1 ENVIRONMENTAL IMPACT ASSESSMENT REPORT for Investment Proposal: BUILDING A NEW NUCLEAR UNIT OF THE LATEST CHAPTER 12: CONCLUSION OF THE TEAM AND TEAM LEADER PREPARING THE ASSESSMENT original copy PREPARED BY: NELLY GROMKOVA - TL VERJINIA DIMITROVA - PM VERSION: 03 VALIDATED BY: TZVETANKA DIMITROVA TQ CONTROL EXPERT DATE: AUGUST 2013
2 VERSION: 03 DATE: AUGUST 2013 PAGE: 2/5 12. CONCLUSION OF THE TEAM AND TEAM LEADER PREPARING THE ASSESSMENT The Environmental Impact Assessment Report outlines and assesses the impact of NNU on the environment and on human health. The EIAR includes detailed analysis, estimates and assessment of the impacts on all components and factors of the environment and also covers the health and hygiene aspects during construction, operation and decommissioning of the Investment Proposal for construction of a new nuclear unit of the latest generation at the Kozloduy NPP site. The Report was prepared in compliance with the requirements of the current legislation and regulations. Some specific measures have been proposed to reduce, prevent or fully eliminate the identified impacts on the environment and human health accounting also for the synergies of background gamma radiation. The major EIAR conclusions are as follows: During NNU construction The existing NPP Kozloduy infrastructure contributes to the safety of the staff during construction; Wastewater generated during construction will not deteriorate the quality of water in the Danube River; Subsurface layers will not be affected substantially by the implementation of the investment proposal; No impact is expected on the land use, mineral diversity, cultural heritage and protected natural areas; Deterioration of the landscape structure is negligible; No impact is expected on the biological diversity and on the areas inhabited by protected, significant and sensitive flora and fauna species; Noise and vibrations are restricted only within the territory of the NNU construction site and have no impact on the environment; No impact due to radiation factors related to the investment proposal during construction is expected as there are no significant, constant and non-regulated radioactive sources at that phase. The tools for non-destructive testing used in compliance with the safety measures shall not be considered as factor for radiation pollution of the working environment during construction of the new nuclear unit;
3 VERSION: 03 DATE: AUGUST 2013 PAGE: 3/5 During NNU operation The existing NPP Kozloduy infrastructure and the extensive experience and expertise in the operation of the power plant contribute to the safety both of the population and of the staff in the NNU operation; The potential radiation impact on the staff operating NNU is expected to be within the limits of the design requirements laid down in the Investment Proposal; In non-radiation aspect, the NNU operation throughout its 60-year lifetime will not have negative impact on the population within the 30 and 100-kilometer zone around the power plant; The health risk for the closest residential area for all the four alternatives sites proposed is insignificant; The gaseous and aerosol releases will not have any significant impact on the health status of the population within the 30-kilometer zone around NPP Kozloduy; Gas emissions from internal combustion engines of the special vehicles and trucks in the NNU area will be negligible; Accounting for the provided quantity of drinking water for NPP Kozloduy and the available reserve in the plant consumption that will be used by NNU, the impact on the total water consumption of NPP Kozloduy will be insignificant; Faecal, industrial and spent cooling wastewater will not affect the ecological status of the water in the Danube River; Non-radiation impact on the environmental components and factors is not Radiation impacts are not expected to occur on waters, land and soil, geological environment, subsoil, land use, mineral diversity, biological diversity, ecology and cultural resources; areas inhabited by protected, significant and sensitive flora and fauna species; scenic countryside; historic and cultural sites, sites protected by virtue of international or national law, or on the health of staff and population; No negative impact is expected from radioactive waste (RAW) if observing the decommissioning plans of the nuclear facility and all applicable Bulgarian and international legislative requirements and practices; The NNU contribution to the background gamma radiation in the area of the town of Kozloduy due to external radiation exposure is negligible even in cumulation with the existing nuclear facilities of the NPP Kozloduy site. The cumulative
4 VERSION: 03 DATE: AUGUST 2013 PAGE: 4/5 impact on the environment in radiation aspect is qualified as insignificant; no cumulative impact in non-radiation aspect is Transboundary impact is not expected. During decommissioning: No negative impact is expected to ensue on the population beyond the 2- kilometer zone during NNU decommissioning; Non-radiation impact on the environmental components and factors is not No radiation impacts are expected on waters, land and soil, geological environment, subsoil, land use, mineral diversity, biological diversity, ecology and cultural resources; areas inhabited by protected, significant and sensitive flora and fauna species; scenic countryside; historic and cultural sites, sites protected by virtue of international or national law, or on the health of staff and population; During decommissioning no cumulative impact due to non-radiation factors is No negative impact is expected from RAW if observing the decommissioning plans of the nuclear facility and all applicable Bulgarian and international legislative requirements and practices; Throughout all the three phases of implementation of the Investment Proposal: construction, operation and decommissioning, no transboundary impact has been identified for the Romanian territory within the 30-kilometer zone around NPP Kozloduy. Based on the analysis and impact assessment on all environmental components and factors, including the protection of biodiversity, resulting from the implementation of the Investment Proposal Construction of a new nuclear unit of the latest generation at the Kozloduy NPP site, the priority option for the construction of a new nuclear unit (NNU) is Site 2. As regards the choice of the type of reactor, a definite model cannot be identified since all the three technical solutions are feasible options for the implementation of the investment proposal. In consideration of the measures proposed by the experts, described in detail in Chapter 8 of the Environmental Impact Assessment Report, focused on observing the environmental quality standards and preventing any adverse effects on public and staff health, and in view of the conformity assessment of the Investment Proposal with the object and purpose of the conservation of protected areas, we hereby recommend to the High Expert Ecological Council of the Ministry of Environment and Water to approve the
5 VERSION: 03 DATE: AUGUST 2013 PAGE: 5/5 implementation of the investment proposal for Construction of a new nuclear unit of the latest generation at the Kozloduy NPP site on Site 2.
How To Conduct An Environmental Impact Assessment
Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot
Proposed Terms of Reference for EIA studies
1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.
Environmental Impact Assessment of Forestry Projects
Environmental Impact Assessment of Forestry Projects Flow chart of EIA process Developer submits grant application FC screens when sufficient info received, normally at "Proposal Submit stage Developer
ENVIRONMENTAL IMPACT ASSESSMENTS AND ENVIRONMENTAL IMPACT STATEMENTS
GOVERNMENT OF BERMUDA Department of Planning ENVIRONMENTAL IMPACT ASSESSMENTS AND Section 1: Introduction... 2 Section 2: What are Environmental Impact Assessments and Environmental Impact Statements and
AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES
AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES Question1 Read the following article from the Fremont Gazette and answer the questions that follow. (a) Identify and describe TWO water-related environmental
PROPOSED TERMS OF REFERENCE
Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed
TERMS OF REFERENCE FOR THE RAPID EIA STUDY
TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment
The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:
Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be
Results of Airborne Monitoring by the Ministry of Education, Culture, Sports, Science and Technology and the U.S. Department of Energy
May 6, 2011 Results of Airborne Monitoring by the Ministry of Education, Culture, Sports, Science and Technology and the U.S. Department of Energy The results of the Airborne Monitoring by the Ministry
Official Journal of the European Communities. (Acts whose publication is obligatory)
22.12.2000 L 327/1 I (Acts whose publication is obligatory) DIRECTIVE 2000/60/EC OF THE EUROPEAN PARLIAMT AND OF THE COUNCIL of 23 October 2000 establishing a framework for Community action in the field
APPENDIX 4. Risk Tables
APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The
Federal Law on Environmental Protection No. 7-FZ of January 10, 2002
Federal Law on Environmental Protection No. 7-FZ of January 10, 2002 Adopted by the State Duma December 20, 2001 Approved by the Federation Council December 26, 2001 Chapter I. General Provisions (Articles
COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO.
COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO. 6 RENEWABLE ENERGY Image Source: (Word Clip Art Stock Photo, 2011) Date: May, 2015 BACKGROUND PLANNING AND DEVELOPMENT SERVICES DEPARTMENT 789
Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION
EUROPEAN COMMISSION Brussels, XXX [ ] (2013) XXX draft Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION Providing minimum principles for the exploration and production of hydrocarbons (especially
Development proposals will require to demonstrate, according to scale, type and location, that they:-
Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on
Environmental Guidelines for Preparation of an Environmental Management Plan
2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF
Kristina Veidemane, Baltic Environmental Forum Panevezys, 12.05.2015
Priority 2 Protection and restoration of biodiversity and soil and promotion of ecosystem services, including through Natura 2000, and green infrastructure Kristina Veidemane, Baltic Environmental Forum
2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited
(IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]
PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions
PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY Introduction and Assumptions 1. The existing section 27 Mineral Extraction of the Zoning Ordinance would remain and continue
Exhibit SHN-029. Commission Mandatory Hearing SHINE Construction Permit Application Environmental Overview December 15, 2015
Exhibit SHN-029 Commission Mandatory Hearing SHINE Construction Permit Application Environmental Overview December 15, 2015 Development of the Environmental Report Began work October 2011 SHINE production
Environmental guidelines for preparation of an Environment Management Plan
Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use
12 ENERGY. 12.1 Introduction
12 Energy 12.1 Introduction Otago is a hydro-electric power producing region and a major exporter of electricity in New Zealand today. The two large existing hydro-electric schemes in the region, Roxburgh
Physical flow accounts: principles and general concepts
Physical flow accounts: principles and general concepts Julian Chow United Nations Statistics Division 1 st Sub-Regional Course on SEEA 23-27 September 2013 Malaysia SEEA Conceptual Framework Outside territory
Environmental Impact Assessment Report for a Nuclear Power Plant. February 2014
Environmental Impact Assessment Report for a Nuclear Power Plant February 2014 Contact information Party responsible for the project: Fennovoima Oy Postal address: Salmisaarenaukio 1, FI-00180 Helsinki,
Published in "Official Gazette of the Republic of Macedonia" No. 67/2004 LAW ON AMBIENT AIR QUALITY I. GENERAL PROVISIONS
Published in "Official Gazette of the Republic of Macedonia" No. 67/2004 LAW ON AMBIENT AIR QUALITY I. GENERAL PROVISIONS Article 1 Subject of regulation (1) This Law shall regulate the measures for avoidance,
ARIMNet 2 Call 2014-15
Coordination of the Agricultural Research In the Mediterranean Area Call i text ARIMNet 2 Call 2014-15 SUBMISSION Pre-proposal by December 1 st, 2014 Full Proposal by May 11 th 2015 on http://arimnet-call.eu/
Sec. 22a-1a page 1 (4-97)
Department of Environmental Protection Sec. 22a-1a page 1 (4-97) TABLE OF CONTENTS Connecticut Environmental Policy Act Definitions... 22a-1a- 1 Determination of sponsoring agency.... 22a-1a- 2 Determination
TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.
TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2
TERMS OF REFERENCE FOR SCOPING OF EIA STUDY
TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking
NASA Stennis Space Center Environmental Resources Document
16.0 Major Environmental Considerations for Proposed Actions All construction, rocket testing, and operations that may potentially impact environmental media, such as air, water, land, aquatic and biotic
Environmental Review Process
The Saskatchewan Natural Gas Advantage Workshop Environmental Review Process Bernie Ryma Environment & Sustainability TransGas February 24, 2010 Presentation Outline The presentation today will provide
FREQUENTLY ASKED QUESTIONS: National Response to I-131 from Japan Nuclear Power Plant March 27, 2011. Environmental Protection Agency (EPA)
FREQUENTLY ASKED QUESTIONS: National Response to I-131 from Japan Nuclear Power Plant March 27, 2011 Environmental Protection Agency (EPA) Are the levels we re seeing in precipitation likely to lead to
MINERALS AND ASSOCIATED WASTE APPLICATIONS APPLICATION FORM
MINERALS AND ASSOCIATED WASTE APPLICATIONS APPLICATION FORM 1. Applicant Details (See guidance note 1) 2. Agent Details Please complete if the applicant has an agent (See guidance note 2) * Title: * Forename:
./01&2/M./T34 1MP36T ST3T.M./T. 1a$t3l$4 536e-al4 13$7363 83%3te9. Sol9ara 1 Pro;ect. !"l$%e ( Mai$ &e(ort. Te-t. )e*te%,e- 2//0 :; <//0=>=?
./01&2/M./T34 1MP36T ST3T.M./T 1a$t3l$4 536e-al4 13$7363 83%3te9 Sol9ara 1 Pro;ect!"l$%e ( Mai$ &e(ort Te-t )e*te%,e- 2//0 :; =?@ ENVIRONMENTAL IMPACT STATEMENT VOLUME A: MAIN REPORT TEXT CR 7008_09_v4
ENVIRONMENTAL PLANNING REGIME: REGIONALITY IN THE FOREGROUND
ENVIRONMENTAL PLANNING REGIME: REGIONALITY IN THE FOREGROUND Róbert ROMÁN Department of Economics and Law, Institute of Economic Science Eszterházy Károly College, Egészségház u. 4, Eger 3300, Hungary
A. WASTE MANAGEMENT A.1. INTRODUCTION AND GENERAL ISSUES ON HAZARDOUS WASTES AND SOLID WASTES
A. WASTE MANAGEMENT A.1. INTRODUCTION AND GENERAL ISSUES ON HAZARDOUS WASTES AND SOLID WASTES The objective of the German government s policy on waste is to achieve a recyclingbased economy that conserves
ENVIRONMENT. Aviation. Property. Marine Services. Trading & Industrial. Beverages
ENVIRONMENT Our ultimate goal, which we first articulated in 2010, is for our operating companies to achieve zero net impact on the environment. We call this goal Net Zero. In, we developed a preliminary
Department of Environmental Engineering
Department of Environmental Engineering Master of Engineering Program in Environmental Engineering (International Program) M.Eng. (Environmental Engineering) Plan A Option 1: (1) Major courses: minimum
SANITATION COUNTRY PROFILE NORWAY
SANITATION COUNTRY PROFILE NORWAY Decision-Making Programmes and Projects Status Capacity-Building, Education, Training and Awareness-Raising Information Research and Technologies Financing Cooperation
International Action Plan On The Decommissioning of Nuclear Facilities
International Action Plan On The Decommissioning of Nuclear Facilities A. Introduction Decommissioning is defined by the International Atomic Energy Agency (the Agency) as the administrative and technical
Envision Framework and Rating System. Melissa Peneycad November 2015
Envision Framework and Rating System Melissa Peneycad November 2015 Outline 1 Introducing Envision 2 Two key ways to think about Envision 3 Become an Envision Sustainability Professional (ENV SP) Like
Aiding the Hydro-scheme development process. Web-links to useful information sources
Aiding the Hydro-scheme development process. Web-links to useful information sources Web-pages are in bold. These pages aim at providing developers, land-owners, decision makers and advisors with a collation
I. BASIC PROVISIONS. Subject of regulation
LAW ON ENVIRONMENTAL IMPACT ASSESSMENT Published in the Official Gazette of the Republic of Serbia, No. 135/2004 ( Službeni glasnik Republike Srbije, br. 135/04) I. BASIC PROVISIONS Subject of regulation
Sustainable Resource Management Ltd
6.0 Predicted nvironmental Impacts 6. Stages and Impacts Considered An nvironmental Impact Analysis has been carried out whereby all the possible environmental, socio economic and health & safety aspects
Summary of Credit Suisse s Sector Policies and Guidelines
ccc Summary of Credit Suisse s Sector Policies and Guidelines CONTENT INTRODUCTION SUMMARY OF FORESTRY AND AGRIBUSINESS POLICY SUMMARY OF MINING POLICY SUMMARY OF OIL AND GAS POLICY SUMMARY OF CONTROVERSIAL
ASEAN GREEN HOTEL STANDARD
FINAL ASEAN GREEN HOTEL STANDARD Presented to the Thirty-Fifth Meeting of the ASEAN National Tourism Organization (35 th ASEAN NTOs) 8-9 January 2012 Manado, Indonesia INDEX PAGE 1. Foreword... 1 2. Introduction...
Republic of Turkey. Date of acceptance: 9 November 2007 PART 1. Goal, scope, definitions and abbreviations. Goal and scope.
Republic of Turkey Unofficial Translation 1 of the Turkish Law No. 5710 2 Concerning the Construction and Operation of Nuclear Power Plants and the Sale of Energy Generated from Those Plants Date of acceptance:
Liability for ecological damage: the added value of the Environmental Liability Directive for nature conservation
Liability for ecological damage: the added value of the Environmental Liability Directive for nature conservation Valerie Fogleman Consultant, Stevens & Bolton LLP Professor of Law, Cardiff University
Amherst County Public Schools. AP Environmental Science Curriculum Pacing Guide. College Board AP Environmental Science Site
Amherst County Public Schools AP Environmental Science Curriculum Pacing Guide College Board AP Environmental Science Site REV: 8/12 1 st 9 weeks AP Objectives Energy Resources and Consumption A. Energy
CHAPTER 9 PERMITTING. 9.2 Scotland 102 9.2.1 Exemption 102 9.2.2 Waste management licence 102 9.2.3 PPC permit 102
CHAPTER 9 PERMITTING 9.1 England and Wales 100 9.1.1 T24 exemption for on-farm AD 100 9.1.2 T25 exemption for off-farm AD 100 9.1.3 Standard rules environmental permits 100 9.1.4 Standard rules for on-farm
NAPCS Product List for NAICS 54162: Environmental Consulting Services
NAPCS List for NAICS : Environmental Consulting Services National 1 Environmental consulting Providing objective information, advice, and guidance to clients concerning the preservation of air, water,
The IMES Master Programme
The IMES Master Programme The IMES Master Programme is built to reach the main goal of the Master, which is to provide to the students the professional skills required for private or public entities undertaking
Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description
Birmingham City University / Students Union and Impacts Register Waste Production of non - hazardous waste Production of hazardous waste Storage of non - hazardous waste Potential for waste to be disposed
ENVIRONMENTAL MANAGEMENT ACCOUNTING IMPLEMENTATION GUIDELINE
ENVIRONMENTAL MANAGEMENT ACCOUNTING IMPLEMENTATION GUIDELINE ENVIRONMENTAL MANAGEMENT ACCOUNTING IMPLEMENTATION GUIDELINE 1. Introduction This guideline follows the Implementation Rules for Company Environmental
LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT
LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government
The Environmental Conservation Law The Pyidaungsu Hluttaw Law No. 9 / 2012 The 8 th Waxing Day of Tagu, 1373 M. E. (30 th March, 2012)
The Environmental Conservation Law The Pyidaungsu Hluttaw Law No. 9 / 2012 The 8 th Waxing Day of Tagu, 1373 M. E. (30 th March, 2012) The Pyidaungsu Hluttaw hereby enacts this Law: Chapter I Title and
APPLICATION for ISO Certification (All Standards)
APPLICATION for ISO Certification (All Standards) Contents Section 1 General Information (Please complete this section for All standards) (Please complete ONLY the sections for the Standard(s) that you
LAKE OHRID CONSERVATION PROJECT (Case Study on Monitoring &Evaluation)
GLOBAL ENVIRONMENTAL FACILITY World Bank ALBANIAN NATIONAL ENVIRONMENTAL AGENCY MACEDONIAN MINISTRY OF ENVIRONMENT AND TERRITORY PLANNING Dr. Lirim Selfo Project Coordinator, Albania Mr. Dejan Panovski
NOTICE OF PREPARATION
PLANNING DIVISION CITY OF SUNNYVALE P.O. BOX 3707 SUNNYVALE, CA 94088-3707 NOTICE OF PREPARATION TO: Responsible, Trustee, and Other Interested Public Agencies FROM: Sunnyvale Community Development 456
HUGO BOSS ENVIRONMENTAL COMMITMENT. Our claim. Our approach
HUGO BOSS ENVIRONMENTAL COMMITMENT HUGO BOSS assumes responsibility for future generations. This entails that we also pursue our high standards for quality and performance in environmental protection.
Queen Lane Addition, Philadelphia, Pennsylvania is a building of approximately 25,000 ft². The client is Drexel University.
Page 1 of 5 INTRODUCTION Queen Lane Addition, Philadelphia, Pennsylvania is a building of approximately 25,000 ft². The client is Drexel University. Queen Lane Addition is described as follows: Medical
Design and Construction policy for sustainable buildings and Campus environments
ESTATES SUPPORT SERVICE Design and Construction policy for sustainable buildings and Campus environments 1.0 INTRODUCTION The Higher Education Funding Council for England, responding to Governmental direction,
The Strategic Environmental Assessment Directive: Guidance for Planning Authorities
The Strategic Environmental Assessment Directive: Guidance for Planning Authorities Practical guidance on applying European Directive 2001/42/EC on the assessment of the effects of certain plans and programmes
Water Services Act (119/2001)
NB: Unofficial translation Ministry of Agriculture and Forestry, Finland Water Services Act (119/2001) Chapter 1 General provisions Section 1 Objective (1) The objective of this Act is to ensure water
PROPASAL FROM FOR PUBLIC LIABILITY INSURANCE (For Industrial Risks and Storage Risks)
PROPASAL FROM FOR PUBLIC LIABILITY INSURANCE (For Industrial Risks and Storage Risks) LIABILITY OF THE COMPANY DOES NOT COMMENCE UNTIL THE PROPOSAL HAS BEEN ACCEPTED AND THE PREMIUM PAID THE TERRITORIAL
SPECIMEN COPY OF KEY CLAUSES/CONDITIONS OF PUBLIC LIABILITY POLICY
SPECIMEN COPY OF KEY CLAUSES/CONDITIONS OF PUBLIC LIABILITY POLICY Appendix 7b 1 WHEREAS the Insured by a proposal which shall be the basis of this Contract and be held as incorporated herein has applied
State of Qatar. Ministry of Environment. Intended Nationally Determined Contributions (INDCs) Report. November 19 th, 2015
State of Qatar Ministry of Environment Intended Nationally Determined Contributions (INDCs) Report November 19 th, 2015 State of Qatar is pleased to submit its Intended Nationally Determined Contributions
CHAPTER 24: ENVIRONMENTAL MANAGEMENT
Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document
BACHELORS DEGREE PROGRAMMES
BACHELORS DEGREE PROGRAMMES Bachelor of Science in Environment Management NUBES31101 Earth structure and Geo-process 60 00 60 04 NUBES31102 Atmospheric Environment and Physics 60 00 60 04 NUBES31103 Soil
Nuclear Energy of Ukraine - History
Nuclear Energy of Ukraine - History 1950-s Uranium Industry was started 1962 Ministry of Energy and Electrification of Ukraine was established(ukraine a Republic of Soviet Union) 1965 Unique Energy System
EBRD s Environmental & Social (E&S) Risk Management Procedures for Mortgage Lending
EBRD s Environmental & Social (E&S) Risk Management Procedures for Mortgage Lending Any EBRD partner Financial Intermediary (FI) must have clearly defined environmental and social management systems in
Environmental Management Plan
Environmental Management Plan This environmental management plan outlines Red Bus Services objectives and strategies for protecting the environment. This plan sets out how Red Bus Services intends to comply
Sustainable Tourism Management - an overview -
of Sustainable Tourism Management - an overview - Dr. Head of Dept of Tourism Dublin Institute of Technology Who are we? Dublin Institute of of Technology 6 x Faculties Faculty of of Tourism and and Food
HOW TO FUND BASIN MANAGEMENT PLANS? Invest in IWRM - it pays back!
HOW TO FUND BASIN MANAGEMENT PLANS? Invest in IWRM - it pays back! Jean-François DONZIER Permanent Technical Secretary of the International Network of Basin Organizations (INBO), General Manager of the
Toxic Municipal Waste Water Treatment
FINAL IC/24 February 2000 Recommendation concerning the Treatment of Municipal Waste Water 2 Recommendation concerning the Treatment of Municipal Waste Water The Commission, recalling Paragraph 1 of Article
American Forest Foundation (AFF) 2010-2015 Standards of Sustainability for Forest Certification
American Forest Foundation (AFF) 2010-2015 Standards of Sustainability for Forest Certification Standards Prologue The American Forest Foundation s (AFF) 2010-2015 Standards of Sustainability for Forest
National Planning Policy for Waste
National Planning Policy for Waste October 2014 Department for Communities and Local Government Crown copyright, 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this
Environmental Science Science Curriculum Framework. Revised 2005
Environmental Science Science Curriculum Framework Revised 2005 Course Title: Environmental Science Course/Unit Credit: 1 Course Number: 424020 Teacher Licensure: Please refer to the Course Code Management
Environmental impact assessment (EIA)
October 2005 Environmental impact assessment (EIA) a campaigner's guide What is this guide for? Environmental Impact Assessment (EIA) is a key aspect of many large scale planning applications. It is a
Environmental Protection: Environmental Protection Policies, Programs and Procedures REGDOC-2.9.1
Environmental Protection: Environmental Protection Policies, Programs and Procedures REGDOC-2.9.1 September 2013 Environmental Protection: Policies, Programs and Procedures Regulatory Document REGDOC-2.9.1
SUSTAINABLE ENERGY BLUEPRINT
SUSTAINABLE ENERGY BLUEPRINT A PLAUSIBLE STRATEGY FOR ACHIEVING A NO-NUCLEAR, LOW- CARBON, HIGHLY-EFFICIENT AND SUSTAINABLE ENERGY FUTURE The following statement outlines an ambitious but doable strategy
Minerals Regulatory Guidelines MG5. Guidelines for miners: tailings and tailings storage facilities in South Australia
Minerals Regulatory Guidelines MG5 Guidelines for miners: tailings and tailings storage facilities in South Australia Mineral Resources Group Division of Minerals and Energy Resources Primary Industries
St Albans Local Development Framework. Core Strategy: Spatial Strategy Options
Centre for Sustainability St Albans Local Development Framework Core Strategy: Spatial Strategy Options Sustainability Appraisal (incorporating Strategic Environmental Assessment) Working Note September
Environmental Accounting Guidelines
Environmental Accounting Guidelines 2002 March 2002 Ministry of the Environment Contents Introduction... 1 1. What is Environmental Accounting?... 3 1.1 Definition...3 1.2 Functions and Roles of Environmental
Master Program In Environmental Engineering
Master Program In Engineering The environmental engineering master program is a multidisciplinary curriculum aimed at engineering and science graduates who would like to pursue graduate studies to enhance
DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment
DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment Water Protection Bureau Name of Project: Applicant: Ueland Land Development LLC Type of Project: Proposed discharge of treated domestic wastewater
Climate Change and Sri Lanka. Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka
Climate Change and Sri Lanka Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka Asia Total Area: 65610 Km Land Area : 62705 Km Inland water : 2905 Km 2 Coastal
Environmental aspects of water fluoridation
KEY POINTS Fluorides are very common in the environment. Reviews of the literature and environmental impact assessments have found no evidence of any adverse environmental effects resulting from water.
Building Drought Resilience through Land and Water Management
Building Drought Resilience through Land and Water Management Request for Proposal for Development of strategic water infrastructure in selected sub-catchments of Lower Tana Basin, Kenya 1. Background
ENVIRONMENT MANAGEMENT PLAN
1.0 INTRODUCTION ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan has been developed with a view to bring down the levels of impacts during proposed mining activities In each of the areas of