1 Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, Background and Repair and Rehabilitation Recommendation Clay County has contracted Camp Dresser & McKee Inc. (CDM) to perform design and permitting of the repair and rehabilitation associated with the failing underground culvert near Carpet n Drapes on Blanding Blvd., east of Blanding Blvd., north of Spencer Rd. (Figure 1) The twin 72-inch corrugated metal culverts are to be rehabilitated, as the parking lot above the pipe and adjacent to the building has collapsed several times. Evaluation of hydraulics, constructability, design life, and cost has yielded the recommendation that the County rehabilitate the existing twin corrugated metal pipes with a high density resin lining commonly known as Cured in Place Pipe (CIPP). Other options for replacement and alternate routes were more costly than the available budget. 2.0 Stormwater Evaluation 2.1 Problem Identification Several sinkholes developed in the parking lot of Carpet n Drapes during 2005 (Figure 2). Internal inspection of the pipes found that the northern culvert was failing in multiple locations, typically at or below the normal flowline elevation. The worst failure area in the pipe consists of a Figure 2: Sinkhole in Parking Lot of Carpet N Drapes A 1
2 Blanding Blvd. Headwall Failure Area Carpet n' Drapes All-Tune Sp en ce r Rd. Figure 1 Clay County: Carpet 'n Drapes Culvert Design Location Map Model Conduit A Feet 200 µ ORANGE PARK, FL
3 portion of pipe that has failed and the bottom of the pipe is now protruding upward into the area of flow (Figure 3). Exposed soil at such failure locations is at risk of being dislodged due to event flow in the pipe. Large events or multiple small events can result in large underground voids, which can collapse, forming surface sinkholes as shown in Figure 2. As part of the site investigation, a geophysical study of the parking lot was conducted using ground penetrating radar. The intent of this study was to determine if any voids in the soil had fingered out laterally to the flowline of the pipes. No anomalies in soil density were identified lateral to the pipes. Figure 3: Failure within Pipe with Bottom Protruding Into Center of Pipe 2.2 Existing Conditions Model The Stormwater Management Model (SWMM) developed by CDM in 2001 for the Loch Rane and Bel-Med Stormwater Management Plan was used as the basis for the hydraulic evaluation of the recommended alternative. The mean-annual, 10-year, 25- year, and 100-year/24-hour design storms were used to determine the hydraulic equivalent for each of the alternatives evaluated (hydraulically equivalent to the existing system). The portion of the model relevant to this study is shown in Figure Equivalent Conduit Evaluation For the twin 72-inch culverts, 4 equivalent pipe types were evaluated for replacement: 1. Twin 72-inch aluminized steel 2. Twin 62-inch reinforced concrete pipe A 2
4 Blanding Blvd. LR Acres "/ LR064S LR065S LR070 "/ LR Acres "/ LR Acres LR Acres LR Acres Kingsley Blvd. LR064S LR Acres LR065S LR070 LR Acres PROJECT AREA µ 0 Feet ,000 1,500 2,000 Figure 4 Clay County: Carpet 'n Drapes Culvert Design Model Schematic A Hydrologic Units Model Junctions TYPE Extran Linking "/ Extran Storage Model Conduits ORANGE PARK, FL
5 x 6.5 preformed concrete box culvert inch CIPP rehabilitated pipe: in-place high density resin lining of existing pipe approximately 1-ft thick CIPP. Manning s roughness values (n) for the existing pipes and the four alternatives are shown in Table 1. For each alternative, pipe sizes were adjusted such that no stage increase occurs upstream or downstream of the replacement pipe for the 25- and 100- year storms. The aluminized steel option was not evaluated for hydraulic equivalency, as it would perform identically to the existing corrugated steel pipes. Table 1: Manning s n Values Conduit n Existing Aluminized Steel Reinforced concrete (round) Reinforced concrete (box) CIPP (resin-lined) For the CIPP option, peak stages and flows are shown to increase for all design storms by replacing the 72-inch CMP with a 70-inch CIPP alone. This is due to the low friction and n value for the resin lining combined with the relatively small reduction in area associated with the lining. As part of the recommended design, a trash rack is recommended at the inlet to the pipes. The rack will provide a public safety function and has been designed to also compensate for the increased flow capacity of the CIPP rehabilitated pipes. This hydraulic equivalency is to be the basis of the SJRWMD permit exemption. 3.0 Construction 3.1 Project Considerations for Culvert Rehabilitation Several constraints and project considerations exist regarding the constructability of any of the replacement options specified above: 1. The pipe run contains two bends of approximately 40 degrees each. The resin lining system is only able to be applied through one bend at a time. Therefore, excavation at the location of the easternmost bend will be required; one length of the CIPP run will be applied west, and one east. A concrete junction box is recommended at this location with manhole access to both pipes. 2. The excavation of the area in (1) may be an open cut or potentially a sheetpiled excavation, according to the contractor s discretion. Due to the proximity of the building and previous earth movements near it, a preconstruction survey is required as previously agreed with the County. In addition, temporary shoring of the southeastern corner of the building with mini-piles is required to ensure no property loss is incurred due to the construction of the junction box. A 3
6 3. Contingencies for construction in the wet will be required, as the system will need to have the ability to convey baseflow and event flow during construction for any replacement option. 3.2 Rehabilitation Options An alternative to rehabilitate the pipe with a CIPP was evaluated and found to be the preferred alternative for this project. A 1.06-inch thick application of resin lining would be required to be adhered to the existing pipe to obtain a structurally sound pipe with a safety factor of 2.0 and a design life of 50 years. One advantage of this technology as typically employed is that above ground structures and infrastructure are minimally disturbed. The technology has been used since the 1970 s and has a proven track record: CIPP is the most widely used pipe rehabilitation method worldwide and accounts for more than all other methods of rehabilitation combined (Figure 5). Figure 5: CIPP Diagram and Example Rehabilitation Project A 4
7 3.2.1 Snap Lining Rehabilitation Another pipe rehabilitation method that was evaluated and found not to be the preferred option is a snap lining system. This system involves lining the existing pipe with a segmental high density polyethylene (HDPE) pipe which contains a system which snaps the segments together automatically when pressed in place. This type of system for this project has two disadvantages which were found to preclude this option. First, three excavations would be required: one at each bend in the pipe and one at the sidewalk/apron adjacent to Blanding Blvd. One of these excavations would be much closer to the Carpet n Drapes building than the excavation proposed in the CIPP alternative. The excavation near Blanding Blvd. would require a retail traffic detour/contingency plan for the three affected retail establishments. Second, the snap lining system results in a system with up to 32 individual pipe joints. Each joint is a point of potential future failure if not installed, or snapped, correctly. In contrast, the CIPP solution has no joints and only one excavation near the rear of the retail establishments, which should not impact traffic significantly. 3.3 Headwall and Lined Ditch The channel near the headwall has multiple failure areas and areas where flow is below or behind the ditch pavement (Figure 6). There does not appear to be steel rebar in the concrete. There are three additional large failures upstream of the headwall, and many signs of more failure areas to come. Due to the steep sideslopes (1.5:1 H:V) and the high rate of flow (385 cfs for the mean annual storm), re-armoring the channel with a more durable material is required. Articulated concrete block is recommended to provide the needed channel protection (Figure 7). It is able to be installed on the steep slopes and will allow vegetation to become established through interstitial spaces between concrete blocks. Figure 6: Failure Area at Headwall A 5
8 Figure 7: Articulated Block Installed on Steep Slopes 4.0 Cost Analysis A preliminary conceptual cost estimate was prepared for each alternative evaluated for the culvert replacement using vendor estimated pricing, average 2004 City of Jacksonville bid prices and 2005 Florida Dept. of Transportation (FDOT) Statewide Average Construction Cost Index (Table 2). 5.0 Recommendation The recommendation for CIPP solution is based on three factors: 1. Constructability 2. Durability a. The CIPP solution is the least invasive option available to the County. There is only one excavation of the parking lot which will not affect access to Blanding Blvd. Pipe replacement methods would require a longer construction window, site-wide excavation and sheetpiling, more time of exposure to risk (e.g., a large flood event), no joints in the pipe run, and maintenance of traffic plans. a. Durability and performance of CIPP is superior to other rehabilitation methods available. b. Calculation of design life for the CIPP rehabilitation option is 50 years. A 6
9 Table 2 Clay County Carpet 'n Drapes Culvert Replacement Preliminary Cost Estimates Cast in place pipe Twin 72" aluminized steel pipe replacement Units Quantity Unit Price Estimated Cost Units Quantity Unit Price Estimated Cost Mobilization EA 1 $ 5,000 $ 5,000 Mobilization EA $ 5,000 Pipe Lining EA 640 $ 906 $ 580,000 Excavation CY $ 12,960 Excavation (regular) CY 261 $ 6 $ 1,566 Sheet piling SF $ 556,800 Junction Box EA 1 $ 102,315 $ 102,315 Bldg. shoring EA $ 60,000 Mitered End EA 1 $ 20,843 $ 20,843 Pipe cost LF $ 99,097 Articulated Block SY 2,034 $ 63 $ 128,142 Junction Box EA $ 102,315 Fence LF 420 $ 16 $ 6,720 Pipe installation EA $ 276,480 Silt Fence LF 820 $ 3.71 $ 3,042 Headwall EA $ 20,843 Building Shoring EA 1 $ 45,000 $ 45,000 Site demo SY $ 14,560 As-builts EA 1 $ 5,000 $ 5,000 Paving SY $ 8,320 As-builts EA $ 5,000 Contingency 30% $ 269,000 Contingency 30% $ 348,000 Total 1 $ 1,167,000 Total $ 1,509,000 Equivalent 6.0' X 6.5' RC precast box culvert Twin 62" RCP Class II pipe replacement Units Quantity Unit Price Estimated Cost Units Quantity Unit Price Estimated Cost Mobilization EA 1 $ 5,000 $ 5,000 Mobilization EA $ 5,000 Excavation CY 2160 $ 6 $ 12,960 Excavation CY $ 12,960 Sheet piling SF 40,000 $ 14 $ 556,800 Sheet piling SF $ 556,800 Bldg. shoring EA 3 $ 20,000 $ 60,000 Bldg. shoring EA $ 60,000 Pipe cost LF 320 $ 960 $ 307,200 Pipe cost LF $ 131,241 Junction Box EA 1 $ 102, $ 102,315 Junction Box EA $ 102,315 Pipe installation EA 1 $ 276,480 $ 276,480 Pipe installation EA $ 276,480 Headwall EA 1 $ 20,843 $ 20,843 Headwall EA $ 20,843 Site demo SY 520 $ 28 $ 14,560 Site demo SY $ 14,560 Paving SY 520 $ 16 $ 8,320 Paving SY $ 8,320 As-builts EA 1 $ 5,000 $ 5,000 As-builts EA $ 5, Rounded to nearest 1,000 Contingency 30% $ 411,000 Contingency % $ 358,000 Total $ 1,780,000 Total $ 1,552,000 Z:\6222_Clay_County\49775_Carpet-n-Drapes\PDR-2\CIPPCostTable xls 7/27/2006
10 3. Cost References a. The cost differential between a pipe replacement solution and a pipe rehabilitation solution is approximately $700,000 and would be greater than the available budget. This excludes all replacement options from recommendation. Chow, V.T., (1959), Open-Channel Hydraulics; McGraw-Hill, New York, NY. Metcalf and Eddy, (1972), Municipal Stormwater Management; McGraw-Hill, New York, NY. A 7
Storm Sewer Trenchless Upgrade Alternatives and Recommendations
Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for
More informationSECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
More informationSection 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
More informationCCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R
CCTV PIPE INSPECTION AND EVALUATION For RUNWAY 17L-35R At ST. PETERSBURG CLEARWATER INTERNATIONAL AIRPORT February 2011 CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R ST. PETERSBURG CLEARWATER INTERNATIONAL
More informationSECTION 7- STORM SEWER
SECTION 7- STORM SEWER 7.1. STORM SEWERS.... 7-1 7.2. SUMP DRAINS... 7-3 7.3. CATCH BASINS... 7-3 7.4. MANHOLES... 7-4 7.5. STORM SEWER CALCULATIONS... 7-4 7.6. CULVERTS AND BRIDGES... 7-5 7.7. OPEN CHANNELS...
More informationEstimating Stormwater System Annual Maintenance and Repair Costs - A GIS Approach
October 5 2011 Estimating Stormwater System Annual Maintenance and Repair Costs - A GIS Approach 2011 SESWA Annual Conference 2011 Southeast Stormwater Associated Annual Conference Presentation Overview
More informationLand Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
More informationFigure 3 Pipe Cracking
The illustration shown below depicts the system analyzed. As-built drawings and survey information were not available; aerial photos and survey shots of inverts were used to determine the system s geometries.
More informationPROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS
C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates
More informationITD Pipe Materials Selection & Specification Procedures. July 2011
ITD Pipe Materials Selection & Specification Procedures July 2011 INTRODUCTION: This technical memorandum is written as a guide to the selection of compliant pipe materials and the elimination of non-compliant
More informationSECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
More informationCHAPTER 5. Storm Sewer
CHAPTER 5 Storm Sewer A. Introduction All proposed developments shall have a properly designed and constructed storm water conveyance system. This chapter deals only with the conveyance system. Storm water
More informationCITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.
More informationWILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued)
BIDDER'S PROPOSAL (continued) Item Estimated No. Description Quantity Unit Unit Cost Total Cost BASE BID 1 Traffic Control 1 LS $ $ 2 Construction Area Signs 1 LS $ $ 3 Excavation Safety 1 LS $ $ 4 Reset
More informationNebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY
Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY Policy: This policy will replace all previous policies regarding the selection of pipe material for cross drains, drive pipe, drop pipe, storm
More informationSTORM DRAINS CHAPTER 7
CHAPTER 7 Chapter 7 - Storm Drains A storm drain is a drainage system that conveys water or stormwater, consisting of two or more pipes in a series connected by one or more structures. Storm drains collect
More informationState of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
More informationCONSTRUCTION COST MODELS
CONSTRUCTION COST MODELS Prepared by: The New England Environmental Finance Center For the Maine Department of Transportation Office of Environmental Planning November 1, 2010 The following are a series
More informationSECTION 5 - STORM DRAINS
Drainage Criteria Manual SECTION 5 - STORM DRAINS 5.1.0 GENERAL This The purpose of this section discusses briefly is to consider the hydraulic aspects of storm drains and their appurtenances in a storm
More informationMemorandum. PROJECT: Postmark Emergency Storm Repair Alternative Analysis
Memorandum CRW Engineering Group, LLC 3940 Arctic Blvd. Suite 300 Anchorage, AK 99503 (907) 562-3252 FAX 561-2273 TO: Mike Lee, P.E., Chief Engineer, ADOT/ANC FROM: Shane Blanchard, P.E. THRU: Mike Rabe,
More informationFLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR
FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR ESTABLISHING CONSTRUCTION CONTRACT DURATION July 2010 DISCLAIMER: The following documentation as a whole was derived from Federal Highway Administration
More informationDIVISION 4300 STORM DRAINAGE
DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES
More informationPremature Storm Drainage System Repairs and Replacement
Premature Storm Drainage System Repairs and Replacement Stewart Edwards Program Manager Design Management Team Charlotte-Mecklenburg Storm Water Services April 8, 2015 Date Agenda Storm Water Infrastructure
More informationSECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING
SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent
More informationSECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.
SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings
More information1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP
5 INDEX TO SHEETS. NOTES AND TYPICAL SECTIONS. H. R. SMITH RD.CULVERT.3 0/5 END BARRIER ACCESS ROAD REPAIR. KISSIMMEE RD. AT MORGAN HOLE CR. ROAD REPAIR.5 RANGE INFRASTRUCTURE REPAIR N 0 000' 3 0,000'
More informationFY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation
644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING
More informationSewer Rehabilitation Design Requirements
Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared
More informationSTANDARD SPECIFICATIONS & CONSTRUCTION DETAILS MANUAL SECTION 5 - STORM DRAINAGE. 5.01 Design
SECTION 5 - STORM DRAINAGE 5.01 Design Storm drainage facilities shall be designed in accordance with the goals and guidelines set forth in the Unified Development Ordinance. The goal shall be to collect
More informationMuddy River Flood Risk Management & Environmental Restoration Project Phase 1 Construction Activities Next 90 Days August 2015
Muddy River Flood Risk Management & Environmental Restoration Project Phase 1 Construction Activities Next 90 Days August 2015 General: The Muddy River Flood Risk Management (FRM) & Environmental Restoration
More informationCHAPTER 3 STORM DRAINAGE SYSTEMS
CHAPTER 3 STORM DRAINAGE SYSTEMS 3.7 Storm Drains 3.7.1 Introduction After the tentative locations of inlets, drain pipes, and outfalls with tail-waters have been determined and the inlets sized, the next
More informationNOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW
NOTICE TO CONTRACTORS CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW The Nebraska Department of Roads will receive sealed bids in
More informationFailing Culverts Structural Problems & Economic Considerations
Failing Culverts Structural Problems & Economic Considerations Al Tenbusch, President, Tenbusch, Inc. Brian Dorwart, Senior Associate, Brierley Associates Albert F. Tenbusch, Engineer, Tenbusch, Inc. June
More informationChapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile
Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality
More informationAppendix J: Pipe Evaluation and Replacement Options and Costs
Appendix J: Pipe Evaluation and Replacement Options and Costs STORMWATER SYSTEM INVENTORY The City of Olympia has an extensive stormwater conveyance system. As a matter prudent management of the Stormwater
More informationTravel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness
3 Chapter 3 of Concentration and Travel Time Time of Concentration and Travel Time Travel time ( T t ) is the time it takes water to travel from one location to another in a watershed. T t is a component
More informationLecture 22 Example Culvert Design Much of the following is based on the USBR technical publication Design of Small Canal Structures (1978)
Lecture 22 Example Culvert Design Much of the following is based on the USBR technical publication Design of Small Canal Structures (1978) I. An Example Culvert Design Design a concrete culvert using the
More informationAPPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.
Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations
More informationX Planning X Quality X Maintenance & Operations
Delaware Department of Transportation Division of Transportation Solutions Design Guidance Memorandum Memorandum Number 1-20 Revised 1. Road Design Manual 2. Bridge Design Manual 3. Utilities Design Manual
More informationCHAPTER 9 STORM DRAINAGE
CHAPTER 9 STORM DRAINAGE 9-1 COUNTY POLICY AND REQUIREMENTS A. Using methods acceptable under County ordinances and Federal guidelines, the storm drainage system design shall be based on a drainage study
More informationCLARK COUNTY REGIONAL FLOOD CONTROL DISTRICT HYDROLOGIC CRITERIA AND DRAINAGE DESIGN MANUAL SECTION 800 STORM SEWER SYSTEMS TABLE OF CONTENTS
CLARK COUNTY REGIONAL FLOOD CONTROL DISTRICT HYDROLOGIC CRITERIA AND DRAINAGE DESIGN MANUAL SECTION 800 STORM SEWER SYSTEMS TABLE OF CONTENTS 801 INTRODUCTION 803 802 DESIGN PARAMETERS 804 802.1 - Allowable
More informationFY08 SEWER POINT REPAIRS BID TABULATION
6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "
More informationCULVERT AND STORM SEWER PIPE MATERIAL POLICY ON FEDERALLY FUNDED LOCAL AGENCY PROJECTS UPDATED March 2013
CULVERT AND STORM SEWER PIPE MATERIAL POLICY ON FEDERALLY FUNDED LOCAL AGENCY PROJECTS UPDATED March 2013 Background Section 5514, a final rule for SAFETEA-LU was issued on November 15, 2006 and became
More informationSTRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
More informationOutlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
More informationChapter 22. Lump Sum Project Guidelines
Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11
More informationRepair or Replacement - Band-Aids vs. Surgery
Repair or Replacement - Band-Aids vs. Surgery Using RCP for the Replacement of Failed or Undersized Culverts www.concrete-pipe.org Introduction and Background Our Nation s infrastructure owners are facing
More informationDRAINAGE HANDBOOK OPTIONAL PIPE MATERIALS
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION DRAINAGE HANDBOOK OPTIONAL PIPE MATERIALS OFFICE OF DESIGN, DRAINAGE SECTION AUGUST 2014 TALLAHASSEE, FLORIDA Table of Contents Chapter 1 - Purpose... 3 1.1
More informationIndex. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
More informationMEMORANDUM: RECOMMENDATIONS FOR PIPE MATERIAL SELECTION
MEMORANDUM: RECOMMENDATIONS FOR PIPE MATERIAL SELECTION Moser and Associates Engineering for CDOT Region 6 Date: 9/30/10 Memorandum to File: Recommendations for Pipe Material Selection for Construction
More informationSECTION 724 PIPE CULVERTS
SECTION 724 PIPE CULVERTS 724.1 Description. This work shall consist of providing pipe or pipe arch of the diameter or shape designated, laid upon a firm bed and backfilled as specified. Where appropriate
More informationDIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant
More informationMinimizes sediment and debris from entering storm drains that lead to waterways and watercourses.
4.5-p DRAIN INLET PROTECTION Alternative Names: DI protection, Drop Inlet Protection DESCRIPTION Storm drain inlet (DI) protection slows and ponds stormwater, and filters sediment and debris before it
More informationSECTION 6A STORM DRAIN DESIGN Mar. 2002 S E C T I O N 6A STORM DRAIN - DESIGN
S E C T I O N 6A STORM DRAIN - DESIGN 6A.l Scope 6A.2 Storm Water Quantity 6A.3 Storm Drain Hydraulics 6A.4 Depths 6A.5 Locations 6A.6 Curved Storm Drains 6A.7 Manholes 6A.8 Catch basins 6A.9 Storm Drain
More informationSPR PE Steel Reinforced Liner
ENGINEERED SOLUTIONS SPR PE Steel Reinforced Liner Reline Done Right Contech is your single source for rehabilitation of sanitary & storm sewers, culverts and bridges. Contech Engineered Solutions has
More informationChapter 9 Storm Sewers
Contents 1.0 Introduction... 1 2.0 Design Storms... 1 2.1 Minor Event... 1 2.2 Major Event... 1 3.0 Pipe Material and Size... 2 3.1 Pipe Material... 2 3.2 Minimum Pipe Size... 2 3.3 Service Life... 2 3.4
More informationCHAPTER 14 SECTION 1
SECTION 1 S SECTION 1 S JANUARY 6, 006 S CH14-100 SECTION 1 S TABLE OF CONTENTS SECTION 1 S 1.1 INTRODUCTION... CH14-103 1. HYDRAULIC DESIGN... CH14-104 1..1 ALLOWABLE STORM WATER CAPACITY...CH14-104 1..
More informationSPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)
SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer
More informationCity of Hilshire Village Pine Creek Ln Reconstruction
City of Hilshire Village Pine Creek Ln Reconstruction OVERVIEW The City will be soliciting bids for the Pine Creek Reconstruction Project with construction scheduled to begin in January 2015. This project
More information3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
More informationCHAPTER II - STORM DRAINAGE
CHAPTER II - STORM DRAINAGE 201 General 201.1 Use of Chapter II 201.2 Triggers for Drainage Report 201.3 Relationship to Chapter on Storm Water Quality 202 Design Guidelines 202.1 Hydrology 202.1.1 General
More informationLet Us Give Utilities the Respect that they Deserve.
Water & Sewer Utilities Miscellaneous Design and Plan Preparation Guidelines Issued by: Ray Mowla, P.E. Jefferson Parish Department of Engineering, Utilities Section The purpose of issuing these miscellaneous
More informationStorm Drain Inlet Protection
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
More informationSECTION 3 SANITARY SEWER DESIGN
SECTION 3 SANITARY SEWER DESIGN 3.1 GENERAL DESIGN CRITERIA 3.1.1 Requirement for Sanitary Sewer 3.1.2 Design Approval 3.1.3 IEPA Permit Required 3.1.4 Differentiation Between Public and Private Sanitary
More informationThe unit costs are based on the trend line of the 3 low bids for the average quantity.
Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally
More informationSECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or
More informationCLEANING, INSPECTION, AND TESTING OF SEWERS
CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and
More informationURBAN DRAINAGE CRITERIA
URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities
More informationCHAPTER 9 STORM DRAINAGE DESIGN AND STORMWATER QUALITY REGULATIONS
June 27, 2011 Chapter 9 Storm Drainage Design and Stormwater Quality Regulations Table of Contents CHAPTER 9 STORM DRAINAGE DESIGN AND STORMWATER QUALITY REGULATIONS Table of Contents Chapter 9 Storm Drainage
More informationNIST Technology Showcase FutureScan
NIST Technology Showcase FutureScan Next-Generation Pipe Penetrating Radar for Sewer and Water Infrastructure Inspection Project NANB9H9009 An Example of a Catastrophic Void Impact of Floods, Earthquakes,
More informationA. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.
19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property
More informationPROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY
PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY Cured-In-Place Pipe Pressure & Gravity Lines Pipe Splitting Trenchless Pipe Replacement EcoCast Advanced
More informationTopic 8: Open Channel Flow
3.1 Course Number: CE 365K Course Title: Hydraulic Engineering Design Course Instructor: R.J. Charbeneau Subject: Open Channel Hydraulics Topics Covered: 8. Open Channel Flow and Manning Equation 9. Energy,
More informationSECTION 02200 SUPPORT OF EXCAVATION
SECTION 02200 PART 1 GENERAL 1.01 DESCRIPTION A. Section including specifications for design and installation of excavation support. B. Section also includes specifications for excavation support systems
More informationStorm Drain Inlet Protection
Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective
More informationAPPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
More informationLegacy Trail Extension Feasibility Study. Preliminary Cost Estimate
Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5
More informationTENNESSEE GAS PIPELINE COMPANY, L.L.C.
TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC & HYDRAULIC CALCULATIONS FOR WATERBODIES CROSSED BY CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,
More informationSoapstone Sewer Rehabilitation Alternative Concepts Design and Associated Impacts
Soapstone Sewer Rehabilitation Alternative Concepts Design and Associated Impacts Outline Update on Soapstone Emergency Response Provide project background Provide project purpose & need Present proposed
More informationDRAINAGE CRITERIA MANUAL (V. 2) CULVERTS CONTENTS
DRAINAGE CRITERIA MANUAL (V. 2) CONTENTS Section Page CU 1.0 INTRODUCTION AND OVERVIEW... 1 1.1 Required Design Information... 3 1.1.1 Discharge... 4 1.1.2 Headwater... 4 1.1.3 Tailwater... 5 1.1.4 Outlet
More informationSECTION III DRAINAGE
SECTION III DRAINAGE TOC-III.1 of 5 TABLE OF CONTENTS DRAINAGE FACILITIES No. Title D-1 Standard Underdrains D-2 Longitudinal Underdrain for Flexible Paving D-3 Spring Control Method & Detail D-4 Trench
More informationCity of Balch Springs, Texas. Request for Proposal (RFP 2016-2-15) Pipe Bursting Sewer Line Replacement
City of Balch Springs, Texas Request for Proposal (RFP 2016-2-15) Pipe Bursting Sewer Line Replacement Balch Springs is a city in Dallas County, Texas, United States. It is a suburb of Dallas and part
More informationDRAINAGE MANUAL CHAPTER VII STORM DRAINAGE SYSTEMS
TDOT DESIGN DIVISION DRAINAGE MANUAL CHAPTER VII STORM DRAINAGE SYSTEMS August 1, 2012 CHAPTER 7 STORM DRAINAGE SYSTEMS SECTION 7.01 INTRODUCTION 7.01 INTRODUCTION...7-1 SECTION 7.02 DOCUMENTATION PROCEDURES
More informationLow Impact Development Checklist
New Jersey Stormwater Best Management Practices Manual February 2004 A P P E N D I X A Low Impact Development Checklist A checklist for identifying nonstructural stormwater management strategies incorporated
More informationSUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS
July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional
More informationCity of La Quinta Public Works Department - Storm Drain Plan Review Checklist
Tract or Parcel Project Name PCN Checked By Date City of La Quinta Public Works Department - Storm Drain Plan Review Checklist SUBMITTAL REQUIREMENTS Approved Tentative Tract Map Conditions of Approval
More informationREHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542
1.0 INTENT REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES 1.01 It is the intent of this specification to provide for the reconstruction of pipelines and conduits by the installation of a resin-impregnated
More informationSECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
More informationIndustrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems.
Industrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems. Aging pipeline infrastructure and industry s inability to evaluate and inspect has left many engineers and plant managers
More informationSECTION 108 - INLETS 108.1 INLET LOCATIONS
Greene County Design Standards -Adopted April 5, 1999 SECTION 108 - INLETS SECTION 108 - INLETS 108.1 INLET LOCATIONS 108.2 INLET INTERCEPTION CAPACITIES 108.2.1 Clogging Factors 108.3 INTERCEPTION AND
More information550 PIPE CULVERTS, SEWERS AND DRAINS
551.01 550 PIPE CULVERTS, SEWERS AND DRAINS 551 GENERAL 551.01 Description 551.02 Materials 551.03 Excavation 551.04 Protection of Excavation 551.05(a) Bedding for Rigid Pipe 551.05(b) Bedding for Non-Rigid
More informationSTORMWATER MANAGEMENT CHECKLIST
STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative
More informationCity of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
More informationSection 402. STORM SEWERS
402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide
More informationRiprap-lined Swale (RS)
Riprap-lined Swale (RS) Practice Description A riprap-lined swale is a natural or constructed channel with an erosion-resistant rock lining designed to carry concentrated runoff to a stable outlet. This
More informationExcavation Procedure. MIDGA Reviewed: 07/29/14 Effective: 06/20/09 Supersedes: Original Preparer: Owner: Approver: Safety Safety Safety
Procedure No.: SOP-0203 Page: 1 of 5 Preparer: Owner: Approver: Safety Safety Safety 1. PURPOSE The purposes of this procedure is to ensure safe excavation, reduce the potential of damaging underground
More informationLocal Road Assessment and Improvement Drainage Manual
Local Road Assessment and Improvement Drainage Manual Donald Walker, T.I.C. Director, author Lynn Entine, Entine & Associates, editor Susan Kummer, Artifax, design Transportation Information Center University
More informationTECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines
More information6-0000 STORM DRAINAGE. 6-0100 GENERAL INFORMATION... 8 6-0101 Drainage Systems... 8 6-0102 VDOT Requirements... 8 6-0103 Metric Plan Preparation...
TABLE OF CONTENTS 6-0100 GENERAL INFORMATION... 8 6-0101 Drainage Systems... 8 6-0102 VDOT Requirements.... 8 6-0103 Metric Plan Preparation... 8 6-0200 POLICY AND REQUIREMENTS FOR ADEQUATE DRAINAGE...
More informationPrattsville Berm Removal Project. 1.0 Project Location
Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed
More information