1 CITY OF BRECKSVILLE BID TABULATION WIESE ROAD RETAINING WALL & STORM SEWER IMPROVEMENTS BID OPENING: MARCH 21, 2012 PROJECT NO SUBURBAN MAINTENANCE & CONSTRUCTION MAROUS BROTHERS CONSTRUCTION NERONE & SONS, INC. SCHIRMER CONSTRUCTION INDEPENDENCE EXCAVATING, INC. UNIT PRICES UNIT PRICES UNIT PRICES UNIT PRICES UNIT PRICES ODOT TOTAL LABOR MATERIAL LABOR/MAT'L ITEM LABOR MATERIAL LABOR/MAT'L ITEM LABOR MATERIAL LABOR/MAT'L ITEM LABOR MATERIAL LABOR/MAT'L ITEM LABOR MATERIAL LABOR/MAT'L ITEM NO. DESCRIPTION ITEM QTY. UNIT ONLY ONLY ONLY TOTAL ONLY ONLY ONLY TOTAL ONLY ONLY ONLY TOTAL ONLY ONLY ONLY TOTAL ONLY ONLY ONLY TOTAL NORTH RETAINING WALL N01 PORTIONS OF STRUCTURE REMOVED: REMOVE TOP OF EXISTING RETAINING WALL L.S. $15, $15, $30, $30, $2, $7, $9, $9, $8, $0.00 $8, $8, $13, $8, $21, $21, $30, $10, $40, $40, N02 EPOXY COATED REINFORCING STEEL LB. $0.80 $0.70 $1.50 $2, $0.75 $1.00 $1.75 $3, $1.00 $1.05 $2.05 $3, $1.80 $1.20 $3.00 $5, $1.00 $1.00 $2.00 $3, N03 DOWEL HOLES WITH CEMENT GROUT EA. $3.50 $3.50 $7.00 $1, $8.85 $2.00 $10.85 $2, $10.00 $5.50 $15.50 $3, $11.00 $7.00 $18.00 $3, $6.00 $6.00 $12.00 $2, N04 N05 N06 CLASS C CONCRETE RETAINING WALL/WINGWALL ABOVE FOOTING C.Y. $ $ $ $6, $ $ $ $13, $ $ $ $9, $ $ $ $13, $ $ $1, $15, " WEEP HOLE DRILLED THROUGH EXISTING WALL EA. $ $50.00 $ $2, $ $0.00 $ $4, $ $0.00 $ $1, $ $90.00 $ $1, $ $ $ $1, SEALING OF CONCRETE SURFACES, AS PER PLAN PERMANENT GRAFFITI PROTECTION S.Y. $2.75 $2.50 $5.25 $1, $11.00 $11.00 $22.00 $4, $9.50 $10.00 $19.50 $3, $3.60 $2.40 $6.00 $1, $15.00 $5.00 $20.00 $4, N07 CONCRETE REPAIR BY EPOXY INJECTION FT. $40.00 $20.00 $60.00 $4, $60.00 $25.00 $85.00 $6, $50.00 $10.00 $60.00 $4, $33.00 $22.00 $55.00 $3, $45.00 $50.00 $95.00 $6, N08 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACES S.Y. $2.00 $0.50 $2.50 $ $20.00 $6.00 $26.00 $5, $24.00 $0.00 $24.00 $4, $7.80 $5.20 $13.00 $2, $15.00 $5.00 $20.00 $4, N09 ACRYLIC SEALER S.Y. $2.50 $2.50 $5.00 $1, $7.00 $7.50 $14.50 $2, $7.50 $6.00 $13.50 $2, $5.00 $3.00 $8.00 $1, $10.00 $5.00 $15.00 $3, N10 RAILING (TWIN STEEL TUBE), AS PER PLAN FT. $80.00 $80.00 $ $15, $15.00 $ $ $20, $50.00 $ $ $21, $ $80.00 $ $20, $25.00 $ $ $11, N11 PATCHING CONCRETE STRUCTURE, AS PER PLAN S.F. $30.00 $20.00 $50.00 $15, $2.25 $1.10 $3.35 $1, $40.00 $20.00 $60.00 $18, $45.00 $30.00 $75.00 $23, $40.00 $40.00 $80.00 $25, N12 PORTABLE CONCRETE BARRIER, 32" FT. $10.00 $13.50 $23.50 $2, $2.25 $19.00 $21.25 $2, $10.00 $19.00 $29.00 $2, $20.00 $10.00 $30.00 $3, $20.00 $5.00 $25.00 $2, SUBTOTAL $82, $74, $85, $102, $120, SOUTH RETAINING WALL S01 S02 STRUCTURE REMOVED, AS PER PLAN: REMOVE EXISTING RETAINING WALL L.S. $50, $50, $100, $100, $42, $0.00 $42, $42, $73, $0.00 $73, $73, $65, $20, $85, $85, $90, $8, $98, $98, REMOVAL MISC.: BRICK LINED DITCH FT. $4.00 $2.50 $6.50 $3, $8.25 $0.00 $8.25 $3, $4.70 $0.00 $4.70 $2, $6.00 $2.00 $8.00 $3, $3.00 $2.00 $5.00 $2, S03 LINEAR GRADING STA. $ $94.67 $ $3, $ $0.00 $ $4, $ $0.00 $ $2, $ $ $1, $6, $ $ $ $1, S04 AGGREGATE BASE C.Y. $25.00 $27.50 $52.50 $2, $51.00 $34.00 $85.00 $4, $20.00 $49.00 $69.00 $3, $20.00 $45.00 $65.00 $3, $20.00 $40.00 $60.00 $3, S05 TACK COAT FOR INTERMEDIATE COURSE GAL. $3.00 $2.00 $5.00 $45.00 $1.00 $4.75 $5.75 $51.75 $1.25 $4.00 $5.25 $47.25 $3.00 $2.00 $5.00 $45.00 $2.00 $2.00 $4.00 $36.00 S06 PRIME COAT GAL. $5.00 $8.00 $13.00 $1, $1.00 $8.00 $9.00 $ $1.25 $7.00 $8.25 $ $6.00 $4.00 $10.00 $ $3.00 $3.00 $6.00 $ S07 S08 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG C.Y. $ $ $ $3, $ $ $ $4, $ $ $ $4, $ $ $ $4, $ $ $ $3, ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG C.Y. $ $ $ $3, $ $ $ $3, $ $ $ $3, $ $ $ $3, $ $ $ $2, S09 UNCLASSIFIED EXCAVATION L.S. $15, $13, $28, $28, $70, $0.00 $70, $70, $61, $0.00 $61, $61, $60, $20, $80, $80, $80, $7, $87, $87, S10 HP 12 X 74 STEEL PILES, FURNISHED AND PLACED FT. $2.00 $38.50 $40.50 $21, $30.00 $72.00 $ $52, $10.00 $33.00 $43.00 $22, $30.00 $21.00 $51.00 $26, $25.00 $ $ $64,875.00
2 SUBURBAN MAINTENANCE CONSTRUCTION MAROUS BROTHERS CONSTRUCTION NERONE & SONS, INC. SCHIRMER CONSTRUCTION INDEPENDENCE EXCAVATING, INC. S11 S12 S13 S14 S15 S16 S17 S18 HP 14X117 STEEL PILES, FURNISHED AND PLACED FT. $2.00 $54.63 $56.63 $31, $30.00 $73.00 $ $56, $10.00 $47.00 $57.00 $31, $30.00 $39.00 $69.00 $38, $25.00 $ $ $79, W 14 X 193 STEEL PILES, FURNISHED AND PLACED FT. $2.00 $ $ $113, $30.00 $ $ $155, $10.00 $ $ $116, $85.00 $70.00 $ $124, $25.00 $ $ $197, PRECAST REINFORCED CONCRETE PANEL S.F. $4.50 $12.84 $17.34 $96, $3.20 $12.00 $15.20 $84, $10.00 $19.00 $29.00 $162, $10.00 $8.00 $18.00 $100, $5.00 $10.00 $15.00 $83, FORM LINER S.F. $0.25 $1.00 $1.25 $6, $0.00 $1.40 $1.40 $7, $0.00 $1.30 $1.30 $7, $0.10 $1.90 $2.00 $11, $0.50 $0.50 $1.00 $5, SEALING OF CONCRETE SURFACES, AS PER PLAN PERMANENT GRAFFITI PROTECTION S.Y. $2.50 $3.20 $5.70 $3, $3.20 $3.20 $6.40 $3, $1.85 $4.00 $5.85 $3, $4.00 $2.00 $6.00 $3, $3.00 $3.00 $6.00 $3, ACRYLIC SEALER S.Y. $4.00 $4.75 $8.75 $14, $3.90 $6.00 $9.90 $15, $2.00 $7.00 $9.00 $14, $5.00 $3.00 $8.00 $12, $5.00 $4.00 $9.00 $14, SPECIAL SHOP PAINTING AND FIELD TOUCH UP OF STRUCTURAL STEEL S.F. $2.00 $2.08 $4.08 $56, $2.30 $2.30 $4.60 $63, $1.25 $3.00 $4.25 $58, $4.00 $1.00 $5.00 $68, $2.00 $2.00 $4.00 $55, STRUCTURE DRAINAGE, MISC.: GEOCOMPOSITE DRAINAGE SYSTEM L.S. $4, $3, $7, $7, $19, $18, $37, $37, $10, $8, $18, $18, $12, $10, $22, $22, $40, $25, $65, $65, S19 DRILLED SHAFTS, 30" DIAMETER, ABOVE BEDROCK FT. $39.02 $39.02 $78.04 $89, $88.00 $0.00 $88.00 $101, $30.00 $60.00 $90.00 $103, $40.00 $50.00 $90.00 $103, $40.00 $10.00 $50.00 $57, S20 PAVED GUTTER, MISC.: TYPE 1 3, AS PER PLAN, FIBER REINFORCED CONCRETE, INCL. APRONS AT CATCH BASINS FT. $20.00 $15.00 $35.00 $20, $15.00 $10.00 $25.00 $14, $10.00 $17.00 $27.00 $16, $50.00 $30.00 $80.00 $47, $25.00 $25.00 $50.00 $29, S21 4" CONDUIT, TYPE F FT. $2.00 $2.00 $4.00 $ $7.50 $8.00 $15.50 $3, $0.25 $0.75 $1.00 $ $6.00 $4.00 $10.00 $2, $5.00 $4.00 $9.00 $1, S22 6" CONDUIT, TYPE C FT. $2.00 $2.00 $4.00 $ $7.50 $9.50 $17.00 $3, $2.00 $3.00 $5.00 $1, $6.00 $6.00 $12.00 $2, $5.00 $5.00 $10.00 $2, S23 6" CONDUIT, TYPE F FT. $2.00 $2.00 $4.00 $ $7.50 $9.50 $17.00 $3, $2.00 $3.00 $5.00 $1, $6.00 $6.00 $12.00 $2, $5.00 $5.00 $10.00 $2, S24 8" CONDUIT, TYPE C FT. $2.00 $3.00 $5.00 $1, $7.50 $11.50 $19.00 $3, $3.00 $5.00 $8.00 $1, $6.00 $10.00 $16.00 $3, $5.00 $6.00 $11.00 $2, S25 8" CONDUIT, TYPE F FT. $2.00 $3.00 $5.00 $1, $7.50 $11.50 $19.00 $3, $3.00 $5.00 $8.00 $1, $6.00 $10.00 $16.00 $3, $5.00 $6.00 $11.00 $2, S26 12" CONDUIT, TYPE C FT. $3.00 $6.00 $9.00 $1, $7.50 $12.50 $20.00 $4, $3.00 $7.00 $10.00 $2, $10.00 $16.00 $26.00 $5, $6.00 $6.00 $12.00 $2, S27 12" CONDUIT, TYPE F FT. $3.00 $6.00 $9.00 $1, $7.50 $12.50 $20.00 $4, $3.00 $7.00 $10.00 $2, $10.00 $16.00 $26.00 $5, $6.00 $6.00 $12.00 $2, S28 FENCE REMOVED AND REBUILT FT. $10.00 $13.81 $23.81 $ $8.25 $1.00 $9.25 $ $0.01 $0.00 $0.01 $0.21 $45.00 $25.00 $70.00 $1, $35.00 $35.00 $70.00 $1, S29 CELLULAR RETAINING WALL (CONCRETE), AS PER PLAN S.F. $20.00 $15.30 $35.30 $1, $31.00 $20.00 $51.00 $2, $50.00 $66.00 $ $5, $ $65.00 $ $8, $45.00 $40.00 $85.00 $4, S30 PORTABLE CONCRETE BARRIER, 32" FT. $10.00 $13.50 $23.50 $1, $2.25 $19.00 $21.25 $1, $15.00 $19.00 $34.00 $2, $20.00 $10.00 $30.00 $2, $10.00 $10.00 $20.00 $1, SUBTOTAL $619, $759, $722, $783, $879, INCIDENTALS I01 CLEARING AND GRUBBING L.S. $10, $10, $20, $20, $1, $0.00 $1, $1, $2, $0.00 $2, $2, $6, $4, $10, $10, $20, $5, $25, $25, I02 MAINTAINING TRAFFIC L.S. $5, $5, $10, $10, $2, $ $2, $2, $3, $ $3, $3, $1, $2, $4, $4, $2, $2, $5, $5, I03 DETOUR SIGNING L.S. $2, $4, $6, $6, $2, $ $2, $2, $ $1, $2, $2, $6, $4, $10, $10, $2, $2, $5, $5, I04 FIELD OFFICE, TYPE A MNTH $ $ $ $4, $ $ $ $2, $ $ $ $3, $ $1, $1, $9, $50.00 $ $ $2, I05 CONSTRUCTION LAYOUT STAKES L.S. $ $ $1, $1, $5, $0.00 $5, $5, $3, $0.00 $3, $3, $15, $10, $25, $25, $15, $5, $20, $20,000.00
3 SUBURBAN MAINTENANCE CONSTRUCTION MAROUS BROTHERS CONSTRUCTION NERONE & SONS, INC. SCHIRMER CONSTRUCTION INDEPENDENCE EXCAVATING, INC. I06 MOBILIZATION L.S. $30, $30, $60, $60, $5, $0.00 $5, $5, $40, $69, $109, $109, $30, $10, $40, $40, $18, $2, $20, $20, I07 SEEDING, MISC.: SEEDING AND MULCHING, CLASS 1, INCLUDING FERTILIZER AND WATER L.S. $1, $1, $2, $2, $1, $ $1, $1, $7, $3, $10, $10, $10, $5, $15, $15, $1, $ $1, $1, I08 EROSION CONTROL EA. $1.00 $2, $0.50 $0.50 $1.00 $2, $1.00 $2, $1.00 $2, $1.00 $2, SUBTOTAL $105, $23, $136, $115, $80, NORTH RETAINING WALL $82, $74, $85, $102, $120, SOUTH RETAINING WALL $619, $759, $722, $783, $879, INCIDENTALS $105, $23, $136, $115, $80, RETAINING WALL IMPROVEMENTS TOTAL $808, $856, $944, $1,001, $1,080, ROADWAY/ SITE R1 EXISTING CATCH BASIN OR MH REMOVED INCL. DISPOSAL OFF SITE SPEC 11 EA. $ $0.00 $ $3, $ $0.00 $ $5, $ $0.00 $ $6, $ $ $ $5, $ $ $ $8, R2 PAVEMENT REMOVED, INCL. DISPOSAL OFF SITE S.Y. $10.00 $0.00 $10.00 $2, $8.00 $8.00 $1, $17.00 $0.00 $17.00 $4, $12.00 $6.00 $18.00 $4, $15.00 $10.00 $25.00 $5, R3 24" & SMALLER PIPE REMOVED INCL. DISPOSAL OFF SITE SPEC 512 L.F. $4.50 $0.00 $4.50 $2, $9.75 $0.00 $9.75 $4, $8.00 $0.00 $8.00 $4, $12.00 $2.00 $14.00 $7, $10.00 $5.00 $15.00 $7, R4 REMOVAL MISC.: BRICK LINED DITCH L.F. $6.50 $0.00 $6.50 $ $7.50 $0.00 $7.50 $ $50.50 $0.00 $50.50 $3, $7.00 $1.00 $8.00 $ $4.00 $5.00 $9.00 $ R5 PAVED GUTTER, TYPE 1 3, AS PER PLAN, FIBER REINFORCED CONCRETE, INCLUDING APRONS AT CATCH BASINS L.F. $20.00 $15.68 $35.68 $3, $35.00 $15.50 $50.50 $4, $70.00 $33.50 $ $9, $50.00 $30.00 $80.00 $7, $30.00 $30.00 $60.00 $5, R6 R7 R8 GAS SERVICE CONNECTION RELOCATED FOR GRADE SPEC 2 EA. $ $ $ $1, $1, $1, $2, $4, $70.00 $30.00 $ $ $ $ $ $1, $ $ $ $1, " WATER SERVICE CONNECTION RELOCATED FOR GRADE SPEC 2 EA. $ $ $ $1, $ $ $ $1, $60.00 $40.00 $ $ $ $ $1, $2, $ $ $ $1, WATER SERVICE STOP BOX OR VALVE BOX ASSEMBLY ADJUSTED TO GRADE SPEC 5 EA. $ $ $ $3, $ $0.00 $ $1, $70.00 $0.00 $70.00 $ $ $50.00 $ $1, $ $ $ $3, R9 MISCELLANEOUS METAL SPEC 500 LBS. $2.50 $2.50 $5.00 $2, $0.00 $1.00 $1.00 $ $0.00 $1.00 $1.00 $ $1.00 $1.00 $2.00 $1, $1.00 $1.00 $2.00 $1, STORM SEWER SUBTOTAL $21, $24, $29, $30, $34, ST1 ST2 12" STORM CONDUIT, INCLUDING PREMIUM BACKFILL, COMPACTED L.F. $11.00 $11.00 $22.00 $10, $34.00 $40.00 $74.00 $36, $10.00 $36.00 $46.00 $22, $30.00 $12.00 $42.00 $20, $15.00 $17.00 $32.00 $15, " STORM CONDUIT, INCLUDING BENDS AS PLAN INDICATED & REGULAR BACKFILL, COMPACTED L.F. $6.25 $6.25 $12.50 $ $37.25 $17.00 $54.25 $2, $50.00 $32.00 $82.00 $3, $30.00 $5.00 $35.00 $1, $15.00 $10.00 $25.00 $1, ST3 STORM MANHOLE EA. $1, $ $1, $11, $ $ $1, $10, $ $1, $1, $8, $2, $1, $3, $18, $1, $1, $2, $12, ST4 ST5 ST6 CATCH BASIN NO. 8, EXCLUDING THE COST OF 6" CONCRETE APRON EA. $1, $ $1, $9, $ $1, $1, $9, $ $1, $1, $6, $1, $1, $2, $11, $1, $1, $2, $11, CATCH BASIN NO. 2 2B, INCLUDING 6" CONCRETE CURB EA. $ $ $1, $1, $ $ $1, $1, $ $ $1, $1, $2, $1, $3, $3, $1, $1, $2, $2, " THRU 8" STORM RE CONNECTION INCL. TEST TEE EA. $ $75.00 $ $ $ $50.00 $ $1, $ $ $ $1, $ $ $ $2, $ $50.00 $ $1, ST7 SUBBEDDING MATERIAL SPEC 100 TON $5.50 $20.00 $25.50 $2, $50.00 $31.00 $81.00 $8, $10.00 $29.00 $39.00 $3, $25.00 $10.00 $35.00 $3, $20.00 $35.00 $55.00 $5, PAVEMENT SUBTOTAL $36, $68, $47, $59, $48, P1 1.5 " ASPHALT CONCRETE SURFACE COURSE 448 TYPE 1, INCL. JOINT SEAL C.Y. $ $ $ $2, $ $ $ $2, $ $ $ $2, $ $ $ $3, $35.00 $ $ $2,350.00
4 SUBURBAN MAINTENANCE CONSTRUCTION MAROUS BROTHERS CONSTRUCTION NERONE & SONS, INC. SCHIRMER CONSTRUCTION INDEPENDENCE EXCAVATING, INC. P2 1.5" ASPHALT CONCRETE INTERMEDIATE COURSE 448 TYPE 2, INCL. TACK COAT C.Y. $ $ $ $2, $ $ $ $2, $ $ $ $2, $ $ $ $3, $25.00 $ $ $2, P3 9" ASPHALT CONCRETE BASE C.Y. $ $ $ $17, $ $ $ $12, $ $ $ $12, $ $ $ $13, $90.00 $ $ $11, P4 4" AGGREGATE BASE, LIMESTONE C.Y. $5.00 $50.00 $55.00 $1, $70.00 $34.00 $ $2, $20.00 $57.00 $77.00 $2, $40.00 $25.00 $65.00 $1, $35.00 $41.00 $76.00 $2, P5 AGGREGATE DRIVE APRON REPLACEMENT, NO. 57 AGGREGATE SPEC 26 S.Y. $6.46 $12.00 $18.46 $ $30.00 $31.00 $61.00 $1, $10.00 $20.00 $30.00 $ $40.00 $25.00 $65.00 $1, $15.00 $10.00 $25.00 $ SUBTOTAL $23, $22, $19, $23, $18, MISCELLANEOUS M1 VIDEO INSPECTION AND TESTING OF STORM SEWERS SPEC 1 L.S. $1, $1, $2, $2, $1, $0.00 $1, $1, $1, $0.00 $1, $1, $2, $ $2, $2, $1, $ $2, $2, M2 CONSTRUCTION LAYOUT STAKES SPEC 1 L.S. $4, $4, $8, $8, $1, $0.00 $1, $1, $6, $0.00 $6, $6, $4, $1, $5, $5, $4, $1, $5, $5, M3 4" CENTER LINE, SOLID DOUBLE (YELLOW) L.F. $0.20 $0.50 $0.70 $ $0.50 $0.63 $1.13 $1, $0.35 $0.25 $0.60 $ $0.60 $0.40 $1.00 $ $0.25 $0.20 $0.45 $ M4 4" EDGE LINE, SOLID (WHITE) L.F. $0.20 $0.50 $0.70 $1, $0.50 $0.34 $0.84 $1, $0.70 $0.10 $0.80 $1, $0.60 $0.40 $1.00 $1, $0.20 $0.20 $0.40 $ SUBTOTAL $12, $4, $9, $10, $8, ROADWAY/ SITE $21, $24, $29, $30, $34, STORM SEWER $36, $68, $47, $59, $48, PAVEMENT $23, $22, $19, $23, $18, MISCELLANEOUS $12, $4, $9, $10, $8, STORM SEWER IMPROVEMENTS TOTAL $94, $120, $105, $123, $110, PROJECT MISCELLANEOUS ITEMS P1 INSPECTION, PERMITS & TESTING FEES SPEC 1 L.S. $2, $10, $12, $12, $2, $0.00 $2, $2, $3, $0.00 $3, $3, $12, $0.00 $12, $12, $7, $1, $8, $8, P2 PERFORMANCE BOND SPEC 1 L.S. $5, $5, $10, $10, $0.00 $9, $9, $9, $0.00 $8, $8, $8, $0.00 $15, $15, $15, $0.00 $13, $13, $13, P3 MAINTENANCE BOND SPEC 1 L.S. $5, $5, $10, $10, $0.00 $ $ $ $0.00 $ $ $ $0.00 $3, $3, $3, $0.00 $2, $2, $2, SUBTOTAL $32, $11, $12, $30, $23, CONTINGENCY ITEMS TO BE USED ONLY WITH THE CITY ENGINEER'S WRITTEN AUTHORIZATION C1 UTILITY ALLOWANCE SPEC 1 L.S. $2, $2, $2, $2, $2, $2, $2, $2, $2, $2, C2 PRIVATE FACILITY ALLOWANCE SPEC 1 L.S. $1, $1, $1, $1, $1, $1, $1, $1, $1, $1, C3 REMOVE & REPLACE EXTG. MANHOLE SPEC 1 EA. $2, $2, $4, $4, $2, $1, $3, $3, $1, $1, $2, $2, $2, $1, $3, $3, $1, $1, $2, $2, C4 CELLULAR RETAINING WALL (CONCRETE), AS PER PLAN (CONTINGENCY FOR ITEM S29) S.F. $20.00 $15.00 $35.00 $ $31.00 $22.00 $53.00 $1, $50.00 $65.00 $ $2, $ $50.00 $ $4, $50.00 $25.00 $75.00 $1, C5 NO. 57 LIMESTONE AGGREGATE FOR DRIVE SPEC 20 C.Y. $5.00 $50.00 $55.00 $1, $3.00 $38.00 $41.00 $ $60.00 $33.00 $93.00 $1, $40.00 $25.00 $65.00 $1, $30.00 $35.00 $65.00 $1, SUBTOTAL $9, $8, $10, $12, $9, PROJECT MISCELLANEOUS ITEMS $32, $11, $12, $30, $23, CONTINGENCY ITEMS $9, $8, $10, $12, $9, MISCELLANEOUS & CONTINGENCY TOTAL $41, $20, $22, $42, $32,975.00
5 CITY OF BRECKSVILLE BID TABULATION WIESE ROAD RETAINING WALL & STORM SEWER IMPROVEMENTS BID OPENING: MARCH 21, 2012 PROJECT NO RETAINING WALL IMPROVEMENTS TOTAL STORM SEWER IMPROVEMENTS TOTAL MISCELLANEOUS & CONTINGENCY TOTAL SUBURBAN MAINTENANCE CONSTRUCTION MAROUS BROTHERS CONSTRUCTION NERONE & SONS, INC. SCHIRMER CONSTRUCTION INDEPENDENCE EXCAVATING, INC. $808, $856, $944, $1,001, $1,080, $94, $120, $105, $123, $110, $41, $20, $22, $42, $32, GRAND TOTAL $944, $997, $1,073, $1,167, $1,224, Present for the City of Brecksville: Becki Burlingham, Director of Purchasing Ron Weidig, Service Director Gerry Wise, City Engineer Contractors Present: Terry Vodicka, Independence Excavating Angelo Martin, Mid American Chad Zurlkehr, Mid American Nick Iafigliola, Schirmer Construction Jeff Jones, Marous Brothers Rick Nerone, Jr., Nerone & Sons Joe Ladd, Perk Company
6 CITY OF BRECKSVILLE BID TABULATION WIESE ROAD RETAINING WALL & STORM SEWER IMPROVEMENTS BID OPENING: MARCH 21, 2012 PROJECT NO PERK COMPANY, INC. MID AMERICAN CONSTRUCTION UNIT PRICES UNIT PRICES ODOT TOTAL LABOR MATERIAL LABOR/MAT'L ITEM LABOR MATERIAL LABOR/MAT'L ITEM NO. DESCRIPTION ITEM QTY. UNIT ONLY ONLY ONLY TOTAL ONLY ONLY ONLY TOTAL NORTH RETAINING WALL N01 PORTIONS OF STRUCTURE REMOVED: REMOVE TOP OF EXISTING RETAINING WALL L.S. $7, $4, $12, $12, $5, $5, $11, $11, N02 EPOXY COATED REINFORCING STEEL LB. $0.93 $0.62 $1.55 $2, $1.05 $1.05 $2.10 $4, N03 DOWEL HOLES WITH CEMENT GROUT EA. $8.34 $5.56 $13.90 $2, $28.30 $28.30 $56.60 $11, N04 N05 N06 CLASS C CONCRETE RETAINING WALL/WINGWALL ABOVE FOOTING C.Y. $ $ $1, $18, $1, $1, $2, $36, " WEEP HOLE DRILLED THROUGH EXISTING WALL EA. $ $72.00 $ $1, $ $ $ $1, SEALING OF CONCRETE SURFACES, AS PER PLAN PERMANENT GRAFFITI PROTECTION S.Y. $11.40 $7.60 $19.00 $3, $6.50 $6.50 $13.00 $2, N07 CONCRETE REPAIR BY EPOXY INJECTION FT. $45.00 $30.00 $75.00 $5, $22.65 $22.65 $45.30 $3, N08 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACES S.Y. $13.80 $9.20 $23.00 $4, $6.80 $6.80 $13.60 $2, N09 ACRYLIC SEALER S.Y. $7.80 $5.20 $13.00 $2, $7.05 $7.05 $14.10 $2, N10 RAILING (TWIN STEEL TUBE), AS PER PLAN FT. $75.30 $50.20 $ $11, $62.25 $62.25 $ $11, N11 PATCHING CONCRETE STRUCTURE, AS PER PLAN S.F. $36.00 $24.00 $60.00 $18, $29.40 $29.40 $58.80 $18, N12 PORTABLE CONCRETE BARRIER, 32" FT. $15.60 $10.40 $26.00 $2, $30.55 $30.55 $61.10 $6, SUBTOTAL $87, $113, SOUTH RETAINING WALL S01 S02 STRUCTURE REMOVED, AS PER PLAN: REMOVE EXISTING RETAINING WALL L.S. $24, $16, $41, $41, $13, $13, $27, $27, REMOVAL MISC.: BRICK LINED DITCH FT. $3.42 $2.28 $5.70 $2, $2.55 $2.55 $5.10 $2, S03 LINEAR GRADING STA. $ $ $ $2, $ $ $1, $8, S04 AGGREGATE BASE C.Y. $32.16 $21.44 $53.60 $2, $22.85 $22.85 $45.70 $2, S05 TACK COAT FOR INTERMEDIATE COURSE GAL. $3.00 $2.00 $5.00 $45.00 $14.50 $14.50 $29.00 $ S06 PRIME COAT GAL. $4.80 $3.20 $8.00 $ $5.90 $5.90 $11.80 $1, S07 S08 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG C.Y. $ $ $ $3, $ $ $ $5, ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG C.Y. $ $ $ $3, $ $ $ $5, S09 UNCLASSIFIED EXCAVATION L.S. $27, $18, $46, $46, $32, $32, $65, $65, S10 HP 12 X 74 STEEL PILES, FURNISHED AND PLACED FT. $29.40 $19.60 $49.00 $25, $83.05 $83.05 $ $86,205.90
7 PERK COMPANY, INC. MID AMERICAN CONSTRUCTION S11 S12 S13 S14 S15 S16 S17 S18 HP 14X117 STEEL PILES, FURNISHED AND PLACED FT. $42.00 $28.00 $70.00 $38, $81.75 $81.75 $ $90, W 14 X 193 STEEL PILES, FURNISHED AND PLACED FT. $ $68.40 $ $137, $ $ $ $204, PRECAST REINFORCED CONCRETE PANEL S.F. $11.16 $7.44 $18.60 $103, $17.15 $17.15 $34.30 $191, FORM LINER S.F. $0.90 $0.60 $1.50 $8, $0.75 $0.75 $1.50 $8, SEALING OF CONCRETE SURFACES, AS PER PLAN PERMANENT GRAFFITI PROTECTION S.Y. $3.42 $2.28 $5.70 $3, $6.50 $6.50 $13.00 $8, ACRYLIC SEALER S.Y. $5.25 $3.50 $8.75 $14, $7.05 $7.05 $14.10 $22, SPECIAL SHOP PAINTING AND FIELD TOUCH UP OF STRUCTURAL STEEL S.F. $4.35 $2.90 $7.25 $99, $1.30 $1.30 $2.60 $35, STRUCTURE DRAINAGE, MISC.: GEOCOMPOSITE DRAINAGE SYSTEM L.S. $29, $19, $49, $49, $5, $5, $10, $10, S19 DRILLED SHAFTS, 30" DIAMETER, ABOVE BEDROCK FT. $ $ $ $310, $56.90 $56.90 $ $130, S20 PAVED GUTTER, MISC.: TYPE 1 3, AS PER PLAN, FIBER REINFORCED CONCRETE, INCL. APRONS AT CATCH BASINS FT. $28.80 $19.20 $48.00 $28, $10.50 $10.50 $21.00 $12, S21 4" CONDUIT, TYPE F FT. $6.00 $4.00 $10.00 $2, $4.90 $4.90 $9.80 $1, S22 6" CONDUIT, TYPE C FT. $7.80 $5.20 $13.00 $2, $9.30 $9.30 $18.60 $3, S23 6" CONDUIT, TYPE F FT. $7.80 $5.20 $13.00 $2, $6.00 $6.00 $12.00 $2, S24 8" CONDUIT, TYPE C FT. $12.00 $8.00 $20.00 $4, $10.15 $10.15 $20.30 $4, S25 8" CONDUIT, TYPE F FT. $12.00 $8.00 $20.00 $4, $6.70 $6.70 $13.40 $2, S26 12" CONDUIT, TYPE C FT. $33.18 $22.12 $55.30 $11, $20.55 $20.55 $41.10 $8, S27 12" CONDUIT, TYPE F FT. $33.18 $22.12 $55.30 $11, $15.85 $15.85 $31.70 $6, S28 FENCE REMOVED AND REBUILT FT. $42.00 $28.00 $70.00 $1, $14.15 $14.15 $28.30 $ S29 CELLULAR RETAINING WALL (CONCRETE), AS PER PLAN S.F. $33.50 $22.35 $55.85 $2, $58.90 $58.90 $ $6, S30 PORTABLE CONCRETE BARRIER, 32" FT. $15.60 $10.40 $26.00 $1, $37.00 $37.00 $74.00 $5, SUBTOTAL $966, $960, INCIDENTALS I01 CLEARING AND GRUBBING L.S. $3, $2, $6, $6, $4, $4, $8, $8, I02 MAINTAINING TRAFFIC L.S. $9, $6, $15, $15, $1, $1, $2, $2, I03 DETOUR SIGNING L.S. $1, $1, $3, $3, $1, $1, $3, $3, I04 FIELD OFFICE, TYPE A MNTH $1, $ $1, $10, $9, $9, $19, $118, I05 CONSTRUCTION LAYOUT STAKES L.S. $7, $4, $12, $12, $10, $10, $20, $20,366.00
8 PERK COMPANY, INC. MID AMERICAN CONSTRUCTION I06 MOBILIZATION L.S. $27, $18, $46, $46, $5, $5, $10, $10, I07 SEEDING, MISC.: SEEDING AND MULCHING, CLASS 1, INCLUDING FERTILIZER AND WATER L.S. $6, $4, $10, $10, $3, $3, $7, $7, I08 EROSION CONTROL EA. $1.00 $2, $1, $1, $1.00 $2, SUBTOTAL $105, $173, NORTH RETAINING WALL $87, $113, SOUTH RETAINING WALL $966, $960, INCIDENTALS $105, $173, RETAINING WALL IMPROVEMENTS TOTAL $1,159, $1,247, ROADWAY/ SITE R1 EXISTING CATCH BASIN OR MH REMOVED INCL. DISPOSAL OFF SITE SPEC 11 EA. $ $ $ $3, $90.25 $90.25 $ $1, R2 PAVEMENT REMOVED, INCL. DISPOSAL OFF SITE S.Y. $11.10 $7.40 $18.50 $4, $3.75 $3.75 $7.50 $1, R3 24" & SMALLER PIPE REMOVED INCL. DISPOSAL OFF SITE SPEC 512 L.F. $5.10 $3.40 $8.50 $4, $9.15 $9.15 $18.30 $9, R4 REMOVAL MISC.: BRICK LINED DITCH L.F. $3.60 $2.40 $6.00 $ $15.15 $15.15 $30.30 $2, R5 PAVED GUTTER, TYPE 1 3, AS PER PLAN, FIBER REINFORCED CONCRETE, INCLUDING APRONS AT CATCH BASINS L.F. $28.80 $19.20 $48.00 $4, $10.50 $10.50 $21.00 $1, R6 R7 R8 GAS SERVICE CONNECTION RELOCATED FOR GRADE SPEC 2 EA. $90.00 $60.00 $ $ $ $ $ $1, " WATER SERVICE CONNECTION RELOCATED FOR GRADE SPEC 2 EA. $2, $1, $3, $7, $ $ $ $1, WATER SERVICE STOP BOX OR VALVE BOX ASSEMBLY ADJUSTED TO GRADE SPEC 5 EA. $ $90.00 $ $1, $17.80 $17.80 $35.60 $ R9 MISCELLANEOUS METAL SPEC 500 LBS. $0.69 $0.46 $1.15 $ $0.90 $0.90 $1.80 $ STORM SEWER SUBTOTAL $26, $21, ST1 ST2 12" STORM CONDUIT, INCLUDING PREMIUM BACKFILL, COMPACTED L.F. $61.47 $40.98 $ $50, $33.90 $33.90 $67.80 $33, " STORM CONDUIT, INCLUDING BENDS AS PLAN INDICATED & REGULAR BACKFILL, COMPACTED L.F. $51.30 $34.20 $85.50 $3, $12.40 $12.40 $24.80 $1, ST3 STORM MANHOLE EA. $1, $1, $3, $19, $1, $1, $2, $12, ST4 ST5 ST6 CATCH BASIN NO. 8, EXCLUDING THE COST OF 6" CONCRETE APRON EA. $1, $1, $2, $13, $2, $2, $5, $27, CATCH BASIN NO. 2 2B, INCLUDING 6" CONCRETE CURB EA. $1, $ $2, $2, $ $ $1, $1, " THRU 8" STORM RE CONNECTION INCL. TEST TEE EA. $ $ $ $1, $57.00 $57.00 $ $ ST7 SUBBEDDING MATERIAL SPEC 100 TON $18.00 $12.00 $30.00 $3, $16.40 $16.40 $32.80 $3, PAVEMENT SUBTOTAL $94, $79, P1 1.5 " ASPHALT CONCRETE SURFACE COURSE 448 TYPE 1, INCL. JOINT SEAL C.Y. $ $96.00 $ $2, $ $ $ $4,695.00
9 PERK COMPANY, INC. MID AMERICAN CONSTRUCTION P2 1.5" ASPHALT CONCRETE INTERMEDIATE COURSE 448 TYPE 2, INCL. TACK COAT C.Y. $ $88.00 $ $2, $ $ $ $4, P3 9" ASPHALT CONCRETE BASE C.Y. $ $76.00 $ $11, $ $ $ $15, P4 4" AGGREGATE BASE, LIMESTONE C.Y. $32.40 $21.60 $54.00 $1, $ $ $ $5, P5 AGGREGATE DRIVE APRON REPLACEMENT, NO. 57 AGGREGATE SPEC 26 S.Y. $12.15 $8.10 $20.25 $ $5.45 $5.45 $10.90 $ SUBTOTAL $17, $30, MISCELLANEOUS M1 VIDEO INSPECTION AND TESTING OF STORM SEWERS SPEC 1 L.S. $1, $1, $2, $2, $1, $1, $2, $2, M2 CONSTRUCTION LAYOUT STAKES SPEC 1 L.S. $4, $2, $7, $7, $15, $15, $30, $30, M3 4" CENTER LINE, SOLID DOUBLE (YELLOW) L.F. $0.60 $0.40 $1.00 $ $0.55 $0.55 $1.10 $ M4 4" EDGE LINE, SOLID (WHITE) L.F. $0.45 $0.30 $0.75 $1, $0.43 $0.42 $0.85 $1, SUBTOTAL $11, $35, ROADWAY/ SITE $26, $21, STORM SEWER $94, $79, PAVEMENT $17, $30, MISCELLANEOUS $11, $35, STORM SEWER IMPROVEMENTS TOTAL $150, $166, PROJECT MISCELLANEOUS ITEMS P1 INSPECTION, PERMITS & TESTING FEES SPEC 1 L.S. $21, $14, $35, $35, $3, $3, $6, $6, P2 PERFORMANCE BOND SPEC 1 L.S. $6, $4, $10, $10, $11, $11, $22, $22, P3 MAINTENANCE BOND SPEC 1 L.S. $1, $1, $2, $2, $ $ $1, $1, SUBTOTAL $48, $29, CONTINGENCY ITEMS TO BE USED ONLY WITH THE CITY ENGINEER'S WRITTEN AUTHORIZATION C1 UTILITY ALLOWANCE SPEC 1 L.S. $2, $2, $2, $2, C2 PRIVATE FACILITY ALLOWANCE SPEC 1 L.S. $1, $1, $1, $1, C3 REMOVE & REPLACE EXTG. MANHOLE SPEC 1 EA. $2, $1, $4, $4, $ $ $1, $1, C4 CELLULAR RETAINING WALL (CONCRETE), AS PER PLAN (CONTINGENCY FOR ITEM S29) S.F. $33.48 $22.32 $55.80 $1, $27.50 $27.50 $55.00 $1, C5 NO. 57 LIMESTONE AGGREGATE FOR DRIVE SPEC 20 C.Y. $50.28 $33.52 $83.80 $1, $30.55 $30.55 $61.10 $1, SUBTOTAL $10, $7, PROJECT MISCELLANEOUS ITEMS $48, $29, CONTINGENCY ITEMS $10, $7, MISCELLANEOUS & CONTINGENCY TOTAL $58, $37,448.00
10 CITY OF BRECKSVILLE BID TABULATION WIESE ROAD RETAINING WALL & STORM SEWER IMPROVEMENTS BID OPENING: MARCH 21, 2012 PROJECT NO RETAINING WALL IMPROVEMENTS TOTAL STORM SEWER IMPROVEMENTS TOTAL MISCELLANEOUS & CONTINGENCY TOTAL PERK COMPANY, INC. MID AMERICAN CONSTRUCTION $1,159, $1,247, $150, $166, $58, $37, GRAND TOTAL $1,368, $1,451, Present for the City of Brecksville: Becki Burlingham, Director of Purchasing Ron Weidig, Service Director Gerry Wise, City Engineer Contractors Present: Terry Vodicka, Independence Excavating Angelo Martin, Mid American Chad Zurlkehr, Mid American Nick Iafigliola, Schirmer Construction Jeff Jones, Marous Brothers Rick Nerone, Jr., Nerone & Sons Joe Ladd, Perk Company
FY08 SEWER POINT REPAIRS BID TABULATION
6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "
More informationFY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation
644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING
More informationStorm Sewer Trenchless Upgrade Alternatives and Recommendations
Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for
More informationVILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial
More informationSECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or
More informationSTORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F
STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix F RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4400 South Street - Piping and Collection
More informationSECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
More informationThe unit costs are based on the trend line of the 3 low bids for the average quantity.
Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally
More information2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS
2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS GENERAL 10/16/2008 The listed average unit prices are based on the
More informationLos Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets
Los Angeles County Department Of Public Works Land Development Division Bond Calculation Sheets Effective July 1, 2015 COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT DIVISION ROADS COST
More informationWILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued)
BIDDER'S PROPOSAL (continued) Item Estimated No. Description Quantity Unit Unit Cost Total Cost BASE BID 1 Traffic Control 1 LS $ $ 2 Construction Area Signs 1 LS $ $ 3 Excavation Safety 1 LS $ $ 4 Reset
More informationSANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D
SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS Appendix D RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: Riverdale Road - Rumbi Grill -
More informationRiverside County Transportation Department Summary of Bids
Bids Open: 2 pm Date: Wednesday, March 4, 2015 BASE BID SCHEDULE 1 - Rudell Road Reconstruction Project NO. CODE CONTRACT PROJECT No. B3-0470 and C4-0069 COUNTY'S ESTIMATE 1 All American Asphalt Corona,
More informationFigure 3 Pipe Cracking
The illustration shown below depicts the system analyzed. As-built drawings and survey information were not available; aerial photos and survey shots of inverts were used to determine the system s geometries.
More informationFDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES
NAICS CODE Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway (includes 300, 320, 327, 330, 334, 336, 337, 338) Application of prime and tack coats, leveling surfaces and
More informationUnit Price Averages Reports
Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation
More informationFDOT Specifications List
FDOT Specifications List TABLE OF CONTENTS DIVISION II CONSTRUCTION DETAILS CLEARING CONSTRUCTION SITE 110 Clearing and Grubbing... 152 EARTHWORK AND RELATED OPERATIONS 120 Excavation and Embankment...
More informationTABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth
TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20
More informationUNIT PRICE LIST January 2009
UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only
More informationHow To Build A Road In A Townhouse
FDOT DBE CERTIFICATION SPECIALTY/ SHEET WITH CAP SIZES Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway $ 22.41 Application of prime and tack coats, leveling surfaces and
More informationSpecial Specification 7021 Water Main and Sewer Line Replacements
Special Specification 7021 Water Main and Sewer Line Replacements 1. DESCRIPTION Furnish, install, or replace water pipe, water valves, water meters and boxes, water service connections, fire hydrant assemblies,
More informationSECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
More informationFLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR
FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR ESTABLISHING CONSTRUCTION CONTRACT DURATION July 2010 DISCLAIMER: The following documentation as a whole was derived from Federal Highway Administration
More informationADDENDUM NO. 2. Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT
ADDENDUM NO. 2 Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT Bridge No. 1460008 (existing) Bridge No. 06806 (new) TO ALL BIDDERS: Anchor Engineering
More informationSUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2016
SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2016 102.5 Bid Deposits The City of Madison bid deposit form is required for all bids unless a Biennial Bid Bond is on file or check deposit is used.
More informationSECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.
SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings
More informationA. Structures Quantity Item Price Cost @ $3,500 EA
PRINCE WILLIAM COUNTY Department of Development Services Land Development Division UNIT PRICE LIST (Performance Bonds, Landscaping Escrows, and Siltation & Erosion Control Escrows) Revised: November 17,
More informationLegacy Trail Extension Feasibility Study. Preliminary Cost Estimate
Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5
More informationNOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW
NOTICE TO CONTRACTORS CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW The Nebraska Department of Roads will receive sealed bids in
More informationDESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
More informationDemo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts
SECTION 00300 BID FORM S For additions and deletions to the Contract, the following unit prices shall be applicable for the specific items listed. Unit Prices shall be complete, in place including required
More informationItem No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount
Engineer's Estimate DiPaolo Company 4350 DiPaolo Center Glenview, IL 60025 Stark Excavating, Inc. 1805 W. Washington Street Bloomington, IL 61701 Rowe Construction 1523 N. Cottage Avenue Bloomington, IL
More information3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch.
To Prospective Bidders: CITY OF TOLEDO, OHIO PARKSIDE AREA SSO ELIMINATION PHASE 2 GRAVITY RELIEF SEWER NO. 2011 Addendum No. 2 December 8, 2011 Information disclosed and/or questions raised since issuing
More informationAIR RELEASE, CLEANOUT, AND SEWER MANHOLES
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing
More informationSECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING
SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent
More informationHow to Do a Water & Sewer System Inventory - Capital Improvements Plan
Table of Contents Background, Objective and Method... 2 Capital Outlay - Water System... 3 Capital Outlay - Sewer System... 4 Summary... 4 Water Exhibit... 5 Sewer Exhibit....6 w w w. c a v a n a u g h
More informationBidding and Contract Requirements:
CITY OF LAREDO, TEXAS WATER UTILITIES DEPARTMENT 24-INCH TRANSMISSION MAIN ADDENDUM 7 June 10, 2016 To Bidder of Record: The following changes, additions, and/or deletions are hereby made a part of the
More informationSECTION 13 REPLACEMENT AND CLEANUP 13.01 SCOPE OF WORK
13.01 SCOPE OF WORK Under this item, the Contractor will restore all lawns, trees, gardens, landscape plantings, sidewalks, ramps, trails, fences, commercial signs, water courses and sand, gravel, dirt,
More informationCITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03
CITY OF SAN ANTONIO Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 (010) FORMAL INVITATION FOR BIDS (IFB) to CONTRACT 2016-2017 TASK ORDER CONTRACT
More informationINVITATION TO BID OFFICE OF THE ORLANDO-ORANGE COUNTY EXPRESSWAY AUTHORITY ORLANDO, FLORIDA
INVITATION TO BID OFFICE OF THE ORLANDO-ORANGE COUNTY EXPRESSWAY AUTHORITY ORLANDO, FLORIDA Sealed Bids will be received in the office of the Orlando-Orange County Expressway Authority, 4974 ORL Tower
More informationSECTION 02221 SELECTIVE DEMOLITION
SECTION 02221 PART 1 -GENERAL 1.01 DESCRIPTION This section includes all material, labor, machinery and supervision required to demolish and remove the following items where applicable and as noted on
More informationPROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS
C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates
More informationSECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
More information2014 Inlet Rehab Project II Various Locations
2014 Inlet Rehab Project II Various Locations in the City of Sioux Falls, South Dakota Bid Request No. 14-1078 Prepared by: Engineering Division 224 West 9 th Street Sioux Falls, SD 57104 TABLE OF CONTENTS
More informationStructures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS
Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS 1 Proposal & Plans Received? 2 Review Proposal, highlight important facts. Know proposal well to be able to find answers quickly.
More informationNew Road 11.0m Asphalt 23m ROW
New Road 11.0m Asphalt 23m ROW Granular A - 150 mm sq. m. $5.35 $69.53 Granular B - 300 mm sq. m. $7.35 $95.54 Concrete Curb and Gutter m. $44.67 $89.34 HL3 Asphalt - 40 mm sq. m. $7.66 $84.23 HL 4 or
More informationLS 2540 SEWER LATERALS AND INSPECTION TEES
LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal
More informationHelen Mercury Mine EE/CA OPINION OF PROBABLE COST
G Cost Estimates Helen Mercury Mine EE/CA Alternative 2: Limited Action 3 Minor Road Improvements 4 Clear & Grub diversion channel areas 5 Surveying 6 Cleanup & Demobilization 7 Pull back of material 8
More informationvolume of concrete occupied by the drain pipe in a cast-in-place structure or structure extension.
715.01 430 volume of concrete occupied by the drain pipe in a cast-in-place structure or structure extension. No additional payment will be made for the repair or replacement of existing concrete damaged
More informationDIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant
More informationSTANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 400 SEWER AND WATER CONSTRUCTION
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 400 SEWER AND WATER CONSTRUCTION Section Number Title 401 GENERAL 402 AMENDMENTS TO WSWS PART I - GENERAL CONDITIONS
More informationDate. Resubmit this form during the year if there are changes in your company ownership or financial standing.
COLORADO DEPARTMENT OF TRANSPORTATION CONTRACTOR PREQUALIFICATION STATEMENT (EXPERIENCE, EQUIPMENT AND FINANCIAL) Return to: Contracts & Market Analysis Prequalification Unit 4201 E. Arkansas,4th Floor
More informationHerbicide Application. Irrigation System (Only) Sanitary System Testing & Inspections
NAICS Code Work Description Work Item 115310 - Support Activities for Forestry 221310 Water Supply and Irrigation Systems 221320 - Sewage Treatment Facilities 236118 Residential Remodelers 236220 Commercial
More informationCW 2130 - GRAVITY SEWERS TABLE OF CONTENTS
August 2010 CW 2130 - GRAVITY SEWERS TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications... 1 1.4 Referenced Standard Details...
More informationSECTION 807 PUMP STATION REHABILITATION
SECTION 807 PUMP STATION REHABILITATION 807-1 DESCRIPTION: Rehabilitation of pump stations shall be defined as the cleaning, removal, repair and/or replacement of any and/or all components including but
More information1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP
5 INDEX TO SHEETS. NOTES AND TYPICAL SECTIONS. H. R. SMITH RD.CULVERT.3 0/5 END BARRIER ACCESS ROAD REPAIR. KISSIMMEE RD. AT MORGAN HOLE CR. ROAD REPAIR.5 RANGE INFRASTRUCTURE REPAIR N 0 000' 3 0,000'
More informationSection 402. STORM SEWERS
402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide
More informationBUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS
Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development
More informationADDENDUM NO. 1. Manchester Boston Regional Airport, City of Manchester, NH
Hoyle, Tanner Project No. 093145 ADDENDUM NO. 1 Manchester Boston Regional Airport, City of Manchester, NH Construct Relocated Roadway Airport Service Rd. Outside Runway Object Free Area (ROFA); Construct
More informationSECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
More informationCity of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014
City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 Section Subsection Name Date Modification Division 1 All subsections General Provisions
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS
San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS 854.1 DESCRIPTION: This item shall govern sanitary sewer laterals installed in accordance with these
More informationBUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS
Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development
More informationSECTION 4Aggegate Subbase
The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages
More informationCONSTRUCTION COST MODELS
CONSTRUCTION COST MODELS Prepared by: The New England Environmental Finance Center For the Maine Department of Transportation Office of Environmental Planning November 1, 2010 The following are a series
More informationSAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT
SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer
More informationMTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS
Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT
More informationSECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
More informationDESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES
SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing
More informationAcceptance Codes APPENDIX - A. Acceptance Criteria
1111 Receipt of a satisfactory Test Report from WSDOT Materials Laboratory is required indicating the lot (or lots) or batch of material meets the requirement of the specifications under which it is listed.
More informationSECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES
SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with
More informationA. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.
PART 1 GENERAL 1.1 SCOPE A. This item shall include the work necessary for the installation of storm sewer line construction. B. Reference Section 3800 Trenching and Backfill and the General Conditions,
More information550 PIPE CULVERTS, SEWERS AND DRAINS
551.01 550 PIPE CULVERTS, SEWERS AND DRAINS 551 GENERAL 551.01 Description 551.02 Materials 551.03 Excavation 551.04 Protection of Excavation 551.05(a) Bedding for Rigid Pipe 551.05(b) Bedding for Non-Rigid
More informationEXHIBIT A Accessible Truck Routes Map
EXHIBIT A Accessible Truck Routes Map ASHEVILLE, NORTH CAROLINA ROUTE: A ROUTE: B ROUTE: C ROUTE: D ROUTE: E EXHIBIT A EXHIBIT B Craven Street Improvements Map ASHEVILLE, NORTH CAROLINA EXHIBIT B EXHIBIT
More informationMicropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 JRHill@HaywardBaker.com
More informationUNIT PRICE LIST (09/30/2012) DIVISION I -EARTHWORK
LIST (09/30/2012) DIVISION I -EARTHWORK 100.1 MOBILIZATION L.S. - 11% 100.2 INSURANCE & BOND L.S. - 3% 101.1 PREPARING RIGHT OF WAY L.S. - 4% 102.1 OBLITERATING ABANDONED STREET ( < 25,000 S.Y.) S.Y. 6
More informationTable of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities
Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)
More information08003-1 WATER SERVICE 2
08003_Mar08_2011.pdf Page 1 of 7 INDEX Page 08003-1 WATER SERVICE 2 1.1 Pipe 2 1.1.1 Copper 2 1.1.2 Polyethylene 2 1.2 Valves and Fittings 2 1.2.1 Main Stops 3 1.2.2 Curb Stops 3 1.2.3 Curb Box 3 1.2.4
More informationCONSTRUCTION PERMIT REQUIREMENTS
CONSTRUCTION PERMIT REQUIREMENTS Any work to be done in the City right-of-way (ROW), in a utility easement, and certain work on private property, requires an Engineering Inspection Permit from the Department
More informationStorm Drain Inlet Protection - IP
Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior
More informationSECTION 33 41 00 REINFORCED CONCRETE PIPE. A. The following is a list of SPECIFICATIONS, which may be related to this section:
SECTION 33 41 00 REINFORCED CONCRETE PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. This section includes construction of reinforced concrete pipe for storm drainage, culverts, and sanitary sewer, including
More informationTabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14
Solcitation No: DTFH71-14-B-00008 Division: Eastern Federal Lands State: DC County: Federal Land: 1 out of 9 Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date:
More informationMay 29, 2015. The Department of Roads has scheduled a bid letting to be held in this office June 25, 2015 at 1:30 PM
May 29, 2015 TO ALL CONCERNED: The Department of Roads has scheduled a bid letting to be held in this office June 25, 2015 at 1:30 PM The Notice to Contractors includes: 1. Website Information 2. Notice
More informationSECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
More informationSection 600 Incidental Construction
Table of Contents 1. Pipe Culverts... 600-1 A. Endwalls, Inlets, Manholes, and Spring Boxes... 600-5 2. Grade Adjustment of Existing Miscellaneous Structures... 600-8 3. Rebuilt Miscellaneous Structures...
More informationSTANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200
STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES PART 1 - GENERAL A. Description This section includes materials, testing, and installation of precast concrete
More informationPreliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006
Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006 1.0 Background and Repair and Rehabilitation Recommendation Clay County has contracted Camp Dresser & McKee Inc. (CDM)
More informationChapter 22. Lump Sum Project Guidelines
Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11
More informationCID STREET INFRASTRUCTURE ASSESSMENT
ABSTRACT An evaluation of the street infrastructure in Foxberry Estates Phase 1, including pavement condition, verification of construction techniques, and subgrade quality. Recommendations and costs for
More informationVOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10
VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1
More informationOPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY
Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic
More informationDeveloping Critical Path Method Scheduling (CPM)
Developing Critical Path Method Scheduling (CPM) Pretest 1. An activity which is on critical path has a planned duration of 5 days. What is the total float for the activity? a. 0 b. 1 c. 2 d. 3 Pretest
More informationSECTION 33 31 00.11 GRAVITY SANITARY SEWERS
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit
More informationCCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS
CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection
More informationProject Performance Review Summary
Rev. March 2009 Standard Specifications 2007 Project Performance Review Summary SC File No. FAP No. County Prime Contractor Date Route RCE Overall Project Evaluation Summary Adjusted Project Score Adjusted
More informationDescription Quantity Cost Total Cost
APPENDIX: ITEMIZED CONSTRUCTION COST ESTIMATE Description Quantity Cost Total Cost 1 CASCADE FALLS 1a Existing Cascade Falls Upgrades Structural Repairs - Steps, Railing, Walls, Pool Lump Sum $500,000
More informationCatch Basin Rehabilitation Road Commission for Oakland County, Michigan
Date: Location: September 14, 2011, 9:45a.m. start East side of street in front of 4656 Maura Lane, West Bloomfield Participants: Oakland County Michelle Belanger, Rick Hall, Matt Mountain, Gary Flounory,
More informationSECTION 15 AIR RELEASE VALVE ASSEMBLIES. 15-1 General
SECTION 15 AIR RELEASE VALVE ASSEMBLIES 15-1.01 Scope 15-1 General This section describes the requirements for furnishing and installing Air Release Valve Assemblies of the size and type shown on the plans,
More informationState of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
More informationPUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0
More information