ITEM DESCRIPTION SPECIFICATION TENDER OFFER
|
|
|
- Lynn Cox
- 9 years ago
- Views:
Transcription
1 TECHNICAL SPECIFICATIONS PL1 & PL2 PLEASE TICK IF YOU COMPLY. SPECIFY YOUR OPTION IF YOU DON'T. ITEM DESCRIPTION SPECIFICATION TENDER OFFER Make (please specify) 1.0 Type Duplex Passenger Lift 2.0 Minimum Capacity 630kg - 8 persons 3.0 Speed 1.6m/s 4.0 Drive System Electric VVVF drive 5.0 Starts per Hour 180 sph 6.0 Voltage - Power Mains 3pH - 400V - 50Hz(specify power/starting current) 7.0 Voltage - Light Mains 1pH V (50Hz) 8.0 Number of Stops Number of Entrances 8 in line 10.0 Total Travel 25m (approx.) 11.0 Over head Height 3750mm 12.0 Minimum Car Dimensions 1100mm W x 1400mm D x 2100mm H 13.0 Well Dimensions (per lift) 3350mm W x 1800mm D 14.0 Dividing beam Dividing beam between lifts (specify thickness) 15.0 Pit Depth 1550mm 16.0 Location of Machine MRL 17.0 Control System Up and down collective 18.0 Controls & Fittings in Cabin Door Open / Hold button Alarm Bell button Floor address buttons including braille code Fan and Switch Overload indication (audio / visual) Control panel accessible by persons on wheelchair Indirect lighting plus emergency light on battery back-up No Smoking sign Instructions on what to do if lift stops Digital position indicator Provision for camera in cabin Interface for card access control (card access by others) 19.0 Control on Landings Digital position indicator on each floor Engaged / free indicator Direction of travel arrows Gong' signal for lift arrival Lift call buttons Emergency landing door open key / lock 20.0 Maintenance Controls On top of cabin & in control panel 21.0 Car Construction Steel girder and heavy gauge frame all metal parts anti-rust treated MTS Consulting Limited 7
2 TECHNICAL SPECIFICATIONS PL1 & PL2 PLEASE TICK IF YOU COMPLY. SPECIFY YOUR OPTION IF YOU DON'T. ITEM DESCRIPTION SPECIFICATION TENDER OFFER 22.0 Wall Finishes Laminate wood finish Car doors and front returns in brushed stainless steel Full length mirrors positioned on rear wall at the sides with a brushed stainless steel panel in between Hand rail on one side Control panel in black glass or brushed stainless steel finish 23.0 Floor Finishes Recess 20/30mm to take marble (marble by others) 24.0 Ceiling Finish Brushed stainless steel finish Linear lighting 25.0 Car Doors 900mm wide x 2000mm high Side opening Brushed stainless steel finish 26.0 Landing Doors 900mm wide x 2000mm high Side opening Brushed stainless steel finish 1 hour fire rating 27.0 Safety Progressive type safety gear Automatic evacuation control (car travels to nearest landing and opens door in case of power failure) Door closing force limiter Infra-red beam on car door Permanent shaft lighting Cabin roof handrail if distance between cabin and wall exceeds 300mm Intercom between lift and control panel Telephone Line Autodialler to EN81-28 Interface to Fire Alarm System Level switch in pit interfaced to lift operation 28.0 Equipment Guarantee 24 months 29.0 Maintenance 24 months MTS Consulting Limited 8
3 TECHNICAL SPECIFICATIONS FF1 PLEASE TICK IF YOU COMPLY. SPECIFY YOUR OPTION IF YOU DON'T. ITEM DESCRIPTION SPECIFICATION TENDER OFFER Make (please specify) 1.0 Type Simplex Passenger Lift 2.0 Minimum Capacity 630kg - 8 persons 3.0 Speed 1.6m/s 4.0 Drive System Electric VVVF drive 5.0 Starts per Hour 180 sph 6.0 Voltage - Power Mains 3pH - 400V - 50Hz(specify power/starting current) 7.0 Voltage - Light Mains 1pH V (50Hz) 8.0 Number of Stops Number of Entrances 8 in line 10.0 Total Travel 25m (approx.) 11.0 Over head Height 4100mm 12.0 Minimum Car Dimensions 1100mm W x 1400mm D x 2100mm H 13.0 Well Dimensions (per lift) 1750mm W x 1900mm D 14.0 Pit Depth 1550mm 15.0 Location of Machine MRL 16.0 Control System Up and down collective 17.0 Controls & Fittings in Cabin Door Open / Hold button Alarm Bell button Floor address buttons including braille code Fan and Switch Overload indication (audio / visual) Control panel accessible by persons on wheelchair Indirect lighting plus emergency light on battery back-up No Smoking sign Instructions on what to do if lift stops Digital position indicator Provision for camera in cabin Firefighters' control key switch Interface for card access control (card access by others) 18.0 Control on Landings Digital position indicator on each floor Engaged / free indicator Direction of travel arrows Gong' signal for lift arrival Lift call buttons Emergency landing door open key / lock Firefighters' control key switch at level Maintenance Controls On top of cabin & in control panel 20.0 Car Construction Steel girder and heavy gauge frame all metal parts anti-rust treated MTS Consulting Limited 9
4 TECHNICAL SPECIFICATIONS FF1 PLEASE TICK IF YOU COMPLY. SPECIFY YOUR OPTION IF YOU DON'T. ITEM DESCRIPTION SPECIFICATION TENDER OFFER 21.0 Wall Finishes Laminate wood finish Car doors and front returns in brushed stainless steel Full length mirrors positioned on rear wall at the sides with a brushed stainless steel panel in between Hand rail on one side Control panel in black glass or brushed stainless steel finish 23.0 Floor Finishes Recess 20/30mm to take marble (marble by others) 24.0 Ceiling Finish Brushed stainless steel finish Linear lighting 25.0 Car Doors 900mm wide x 2000mm high Side opening Brushed stainless steel finish 26.0 Landing Doors 900mm wide x 2000mm high Side opening Brushed stainless steel finish 1 hour fire rating 27.0 Safety Progressive type safety gear Automatic evacuation control (car travels to nearest landing and opens door in case of power failure) Door closing force limiter Infra-red beam on car door Permanent shaft lighting Cabin roof handrail if distance between cabin and wall exceeds 300mm Intercom between lift and control panel Autodialler to EN81-28 Conformance to EN81-72 Level switch in pit interfaced to lift operation 28.0 Equipment Guarantee 24 months 29.0 Maintenance 24 months MTS Consulting Limited 10
5 TECHNICAL SPECIFICATIONS CH1 PLEASE TICK IF YOU COMPLY. SPECIFY YOUR OPTION IF YOU DON'T. ITEM DESCRIPTION SPECIFICATION TENDER OFFER Make (please specify) 1.0 Type Simplex Car Lift 2.0 Minimum Capacity 3500kg 3.0 Speed m/s - please specify 4.0 Drive System Hydraulic drive - please specify type (direct acting preferred) 5.0 Starts per Hour please specify 6.0 Voltage - Power Mains 3pH - 400V - 50Hz(specify power/starting current) 7.0 Number of Stops Number of Entrances 2 in line 9.0 Total Travel 3m (approx.) 10.0 Over head Height 4200mm 11.0 Minimum Car Dimensions 3400mm W x 5700mm D x 2200mm H 12.0 Well Dimensions (per lift) 3500mm W x 6000mm D 13.0 Pit Depth 3000mm 14.0 Location of Machine Adjacent to lift shaft - please advise size required 15.0 Control System Up and down collective 16.0 Controls & Fittings in Cabin Door Open / Hold button Alarm Bell button Floor address buttons including Braille code Fan and Switch Overload indication (audio / visual) Control panel accessible by persons on wheelchair Indirect lighting plus emergency light on battery back-up No Smoking sign Instructions on what to do if lift stops Digital position indicator Provision for camera in cabin Interface for card access control (card access by others) Key access 17.0 Control on Landings Digital position indicator on each floor Engaged / free indicator Direction of travel arrows Gong' signal for lift arrival Lift call buttons Emergency landing door open key / lock 18.0 Maintenance Controls On top of cabin & in control panel 19.0 Car Construction Steel girder and heavy gauge frame all metal parts anti-rust treated MTS Consulting Limited 11
6 TECHNICAL SPECIFICATIONS CH1 PLEASE TICK IF YOU COMPLY. SPECIFY YOUR OPTION IF YOU DON'T. ITEM DESCRIPTION SPECIFICATION TENDER OFFER 20.0 Wall Finishes Decorative textured finish stainless steel Car doors and front returns in stainless steel Hand rail on one side Bumpers on all walls 21.0 Floor Finishes Stainless steel chequered plate 22.0 Car Doors 2200mm wide x 2100mm high Central opening Decorative textured finish stainless steel 23.0 Landing Doors 2200mm wide x 2100mm high Central opening Decorative textured finish stainless steel 1 hour fire rating 24.0 Safety Progressive type safety gear Automatic evacuation control (car travels to nearest landing and opens door in case of power failure) Door closing force limiter Infra-red beam on car door Permanent shaft lighting Cabin roof handrail if distance between cabin and wall exceeds 300mm Intercom between lift and control panel Autodialler to EN81-28 Level switch in pit interfaced to lift operation 25.0 Equipment Guarantee 24 months 26.0 Maintenance 24 months MTS Consulting Limited 12
7 TECHNICAL SPECIFICATION TABLE OF CONTENTS PASSENGER LIFTS General Regulations and Standards Limits of Work Maintenance Documents to be Submitted with Tender Drawings to be Submitted Inspection and Certificate of Compliance Systems Supply Overvoltage Trip LIFTS Maintenance Control Gear Samples Telephone and Camera in Lift Cabin Essential Power Supply / Automatic Evacuation Fire Control Access Control Firefighters s Lift SUMP PUMPS General Designation Design Operating Parameters 6 MTS Consulting Ltd 1
8 PARTICULAR SPECIFICATION PASSENGER LIFTS 1.0 GENERAL 1.1 Regulations and Standards The lifts, the material and the installation including the machine room and pit shall comply with all the relevant standards and regulations. In particular: (i) European Parliament and Council Directive 95/16/EC of 29 June 1995 as adopted in Malta, by virtue of the Legal Notice 370 of 2002 Lifts Regulations. All lifts and safety components within the scope of the Regulations, which are to be provided under this contract will have to: Be safe (or in the case of a safety component enable the lift in which it is installed to be safe); Meet the relevant essential health and safety requirements in their design, construction and installation; Satisfy the appropriate conformity assessment procedures set out in the Regulations. Carry CE marking; Be accompanied by an EC declaration of conformity. (ii) Maltese Standard MSA EN for the hydraulic lift, MSA EN for the electric traction lift, as applicable. (iii) European standard EN for firefighters lift, as applicable. (iv) European standard EN for safety rules for the construction and installation of passenger lifts, particular applications for passenger and goods passenger lifts and accessibility to lifts for persons including persons with disability. (v) Factories (Hoists and Lifts) Regulations, (vi) Current Edition of the I.E.E. Wiring Regulations. (vii) Current Edition of the Electricity Supply Regulations as issued by the Enemalta Corporation. The Tenderer shall be required to certify, at tendering stage, that the whole installation will conform to the above standards and regulations. MTS Consulting Ltd 2
9 Any deviations from the above standards must be clearly indicated by the contractor at tendering stage. 1.2 Limits of Work All civil engineering works, including pit, lift well motor room and relative openings, shall be carried out by others. The supply and fixing of any part of any metal structure necessary for the operation of the lift shall, however, form part of this tender. 1.3 Maintenance The tenderer shall cover complete maintenance of the equipment and the installation for a period of twenty-four (24) months following handover. The maintenance shall be in line with the Maltese Standard MSA EN 13015:2001. This shall also include routine bimonthly visits as necessary, to keep the lifts in continuous working order, the free supply and use of lubricants, all replacements, including lights and batteries, etc. A six monthly examination by a competent person shall also be undertaken, on the general operation, running clearances, main drive system and gearing and operational check of safety devices. A report of Examination of Lift shall be compiled and copies passed to client, competent Authorities and the O.H.S.V. A log book shall be kept in order to record dates and nature of visits and condition of lifts. 1.4 Documents to be Submitted with Tender The tenderer shall submit with his tender the following documentation : a. Descriptive brochure regarding cabin and doors finishes he is proposing. b. Certification that the whole installation shall conform to standards as specified in 1.1 above. c. Reference list of projects with similar type / capacity lifts. d. Confirmation that lift shaft dimensions are acceptable and will accommodate proposed lift installation. 1.5 Drawings to be Submitted The successful contractor shall within 4 weeks from signing of contract submit the drawings / documents listed hereunder: Three sets of general arrangement drawings, indicating also civil engineering works to comply with the dimension of the lift shafts as indicated in the drawing and all other relevant builder s work. 1.6 Inspection and Certificate of Compliance Prior to handing over of the lift, the contractor shall obtain the certificate of inspection in accordance with the Factories (Hoists and Lifts) Regulation, 1964 and the Certification of a Notified Body. 1.7 Systems Supply All equipment and components, including cabins and their accessories, shall be supplied as a complete system by the same manufacturer, details of which are to be submitted with the tender. MTS Consulting Ltd 3
10 1.8 Overvoltage Trip A three phase motor protector is to be supplied and installed for each motor. The motor protector is to automatically isolate the power supply to the motor in the event of: a. A phase loss. b. A phase reversal. c. A 9% voltage difference between phases. d. A phase angle variation of more than 10%. e. The voltage goes below the under voltage setting. f. The voltage goes above the over voltage setting. The adjustable voltage setting ranges are to be: under voltage over voltage 300 to 500 volts 360 to 560 volts The tripping unit can be reset automatically or manually after a set time delay in the range of 20 to 300 seconds. 2.0 LIFTS 2.1 Maintenance Control Gear Up / Down / Stop / Control and Inspection buttons to be installed in control panel as well as on top of car. 2.2 Samples It is very important for the client that samples of the finishes be forwarded with the tender document. 2.3 Telephone and Camera in Lift Cabin The travelling cable in all lifts shall include a dedicated line for the telephone. It is important that the lifts contractor provides a telephone line for this particular lift and as such all necessary co-ordination shall be the responsibility of the contractor. A co-ax cable for future installation of a camera in the lift cabin is to be provided. This cable shall be terminated in appropriate individual box fixed to the wall besides the lift control panel. 2.4 Essential Power Supply / Automatic Evacuation Essential power supply shall be provided for the firefighter s, lift FF1. A power supply from the essential system, off the building s stand-by generator, will be provided (by others) to feed the control panel and will be terminated in a main switch in the shaft. The passenger lifts PL1 and PL2, and the car hoist CH1 shall be equipped with an automatic evacuation control. This will allow the lifts to move to the nearest floor and allow evacuation of any trapped passengers. The operation of the lift will cease until power is restored. FF1 shall also be provided with an automatic evacuation control that will be required in the event that the generator does not operate. MTS Consulting Ltd 4
11 2.5 Access Control All lifts shall be provided by means of a card access control system, which shall be provided by the access control contractor. In view of this, an interface shall be allowed in each lift cabin for connection by the access control contractor. The car hoist, in addition to the interface described above, shall also have a key access control that will only allow travelling between floors by use of a key. This is to be provided by the lift s contractor. 2.6 Fire Control On receipt of a signal from the Fire Alarm Panel, all the lifts shall descend / ascend to the pre-assigned (evacuation) floor, open doors to allow passengers out, then remain stationary with doors closed. FF1 shall be assigned as firefighters s lift. Thus on the cabin control panel and on the landing at ground floor (to be confirmed by the Engineer prior to installation) there shall be a firefighters s control key switch. The relative keys are to be handed over to the Estate Manager on commissioning. The firefighters s switch shall include a two-phase operation for lift calling and lift operation as specified in EN Further requirements specified in EN81-72 shall also be included, such as its positioning and labelling. 2.7 Firefighters s Lift The lift designated to be firefighters s lift shall be so designed to ensure proper operation during a fire, as specified in EN Compliance shall be ensured for the electrical and electronic landing control devices, car and landing controls, and all other necessary equipment. The lift shall include an emergency trap door that ensures a means of escape from the car. This trap door shall form part of a complete system that allows evacuation at any point, as specified in EN A sump pump shall be supplied and installed within this scope of works to prevent the water level in the pit from reaching the car or equipment which could create malfunction of the firefighters lift. The pump shall be as specified in section SUMP PUMP The contractor shall supply, install, test and commission the submersible pumps including electrical connection and 50mm diameter HDPE discharge pipework (allow for 15meters of pipework). 3.1 General The sump pump shall be a submersible motor pump for percolating or leakage water. It shall be suitable for handling chemically neutral, slightly contaminated wastewater containing solids with a grain size of up to 10 mm as well as wash water and sea water. The sump pump shall not be required to pump sewage or corrosive liquids. MTS Consulting Ltd 5
12 3.2 Designation When selecting the brand and model, contractor shall ensure that the variant suitable for aggressive water, such as sea water, is chosen. A typical pump suitable for this use is : Brand : KSB Model : Ama-Drainer 301 S E Variant : C = variant for aggressive water An equal and approved brand and model may be offered provided the manufacturer guarantees its use for the application specified. 3.3 Design The pump shall be: vertical submersible motor pump, single-stage, with level control. The motor shall be single phase (230v), equipped with thermal motor protection with automatic reset and start-up. The motor is cooled by the medium pumped. The pump shall include a non-return valve and a female thread connection socket. All wetted components are manufactured from materials that can withstand corrosion. The motor shall include sealed-for-life grease-lubricated bearings, and a settable float switch. 3.4 Operating Parameters Head max. 6.5 m Capacity max. 9 m 3 /h Immersion depth max. 2 m Voltage/frequency max. 230 V / 50 Hz Max. temperature, continuous 0 up to 35 C Grain size 10 mm max. Power input 350 W max. Type of protection IP 68 Noise level <70 db(a) Supply cable 10 m H07RNF MTS Consulting Ltd 6
13 BANK OF VALLETTA TENDER DOCUMENT JOB NO.: C/43284 DATE: AUGUST 2015
Planning Information. Passenger and Freight Elevators.
A company of ThyssenKrupp Elevator Thyssen Aufzüge tk This planning information will give you an overview of the most important planning criteria of passenger and freight elevators. However you should
S WORK CATALOGUE FAA29100H_BWC
MACHINE ABOVE - 2, m/s BUILDER S WORK CATALOGUE FAA29100H_BWC 07-04-15 Version: a-e 800 kg 0 kg Otis Elevator Company 2007, All rights reserved MAIN 2/38 This catalogue summarizes useful information for
Fire. The Fire Installers Mate. A guide to fire alarm systems design
Fire The Fire Installers Mate A guide to fire alarm systems design BS 5839 Part 1:2002 A guide to BS 5839 Part 1:2002 Disclaimer This booklet is not intended to be a comprehensive guide to all aspects
The Impact of the new Directive 2014/33/EU and Standard EN81-20 on New Lifts
The Impact of the new Directive 2014/33/EU and Standard EN81-20 on New Lifts Malta Lift Association Workshop Ing Ray Spiteri DMS, MBA (Brunel), B.Sc.. Mech Eng (Hons), EUR Ing, MIMechE, MASHRAE, MIAEE,
OTIS. Lumina. LUMINA. We set out to meet your design expectations. Then we endeavoured to exceed them.
OTIS Lumina LUMINA. We set out to meet your design expectations. Then we endeavoured to exceed them. LUMINA LUXURY APARTMENTS PRESTIGE OFFICES LUXURY HOTELS CAR DESIGNS CAPACITY CAR WALL FINISHES 4 4-26
Schindler 3100 Simple and practical. Our passenger elevator for small residential buildings really gets you moving.
Simple and practical. Our passenger elevator for small residential buildings really gets you moving. Schindler Passenger Elevators 2 We keep what we promise. And we promise alot. A sensible choice Are
QUOTATION FOR UPGRADING OF LIFT AT BINJA SAN DAVID, TRIQ SAN DAVID, MTARFA
Housing Authority AWTORITÀ TAD-DJAR HOUSING AUTHORITY 22, Pietro Floriani Street, Floriana Telephone: (356) 22991000 Fax: (356) 21243284 E-mail: [email protected] Website: http://www.housingauthority.gov.mt/
26 3213.13 Diesel Engine Driven Generators Page 1 of 6
Last Update: December 8, 2014 A. Description of System Consultant s Handbook Page 1 of 6 1. Provide a diesel engine driven electric generating unit, factory assembled, tested and certified to operate at
Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling
Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling 250_P1 R10/7/2015 Copyright 2015 Liberty Pumps Inc. All rights reserved. Specifications subject to change without notice.
ThyssenKrupp Company Name
synergy ONE WORLD. ONE ELEVATOR. A ThyssenKrupp Elevator Company ThyssenKrupp Company Name TK 1 Nothing above. synergy is the passenger elevator without shaft head. Nothing below. synergy is the passenger
Roped Hydraulic Residential Elevator Specifications
January 1, 2004 Roped Hydraulic Residential Elevator Specifications P.O. Box 749, 5191 Stump Rd., Plumsteadville, PA 18949 Toll Free: 888-443-2800, Phone: 215-766-3380, Fax: 215-766-3385 CONTENTS Part
AVAILABLE TO DOWNLOAD ON THE APOLLO APP. Fire Alarm Systems Design. a guide to BS5839
AVAILABLE TO DOWNLOAD ON THE APOLLO APP a guide to Fire Alarm Systems Design BS5839 Part1:2013 The Regulatory Reform (Fire Safety) Order (FSO) became law on 1 October 2006 Legally you must comply! What
Schindler 3300 AP A remarkable style that suits the building. The machine room-less passenger elevator that unifies form and function.
A remarkable style that suits the building. The machine room-less passenger elevator that unifies form and function. Schindler Passenger Elevators Key figures Capacity Travel height One- or two-sided entrance*
LIFT CONTROL SYSTEMS CATALOGUE 2007
LIFT CONTROL SYSTEMS CATALOGUE 2007 All Your Needs For Elevators INDEX 1. Lift Control Cards... 3 2. Speed Control Units... 7 3. Emergency Rescue Cards... 8 4. Lift Control Panels... 10 5. Photocells...
Conlift1, Conlift2, Conlift2 ph+
GRUNDFOS DATA BOOKLET Conlift1, Conlift2, Conlift2 ph+ Small lifting stations 50 Hz CONLIFT1, CONLIFT2, CONLIFT2 ph+ Table of contents 1. Product overview 3 Conlift for condensate applications 3 Applications
LET OUR HYDRAULIC LIFTS HANDLE THE PRESSURE
LET OUR HYDRAULIC LIFTS HANDLE THE PRESSURE Introduction to the Elite Group of Companies, represented by VWS Lifts Elite Elevators Limited was formed in 1988 and in 1999 we divided into three operating
LIFT CONTROL SYSTEMS CATALOGUE 2007
LIFT CONTROL SYSTEMS CATALOGUE 2007 All Your Needs For Elevators INDEX 1. Lift Control Cards... 3 2. Speed Control Units... 7 3. Emergency Rescue Cards... 8 4. Lift Control Panels... 10 5. Photocells...
This unit is a pump that will clear the waste from a domestic shower and washbasin, bath, washing machine, glass washer and a sink.
1. Description This unit is a pump that will clear the waste from a domestic shower and washbasin, bath, washing machine, glass washer and a sink. The unit will start automatically. Please pay particular
Series description: Wilo-Drain TC 40
Series description: Wilo-Drain TC 40 H[m] Wilo-Drain TC 40 10 8 6 4 2 TC 40/8 TC 40/10 0 0 2 4 6 8 10 12 14 Q[m³/h] Design Submersible sewage pump Application Pumping heavily contaminated fluids for House/site
Morgue refrigeration unit
Morgue refrigeration unit The Morgue refrigeration units are made of sturdy, self-supporting walls, floor and ceiling elements. They are delivered in separate components and are to be assembled on site
Procurement Specification for a High Security Lift Arm Barrier (HSLAB) EB950 CR Armstrong High Security Lift Arm Barrier
Procurement Specification for a High Security Lift Arm Barrier (HSLAB) EB950 CR Armstrong High Security Lift Arm Barrier A. Requirement This document is to be used to specify the physical and operational
MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION
MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION Fire Pump Plan Review 2009 International Fire Code and NFPA 20 Date of Review / / BLD201 - Project Address: Project Name: Contractor s Business
Fire Pump Plan Review March 2010
Fire Pump Plan Review March 2010 Date of Review: / / Permit Number: Business/Building Name: Address of Project: Designer Name: Designer s Phone: Contractor: Contractor s Phone: Occupancy Classification:
Please also see 10 golden rules for correct Saniflo installation on www.saniflo.co.uk
1. Description Sanicom is a lifting pump for wastewater used in commercial applications (restaurants, hairdressing salons, the catering industry etc.). The unit operates automatically, has a high performance
P.A.L. S SPECIFICATIONS
PART 1- GENERAL 1.1 SCOPE To furnish all labor, materials and equipment necessary or required to complete the installation of the lift as indicated on the Drawings and Specifications. This specification
Thyristor-controlled power supplies and battery chargers
Thyristor-controlled power supplies and battery chargers Input voltage: 115 / 230 VAC, single phase, 50 / 60 Hz or 208 / 400 / 480 VAC, three phases, 50 / 60 Hz Output voltage: 12 / 24 / 48 / 60 / 72 /
GUARDIAN REFUGE & EMERGENCY VOICE COMMUNICATION SYSTEMS
GUARDIAN REFUGE & EMERGENCY VOICE COMMUNICATION SYSTEMS All Guardian Refuge and EVC Systems are BS9999 & BS5839 Pt9. 2010 compliant, and we offer our consultants assistance for BS5839, BS9999, (Fire safety
Lift and Escalator Installations
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-29 Lift and Escalator Installations Building Works Requirements The
REVIEWED BY CAPITAL PROJECTS MANAGER (DAN REDDY) GENERAL MANAGER EQUIPMENT ENGINEERING & ASSET MANAGEMENT (HAMILTON NXUMALO)
SA Port Operations DOCUMENT TYPE: REFERENCE EEAM-Q-014 (ORIGINAL SPECIFICATION HE8.2.3 Ver5) REVISION 0 SPECIFICATION TITLE: SPECIFICATION FOR ELECTRICAL MOTORS AND GENERATORS PAGE 0 of 07 COMPILED BY
V1504 Vertical Platform Lift OWNER S MANUAL
V1504 Vertical Platform Lift OWNER S MANUAL (To Be Retained by Owner After Installation by Authorized Savaria Dealer) Part No. 000692 03-m12-2013 2 IMPORTANT Ensure that only an authorized Savaria Dealer
V1504 Vertical Platform Lift OWNER S MANUAL
V1504 Vertical Platform Lift OWNER S MANUAL (To Be Retained by Owner After Installation by Authorized Savaria Dealer) Part No. 000692 01-m03-2016 2 IMPORTANT Ensure that only an authorized Savaria Dealer
Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone: 0041 22 77 66 051 [email protected]
CARDOK CARLIFT Fast access to underground garages Fast, Silent, Discreet, Design, High-Tech Installation to replace an access ramp on private property Dimensions: (Built to measure, all dimensions can
Ergo-Pro Single Line Solar Station Installation and Operating Instructions
Rp 3/4 Ergo-Pro Single Line Solar Station Installation and Operating Instructions Item No Pump type 677.21.70 WILO ST 15/6 13 2 4 11 Technical Specifications Max. operating pressure: 6 bar Max. operating
KESSEL KTP 500 Submersible Pump with lateral and vertical outlet connection Order Numbers 28710, 28810, 28850
INSTALLATION AND OPERATING INSTRUCTIONS KESSEL KTP 500 Submersible Pump with lateral and vertical outlet connection Order Numbers 28710, 28810, 28850 Product advantages Automatic float switch as water
DIGITUS Network & Server Cabinets. UNIQUE Series
DIGITUS Network & Server Cabinets UNIQUE Series Benefits - Server Rack 4-Point locking system front door 3-point locking system rear door Swing handle lock with profile zylinder in front and rear door
Ministry of the Environment Decree on accessible building
F1 THE FINNISH BUILDING REGULATIONS 1 Barrier-free Building Regulations and 2005 Ministry of the Environment Decree on accessible building adopted in Helsinki on the 1 st of October 2004 In accordance
LOADING DOCK EQUIPMENT. A. Section 03100 - Concrete Forms and Accessories: Placement of anchors into concrete.
LOADING DOCK EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES A. Loading dock equipment of the following types: 1. Dock lifts. 2. Control stations. 1.2 RELATED SECTIONS A. Section 03100 - Concrete Forms and
ELECTRICAL INSPECTION BULLETIN (Effective 2000-03-01)
ELECTRICAL INSPECTION BULLETIN (Effective 2000-03-01) Rule 28-900 Standby Generator Installations Due to the increasing number of standby generator installations being established to maintain continuity
OPTIONS Living Collection and Prime Series
OPTIONS Living Collection and Prime Series 1 Content LIVING COLLECTION LIVING CL4000...4 LIVING M4000...6 LIVING C4000... 10 LIVING C7000... 13 LIVING XTR 2000... 16 LIVING XTR7000... 18 PRIME SERIES PRIME
FIRE DETECTION AND ALARM SYSTEMS
HMO Information Sheet No 1 FIRE DETECTION AND ALARM SYSTEMS 1. Introduction When a property is in multiple occupation, the risk of fire breaking out is greater than in an ordinary single family home. Some
Oil and Coolant Circulating Heating System. Model - OCSM
Oil and Coolant Circulating Heating System Model - OCSM Installation & Operation Manual 216280-000 REV 2 Identifying Your System The HOTSTART heating system is designed to heat fluids for use in marine
3.1.1 Full Type Tests & Routine Tests according to Clause 8 2 & 8 3. 4.0 Instructions For Installation, Operation & Maintenance
SPECIFICATION FOR LOW VOLTAGE SWITCHBOARD SEN I N D E X Description 10 STANDARD TECHNICAL REQUIREMENTS 11 Standards 12 General Operating Conditions 13 General Description Of Switchboard 131 Structure 132
DEPARTMENT OF CORRECTIONS
Elevator Consulting, LLC. Post Office Box 464 Mequon, WI 53092-0464 Voice/Fax: 262-242-3077 Mobile No: 262-853-1054 E-mail: [email protected] DEPARTMENT OF CORRECTIONS MILWAUKEE SECURE DETENTION
Standard the the Raising
Raising the Standard Introduction to BS 5839-1:2013 An Overview of the BS 5839 1:2013 for professionals who are responsible for the provision of fire detection and alarm systems for buildings Agenda Introduction
1. Description. 2. List of Accessories included A B C F G H
1. Description This unit is a pump that will clear the waste from a domestic shower and washbasin. The unit will start automatically. Please pay particular attention to the following: Possible danger to
HERZ-Thermal Actuators
HERZ-Thermal Actuators Data Sheet 7708-7990, Issue 1011 Dimensions in mm 1 7710 00 1 7710 01 1 7711 18 1 7710 80 1 7710 81 1 7711 80 1 7711 81 1 7990 00 1 7980 00 1 7708 11 1 7708 10 1 7708 23 1 7709 01
FIRE-FIGHTING DESIGN BRIEF REPORT
P a g e 1 SECTION 04 (Doc.No.A/DBR 001) FIRE-FIGHTING DESIGN BRIEF REPORT P a g e 2 1.0 SCOPE 2.0 STANDARDS AND CODES 3.0 TYPES OF SYSTEM PROPOSED 4.0 FIRE HYDRANT SYSTEM 5.0 AUTOMATIC SPRINKLER SYSTEM
CoolTop. A unique water cooled air-conditioning unit for server room cooling from the top AC-TOPx-CW-240/60
CoolTop A unique water cooled air-conditioning unit for server room cooling from the top AC-TOPx-CW-240/60 Application CoolTop is a new, unique air conditioning unit especially designed for datacenters.
Lödige Goods Passenger Lifts
Lödige Goods Passenger Lifts OLYMPUS-Series Goods Lifts TRAFFICO Car Lifts TECHNOLOGY IN MOTION Service Intralogistik Systems Machines Lifts Road Lödige Industries Technology in Motion The core competence
MODEL 300505 INSTALLATION INSTRUCTIONS
WWW.BURCAM.COM 2190 Boul. Dagenais West TEL: 514.337.4415 LAVAL (QUEBEC) FAX: 514.337.4029 CANADA H7L 5X9 [email protected] Your pump has been carefully packaged at the factory to prevent damage during shipping.
The KONE Motala 2000 platform lift suits the architecture of any building, thanks to the wide range of car and shaft design options.
A solution for making all premises accessible KONE Motala 2000 The KONE Motala 2000 platform lift suits the architecture of any building, thanks to the wide range of car and shaft design options. This
JUBILEE TECHNICAL TRAINING CENTRE TAKORADI POLYTECHNIC 2015 TRAINING PROGRAMMES
JUBILEE TECHNICAL TRAINING CENTRE TAKORADI POLYTECHNIC 2015 TRAINING PROGRAMMES Main Courses Duration: 26 weeks 1. NVQ Level 2 Performing Process Operation in Replicating Environment 2. NVQ Level 2 Performing
All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.
DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,
ACCESS AUDIT OF WESTPORT HOUSE
ACCESS AUDIT OF WESTPORT HOUSE Large sign on the highway to indicate the entrance to Purbeck District Council Large and wide entrance Entrance showing sign for opening times Entrance sign Main entrance
A U T O M O T I V E L I F T S
Q U A L I T Y Y O U E X P E C T AT A P R I C E Y O U W O U L D N T T H E S TA N D A R D I N I N F O R M AT I O N, E Q U I P M E N T A N D D I A G N O S T I C S S Y S T E M S h t t p : / / d i a g n o s
UBC Technical Guidelines Division 14 2016 Edition CONVEYING EQUIPMENT Page 1 of 1 INDEX. Section 14 40 00
UBC Technical Guidelines Division 14 2016 Edition CONVEYING EQUIPMENT Page 1 of 1 INDEX Section 14 20 00 Section 14 40 00 Elevators Lifts Page 1 of 14 1.0 GENERAL 1.1 Related UBC Guidelines.1 Division
Walking and Working Surface Checklist:
Walking and Working Surfaces Purpose: This information is presented to improve the level of safety in our operations, and to inform you that we will comply with the OSHA Standard 29 CFR 1910.23. Responsibility:
Model: 400E-2M. Bermad Electrically Controlled Deluge Valve with Easy Lock Manual Reset. Installation Operation Maintenance. Application Engineering
Model: 400E-2M Bermad Electrically Controlled Deluge Valve with Easy Lock Manual Reset Installation Operation Maintenance Application Engineering BERMAD 1. Safety First BERMAD believes that the safety
Pre-site Installation Instructions for Aga Electric Cooker Models Electric C Electric E
Electric Cookers Pre-site Installation Instructions for Aga Electric Cooker Models Electric C Electric E PLEASE READ THESE INSTRUCTIONS BEFORE INSTALLING YOUR AGA Consumer Protection As responsible manufacturers
PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations.
PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this regulation, current to August 1, 2013. It is intended for information and reference purposes only.
BERMAD Fire Protection
Model: 400E-2M BERMAD Electrically Controlled Deluge Valve with Easy Lock Manual Reset Installation Operation Maintenance Safety First BERMAD believes that the safety of personnel working with and around
Current valve. for AC 24 V pulse/pause control of electrical loads up to 30 kw
4 937 DESIO Current valve for AC 24 V pulse/pause control of electrical loads up to 30 kw SEA45.1 Use The current valve is used for the control of electric heating elements in heating, ventilation and
ZMR 80 STEREO MODULAR ZONER USERS MANUAL
ZMR 80 STEREO MODULAR ZONER USERS MANUAL Lime Technologies http://limetechnologies.co.uk Tel: 08712 233127 ZMR80 Stereo Modular Zoner Mixer Introduction The modular construction of the ZMR80 allows it
LUCCI AIRFUSION QUEST II CEILING FAN
LUCCI AIRFUSION QUEST II CEILING FAN WITH IR REMOTE INSTALLATION OPERATION MAINTENANCE WARRANTY INFORMATION CAUTION READ INSTRUCTIONS CAREFULLY FOR SAFE INSTALLATION AND FAN OPERATION. V1.0 QUEST II IR
Operating Instructions Drill rig DRU160
Operating Instructions Drill rig DRU160 Index 000 / 001 Original operating instructions 10988825 en / 20.10.2009 Congratulations! With a Hydrostress unit from TYROLIT you have chosen a tried and tested
12 Volt 30 Amp Digital Solar Charge Controller Installation & Operation Manual
12 Volt 30 Amp Digital Solar Charge Controller Installation & Operation Manual This 30Amp charge controller is designed to protect your 12Volt Lead-acid or Gel-cell battery from being overcharge by solar
BOWL ASSEMBLY SELECTION Select impeller in exactly the same manner as for lineshaft type pump. Note comments under WELL SIZE.
SUBMERSIBLE PUMP selection A submersible pump consists of the following basic elements: < Bowl Assembly < Motor < Cable < Drop Pipe < Surface Plate (with)(without) discharge elbow DATA REQUIRED FOR SELECTION
DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION 17650 SECURITY SYSTEMS
PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES A. Inspections and observations by the Owner do not relieve the A/E of contract responsibilities. B. Chain of command 1. The DPS Project Manager is
SOHOline and SOHO Slimline The SOHOline and SOHO Slimline offer a modular, sturdy and compact design
SOHOline and SOHO Slimline The SOHOline and SOHO Slimline offer a modular, sturdy and compact design Ideal installation for; Offices Branch Offices Schools Computer Aided Classes Government Offices Hotels
Interfacing Elevators with Fire Alarm and Sprinklers
Interfacing Elevators with Fire Alarm and Sprinklers IEEE Atlanta Chapter May 15, 2006 Brian K Fabel, PE Agenda Today s Codes NFPA, ASME, IBC/IFC Conflicts/Issues Tomorrow s Codes? Applicable Codes NFPA
INSTALLATION. General. Important Note. Design. Transport
General The roof trusses you are about to install have been manufactured to precise engineering standards. To ensure that the trusses perform as designed, it is essential that they be handled, erected
Recommendations to improve the safety of existing lifts
Recommendations to improve the safety of existing lifts Lift & Escalator Industry Association Lift Safety an introduction Lifts are amongst the very few modes of transport available for continuous unsupervised
Instruction manual of pumps WQ, WQF, SN, Furiatka, Furia, KRAKEN, BIG, IP, IPE, SWQ, CTR
CAUTION! Instruction manual of pumps WQ, WQF, SN, Furiatka, Furia, KRAKEN, BIG, IP, IPE, SWQ, CTR NOTE: read the manual prior to commencement of use. For safety reasons, the pump can only be operated by
Linkeo 19" freestanding cabinets
87045 LIMOGES Cedex France Telephone: (+33) 05 55 06 87 87 - Fax: (+33) 05 55 06 88 88 Linkeo 19" freestanding cabinets Page 1. General characteristics....1 2. Range....2 3. Technical characteristics...3
SEWER CHEWER Wastewater / Sludge Grinder Submersible Gearmotor
INSTALLATION, OPERATION AND MAINTENANCE MANUAL For SEWER CHEWER Wastewater / Sludge Grinder Submersible Gearmotor Yeomans Chicago Corporation 3905 Enterprise Court P.O. Box 6620 Aurora, IL 60598-0620 Phone:
Commercial Gas Furnace Upflow
Commercial Gas Furnace Upflow Model G24-200 80% A.F.U.E. 200,000 Btuh Input Heating Cap. 7.5 or 10 Tons Nominal Add-On Cooling GUK FEATURES Certified by A.G.A./C.G.A. Laboratories. Heavy gauge painted
Fluid Level Gauge Fluid Level Sensor Temperature Switch FSA / FSK / TS
Fluid Level Gauge Fluid Level Sensor Temperature Switch FSA / FSK / TS up to size 381; to PN 0.5; to T = 80 C 1. Description 1.1. General FSA fluid level gauges, FSK fluid level sensors and TS temperature
FIREDEX 2200. Conventional Fire Panels
68 Flexible, high specification system Choice of 1, 2, 4 or 8 zones Simple one-shot auto-reset user test facility Approved to EN54 Maintenance free poly switch circuit protection, with auto reset Class
FLOAT SWITCHES FLOW SWITCHES FOR LIQUIDS PRESSURE SWITCHES
01D351-GB FLOAT SWITCHES FLOW SWITCHES FOR LIQUIDS PRESSURE SWITCHES DOLOMIT FLOAT SWITCHES The DOLOMIT float switches find application in liquid level control in tanks and wells; they require connection
MEDIUM VOLTAGE CE-BF SWITCHBOARDS. UP TO 40.5 kv. CE - BF - C - en - REV.00 2012.4
CE - BF - C - en - REV.00 2012.4 APPLICATION CE-BF Switchbords up to 40.5 kv are designed for use in public and industrial distribution system up to 40,5KV for the operation and protection of lines, transformers,
Daker DK 1, 2, 3 kva. Manuel d installation Installation manual. Part. LE05334AC-07/13-01 GF
Daker DK 1, 2, 3 kva Manuel d installation Installation manual Part. LE05334AC-07/13-01 GF Daker DK 1, 2, 3 kva Index 1 Introduction 24 2 Conditions of use 24 3 LCD Panel 25 4 Installation 28 5 UPS communicator
Laserlyte-Flex Alignment System
Laserlyte-Flex Alignment System LaserLyte-Flex The LaserLyte-Flex Alignment System is a unique, interchangeable, low cost plug and play laser system. Designed specifically for aligning and positioning
1-Way Chilled Water Cassettes KCO 60, 90 & 120. Technical Brochure. TM KCO-W.1GB Date : November 2005 Supersedes : None
1-Way Chilled Water Cassettes KCO 60, 90 & 120 Technical Brochure TM KCO-W.1GB Date : November 2005 Supersedes : None General Features Control valve (optional) Air vent In-tube electric heating elements
SWIMMING POOL, SPA, & HOT TUB GUIDELINES
SWIMMING POOL, SPA, & HOT TUB GUIDELINES Pool permit cost is based on the total value of the project. See Permit Fee Schedule Table 1A. A. Adopted construction codes and installation requirements 1. 2015
50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance
02/15 Labko GRP cesspools Instructions for installation, operation and maintenance Reliable solutions Wastewater treatment systems Contents 1 LABKO CESSPOOLS... 3 1.1 GENERAL... 3 1.2 IMPORTANT TO KNOW
DBS720 / FDS221-R / FDS221-W Sounder base, Alarm sounders
DBS720 / FDS221-R / FDS221-W Sounder base, Alarm sounders For the automatic addressable detector bus C-NET Cerberus PRO Sounder base DBS720 11 selectable tones, 2 programmable activation levels Sound intensity
Art.S001-S002 SOLAR MODULE WITH DELIVERY AND RETURN CONNECTIONS
Art.S001-S002 SOLAR MODULE WITH DELIVERY AND RETURN CONNECTIONS Technical Information sheet 0001/07/Rev01 ENG FUNCTION Series S001 and S002 circulation units are applied to the primary circuit of solar
KONE EN81-71 CAtegory 1. Vandal Resistant Lift
KONE EN81-71 CAtegory 1 Vandal Resistant Lift Car Finishing Options: MonoSpace Standard Ceilings LF94 Doors Asturias Satin (F) Walls Stainless steel Asturias Satin (F) Flemish Linen (M) Scottish Quad (K)
BROWACOM PRODUCTS. Our web-pages can be found from: http://www.browacom.fi
BROWACOM PRODUCTS manufactures and sells telecom solutions for professional users. Products include CityCabinet-product family, as a service Browacom offers subcontracting services in electromechanical
AVAILABLE TO DOWNLOAD ON THE APOLLO APP. Pocket guide to. Fire Alarm Systems Design BS 5839-1. Standard
Pocket guide to Fire Alarm Systems Design BS 5839-1 Standard AVAILABLE TO DOWNLOAD ON THE APOLLO APP The Regulatory Reform (Fire Safety) Order (FSO) became law on 1 October 2006 Legally you must comply!
Incubator with mechanical convection
BF series 400 Incubators and cooling incubators Incubator with mechanical convection The BINDER incubator of the BF series with mechanical convection is suitable for all gentle incubation applications,
VXT. Open Cooling Towers. Open Cooling Towers. Product Detail VXT - B 1. Engineering Data... B2. Structural Support... B6
- B 1 Product Detail Engineering Data... B2 Structural Support... B6 Engineering Specifications... B9 - B 2 Engineering Data REMARK: Do not use for construction. Refer to factory certified dimensions &
Ammonia Detection System Codes and Design Specifications
Ammonia Detection System Codes and Design Specifications December 28, 2015 Revision 5 920 N Trade Winds Pkwy Columbia, MO 65201 Ammonia detection system codes and design specifications Following is a discussion
Digital pressure gauge for industrial applications Model DG-10-S, Standard version Model DG-10-E, Enhanced version
Electronic pressure measurement Digital pressure gauge for industrial applications Model DG-10-S, Standard version Model DG-10-E, Enhanced version WIKA data sheet PE 81.66 Applications Machine building
Wilo SP Series Submersible Sump Pumps ECS. ECS19-15.25 ECS22-15.33 ECS24-15.50 Installation and operating instructions
Wilo SP Series Submersible Sump Pumps ECS ECS19-15.25 ECS22-15.33 ECS24-15.50 Installation and operating instructions PREINSTALLATION CHECK Inspect this pump before it is used. Occasionally, pumps can
FFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid
Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars Presented By: Greg Pelster & Robert Schmid FFI Ferrie, Franzmann Industries LOW VOLTAGE SWITCHGEAR & LOW VOLTAGE
ST Series POWER SUPPLIES USER INSTRUCTIONS
Introduction These instructions detail the installation and operation requirements for the ST20 & ST35 power supplies. These have been designed for operation in RV s providing a DC power system, with optional
Elegant ECM. ELEGANT ECM air conditioners allow. The range is made up of 12 models: Ceiling Air Conditioner
Elegant ECM Ceiling Air Conditioner ELEGANT ECM air conditioners allow to heat and cool very economically small and medium areas, like shops, show rooms, workshops, supermarkets. The range is made up of
Proposed A&A work at E-Commerce Air-Hub at SATS Airfreight Terminal 1 (AFT1)
1. ADDITION & ALTERATION TO THE MAIN WAREHOUSE 1.1 ELECTRICAL WORKS 1.1.1 The Contractor shall provide into the AFT1 building with 2 x 1000Amp power supply to be terminated with a main isolator. The power
Art Basel Miami Beach Dec 3 6 2015 Booth Design Regulations
1 6 1 BOOTH CONSTRUCTION The Art Basel in Miami Beach form an integral part of the contract between the exhibitor and Art Basel U.S. Corp. (see Art Basel in Miami Beach Exhibition Regulations). The following
