1

2 BIDDER'S PROPOSAL (continued) Item Estimated No. Description Quantity Unit Unit Cost Total Cost BASE BID 1 Traffic Control 1 LS $ $ 2 Construction Area Signs 1 LS $ $ 3 Excavation Safety 1 LS $ $ 4 Reset Timber Lagging 1 LS $ $ 5 Reset Metal Beam Guard Rail 75 LF $ $ 6 Roadway Excavation 85 CY $ $ 7 Hot Mix Asphalt (Type A) 23 TON $ $ 8 Class 2 Aggregate Base 20 CY $ $ 9 Storm Drain Manhole 2 EA $ $ 10 Drainage Inlet 1 EA $ $ inch Downdrain Anchors 6 EA $ $ inch HDPE Pipe (Type C) 130 LF $ $ inch CSP (Polymer Ctd., 0.079" Thick) 32 LF $ $ 14 Energy Dissipater 2 EA $ $ 15 Subdrain System 1 LS $ $ 16 Rock Slope Protection (1/2 Ton, Method A) 103 CY $ $ 17 Rock Slope Protection (Backing No. 1) 96 CY $ $ 18 Rock Slope Protection Fabric 223 SQYD $ $ 19 Thermoplastic Traffic Stripe (Detail 27b) 60 LF $ $ 20 Thermoplastic Traffic Stripe (Detail 22) 7 LF $ $ BASE BID TOTAL $ ADDITIVE BID 21 Remove Drainage Inlet 1 EA $ $ 22 Abandon and Remove 12-inch CSP 1 LS $ $ 23 Abandon 12-inch HDPE Pipe 1 LS $ $ 24 Roadway Excavation (F) 6 CY $ $ 25 Drainage Inlet 1 EA $ $ inch CSP Downdrain (Polymer Coated, Thick) 138 LF $ $ inch Downdrain Anchors 14 EA $ $ 28 Energy Dissipater 1 EA $ $ 29 Energy Dissipater (Deduct Item 14) -1 EA $ * $ (F) Indicates a Final Pay Item of Work ADDITIVE BID TOTAL $ *Unit Cost for Item 29 shall match Item 14. AWARD OF THE PROJECT IS BASED ON THE LOWEST RESPONSIBLE BASE BID TOTAL. ADDITIVE BID ITEMS OF WORK ARE REVOCABLE. THE CITY RESERVES THE RIGHT TO AWARD OR NOT AWARD THE ADDITIVE BID WITH THE CONTRACT. TOTAL COST OF BASE BID ITEMS 1-20 IN WORDS AND FIGURES: Dollars and Cents ($ ). Addendum No. 1 Page 3 of 4 [BIDDERS]

3 BIDDER'S PROPOSAL (continued) The undersigned bidder agrees to accept payment in full for the work at the unit price set forth above in accordance with provisions of the specifications, the special provisions, and as shown on the plans. The Contractor agrees to start work within fourteen (14) calendar days from the Notice to Proceed. This work shall be diligently prosecuted to completion before the expiration of 25 WORKING DAYS after issuance of the Notice to Proceed. The Contractor shall pay to the City of Berkeley the sum of $ per day, for each and every calendar day delay in finishing the work in excess of the number of working days prescribed above. The City will strictly enforce liquidated damages on this contract. Prior to submitting a bid for the work, the Contractor shall carefully assess his or her capacity to complete the work within 25 working days and agrees that the 25 working days is sufficient to complete the work. Company Address By Title Phone ( ) Taxpayer I.D. No. Date Corporation Yes [ ] No [ ] (The following spaces to be used by the City) Pursuant to City of Berkeley Council Resolution No. N.S. adopted on, the City of Berkeley agrees to pay the prices set forth above for the Total Bid Items in the amount of ($ ), in accordance with the terms and conditions set forth in Specification No The contractor shall complete all work specified in the contract documents in accordance with the plans and specifications within twenty-five (25) working days from the date established in the Notice to Proceed. CITY OF BERKELEY Dated: By: Registered By: Attested By: City Manager Auditor City Clerk Addendum No. 1 Page 4 of 4 [BIDDERS]

4 SPECIAL PROVISIONS BID ITEM BID ITEM BID ITEM NO. 21 REMOVE DRAINAGE INLET NO. 22 ABANDON AND REMOVE 12-INCH CSP NO. 23 ABANDON 12 HDPE PIPE The work performed in connection with various existing facilities shall conform to the provisions in Section 14-10, Solid Waste Disposal and Recycling, Section 15, "Existing Facilities," Section , Property and Facility Preservation, Section , Indemnification, and Section , Insurance, of the Standard Specifications, as well as these special provisions. Nothing in these special provisions shall relieve the Contractor of the Contractor's responsibilities as specified in Section , "Public Safety", of the Standard Specifications. The Contractor shall protect from damage, any utilities and other facilities that are to remain in place. Damage to concrete or any adjacent existing structure or improvement, which is to remain in place, shall be repaired to a condition satisfactory to the Engineer. Repairing or removing and replacing structures, improvements, and/or the concrete to remain in place, that are damaged outside the limits of concrete to be replaced, shall be at the Contractor's expense and will not be measured nor paid for. REMOVE DRAINAGE INLET: This work shall consist of removal of existing drainage inlet at the location shown on the plans. ABANDON AND REMOVE 12-INCH CSP: This work shall consist of removing exposed and abandoning remaining corrugated steel pipes as shown on the plans. Removed facilities to be disposed of shall become the property of the Contractor. Portion of the pipes to be abandoned shall be filled with sand and the ends plugged with concrete. The Contractor shall be responsible for the proper disposal of all waste materials generated in the removal of storm drain culverts. All hazardous material will be disposed of in accordance with applicable laws, and appropriate records shall be maintained. The opening into the existing structure must be plugged with non-shrink grout or minor concrete conforming to Section 90-2, Minor Concrete, of the Standard Specifications. The culvert must be completely filled by authorized methods. Backfill with sand that is clean, free draining, and free from roots and other deleterious substances. As an alternative to sand, you may backfill with one of the following: 1. Controlled low-strength material under Section F of the Standard Specifications. 2. Slurry cement backfill under section D of the Standard Specifications. ABANDON 12-INCH HDPE PIPE: This work shall consist of abandoning remaining HDPE pipes as shown on the plans. Pipes to be abandoned shall be filled with sand and the ends plugged with concrete. Addendum No. 1 SP-36 [SPECPRO]

5 SPECIAL PROVISIONS The opening into the existing structure must be plugged with non-shrink grout or minor concrete conforming to Section 90-2, Minor Concrete, of the Standard Specifications. The culvert must be completely filled by authorized methods. Backfill with sand that is clean, free draining, and free from roots and other deleterious substances. As an alternative to sand, you may backfill with one of the following: 1. Controlled low-strength material under Section F of the Standard Specifications. 2. Slurry cement backfill under section D of the Standard Specifications. Measurement and Payment The contract unit price paid for Remove Drainage Inlet shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in removing drainage inlet, including sawcutting, excavation, backfill, hauling, recycling, disposal, and other incidental work, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer. The contract lump sum price paid for Abandon and Remove 12-inch CSP shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in removing and abandoning the corrugated steel storm drain pipe, complete in place, including sawcutting, excavation, sand backfill, concrete plugs, hauling, recycling, disposal, and other incidental work, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer. The contract lump sum price paid for Abandon 12-inch HDPE Pipe shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in abandoning the HDPE storm drain pipe, complete in place, including sand backfill, concrete plugs, hauling, and other incidental work, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer. BID ITEM NO. 24 Roadway Excavation (F) Earthwork shall conform to Section 19, "Earthwork," of the Standard Specifications and these special provisions. Earthwork involved in this item of work shall be considered as a final pay quantity and no adjustment to the quantity is allowed. Ditch excavation shall be measured and paid for as Roadway Excavation. Addendum No. 1 SP-37 [SPECPRO]

6 SPECIAL PROVISIONS Measurement and Payment The contract price paid per cubic yard for Roadway Excavation shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals required to excavate material and place embankment complete in place, including sawcutting, backfill, off haul, disposal, temporary support and protection of existing utilities, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer. BID ITEM NO. 25 Drainage Inlet Storm drainage inlets shall conform to Section 51-7, Minor Structures, of the Standard Specifications and these special provisions. Measurement and Payment The contract unit price paid for Drainage Inlet shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals required to furnish and install drainage inlet complete in place, including excavation, backfill, concrete, pipe connections to structures, miscellaneous metal, and appurtenances, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer. BID ITEM NO INCH CSP DOWNDRAIN Corrugated steel pipe downdrain shall conform to Section 69, "Overside Drains," of the Standard Specifications and these special provisions. The Contractor shall be responsible for verifying the actual horizontal and vertical location of the existing utilities within the proposed alignment of the drain pipe. The Contractor shall be cognizant of the existing utility lines in the proximity of the work area and take precautions, as necessary, to not disturb these facilities. The Contractor shall notify Underground Service Alert at (800) prior to excavation. The Contractor s attention is directed to the section entitled Obstructions of these special provisions. BACKFILL. Structure backfill shall comply with the provisions in Section B, Structure Excavation and Backfill, of the Standard Specifications. The Contractor shall use Class 2 Aggregate Base as Structure Backfill under the roadway. Backfill shall be compacted to 95% relative compaction. Addendum No. 1 SP-38 [SPECPRO]

7 SPECIAL PROVISIONS Corrugated steel pipe shall conform to Section 66, "Corrugated Metal Pipe," of the Standard Specifications and these special provisions. Pipe wall steel shall be inches thick. Corrugated steel pipe shall be epoxy coated or polymeric sheet coated. Coating shall be protected from abrasion or damage, any damage to the coating shall be repaired by a method acceptable to the Engineer. Coupling bands and connecting hardware for coated pipes must have a protective coating. Coupling bands to be protected by coatings under AASHTO M 190 may be single-dipped with the coating thickness requirement waived. Fittings shall be the same material as pipe molded or formed to suit pipe sizes and end design, in required wyes, bends, elbows, cleanouts, reducers and other configurations required. Fittings shall be epoxy coated or polymeric sheet coated. Measurement and Payment The contract price paid per linear foot for 10-inch Corrugated Steel Pipe Downdrain shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals required to construct corrugated steel pipe downdrains complete in place, including excavation, backfill, joint couplings, elbows, fittings and appurtenances, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer. BID ITEM NO inch Downdrain Anchor Downdrain Anchors shall conform to Section 69, "Overside Drains," of the Standard Specifications and these special provisions. A single downdrain anchor includes 2 pipe stakes with necessary hardware, bars or coupling bands, and hardware for fastening downdrain pipe or flume downdrain. Pipe stakes, plates, bars, clip brackets, and hardware must be hot-dip galvanized after fabrication under section Measurement and Payment The contract unit price paid for 10-inch Downdrain Anchor shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals required to construct downdrain anchor assembly complete in place, including coupling bands, pipe stakes, plates, bars, and hardware, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer. BID ITEM NO. 28 Energy Dissipater Energy dissipater shall conform to the details shown on the plans and Section 69, "Overside Drains," and Section 72, Slope Protection, of the Standard Specifications and Addendum No. 1 SP-39 [SPECPRO]

8 SPECIAL PROVISIONS these special provisions. Measurement and Payment Measurement for energy dissipater includes all materials and labor to install pipe tee, downdrain joint coupling, rock slope protection, rock slope protection fabric. The contract unit prices paid for Energy Dissipater shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals required to construct energy dissipater complete in place, including excavation, backfill, pipe tee, downdrain joint coupling, rock slope protection, and rock slope protection fabric, as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer. Addendum No. 1 SP-40 [SPECPRO]

9

10

11

12

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

FY08 SEWER POINT REPAIRS BID TABULATION

FY08 SEWER POINT REPAIRS BID TABULATION 6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "

More information

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or

More information

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20

More information

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors. SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information

Section 2100-Trenching and Tunneling

Section 2100-Trenching and Tunneling SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial

More information

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains

More information

FDOT Specifications List

FDOT Specifications List FDOT Specifications List TABLE OF CONTENTS DIVISION II CONSTRUCTION DETAILS CLEARING CONSTRUCTION SITE 110 Clearing and Grubbing... 152 EARTHWORK AND RELATED OPERATIONS 120 Excavation and Embankment...

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS 854.1 DESCRIPTION: This item shall govern sanitary sewer laterals installed in accordance with these

More information

Special Specification 7021 Water Main and Sewer Line Replacements

Special Specification 7021 Water Main and Sewer Line Replacements Special Specification 7021 Water Main and Sewer Line Replacements 1. DESCRIPTION Furnish, install, or replace water pipe, water valves, water meters and boxes, water service connections, fire hydrant assemblies,

More information

LS 2540 SEWER LATERALS AND INSPECTION TEES

LS 2540 SEWER LATERALS AND INSPECTION TEES LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal

More information

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS 2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS GENERAL 10/16/2008 The listed average unit prices are based on the

More information

ADDENDUM NO. 2. Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT

ADDENDUM NO. 2. Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT ADDENDUM NO. 2 Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT Bridge No. 1460008 (existing) Bridge No. 06806 (new) TO ALL BIDDERS: Anchor Engineering

More information

SECTION 724 PIPE CULVERTS

SECTION 724 PIPE CULVERTS SECTION 724 PIPE CULVERTS 724.1 Description. This work shall consist of providing pipe or pipe arch of the diameter or shape designated, laid upon a firm bed and backfilled as specified. Where appropriate

More information

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets Los Angeles County Department Of Public Works Land Development Division Bond Calculation Sheets Effective July 1, 2015 COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT DIVISION ROADS COST

More information

TABLE OF CONTENTS SECTION 300 STORM SEWER

TABLE OF CONTENTS SECTION 300 STORM SEWER TABLE OF CONTENTS SECTION 300 STORM SEWER Starts on Page 300 GENERAL... 2 301 MATERIALS... 2 302 CONSTRUCTION PROCEDURES... 5 303 TESTING... 5 304 ABANDONMENT OF EXISTING STORM SEWER FACILITIES... 6 305

More information

Section 402. STORM SEWERS

Section 402. STORM SEWERS 402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

BID FORM. BASE BID (including the following parts but excluding work in Additive Bid Items): PART A = Dollars ($ )

BID FORM. BASE BID (including the following parts but excluding work in Additive Bid Items): PART A = Dollars ($ ) Standard Bid Form Format [Note: The following format shall be used for the project Bid Form. Instruction/explanations are in [Brackets]. They should not appear on the actual document. Replace sample wording

More information

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS TABLE OF CONTENTS 2.18 CONCRETE AND/OR CORRUGATED STEEL STORM SEWER... 1 2.18.1 GENERAL... 1 2.18.2 MATERIALS... 1 2.18.2.1 Storm Sewer Pipe... 1 2.18.2.2 Cement Mortar... 1 2.18.2.3 Granular Materials...

More information

SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS

SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS PART 1: GENERAL 1.01 SECTION INCLUDES A. Abandonment in place, by cutting and capping, of existing sewers, junction structures, manholes, service lines, and

More information

Bidding and Contract Requirements:

Bidding and Contract Requirements: CITY OF LAREDO, TEXAS WATER UTILITIES DEPARTMENT 24-INCH TRANSMISSION MAIN ADDENDUM 7 June 10, 2016 To Bidder of Record: The following changes, additions, and/or deletions are hereby made a part of the

More information

C. Section 014510 TESTING LABORATORY SERVICE.

C. Section 014510 TESTING LABORATORY SERVICE. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,

More information

SECTION 807 PUMP STATION REHABILITATION

SECTION 807 PUMP STATION REHABILITATION SECTION 807 PUMP STATION REHABILITATION 807-1 DESCRIPTION: Rehabilitation of pump stations shall be defined as the cleaning, removal, repair and/or replacement of any and/or all components including but

More information

SECTION 02563 SANITARY SEWER FORCE MAINS

SECTION 02563 SANITARY SEWER FORCE MAINS SECTION 02563 SANITARY SEWER FORCE MAINS 1.0 GENERAL A. Description Sanitary sewer force main installation shall include, but not necessarily be limited to, furnishing and installing pressure rated pipe,

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located

More information

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent

More information

SECTION 02221 SELECTIVE DEMOLITION

SECTION 02221 SELECTIVE DEMOLITION SECTION 02221 PART 1 -GENERAL 1.01 DESCRIPTION This section includes all material, labor, machinery and supervision required to demolish and remove the following items where applicable and as noted on

More information

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts SECTION 00300 BID FORM S For additions and deletions to the Contract, the following unit prices shall be applicable for the specific items listed. Unit Prices shall be complete, in place including required

More information

DIVISION 4300 STORM DRAINAGE

DIVISION 4300 STORM DRAINAGE DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES

More information

SECTION 300 STORM SEWER AND SUMP PUMP DRAIN SYSTEMS

SECTION 300 STORM SEWER AND SUMP PUMP DRAIN SYSTEMS SECTION 300 STORM SEWER AND SUMP PUMP DRAIN SYSTEMS Section Title Page 301 General................................... 18 302 Materials.................................. 18 303 Design Requirements........................

More information

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials. PART 1 GENERAL 1.1 SCOPE A. This item shall include the work necessary for the installation of storm sewer line construction. B. Reference Section 3800 Trenching and Backfill and the General Conditions,

More information

SECTION 4 EXCAVATION, TRENCHING AND BACKFILLING 4.01 SCOPE OF WORK

SECTION 4 EXCAVATION, TRENCHING AND BACKFILLING 4.01 SCOPE OF WORK 4.01 SCOPE OF WORK The work covered by this section shall consist of furnishing all materials, equipment and labor for the excavating, trenching, backfilling, and bore and jack required to install or repair

More information

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials

More information

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, Storm Drain Installation, of these Standard Provisions. SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 CITY OF SAN ANTONIO Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 (010) FORMAL INVITATION FOR BIDS (IFB) to CONTRACT 2016-2017 TASK ORDER CONTRACT

More information

volume of concrete occupied by the drain pipe in a cast-in-place structure or structure extension.

volume of concrete occupied by the drain pipe in a cast-in-place structure or structure extension. 715.01 430 volume of concrete occupied by the drain pipe in a cast-in-place structure or structure extension. No additional payment will be made for the repair or replacement of existing concrete damaged

More information

GOUVEIA ENGINEERING. Pre-Bid Conference Meeting Minutes. City of Los Banos. Henry Miller Area Storm Drain and L Street Waterline

GOUVEIA ENGINEERING. Pre-Bid Conference Meeting Minutes. City of Los Banos. Henry Miller Area Storm Drain and L Street Waterline GOUVEIA ENGINEERING Pre-Bid Conference Meeting Minutes City of Los Banos Henry Miller Area Storm Drain and L Street Waterline Conference held at Intersection of West I Street and L Street, in Los Banos

More information

Plan Preparation Guide. Chapter 9

Plan Preparation Guide. Chapter 9 Plan Preparation Guide Chapter 9 Drainage Structures R.C. Box Culverts Ditches - Gutters - Curbs Section Description Page 1 Plans for Hydrology 9-1 2 Catch Basin Types and Uses 9-2 3 Drop Inlet Types and

More information

Developing Critical Path Method Scheduling (CPM)

Developing Critical Path Method Scheduling (CPM) Developing Critical Path Method Scheduling (CPM) Pretest 1. An activity which is on critical path has a planned duration of 5 days. What is the total float for the activity? a. 0 b. 1 c. 2 d. 3 Pretest

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks

More information

Beacon Hill Sewer District Standard Specifications

Beacon Hill Sewer District Standard Specifications Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions

More information

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines: Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections

More information

ARLINGTON HEIGHTS MUNICIPAL CODE CHAPTER 22 SEWERS

ARLINGTON HEIGHTS MUNICIPAL CODE CHAPTER 22 SEWERS ARLINGTON HEIGHTS MUNICIPAL CODE CHAPTER 22 SEWERS Article I General Provisions Section 22-101 Definitions Section 22-102 Supervision of Sewer System Section 22-103 Inspections Section 22-104 Use of Public

More information

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION

CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION 1 This item shall consist of furnishing and erecting Chain-Link fence in accordance with these specifications and the details shown on the plans and in

More information

SECTION 63 CHAIN-LINK FENCES (FAA F-162) ITEM F-162 CHAIN-LINK FENCES DESCRIPTION MATERIALS

SECTION 63 CHAIN-LINK FENCES (FAA F-162) ITEM F-162 CHAIN-LINK FENCES DESCRIPTION MATERIALS SECTION 63 CHAIN-LINK FENCES (FAA F-162) 63-1 GENERAL This specification covers the furnishing and installation of chain link fencing and gates, both permanent and temporary, at the locations shown on

More information

STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES

STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES CITY OF PETALUMA STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES AUGUST 1999 Revised 10/98 City of Petaluma Petaluma, California STORM DRAIN INSTALLATION DETAIL

More information

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE FORM A PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE The following suggested specifications are written as a guide to assist the specifier in writing his own specifications. Specific circumstances

More information

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix F RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4400 South Street - Piping and Collection

More information

550 PIPE CULVERTS, SEWERS AND DRAINS

550 PIPE CULVERTS, SEWERS AND DRAINS 551.01 550 PIPE CULVERTS, SEWERS AND DRAINS 551 GENERAL 551.01 Description 551.02 Materials 551.03 Excavation 551.04 Protection of Excavation 551.05(a) Bedding for Rigid Pipe 551.05(b) Bedding for Non-Rigid

More information

SECTION 4Aggegate Subbase

SECTION 4Aggegate Subbase The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages

More information

1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP

1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP 5 INDEX TO SHEETS. NOTES AND TYPICAL SECTIONS. H. R. SMITH RD.CULVERT.3 0/5 END BARRIER ACCESS ROAD REPAIR. KISSIMMEE RD. AT MORGAN HOLE CR. ROAD REPAIR.5 RANGE INFRASTRUCTURE REPAIR N 0 000' 3 0,000'

More information

Section 600 Incidental Construction

Section 600 Incidental Construction Table of Contents 1. Pipe Culverts... 600-1 A. Endwalls, Inlets, Manholes, and Spring Boxes... 600-5 2. Grade Adjustment of Existing Miscellaneous Structures... 600-8 3. Rebuilt Miscellaneous Structures...

More information

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Storm Sewer Trenchless Upgrade Alternatives and Recommendations Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for

More information

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 Section Subsection Name Date Modification Division 1 All subsections General Provisions

More information

DESERT WILDLIFE UNLIMITED POB 1388 Brawley, CA 92227 760 275 3953 NOTICE TO BIDDERS ALAMO RIVER TREATMENT WETLANDS AT SHANK ROAD

DESERT WILDLIFE UNLIMITED POB 1388 Brawley, CA 92227 760 275 3953 NOTICE TO BIDDERS ALAMO RIVER TREATMENT WETLANDS AT SHANK ROAD DESERT WILDLIFE UNLIMITED POB 1388 Brawley, CA 92227 760 275 3953 NOTICE TO BIDDERS ALAMO RIVER TREATMENT WETLANDS AT SHANK ROAD The contactor shall possess a California contractor s license, Class A,

More information

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional

More information

ADVERTISEMENT FOR BIDDERS

ADVERTISEMENT FOR BIDDERS ADVERTISEMENT FOR BIDDERS Sealed Bids will be received by the City of Lookout Mountain, Georgia, 1214 Lulu Lake Road, Lookout Mountain, Georgia 30103, Attention: Brad Haven, City Manager until: for the

More information

SECTION 32 31 13 CHAIN LINK FENCES AND GATES

SECTION 32 31 13 CHAIN LINK FENCES AND GATES SECTION 32 31 13 CHAIN LINK FENCES AND GATES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Fence framework, fabric, and accessories. 2. Excavation for post bases. 3. Concrete foundation for posts

More information

STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223

STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223 STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES PART 1 - GENERAL A. Description This section describes the installation of gravity sewer pipelines fabricated of vitrified

More information

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions. SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings

More information

STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS

STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for cleaning and lining existing cast iron and ductile iron water mains

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,

More information

Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount

Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount Engineer's Estimate DiPaolo Company 4350 DiPaolo Center Glenview, IL 60025 Stark Excavating, Inc. 1805 W. Washington Street Bloomington, IL 61701 Rowe Construction 1523 N. Cottage Avenue Bloomington, IL

More information

AIRPORT SECURITY FENCING. A. American Society for Testing and Materials (ASTM):

AIRPORT SECURITY FENCING. A. American Society for Testing and Materials (ASTM): SECTION 02832 AIRPORT SECURITY FENCING PART 1-GENERAL 1.1 SUMMARY A. Section includes: Construct airport security chain-link fence and gate at specified areas and conforming lines, grades, details indicated

More information

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY Approved and adopted as Official Document Number 800576 this 10th day of December, 1980 Donald R. Boyd, P.E., Director Water

More information

X Planning X Quality X Maintenance & Operations

X Planning X Quality X Maintenance & Operations Delaware Department of Transportation Division of Transportation Solutions Design Guidance Memorandum Memorandum Number 1-20 Revised 1. Road Design Manual 2. Bridge Design Manual 3. Utilities Design Manual

More information

COUNTY OF SACRAMENTO MUNICIPAL SERVICES Department of Waste Management and Recycling CONTRACT SPECIFICATIONS FOR

COUNTY OF SACRAMENTO MUNICIPAL SERVICES Department of Waste Management and Recycling CONTRACT SPECIFICATIONS FOR COUNTY OF SACRAMENTO MUNICIPAL SERVICES Department of Waste Management and Recycling CONTRACT SPECIFICATIONS FOR NORTH AREA RECOVERY STATION (NARS) PAVEMENT REPLACEMENT UNLOADED TRAILER PARKING AREA Project

More information

SECTION 221413 FACILITY STORM DRAINAGE PIPING

SECTION 221413 FACILITY STORM DRAINAGE PIPING SECTION 221413 FACILITY STORM DRAINAGE PIPING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...

More information

SECTION 701 CULVERT PIPE, ENTRANCE PIPE, STORM SEWER PIPE, AND EQUIVALENTS

SECTION 701 CULVERT PIPE, ENTRANCE PIPE, STORM SEWER PIPE, AND EQUIVALENTS SECTION 701 CULVERT PIPE, ENTRANCE PIPE, STORM SEWER PIPE, AND EQUIVALENTS 701.01 DESCRIPTION. Furnish and install culvert pipe, entrance pipe, and storm sewer pipe. Use units conforming to the dimensions,

More information

SECTION 15062 POLYVINYL CHLORIDE GRAVITY SEWER PIPE AND FITTINGS

SECTION 15062 POLYVINYL CHLORIDE GRAVITY SEWER PIPE AND FITTINGS SECTION 15062 POLYVINYL CHLORIDE (PVC) GRAVITY SEWER PIPE AND FITTINGS PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for the manufacture and installation of polyvinyl chloride,

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by

More information

Asphaltic Wedge Paving

Asphaltic Wedge Paving OFFICIAL NOTICE ADVERTISEMENT FOR BIDS Notice is hereby given by the Town of Oregon, Dane County, Wisconsin, will receive sealed bids for Road Construction as listed in this request until 4:00 P.M., Local

More information

Instructions for the Installation of Driveway Entrances

Instructions for the Installation of Driveway Entrances Instructions for the Installation of Driveway Entrances 1 Step 1 - Permits Complete the Work Within Highway Right-of-Way Permit. A representative from the Department of Transportation and Infrastructure

More information

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes)

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes) SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes) Maintenance Office Administrative Office Billing Office 530-426-7802 530-426-7800 916-332-4872

More information

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE 6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction

More information

SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES

SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with

More information

SECTION 02100 SITE PREPARATION

SECTION 02100 SITE PREPARATION SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

BIDDERS MUST OBTAIN ADDENDUM FROM MDOT CONTRACT ADMINISTRATION DIVISION TO BID.

BIDDERS MUST OBTAIN ADDENDUM FROM MDOT CONTRACT ADMINISTRATION DIVISION TO BID. S E C T I O N 9 0 5 -- P R O P O S A L (CONTINUED) I (We) further propose to execute the attached contract agreement (Section 902) as soon as the work is awarded to me (us), and to begin and complete the

More information

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe. SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price

More information

Date. Resubmit this form during the year if there are changes in your company ownership or financial standing.

Date. Resubmit this form during the year if there are changes in your company ownership or financial standing. COLORADO DEPARTMENT OF TRANSPORTATION CONTRACTOR PREQUALIFICATION STATEMENT (EXPERIENCE, EQUIPMENT AND FINANCIAL) Return to: Contracts & Market Analysis Prequalification Unit 4201 E. Arkansas,4th Floor

More information

Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY

Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY Policy: This policy will replace all previous policies regarding the selection of pipe material for cross drains, drive pipe, drop pipe, storm

More information

SECTION 02824 EXPANDED METAL MESH FENCE

SECTION 02824 EXPANDED METAL MESH FENCE SECTION 02824 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for expanded metal mesh fence on the right-of-way. 1.02 REFERENCE STANDARDS A. ASTM International (ASTM): 1.03 SUBMITTALS

More information

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development

More information

Section 02702 SEWER PIPE INSTALLATION AND TESTING

Section 02702 SEWER PIPE INSTALLATION AND TESTING PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete

More information

SECTION 02832 CHAIN LINK FENCE AND GATES

SECTION 02832 CHAIN LINK FENCE AND GATES SECTION 02832 CHAIN LINK FENCE AND GATES PART 1 GENERAL 1.01 SECTION INCLUDES A. Fabrication, furnishing and installation of chain link fence, chain link gates, and extension brackets with barbed wire.

More information

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES NAICS CODE Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway (includes 300, 320, 327, 330, 334, 336, 337, 338) Application of prime and tack coats, leveling surfaces and

More information

SECTION TRENCHING AND BACKFILLING. 1. Section , Temporary Environmental Controls. 2. Section , Excavation and Fill.

SECTION TRENCHING AND BACKFILLING. 1. Section , Temporary Environmental Controls. 2. Section , Excavation and Fill. SECTION 31 23 33 TRENCHING AND BACKFILLING PART 1 GENERAL 1.01 SECTION INCLUDES A. This WORK shall consist of all labor, equipment, and materials necessary for excavation, trenching, and backfilling for

More information

Town House 11265 Center Highway North Huntingdon, PA 15642

Town House 11265 Center Highway North Huntingdon, PA 15642 APPENDIX C SPECIFICATIONS FOR THE CONSTRUCTION OF BUILDING LATERAL SANITARY SEWERS DECEMBER 2004, INCLUDING AMENDMENTS ADOPTED ON FEBRUARY 6, 2008 AND APRIL 2, 2008; EFFECTIVE ON MAY 1, 2008 Town House

More information

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

CONCRETE SEGMENTAL RETAINING WALL SYSTEM CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8 with PCS unit segmental retaining wall

More information