INTRODUCTION

LONDON BOROUGH OF BROMLEY STANDARDS FOR HOUSES IN MULTIPLE OCCUPATION (HMO) INTRODUCTION LONDON BOROUGH OF BROMLEY STANDARDS FOR HOUSES IN MULTIPLE OCCUPATION (HMO) INTRODUCTION 1. Minimum Standards: This document sets out the minimum standards required in HMOs located within the London Borough

More information

HA5 4JX T: 020 8421 0107. NEW Instruction. One Bedroom Retirement Flat for the over 60's. Greater London HA5 4JX. 523 Uxbridge Road Road

HA5 4JX T: 020 8421 0107. NEW Instruction. One Bedroom Retirement Flat for the over 60's. Greater London HA5 4JX. 523 Uxbridge Road Road T: 020 8421 0107 NEW Instruction Flat Flat 22 22, Lutyens Lutyens Lodge Lodge, 523 Uxbridge Road Road Hatch Pinner End Greater London HA5 4JX HA5 4JX London Borough of Harrow * One Bedroom Retirement Flat

More information

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT

More information

How to report a repair

How to report a repair How to report a repair for repairs to your home? We are committed to making sure your home is in a good state of repair. To meet our legal responsibilities we will: Keep the exterior (eg roof, walls, doors,

More information

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715, 4658.4500 PLUMBING SYSTEMS; NEW CONSTRUCTION. Subpart 1. Installation. All plumbing systems must be installed and tested according to this chapter and chapter 4715, the Minnesota Plumbing Code. Subp. 2.

More information

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES Department of Health and Human Services, Division of Public Health Occupational and Environmental Epidemiology Branch 1912 Mail Service Center, Raleigh, North Carolina 27699-1912 BUILDING ASSESSMENT QUESTIONNAIRE

More information

PUBLIC RESTROOMS, DESIGN INTENT

PUBLIC RESTROOMS, DESIGN INTENT PUBLIC RESTROOMS, DESIGN INTENT 1.01 STRUCTURAL A. Where feasible, metal stud partitions will be constructed on a 6 high concrete curb. 1.02 MECHANICAL A. Restrooms will have a minimum of 15 air changes

More information

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No. Classification: Cluster: Location: Total Area: No. of Stories Aquarium Acreage Owned: Acquired: 1904 Most Recent Improvements: THE AQUARIUM Close to junction of Inselrhue and Loiter Way, Belle Isle Two

More information

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management. AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled

More information

- 5 - Table1. Maximum Compartment Volumes

- 5 - Table1. Maximum Compartment Volumes - 5 - Part II - SPECIFIC REQUIREMENTS 5. Compartmentation 5.1 Every building should be divided into compartments by walls and floors to inhibit the spread of fire. 5.2 Compartment walls, compartment floors,

More information

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management. AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled

More information

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004 School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 0004 Time In Last Edited 255 MECHANICAL 205-05-8 09:00AM

More information

TENANT AND LANDLORD REPAIR RESPONSIBILITIES

TENANT AND LANDLORD REPAIR RESPONSIBILITIES TENANT AND LANDLORD REPAIR RESPONSIBILITIES REPAIR LANDLORD TENANT Notifying Repairs Any alteration or improvement you have carried out to the property Permission required Water damage caused by push-on

More information

Repairs and looking after your home

Repairs and looking after your home A guide to Repairs and looking after your home Contents Page No. Introduction 1 Information for tenants 2 Information for homeowners 3-4 Information for onsite NHS workers 5 Information for students 5

More information

ITEM DESCRIPTION SPECIFICATION TENDER OFFER

ITEM DESCRIPTION SPECIFICATION TENDER OFFER TECHNICAL SPECIFICATIONS PL1 & PL2 PLEASE TICK IF YOU COMPLY. SPECIFY YOUR OPTION IF YOU DON'T. ITEM DESCRIPTION SPECIFICATION TENDER OFFER Make (please specify) 1.0 Type Duplex Passenger Lift 2.0 Minimum

More information

ACCESS AUDIT OF WESTPORT HOUSE

ACCESS AUDIT OF WESTPORT HOUSE ACCESS AUDIT OF WESTPORT HOUSE Large sign on the highway to indicate the entrance to Purbeck District Council Large and wide entrance Entrance showing sign for opening times Entrance sign Main entrance

More information

HOUSING STANDARDS POLICY TRANSITION STATEMENT IMPLEMENTATION: OCTOBER 2015. May 2015

HOUSING STANDARDS POLICY TRANSITION STATEMENT IMPLEMENTATION: OCTOBER 2015. May 2015 HOUSING STANDARDS POLICY TRANSITION STATEMENT IMPLEMENTATION: OCTOBER 2015 May 2015 MAYOR OF LONDON Housing Standards: Transition Policy Statement. On 25 March 2015 through a written ministerial statement,

More information

THE VOID LETTABLE STANDARD

THE VOID LETTABLE STANDARD THE VOID LETTABLE STANDARD North West Leicestershire District Council is responsible for allocating empty Council owned homes. The Lettable standard has been agreed in consultation with the tenants of

More information

Fire. The Fire Installers Mate. A guide to fire alarm systems design

Fire. The Fire Installers Mate. A guide to fire alarm systems design Fire The Fire Installers Mate A guide to fire alarm systems design BS 5839 Part 1:2002 A guide to BS 5839 Part 1:2002 Disclaimer This booklet is not intended to be a comprehensive guide to all aspects

More information

Contents. Overview 3. Structure 23

Contents. Overview 3. Structure 23 Technical Summary Contents Overview 3 Architectural Summary Specification 4 Building Description 5 Location Map 6 Design Criteria 7 Floor Areas and Heights 7 Floor Plans 8 Exterior Envelope 15 Internal

More information

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space) COST OF WORK FORM All costs shown are estimates using base grade materials, taxes, and labor. For houses where a higher quality is indicated, the costs should be increased for work requiring upgraded materials.

More information

Aurora Mall. Aurora (Denver), Colorado

Aurora Mall. Aurora (Denver), Colorado is the largest superregional mall in the city of Aurora, and it s only getting bigger and better. The mall is currently undergoing a significant interior and exterior renovation, scheduled for completion

More information

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS St. Louis County Department of Public Works Division of Code Enforcement KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS This guideline is intended to provide the homeowner/contractor with the

More information

A NEW 21ST CENTURY LANDMARK FOR SOHO

A NEW 21ST CENTURY LANDMARK FOR SOHO PREVIEW DOCUMENT A NEW 21ST CENTURY LANDMARK FOR SOHO HISTORY AND VISION 11 Soho Street is a brand new building, but architects AHMM have taken their inspiration from historical sources, including the

More information

Green House, Hungary

Green House, Hungary Further information Skanska AB www.skanska.com Contact Noel Morrin, SVP Sustainability & Green Support noel.morrin@skanska.se Green House, Hungary Case Study 109 Aspects of Sustainability This project

More information

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management. AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled

More information

Restaurant and Café Risk Management Guide. Don t Risk It!

Restaurant and Café Risk Management Guide. Don t Risk It! property & liability Restaurant and Café Risk Management Guide Don t Risk It! About Lumley Insurance Lumley Insurance has extensive experience in restaurant insurance and risk management. This experience

More information

WASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST

WASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST 0 RIVERSIDE DRIVE, OTTAWA, ON A0.0 COVER SHEET / DRAWING LIST A0. LEGEND AND GENERAL NOTES A0. GENERAL NOTES A0. GENERAL NOTES A0. TYPICAL WASHROOM WALL/SINK SECTION A0. DETAIL - CONTROL JOINT A0. DETAIL

More information

Building Control Guidance Note

Building Control Guidance Note Issued 01/01/13 Rev Page 1 of 5 If you intend to convert an existing loft space into additional rooms you will need to apply for Building Regulation Approval. You may also need Planning Permission if you

More information

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN 46787 Phone (260) 723-5131 Sales Fax (260) 723-6396 whitley@whitleyman.

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN 46787 Phone (260) 723-5131 Sales Fax (260) 723-6396 whitley@whitleyman. Building Type Building Code Whitley Classroom Buildings BOCA, UBC, SBCCI, NEC, ADA Structural Support Outrigger construction standard, Whitley model classrooms. Main support beams to be 12 11.8# per lineal

More information

Appendix G. Security management plan

Appendix G. Security management plan Appendix G Security management plan Security Management Plan Prepared by: Kann Finch Group Project Energy Australia Belmore Park Zone 1- Sub-station component General Design Requirements The perimeter

More information

ECOCIAT. Domestic hot water heat recovery unit

ECOCIAT. Domestic hot water heat recovery unit Heat recovery unit Domestic hot water High energy efficiency with R410A Compact and quiet Scroll compressors Brazed-plate heat exchangers Heating Heat recovery ENVIRONMENTALLY HFC R410A PROTECTION DE FRIENDLY

More information

Directorate for the Built Environment Building Standards Division

Directorate for the Built Environment Building Standards Division Directorate for the Built Environment Building Standards Division Energy Management Solutions Ltd Investigation of measures to improve the energy performance of a existing building: Retail JUNE 2009 Report

More information

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone: 0041 22 77 66 051 info@cardok.com

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone: 0041 22 77 66 051 info@cardok.com CARDOK CARLIFT Fast access to underground garages Fast, Silent, Discreet, Design, High-Tech Installation to replace an access ramp on private property Dimensions: (Built to measure, all dimensions can

More information

SCHEDULE OF CONDITION

SCHEDULE OF CONDITION JOB REFERENCE: SCHEDULE OF CONDITION Islington, London. N1 XXX FOR Miss X Prepared by: INDEPENDENT CHARTERED SURVEYORS Marketing by: Islington, London. N1 XXX CONTENTS SCHEDULE OF CONDITION Elevations

More information

Under sill units. Type FSL-B-ZAS

Under sill units. Type FSL-B-ZAS .1 X X testregistrierung Under sill units Type, heat recovery Centrifugal fan Adaptive heat recovery damper HYGIENISCH GETESTET V DI 022 Tested to VDI 022 Secondary air unit for supply air and extract

More information

Current as of 11/10/08 1 of 1

Current as of 11/10/08 1 of 1 BEST PRACTICES STANDARDS FOR SCHOOLS UNDER CONSTRUCTION OR BEING PLANNED FOR CONSTRUCTION I. Site Layout A. School buildings shall be provided with a securable perimeter. A securable perimeter means that

More information

Repairs and maintenance

Repairs and maintenance Repairs and maintenance Customer focused, quality driven Repairs and maintenance Repairs and maintenance of your home is a joint responsibility between you as our tenant and us as your landlord. We are

More information

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE - The original section of this building was constructed in 1941. The exterior walls are built of good quality stone. In the early 1980 s a similar addition was added to the north elevation. The exterior

More information

Repairs and maintenance

Repairs and maintenance Section 9 Who repairs what? Reporting repairs Repairs and maintenance Emergencies Repair response times Appointments Maintaining and improving your home What if Hastoe get it wrong? 34 Repairs and maintenance

More information

Repair Responsibilities A Guide for Sadeh Lok Residents

Repair Responsibilities A Guide for Sadeh Lok Residents Repair Responsibilities A Guide for Sadeh Lok Residents Sadeh Lok is responsible for most of the repairs that may arise in and around your home, but not all. Each repair type is given a likely priority

More information

17,280 square feet Overview:

17,280 square feet Overview: CENTRAL OFFICE Located at 167 Boston Post Road, East Lyme, Connecticut, the Central Office was built in 1916 as the original Flanders Elementary School and remains connected to the current school. The

More information

Minimum Housing and Health Standards

Minimum Housing and Health Standards APPENDIX M.O. 57/2012 Minimum Housing and Health Standards Original version July 20, 1999. Revisions to Part lll, Housing Premises, sections 3 and 4, June 30, 2012 (all revisions are bolded and underlined).

More information

RULES FOR THE SETTING UP OF SUSTAINABLE BRANCHES Summary

RULES FOR THE SETTING UP OF SUSTAINABLE BRANCHES Summary RULES FOR THE SETTING UP OF SUSTAINABLE BRANCHES Summary January 2013 TABLE OF CONTENTS INTRODUCTION... 3 GENERAL RECOMMENDATIONS... 3 Communication with customers in the field of environmental sustainability...

More information

Pollution CO CO 2. Carbonaceo us soot H 2 S, NOX, SO2

Pollution CO CO 2. Carbonaceo us soot H 2 S, NOX, SO2 Pollution CO CO 2 Carbonaceo us soot H 2 S, NOX, SO2 The National Building Code (NBC) contains set of minimum provisions, designed to protect the safety of the public with regard to structural sufficiency,

More information

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic

More information

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION

More information

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N PLAN REVIEW FOR: PROJECT NAME: OWNER: ARCH/DESIGNER: ADDRESS: Ph/Fx: Plans Dated: E-mail: Sealed By: Estimated Project Cost - $ REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

More information

Summary of Preliminary Assessment on Structural, Fire and Electrical Safety

Summary of Preliminary Assessment on Structural, Fire and Electrical Safety Name of the Factory Address of the Factory Present Status of the Factory Structural Assessment Conducted by : Galaxy Stitch Ltd. : BSCIC Industrial Estate, Plot no. A102, Tongi Gazipur Bangladesh : Under

More information

The White House 15 Whirlow Park Road, Sheffield. Park Estates

The White House 15 Whirlow Park Road, Sheffield. Park Estates The White House 15 Whirlow Park Road, Sheffield Park Estates A Stunning and Stylish Residence in the most Sought after Location The White House Welcome to The White House A unique opportunity has arisen

More information

PLAN REVIEW SERVICES CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW

PLAN REVIEW SERVICES CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW PRELIMINARY BUILDING REVIEW two sets of the following: Architectural/engineering design development drawings indicating size of the building,

More information

110 BISHOPSGATE, EC2

110 BISHOPSGATE, EC2 110 BISHOPSGATE, EC2 FOREWORD It is my firm belief that the Salesforce Tower is the finest commercial accommodation proposition in the world today. This brochure will identify the many specific merits

More information

Site Survey Questionnaire

Site Survey Questionnaire Site Survey Questionnaire Site location:. Grid refereence.. Date:././. Name of company:... Address:........ Name and position of respondent:... Type of business, including specialisations:.... MCM land

More information

Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com

Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com Portland Area PO Box 665 West Linn, OR 97068 Ph: (503) 650-6957 Salem Area 5434 River Rd. N; #192 Keizer, OR 97303 Ph: (503) 362-5809

More information

NOVEMBER 2010 Photo 1 Floor fitout is now substantially completed up to level L34, and plantroom installations are also near completion. Internal Inspections and de-snagging are in progress up to level

More information

Capital Expenditure. The common definition of capital expenditure is

Capital Expenditure. The common definition of capital expenditure is Capital Expenditure Under standard accounting practices local authorities are required to account for revenue expenditure and capital expenditure differently. Capital expenditure is defined in the Local

More information

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012 2012 Ontario Building Code Requirements for New Construction Bradford West Gwillimbury Building Division March 5, 2012 1 Ontario Building Code changes Applicable to permits applied for after December 31,

More information

Defining who is responsible for items and areas in a Strata Scheme

Defining who is responsible for items and areas in a Strata Scheme www.lpi.nsw.gov.au No: 2011/07 Date: October 2011 Defining who is responsible for items and areas in a Strata Scheme Land and Property Information, a division of the Department of Finance and Services

More information

Emergency voice communications Product Name

Emergency voice communications Product Name Product Name 76 EATON FIRE AND VOICE ALARM SYSTEMS CFCC2556 January 2015 Contents Contents Emergency voice communications Panels Network exchange units 78 Non network exchange units 80 Devices Outstations

More information

2. What building projects are exempted? (permit not required)

2. What building projects are exempted? (permit not required) BUILDING AND SAFETY DEPARTMENT 1. What building projects require a permit? Following is a list of projects that require building permits based on Appendix chapter 1 of the California Building Code and

More information

Europe Facility Management Conference. Tall Buildings in the Middle East FM Vision & Challenges Presented BY Ali Alsuwaidi

Europe Facility Management Conference. Tall Buildings in the Middle East FM Vision & Challenges Presented BY Ali Alsuwaidi Europe Facility Management Conference Tall Buildings in the Middle East FM Vision & Challenges Presented BY Ali Alsuwaidi 1 Speaker - PROFILE 1. VP- Idama FMS 2. Global FM Board 3. MEFMA Founding Board

More information

Fire precautions in dwellings. Private sector housing Providing homes building communities

Fire precautions in dwellings. Private sector housing Providing homes building communities Fire precautions in dwellings Private sector housing Providing homes building communities Version 3 Published by Norwich City Council August 2011 Contents Page Introduction 1 2 Types of dwellings (A) Shared

More information

RPV - RP - RA air handling units

RPV - RP - RA air handling units APPLICATIONS Heating, ventilation, cooling >> FACTORIES >> WAREHOUSES >> HALLS >> DISTRIBUTION CENTRES >> COMMERCIAL PREMISES >> PLACES OF WORSHIP RPV - RP - RA air handling units www.reznor.eu RPV - RP

More information

City of Oviedo Commercial Shell Building Permit Application Guidelines

City of Oviedo Commercial Shell Building Permit Application Guidelines City of Oviedo Commercial Shell Building Permit Application Guidelines All permit application packages must be complete prior to acceptance. A complete application package shall include the following:

More information

Decree of the Ministry of the Environment on fire safety of ventilation systems

Decree of the Ministry of the Environment on fire safety of ventilation systems THE NATIONAL BUILDING CODE OF FINLAND MINISTRY OF THE ENVIRONMENT Housing and Building Department Decree of the Ministry of the Environment on fire safety of ventilation systems Adopted in Helsinki, 18

More information

ANNEX C - DESIGN BRIEF

ANNEX C - DESIGN BRIEF ANNEX C - DESIGN BRIEF SCOPE OF WORKS 1.0 OBJECTIVE The Contractor undertakes the fit-out works in the area outlined in the layout plan, 2 nd Floor and new extension space on the 11 th Floor, at the EBRD

More information