Unit Price Averages Reports

Save this PDF as:
 WORD  PNG  TXT  JPG

Size: px
Start display at page:

Download "Unit Price Averages Reports"

Transcription

1 Unit Price Averages Reports

2 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation staff and its Consultants for the development of construction cost estimates on Department construction projects. The unit price averages presented in this report are based on the cumulative average of the unit prices from the three lowest bids received for the period from August 1, 2014, to September 30, 2015 for 2015 construction projects. As well, the unit price averages are weighted by bid quantity. These unit price averages are provided for information only and, while thought to be accurate, are provided without warranty of any kind, either expressed or implied. The Crown, its agents, employees or contractors will not be liable for any damages, direct or indirect, or lost profits arising out of the use of this information, and as such, any user of this information shall assume all associated risks.

3 10/23/2015 PROVINCIAL, Weighted Unit Price Averages Page 1 of 6 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item A051 Supply of Aggregate - No Option 1 $0 2,600 m3 $0.00 A805 Supply of Aggregate - No Option 10 $539, ,197 t $0.96 B100 Subgrade Excavation 19 $589,895 19,845 m3 $29.73 B152 Granular Fill (Pit-run) - Des $2,731,173 95,705 t $28.54 B153 Granular Fill - Des $410,654 10,955 t $37.49 B154 Granular Fill (Pit-Run) 2 $212,702 10,450 t $20.35 B155 Granular Fill, 6, $15, t $31.46 B175 Granular Fill, 6, $42, m3 $ B180 Preparing Subgrade Surface (First Layer) 20 $1,177, ,630 m2 $1.67 B181 Preparing Subgrade Surface (Second Layer) 3 $153, ,400 m2 $1.27 B282 Granular Base Course - Des. 2 Cl $24,615, ,804 t $31.37 C055 Topsoil and Subsoil Stripping 4 $834, ,500 m3 $5.10 C056 Topsoil and Subsoil Placement 4 $257,618 32,755 m3 $7.86 C060 Common Excavation - Civil Projects 3 $992, ,000 m3 $8.01 C062 Borrow Area Excavation 2 $3,532, ,000 m3 $5.52 C063 Wet Excavation - Type 1 1 $305,200 40,000 m3 $7.63 C064 Wet Excavation - Type 2 2 $175,056 12,800 m3 $13.68 C065 Impervious Fill Zone 1A 3 $1,445, ,500 m3 $5.68 C069 Random Fill Zone 2A 2 $525, ,000 m3 $1.48 C091 Pitrun Gravel Zone 4C 3 $569,865 28,400 t $20.07 C100 Riprap Bedding Gtavel Zone 5A 2 $589,390 17,000 m3 $34.67 C102 Coarse Rip-rap Bedding Zone 5B 2 $702,000 13,000 m3 $54.00 C105 Gravel Armour Zone 5C 1 $266,640 8,000 m3 $33.33 C106 Gravel Armour Zone 5C 2 $50,753 1,500 t $33.84 C110 Riprap Zone 6A 2 $720,275 9,700 m3 $74.26 C120 Riprap Zone 6B 2 $945,000 10,500 m3 $90.00 C140 Riprap Zone 6C 1 $3,240,000 24,000 m3 $ C143 Salvage and Reinstall Existing Riprap 1 $3, m3 $65.00 C145 Impervious Fill Zone 1A 1 $147,450 15,000 m3 $9.83 C150 Fine Filter Zone 3A 1 $1,300,550 19,000 m3 $68.45 C160 Coarse Filter Zone 3B 1 $129,990 3,000 m3 $43.33 C200 Geotextile 3 $15,217 3,960 m2 $3.84 C225 Erosion Control Blanket 1 $3, m2 $3.92 C230 Drill Seeding 3 $208, ,000 m2 $0.65 C232 Hydroseeding 3 $54,540 40,000 m2 $1.36 C248 Temporary Fencing 1 $38,340 2,000 m $19.17 C250 Barbed Wire Fence 1 $9,030 1,000 m $9.03 C254 Barbed Wire Fencing and Gates 2 $59,662 5,600 m $10.65 C265 Vehicle Access Control Gate 1 $20,800 4 Each $5, D100 Culverts - Remove and Dispose (C.S.P.) (up to 700 mm dia.) 22 $250,416 2,248 m $ D105 Culverts - Remove and Dispose (C.S.P.) (over 700 mm dia.) 19 $85, m $ D200 Granular Backfill - Culverts 3 $13, m3 $81.28 D235 Granular Backfill - Culverts 8 $55, t $55.90 D326 Culverts - Supply and Install (up to 700 mm dia. R.G.R.C.P.) 2 $8, m $ D405 Culverts - Supply and Install (500 mm dia. C.S.P.) 3 $67, m $313.36

4 10/23/2015 PROVINCIAL, Weighted Unit Price Averages Page 2 of 6 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item D410 Culverts - Supply and Install (600 mm dia. C.S.P.) 21 $1,101,095 3,255 m $ D425 Culverts - Supply and Install (800 mm dia. C.S.P.) 13 $722,249 1,285 m $ D430 Culverts - Supply and Install (900 mm dia. C.S.P.) 9 $126, m $ D435 Culverts - Supply and Install (1200 mm dia. C.S.P.) 3 $37, m $ D460 Culverts - Supply and Install (450 mm dia. R.C.P.) 2 $8, m $ D500 Smoothwall Steel Pipe Culvert - Supply and Auger (750 mm dia 1 $49, m $1, D510 Smoothwall Steel Pipe Culvert - Supply and Auger (600 mm dia 4 $425, m $1, D520 Smoothwall Steel Pipe Culvert - Supply and Auger (800 mm dia 5 $736, m $1, D525 Smoothwall Steel Pipe Culvert - Supply and Auger (900 mm dia 2 $258, m $1, D540 Grouting of Abandoned Culverts 19 $678, m3 $ D555 Riprap - Random - Supply and Place 1 $11, m3 $ D607 Filter Material 1 $30, m3 $ D615 Perforated Pipe 2 $34, m $ D732 Adjust Manholes 2 $5,333 3 units $1, D733 Adjust Catch Basins 1 $1,083 1 units $1, D734 Ajust Water Valve 2 $20, units $1, D795 Leads - Supply and Install 1 $8, m $ D825 Culvert Liner - Supply and Install (375 mm Dia.) 1 $7, m $ D850 Culvert Liner - Supply and Install (S.W.S.P.) ( mm) 2 $62, m $ E003 Misc. Environmental Work 3 $57, plantings $ E110 Granular Fill for Drainage Layer 2 $91,545 5,100 m3 $17.95 E331 Gabion Mattress - Supply and Install 1 $83, m2 $ E420 Stone Barrier 1 $65, m3 $ E435 Geotextile Fence Barrier - Ditch 25 $180,449 11,770 m $15.33 E452 Geotextile - Nonwoven (Supply and Install) 7 $839, ,860 m2 $2.74 E453 Geogrid - Supply and Install 1 $1, m2 $2.67 E454 Geotextile for Materials Separation - Supply and Install 4 $15,334 2,805 m2 $5.47 E456 Geotextile for Stabilization - Supply and Install 8 $178,397 38,940 m2 $4.58 E500 Soil Covering (Low Flow) 1 $2,040 1,000 m2 $2.04 E505 Soil Covering (Medium Flow) 7 $192,251 67,135 m2 $2.86 E510 Soil Covering (High Flow) 13 $263,482 35,779 m2 $7.36 E515 Synthetic Permeable Ditch Barrier 5 $73,073 4,200 m $17.40 E607 Drill Seeding 7 $44, ha $2, E608 Broad-Cast Seeding 12 $140, ha $ E609 Hydro-Seeding 4 $58,306 6 ha $9, E610 Slope Texturing 3 $78, ,400 m2 $0.47 F169 Haul of Bridge Materials 1 $5,682 1 t.km $5, F189 Excavation - Channel 1 $6, m3 $13.51 F195 Backfill - Non-Granular 2 $36, m3 $73.95 F200 Backfill - Pit Run Granular - Des. 6 Cl $87, m3 $ F203 Backfill - Crushed Granular, 2, 25 3 $58, m3 $ F495 CSP with Couplers - Supply 1 $38, m $ F496 CSP - Assembly 2 $63, m $ F500 Heavy Rock RipRap (Class 1) 20 $947,465 3,996 m3 $ F505 Heavy Rock RipRap (Class 1M) 3 $127, m3 $282.50

5 10/23/2015 PROVINCIAL, Weighted Unit Price Averages Page 3 of 6 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item F515 Heavy Rock RipRap (Class 2) 5 $191, m3 $ F525 Heavy Rock RipRap (Class 3) 3 $859,820 6,180 m3 $ F755 Surface Removal 5 $299,632 13,223 m2 $22.66 F760 Partial Depth Repair 8 $474, m2 $1, F765 Full Depth Repair 4 $43, m2 $1, F770 Sandblasting (Deck Surface) 3 $59,190 2,675 m2 $22.13 F775 Deck Overlay Concrete 3 $314, m3 $1, F776 Placement Deck Overlay Concrete 3 $268,526 2,665 m2 $ F812 Supply of Piling - H-Pile 4 $126, m $ F814 Supply of Piling - Pipe Pile 3 $101, m $ F816 Pile Set-up 7 $413, piles $2, F818 Pile Driving 7 $213,963 1,903 m $ F820 Loading Tests 3 $32,276 7 tests $4, F822 Pile Concrete 6 $1,294,645 3,465 m3 $ F824 Drill Rig Set-up 5 $344, piles $2, F826 Pile Installation 4 $727,783 3,132 m $ F834 Concrete - Class C 8 $1,116, m3 $1, F836 Concrete - Class D 1 $3,439,418 3,550 m3 $ F838 Concrete - Class S 1 $469, m3 $ F841 Concrete - Class HPC 5 $739, m3 $2, F850 Plain Reinforcing Steel - Supply 8 $665, ,398 kg $1.63 F854 Reinforcing Steel - Place 11 $2,110, ,936 kg $2.65 F974 Deck Waterproofing 4 $158,966 1,977 m2 $80.41 F980 Asphalt Concrete Pavement - Mix Type H2 ( A) 7 $768,875 2,535 t $ F982 Asphalt Concrete Pavement - Mix Type M1 ( A) 1 $52, t $ G100 Clearing 6 $25,004 2 ha $12, G220 Channel Excavation 13 $270,832 41,385 m3 $6.54 G225 Common Excavation 20 $14,523,242 2,493,247 m3 $5.83 G230 Borrow Topsoil Excavation 4 $1,342, ,497 m3 $3.57 G235 Borrow Excavation 2 $4,764, ,800 m3 $5.72 G236 Borrow Excavation - Contractor's Supply 12 $2,278, ,437 m3 $17.33 G239 Overhaul 1 $1,642,816 1,235,200 m3.km $1.33 G248 Common and/or Borrow Excavation Loaded to Trucks 4 $1,542, ,350 m3 $13.26 G270 Sideslope Improvement 13 $3,371, km $44, G300 Topsoil Placement 20 $1,452,712 1,928,253 m2 $0.75 G320 Topsoil (Supply and Place) 2 $17,133 1,775 m2 $9.65 G452 Remove and Dispose of Existing Fence 10 $76, km $4, G453 Remove and Salvage of Existing Fence 1 $2,505 0 km $17, G470 New Fence - Supply and Install - Class A 1 $0 0 km $0.00 G475 New Fence - Supply and Install - Class B 9 $169, km $11, G483 New Fence - Supply and Install - Class F 1 $2,087 0 km $20, M102 Crack Repair - Spray Patch 5 $764, ,255 m $5.87 M103 Transverse Crack Repair - Mill & Fill 1 $142,476 3,100 m $45.96 Q185 Gravel Surfacing - Des. 4 Cl $49,014 1,510 t $32.46 Q186 Gravel Surfacing - Des. 4 Cl $543,123 13,555 t $40.07

6 10/23/2015 PROVINCIAL, Weighted Unit Price Averages Page 4 of 6 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item Q510 Asphalt Mix For Others 9 $560,561 9,025 t $62.11 Q560 Cold Milling Asphalt Pavement 3 $668,605 20,543 m3 $32.55 Q565 Cold Milling Asphalt Pavement 20 $3,539,343 1,246,192 m2 $2.84 Q567 Supply Rejuvenating Agent 1 $6,315 2,170 l $2.91 Q722 Supply and Place Fog Coat 5 $86, ,910 m2 $0.85 Q770 Graded Aggregate Seal Coat - Des. 3 Cl. 12.5C 3 $2,646, ,831 m2 $3.54 Q771 Graded Aggregate Seal Coat - Bridge Decks 3 $79,891 3,805 m2 $21.00 Q785 Chip Seal Coat - Des. 3 Cl. 12.5BW 3 $4,512,548 1,183,331 m2 $3.81 Q798 Chip Seal Coat - Bridge Decks 3 $115,671 4,262 m2 $27.14 Q987 Asphalt Concrete Pavement - EPS Mix Type H1 (PG58-34) 1 $4,761,792 50,400 t $94.48 Q990 Asphalt Concrete Pavement - EPS Mix Type H1 17 $88,064,606 1,103,323 t $79.82 Q991 Asphalt Concrete Pavement - EPS Mix Type H2 14 $37,828, ,267 t $83.46 Q992 Asphalt Concrete Pavement - EPS Mix Type M1 16 $71,492, ,615 t $78.68 Q993 Asphalt Concrete Pavement - EPS Mix Type L1 4 $7,098,713 85,135 t $83.38 Q994 Asphalt Concrete Pavement - EPS Mix Type S1 12 $14,494, ,740 t $91.31 Q996 Asphalt Concrete Pavement - EPS Mix Type S3 16 $42,125, ,850 t $71.91 S261 Concrete Base - Supply and Install 9 $226, units $1, S270 Supply of Signs, 3/4" Plywood 9 $35, m2 $ S271 Supply of Signs, Extruded Aluminum 9 $162, m2 $ S272 Supply of Signs, Aluminum 20 $39, m2 $ S273 Supply of Signs, Aluminum - 3M Diamond Grade (VIP) 19 $111, m2 $ S275 Removal and Reinstallation or Disposal of Existing Signs - One 25 $122, signs $ S277 Removal and Reinstallation or Disposal of Existing Signs - Two 18 $36, signs $ S283 Concrete Base - Remove and Reinstall 1 $1,867 2 units $ S288 Install Sign - Less than 1 m2 26 $69, signs $81.39 S289 Install Sign - 1 m2 to 3 m2 16 $35, signs $ S290 Install Sign - over 3 m2 8 $40, signs $ S291 Remove and Reinstall Breakaway Steel Posts 1 $1,350 2 posts $ S292 Remove and Dispose - Breakaway Steel Posts 5 $10, posts $ S309 Pavement Messages - Gore Area 10 $83, messages $1, S310 Pavement Messages - Turn Arrow (Single or Double) 11 $32, messages $ S315 Pavement Messages - Stop Bar 16 $17, messages $ S320 Pavement Messages - Stop Ahead 5 $3, messages $ S321 Pavement Messages - STOP 2 $612 3 messages $ S326 Pavement Messages - Railway Crossing 2 $2,400 4 messages $ S327 Pavement Messages - Pedestrian Crossing 2 $724 3 messages $ S341 Durable Pavement Messages - Turn or Straight Arrows (Single 17 $95, messages $ S342 Durable Pavement Messages - Stop Bar 18 $93, messages $ S343 Durable Pavement Messages - Railway Crossing 3 $7,572 8 messages $ S344 Durable Pavement Messages - Stop Ahead 6 $11, messages $ S345 Durable Pavement Messages - Aircraft Patrol Zone 3 $14, messages $1, S346 Durable Pavement Messages - Pedestrian Crossing 1 $9,900 6 messages $1, S347 Durable Pavement Messages - STOP 10 $22, messages $ S348 Durable Pavement Messages - SCHOOL ZONE 1 $1,755 2 messages $ S349 Removal of Existing Durable Pavement Messages 2 $1,527 5 messages $305.46

7 10/23/2015 PROVINCIAL, Weighted Unit Price Averages Page 5 of 6 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item S350 Roadway Lines - Supplying Paint and Painting (Directional Divid 33 $481, km $ S351 Roadway Lines - Supplying Paint and Painting (Lane Dividing a 14 $350, km $ S352 Roadway Lines - Supplying Paint and Painting (Lane Dividing L 14 $19, km $ S355 Roadway Lines - Supplying Paint and Paiting (Directional Divid 2 $3,460 6 km $ S360 Intersection Lines - Supplying Paint and Painting 32 $51, intersection $ S370 Interchange Lines - Supplying Paint and Painting 4 $50, interchange $3, S375 Removal of Existing Painted Lines 2 $3, m $5.08 S376 Removal of Existing Roadway Lines 2 $72, km $2, S400 Underground Electrical Conduit - Supply and Install - Trench Ex 6 $275,830 6,487 m $42.52 S405 Underground Electrical Conduit - Supply and Install - Pushed C 8 $119, m $ S700 Milled Rumble Strips for Stop Conditions 10 $44, sets $2, S706 Milled Rumble Strips 25 $939,158 1,212 km $ S730 Supply and Install Breakaway Steel Posts - W150 X 14 8 $123, m $1, S740 Supply and Install Breakaway Steel Posts - W150 X 22 1 $19, m $1, S745 Supply and Install Breakaway Steel Posts - W200 X 27 1 $38, m $1, S765 Cluster Frames - Supply and Install 3 $3,477 7 frames $ S770 Supply and Install - Wooden Post 4 $21, posts $ S772 Supply and Install Post (100mm X 150mm) 26 $163, posts $ S775 Removal and Reinstallation or Disposal of Existing Signs 2 $1,826 4 signs $ S800 W-Beam Guardrail - Supply and Install 1 $14, m $ S805 Strong Post W-Beam Guardrail - Supply and Install 23 $1,952,034 14,029 m $ S815 Cable Barrier - Supply and Install 3 $1,113,500 10,231 m $ S820 Remove, Salvage and Reinstall Existing Guardrail 9 $182,312 1,407 m $ S822 Supply of Guardrail Posts 5 $29, posts $99.18 S825 Remove and Dispose of Existing Guardrail 30 $1,102,782 37,725 m $29.23 S830 Flexible Guide Post/Delineators - Round - Supply and Install 32 $452,571 5,349 posts $84.61 U100 Trenching and Backfilling 9 $315,379 16,972 m $18.58 U105 Secondary Cable - Supply and Install 10 $506,754 50,921 m $9.95 U110 Removal and Salvage of Existing Standards 2 $5,393 8 units $ U115 Removal and Disposal of Existing Light Fixures 4 $27, units $ U120 Cast In Place Concrete Base - Supply and Install 6 $420, units $2, U125 Street Light Standard - Supply and Install 8 $506, units $2, U130 Salvaged Street Light Standard - Install 2 $7,073 8 poles $ U135 Distribution Enclosure - Supply and Install 7 $163, units $12, X215 Removing Curb and Gutter 1 $75, m $ X220 Removing Concrete Surface 1 $1,333 5 m2 $ X225 Removing Manhole 1 $4,667 1 units $4, X230 Removing Catch Basin 1 $17,333 4 units $4, X235 Removing Curb 1 $1,800 9 m $ X320 Concrete Curb (all Types) 2 $98,912 1,260 m $78.50 X325 Curb and Gutter (all heights) 3 $442,434 3,218 m $ X346 Rock Rip-Rap - Hand Laid 2 $14, m2 $ X350 Solid Concrete Islands 2 $111, m2 $ X400 Solid Concrete Medians 1 $31, m2 $ X415 Granular Fill for Medians 2 $51,660 1,280 t $40.36

8 10/23/2015 PROVINCIAL, Weighted Unit Price Averages Page 6 of 6 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item X435 Median Asphalt Concrete Surfacing 2 $194,402 1,185 t $ X440 Median Concrete Surfacing 3 $486,553 5,205 m2 $93.48 X510 Cutting of Pavement Edge 25 $360,167 45,609 m $7.90

9 10/23/2015 SOUTHERN REGION, Weighted Unit Price Averages Page 1 of 4 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item A805 Supply of Aggregate - No Option 2 $120, ,330 t $0.61 B100 Subgrade Excavation 6 $126,936 6,670 m3 $19.03 B152 Granular Fill (Pit-run) - Des. 6 7 $1,105,338 51,515 t $21.46 B153 Granular Fill - Des. 2 2 $10, t $39.48 B155 Granular Fill, 6, $15, t $31.46 B180 Preparing Subgrade Surface (First Layer) 1 $14,820 11,060 m2 $1.34 B282 Granular Base Course - Des. 2 Cl $1,028,420 39,840 t $25.81 C055 Topsoil and Subsoil Stripping 4 $834, ,500 m3 $5.10 C056 Topsoil and Subsoil Placement 4 $257,618 32,755 m3 $7.86 C060 Common Excavation - Civil Projects 3 $992, ,000 m3 $8.01 C062 Borrow Area Excavation 2 $3,532, ,000 m3 $5.52 C063 Wet Excavation - Type 1 1 $305,200 40,000 m3 $7.63 C064 Wet Excavation - Type 2 2 $175,056 12,800 m3 $13.68 C065 Impervious Fill Zone 1A 3 $1,445, ,500 m3 $5.68 C069 Random Fill Zone 2A 2 $525, ,000 m3 $1.48 C091 Pitrun Gravel Zone 4C 3 $569,865 28,400 t $20.07 C100 Riprap Bedding Gtavel Zone 5A 2 $589,390 17,000 m3 $34.67 C102 Coarse Rip-rap Bedding Zone 5B 2 $702,000 13,000 m3 $54.00 C105 Gravel Armour Zone 5C 1 $266,640 8,000 m3 $33.33 C106 Gravel Armour Zone 5C 2 $50,753 1,500 t $33.84 C110 Riprap Zone 6A 2 $720,275 9,700 m3 $74.26 C120 Riprap Zone 6B 2 $945,000 10,500 m3 $90.00 C140 Riprap Zone 6C 1 $3,240,000 24,000 m3 $ C143 Salvage and Reinstall Existing Riprap 1 $3, m3 $65.00 C145 Impervious Fill Zone 1A 1 $147,450 15,000 m3 $9.83 C150 Fine Filter Zone 3A 1 $1,300,550 19,000 m3 $68.45 C160 Coarse Filter Zone 3B 1 $129,990 3,000 m3 $43.33 C200 Geotextile 3 $15,217 3,960 m2 $3.84 C230 Drill Seeding 3 $208, ,000 m2 $0.65 C232 Hydroseeding 3 $54,540 40,000 m2 $1.36 C248 Temporary Fencing 1 $38,340 2,000 m $19.17 C250 Barbed Wire Fence 1 $9,030 1,000 m $9.03 C254 Barbed Wire Fencing and Gates 2 $59,662 5,600 m $10.65 C265 Vehicle Access Control Gate 1 $20,800 4 Each $5, D100 Culverts - Remove and Dispose (C.S.P.) (up to 700 mm dia.) 4 $20, m $ D105 Culverts - Remove and Dispose (C.S.P.) (over 700 mm dia.) 4 $15, m $ D200 Granular Backfill - Culverts 2 $12, m3 $86.56 D326 Culverts - Supply and Install (up to 700 mm dia. R.G.R.C.P.) 2 $8, m $ D405 Culverts - Supply and Install (500 mm dia. C.S.P.) 2 $57, m $ D410 Culverts - Supply and Install (600 mm dia. C.S.P.) 5 $75, m $ D425 Culverts - Supply and Install (800 mm dia. C.S.P.) 2 $41, m $ D430 Culverts - Supply and Install (900 mm dia. C.S.P.) 2 $26, m $ D460 Culverts - Supply and Install (450 mm dia. R.C.P.) 1 $2,386 4 m $ D520 Smoothwall Steel Pipe Culvert - Supply and Auger (800 mm dia 2 $134, m $1, D540 Grouting of Abandoned Culverts 5 $122, m3 $726.84

10 10/23/2015 SOUTHERN REGION, Weighted Unit Price Averages Page 2 of 4 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item D555 Riprap - Random - Supply and Place 1 $11, m3 $ D734 Ajust Water Valve 1 $1,917 1 units $1, D825 Culvert Liner - Supply and Install (375 mm Dia.) 1 $7, m $ D850 Culvert Liner - Supply and Install (S.W.S.P.) ( mm) 1 $17, m $ E110 Granular Fill for Drainage Layer 2 $91,545 5,100 m3 $17.95 E435 Geotextile Fence Barrier - Ditch 8 $88,488 6,075 m $14.57 E454 Geotextile for Materials Separation - Supply and Install 2 $1, m2 $4.63 E456 Geotextile for Stabilization - Supply and Install 2 $29,268 5,350 m2 $5.47 E505 Soil Covering (Medium Flow) 1 $8, m2 $16.29 E510 Soil Covering (High Flow) 1 $64,416 9,600 m2 $6.71 E607 Drill Seeding 3 $21,089 6 ha $3, E609 Hydro-Seeding 2 $26,310 1 ha $23, F203 Backfill - Crushed Granular, 2, 25 1 $22, m3 $ F495 CSP with Couplers - Supply 1 $38, m $ F496 CSP - Assembly 2 $63, m $ F500 Heavy Rock RipRap (Class 1) 2 $19, m3 $ F505 Heavy Rock RipRap (Class 1M) 2 $69, m3 $ F515 Heavy Rock RipRap (Class 2) 2 $114, m3 $ F525 Heavy Rock RipRap (Class 3) 1 $99, m3 $ F755 Surface Removal 1 $14, m2 $64.72 F760 Partial Depth Repair 1 $172, m2 $1, F765 Full Depth Repair 1 $10,574 4 m2 $2, F812 Supply of Piling - H-Pile 2 $62, m $ F814 Supply of Piling - Pipe Pile 1 $12, m $ F816 Pile Set-up 2 $125, piles $2, F818 Pile Driving 2 $99, m $ F820 Loading Tests 2 $14,898 2 tests $7, F822 Pile Concrete 2 $20, m3 $ F824 Drill Rig Set-up 2 $134, piles $5, F826 Pile Installation 2 $96, m $ F834 Concrete - Class C 2 $49, m3 $1, F836 Concrete - Class D 1 $3,439,418 3,550 m3 $ F838 Concrete - Class S 1 $469, m3 $ F850 Plain Reinforcing Steel - Supply 2 $11,982 3,511 kg $3.41 F854 Reinforcing Steel - Place 3 $1,541, ,011 kg $4.76 F974 Deck Waterproofing 1 $30, m2 $83.33 F980 Asphalt Concrete Pavement - Mix Type H2 ( A) 2 $94, t $ G220 Channel Excavation 2 $18,897 1,530 m3 $12.35 G225 Common Excavation 4 $517,001 35,930 m3 $14.39 G230 Borrow Topsoil Excavation 1 $4, m3 $12.30 G235 Borrow Excavation 1 $46,000 2,000 m3 $23.00 G236 Borrow Excavation - Contractor's Supply 2 $83,558 3,550 m3 $23.54 G248 Common and/or Borrow Excavation Loaded to Trucks 1 $52,272 4,800 m3 $10.89 G270 Sideslope Improvement 5 $711, km $32, G300 Topsoil Placement 4 $93,893 62,100 m2 $1.51

11 10/23/2015 SOUTHERN REGION, Weighted Unit Price Averages Page 3 of 4 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item G320 Topsoil (Supply and Place) 1 $14,677 1,300 m2 $11.29 M102 Crack Repair - Spray Patch 2 $62,655 9,255 m $6.77 Q185 Gravel Surfacing - Des. 4 Cl $3, t $70.06 Q186 Gravel Surfacing - Des. 4 Cl $21, t $38.74 Q510 Asphalt Mix For Others 3 $157,010 3,000 t $52.34 Q565 Cold Milling Asphalt Pavement 4 $178,298 43,841 m2 $4.07 Q722 Supply and Place Fog Coat 5 $86, ,910 m2 $0.85 Q990 Asphalt Concrete Pavement - EPS Mix Type H1 6 $36,973, ,280 t $69.20 Q991 Asphalt Concrete Pavement - EPS Mix Type H2 2 $2,240,402 30,600 t $73.22 Q992 Asphalt Concrete Pavement - EPS Mix Type M1 1 $4,447,328 65,450 t $67.95 Q993 Asphalt Concrete Pavement - EPS Mix Type L1 2 $2,518,760 33,425 t $75.36 Q994 Asphalt Concrete Pavement - EPS Mix Type S1 4 $4,602,755 54,540 t $84.39 Q996 Asphalt Concrete Pavement - EPS Mix Type S3 4 $8,053, ,550 t $60.76 S261 Concrete Base - Supply and Install 1 $43, units $1, S270 Supply of Signs, 3/4" Plywood 1 $2,352 6 m2 $ S271 Supply of Signs, Extruded Aluminum 1 $53, m2 $ S272 Supply of Signs, Aluminum 5 $7, m2 $ S273 Supply of Signs, Aluminum - 3M Diamond Grade (VIP) 4 $6, m2 $ S275 Removal and Reinstallation or Disposal of Existing Signs - One 5 $40, signs $ S277 Removal and Reinstallation or Disposal of Existing Signs - Two 4 $11, signs $ S283 Concrete Base - Remove and Reinstall 1 $1,867 2 units $ S288 Install Sign - Less than 1 m2 5 $10, signs $ S289 Install Sign - 1 m2 to 3 m2 2 $5, signs $ S290 Install Sign - over 3 m2 1 $6,050 6 signs $1, S291 Remove and Reinstall Breakaway Steel Posts 1 $1,350 2 posts $ S292 Remove and Dispose - Breakaway Steel Posts 1 $6, posts $ S309 Pavement Messages - Gore Area 4 $45, messages $1, S341 Durable Pavement Messages - Turn or Straight Arrows (Single 7 $35, messages $ S342 Durable Pavement Messages - Stop Bar 8 $28, messages $ S343 Durable Pavement Messages - Railway Crossing 1 $1,738 2 messages $ S344 Durable Pavement Messages - Stop Ahead 3 $6,205 7 messages $ S345 Durable Pavement Messages - Aircraft Patrol Zone 3 $14, messages $1, S347 Durable Pavement Messages - STOP 7 $19, messages $ S348 Durable Pavement Messages - SCHOOL ZONE 1 $1,755 2 messages $ S349 Removal of Existing Durable Pavement Messages 2 $1,527 5 messages $ S350 Roadway Lines - Supplying Paint and Painting (Directional Divid 9 $59, km $ S351 Roadway Lines - Supplying Paint and Painting (Lane Dividing a 5 $115, km $ S352 Roadway Lines - Supplying Paint and Painting (Lane Dividing L 4 $3, km $ S355 Roadway Lines - Supplying Paint and Paiting (Directional Divid 1 $1,202 2 km $ S360 Intersection Lines - Supplying Paint and Painting 8 $13, intersection $ S370 Interchange Lines - Supplying Paint and Painting 3 $39, interchange $3, S375 Removal of Existing Painted Lines 2 $3, m $5.08 S376 Removal of Existing Roadway Lines 1 $2,415 0 km $5, S400 Underground Electrical Conduit - Supply and Install - Trench Ex 2 $1, m $58.19 S405 Underground Electrical Conduit - Supply and Install - Pushed C 1 $12, m $86.39

12 10/23/2015 SOUTHERN REGION, Weighted Unit Price Averages Page 4 of 4 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item S700 Milled Rumble Strips for Stop Conditions 3 $12,125 5 sets $2, S706 Milled Rumble Strips 7 $257, km $ S745 Supply and Install Breakaway Steel Posts - W200 X 27 1 $38, m $1, S772 Supply and Install Post (100mm X 150mm) 5 $24, posts $ S775 Removal and Reinstallation or Disposal of Existing Signs 1 $763 2 signs $ S800 W-Beam Guardrail - Supply and Install 1 $14, m $ S805 Strong Post W-Beam Guardrail - Supply and Install 7 $988,999 8,214 m $ S820 Remove, Salvage and Reinstall Existing Guardrail 4 $54, m $ S822 Supply of Guardrail Posts 2 $1, posts $80.18 S825 Remove and Dispose of Existing Guardrail 8 $367,072 11,491 m $31.94 S830 Flexible Guide Post/Delineators - Round - Supply and Install 7 $83, posts $85.13 U100 Trenching and Backfilling 2 $29,452 1,257 m $23.43 U105 Secondary Cable - Supply and Install 2 $26,757 2,645 m $10.12 U110 Removal and Salvage of Existing Standards 1 $2,143 2 units $1, U115 Removal and Disposal of Existing Light Fixures 1 $4,700 6 units $ U120 Cast In Place Concrete Base - Supply and Install 1 $4,000 2 units $2, U125 Street Light Standard - Supply and Install 1 $65, units $4, U130 Salvaged Street Light Standard - Install 1 $2,143 2 poles $1, U135 Distribution Enclosure - Supply and Install 1 $12,700 1 units $12, X325 Curb and Gutter (all heights) 1 $237,518 1,765 m $ X350 Solid Concrete Islands 1 $6, m2 $ X415 Granular Fill for Medians 1 $18, t $28.67 X440 Median Concrete Surfacing 1 $143,948 1,400 m2 $ X510 Cutting of Pavement Edge 8 $92,780 15,209 m $6.10

13 10/23/2015 CENTRAL REGION, Weighted Unit Price Averages Page 1 of 3 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item A051 Supply of Aggregate - No Option 1 $0 2,600 m3 $0.00 A805 Supply of Aggregate - No Option 2 $103, ,365 t $0.80 B100 Subgrade Excavation 1 $3, m3 $73.83 B152 Granular Fill (Pit-run) - Des. 6 3 $219,066 7,550 t $29.02 B153 Granular Fill - Des. 2 1 $32, t $33.57 B154 Granular Fill (Pit-Run) 2 $212,702 10,450 t $20.35 B175 Granular Fill, 6, $42, m3 $ B180 Preparing Subgrade Surface (First Layer) 6 $115,937 77,820 m2 $1.49 B181 Preparing Subgrade Surface (Second Layer) 1 $11,055 16,500 m2 $0.67 B282 Granular Base Course - Des. 2 Cl $3,065,306 91,318 t $33.57 D100 Culverts - Remove and Dispose (C.S.P.) (up to 700 mm dia.) 6 $87, m $ D105 Culverts - Remove and Dispose (C.S.P.) (over 700 mm dia.) 5 $16, m $ D235 Granular Backfill - Culverts 3 $18, t $54.73 D410 Culverts - Supply and Install (600 mm dia. C.S.P.) 5 $384,949 1,136 m $ D425 Culverts - Supply and Install (800 mm dia. C.S.P.) 3 $58, m $ D430 Culverts - Supply and Install (900 mm dia. C.S.P.) 2 $37, m $ D435 Culverts - Supply and Install (1200 mm dia. C.S.P.) 1 $7,000 6 m $1, D460 Culverts - Supply and Install (450 mm dia. R.C.P.) 1 $5, m $ D520 Smoothwall Steel Pipe Culvert - Supply and Auger (800 mm dia 1 $163, m $1, D540 Grouting of Abandoned Culverts 4 $71, m3 $ D732 Adjust Manholes 1 $4,167 2 units $2, D734 Ajust Water Valve 1 $18, units $1, E003 Misc. Environmental Work 3 $57, plantings $ E331 Gabion Mattress - Supply and Install 1 $83, m2 $ E435 Geotextile Fence Barrier - Ditch 9 $42,015 2,660 m $15.80 E452 Geotextile - Nonwoven (Supply and Install) 2 $38,909 10,950 m2 $3.55 E453 Geogrid - Supply and Install 1 $1, m2 $2.67 E456 Geotextile for Stabilization - Supply and Install 2 $87,903 21,140 m2 $4.16 E500 Soil Covering (Low Flow) 1 $2,040 1,000 m2 $2.04 E505 Soil Covering (Medium Flow) 2 $9,705 4,550 m2 $2.13 E510 Soil Covering (High Flow) 4 $21,261 2,244 m2 $9.47 E607 Drill Seeding 2 $18,700 7 ha $2, E608 Broad-Cast Seeding 5 $22, ha $1, E609 Hydro-Seeding 1 $14,233 2 ha $7, E610 Slope Texturing 1 $14,444 31,400 m2 $0.46 F169 Haul of Bridge Materials 1 $5,682 1 t.km $5, F189 Excavation - Channel 1 $6, m3 $13.51 F195 Backfill - Non-Granular 2 $36, m3 $73.95 F200 Backfill - Pit Run Granular - Des. 6 Cl $54, m3 $ F203 Backfill - Crushed Granular, 2, 25 2 $35, m3 $ F500 Heavy Rock RipRap (Class 1) 7 $305,893 1,395 m3 $ F505 Heavy Rock RipRap (Class 1M) 1 $57, m3 $ F525 Heavy Rock RipRap (Class 3) 2 $760,138 5,700 m3 $ F755 Surface Removal 1 $31, m2 $46.33 F760 Partial Depth Repair 4 $113, m2 $960.48

14 10/23/2015 CENTRAL REGION, Weighted Unit Price Averages Page 2 of 3 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item F765 Full Depth Repair 1 $9,908 5 m2 $1, F770 Sandblasting (Deck Surface) 1 $12, m2 $19.33 F775 Deck Overlay Concrete 1 $63, m3 $1, F776 Placement Deck Overlay Concrete 1 $93, m2 $ F816 Pile Set-up 1 $5, piles $ F818 Pile Driving 1 $26, m $64.46 F820 Loading Tests 1 $17,378 5 tests $3, F834 Concrete - Class C 1 $27, m3 $2, F854 Reinforcing Steel - Place 1 $2,779 1,570 kg $1.77 F974 Deck Waterproofing 1 $22, m2 $68.20 F980 Asphalt Concrete Pavement - Mix Type H2 ( A) 1 $213, t $ F982 Asphalt Concrete Pavement - Mix Type M1 ( A) 1 $52, t $ G100 Clearing 1 $4,571 0 ha $114, G220 Channel Excavation 4 $29,541 2,555 m3 $11.56 G225 Common Excavation 7 $1,546, ,080 m3 $9.66 G230 Borrow Topsoil Excavation 1 $98,315 26,500 m3 $3.71 G236 Borrow Excavation - Contractor's Supply 4 $833,309 43,127 m3 $19.32 G248 Common and/or Borrow Excavation Loaded to Trucks 1 $1,065,750 87,000 m3 $12.25 G270 Sideslope Improvement 1 $439, km $39, G300 Topsoil Placement 7 $250, ,003 m2 $1.40 G452 Remove and Dispose of Existing Fence 7 $17,195 4 km $4, G453 Remove and Salvage of Existing Fence 1 $2,505 0 km $17, G470 New Fence - Supply and Install - Class A 1 $0 0 km $0.00 G475 New Fence - Supply and Install - Class B 6 $69,166 5 km $14, G483 New Fence - Supply and Install - Class F 1 $2,087 0 km $20, Q185 Gravel Surfacing - Des. 4 Cl $6, t $33.63 Q186 Gravel Surfacing - Des. 4 Cl $55,539 1,700 t $32.67 Q560 Cold Milling Asphalt Pavement 1 $154,000 3,500 m3 $44.00 Q565 Cold Milling Asphalt Pavement 4 $465, ,700 m2 $2.28 Q567 Supply Rejuvenating Agent 1 $6,315 2,170 l $2.91 Q990 Asphalt Concrete Pavement - EPS Mix Type H1 3 $5,832,218 72,470 t $80.48 Q991 Asphalt Concrete Pavement - EPS Mix Type H2 4 $13,150, ,220 t $83.64 Q992 Asphalt Concrete Pavement - EPS Mix Type M1 3 $12,365, ,880 t $71.53 Q993 Asphalt Concrete Pavement - EPS Mix Type L1 1 $2,025,051 27,410 t $73.88 Q994 Asphalt Concrete Pavement - EPS Mix Type S1 1 $497,988 5,800 t $85.86 Q996 Asphalt Concrete Pavement - EPS Mix Type S3 6 $15,704, ,250 t $69.72 S261 Concrete Base - Supply and Install 4 $69, units $1, S270 Supply of Signs, 3/4" Plywood 3 $2, m2 $ S271 Supply of Signs, Extruded Aluminum 3 $68, m2 $ S272 Supply of Signs, Aluminum 5 $7, m2 $ S273 Supply of Signs, Aluminum - 3M Diamond Grade (VIP) 4 $43, m2 $ S275 Removal and Reinstallation or Disposal of Existing Signs - One 6 $19, signs $ S277 Removal and Reinstallation or Disposal of Existing Signs - Two 4 $9, signs $ S288 Install Sign - Less than 1 m2 6 $14, signs $73.75 S289 Install Sign - 1 m2 to 3 m2 5 $6, signs $267.51

15 10/23/2015 CENTRAL REGION, Weighted Unit Price Averages Page 3 of 3 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item S290 Install Sign - over 3 m2 3 $17, signs $ S292 Remove and Dispose - Breakaway Steel Posts 2 $1,053 6 posts $ S309 Pavement Messages - Gore Area 1 $1,970 2 messages $ S310 Pavement Messages - Turn Arrow (Single or Double) 1 $8, messages $ S315 Pavement Messages - Stop Bar 3 $3, messages $ S320 Pavement Messages - Stop Ahead 3 $2,072 8 messages $ S321 Pavement Messages - STOP 2 $612 3 messages $ S341 Durable Pavement Messages - Turn or Straight Arrows (Single 5 $25, messages $ S342 Durable Pavement Messages - Stop Bar 4 $13, messages $ S343 Durable Pavement Messages - Railway Crossing 1 $3,600 4 messages $ S344 Durable Pavement Messages - Stop Ahead 1 $2,880 3 messages $ S347 Durable Pavement Messages - STOP 1 $953 2 messages $ S350 Roadway Lines - Supplying Paint and Painting (Directional Divid 5 $56, km $ S351 Roadway Lines - Supplying Paint and Painting (Lane Dividing a 2 $60, km $ S352 Roadway Lines - Supplying Paint and Painting (Lane Dividing L 1 $1,625 5 km $ S360 Intersection Lines - Supplying Paint and Painting 5 $11, intersection $ S400 Underground Electrical Conduit - Supply and Install - Trench Ex 3 $18, m $71.24 S405 Underground Electrical Conduit - Supply and Install - Pushed C 4 $49, m $98.81 S700 Milled Rumble Strips for Stop Conditions 4 $21, sets $1, S706 Milled Rumble Strips 4 $145, km $ S730 Supply and Install Breakaway Steel Posts - W150 X 14 3 $40, m $1, S740 Supply and Install Breakaway Steel Posts - W150 X 22 1 $19, m $1, S765 Cluster Frames - Supply and Install 1 $683 1 frames $ S772 Supply and Install Post (100mm X 150mm) 6 $38, posts $ S805 Strong Post W-Beam Guardrail - Supply and Install 4 $176,125 1,194 m $ S815 Cable Barrier - Supply and Install 1 $43, m $ S825 Remove and Dispose of Existing Guardrail 7 $232,529 6,796 m $34.22 S830 Flexible Guide Post/Delineators - Round - Supply and Install 7 $96,734 1,310 posts $73.84 U100 Trenching and Backfilling 4 $75,125 5,015 m $14.98 U105 Secondary Cable - Supply and Install 5 $130,740 6,917 m $18.90 U110 Removal and Salvage of Existing Standards 1 $3,250 6 units $ U115 Removal and Disposal of Existing Light Fixures 3 $22, units $ U120 Cast In Place Concrete Base - Supply and Install 3 $121, units $2, U125 Street Light Standard - Supply and Install 4 $202, units $2, U130 Salvaged Street Light Standard - Install 1 $4,930 6 poles $ U135 Distribution Enclosure - Supply and Install 4 $68,768 6 units $11, X235 Removing Curb 1 $1,800 9 m $ X320 Concrete Curb (all Types) 2 $98,912 1,260 m $78.50 X325 Curb and Gutter (all heights) 1 $139,380 1,000 m $ X346 Rock Rip-Rap - Hand Laid 1 $9, m2 $78.33 X350 Solid Concrete Islands 1 $104, m2 $ X400 Solid Concrete Medians 1 $31, m2 $ X435 Median Asphalt Concrete Surfacing 1 $139, t $ X440 Median Concrete Surfacing 1 $341,582 3,800 m2 $89.89 X510 Cutting of Pavement Edge 5 $90,480 12,410 m $7.29

16 10/26/2015 NORTH CENTRAL REGION, Weighted Unit Price Averages Page 1 of 3 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item A805 Supply of Aggregate - No Option 3 $126, ,930 t $0.56 B100 Subgrade Excavation 5 $224,223 8,490 m3 $26.41 B152 Granular Fill (Pit-run) - Des. 6 4 $327,493 10,500 t $31.19 B153 Granular Fill - Des. 2 3 $183,333 5,570 t $32.91 B180 Preparing Subgrade Surface (First Layer) 4 $46,437 15,250 m2 $3.05 B282 Granular Base Course - Des. 2 Cl $251,304 8,780 t $28.62 D100 Culverts - Remove and Dispose (C.S.P.) (up to 700 mm dia.) 4 $32, m $ D105 Culverts - Remove and Dispose (C.S.P.) (over 700 mm dia.) 3 $20, m $ D235 Granular Backfill - Culverts 1 $7, t $43.33 D405 Culverts - Supply and Install (500 mm dia. C.S.P.) 1 $10, m $ D410 Culverts - Supply and Install (600 mm dia. C.S.P.) 3 $79, m $ D425 Culverts - Supply and Install (800 mm dia. C.S.P.) 3 $37, m $ D430 Culverts - Supply and Install (900 mm dia. C.S.P.) 2 $34, m $ D510 Smoothwall Steel Pipe Culvert - Supply and Auger (600 mm dia 2 $338, m $1, D540 Grouting of Abandoned Culverts 4 $181, m3 $ D607 Filter Material 1 $30, m3 $ D615 Perforated Pipe 1 $29, m $ D732 Adjust Manholes 1 $1,167 1 units $1, D733 Adjust Catch Basins 1 $1,083 1 units $1, D795 Leads - Supply and Install 1 $8, m $ D850 Culvert Liner - Supply and Install (S.W.S.P.) ( mm) 1 $44, m $ E435 Geotextile Fence Barrier - Ditch 1 $ m $28.33 E454 Geotextile for Materials Separation - Supply and Install 1 $4, m2 $5.47 E456 Geotextile for Stabilization - Supply and Install 3 $15,342 2,950 m2 $5.20 E505 Soil Covering (Medium Flow) 1 $11, m2 $13.33 E510 Soil Covering (High Flow) 3 $25,410 2,705 m2 $9.39 E607 Drill Seeding 1 $1,000 1 ha $1, F500 Heavy Rock RipRap (Class 1) 3 $118, m3 $ F515 Heavy Rock RipRap (Class 2) 2 $52, m3 $ F755 Surface Removal 2 $195,692 11,813 m2 $16.57 F760 Partial Depth Repair 2 $167, m2 $1, F765 Full Depth Repair 1 $15, m2 $1, F770 Sandblasting (Deck Surface) 1 $34,832 1,493 m2 $23.33 F775 Deck Overlay Concrete 1 $125, m3 $1, F776 Placement Deck Overlay Concrete 1 $121,426 1,493 m2 $81.33 F834 Concrete - Class C 1 $344, m3 $2, F841 Concrete - Class HPC 1 $96, m3 $1, F850 Plain Reinforcing Steel - Supply 1 $3,292 1,799 kg $1.83 F854 Reinforcing Steel - Place 2 $34,837 17,920 kg $1.94 F980 Asphalt Concrete Pavement - Mix Type H2 ( A) 2 $363,399 1,239 t $ G100 Clearing 1 $0 0 ha $0.00 G225 Common Excavation 1 $58,000 5,800 m3 $10.00 G236 Borrow Excavation - Contractor's Supply 1 $243,000 13,500 m3 $18.00 G270 Sideslope Improvement 4 $1,760, km $97, G300 Topsoil Placement 1 $26,000 13,000 m2 $2.00

17 10/26/2015 NORTH CENTRAL REGION, Weighted Unit Price Averages Page 2 of 3 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item G320 Topsoil (Supply and Place) 1 $2, m2 $5.17 G452 Remove and Dispose of Existing Fence 1 $0 0 km $0.00 G475 New Fence - Supply and Install - Class B 1 $0 0 km $0.00 M103 Transverse Crack Repair - Mill & Fill 1 $142,476 3,100 m $45.96 Q185 Gravel Surfacing - Des. 4 Cl $25, t $33.00 Q186 Gravel Surfacing - Des. 4 Cl $18, t $23.29 Q510 Asphalt Mix For Others 1 $28, t $56.89 Q560 Cold Milling Asphalt Pavement 2 $514,605 17,043 m3 $30.19 Q565 Cold Milling Asphalt Pavement 2 $702, ,730 m2 $2.49 Q770 Graded Aggregate Seal Coat - Des. 3 Cl. 12.5C 2 $915, ,412 m2 $3.06 Q771 Graded Aggregate Seal Coat - Bridge Decks 2 $18, m2 $19.28 Q785 Chip Seal Coat - Des. 3 Cl. 12.5BW 2 $1,926, ,660 m2 $3.39 Q798 Chip Seal Coat - Bridge Decks 2 $32, m2 $37.34 Q990 Asphalt Concrete Pavement - EPS Mix Type H1 4 $16,664, ,523 t $89.34 Q991 Asphalt Concrete Pavement - EPS Mix Type H2 3 $12,939, ,097 t $79.34 Q992 Asphalt Concrete Pavement - EPS Mix Type M1 5 $14,535, ,620 t $80.48 Q994 Asphalt Concrete Pavement - EPS Mix Type S1 2 $2,198,366 25,100 t $87.58 Q996 Asphalt Concrete Pavement - EPS Mix Type S3 2 $1,747,907 20,900 t $83.63 S261 Concrete Base - Supply and Install 1 $2,967 2 units $1, S271 Supply of Signs, Extruded Aluminum 1 $1,260 3 m2 $ S272 Supply of Signs, Aluminum 3 $2,928 7 m2 $ S273 Supply of Signs, Aluminum - 3M Diamond Grade (VIP) 3 $3, m2 $ S275 Removal and Reinstallation or Disposal of Existing Signs - One 3 $10, signs $ S277 Removal and Reinstallation or Disposal of Existing Signs - Two 3 $1,900 4 signs $ S288 Install Sign - Less than 1 m2 5 $3, signs $87.69 S289 Install Sign - 1 m2 to 3 m2 1 $1,000 2 signs $ S290 Install Sign - over 3 m2 1 $485 1 signs $ S309 Pavement Messages - Gore Area 2 $20, messages $ S310 Pavement Messages - Turn Arrow (Single or Double) 4 $12, messages $ S315 Pavement Messages - Stop Bar 5 $3, messages $ S326 Pavement Messages - Railway Crossing 1 $1,433 2 messages $ S327 Pavement Messages - Pedestrian Crossing 1 $518 2 messages $ S341 Durable Pavement Messages - Turn or Straight Arrows (Single 3 $26, messages $ S342 Durable Pavement Messages - Stop Bar 3 $40, messages $ S344 Durable Pavement Messages - Stop Ahead 1 $867 1 messages $ S346 Durable Pavement Messages - Pedestrian Crossing 1 $9,900 6 messages $1, S350 Roadway Lines - Supplying Paint and Painting (Directional Divid 7 $107, km $ S351 Roadway Lines - Supplying Paint and Painting (Lane Dividing a 2 $62, km $ S352 Roadway Lines - Supplying Paint and Painting (Lane Dividing L 4 $8, km $ S360 Intersection Lines - Supplying Paint and Painting 8 $11, intersection $ S370 Interchange Lines - Supplying Paint and Painting 1 $11,177 3 interchange $3, S405 Underground Electrical Conduit - Supply and Install - Pushed C 1 $4, m $ S700 Milled Rumble Strips for Stop Conditions 1 $2,500 1 sets $2, S706 Milled Rumble Strips 5 $149, km $ S730 Supply and Install Breakaway Steel Posts - W150 X 14 1 $2,030 2 m $1,015.00

18 10/26/2015 NORTH CENTRAL REGION, Weighted Unit Price Averages Page 3 of 3 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item S772 Supply and Install Post (100mm X 150mm) 4 $8, posts $ S805 Strong Post W-Beam Guardrail - Supply and Install 3 $333,824 2,204 m $ S815 Cable Barrier - Supply and Install 2 $1,070,000 10,051 m $ S820 Remove, Salvage and Reinstall Existing Guardrail 2 $111, m $ S822 Supply of Guardrail Posts 1 $24, posts $ S825 Remove and Dispose of Existing Guardrail 3 $321,623 14,187 m $22.67 S830 Flexible Guide Post/Delineators - Round - Supply and Install 6 $64, posts $98.28 U100 Trenching and Backfilling 1 $4, m $30.93 U105 Secondary Cable - Supply and Install 1 $2, m $11.64 U125 Street Light Standard - Supply and Install 1 $8,882 3 units $2, U135 Distribution Enclosure - Supply and Install 1 $10,028 1 units $10, X215 Removing Curb and Gutter 1 $75, m $ X220 Removing Concrete Surface 1 $1,333 5 m2 $ X225 Removing Manhole 1 $4,667 1 units $4, X230 Removing Catch Basin 1 $17,333 4 units $4, X325 Curb and Gutter (all heights) 1 $65, m $ X415 Granular Fill for Medians 1 $33, t $52.42 X435 Median Asphalt Concrete Surfacing 1 $54, t $ X440 Median Concrete Surfacing 1 $1,023 5 m2 $ X510 Cutting of Pavement Edge 3 $16,704 1,780 m $9.38

19 10/26/2015 PEACE REGION, Weighted Unit Price Averages Page 1 of 3 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item A805 Supply of Aggregate - No Option 3 $188,190 13,572 t $13.87 B100 Subgrade Excavation 6 $205,648 3,540 m3 $58.09 B152 Granular Fill (Pit-run) - Des. 6 2 $58,920 1,440 t $40.92 B153 Granular Fill - Des. 2 5 $184,296 4,150 t $44.41 B180 Preparing Subgrade Surface (First Layer) 7 $478, ,000 m2 $1.74 B181 Preparing Subgrade Surface (Second Layer) 1 $77,550 55,000 m2 $1.41 B282 Granular Base Course - Des. 2 Cl $4,673, ,816 t $23.51 C225 Erosion Control Blanket 1 $3, m2 $3.92 D100 Culverts - Remove and Dispose (C.S.P.) (up to 700 mm dia.) 6 $63, m $ D105 Culverts - Remove and Dispose (C.S.P.) (over 700 mm dia.) 5 $16, m $ D200 Granular Backfill - Culverts 1 $ m3 $41.67 D235 Granular Backfill - Culverts 2 $5, t $34.20 D410 Culverts - Supply and Install (600 mm dia. C.S.P.) 5 $190, m $ D425 Culverts - Supply and Install (800 mm dia. C.S.P.) 3 $99, m $ D430 Culverts - Supply and Install (900 mm dia. C.S.P.) 2 $16, m $ D435 Culverts - Supply and Install (1200 mm dia. C.S.P.) 2 $30, m $ D500 Smoothwall Steel Pipe Culvert - Supply and Auger (750 mm dia 1 $49, m $1, D510 Smoothwall Steel Pipe Culvert - Supply and Auger (600 mm dia 1 $26, m $ D520 Smoothwall Steel Pipe Culvert - Supply and Auger (800 mm dia 1 $230, m $ D525 Smoothwall Steel Pipe Culvert - Supply and Auger (900 mm dia 2 $258, m $1, D540 Grouting of Abandoned Culverts 4 $206, m3 $ D615 Perforated Pipe 1 $5, m $76.67 E435 Geotextile Fence Barrier - Ditch 5 $23,328 1,395 m $16.72 E452 Geotextile - Nonwoven (Supply and Install) 3 $5, m2 $6.21 E454 Geotextile for Materials Separation - Supply and Install 1 $8,535 1,500 m2 $5.69 E505 Soil Covering (Medium Flow) 2 $18,825 1,855 m2 $10.15 E510 Soil Covering (High Flow) 4 $35,211 2,920 m2 $12.06 E515 Synthetic Permeable Ditch Barrier 3 $22, m $23.56 E608 Broad-Cast Seeding 5 $12, ha $1, E610 Slope Texturing 1 $5,600 8,000 m2 $0.70 F200 Backfill - Pit Run Granular - Des. 6 Cl $32, m3 $ F500 Heavy Rock RipRap (Class 1) 7 $419,176 1,793 m3 $ F515 Heavy Rock RipRap (Class 2) 1 $23, m3 $ F755 Surface Removal 1 $58, m2 $ F760 Partial Depth Repair 1 $20, m2 $ F765 Full Depth Repair 1 $7,830 5 m2 $1, F770 Sandblasting (Deck Surface) 1 $11, m2 $22.28 F775 Deck Overlay Concrete 1 $126, m3 $2, F776 Placement Deck Overlay Concrete 1 $53, m2 $ F812 Supply of Piling - H-Pile 2 $63, m $ F814 Supply of Piling - Pipe Pile 2 $88, m $ F816 Pile Set-up 4 $282, piles $4, F818 Pile Driving 4 $87, m $95.39 F822 Pile Concrete 4 $1,274,404 3,434 m3 $ F824 Drill Rig Set-up 3 $209, piles $1,516.74

20 10/26/2015 PEACE REGION, Weighted Unit Price Averages Page 2 of 3 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item F826 Pile Installation 2 $630,932 2,955 m $ F834 Concrete - Class C 4 $695, m3 $1, F841 Concrete - Class HPC 4 $643, m3 $2, F850 Plain Reinforcing Steel - Supply 5 $650, ,088 kg $1.61 F854 Reinforcing Steel - Place 5 $532, ,435 kg $1.17 F974 Deck Waterproofing 2 $105,961 1,281 m2 $82.72 F980 Asphalt Concrete Pavement - Mix Type H2 ( A) 2 $97, t $ G100 Clearing 3 $20,433 2 ha $10, G220 Channel Excavation 5 $6, m3 $9.64 G225 Common Excavation 5 $736,970 90,417 m3 $8.15 G230 Borrow Topsoil Excavation 1 $12, m3 $12.75 G236 Borrow Excavation - Contractor's Supply 3 $708,644 48,290 m3 $14.67 G248 Common and/or Borrow Excavation Loaded to Trucks 2 $424,373 24,550 m3 $17.29 G270 Sideslope Improvement 2 $199,750 4 km $53, G300 Topsoil Placement 5 $150, ,180 m2 $1.46 G452 Remove and Dispose of Existing Fence 1 $0 0 km $0.00 G475 New Fence - Supply and Install - Class B 1 $0 0 km $0.00 M102 Crack Repair - Spray Patch 2 $567,555 93,500 m $6.07 Q185 Gravel Surfacing - Des. 4 Cl $13, t $27.41 Q186 Gravel Surfacing - Des. 4 Cl $43,192 1,170 t $36.92 Q510 Asphalt Mix For Others 5 $375,106 5,525 t $67.89 Q565 Cold Milling Asphalt Pavement 7 $1,103, ,921 m2 $2.40 Q770 Graded Aggregate Seal Coat - Des. 3 Cl. 12.5C 1 $1,730, ,419 m2 $3.86 Q771 Graded Aggregate Seal Coat - Bridge Decks 1 $61,266 2,839 m2 $21.58 Q785 Chip Seal Coat - Des. 3 Cl. 12.5BW 1 $2,585, ,671 m2 $4.20 Q798 Chip Seal Coat - Bridge Decks 1 $82,957 3,386 m2 $24.50 Q990 Asphalt Concrete Pavement - EPS Mix Type H1 1 $6,473,447 87,550 t $73.94 Q991 Asphalt Concrete Pavement - EPS Mix Type H2 5 $9,498, ,350 t $92.80 Q992 Asphalt Concrete Pavement - EPS Mix Type M1 6 $33,409, ,465 t $82.20 Q993 Asphalt Concrete Pavement - EPS Mix Type L1 1 $2,554,902 24,300 t $ Q994 Asphalt Concrete Pavement - EPS Mix Type S1 3 $3,635,176 40,000 t $90.88 Q996 Asphalt Concrete Pavement - EPS Mix Type S3 1 $7,009, ,600 t $68.99 S261 Concrete Base - Supply and Install 2 $9,020 8 units $1, S270 Supply of Signs, 3/4" Plywood 3 $5, m2 $ S271 Supply of Signs, Extruded Aluminum 3 $12, m2 $ S272 Supply of Signs, Aluminum 6 $12, m2 $ S273 Supply of Signs, Aluminum - 3M Diamond Grade (VIP) 7 $27, m2 $ S275 Removal and Reinstallation or Disposal of Existing Signs - One 8 $43, signs $ S277 Removal and Reinstallation or Disposal of Existing Signs - Two 5 $7, signs $ S288 Install Sign - Less than 1 m2 9 $22, signs $85.87 S289 Install Sign - 1 m2 to 3 m2 5 $4, signs $ S290 Install Sign - over 3 m2 2 $3,850 5 signs $ S292 Remove and Dispose - Breakaway Steel Posts 1 $1,200 4 posts $ S309 Pavement Messages - Gore Area 1 $9,042 7 messages $1, S310 Pavement Messages - Turn Arrow (Single or Double) 3 $6, messages $174.17

SECTION 609 PAVED DRAINAGE SECTION CONCRETE CURB, GUTTER AND PAVED DITCH.

SECTION 609 PAVED DRAINAGE SECTION CONCRETE CURB, GUTTER AND PAVED DITCH. SECTION 609 PAVED DRAINAGE SECTION 609.10 CONCRETE CURB, GUTTER AND PAVED DITCH. 609.10.1 Description. This work shall consist of constructing curb, gutter or combination curb and gutter and paved ditches

More information

MINNESOTA DEPARTMENT OF TRANSPORTATION ESTIMATED PRODUCTION RATES FOR COMPUTING CONTRACT TIME

MINNESOTA DEPARTMENT OF TRANSPORTATION ESTIMATED PRODUCTION RATES FOR COMPUTING CONTRACT TIME SET-UP AND MOBILIZATION MOBILIZATION LS 1-3 Days CONTRACTOR SURVEY LS 1-3 Days REMOVALS CONCRETE PAVEMENT SQ YD 1000-4000 BITUMINOUS SURFACE SQ YD 8000-12000 CLEAR AND GRUBBING ACRE/DAY 2-4 CLEAR AND GRUBBING

More information

LETTING : CALL : 015 COUNTIES : BIG STONE SWIFT

LETTING : CALL : 015 COUNTIES : BIG STONE SWIFT S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 30 BRIDGE COUNT : 0 CONTRACT DESCRIPTION : GRADING, BITUMINOUS MILL & OVERLAY AND GUARDRAIL CONTRACT LOCATION: LOCATED ON TH 7 FROM 638 FT NORTHWEST

More information

Permeable Pavement Construction Guide

Permeable Pavement Construction Guide Permeable Pavement Construction Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems that reduce

More information

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or

More information

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES NAICS CODE Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway (includes 300, 320, 327, 330, 334, 336, 337, 338) Application of prime and tack coats, leveling surfaces and

More information

Section 3 Specification 3.2 Aggregate Production and Stockpiling TABLE OF CONTENTS

Section 3 Specification 3.2 Aggregate Production and Stockpiling TABLE OF CONTENTS TABLE OF CONTENTS 3.2 AGGREGATE PRODUCTION AND STOCKPILING... 1 3.2.1 GENERAL... 1 3.2.2 MATERIALS... 1 3.2.3 PRODUCTION... 1 3.2.3.1 General... 1 3.2.3.2 Quality Control... 3 3.2.3.2.1 General... 3 3.2.3.2.2

More information

CHAPTER VI PAVEMENT STRUCTURE DESIGN

CHAPTER VI PAVEMENT STRUCTURE DESIGN 1 CHAPTER VI PAVEMENT STRUCTURE DESIGN 6-03.1 GENERAL. Pavements are designed to provide adequate support for loads imposed by traffic, and to provide a uniformly firm, stable, smooth, all-weather surface.

More information

ADDENDUM NO. 2. This Addendum shall form part of the Contract Documents.

ADDENDUM NO. 2. This Addendum shall form part of the Contract Documents. FO-153 Date: January 16, 2015 To: Bidders for Norfolk County Bid No. PW-E-15-62 Robinson Street Reconstruction Queen Street to Talbot Street From: Jeff Demeulemeester, Engineering Programs Supervisor,

More information

1-D, Field Density Item Embankment For every 1500 cu.m. or fraction thereof:

1-D, Field Density Item Embankment For every 1500 cu.m. or fraction thereof: SCHEDULE OF GOVERNING ITEMS OF WORK OF THE DPWH STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS, 1998, (VOLUME II) PART C - EARTHWORK Item 100 - Clearing & Grubbing None Item 101 - Removal of

More information

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 10 HEAVY ROCK RIPRAP

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 10 HEAVY ROCK RIPRAP SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 10 HEAVY ROCK RIPRAP TABLE OF CONTENTS 10.1 General... 10-1 10.2 Permits... 10-1 10.3 Rock Material... 10-1 10.4 Geotextile Filter Fabric... 10-3 10.5 Placing

More information

STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION

STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION 2009 Edition Written And Promulgated By Public Works Standards, Inc. Published By Division of BNi Publications, Inc. 990 Park Center Drive, Suite E, Vista,

More information

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 11/22/13 PAGE : VENDOR RANKING

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 11/22/13 PAGE : VENDOR RANKING PAGE : 998-1 VENDOR RANKING CONTRACT TIME : 390 Working Days (available days) CONTRACT DESCRIPTION : BIRMINGHAM PROJECT(S) : APD-1602(551) for constructing the Grade, Drain, Partial Base & Pave, Bridge

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

FDOT DBE CERTIFICATION SPECIALTY/NAICS CODE SHEET WITH CAP SIZES

FDOT DBE CERTIFICATION SPECIALTY/NAICS CODE SHEET WITH CAP SIZES FDOT DBE CERTIFICATION SPECIALTY/ SHEET WITH CAP SIZES Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway $ 22.41 Application of prime and tack coats, leveling surfaces and

More information

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW NOTICE TO CONTRACTORS CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW The Nebraska Department of Roads will receive sealed bids in

More information

FY08 SEWER POINT REPAIRS BID TABULATION

FY08 SEWER POINT REPAIRS BID TABULATION 6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "

More information

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial

More information

Stormwater/Wetland Pond Construction Inspection Checklist

Stormwater/Wetland Pond Construction Inspection Checklist : Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials

More information

512 UTILITIES. A. General

512 UTILITIES. A. General 512 UTILITIES A. General 1. Any Utility s use of county rights-of-way will be coordinated with the primary purpose of the rights-of-way which is to provide safe, efficient, and convenient passage for motor

More information

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

SECTION 4 EXCAVATION, TRENCHING AND BACKFILLING 4.01 SCOPE OF WORK

SECTION 4 EXCAVATION, TRENCHING AND BACKFILLING 4.01 SCOPE OF WORK 4.01 SCOPE OF WORK The work covered by this section shall consist of furnishing all materials, equipment and labor for the excavating, trenching, backfilling, and bore and jack required to install or repair

More information

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS December 2014 CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications...

More information

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION Item meets standard

More information

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11 Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;

More information

Helen Mercury Mine EE/CA OPINION OF PROBABLE COST

Helen Mercury Mine EE/CA OPINION OF PROBABLE COST G Cost Estimates Helen Mercury Mine EE/CA Alternative 2: Limited Action 3 Minor Road Improvements 4 Clear & Grub diversion channel areas 5 Surveying 6 Cleanup & Demobilization 7 Pull back of material 8

More information

MWA SPLOST (Projects C F) Bid Math Check. Project C F, I, & L Bid Results (for MWA).xlsx.xls Worksheet: "Projects C F Bid Math Check" 1/8

MWA SPLOST (Projects C F) Bid Math Check. Project C F, I, & L Bid Results (for MWA).xlsx.xls Worksheet: Projects C F Bid Math Check 1/8 SPLOST Drainage Projects Package 2013-1 Project C: Hillcrest Avenue (Hillcrest Boulevard -to- Dillon Branch) Project D: Main Street Project E: Riverside Drive (at Railroad) Project F: Riverside Drive (at

More information

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch.

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch. To Prospective Bidders: CITY OF TOLEDO, OHIO PARKSIDE AREA SSO ELIMINATION PHASE 2 GRAVITY RELIEF SEWER NO. 2011 Addendum No. 2 December 8, 2011 Information disclosed and/or questions raised since issuing

More information

Infrastructure Cost Data

Infrastructure Cost Data Hewitt Estimating Consultants a Division of International Project Estimating Limited Infrastructure Cost Data www.infrastructurecost.com The Chief Estimator Software 150 Couling Crescent, Guelph Ontario,

More information

Construction Specification for Concrete Curb and Concrete Curb and Gutter

Construction Specification for Concrete Curb and Concrete Curb and Gutter Engineering & Construction Services Division Standard Specifications for Road Works TS 3.50 April 2015 for Concrete Curb and Table of Contents TS 3.50.01 SCOPE... 3 TS 3.50.02 REFERENCES... 3 TS 3.50.03

More information

VDOT 2001 Road and Bridge Standards Section 100 - Drainage Items

VDOT 2001 Road and Bridge Standards Section 100 - Drainage Items VDOT 2001 Road and Bridge s Page Title EW-1 EW-1A 101.01 Endwall for Pipe Culverts 12" - 36" Circular and 23" X 14" - 53" X 34" Elliptical Pipes EW-1PC EW-1APC 101.02 Precast Endwall for Pipe Culverts

More information

DIVISION 4 TABLE OF CONTENTS

DIVISION 4 TABLE OF CONTENTS DIVISION 4 TABLE OF CONTENTS SECTION SUBJECT PAGES 406 REINFORCING STEEL I II III GENERAL 406-2 406-2 414 RIPRAP I II III GENERAL 414-1 414-1 414-1 to 414-2 414-2 414-2 414-3 June 2016 400A - 1 SECTION

More information

Catch Basin Rehabilitation Road Commission for Oakland County, Michigan

Catch Basin Rehabilitation Road Commission for Oakland County, Michigan Date: Location: September 14, 2011, 9:45a.m. start East side of street in front of 4656 Maura Lane, West Bloomfield Participants: Oakland County Michelle Belanger, Rick Hall, Matt Mountain, Gary Flounory,

More information

FDOT Specifications List

FDOT Specifications List FDOT Specifications List TABLE OF CONTENTS DIVISION II CONSTRUCTION DETAILS CLEARING CONSTRUCTION SITE 110 Clearing and Grubbing... 152 EARTHWORK AND RELATED OPERATIONS 120 Excavation and Embankment...

More information

Section 2100-Trenching and Tunneling

Section 2100-Trenching and Tunneling SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial

More information

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition. Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer

More information

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20

More information

Underground Injection Control Storm Water Information

Underground Injection Control Storm Water Information Underground Injection Control Storm Water Information Best Management Practices DEQ has reviewed the EPA definition of a subsurface fluid distribution system and the infiltration design best management

More information

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS TABLE OF CONTENTS 2.18 CONCRETE AND/OR CORRUGATED STEEL STORM SEWER... 1 2.18.1 GENERAL... 1 2.18.2 MATERIALS... 1 2.18.2.1 Storm Sewer Pipe... 1 2.18.2.2 Cement Mortar... 1 2.18.2.3 Granular Materials...

More information

TABLE OF CONTENTS SECTION 200 UNDERGROUND PIPE CONSTRUCTION

TABLE OF CONTENTS SECTION 200 UNDERGROUND PIPE CONSTRUCTION TABLE OF CONTENTS SECTION 200 UNDERGROUND PIPE CONSTRUCTION Starts on Page 200 EXCAVATION... 2 201 PIPE BEDDING... 3 202 LAYING OF PIPE... 4 203 COVER MATERIAL... 5 204 INSULATION... 6 205 BACKFILLING...

More information

City of Shelbyville Site Inspection Checklist

City of Shelbyville Site Inspection Checklist City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather

More information

Tabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14

Tabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14 Solcitation No: DTFH71-14-B-00008 Division: Eastern Federal Lands State: DC County: Federal Land: 1 out of 9 Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date:

More information

Storm Drain Inlet Protection - IP

Storm Drain Inlet Protection - IP Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior

More information

ASPHALT CONCRETE PAVEMENT. Asphalt concrete pavement normally consists of two 40mm lifts.

ASPHALT CONCRETE PAVEMENT. Asphalt concrete pavement normally consists of two 40mm lifts. 17.1 Asphalt Concrete Pavement - General Asphalt concrete pavement consists of well-graded crushed coarse aggregate, fine aggregate and asphalt cement. When these components are properly mixed in an asphalt

More information

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0

More information

No allowance will be made for classification of different types of material encountered.

No allowance will be made for classification of different types of material encountered. PROJECT : Repair/ Maintenance of Flood Control and Drainage Structures Along Butuan City Cagayan de Oro City Iligan City Road LOCATION : San Antonio, Jasaan, Misamis Oriental SUBJECT : General Notes and

More information

Section 600 Incidental Construction

Section 600 Incidental Construction Table of Contents 1. Pipe Culverts... 600-1 A. Endwalls, Inlets, Manholes, and Spring Boxes... 600-5 2. Grade Adjustment of Existing Miscellaneous Structures... 600-8 3. Rebuilt Miscellaneous Structures...

More information

Permeable Pavement Operation & Maintanence Guide

Permeable Pavement Operation & Maintanence Guide Permeable Pavement Operation & Maintanence Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems

More information

Section 402. STORM SEWERS

Section 402. STORM SEWERS 402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide

More information

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent

More information

ASPHALT CONCRETE PAVING

ASPHALT CONCRETE PAVING CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02743-1 PART 1 GENERAL 1.1 Related Work.1 All Division 1 Specification Sections.2 Section 01330 Submittals.3 Section 01450 Quality Control & Inspection.4

More information

UNIT PRICE LIST January 2009

UNIT PRICE LIST January 2009 UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only

More information

SECTION 02100 SITE PREPARATION

SECTION 02100 SITE PREPARATION SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division

More information

STANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS

STANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS STANDARD SPECIFICATIONS SECTION 02950 PAVEMENT REQUIREMENTS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for removing, replacing and providing new paving for roads, driveways, parking

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

ROADS CONSTRUCTION 2012 STANDARD SPECIFICATIONS

ROADS CONSTRUCTION 2012 STANDARD SPECIFICATIONS ROADS CONSTRUCTION 2012 STANDARD SPECIFICATIONS Transportation Department The City of Calgary, ROADS Construction Division The City of Calgary, 2012. ALL RIGHTS RESERVED. No part of this document may be

More information

The unit costs are based on the trend line of the 3 low bids for the average quantity.

The unit costs are based on the trend line of the 3 low bids for the average quantity. Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally

More information

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 CITY OF SAN ANTONIO Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 (010) FORMAL INVITATION FOR BIDS (IFB) to CONTRACT 2016-2017 TASK ORDER CONTRACT

More information

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts SECTION 00300 BID FORM S For additions and deletions to the Contract, the following unit prices shall be applicable for the specific items listed. Unit Prices shall be complete, in place including required

More information

CHAPTER 4 INSTALLATION OF PIPE AND TESTING OF PIPE BACKFILL

CHAPTER 4 INSTALLATION OF PIPE AND TESTING OF PIPE BACKFILL CHAPTER 4 INSTALLATION OF PIPE AND TESTING OF PIPE BACKFILL Why talk about pipe in a Soils and Aggregate School? Pipe-soil interaction is critical to successful performance of system Treatment of soils

More information

1 INSTRUCTIONS TO ARCHITECTS APPLICATIONS BASE FOR ASPHALT AREAS BASE EXECUTION ASPHALT MIX APPLICATION...

1 INSTRUCTIONS TO ARCHITECTS APPLICATIONS BASE FOR ASPHALT AREAS BASE EXECUTION ASPHALT MIX APPLICATION... TABLE OF CONTENTS 1 INSTRUCTIONS TO ARCHITECTS... 1 1.1 SPECIAL NOTES... 1 2 APPLICATIONS... 1 3 BASE FOR ASPHALT AREAS... 2 3.1 LIGHT DUTY CONSTRUCTION... 2 3.2 MEDIUM DUTY CONSTRUCTION... 2 3.3 HEAVY

More information

TYPICAL SECTION - 24'/28' STRIP PAVING TYPICAL SECTION - 24'/28' GRAVEL STREET TYPICAL SECTIONS FOR 24'/28' STRIP PAVING AND GRAVEL STREETS

TYPICAL SECTION - 24'/28' STRIP PAVING TYPICAL SECTION - 24'/28' GRAVEL STREET TYPICAL SECTIONS FOR 24'/28' STRIP PAVING AND GRAVEL STREETS TYPICAL SECTION - 24'/28' STRIP PAVING TYPICAL SECTION - 24'/28' GRAVEL STREET TYPICAL SECTIONS FOR 24'/28' STRIP PAVING AND GRAVEL STREETS PAVEMENT WIDTH (B) PAVEMENT (C) LIP C&G (D) F.L. C&G (E) BACK

More information

Taseko Mine Potential Costs to Public Road System from Truck Transport of Mine Concentrate

Taseko Mine Potential Costs to Public Road System from Truck Transport of Mine Concentrate Taseko Mine Potential Costs to Public Road System from Truck Transport of Mine Concentrate Introduction and Purpose of Road Review EIS did not include costs or impacts of year-round transport of mine concentrate

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT Volkert Field Office 80 M Street SE, Suite 725 Washington, DC 20003 RIVERSMART WASHINGTON - CONSTRUCTION RIVERSMART MACFARLAND, RIVERSMART LAFAYETTE AND GREEN ALLEYS CHEVY CHASE D.C. Contract No.: DCKA-2013-C-0160

More information

1.1 SECTION INCLUDES.1 Materials and installation for asphalt concrete pavement for car park areas, driveways to buildings, and walks or play areas.

1.1 SECTION INCLUDES.1 Materials and installation for asphalt concrete pavement for car park areas, driveways to buildings, and walks or play areas. Issued 2005/06/01 Section 02742 Asphalt Concrete Pavement for Building Sites Page 1 of 8 PART 1 GENERAL 1.1 SECTION INCLUDES.1 Materials and installation for asphalt concrete pavement for car park areas,

More information

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development

More information

Transport and Main Roads Specifications MRS03 Drainage, Retaining Structures and Protective Treatments

Transport and Main Roads Specifications MRS03 Drainage, Retaining Structures and Protective Treatments Specification (Measurement) Transport and Main Roads Specifications MRS03 Drainage, Retaining Structures and Protective Treatments October 2016 Copyright http://creativecommons.org/licenses/by/3.0/au/

More information

A. Structures Quantity Item Price Cost @ $3,500 EA

A. Structures Quantity Item Price Cost @ $3,500 EA PRINCE WILLIAM COUNTY Department of Development Services Land Development Division UNIT PRICE LIST (Performance Bonds, Landscaping Escrows, and Siltation & Erosion Control Escrows) Revised: November 17,

More information

NRC INSPECTION MANUAL

NRC INSPECTION MANUAL NRC INSPECTION MANUAL INSPECTION PROCEDURE 88001 LLUR ON-SITE CONSTRUCTION PROGRAM APPLICABILITY: 2600, 2801 88001-01 INSPECTION OBJECTIVES 01.01 To determine by direct observation if on-site construction

More information

Mine Plan of Operations Reclamation Bond Checklist

Mine Plan of Operations Reclamation Bond Checklist Mine Plan of Operations Reclamation Bond Checklist NOTE: This checklist is provided to assist the operator in calculating the engineering and environmental costs required to properly stabilize, reclaim,

More information

UNIT PRICE LIST ITEM UNIT UNIT PRICE STREETS & DRAINAGE CURB & GUTTER/SIDEWALKS/HANDICAP RAMPS

UNIT PRICE LIST ITEM UNIT UNIT PRICE STREETS & DRAINAGE CURB & GUTTER/SIDEWALKS/HANDICAP RAMPS STREETS & DRAINAGE CURB & GUTTER/SIDEWALKS/HANDICAP RAMPS CG-2/3 LF $12.75 CG-5 LF $15.00 CG-6 LF $18.00 CG-7 EA $3,133.50 CG-7A (STONE) SY $10.00 CG-8 EA $6,500.00 CG-9/10 EA $6,200.00 CG-11 EA $6,900.00

More information

Vehicle Tracking Pad

Vehicle Tracking Pad Stormwater Quality Best Management Practices Construction Sites s When to use: Where construction vehicles leave active construction areas onto surfaces where runoff is not checked by sediment controls

More information

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown

More information

Maintaining Gravel Roadways 17 th Annual TSAG Conference

Maintaining Gravel Roadways 17 th Annual TSAG Conference Maintaining Gravel Roadways 17 th Annual TSAG Conference Introduction- Gravel Roads What makes a good gravel road? Various sized crushed stones and fines that are compacted together to form a durable structure

More information

SECTION 31 20 00 EARTH MOVING

SECTION 31 20 00 EARTH MOVING SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to

More information

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets Los Angeles County Department Of Public Works Land Development Division Bond Calculation Sheets Effective July 1, 2015 COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT DIVISION ROADS COST

More information

Single Family Residential Erosion and Sediment Control Standards

Single Family Residential Erosion and Sediment Control Standards July 2011 Planning and Development Services Single Family Residential Erosion and Sediment Control Standards This booklet contains standard plans and procedures appropriate for typical residential building

More information

A. Related work in other sections of these Specifications includes but is not limited to:

A. Related work in other sections of these Specifications includes but is not limited to: PART 1 GENERAL 1.01 GENERAL Work includes but is not limited to the following: A. This work shall consist of one or more courses of plant mixed asphalt concrete placed on a prepared foundation or base

More information

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development

More information

Final Report FHWA/IN/JTRP-2004/11. Determination of INDOT Highway Construction Production Rates and Estimation of Contract Times

Final Report FHWA/IN/JTRP-2004/11. Determination of INDOT Highway Construction Production Rates and Estimation of Contract Times Final Report FHWA/IN/JTRP-2004/11 Determination of INDOT Highway Construction Production Rates and Estimation of Contract Times By Yi Jiang, Ph.D., P.E. Department of Building Construction Management Purdue

More information

Table 4.9 Storm Drain Inlet Protetion Applicable for

Table 4.9 Storm Drain Inlet Protetion Applicable for BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection

More information

SECTION 02221 SELECTIVE DEMOLITION

SECTION 02221 SELECTIVE DEMOLITION SECTION 02221 PART 1 -GENERAL 1.01 DESCRIPTION This section includes all material, labor, machinery and supervision required to demolish and remove the following items where applicable and as noted on

More information

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems

More information

- 1 - Jb James Construction Llc. Measure. Total Amount. Unit Price

- 1 - Jb James Construction Llc. Measure. Total Amount. Unit Price Lead Project: H.002303.6 Parish: East Baton Rouge Routes: LA 37 Description: LA 37 at Central Thruway Type Const: GRADING, DRAIN STRUCT, SEWER FORCE MAINS, CLASS II BC, SUPERPAVE ACP, PCCP, TRAFFIC SIGNALIZATION,

More information

Tobique Employment & Training

Tobique Employment & Training APPENDICES 3 Tobique Employment & Training Flood Mitigation July 30, 2012 Overview This proposal outlines the work required and budget for flood mitigation measures on Tobique First Nation which is required

More information

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1 CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm

More information

SECTION 4Aggegate Subbase

SECTION 4Aggegate Subbase The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages

More information

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 20 DECK OVERLAY AND CONCRETE REHABILITATION

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 20 DECK OVERLAY AND CONCRETE REHABILITATION SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 20 DECK OVERLAY AND CONCRETE REHABILITATION TABLE OF CONTENTS 20.1 General... 20-1 20.2 Traffic Accommodation... 20-1 20.3 Preparation Work... 20-1 20.3.1

More information

CITY OF WINTER GARDEN CONSTRUCTION SERVICES LABOR, EQUIPMENT, AND MATERIALS BID FORM MOBILIZATION/DEMOBILIZATION

CITY OF WINTER GARDEN CONSTRUCTION SERVICES LABOR, EQUIPMENT, AND MATERIALS BID FORM MOBILIZATION/DEMOBILIZATION 1 2 3 4 < 100K Work Order > 100K Work Order < 100K Work Order > 100K Work Order % of Work Order % of Work Order % of Work Order % of Work Order 5 1 Each/Day Type I Barricade 6 1 Each/Day Type II Barricade

More information

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS 2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS GENERAL 10/16/2008 The listed average unit prices are based on the

More information

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 Section Subsection Name Date Modification Division 1 All subsections General Provisions

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

CHAPTER 8. Roadway Standards

CHAPTER 8. Roadway Standards CHAPTER 8 Roadway Standards A. Introduction This chapter outlines the standards for all pavements and other roadway improvements, such as curb and gutter improvements, sidewalks, and driveway approaches

More information

City of Doral 8300 NW 53 rd St. Doral, FL (305)

City of Doral 8300 NW 53 rd St. Doral, FL (305) City of Doral 8300 NW 53 rd St. Doral, FL 33166 (305) 593-6725 National Pollution Discharge Elimination System (NPDES) Construction Site Erosion and Sedimentation Control Introduction: The City of Doral

More information

SECTION 701 CULVERT PIPE, ENTRANCE PIPE, STORM SEWER PIPE, AND EQUIVALENTS

SECTION 701 CULVERT PIPE, ENTRANCE PIPE, STORM SEWER PIPE, AND EQUIVALENTS SECTION 701 CULVERT PIPE, ENTRANCE PIPE, STORM SEWER PIPE, AND EQUIVALENTS 701.01 DESCRIPTION. Furnish and install culvert pipe, entrance pipe, and storm sewer pipe. Use units conforming to the dimensions,

More information