1 Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site.
2 Background & Planning Context The Site The site is an area of 1.27 hectares and is currently accessed via a gate from Duke s Ride. For several years the College has identified the need to provide teacher accommodation within the estate, as they currently own and rent a number of properties in Crowthorne for staff living quarters. This is essential to support the ongoing function of the College, but more importantly in terms of pastoral care requirements. The Proposal Background studies have been undertaken in relation to the following matters which have influenced the design, and the final reports will be submitted alongside the planning application: Topography Ecology surveys Tree Survey Planning Policy and Housing Requirement The Bracknell Forest Site Allocations Local Plan (SALP) - The SALP was adopted in July 2013 and allocates the subject site for housing. The principle of residential development has therefore been assessed and considered acceptable. The SALP identifies the site (Land South of Dukes Ride) as having a capacity for approximately 23 dwellings (net). Flood Risk Assessment and Drainage Statement Landscape and Visual Assessment Transport
3 Site Context & Appraisal 1 Bowmans Court 2 Building on Dukes Ride 3 Houses west of site - Stronshira and Cypress Cottage 4 Looking East from College entrance Constraints and Opportunities Plan Duke s ride Open space Retain tree group Respect overlooking Key New access Existing trees Natural tree buffer Private road 5 Looking down Bowman Court to the College 6 Looking West across the site 7 Looking South across the site 8 Looking South East across the site Concept Plan Teacher accommodation Private sale accommodation Retain health club parking
4 Highways The nine open housing market units will be accessed off Dukes Ride, with vehicular access to the teacher accommodation provided to the south, via the College grounds. The open market site access will be similar in design to the nearby residential accesses onto Duke s Ride. The access will have pedestrian footways on either side and will be designed to provide sufficient space to allow for large vehicles such as delivery, refuse collection and emergency services vehicles to enter and exit the site. Inside the site, the access way will become shared surface and a turning area will be provided to enable lorries to turn around. In terms of parking, the 9 x 4 bedroom open market units will each have three parking spaces, as well as use of the two visitor spaces in a layby close to the access. will be to the college and will have no impact on the local transport network during the peak hour periods. There will also be fewer commuting trips to and from the College, with more staff living on the College site. Traffic surveys undertaken on Duke s Ride near the proposed open market units site access show that during the AM peak there are approximately 1,100 vehicles travelling eastbound and westbound. Therefore, the total proposed development traffic (open market and teacher accommodation) will account for just 2.0% of the total traffic currently travelling along Dukes Ride. Similarly, during the PM peak there are approximately 1,000 vehicles travelling eastbound and westbound. This accounts for just 2.3% of the total traffic currently travelling along Dukes Ride. Therefore, the proposed development will have a negligible impact on the local road network. The teacher accommodation will have 1.5 parking spaces per unit, plus one visitor space for every 5 units. All parking associated with the development will be provided within the curtilage of the site. Cycle parking for the whole development will meet local parking standards. The trip generation calculations for the development predict that during the peak hour periods (morning and evening) the site will generate a total of approximately 23 vehicle movements; 6 from the open market housing and 17 from the teacher accommodation. As the college accommodation will only be occupied by college staff and their families, a large proportion of the trips generated by the development
5 Flood Risk & Drainage The drainage strategy will ensure that flood risk within the area will not be exacerbated as a result of the proposal. The built development will be located within an area of Flood Zone 1, which is outside the 0.1% annual probability of flooding. The site has been assessed and found to be sustainable in terms of flood risk and compliant with the criteria set out in the NPPF. Sustainable Urban Drainage Strategies will be implemented throughout the development to control and attenuate surface waters whilst also providing water quality and bio diversity enhancement. Surface water run-off will be attenuated on-site for events up to 1 in 100 year storm rainfall event with a 30% allowance for climate change.
6 Landscaping and Ecology An Ecological Appraisal has been undertaken by HDA which has included: Extended Phase 1 Habitat Survey Badger Survey Phase 1 Bat Scoping Survey Phase 2 Bat Survey The report identified that the majority of the site was of nature conservation importance at a site level in its own right and is unlikely to support notable populations of protected or notable species. No badger setts were recorded on the site. Three trees with potential to support roosting bats are located within the site however no bat roosts were recorded at the site during the Phase 2 bat surveys. Duke s Ride Entrance - Landscape Strategy A tree survey has been completed by an independent Arboricultural Consultant, which has informed the project. This concluded that the impact upon the trees would be minimal, with no detrimental impacts upon the environmental or the aesthetic of the area. The removal of the large Leyland hedge and the proposed re-planting would provide a significant long term and valuable environmental improvement. All trees are to be retained with the exception of some declining unstable specimens. The architect has sought to retain as many trees as possible, which includes a large group of trees located in the north east corner, adjacent to Dukes Ride. This provides a visual screen to the proposal and contributes to maintaining the character of the area. A large open space is also provided, which will be available as a play area for the nine front properties. Perspective Sketch of new entrance off Duke s Ride
7 Thank you! Thank you for attending the exhibition for Land at Bowman Field. We would welcome your comments on the proposals for the development of the site. The feedback form will help inform the proposal before the application is submitted. Please pass your comments on to a member of the team by: Completing the feedback form and placing in the box provided or Posting to the address on the form. or ing comments to Wokingham@boyerplanning.co.uk. We would be grateful if all comments were received by Friday 27th February 2015 to enable the project team to consider them. It is anticipated that a planning application will be made to Bracknell Forest Council in Spring Once the Council receive our planning application they will undertake a 21 day consultation for the application. This will include posting a notice on the site, consulting with neighbours and you will be invited to provide them with comments, with access to the final scheme and supporting documents.
AGENT(S) / APPLICANT(S): AGENT Dave Dickerson, DK Architects. APPLICANT Halton Housing Trust. DEVELOPMENT PLAN ALLOCATION: Greenspace.
APPLICATION NO: 14/00168/FUL LOCATION: Land to the west of 19 Crow Wood Lane, Widnes. PROPOSAL: Proposed erection of 10 no. 1 bedroom apartments with individual access doors arranged in 2no. 2 storey height
More informationSite Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015
Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1
More informationDEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY
DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY 1.0 Introduction and Purpose 1.1 Clackmannanshire Council is seeking to dispose of a site at Alloa Road, Tullibody for redevelopment. The site extends
More informationDevelopment Layout Design
Development Layout Design General Design Considerations for Adoptable Highways Version 1 June 2012 Transportation, Waste and Environment Service Issue and Revisions Record Revision Date Originator Purpose
More information1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site.
1 Welcome Thank you for taking the time to attend this public exhibition of our proposals for residential development on Land at Daws Farm, Back Road, Writtle (site shown opposite). The exhibition comprises
More informationDevelopment proposals will require to demonstrate, according to scale, type and location, that they:-
Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on
More informationWELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.
WELCOME WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. The purpose of the exhibition is to provide the community with the opportunity to view our initial ideas
More informationMount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with
Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement November 2013 with Tibbalds Planning & Urban Design 19 Maltings Place 169 Tower Bridge Road London SE1 3JB Telephone 020
More informationCOPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited
COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT COPCUT RISE November 2010 Prepared by Capita Lovejoy on behalf of William Davis Limited Copcut Rise Land north of Copcut Lane, Droitwich Spa: Consultation
More informationReport to Planning applications committee Item Date 6 March 2014 Head of planning services
Report to Planning applications committee Item Date 6 March 2014 Report of Head of planning services 4(7) Subject 13/02051/F Former Wellesley First School Wellesley Avenue North Norwich NR1 4NT Description:
More informationTHE GRANGE, SOUTH PARK DRIVE, POYNTON, CHESHIRE, SK12 1BS
Application No: 15/4137M Location: Proposal: Applicant: Expiry Date: THE GRANGE, SOUTH PARK DRIVE, POYNTON, CHESHIRE, SK12 1BS Demolition of detached dwelling house and associated buildings, and erection
More informationSite Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons
Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons Representor Number 1135 AS(N)4 Persimmon Homes 9 th February 2015 Contents Site Deliverability Statement Alternative Site
More informationDevelopment Management Report
Committee and Date Central Planning Committee 5 th April 2012 Item 13 Public Development Management Report Responsible Officer: Stuart Thomas email: stuart.thomas@shropshire.gov.uk Tel: 01743 252665 Fax:
More informationK M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU
Application No: 11/2196N Location: Proposal: Applicant: Expiry Date: K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Extension and New Store Mr Dan Mellor 17-Aug-2011 SUMMARY RECOMMENDATION Approve
More informationCHANGE OF USE FROM AGRICULTURE TO A USE FOR CARAVAN STORAGE COMPOUND AND OPERATIONAL DEVELOPMENT.
2014/1898 BIRMINGHAM ROAD MERIDEN Application No: Ward/Area: Location: 2014/1898/S MERIDEN BIRMINGHAM ROAD MERIDEN Date Registered: 21/11/2014 Applicant: Proposal: MR VAUGHN WILLIAMS CHANGE OF USE FROM
More informationWELCOME. www.firstbase-haslemere.london
Aerial view of the existing site Welcome to the second public exhibition on our ideas for the future of the Haslemere Industrial Estate. We held our first public exhibition in June where we set out our
More informationTaylor Wimpey UK Ltd. December 2007
Taylor Wimpey UK Ltd December 2007 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft For Planning Date 3 August 2007 20 December 2007 Prepared by D Gooding P Barton Signature Checked
More informationOn the instruction of Ros Goode & Roland Morgan, Joint Fixed Charge Receivers
FOR SALE On the instruction of Ros Goode & Roland Morgan, Joint Fixed Charge Receivers Land at Teville Gate, Teville Road, Worthing, West Sussex BN11 1AZ ibrochure - www.cbre-ibrochure.co.uk/worthing ENTER
More informationChapter 12: Impacts, Mitigation, Cumulative Impacts and Residual Effects
Chapter 12: Impacts, Mitigation, Cumulative Impacts and Residual Effects REnescience Northwich Quality Management Prepared by: Tom Dearing Senior Environmental Consultant 02/10/15 Reviewed & checked by:
More informationLONDON ROAD SEVENOAKS
WELCOME TO THE BERKELEY HOMES EXHIBITION Train Station Gr anv i ll e Dar tford Road Lo ad Ro nd on ad Ro Eard SITE Th ed riv e ley R oad on R oad A 224 Gord Pem b rok e Roa d Site Location Since the submission
More informationCouncil, Municipal Building, Kingsway, Widnes, Cheshire, WA8 7QF. Greenspace. DEVELOPMENT PLAN ALLOCATION:
APPLICATION NO: LOCATION: PROPOSAL: WARD: PARISH: CASE OFFICER: AGENT(S) / APPLICANT(S): DEVELOPMENT PLAN ALLOCATION: 13/00397/HBCOUT Land at Widnes Recreation Ground, Liverpool Road, Widnes, Cheshire.
More information10.1 WILL HEY FARM WATFORD LANE NEW MILLS RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS AND LANDSCAPING (FULL - MINOR)
HPK/2012/0207 03/04/2012 WILL HEY FARM WATFORD LANE NEW MILLS MR & MRS M WILSON KIRSTY WILSON EQUINE AND WILL HEY FARM BED & BREAKFAST RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS
More informationNovember 2013 PLANNING PRE- APPLICATION ADVICE AND PLANNING PERFORMANCE AGREEMENT SERVICE
November 2013 PLANNING PRE- APPLICATION ADVICE AND PLANNING PERFORMANCE AGREEMENT SERVICE PRE-APPLICATION ADVICE AND PLANNING PERFORMANCE AGREEMENT SERVICE PRE-APPLICATION The Council welcomes and encourages
More informationK M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU
Application No: 11/2196N Location: Proposal: Applicant: Expiry Date: K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Extension and New Store Mr Dan Mellor 17-Aug-2011 SUMMARY RECOMMENDATION Approve
More informationMajor and Minor Schemes
1 Major and Minor Schemes Peterborough City Council has identified a number of proposals for major transport schemes over the next five year period that will support the planned housing and employment
More informationHurlinghamRetailPark. Aerial view of site. Welcome to our exhibition of proposals for the redevelopment of the Hurlingham Retail Park.
HurlinghamRetailPark Aerial view of site Welcome Welcome to our exhibition of proposals for the redevelopment of the Hurlingham Retail Park. Londonewcastle, a specialist residential developer, has been
More informationLOCAL MEMBERS COMMENTS APPLICATION NO: 06/2060/W DATE RECEIVED: 08/09/2006
COMMITTEE DATE: 17/01/2006 LOCAL MEMBERS COMMENTS APPLICATION NO: 06/2060/W DATE RECEIVED: 08/09/2006 ED: APP: TYPE: APPLICANT: LOCATION: PROPOSAL: WHITCHURCH/TONGWYNLAIS Full Planning Permission Orbis
More informationAdvice can also be sought from specific specialist officers in the Council.
Canterbury City Council Validation of Planning Applications Guidance note 2010: Introduction Up to date advice on the validation of planning applications is contained in the CLG Guidance on information
More informationPLANNING APPLICATION: 12/00056/APP
PLANNING APPLICATION: 12/00056/APP In the event that a recommendation on this planning application is overturned the Committee is reminded of the advice contained on the front page of the agenda for Reports
More informationRecommendations for future developments
C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site
More informationThe land is allocated within the Westbury on Trym Conservation Area and the land is protected by a blanket TPO 340.
SITE DESCRIPTION The site is occupied by a large single dwelling house which was built in 2007. The building is surrounded by large trees and has a substantial rear garden. The land is allocated within
More informationPerth and Kinross Council Development Control Committee 18 March 2009 Recommendation by Development Quality Manager
Perth and Kinross Council Development Control Committee 18 March 2009 Recommendation by Development Quality Manager 4(9) 09/161 Alteration and Extension to Existing Public House to Provide a New Bookmakers
More informationEngagement with the community will be in accordance with Council s Community Participation Policy.
CLARENCE CITY COUNCIL ASSET MANAGEMENT 7 DEC 2015 86 11.5 ASSET MANAGEMENT 11.5.1 CLARENCE STREET SAFETY ASSESSMENT PROJECT (File No 04-03-01) EXECUTIVE SUMMARY PURPOSE The purpose of this report is to
More informationAlternatives and Design Evolution: Planning Application 1 - RBKC
3 Alternatives and Design Evolution: Planning Application 1 - RBKC Design Freeze Draft One (January 2011) Figure 3-19 3.82 The design freeze draft one was a point in time in the evolution of the Masterplan
More informationConstruction Traffic Management Plan
Construction Traffic Management Plan Proposed Additional Accommodation for SWDPLS Shinners Bridge Dartington Produced for and on behalf of Built Environments Team Devon County Council NPS South West Ltd
More informationComment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.
Proposed Truck Climbing Lane Route 7 Westbound Between West Market Street and Route 9 UPC# 58599, Project # 6007-053-133, P101 Date of Meeting: August 24, 2010 Time: 6:00PM to 8:00PM Location: Rust Library
More informationFLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES
FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES Integra Consulting Engineers Limited NS / 2543 Fountain House
More informationGuidance on the Introduction of Residents Parking Schemes
Guidance on the Introduction of Residents Parking Schemes Bath and North East Somerset - The place to live, work and visit Contents Introduction... 3 1 0 Layout of RPS (including times of operation)...
More informationRelevant Planning History P/2006/1070: Demolition of building and construction of supermarket and 14 2 bed flats. Withdrawn.
P/2010/1404/MPA St Marychurch Ward Former G A Insurance Buildng, Greenway Road/St Marychurch Road, St Marychurch Torquay Demolition of former G A building; formation of up to 7 retail units for purposes
More informationAGRICULTURAL BUILDING WITH PHOTOVOLTARIC SOLAR PANELS TO SOUTH FACING ROOF
DC/2015/00494 AGRICULTURAL BUILDING WITH PHOTOVOLTARIC SOLAR PANELS TO SOUTH FACING ROOF LAND AT ONEN, ADJACENT TO B4233, NP25 5EN. RECOMMENDATION: APPROVE Case Officer: Elizabeth Bennett Date Registered:
More informationRichmond upon Thames College. Draft Planning Brief. May 2008
Richmond upon Thames College Draft Planning Brief May 2008 1. Introduction 1.1 The purpose of this Planning Brief is to establish a development framework for the proposed comprehensive redevelopment of
More information4 Alternatives and Design Evolution
4 Introduction 4.1 This Chapter describes the considerations and constraints influencing the siting, layout and massing of the Development. It also describes the main alternatives to the Development that
More informationOrchard Barn, Newcastle Road, Blakelow, Cheshire, CW5 7ET. New Detached Double Garage Block with Integrated Garden Store and Loft Storage Area.
Application No: 13/2596N Location: Proposal: Applicant: Expiry Date: Orchard Barn, Newcastle Road, Blakelow, Cheshire, CW5 7ET New Detached Double Garage Block with Integrated Garden Store and Loft Storage
More informationDEVELOPMENT MANAGEMENT
DEVELOPMENT MANAGEMENT Sub Heading Sub Heading 2 march 2012 PRE APPLICATION ADVICE SERVICE FOR PLANNING APPLICATIONS Introduction CONTACT DETAILS Telephone 0191 433 3416 / 0191 433 3426 Fax 0191 477 8422
More informationCorridor Goals and Objectives
Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty
More informationSite Deliverability Statement Development at: Bridgnorth Road, Much Wenlock. Persimmon Homes October 2013
Site Deliverability Statement Development at: Bridgnorth Road, Much Wenlock Persimmon Homes October 2013 Contents Site Deliverability Statement Development at: Bridgnorth Road, Much Wenlock. 1.INTRODUCTION
More informationTree Management Policy
Tree Management Policy This policy is designed to be a policy framework for the management of trees owned and managed by the Connect HA. It sets out the guiding principles for managing our stock, to assist
More informationPLANNING & REGULATION COMMITTEE 16 JANUARY 2012
Division(s): Sutton Courtenay & Harwell Contact Officer: John Duncalfe (john.duncalfe@oxfordshire.gov.uk) Tel: 01865 815356 PLANNING & REGULATION COMMITTEE 16 JANUARY 2012 TO CRUSH, SCREEN, BLEND AND STOCK
More informationCroft House Lodge Tree Removal and Building Relocation Mitigation Report. November 2010
Croft House Lodge Tree Removal and Building Relocation Mitigation Report November 2010 1 A site meeting was held on 24/05/2010 at the site of the proposed Croft House Lodge Respite Centre, Carleton Road,
More informationRezoning case no. RZ15-08: Adam Development Properties, LP
PLANNING AND ZONING COMMISSION STAFF REPORT June 4, 2015 Rezoning case no. RZ15-08: Adam Development Properties, LP CASE DESCRIPTION: LOCATION: a request to amend the development plan of a previously-approved
More informationCONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13
Note: Please refer to the end of this document for guidance notes about completing this form Q1. What is the full postal address of the site? Your response Q2. Planning reference and revision number (if
More information2010 Salida Community Priorities Survey Summary Results
SURVEY BACKGROUND The 2010 Salida Community Priorities Survey was distributed in September in an effort to obtain feedback about the level of support for various priorities identified in the draft Comprehensive
More informationA Developer s Guide: Watershed-Wise Development
A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another
More informationCouncillor R. Hollingworth has requested that this application be considered by the Committee, rather than being determined under delegated powers.
Name of Applicant Type of Certificate Proposal Map/Plan Policy Plan Date Mr Timothy D. Hosking A Proposed extension to form bespoke living accommodation for disabled family member (As augmented by information
More information22.01 SETTLEMENT 24/04/2014 C73
22.01 SETTLEMENT 24/04/2014 C73 22.01-1 Urban Growth and Development 24/04/2014 C73 This policy applies to the urban areas and fringes of Portland, Heywood, Casterton, Dartmoor, Nelson, Cape Bridgewater,
More informationCathkin Relief Road Planning Statement
Cathkin Relief Road Planning Statement The Proposal This statement sets out the background to the Cathkin Relief Road project currently being progressed by South Lanarkshire Council. The project will provide
More informationConstruction Traffic Management Plan
Construction Traffic Management Plan Proposed Additional Classroom Accommodation for Woolacombe Primary School Produced for and on behalf of Built Environments Team Devon County Council NPS South West
More informationPrior Notification of Proposed Demolition Validation Checklist
Prior Notification of Proposed Demolition Validation Checklist Introduction Submitting your application can be made easier by ensuring you have submitted all of the necessary information. Should important
More informationSite Alternative Deliverability Report. SALT 033 Former Mid Wales Hospital, Talgarth Resubmission: Undeliverable. Local Development Plan
Local Development Plan Site Alternative Deliverability Report Brecon Beacons National Park Authority SALT 033 Former Mid Wales Hospital, Talgarth Resubmission: Undeliverable SALT 033 Former Mid Wales Hospital
More informationBLOCK 400 PLANNED COMMUNITY DISTRICT
BLOCK 400 PLANNED COMMUNITY DISTRICT Newport Center December 1983 Newport Beach, California Ordinance 88-119 Adopted December 12, 1988 Amendment No. 672 Resolution No. 95-115 Adopted October 9, 1995 Amendment
More informationLand at Cofton Lake Road Cofton Hackett
Land at Cofton Lake Road Cofton Hackett Prepared by Pegasus Planning Group Richborough Estates February 2009 Bir.3085 1 2 Introduction This Background Document has been produced on behalf of Richborough
More informationGUIDANCE ON PRE APPLICATION ADVICE
Issued 21 st May 2014 1. Introduction GUIDANCE ON PRE APPLICATION ADVICE 1.1 In line with national planning policy, the Council welcomes and encourages discussion before a developer submits an application
More information74 Rivington Street. Planning Statement JULY 2013 DP9. 100 Pall Mall. London SW1Y 5NQ. Tel: 020 7004 1700. Fax: 020 7004 1790
74 Rivington Street Planning Statement JULY 2013 DP9 100 Pall Mall London SW1Y 5NQ Tel: 020 7004 1700 Fax: 020 7004 1790 CONTENTS Page 1.0 Introduction 1 2.0 Site Description 2 3.0 The Proposed Development
More informationSt. Clair College Planning Area Introduction
Introduction What is the Study Area? St. Clair College Planning Area is bounded by Highway 3 to the west, Cabana Road to the north, the residential community of South Windsor to the east and Cousineau
More information8 DELIVERING THE MOVEMENT FRAMEWORK
8 DELIVERING THE MOVEMENT FRAMEWORK Introduction 8.1 The purpose of this section of the design code is to orchestrate the delivery of essential road infrastructure highlighted in the masterplan and movement
More informationMillennium Quarter Public Realm Guidance Manual 2008
Millennium Quarter Public Realm Guidance Manual 2008 Table of Contents Introduction Purpose of guide How to use this guide Background and Vision Studies Conservation and Heritage Biodiversity Strategic
More informationKey Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.
Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is
More informationGlossop Design & Place Making Strategy
Supplementary Planning Document to the High Peak Local Plan June 2011 Design Brief for the Town Hall Complex GILLESPIES I GERALD EVE Reproduced from the Ordnance Survey map with the permission of Ordnance
More informationKings Road, Beith. Development Brief. Part 1: Site Specific Information
Kings Road, Beith Development Brief Part : Site Specific Information Introduction Kings Road is a greenfield site on the north west edge of Beith and is currently let for grazing. The site is roughly rectangular
More information(Part 2 of 2) February 2016. 50511/JG/AJk
Kirklees Local Plan Representations in Support of site at Windy Bank Lane, Hightown (H596) (Part 2 of 2) KeyLand Developments Ltd February 2016 50511/JG/AJk Nathaniel Lichfield & Partners 3rd Floor 15
More informationDesign and Access Statement. 141-145 Earls Court Road London SW5 9RH
J U L I A N A R E N D T A S S O C I A T E S 1 7 a P i n d o c k M e w s L i t t l e V e n i c e L o n d o n W 9 2 P Y F + 4 4 2 0 7 2 8 6 9 9 0 1 Design and Access Statement T + 4 4 2 0 7 2 8 6 9 9 9 1
More informationDevelopment Brief Erskine Lodge Site, Great Whelnetham
Development Brief Erskine Lodge Site, Great Whelnetham Development Brief Contents 1.0 Introduction 2.0 Site Context 3.0 Development Constraints 4.0 Whelnetham Context Analysis 5.0 Development Opportunities
More informationPLANNING SUPPORT STATEMENT. 29 Fernshaw Road, London SW10 0TG MRS. GAIL TAYLOR & MRS. KAREN HOWES. Prepared For TR/6570
PLANNING SUPPORT STATEMENT 29 Fernshaw Road, London SW10 0TG Prepared For MRS. GAIL TAYLOR & MRS. KAREN HOWES November 2012 Contents 1 INTRODUCTION 1 THE APPLICATION PROPERTY AND SURROUNDING AREA 1 RELEVANT
More informationabcde Buckinghamshire County Council Report to: Development Control Committee AGENDA ITEM 8 Date 9 April 2002
abcde Report to: Buckinghamshire County Council Development Control Committee AGENDA ITEM 8 Date 9 April 2002 Title Author Electoral Divisions Affected Recommendation Resources Appraisal Proposed Demolition
More informationSt Albans Local Development Framework. Core Strategy: Spatial Strategy Options
Centre for Sustainability St Albans Local Development Framework Core Strategy: Spatial Strategy Options Sustainability Appraisal (incorporating Strategic Environmental Assessment) Working Note September
More informationRev Issue Status Prepared / Date Approved/Date. - Draft 1 LOA / 15.09.14 JSE / 19.09.14
Nancy Hawksworth Barn Conversion: Moor Farm, London Road, Shardlow, Derbyshire Bat Survey Report September 2014 FPCR Environment and Design Ltd Registered Office: Lockington Hall, Lockington, Derby DE74
More informationPLANNING STATEMENT. Somerset House / 14 Elmtree Road Teddington. on behalf of Ashill Developments Ltd. May 2010
PLANNING STATEMENT Somerset House / 14 Elmtree Road Teddington on behalf of Ashill Developments Ltd May 2010 2827 UK House, 82 Heath Road, Twickenham, Middlesex TW1 4BW T 020 8843 8211 F 020 8843 8219
More informationThames Water is pleased to comment on the proposed changes to the London Plan 2014.
Boris Johnson Mayor of London (London Plan) Greater London Authority City Hall More London The Queen s Walk London SE1 2AA Thames Water Property Services Your ref Our ref Name Phone Email London Plan Review
More informationWelcome & background. www.theperfumefactory.info
Welcome & background Essential Living welcomes you to this community involvement event introducing the proposed redevelopment of The Perfume Factory, North Acton. EXISTING SITE PLAN AERIAL VIEW OF SITE
More informationWe have consulted with internal and external. King Square Estate Newsletter. Regeneration Proposals
www.islington.gov.uk/housing Regeneration Proposals NOVEMBER 2014 Welcome to the third edition of the King Square newsletter, with the latest update on the King Square Estate regeneration project. This
More informationSCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY
SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY 1.0 Conditions and requirements for permits A permit to use and develop the
More informationSite Alternative Deliverability Report. SALT 034 Ty Nant, Groesffordd Resubmission: Deliverable. Local Development Plan
Local Development Plan Site Alternative Deliverability Report Brecon Beacons National Park Authority SALT 034 Ty Nant, Groesffordd Resubmission: Deliverable SALT 034 Ty Nant Groesffordd (Llanfrynach) Existing
More informationConstruction Traffic Management Plan
Introduction This (CTMP) has been prepared in order to discharge Condition 20 of planning permission ref 07/02879/EFUL for the enabling site works associated with the wider Bath Western Riverside development.
More informationDraft Winchester District Local Plan Part 2. Recommended Responses to Issues Raised WALTHAM CHASE
Draft Winchester District Local Plan Part 2 Recommended Responses to Issues Raised WALTHAM CHASE 1. A summary of all the representations on the draft Local Plan directly relating to Waltham Chase was presented
More information6 Streetscape character 6.1
6 6.1 6 Streetscape character Introduction Transport interchanges The TLRN is the strategic road network for London and varies in character across the capital. The variation of the land use across London
More informationDraft Site Development Brief: Land at HM Stanley Hospital, St Asaph
Draft Site Development Brief: Land at HM Stanley Hospital, St Asaph Strategic Planning and Housing September 2015 Content Page No. 1. Introduction 2 2. Document Status and Stages in Preparation 2 3. Site
More informationRAEBURN GARAGE, 118 RAEBURN AVENUE, SURBITON
RAEBURN GARAGE, 118 RAEBURN AVENUE, SURBITON DELIVERY AND SERVICING PLAN August 2015 Introduction This Delivery and Servicing Plan (DSP) has been prepared in relation to the proposed redevelopment of Raeburn
More informationOverview... Bus Options... Carpooling, Biking or Walking to School... Driving to Campus: The Loop... The Queue: Managing Lincoln Ave Traffic...
Overview... Bus Options... Carpooling, Biking or Walking to School... Driving to Campus: The Loop... The Queue: Managing Lincoln Ave Traffic... 2 3 4 5 6 What is the Queue?... 7 How the Queue and Loop
More informationDraft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT
Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT MAY 2015 1 Contents 1 INTRODUCTION 3 2 DRAFT NEW MUSEUMS SITE SPD 4 3 STRATEGIC ENVIRONMENTAL
More informationapproval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013
Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a
More informationMINUTES of a meeting of CABINET held on 13 October 2015 at County Hall, Matlock. PRESENT. Councillor A Western (in the Chair)
MINUTES of a meeting of CABINET held on 13 October 2015 at County Hall, Matlock. PRESENT Councillor A Western (in the Chair) Councillors D Allen, A Botham, D Collins, J A Coyle and P J Smith. Councillor
More informationWard: Purley DELEGATED BUSINESS MEETING Lead Officer: Head of Planning Control week of 23/03/2009
Ward: Purley DELEGATED BUSINESS MEETING Lead Officer: Head of Planning Control week of 23/03/2009 Application No. 09/00389/LP - 51-61 Whytecliffe Road South, Purley, CR8 1. SUMMARY 1.1 This report concerns
More informationDEVELOPMENT ASSESSMENT PANEL
of DEVELOPMENT ASSESSMENT PANEL Pursuant to the provisions of Section 56A of the Development Act 1993 as amended. TO BE HELD IN COMMITTEE ROOM, ELIZABETH SERVICE CENTRE 3 WINDSOR SQUARE, ELIZABETH ON TUESDAY
More informationHousehold waste & recycling storage requirements
South Gloucestershire Council Guidance for Developers on Household waste & recycling storage requirements INTRODUCTION As part of the Council s aim to improve the quality of life for residents as well
More informationWESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24
Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge
More informationHISTORIC LANDSCAPE LYTCHETT MINSTER SCHOOL STOWE SCHOOL COOMBE HOUSE TRACY PARK
New design in the context of a historic setting is an exciting challenge, allowing both modern and traditional design motifs to be used. Integrating new design having understood the history of the site
More informationThe Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603. Framework Residential Travel Plan
The Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603 Framework Residential Travel Plan September 2013 CONTROL SHEET CLIENT: PROJECT TITLE: REPORT TITLE: THE
More informationPOLICY P350.5 Trees on Development Sites and Street Verges. Relevant Management Practice Nil Relevant Delegation Delegations DC 342 and DM 342
POLICY P350.5 Trees on Development Sites and Street Verges Strategic Plan Goal 3 Environmental Management Relevant Management Practice Nil Relevant Delegation Delegations DC 342 and DM 342 Rationale Trees
More informationCoventry Development Plan 2016 Appendix 89. Glossary of Key Terms
Coventry Development Plan 2016 Appendix 89 Glossary of Key Terms Area Action Plan A Development Plan Document which focuses upon a specific location or an area subject to significant change. Affordable
More informationPre Application Engagement A guide to best practice
Pre Application Engagement A guide to best practice 1 Introduction Early engagement has significant potential to improve the efficiency and effectiveness of the planning application system for all parties.
More information