Basics of Atrium Smoke Control

Size: px
Start display at page:

Download "Basics of Atrium Smoke Control"

Transcription

1 This article was published in ASHRAE Journal, June Copyright 2012 ASHRAE. Posted at This article may not be copied and/or distributed electronically or in paper form without permission of ASHRAE. For more information about ASHRAE Journal, visit www. ashrae.org. Basics of Atrium Smoke Control By John H. Klote, Ph.D., P.E., Fellow/Life Member ASHRAE Smoke is recognized as the major killer in building fires. Smoke control in large-volume spaces is based on a long history of experience and research going back to the 1881 Ring Theater fire in Vienna that killed 449 people. After that fire, the Austrian Society of Engineers conducted reduced-scale fire tests that showed how roof vents over the stage would have protected the audience from smoke. Thirty years later, such smoke vents worked as intended in the Palace Theater fire in Edinburgh, Scotland. In addition to such natural smoke venting, today there are a number of design approaches to deal with smoke in large-volume spaces. A large-volume space is a space that is at least two stories high such as an atrium, a sports arena, or an airplane hangar. In this article the term atrium is used in a generic sense to mean any large-volume space. This article is adapted from part of Chapter 15 of the new ASHRAE publication, Handbook of Smoke Control Engineering. 1 In this article, when a chapter number is mentioned, it is a chapter in this new handbook. Design Scenarios A design scenario is the outline of events and conditions that are critical to determining the outcome of alternate situations or designs. In addition to the fire location and heat release rate (HRR), a design scenario may include many other conditions such as the materials being burned, the weather, the status of the HVAC system, and doors that are opened and closed. A design analysis should include a number of design scenarios to provide a level of assurance that the smoke control system will operate as intended. Design fires need to be realistically selected as discussed in Chapter 5. In general, a design analysis needs to include design fires located in the atrium and in communicating spaces. A communicating space is one that has an open About the Author John H. Klote, Ph.D., P.E., is is an expert in smoke control technology in Leesburg, Va. 36 ASHRAE Journal ashrae.org June 2012

2 A B Smoke Layer Separated Space Separated Space Communicating Space Atrium (Large-Volume Space) Smoke Exhaust Is Not Shown Plume Communicating Space C Spaces Related to Atriums Smoke Layer D Fire in the Atrium Smoke Layer Balcony Spill Plume Smoke Exhaust Is Not Shown Smoke Exhaust Is Not Shown Window Plume This Room is Fully Involved in Fire Fire in a Communicating Space Figure 1: Fire locations for atrium smoke control analysis. Fully Developed Fire in a Room Open to the Atrium pathway to an atrium so that smoke from a fire either in the atrium or the communicating space can move from one to the other without restriction. Figure 1A illustrates these spaces. A separated space is one that is isolated from the atrium by smoke barriers (Figure 1A). For this handbook, a smoke barrier is a continuous membrane, either vertical or horizontal, that is designed and constructed to restrict the movement of smoke in conjunction with a smoke control system. Smoke movement at these smoke barriers can be controlled by pressurization or by compartmentation alone. Figure 1B shows a fire in the atrium with smoke rising above the fire to form a smoke layer under the ceiling of the atrium. The most widely used approach to atrium smoke control is smoke exhaust, but other approaches can also be used. Regardless of the smoke control approach, there is a distance around the fire where occupants cannot go because of the intensity of the fire. To determine the minimum distance that a person can be from a fire for a few minutes without unbearable pain see Chapter 6. For a scenario with the fire in the atrium, the design fire does not normally take into account any benefit of sprinklers. In spaces with high ceilings, the temperature of the smoke plume can drop so much that sprinklers may not activate or activation may be so delayed that the spray may evaporate before it reaches the fire. Information about the interaction of sprinklers with the smoke layer is in the Handbook of Smoke Control Engineering. For information about design fires, see Chapter 5. Smoke from a fire in a communicating space can flow into the atrium and form a balcony spill plume as shown in Figure 1C. This figure shows smoke blocking of parts of balconies above the fire. It is beyond the capability of smoke control technology to prevent such smoke blocking, but the balcony is not blocked away from the balcony spill plume (Figure 2).The comments earlier regarding the minimum distance that a person can be from a fire also apply here. For a scenario with the fire in a communicat- Smoke exhaust through a plenum with a suspended ceiling not recommended. The pressures produced by the exhaust flow through a plenum with a suspended ceiling can be high enough to lift ceiling tiles out of their frames. Such relocation of ceiling tiles could have an adverse impact on the performance of the smoke exhaust system. The effort involved with periodic testing of such a smoke exhaust system can be significantly increased due to the need for repair of suspended ceilings after testing. June 2012 ASHRAE Journal 37

3 ing space, the growth of the design fire generally stops upon sprinkler activation. Figure 1D shows a fully developed fire and smoke forming a window plume. A fully developed fire would not happen when a sprinkler system is operating properly. Because most new commercial buildings in the United States are fully sprinklered, design fire scenarios that include a fully developed fire are uncommon in the United States. In countries where fully sprinklered buildings are uncommon, design fire scenarios may include fully developed fires. It is also possible that some building owners or building managers may want the very high level of protection associated with a smoke control system that can handle even a fully developed fire. Design Approaches Design approaches that have been used for atrium smoke control are (1) natural smoke filling, (2) steady mechanical smoke exhaust, (3) unsteady mechanical smoke exhaust, (4) steady natural smoke venting, and (5) unsteady natural smoke venting. These approaches are discussed later. Airflow can also be used to control smoke flow in conjunction with these approaches, but care must be exercised because airflow has the potential to provide combustion air to the fire. Many design approaches are intended to prevent occupants from coming into contact with smoke. The idea is to control smoke so that it descends only to a predetermined height during the operation of the smoke control system. In many locations, there are code requirements for the predetermined height. This height is often in the range from 6 to 10 ft (1.83 to 3.05 m) above the highest walking surface that forms a portion of a required egress in the atrium. Other design approaches are intended to maintain a tenable environment when people come into contact with smoke. When the products of combustion are sufficiently diluted, the resulting diluted smoke can be tenable, and tenability analyses routinely deal with reduced visibility and exposure to toxic gases, heat and thermal radiation. See Chapter 6 for more information about tenability. The following discussion of design approaches address systems that are intended to prevent occupant contact with smoke, but these systems can be modified to ones that address tenability. Natural Smoke Filling This approach consists of allowing smoke to fill the atrium without any smoke exhaust or other smoke removal. For some spaces the smoke filling time with the design fire is more than sufficient for evacuation. The smoke filling time is the time from ignition until the smoke descends to the predetermined height. Applications that are appropriate for natural smoke filling are not common, because there needs to a very large space above the highest occupied level of the atrium. Any of the methods of analysis discussed below can be used for this system. It is essential that calculations of evacuation time Smoke exhaust is not shown. Smoke Layer Balcony Spill Plume Figure 2: Front view of balcony spill plume. include the times needed for recognition, validation and premovement as discussed in Chapter 4. Steady Mechanical Smoke Exhaust This is the most commonly used approach in North America. This system consists of mechanical smoke exhaust sized to keep the bottom of the smoke layer at the predetermined height for the design fire. Unsteady Mechanical Smoke Exhaust This approach also uses mechanical smoke exhaust, but the flow rate of the exhaust is less than steady mechanical exhaust such that the exhaust only slows the rate of smoke layer descent for a time that allows occupants to safely egress from the space. This method needs to maintain at least the predetermined height mentioned previously for the time it takes the occupants to safely evacuate. The considerations about calculation evacuation time for natural smoke filling systems also apply here. Steady Natural Venting As previously mentioned, this kind of venting has a history going back to the Ring Theater fire of This approach is not common in the United States, but it is common in Europe, Australia, New Zealand and Japan. Rather than exhaust fans, this approach uses non-powered smoke vents at or near the top of the atrium. Often this kind of venting is called gravity venting because the smoke is vented due to buoyancy. The flow rate of the smoke through the vents needs to be such that the bottom of the smoke layer is kept at the predetermined height for an indefinite time. The previous comments regarding the predetermined height also apply here. An equation for the steady mass flow rate through a natural vent is discussed later. It is recommended that steady natural venting systems be analyzed with the aid of a computational fluid dynamics (CFD) model, discussed in Chapter 20. Unsteady Natural Venting This approach is like steady natural venting except the smoke venting rate is such that it only slows the rate of smoke layer descent for a time that allows occupants to safely egress from the space. This method needs to maintain at least the 38 ASHRAE Journal ashrae.org June 2012

4

5 A Ceiling Jet B Exhaust Uniform Smoke Layer Transition Zone Plume Smoke Layer Interface Plume Smoke Exhaust Not Shown Fire Fire Atrium Fire Zone Model Idealization of an Atrium Fire Figure 3: Sketch of an idealized zone model representation of an atrium fire. predetermined height mentioned previously for the time it takes the occupants to safely evacuate. It also is recommended that unsteady natural venting systems be analyzed with the aid of a CFD model. The considerations about calculation evacuation time for natural smoke filling systems also apply here. Methods of Analysis The methods that can be used for analysis of atrium smoke control systems are algebraic equations, zone fire modeling, CFD modeling and scale modeling. Algebraic Equations Atrium smoke control makes use of many algebraic equations. Some of these are based on the fundamental principles of engineering, and others are empirical correlations based on experimental data. Equations for smoke filling, natural venting and the airflow velocity to prevent smoke backflow are discussed later in the chapter. Chapter 16 addresses the algebraic equations for steady mechanical smoke exhaust, and these equations are based on the zone fire model concepts discussed in the next section. In the following section on zone fire modeling, the discussion about smoke exposure in the transition zone also applies to systems designed with the algebraic equations of Chapter 16. When another method of analysis is used, algebraic equations are often used to determine starting points for the analysis. Zone Fire Modeling In an atrium fire, smoke flows upward in a plume that entrains air as it rises. When the plume reaches the ceiling, it turns and becomes a ceiling jet that flows under the ceiling (Figure 3A). Figure 3B shows an idealized zone model representation of an atrium fire. Zone fire models are simple models that consider a fire compartment to be divided into two zones: (1) a smoke layer and (2) a lower layer that is free or nearly free of combustion products. The smoke layer can change in size based on the mass flowing into and out of it. In a real fire, the temperature and concentration of contaminants vary throughout the smoke layer with the highest values tending to be near top of the smoke layer. In real fires, there is also a gradual transition zone between the smoke layer and the lower layer as shown in Figure 3A. In a zone fire model, the smoke layer has a uniform temperature and uniform concentrations. This means that the temperature at any place in the smoke layer is the same as everywhere else in the smoke layer, and the same can be said about the concentration of each contaminant. Zone fire models do not simulate the transition zone, but the bottom of the smoke layer is simulated as a horizontal plane called the smoke layer interface as shown in Figure 3B. The zone model considers the air a fraction of an inch (or centimeter) below the smoke layer interface to be as free of smoke as the rest of the lower layer. Occupants in the lower layer near the smoke layer interface will actually be in the transition zone exposed to some smoke. Unfortunately, neither zone fire models nor the algebraic equations of Chapter 16 can be used to evaluate this smoke exposure. It is believed that in many situations, conditions in the transition zone may be tenable. CFD modeling can be used to evaluate tenability at this location. Zone fire models do not simulate the time it takes for the plume to reach the ceiling, which is small in a normal size room but larger in an atrium. Empirical equations for this lag time are discussed later in this Chapter. Zone fire models do not simulate plume flow, but they use empirical equations to calculate plume temperature and the mass flow. Even with the previous limitations, zone fire models have proven to be very useful tools for many applications, but they must be used with care. Chapter 18 has more detailed information about zone fire models. CFD Modeling CFD consists of dividing a space of interest such as an atrium into a large number of cells, and using a computer program to solve the governing equations for each cell. CFD is 40 ASHRAE Journal ashrae.org June 2012

6

7 capable of highly realistic simulations. The plume, ceiling jet, smoke layer and the transition zone are all simulated by the CFD model. CFD models are capable of simulating plugholing, and they can simulate any adverse effects of makeup air velocity on plume formation. Plugholing is discussed later. CFD modeling requires a level of knowledge and experience beyond that of zone fire modeling, and CFD simulations typically require hours and sometimes days of computer time. For more information about this kind of modeling, see Chapter 20. Scale Modeling Scale modeling is capable of highly realistic simulations. This kind of modeling consists of conducting fire tests in a small model of the atrium or other facility, and converting the data from those tests to the full scale facility. Scale modeling is addressed in Chapter 21. Ceiling Jet Plume Figure 4: Minimum smoke layer depth. Minimum Smoke Layer Depth is 20% of Floor-to-Ceiling Height Flow Under Ceiling Jet Atrium Temperature For systems that rely on mechanical smoke exhaust, the temperature of the air below the smoke layer quickly approaches the outdoor temperature. This is because of the very large amounts of makeup air that enter the atrium. For design analysis of systems using mechanical smoke exhaust, the outside design temperature should be used for the ambient temperature of the atrium. As the gas temperatures increase, the density of the gas decreases, and the volumetric flow rate needed to maintain a constant mass flow increases. Atrium exhaust fans need to be sized for the maximum volumetric flow needed to control smoke for the design conditions. This maximum volumetric flow will happen when the summer outside design temperature is used for the ambient temperature of the atrium. For this reason, smoke exhaust fans need to be sized with an ambient temperature of the atrium equal to the summer outside design temperature. Minimum Smoke Layer Depth The minimum smoke layer depth needs to be 20% of the floor-to-ceiling height except when an engineering analysis using full scale data, scale modeling, or CFD modeling indicates otherwise. The formation of the minimum smoke layer depth is shown in Figure 4. When a smoke plume reaches the ceiling, the smoke flows away from the point of impact in a radial direction forming a ceiling jet. When the ceiling jet reaches a wall the smoke flow turns down and flows back under the ceiling jet. The ceiling jet has a depth of about 10% of the floor-toceiling height, and the smoke flow under the ceiling jet is also about 10% of the floor-to-ceiling height. This means that the smoke layer depth is about 20% of the floor-to-ceiling height. Makeup Air Makeup air is outdoor air either supplied by openings to the outside or by mechanical fans. For systems that have fan powered smoke exhaust, makeup air needs to be provided by mechanical fans or by openings to the outside. Makeup air has to be provided so that the exhaust fans can remove the design quantities of smoke and that the door opening force requirements are not exceeded. Makeup air must be supplied far enough below the smoke layer interface so that it does not disrupt the smoke layer. When providing makeup air through openings to the outside, some air also flows by way of leakage paths. The large openings (such as vents, doors and windows) need to open automatically on system activation. The leakage paths consist of construction cracks, gaps around closed doors, gaps around closed windows, and other similar small paths. The large openings should be sized to provide about 85% to 95% of the makeup air with the rest coming through the leakage paths. When makeup air is provided by mechanical fans, the makeup air should be less than the mass flow rate of the mechanical smoke exhaust. It is recommended that makeup air for fan powered smoke exhaust systems be designed at 85% to 95% of the exhaust. The idea is that the remaining air (5% to 15%) will enter the large-volume space through leakage paths preventing positive pressurization of the atrium. The makeup air must not exceed 200 fpm (1.02 m/s) where the makeup air could come into contact with the plume unless a higher makeup air velocity is supported by an engineering analysis. The primary reason for this 200 fpm (1.02 m/s) limit is to prevent significant deflection of the plume and disruption of the smoke layer. 2 Deflection of the plume results in increased air entrainment that can cause smoke control system failure. A secondary reason for this velocity restriction is that it reduces the potential for fire growth and spread due to airflow. The 200 fpm (1.02 m/s) limitation is not relevant in communicating spaces one story high that are sprinklered. At these locations, successfully sprinklered fires do not form plumes as they would in the atrium, and successfully sprinklered fires limit fire growth. However, air introduced in a communicat- 42 ASHRAE Journal ashrae.org June 2012

8

9 A Exhaust Fan B Exhaust Fan Plugholing of Air Into Smoke Exhaust It Cannot Be Seen, But The Fan is Still Pulling Air Into the Smoke Exhaust Smoke Layer Height Falling Due to Plugholing Figure 5: Plugholing causing the smoke layer to fall below the intended height. Smoke Below the Intended Height Due to Plugholing ing space needs to slow down to meet the 200 fpm (1.02 m/s) limitation when it reaches the atrium. For example, consider makeup air supplied to the communicating space on the ground floor of Figure 1A. The makeup air enters the communicating space at a velocity above the limitation. A jet of supply air forms as it would from an HVAC diffuser. The velocity of this jet needs to drop to 200 fpm (1.02 m/s) or less when it reaches the atrium space. The design calculations need to include velocity calculations of this makeup air jet at the point where it reaches the atrium. When makeup air is provided by openings to the outside, the design analysis of the system needs to address wind effects as discussed below. Wind Atrium smoke control systems need to be designed to minimize the potential for wind to result in: (1) velocities greater than 200 fpm (1.02 m/s) where the makeup air could come into contact with the plume, and (2) smoke feedback from the smoke exhaust (or smoke vents) into the makeup air. When makeup air openings face in different directions, wind forces can result in velocities exceeding 200 fpm (1.02 m/s) inside the atrium. The wind can blow into openings facing one direction and out the other openings. A simple approach for minimizing wind effects inside an atrium is to have all the makeup air openings face in the same direction. Another simple approach is using mechanical fans for both smoke exhaust and makeup air such that the impact of the wind is minimized. When such simple approaches are not feasible, a detailed analysis is needed that takes into account the prevailing wind directions. Such an analysis can be done with a network model or a CFD model. Smoke can be carried by the wind from the smoke exhaust or from smoke vents to makeup air openings or inlets. The simple approach to minimize the potential for this is to locate the smoke exhaust (or vents) and makeup air openings (or inlets): (1) far away from each other, and (2) such that the prevailing wind directions carry the smoke away from makeup air openings (or inlets). When this simple approach is not feasible, CFD analysis or wind tunnel analysis is needed to evaluate the potential for smoke feedback into the atrium. Plugholing Plugholing is a phenomenon where air from below the smoke layer is pulled through the smoke layer into the smoke exhaust. Plugholing can cause system failure, but it can be easily prevented. Plugholing reduces the exhaust from the smoke layer, which tends to lower the smoke layer and expose occupants to smoke. The following discussion of plugholing applies to steady mechanical smoke exhaust systems. Figure 5A shows a smoke layer that is at the intended design height, but the layer is still descending due to plugholing. As the smoke layer depth increases, the buoyancy forces of the smoke layer increase, and the amount of plugholing decreases. Eventually, the smoke layer becomes deep enough that a state of equilibrium is achieved with a constant smoke layer height as shown in Figure 5B. Plugholing has resulted in a smoke layer below what was intended. The important forces for plugholing are the kinetic forces of the smoke exhaust and the buoyancy forces of the smoke layer. When kinetic forces dominate, there will be plugholing. When the buoyancy forces dominate, there will be no plugholing. The kinetic forces depend on the flow rate of the smoke exhaust, and the buoyancy forces depend on the temperature and depth of the smoke layer. When these forces are balanced at an exhaust inlet, the flow at that inlet is the maximum that can be achieved without plugholing. Plugholing can be prevented by using a number of smoke exhaust inlets such that the flow rate at each inlet is at or below this maximum value. 44 ASHRAE Journal ashrae.org June 2012

10

11 There is an empirical equation in Chapter 16 for the maximum volumetric flow rate that can happen at an exhaust inlet without plugholing. This equation and the earlier discussion also apply to systems that use natural venting. Scale modeling and CFD modeling can simulate plugholing without the use for the empirical maximum flow rate equation of Chapter 16. This empirical equation can be conservative, and it is possible that an analysis using scale modeling or CFD modeling would result in a lower number of exhaust inlets than an analysis using the empirical equation. Stratification A hot layer of air can form under the ceiling of an atrium due to solar radiation on the atrium roof. The temperature of such a layer can be 120 F (50 C) or more. When the aver- age temperature of the plume is less than that of the hot air layer, a stratified smoke layer can form under the hot air layer preventing smoke from reaching ceiling-mounted smoke detectors. If smoke stratification can occur, projected beam smoke detectors should be used, and three arrangements of these detectors are discussed in the handbook. Control and Operation Atrium smoke control systems must be activated automatically to quickly provide smoke protection for the occupants. For atria where smoke stratification can happen, projected beam smoke detectors should be used as mentioned previously. Some other methods of system activation are ceiling mounted smoke detectors, heat detectors and sprinkler water flow. The smoke control system needs to reach full operation before conditions in the atrium reach the design conditions. Determination of the time for the system to become operational needs to take into account (1) the time for detection of the fire and (2) the HVAC system activation time including shut-down and start-up of air-handling equipment, opening and closing dampers, and opening and closing natural ventilation devices. A means of manually starting and stopping the smoke control system needs to be provided at a location acceptable to the fire department. These manual controls need to be able to override the automatic controls. For general information about controls of smoke control systems see Chapter 8. References 1. Klote, J.H Handbook of Smoke Control Engineering. Atlanta: ASHRAE. 2. Hadjisophocleous, G., J. Zhou Evaluation of atrium smoke exhaust make-up air velocity. ASHRAE Transactions, Part ASHRAE Journal June 2012

12

Validation of Modeling Tools for Detection Design in High Airflow Environments

Validation of Modeling Tools for Detection Design in High Airflow Environments Validation of Modeling Tools for Detection Design in High Airflow Environments Joshua B. Dinaburg Dr. Jason Floyd, Ph.D. Dr. Sai Thumuluru, Ph.D FM Global MODELING DETECTION RESPONSE Establish validated

More information

CFD Grows Up! Martin W. Liddament Ventilation, Energy and Environmental Technology (VEETECH Ltd) What is Computational Fluid Dynamics?

CFD Grows Up! Martin W. Liddament Ventilation, Energy and Environmental Technology (VEETECH Ltd) What is Computational Fluid Dynamics? CIBSE/ASHRAE Meeting CFD Grows Up! Martin W. Liddament Ventilation, Energy and Environmental Technology (VEETECH Ltd) 10 th December 2003 What is Computational Fluid Dynamics? CFD is a numerical means

More information

Basic Selection & Proper Application of Overhead Air Distribution Devices

Basic Selection & Proper Application of Overhead Air Distribution Devices Basic Selection & Proper Application of Overhead Air Distribution Devices GRD Selection & Application Terms Selection Throw Sound Installation Variations affect Performance Inlet Effects Basics Return

More information

Australian/New Zealand Standard

Australian/New Zealand Standard Australian/New Zealand Standard The use of ventilation and air conditioning in buildings - Part 1: Fire and smoke control in buildings UPDATED AS/NZS 1668.1:2015 What is the scope of this Standard? The

More information

Piotr Tofiło a,*, Marek Konecki b, Jerzy Gałaj c, Waldemar Jaskółowski d, Norbert Tuśnio e, Marcin Cisek f

Piotr Tofiło a,*, Marek Konecki b, Jerzy Gałaj c, Waldemar Jaskółowski d, Norbert Tuśnio e, Marcin Cisek f Available online at www.sciencedirect.com Procedia Engineering 57 (2013 ) 1156 1165 11th International Conference on Modern Building Materials, Structures and Techniques, MBMST 2013 Expert System for Building

More information

ON MOST schemes, the architectural design of. Flexible strategy. Case study. The Forum

ON MOST schemes, the architectural design of. Flexible strategy. Case study. The Forum Flexible strategy ON MOST schemes, the architectural design of a building is influenced by fire engineering strategy. This could be in the form of visual, physical elements such as fire doors, fire curtains,

More information

Case Studies: Infrared Heating in Industrial Applications

Case Studies: Infrared Heating in Industrial Applications Case Studies: Infrared Heating in Industrial Applications Chao Chen, Puget Sound Energy ABSTRACT Puget Sound Energy (PSE) is a utility which serves more than one million electric customers and over 700,000

More information

Eco Pelmet Modelling and Assessment. CFD Based Study. Report Number 610.14351-R1D1. 13 January 2015

Eco Pelmet Modelling and Assessment. CFD Based Study. Report Number 610.14351-R1D1. 13 January 2015 EcoPelmet Pty Ltd c/- Geoff Hesford Engineering 45 Market Street FREMANTLE WA 6160 Version: Page 2 PREPARED BY: ABN 29 001 584 612 2 Lincoln Street Lane Cove NSW 2066 Australia (PO Box 176 Lane Cove NSW

More information

DESIGN OF NATURAL VENTILATION WITH CFD CHAPTER SEVEN. Qingyan Chen. difficult to understand and model, even for simple

DESIGN OF NATURAL VENTILATION WITH CFD CHAPTER SEVEN. Qingyan Chen. difficult to understand and model, even for simple CHAPTER SEVEN L. Glicksman and J. Lin (eds), Sustainable Urban Housing in China, 116-123 2006 Springer. Printed in the Netherlands. DESIGN OF NATURAL VENTILATION WITH CFD Qingyan Chen INTRODUCTION As the

More information

Problem Statement In order to satisfy production and storage requirements, small and medium-scale industrial

Problem Statement In order to satisfy production and storage requirements, small and medium-scale industrial Problem Statement In order to satisfy production and storage requirements, small and medium-scale industrial facilities commonly occupy spaces with ceilings ranging between twenty and thirty feet in height.

More information

Methods for Effective Room Air Distribution. Dan Int-Hout Chief Engineer, Krueger Richardson, Texas

Methods for Effective Room Air Distribution. Dan Int-Hout Chief Engineer, Krueger Richardson, Texas Methods for Effective Room Air Distribution Dan Int-Hout Chief Engineer, Krueger Richardson, Texas Agenda Overview LEED issues and Update Perimeter Acoustics Thermal Comfort IAQ / Standard 62.1 Update

More information

NUMERICAL SIMULATION OF FLOW FIELDS IN CASE OF FIRE AND FORCED VENTILATION IN A CLOSED CAR PARK

NUMERICAL SIMULATION OF FLOW FIELDS IN CASE OF FIRE AND FORCED VENTILATION IN A CLOSED CAR PARK FACULTY OF ENGINEERING NUMERICAL SIMULATION OF FLOW FIELDS IN CASE OF FIRE AND FORCED VENTILATION IN A CLOSED CAR PARK Xavier Deckers, Mehdi Jangi, Siri Haga and Bart Merci Department of Flow, Heat and

More information

SMOKE HAZARD ASSESSMENT USING COMPUTATIONAL FLUID DYNAMICS (CFD) MODELLING

SMOKE HAZARD ASSESSMENT USING COMPUTATIONAL FLUID DYNAMICS (CFD) MODELLING SMOKE HAZARD ASSESSMENT USING COMPUTATIONAL FLUID DYNAMICS (CFD) MODELLING Baldev S Kandola and Mark Morris AEA Consultancy Services (SRD), Thomson House, Risley, Warrington, Cheshire WA3 6AT Fire is a

More information

Single-Ended Reflected Beam Smoke Detector

Single-Ended Reflected Beam Smoke Detector A P P L I C A T I O N S G U I D E Single-Ended Reflected Beam Smoke Detector APPLICATIONS GUIDE: SINLGE-ENDED REFLECTED BEAM SMOKE DETECTOR Single-Ended Reflected Beam Smoke Detector Contents Section 1:

More information

CHAPTER 4 VENTILATION

CHAPTER 4 VENTILATION CHAPTER 4 VENTILATION SECTION 401 GENERAL 401.1 Scope. This chapter, in conjunction with the building code, shall govern the ventilation of spaces within a building intended to be occupied. Mechanical

More information

Fire Development and Fire Behavior Indicators

Fire Development and Fire Behavior Indicators Battalion Chief Ed Hartin, MS, EFO, MIFireE, CFO Introduction Building Factors, Smoke, Air Track, Heat, and Flame (B-SAHF) are critical fire behavior indicators. Understanding the indicators is important,

More information

I. Basic Smoke Control Strategy and Tactics

I. Basic Smoke Control Strategy and Tactics 1 2 Contents I. Basic Smoke Control Strategy and Tactics... 3 Introduction... 3 Balanced strategy... 3 Smoke control tactics... 5 Compartmentation containment Dampers... 5 II. Engineered Smoke Control

More information

How To Model With Cfd Using Phoenics

How To Model With Cfd Using Phoenics The Use and Application of CFD in the Air Conditioning and Fire Protection Industry AIRAH NSW February 2008 The Use and Application of CFD in the Air Conditioning and Fire Protection Industry An Introduction

More information

Heating Load Calculation

Heating Load Calculation Heating Load Calculation ME 425 Air Conditioning System Design Keith E. Elder, P.E. Heating Load Calculation The heating load calculation begins with the determination of heat loss through a variety of

More information

HVAC Calculations and Duct Sizing

HVAC Calculations and Duct Sizing PDH Course M199 HVAC Calculations and Duct Sizing Gary D. Beckfeld, M.S.E., P.E. 2007 PDH Center 2410 Dakota Lakes Drive Herndon, VA 20171-2995 Phone: 703-478-6833 Fax: 703-481-9535 www.pdhcenter.com An

More information

Fire and Rescue Service Operational Guidance. GRA 5.8 flashover, backdraught and fire gas ignitions

Fire and Rescue Service Operational Guidance. GRA 5.8 flashover, backdraught and fire gas ignitions Fire and Rescue Service Operational Guidance GRA 5.8 flashover, backdraught and fire gas ignitions Generic Risk Assessment 5.8 Flashover, backdraught and fire gas ignitions August 2009 London: TSO Published

More information

EFA PSBP. Natural Ventilation Strategy. Introduction. 1.1 Relevant legislation. 1.1.1 The Building Regulations 2010

EFA PSBP. Natural Ventilation Strategy. Introduction. 1.1 Relevant legislation. 1.1.1 The Building Regulations 2010 EFA PSBP Natural Ventilation Strategy Introduction The Baseline Designs Project will provide scheme design details for a number of Primary and Secondary School Exemplars. For the purposes of setting a

More information

Pollution CO CO 2. Carbonaceo us soot H 2 S, NOX, SO2

Pollution CO CO 2. Carbonaceo us soot H 2 S, NOX, SO2 Pollution CO CO 2 Carbonaceo us soot H 2 S, NOX, SO2 The National Building Code (NBC) contains set of minimum provisions, designed to protect the safety of the public with regard to structural sufficiency,

More information

Wyoming State Capitol Building Restoration and Modernization

Wyoming State Capitol Building Restoration and Modernization Wyoming State Capitol Building Restoration and Modernization Level I / II Life Safety and Fire Protection Assessment 25 September 2013 Presentation Overview Project Overview Applicable Codes Non-Conformance

More information

Mechanical and Natural Ventilation

Mechanical and Natural Ventilation BBSE3006: Air Conditioning and Refrigeration II http://www.hku.hk/bse/bbse3006/ Mechanical and Natural Ventilation Dr. Sam C. M. Hui Department of Mechanical Engineering The University of Hong Kong E-mail:

More information

INITIAL ASSESSMENT OF THE IMPACT OF JET FLAME HAZARD FROM HYDROGEN CARS IN ROAD TUNNELS AND THE IMPLICATION ON HYDROGEN CAR DESIGN

INITIAL ASSESSMENT OF THE IMPACT OF JET FLAME HAZARD FROM HYDROGEN CARS IN ROAD TUNNELS AND THE IMPLICATION ON HYDROGEN CAR DESIGN INITIAL ASSESSMENT OF THE IMPACT OF JET FLAME HAZARD FROM HYDROGEN CARS IN ROAD TUNNELS AND THE IMPLICATION ON HYDROGEN CAR DESIGN Wu, Y Department of Chemical and Process Engineering, University of Sheffield,

More information

Flexibility, Efficiency In San Antonio Arena

Flexibility, Efficiency In San Antonio Arena 2005, American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (www.ashrae.org). Reprinted by permission from ASHRAE Journal, (Vol. 47, No. 9, September 2005). This article may not

More information

Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001

Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001 Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001 Presented by: Liberty Engineering, LLP 1609 Connecticut Avenue

More information

CAN DEMAND CONTROLLED VENTILATION REPLACE SPACE HEATING IN OFFICE BUILDINGS WITH LOW HEATING DEMAND?

CAN DEMAND CONTROLLED VENTILATION REPLACE SPACE HEATING IN OFFICE BUILDINGS WITH LOW HEATING DEMAND? Topic B3: Control of indoor environment CAN DEMAND CONTROLLED VENTILATION REPLACE SPACE HEATING IN OFFICE BUILDINGS WITH LOW HEATING DEMAND? Axel CABLE 1,*, Mads MYSEN 1,2, Kari THUNSHELLE 1 1 SINTEF,

More information

Unique Airflow Visualization Techniques for the Design and Validation of Above-Plenum Data Center CFD Models

Unique Airflow Visualization Techniques for the Design and Validation of Above-Plenum Data Center CFD Models Unique Airflow Visualization Techniques for the Design and Validation of Above-Plenum Data Center CFD Models The MIT Faculty has made this article openly available. Please share how this access benefits

More information

SPECIAL APPLICATIONS

SPECIAL APPLICATIONS Page 1 SPECIAL APPLICATIONS The protection of microelectronics clean rooms using aspirating smoke detection systems requires special consideration. The physical configuration of the room(s) and the direction

More information

Requirements for Hydrogen Storage and Use

Requirements for Hydrogen Storage and Use Requirements for Hydrogen Storage and Use I. INTRODUCTION Fire and Life-Safety Group (FLS) The following is a summary of the fire and building code requirements for the storage and use of hydrogen. These

More information

Enclosure and Airflow Management Solution

Enclosure and Airflow Management Solution Enclosure and Airflow Management Solution CFD Analysis Report Des Plaines, Illinois December 22, 2013 Matt Koukl- DECP Mission Critical Systems Affiliated Engineers, Inc. Contents Executive Summary...

More information

Fundamentals of CFD and Data Center Cooling Amir Radmehr, Ph.D. Innovative Research, Inc. radmehr@inres.com

Fundamentals of CFD and Data Center Cooling Amir Radmehr, Ph.D. Innovative Research, Inc. radmehr@inres.com Minneapolis Symposium September 30 th, 2015 Fundamentals of CFD and Data Center Cooling Amir Radmehr, Ph.D. Innovative Research, Inc. radmehr@inres.com Learning Objectives 1. Gain familiarity with Computational

More information

SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP

SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP research journal 2013 / VOL 05.01 www.perkinswill.com SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP ARCHITECTURE AND ENGINEERING OF SUSTAINABLE BUILDINGS Current Trends in Low-Energy HVAC Design

More information

SECTION EG. Engineering Guide Air Distribution. Please refer to the Price Engineer s HVAC Handbook for more information on Air Distribution.

SECTION EG. Engineering Guide Air Distribution. Please refer to the Price Engineer s HVAC Handbook for more information on Air Distribution. SECTION EG Air Distribution Please refer to the Price Engineer s HVAC Handbook for more information on Air Distribution. Space Air Diffusion AIR DISTRIBUTION ENGINEERING GUIDE Proper selection of air diffusion

More information

Building Code Clarifications - 7. Fire Resistance

Building Code Clarifications - 7. Fire Resistance Building Code Clarifications - 7. Fire Resistance 7.1 (15-12-030) Use of combustibles in Type III construction roof assemblies Code Section (15-12-030) Use of Combustibles was revised on May 17, 2000,

More information

Benefits of Cold Aisle Containment During Cooling Failure

Benefits of Cold Aisle Containment During Cooling Failure Benefits of Cold Aisle Containment During Cooling Failure Introduction Data centers are mission-critical facilities that require constant operation because they are at the core of the customer-business

More information

Principles of Ventilation. Patrick N. Breysse, PhD, CIH Peter S.J. Lees, PhD, CIH Johns Hopkins University

Principles of Ventilation. Patrick N. Breysse, PhD, CIH Peter S.J. Lees, PhD, CIH Johns Hopkins University This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike License. Your use of this material constitutes acceptance of that license and the conditions of use of materials on this

More information

How To Improve Energy Efficiency Through Raising Inlet Temperatures

How To Improve Energy Efficiency Through Raising Inlet Temperatures Data Center Operating Cost Savings Realized by Air Flow Management and Increased Rack Inlet Temperatures William Seeber Stephen Seeber Mid Atlantic Infrared Services, Inc. 5309 Mohican Road Bethesda, MD

More information

Circulator Fan Performance Testing Standards BY CHRISTIAN TABER, BEMP, HBDP, MEMBER ASHRAE

Circulator Fan Performance Testing Standards BY CHRISTIAN TABER, BEMP, HBDP, MEMBER ASHRAE This article was published in ASHRAE Journal, September 2015. Copyright 2015 ASHRAE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically or in paper form without

More information

Air distribution effectiveness with stratified air distribution systems

Air distribution effectiveness with stratified air distribution systems Lee, K.S., Jiang, Z., and Chen, Q. 2009 Air distribution effectiveness with stratified air distribution systems, ASHRAE Transactions, 115(2). Air distribution effectiveness with stratified air distribution

More information

Overview. Introduction Cooling Tower Basics Principles of Operation Types of Cooling Towers Common Applications Design Considerations

Overview. Introduction Cooling Tower Basics Principles of Operation Types of Cooling Towers Common Applications Design Considerations Stephen Lowe ASHRAE Hampton Roads Chapter Past President AECOM Design Mechanical Engineering Discipline Manager, Virginia Beach Division Professional Engineer Commonwealth of Virginia, NCEES BSME University

More information

Thermal Mass Availability for Cooling Data Centers during Power Shutdown

Thermal Mass Availability for Cooling Data Centers during Power Shutdown 2010 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (www.ashrae.org). Published in ASHRAE Transactions (2010, vol 116, part 2). For personal use only. Additional reproduction,

More information

SAM HOUSTON STATE UNIVERSITY

SAM HOUSTON STATE UNIVERSITY PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the

More information

2013 Code_Saturne User Group Meeting. EDF R&D Chatou, France. 9 th April 2013

2013 Code_Saturne User Group Meeting. EDF R&D Chatou, France. 9 th April 2013 2013 Code_Saturne User Group Meeting EDF R&D Chatou, France 9 th April 2013 Thermal Comfort in Train Passenger Cars Contact For further information please contact: Brian ANGEL Director RENUDA France brian.angel@renuda.com

More information

Using Computational Fluid Dynamics (CFD) for improving cooling system efficiency for Data centers

Using Computational Fluid Dynamics (CFD) for improving cooling system efficiency for Data centers Data Centre Best Practises Workshop Using Computational Fluid Dynamics (CFD) for improving cooling system efficiency for Data centers Shishir Gupta 17 th March 2009 You are Here Introduction to CFD Data

More information

Benefits of. Air Flow Management. Data Center

Benefits of. Air Flow Management. Data Center Benefits of Passive Air Flow Management in the Data Center Learning Objectives At the end of this program, participants will be able to: Readily identify if opportunities i where networking equipment

More information

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal Ontario Fire Code SECTION 5.13 DIP TANKS Illustrated Commentary Office of the Ontario Fire Marshal Dip Tanks Illustrated Commentary 1 5.13.1. Location 5.13.1.1. Dip tank operations involving flammable

More information

Vestibule Case Study. Vestibule Requirement Intent [2003 IECC, 2006 IECC, 2003 IBC, 2006 IBC, 90.1-2001, 90.1-2004]

Vestibule Case Study. Vestibule Requirement Intent [2003 IECC, 2006 IECC, 2003 IBC, 2006 IBC, 90.1-2001, 90.1-2004] Vestibule Case Study [2003 IECC, 2006 IECC, 2003 IBC, 2006 IBC, 90.1-2001, 90.1-2004] Vestibule Requirement Intent Page 1 of 14 The primary intent behind the requirement for a vestibule is to reduce infiltration

More information

Development of Ventilation Strategy in Diesel Engine Power Plant by Using CFD Modelling

Development of Ventilation Strategy in Diesel Engine Power Plant by Using CFD Modelling Development of Ventilation Strategy in Diesel Engine Power Plant by Using CFD Modelling Panu Mustakallio and Risto Kosonen Halton Oy, Haltonintie 1-3, 47400 Kausala, Finland E-mail: panu.mustakallio@halton.com

More information

NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES

NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES 8.1 INTRODUCTION Testing, adjusting, and balancing of HVAC systems can best be accomplished by following a series of systematic procedures. The NEBB TAB

More information

VAV Laboratory Room Airflow The Lowdown on Turndown

VAV Laboratory Room Airflow The Lowdown on Turndown Technology Report March, 2003 VAV Laboratory The Lowdown on Turndown Turndown comparison of these two turndown ratios. Note the small actual airflow difference between them. control ranges are normally

More information

CFD STUDY OF TEMPERATURE AND SMOKE DISTRIBUTION IN A RAILWAY TUNNEL WITH NATURAL VENTILATION SYSTEM

CFD STUDY OF TEMPERATURE AND SMOKE DISTRIBUTION IN A RAILWAY TUNNEL WITH NATURAL VENTILATION SYSTEM CFD STUDY OF TEMPERATURE AND SMOKE DISTRIBUTION IN A RAILWAY TUNNEL WITH NATURAL VENTILATION SYSTEM J. Schabacker, M. Bettelini, Ch. Rudin HBI Haerter AG Thunstrasse 9, P.O. Box, 3000 Bern, Switzerland

More information

Calculation of Liquefied Natural Gas (LNG) Burning Rates

Calculation of Liquefied Natural Gas (LNG) Burning Rates Calculation of Liquefied Natural Gas (LNG) Burning Rates Carolina Herrera, R. Mentzer, M. Sam Mannan, and S. Waldram Mary Kay O Connor Process Safety Center Artie McFerrin Department of Chemical Engineering

More information

Performance Estimation of Water Thermal Energy Storage Tank by Using Simplified Simulation

Performance Estimation of Water Thermal Energy Storage Tank by Using Simplified Simulation Performance Estimation of Water Thermal Energy Storage Tank by Using Simplified Simulation M. Kubota, K. Sagara, T. Yamanaka, H. Kotani Division of Global Architecture, Graduate School of Engineering,

More information

Dealing with Thermal Issues in Data Center Universal Aisle Containment

Dealing with Thermal Issues in Data Center Universal Aisle Containment Dealing with Thermal Issues in Data Center Universal Aisle Containment Daniele Tordin BICSI RCDD Technical System Engineer - Panduit Europe Daniele.Tordin@Panduit.com AGENDA Business Drivers Challenges

More information

CFD ANALYSIS CHALLENGES IN BUILDING SIMULATION FOR SIMBUILD2004 CONFERENCE. Ferdinand Schmid and Galen Burrell Architectural Energy Corporation

CFD ANALYSIS CHALLENGES IN BUILDING SIMULATION FOR SIMBUILD2004 CONFERENCE. Ferdinand Schmid and Galen Burrell Architectural Energy Corporation CFD ANALYSIS CHALLENGES IN BUILDING SIMULATION FOR SIMBUILD2004 CONFERENCE Ferdinand Schmid and Galen Burrell Architectural Energy Corporation ABSTRACT This paper discusses the capabilities and challenges

More information

CFD AND MULTI-ZONE MODELLING OF FOG FORMATION RISK IN A NATURALLY VENTILATED INDUSTRIAL BUILDING

CFD AND MULTI-ZONE MODELLING OF FOG FORMATION RISK IN A NATURALLY VENTILATED INDUSTRIAL BUILDING 2000 Elsevier Science Ltd. All rights reserved., Air Distribution in Rooms, (ROOMVENT 2000) Editor: H.B. Awbi 767 CFD AND MULTI-ZONE MODELLING OF FOG FORMATION RISK IN A NATURALLY VENTILATED INDUSTRIAL

More information

Investigation on Smoke Movement and Smoke Control for Atrium in Green and Sustainable Buildings

Investigation on Smoke Movement and Smoke Control for Atrium in Green and Sustainable Buildings Investigation on Smoke Movement and Smoke Control for Atrium in Green and Sustainable Buildings Liu Fang Peter V. Nielsen Henrik Brohus ISSN 1901-726X DCE Technical Report No. 32 Department of Civil Engineering

More information

Glossary of HVAC Terms

Glossary of HVAC Terms Glossary of HVAC Terms Heating, Ventilation and Air Conditioning (HVAC) is a major sub- discipline of mechanical engineering. The goal of HVAC design is to balance indoor environmental comfort with other

More information

Optimizing Network Performance through PASSIVE AIR FLOW MANAGEMENT IN THE DATA CENTER

Optimizing Network Performance through PASSIVE AIR FLOW MANAGEMENT IN THE DATA CENTER Optimizing Network Performance through PASSIVE AIR FLOW MANAGEMENT IN THE DATA CENTER Lylette Macdonald, RCDD Legrand Ortronics BICSI Baltimore 2011 Agenda: Discuss passive thermal management at the Rack

More information

SBi 2013:12. Use of perforated acoustic panels as supply air diffusers in diffuse ceiling ventilation systems

SBi 2013:12. Use of perforated acoustic panels as supply air diffusers in diffuse ceiling ventilation systems SBi 2013:12 Use of perforated acoustic panels as supply air diffusers in diffuse ceiling ventilation systems Use of perforated acoustic panels as supply air diffusers in diffuse ceiling ventilation systems

More information

c. As mandated by law, facilities must obtain and maintain valid zoning permits as well as permits for intended use.

c. As mandated by law, facilities must obtain and maintain valid zoning permits as well as permits for intended use. Walmart Standards for Suppliers Section 7. Health and Safety 7. Health and Safety Suppliers must provide workers with a safe and healthy work environment. Suppliers must take proactive measures to prevent

More information

NUMERICAL ANALYSIS OF THE EFFECTS OF WIND ON BUILDING STRUCTURES

NUMERICAL ANALYSIS OF THE EFFECTS OF WIND ON BUILDING STRUCTURES Vol. XX 2012 No. 4 28 34 J. ŠIMIČEK O. HUBOVÁ NUMERICAL ANALYSIS OF THE EFFECTS OF WIND ON BUILDING STRUCTURES Jozef ŠIMIČEK email: jozef.simicek@stuba.sk Research field: Statics and Dynamics Fluids mechanics

More information

James R. Quiter, P.E., Senior Vice President Rolf Jensen & Associates, Inc.

James R. Quiter, P.E., Senior Vice President Rolf Jensen & Associates, Inc. AT THE STRATOSPHERE TOWER, LAS VEGAS NEVADA By: James R. Quiter, P.E., Senior Vice President Rolf Jensen & Associates, Inc. INTRODUCTION This paper discusses the performance based approach to fire protection

More information

Effect of Rack Server Population on Temperatures in Data Centers

Effect of Rack Server Population on Temperatures in Data Centers Effect of Rack Server Population on Temperatures in Data Centers Rajat Ghosh, Vikneshan Sundaralingam, Yogendra Joshi G.W. Woodruff School of Mechanical Engineering Georgia Institute of Technology, Atlanta,

More information

Firefighter Review. Instructor Guide

Firefighter Review. Instructor Guide Firefighter Review Instructor Guide Session Reference: 3 Topic: Attack Line Handling Level of Instruction: Time Required: Three Hours Materials: Two Fully Equipped Pumpers Structure for Use in Advancing

More information

Educational. Educational-Existing 1/28/2014. OCCUPANT LOADS [no change] Application. Application

Educational. Educational-Existing 1/28/2014. OCCUPANT LOADS [no change] Application. Application February 2014 Code Requirements and Inspections in Educational Occupancies Presented By: Barry W. Rickert Douglas M. Schanne Fire Marshal Training Program Supervisor Office of Education & Data Management

More information

Saving Heating Costs In Warehouses

Saving Heating Costs In Warehouses 2005, American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (www.ashrae.org). Reprinted by permission from ASHRAE Journal, (Vol. 47, No. 12, December 2005). This article may not

More information

Element D Services Heating, Ventilating, and Air Conditioning

Element D Services Heating, Ventilating, and Air Conditioning PART 1 - GENERAL 1.01 OVERVIEW A. This section supplements Design Guideline Element D3041 on air handling distribution with specific criteria for projects involving design of a Data Center spaces B. Refer

More information

Ventilation Standard For Health Care Facilities

Ventilation Standard For Health Care Facilities The following article was published in ASHRAE Journal, October 2008. Copyright 2008 American Society of Heating, Refrigerating and Air- Conditioning Engineers, Inc. It is presented for educational purposes

More information

Application of CFD modelling to the Design of Modern Data Centres

Application of CFD modelling to the Design of Modern Data Centres Application of CFD modelling to the Design of Modern Data Centres White Paper March 2012 By Sam Wicks BEng CFD Applications Engineer Sudlows March 14, 2012 Application of CFD modelling to the Design of

More information

Components HVAC General Standards HVAC Guidelines HVAC System Selection Life Cycle Cost Analysis

Components HVAC General Standards HVAC Guidelines HVAC System Selection Life Cycle Cost Analysis Components HVAC General System Selection Life Cycle Cost Analysis Outdoor Air Design Values Indoor Air Design Values Outdoor Air Ventilation Welding Ventilation Temperature Control Systems Ductwork HVAC

More information

Fire and Smoke Dampers: Best Practice Design Tips. An AMCA International White Paper. July 2015

Fire and Smoke Dampers: Best Practice Design Tips. An AMCA International White Paper. July 2015 July 2015 Fire and Smoke Dampers: Best Practice Design Tips An AMCA International White Paper AMCA International 30 West University Dr. Arlington Heights, IL 60004 USA www.amca.org June 2015 This white

More information

Reducing the Annual Cost of a Telecommunications Data Center

Reducing the Annual Cost of a Telecommunications Data Center Applied Math Modeling White Paper Reducing the Annual Cost of a Telecommunications Data Center By Paul Bemis and Liz Marshall, Applied Math Modeling Inc., Concord, NH March, 2011 Introduction The facilities

More information

THERMAL STRATIFICATION IN A HOT WATER TANK ESTABLISHED BY HEAT LOSS FROM THE TANK

THERMAL STRATIFICATION IN A HOT WATER TANK ESTABLISHED BY HEAT LOSS FROM THE TANK THERMAL STRATIFICATION IN A HOT WATER TANK ESTABLISHED BY HEAT LOSS FROM THE TANK J. Fan and S. Furbo Abstract Department of Civil Engineering, Technical University of Denmark, Brovej, Building 118, DK-28

More information

SECTION 15950 - TESTING, ADJUSTING, AND BALANCING

SECTION 15950 - TESTING, ADJUSTING, AND BALANCING SECTION 15950 - TESTING, ADJUSTING, AND BALANCING PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SMOKE DETECTOR INSTALLATION PROGRAM The Burlington Ordinance Perspective

SMOKE DETECTOR INSTALLATION PROGRAM The Burlington Ordinance Perspective SMOKE DETECTOR INSTALLATION PROGRAM The Burlington Ordinance Perspective The National Fire Alarm Code, NFPA 72, sets the minimum requirements of performance, selection, use and location of automatic detection

More information

A P P L I C A T I O N S G U I D E. Single-Ended Reflective Beam Smoke Detector

A P P L I C A T I O N S G U I D E. Single-Ended Reflective Beam Smoke Detector A P P L I C A T I O N S G U I D E Single-Ended Reflective Beam Smoke Detector A P P L I C A T I O N S G U I D E Single-Ended Reflective Beam Smoke Detector Contents Section 1 Glossary of Terms...2 Section

More information

NEW SCIENCE FIRE SAFETY ARTICLE INNOVATING FIRE ATTACK TACTICS SUMMER 2013 UL.COM/NEWSCIENCE

NEW SCIENCE FIRE SAFETY ARTICLE INNOVATING FIRE ATTACK TACTICS SUMMER 2013 UL.COM/NEWSCIENCE NEW SCIENCE FIRE SAFETY ARTICLE INNOVATING FIRE ATTACK TACTICS SUMMER 2013 UL.COM/NEWSCIENCE NEW SCIENCE FIRE SAFETY OVERVIEW UL s dedicated team of scientists, engineers and researchers is creating New

More information

BRUNS-PAK Presents MARK S. EVANKO, Principal

BRUNS-PAK Presents MARK S. EVANKO, Principal BRUNS-PAK Presents MARK S. EVANKO, Principal Data Centers of the Future and the Impact of High Density Computing on Facility Infrastructures - Trends, Air-Flow, Green/LEED, Cost, and Schedule Considerations

More information

Development Services City of Lawrence, KS

Development Services City of Lawrence, KS Development Services City of Lawrence, KS Building Planning Table R301.2 (1) Climatic & Geographic Design Criteria Building Planning The design criteria for wind speed increased from 90 MPH to 115 MPH.

More information

- White Paper - Data Centre Cooling. Best Practice

- White Paper - Data Centre Cooling. Best Practice - White Paper - Data Centre Cooling Best Practice Release 2, April 2008 Contents INTRODUCTION... 3 1. AIR FLOW LEAKAGE... 3 2. PERFORATED TILES: NUMBER AND OPENING FACTOR... 4 3. PERFORATED TILES: WITH

More information

CFD MODELLING FOR SWIRL DIFFUSER AND ITS IMPLICATIONS ON AIR CHANGE EFFECTIVENESS ASSESSMENT TO GREEN STAR'S IEQ-2

CFD MODELLING FOR SWIRL DIFFUSER AND ITS IMPLICATIONS ON AIR CHANGE EFFECTIVENESS ASSESSMENT TO GREEN STAR'S IEQ-2 CFD MODELLING FOR SWIRL DIFFUSER AND ITS IMPLICATIONS ON AIR CHANGE EFFECTIVENESS ASSESSMENT TO GREEN STAR'S IEQ-2 Eddy Rusly 1 and Mirek Piechowski 2 1,2 Meinhardt (VIC), Melbourne, Australia ABSTRACT

More information

CARL HANSER VERLAG. Jürgen Troitzsch. Plastics Flammability Handbook Principles - Regulations - Testing and Approval 3-446-21308-2. www.hanser.

CARL HANSER VERLAG. Jürgen Troitzsch. Plastics Flammability Handbook Principles - Regulations - Testing and Approval 3-446-21308-2. www.hanser. CARL HANSER VERLAG Jürgen Troitzsch Plastics Flammability Handbook Principles - Regulations - Testing and Approval 3-446-21308-2 www.hanser.de 3.1 Introduction 33 3 The Burning Process and Enclosure Fires

More information

Current as of 11/10/08 1 of 1

Current as of 11/10/08 1 of 1 BEST PRACTICES STANDARDS FOR SCHOOLS UNDER CONSTRUCTION OR BEING PLANNED FOR CONSTRUCTION I. Site Layout A. School buildings shall be provided with a securable perimeter. A securable perimeter means that

More information

A Code Review for Emergency Generators and Indoor Use of Portable Generators

A Code Review for Emergency Generators and Indoor Use of Portable Generators A Code Review for Emergency Generators and Indoor Use of Portable Generators By: the Fire and Life-Safety Group (FLS) Fire Code requires that emergency generators be stationary generators. Therefore, a

More information

Influence of fire source locations on the actuation of wet-type sprinklers in an office fire

Influence of fire source locations on the actuation of wet-type sprinklers in an office fire Influence of fire source locations on the actuation of wet-type sprinklers in an office fire Ko-Jen Chen 1 Chun-Ta Tzeng 2 Chi-ming Lai 3 Abstract An experiment is conducted on a full-scale model office

More information

IECC Compliance Guide for Homes in Virginia

IECC Compliance Guide for Homes in Virginia IECC Compliance Guide for Homes in Virginia Amended Version of 2012 International Energy Conservation Code July 14, 2014 Climate Zone Since the entire state of Virginia falls in the IECC Climate Zone 4,

More information

February 2014 Alberta Fire Code 4.2.6.3. Page 1 of 5. Fire Safety and Hand Hygiene in Healthcare Facilities

February 2014 Alberta Fire Code 4.2.6.3. Page 1 of 5. Fire Safety and Hand Hygiene in Healthcare Facilities FIRE CODE VARIANCE February 2014 Alberta Fire Code 4.2.6.3. Page 1 of 5 ISSUE: Fire Safety and Hand Hygiene in Healthcare Facilities This Variance covers alcohol based hand hygiene products used in healthcare

More information

HVAC Checklist - Long Form

HVAC Checklist - Long Form HVAC Checklist - Long Form Page 1 of 14 Appendix B discusses HVAC system components in relation to indoor air quality. utside Air Intake Location pen during occupied hours? Unobstructed? Standing water,

More information

CITY PLAN REVIEW AND INSPECTION. Lisa Fleming Brown, CPM

CITY PLAN REVIEW AND INSPECTION. Lisa Fleming Brown, CPM CITY PLAN REVIEW AND INSPECTION Lisa Fleming Brown, CPM Houston Commercial Energy Conservation Code (2011) A choice of 2009 IECC or ASHRAE 90.1-2007 with amendments. Effective September 2, 2011. Complete

More information

International Refrigerant Standards and their Influence on the Global HVAC Industry and Refrigerant Replacement

International Refrigerant Standards and their Influence on the Global HVAC Industry and Refrigerant Replacement International Refrigerant Standards and their Influence on the Global HVAC Industry and Refrigerant Replacement Tom Watson, P.E. Fellow ASHRAE, Life Member President ASHRAE Issues Choosing a refrigerant

More information

AIR DISTRIBUTION FOR COMFORT AND IAQ

AIR DISTRIBUTION FOR COMFORT AND IAQ AIR DISTRIBUTION FOR COMFORT AND IAQ Heating Piping and Air Conditioning March 1998 Dan Int-Hout Chief Engineer KRUEGER EXCELLENCE IN AIR DISTRIBUTION Modern environmentally controlled spaces consume significant

More information

PANDA SPRAY BOOTH FILTER INFORMATION

PANDA SPRAY BOOTH FILTER INFORMATION PANDA SPRAY BOOTH FILTER INFORMATION Our Spray Booth has been designed to reduce the risk of potential hazardous situations occurring. You must adhere to the specifications chart listed below when replacing

More information

Displacement Ventilation in Schools

Displacement Ventilation in Schools Displacement Ventilation in Schools Price Displacement Ventilation in Schools Introduction Displacement Ventilation (DV) originated in industrial facilities in Europe as an effective way to remove contaminants

More information

COMPARISON OF THE THERMAL ENVIRONMENT IN ROOMS WITH CHILLED BEAM AND RADIANT PANEL SYSTEMS

COMPARISON OF THE THERMAL ENVIRONMENT IN ROOMS WITH CHILLED BEAM AND RADIANT PANEL SYSTEMS COMPARISON OF THE THERMAL ENVIRONMENT IN ROOMS WITH CHILLED BEAM AND RADIANT PANEL SYSTEMS Risto Kosonen, Panu Mustakallio Arsen Melikov 2, Marcin Duszyk 2 Oy Halton Group Ltd., Helsinki, Finland. 2 International

More information

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR 1910.252 WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR 1910.252 WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600 OSHA REGULATION: 9 CFR 90.5 WELDING, CUTTING, AND BRAZING ( HOT WORK ) A. POLICY. This procedure follows requirements set forth in 9 CFR 90.5.. This policy applies to all Hot Work operations being done

More information

HVAC Systems: Overview

HVAC Systems: Overview HVAC Systems: Overview Michael J. Brandemuehl, Ph.D, P.E. University of Colorado Boulder, CO, USA Overview System Description Secondary HVAC Systems Air distribution Room diffusers and air terminals Duct

More information