1 Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for an upgrade using trenchless construction methods. The existing pipe is located under the paved street from 4 th Avenue to Pine Street. At manhole M22, the incoming upstream storm water flow will be diverted around this pipe section to be rehabilitated. A new parallel storm sewer will be constructed in a new alignment. The new parallel storm pipe would convey the incoming upstream runoff while the trenchless portion is being built. With the proposed reduced design flow capacity, the existing storm pipe from M22 to M12 can be rehabilitated with a smaller diameter pipe. The existing CMP storm pipes will be reduced to an inside diameter 24-inches. The 24-inch pipe will have the capacity to convey the storm flow from the adjacent nearby drainage area. Two trenchless repair options were evaluated: Traditional sliplining with a HDPE pipe and grout in the annular space Cured in place pipe liner with grout in the annular space Existing Pipe Condition The 1,930 feet of existing storm pipe has the following characteristics: There are 9 manholes total. Five of the manholes are constructed of CMP and four are precast concrete. There is 652 feet of perforated 40-inch CMP pipe in the section along 4 th Avenue. The 40-inch CMP is perforated with ¾ holes located at the bottom of the pipe at the 4:30 and 7:30 positions. There is 1,278 feet of 42-inch CMP pipe. Portions of the existing CMP have significant metal loss in the invert. Two sanitary sewer service pipes penetrate through the existing 42-inch CMP in the 330 foot segment between MH17 and MH15. One electric or phone utility cable penetrates the CMP pipe between MH15 and MH13. A number of localized defects were observed in the existing pipe including rough joints, holes, offset joints and debris piles. The invert grade is fairly uniform. Overall the pipe is fairly round and is not collapsing at this time. Two catch basin leader pipes connect directly into the storm pipe (no manhole at these connections). 1

2 The pipe is buried in the street, under 4 feet to 8 feet of cover. The storm pipe has a constant flow of approximately 8 to 10-inches. Sliplining with a HDPE Pipe In this trenchless repair alternative, a 28-inch SDR 17 HDPE butt-fused pipe with an inside diameter of approximately 24.7-inches would be inserted inside the existing 40 and 42-inch CMP storm drain pipe. The annular space between the two pipes would be filled with a cement grout. The five existing CMP manholes would be removed and replaced with modern concrete manholes. The end result would be a strong, long-lasting HDPE storm sewer. This pipe rehabilitation method includes: Pipe cleaning and pre-construction CCTV inspection Storm flow bypassing Modify three utility crossings Install HDPE slipliner from excavated access pits Connect two catch basin leaders Install cement grout in the annular space Surface restoration Pipe cleaning and pre-construction CCTV inspection Prior to starting rehabilitation work, the pipe will be thoroughly cleaned by the construction contractor and inspected with a camera. The purpose of the pre-construction CCTV is to identify any defects that may restrict the insertion process and confirm the pipe is ready for sliplining. Storm flow bypassing A new parallel storm pipe system will be constructed from M22 to M12 prior to performing the sliplining work. All runoff that is collected upstream of M22 will be diverted through the new parallel pipe. Therefore, the only storm flow that will need to be controlled during the sliplining work will be local runoff coming from the immediate surrounding streets and drainage areas. The design flow for this section of the storm system is 6.5 cubic feet per second or 3,000 gallons per minute (gpm). The storm flow must be bypassed around the work area to prevent washout of the cement grout in the annular space and reduce complications with water flowing through the pipe when the HDPE liner is being installed. The primary bypass pump shall have a minimum capacity of 3,000 gpm and a standby pump of the same capacity shall be available at the site. It is anticipated that two 8-inch dri-prime type pumps would be needed. Bypassing would be accomplished by installing pumps and a temporary bypass pipe between manholes that are upstream and downstream of the pipe being lined. Typically, the sewage is pumped from the next manhole upstream of 2

3 the segment being lined and discharged into the next manhole downstream of the segment being worked on. There are intermediate catch basins that contribute runoff flow to the storm sewer being rehabilitated. Water would be collected with individual pumps that would be placed at each one of these points as the work progresses through the site. Modify Three Utility Crossings Two sanitary sewer services and one electric/phone cable penetrate and cut through the existing CMP storm pipe in three separate places along the pipe alignment. The electrical/phone cable that is approximately 14 feet upstream of M13 will need to be protected from damage during the HDPE liner installation. This can be accomplished by having a man enter the storm pipe and temporarily raise the flexible conduit up and support it from the crown of the 42 inch CMP host pipe. An excavation will not be needed here. The existing electric/phone conduit can remain inside the CMP host pipe. After the liner is installed it will be encased and protected in the annular space grout. Excavations will be required to expose the two sanitary sewer pipes that cross through the 42 inch storm pipe between M17 and M15. From the video image, it is estimated that there is approximately 24 to 30 inches of space between the bottom of the CMP casings and the invert of the 42 inch CMP host pipe. Prior to inserting the HDPE liner, the small CMP casings will be removed and the sanitary sewer lines temporarily removed. After the HDPE liner is in place, the sanitary pipes can be reinstalled, without the CMP casings around them. The new grout in the annular space will support the sanitary sewer crossings. Therefore the CMP casing around the sewer services is not required. This will provide additional space below the existing sanitary pipes. Some slight downward deflection of the HDPE crown may be needed to make this fit. The overall impact to the new HDPE liner capacity will be minimal. Install HDPE slipliner Sliplining the existing storm pipe would involve insertion of a continuous butt-fused HDPE liner into the existing CMP host pipes. A 28-inch SDR 17 HDPE liner would provide an interior pipe diameter of approximately 24.7-inches. The 24.7-inch pipe would have adequate capacity to convey the future design flows. Sliplining with a continuous butt-fused pipe requires the excavation of insertion pits at strategic points along the storm pipe to provide access points for the pipe insertion. The insertion pits would be approximately 40 feet long and 15 feet wide at the ground surface. Four insertion pits would be required along the CMP host pipe alignment. Additional excavations would be required to reconnect the two directly connected storm pipes to the new HDPE liner. Insertion pits can be located where other excavations are already required for other work such as new manholes, utility crossings or reconnection of catch 3

4 basin leaders. The final location may be adjusted depending on the Contractor s method of construction. We anticipate that the five sliplining insertion pits would be constructed in conjunction with manhole removal and replacement work. It is assumed that the slipline pit excavations would be at the following manholes: M13 M15 M17 M19 M22 These five proposed pit locations also have adequate space behind them to layout the long butt-fused HDPE pipe during the initial insertion process. Two Direct Storm Pipe Connections Excavations will be needed to connect two existing catch basin leaders to the new HDPE liner. One is located downstream of M17 and the other is located downstream of M15. The tie-in between the new HDPE and the existing CMP leaders would be completed before the annular space grout is installed. Install cement grout in the annular space The entire annular space between the liner and host pipe will be filled with light-weight flowable cement grout. This will prevent ground water from entering the annular space, prevent the liner from floating inside the carrier pipe, prevent collapse of the liner due to hydrostatic pressure and will also provide a structurally sound storm pipe system when complete. A special light-weight flowable grout is required to prevent the HDPE liner from floating during installation and also to fill the entire space when injected from one end of the pipe run. This specialized grout is available locally and has been used successfully on other projects in Anchorage. Post-rehabilitation CCTV inspection A post-construction CCTV inspection by the contractor will be reviewed by the engineer to confirm that the work has been completed as required and that the pipe is clean and functioning properly. Surface Restoration Restoration of the surface will be required after the work is completed. Asphalt repair and landscaping repairs would be needed at the excavation areas as well as surrounding surface that is damaged during the work. 4

5 Estimated Cost Sliplining in conjunction with grouting of the annular space will provide a structural rehabilitation of the pipe. The overall construction cost to complete this rehabilitation method is estimated to be $1,020,000. A more detailed description of the cost is contained in the following table. PROJECT: Pine Street Storm Sewer Upgrade OPTION: HDPE Sliplining NO. DESCRIPTION QTY UNIT UNIT TOTAL COST 1 Type II & II-A classified fill and backfill 1400 Ton $20 $28,000 2 Bedding material 100 Ton $25 $2,500 3 Disposal of unusable or surplus material 800 CY $18 $14,400 4 Adjust Sanitary Sewer Crossing 2 EA $10,000 $20,000 5 Adjust Electric/Phone Utility Crossing 1 EA $3,000 $3,000 6 F&I Type I Storm Manhole 5 EA $7,000 $35,000 7 Furnish and Install 28" SDR 17 HDPE Slipliner 1930 LF $180 $347,400 8 Storm Sewer Flow Control 1 LS $35,000 $35,000 9 Connect Existing Catch Basin Leaders 2 EA $5,000 $10, Annular Space Grouting 380 CY $600 $228, Pre-rehabilitation Sewer Pipe Television Inspection 1930 LF $7 $13, Post-rehabilitation Sewer Pipe Television Inspection 1930 LF $4 $7, Remove and Replace Existing Pavement 900 SY $60 $54, Construction Survey Measurement 1 LS $5,000 $5, Traffic Maintenance 1 LS $15,000 $15,000 SUBTOTAL $818,530 CONTINGENCY 25% $204,633 TOTAL ESTIMATED CONSTRUCTION COST $1,020,000 Lining with a Cured in Place (CIPP) Pipe 5

6 In this trenchless repair alternative, a 24-inch CIPP liner pipe would be inserted inside the existing 40 and 42-inch CMP storm drain pipe. The annular space between the new liner and the host pipe would be filled with a cement grout. The existing CMP manholes would be removed and replaced with modern concrete manholes. The end result would be a strong, long-lasting storm sewer. This pipe rehabilitation method includes: Pipe cleaning and pre-construction CCTV inspection Storm flow bypassing Install CIPP from existing manholes Connect existing catch basin leaders Install cement grout in the annular space Surface restoration Pipe cleaning and pre-construction CCTV inspection Prior to starting rehabilitation work, the pipe will be thoroughly cleaned by the construction contractor and inspected with a camera. The purpose of the pre-construction CCTV is to identify any defects that may restrict the insertion process and confirm the pipe is clean and ready for sliplining. Storm flow bypassing A new parallel storm pipe system will be constructed from M22 to M12 prior to performing the sliplining work. All runoff that is collected upstream of MH22 will be diverted through the new parallel pipe. Therefore, only local storm flow coming from the immediately surrounding streets and drainage areas will need to be controlled during the lining work. The design flow for this section of the storm system is 6.5 cubic feet per second or 3,000 gallons per minute (gpm). The storm flow must be bypassed around the work area to prevent washout of the cement grout in the annular space and reduce complications with water flowing through the pipe when the CIPP liner is being installed. The primary bypass pump shall have a minimum capacity of 3,000 gpm and a standby pump of the same capacity will be available at the site. It is anticipated that two 8-inch dri-prime type pumps would be needed. Typically, the sewage is pumped from the next manhole upstream of the segment being lined and discharged into the next manhole downstream of the segment being worked on. There are two intermediate catch basins that contribute runoff flow to the storm sewer being rehabilitated. Water would be collected with individual pumps that would be placed at each one of these points as the work progresses through the site. Three Utility Crossings 6

7 Two sanitary sewer services and one electric/phone cable penetrate and cut through the existing CMP storm pipe in three separate places along the pipe alignment. The electrical/phone cable that is approximately 14 feet upstream of M13 will need to be protected from damage during the CIPP liner installation. This can be accomplished by having a man enter the storm pipe and temporarily raise the flexible conduit up and support it from the crown of the 42 inch CMP host pipe. An excavation will not be needed. The existing electric/phone conduit can remain inside the CMP host pipe. After the liner is installed, the utility would be encased in the grout that is pumped into the annular space. Two sanitary sewer pipes cross through the 42 inch storm pipe between M17 and M15. From the video image, it is estimated that there is approximately 24 to 30 inches of space between the bottom of the CMP casings and the invert of the 42 inch CMP host pipe. The small CMP casings would be left in place during the CIPP liner installation work and during the grouting work. The new grout in the annular space will provide additional support to the sanitary sewer crossings. Install CIPP liner Rehabilitating the existing storm pipe with a cured in place liner would involve inverting a resin impregnated CIPP liner into the existing CMP host pipes and filling the annular space with grout after the liner has cured and is rigid. The 24-inch CIPP liner would provide an interior pipe diameter of approximately 24-inches. The CIPP liner wall is relatively thin in comparison to the HDPE pipe option. The CIPP liner would be supported by the surrounding low strength grout. The CIPP liner has a smooth interior wall and would provide excellent flow characteristics and would have adequate capacity to convey the future design flows. This proposed trenchless rehabilitation method is unique. The CIPP lining process itself is standard and is proven. The annular space grouting is a common construction practice. The combination of the two is unique. The advantage to this process is the ability to reduce the number and size of the excavation areas, no need for a long layout area for the insertion pipe and a reduced impact to the public due to the smaller project footprint. The challenge with this process is inflating the liner bag and curing it into a round shape. One option is to add a rigid liner bag on the outside of the resin impregnated CIPP liner. The rigid bag would prevent the liner from stretching and help it maintain a round pipe shape. Two Direct Storm Pipe Connections Excavations will be needed to connect two existing catch basin leaders to the new CIPP liner. One is located downstream of M17 and the other is located downstream of M15. 7

8 The tie-in between the new CIPP and the existing CMP leaders would be completed before the annular space grout is installed. Install cement grout in the annular space The entire annular space between the liner and host pipe will be filled with cement grout. This will prevent ground water from entering the annular space, prevent the liner from floating inside the carrier pipe, prevent collapse of the liner due to hydrostatic pressure and will also provide a structurally sound pipe system when complete. A special lightweight flowable grout is required to prevent the CIPP liner from floating. It will also to fill the entire space when injected from one end of the pipe run. This unique grout is available locally and has been used successfully on other projects in Anchorage. The CIPP liner will be filled with water during the grout process to keep it from floating. The new CIPP liner will rest on the CMP host pipe invert when the grout work is complete and cured. Post-rehabilitation CCTV inspection A post-construction CCTV inspection by the contractor will be reviewed by the engineer to confirm that the work has been completed as required and that the pipe is clean and functioning properly. Surface Restoration Restoration of the surface will be required after the work is completed. Asphalt repair and landscaping repairs would be needed at the excavation areas as well as surrounding surface that is damaged during the work. Estimated Cost CIPP lining in conjunction with grouting of the annular space will provide a structural rehabilitation of the pipe. The overall construction cost to complete this rehabilitation method is estimated to be $1,320,000. A more detailed description of the cost is contained in the following table. 8

9 PROJECT: Pine Street Storm Sewer Upgrade OPTION: Cured In Place Pipe and Grouting NO. DESCRIPTION QTY UNIT UNIT TOTAL COST 1 Type II & II-A classified fill and backfill 1100 Ton $20 $22,000 2 Bedding material 70 Ton $25 $1,750 3 Disposal of unusable or surplus material 600 CY $18 $10,800 4 Adjust Electric/Phone Utility Crossing 1 EA $3,000 $3,000 5 F&I Type I Storm Manhole 5 EA $7,000 $35,000 6 Furnish and Install 24" CIPP Liner 1930 LF $250 $482,500 7 Storm Sewer Flow Control 1 LS $35,000 $35,000 8 Connect Existing Catch Basin Leaders 2 EA $5,000 $10,000 9 Annular Space Grouting 470 CY $800 $376, Pre-rehabilitation Sewer Pipe Television Inspection 1930 LF $7 $13, Post-rehabilitation Sewer Pipe Television Inspection 1930 LF $4 $7, Remove and Replace Existing Pavement 700 SY $60 $42, Construction Survey Measurement 1 LS $5,000 $5, Traffic Maintenance 1 LS $15,000 $15,000 SUBTOTAL $1,059,280 CONTINGENCY 25% $264,820 TOTAL ESTIMATED CONSTRUCTION COST $1,320,000 Storm Sewer Trenchless Repair Recommendations The traditional HDPE sliplining process is the recommended trenchless option. This is the lowest cost trenchless method and is also a proven process that can be constructed by any number of construction contractors in Anchorage. A trenchless upgrade of the existing storm system from manholes M22 to M12 using HDPE sliplining is estimated to cost $1,020,000 to construct. 9

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer

More information

FY08 SEWER POINT REPAIRS BID TABULATION

FY08 SEWER POINT REPAIRS BID TABULATION 6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located

More information

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines: Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections

More information

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines

More information

FY15 Gravity Sewer and Manhole Rehabilitation

FY15 Gravity Sewer and Manhole Rehabilitation Contract Drawings For FY15 Gravity Sewer and Manhole Rehabilitation TRAVELERS REST TAYLORS Frazier Project No. -030 BASIN 850 Greenville, South Carolina April 2015 BASIN 700A GREENVILLE BASIN 700B FIVE

More information

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe. SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by

More information

DIVISION 4300 STORM DRAINAGE

DIVISION 4300 STORM DRAINAGE DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES

More information

INSTALLATION OF INSITUFORM LINER

INSTALLATION OF INSITUFORM LINER PART 1 GENERAL 1.1 SCOPE: A. This item shall include all work and materials to install, insert a flexible polyester felt liner saturated with a thermo-setting resin into the existing sewer line for rehabilitation

More information

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS Appendix D RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: Riverdale Road - Rumbi Grill -

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix F RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4400 South Street - Piping and Collection

More information

Section 402. STORM SEWERS

Section 402. STORM SEWERS 402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide

More information

Special Specification 7021 Water Main and Sewer Line Replacements

Special Specification 7021 Water Main and Sewer Line Replacements Special Specification 7021 Water Main and Sewer Line Replacements 1. DESCRIPTION Furnish, install, or replace water pipe, water valves, water meters and boxes, water service connections, fire hydrant assemblies,

More information

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, Storm Drain Installation, of these Standard Provisions. SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and

More information

SECTION 15200 GRAVITY SANITARY SEWERS. A. Gravity sanitary sewers and appurtenances, including stacks and service connections.

SECTION 15200 GRAVITY SANITARY SEWERS. A. Gravity sanitary sewers and appurtenances, including stacks and service connections. SECTION 15200 GRAVITY SANITARY SEWERS PART 1 GENERAL.01 SCOPE A. Gravity sanitary sewers and appurtenances, including stacks and service connections..02 SUBMITTALS A. Conform to requirements of Section

More information

SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS

SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS PART 1: GENERAL 1.01 SECTION INCLUDES A. Abandonment in place, by cutting and capping, of existing sewers, junction structures, manholes, service lines, and

More information

Rehabilitation or Replacement? That Is The Question

Rehabilitation or Replacement? That Is The Question Rehabilitation or Replacement? That Is The Question Chris L. Windley PE Greg Anderson, PE 94th Annual Conference November 18, 2014 Overview Project Background Existing Sewer Condition Flow Projections

More information

SPR PE Steel Reinforced Liner

SPR PE Steel Reinforced Liner ENGINEERED SOLUTIONS SPR PE Steel Reinforced Liner Reline Done Right Contech is your single source for rehabilitation of sanitary & storm sewers, culverts and bridges. Contech Engineered Solutions has

More information

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit

More information

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20

More information

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION ITEM 866 SEWER MAIN TELEVISION INSPECTION 866.1 DESCRIPTION: The Contractor shall furnish all labor, materials, equipment, and incidentals to provide the televising and a NASSCO-(PACP) standard video,

More information

Preliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006

Preliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006 Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006 1.0 Background and Repair and Rehabilitation Recommendation Clay County has contracted Camp Dresser & McKee Inc. (CDM)

More information

SECTION 300 STORM SEWER AND SUMP PUMP DRAIN SYSTEMS

SECTION 300 STORM SEWER AND SUMP PUMP DRAIN SYSTEMS SECTION 300 STORM SEWER AND SUMP PUMP DRAIN SYSTEMS Section Title Page 301 General................................... 18 302 Materials.................................. 18 303 Design Requirements........................

More information

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions. SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings

More information

SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE

SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE PART 1 - GENERAL 1.01 WORK INCLUDED A. This section covers the initial and final cleaning, and the initial and final

More information

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent

More information

CLEANING, INSPECTION, AND TESTING OF SEWERS

CLEANING, INSPECTION, AND TESTING OF SEWERS CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and

More information

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene

More information

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY Cured-In-Place Pipe Pressure & Gravity Lines Pipe Splitting Trenchless Pipe Replacement EcoCast Advanced

More information

Sewer Rehabilitation Design Requirements

Sewer Rehabilitation Design Requirements Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared

More information

Sewer Line Rehabilitation

Sewer Line Rehabilitation 1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing sanitary sewers using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting

More information

Design Considerations and Benefits of Pipe Bursting

Design Considerations and Benefits of Pipe Bursting Design Considerations and Benefits of Pipe Bursting Presented by the Leadership of the IPBA A Division of NASSCO George Mallakis IPBA Chairman Regional Manager, TT Technologies, Inc. WHAT IS PIPE BURSTING?

More information

Repair or Replacement - Band-Aids vs. Surgery

Repair or Replacement - Band-Aids vs. Surgery Repair or Replacement - Band-Aids vs. Surgery Using RCP for the Replacement of Failed or Undersized Culverts www.concrete-pipe.org Introduction and Background Our Nation s infrastructure owners are facing

More information

SANITARY SEWER MANHOLE CONSTRUCTION 2.2 PORTLAND CEMENT AND PORTLAND CEMENT CONCRETE (PCC):

SANITARY SEWER MANHOLE CONSTRUCTION 2.2 PORTLAND CEMENT AND PORTLAND CEMENT CONCRETE (PCC): PART 1 GENERAL 1.1 SCOPE: A. This item includes the work necessary for the construction and installation of sanitary sewer manholes. B. The Contractor may, at his option, use cast-in-place type manholes,

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD 21.01 SCOPE: It is the intent of the Specification to define the approved methods and materials

More information

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Abstract The United States Virgin Islands Waste Management Authority

More information

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology 2007 Pumper & Cleaner Environmental Expo International Wednesday February 7, 2007 Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology What is Cured-In-Place Pipe (CIPP)

More information

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or

More information

CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R

CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R CCTV PIPE INSPECTION AND EVALUATION For RUNWAY 17L-35R At ST. PETERSBURG CLEARWATER INTERNATIONAL AIRPORT February 2011 CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R ST. PETERSBURG CLEARWATER INTERNATIONAL

More information

CONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES

CONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES North American Society for Trenchless Technology (NASTT) No-Dig Show 2010 Chicago, Illinois May 2-7, 2010 Paper C-4-04 CONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES Brad Jenson

More information

UNDERGROUND INFRASTRUCTURE SPECIALISTS TABLE OF CONTENTS

UNDERGROUND INFRASTRUCTURE SPECIALISTS TABLE OF CONTENTS U UNDERGROUND INFRASTRUCTURE SPECIALISTS TABLE OF CONTENTS 3. COMPANY PROFILE A growing company excelling in the fields of infrastructure repair and maintenance. 6. MANDREL TESTING Individually approved

More information

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

1.3.2 Method of construction and restoration of existing water service connections. This shall include: 1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting

More information

12/8/2014. Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA.

12/8/2014. Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA. Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA. 1 Pipe Bursting A Mature and Diverse Trenchless Technology December 10, 2014 1:00 3:00 pm Eastern How to Participate Today

More information

REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542

REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542 1.0 INTENT REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES 1.01 It is the intent of this specification to provide for the reconstruction of pipelines and conduits by the installation of a resin-impregnated

More information

Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe

Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe September 11, 2012 NEWEA Collection Systems Conference Presented by: Laurie L. Perkins, PE Dennis A. Dievert, PE C. Frederick

More information

Wayne County s Rouge Valley Sewage Disposal System Sewer Lining Very Large Pipe. 2013 MWEA WWAdCon

Wayne County s Rouge Valley Sewage Disposal System Sewer Lining Very Large Pipe. 2013 MWEA WWAdCon Wayne County s Rouge Valley Sewage Disposal System Sewer Lining Very Large Pipe 2013 MWEA WWAdCon Overview of Rouge Valley (RV) Sewage Disposal System and Short Term Corrective Action Plan Lining Considerations

More information

SANITARY SEWER SPECIFICATIONS

SANITARY SEWER SPECIFICATIONS SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,

More information

Let Us Give Utilities the Respect that they Deserve.

Let Us Give Utilities the Respect that they Deserve. Water & Sewer Utilities Miscellaneous Design and Plan Preparation Guidelines Issued by: Ray Mowla, P.E. Jefferson Parish Department of Engineering, Utilities Section The purpose of issuing these miscellaneous

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

Rehabilitation Alternatives. MWEA Collection System Seminar October 1, 2009

Rehabilitation Alternatives. MWEA Collection System Seminar October 1, 2009 Rehabilitation Alternatives MWEA Collection System Seminar October 1, 2009 Overview Types of Rehabilitation Trenchless Categories On-Line Replacement In-Situ Options Selecting the Best Solution Types of

More information

Section 2100-Trenching and Tunneling

Section 2100-Trenching and Tunneling SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial

More information

MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E.

MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. MIAMI-DADE LATERAL PILOT PROGRAM James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. Hazen and Sawyer, P.C. 4000 Hollywood Boulevard Hollywood, FL 33021 ABSTRACT Since 1994 the Miami-Dade

More information

Beacon Hill Sewer District Standard Specifications

Beacon Hill Sewer District Standard Specifications Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions

More information

Annular Space Grouting of Slipline Products

Annular Space Grouting of Slipline Products Annular Space Grouting of Slipline Products by David Gellings(, M.APWA & John Jurgens(, M.WWCPA Traditional methods of using neat cement slurries, (Portland cement and water, cement with fly ash or cement

More information

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing

More information

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors. SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION

More information

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE 6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction

More information

STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223

STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223 STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES PART 1 - GENERAL A. Description This section describes the installation of gravity sewer pipelines fabricated of vitrified

More information

PART B SPECIAL PROVISIONS

PART B SPECIAL PROVISIONS PART B SPECIAL PROVISIONS SPECIFICATIONS FOR SANITARY SEWER REHABILITATION GRIZZLY PEAK BOULEVARD, FOREST LANE, CRESTON ROAD BACKLINES, LATHAM LANE, BRET HARTE LANE, LE CONTE AVENUE, EUCLID AVENUE, LE

More information

Section 02702 SEWER PIPE INSTALLATION AND TESTING

Section 02702 SEWER PIPE INSTALLATION AND TESTING PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete

More information

PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET

PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET Name of Municipality or Sewer District Name of Project Original Township and Lot Number Name of Engineer of Firm Preparing Plans

More information

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials. PART 1 GENERAL 1.1 SCOPE A. This item shall include the work necessary for the installation of storm sewer line construction. B. Reference Section 3800 Trenching and Backfill and the General Conditions,

More information

City of Mill Valley Sewer Capital Improvement Plan 2012 2016

City of Mill Valley Sewer Capital Improvement Plan 2012 2016 City of Mill Valley Sewer Capital Improvement Plan 2012 2016 I. BACKGROUND Between December 2004 and February 2008, the ed States Environmental Protection Agency (EPA) conducted inspections of the SASM

More information

Memorandum. PROJECT: Postmark Emergency Storm Repair Alternative Analysis

Memorandum. PROJECT: Postmark Emergency Storm Repair Alternative Analysis Memorandum CRW Engineering Group, LLC 3940 Arctic Blvd. Suite 300 Anchorage, AK 99503 (907) 562-3252 FAX 561-2273 TO: Mike Lee, P.E., Chief Engineer, ADOT/ANC FROM: Shane Blanchard, P.E. THRU: Mike Rabe,

More information

Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam

Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam Education Master of Business Administration University of Houston, 1985 Bachelor of Science, Civil Engineering University

More information

Texas Commission on Environmental Quality Organized Sewage Collection System General Construction Notes

Texas Commission on Environmental Quality Organized Sewage Collection System General Construction Notes Texas Commission on Environmental Quality Organized Sewage Collection System General Construction Notes 1. This Organized Sewage Collection System must be designed and constructed in accordance with the

More information

STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS

STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements to execute internal closed

More information

SECTION 810 SEWER LINE CLEANING

SECTION 810 SEWER LINE CLEANING SECTION 810 SEWER LINE CLEANING I. GENERAL 1.1 DESCRIPTION OF WORK The work covered by this section consists of providing all labor, equipment, material and supplies and performing all operations required

More information

Trouble Shooting for Trenchless Liner Installation During Sewer Line Rehabilitation

Trouble Shooting for Trenchless Liner Installation During Sewer Line Rehabilitation Trouble Shooting for Trenchless Liner Installation During Sewer Line Rehabilitation Salam Khan*, P.E. and Christoph Dobson, P.E. Sacramento County Sanitation District 1 (CSD-1) 10545 Armstrong Avenue,

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS

STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements to execute internal closed

More information

REHABILITATION OR REPLACEMENT? THAT IS THE QUESTION

REHABILITATION OR REPLACEMENT? THAT IS THE QUESTION REHABILITATION OR REPLACEMENT? THAT IS THE QUESTION ABSTRACT Chris L. Windley PE, McKim & Creed, Inc. Ben R. Latino, Jr., PE, McKim & Creed, Inc. Greg Anderson, PE, McKim & Creed, Inc. When designing to

More information

San Antonio, TX July 28, 2011

San Antonio, TX July 28, 2011 Rehabilitation of a Deteriorated 60 RCP Wastewater Interceptor Using Competing Trenchless Technologies Bruce Cole, PE Corey Anderson, EIT TAWWA/WEAT Summer Seminar San Antonio, TX July 28, 2011 Wendy Martinez,

More information

WASHINGTON COUNTY SANITARY SERVICE LATERAL MATERIAL AND INSTALLATION GUIDE. Established By: THE BOARD OF COUNTY COMMISSIONERS WASHINGTON COUNTY, OHIO

WASHINGTON COUNTY SANITARY SERVICE LATERAL MATERIAL AND INSTALLATION GUIDE. Established By: THE BOARD OF COUNTY COMMISSIONERS WASHINGTON COUNTY, OHIO WASHINGTON COUNTY SANITARY SERVICE LATERAL MATERIAL AND INSTALLATION GUIDE Established By: THE BOARD OF COUNTY COMMISSIONERS WASHINGTON COUNTY, OHIO Commissioners Mr. Timothy C. Irvine, President Ms. Cora

More information

LS 2540 SEWER LATERALS AND INSPECTION TEES

LS 2540 SEWER LATERALS AND INSPECTION TEES LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal

More information

See Appendix A for additional information, or contact ASTM directly.

See Appendix A for additional information, or contact ASTM directly. DEFINITIONS Wherever used in these specification guidelines, the following words and terms have the meanings indicated. AREAWAY: A paved surface, serving as an entry area to a basement or subsurface portion

More information

SECTION 9.02 BUILDING SUBSURFACE DRAINS (PERIMETER, ETC.)

SECTION 9.02 BUILDING SUBSURFACE DRAINS (PERIMETER, ETC.) CHAPTER 9 SEWER / STORM DRAIN / IRRIGATION LINES SECTION 9.01 GENERAL This section covers the requirements for piping materials and installation of Lehi City sewer, storm drainage and irrigation collection

More information

CURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING

CURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING North American Society for Trenchless Technology 2007 No-Dig Conference & Exhibition San Diego, California April 16-19, 2007 CURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING Robert K. Lee, P.E. 1 1

More information

Failing Culverts Structural Problems & Economic Considerations

Failing Culverts Structural Problems & Economic Considerations Failing Culverts Structural Problems & Economic Considerations Al Tenbusch, President, Tenbusch, Inc. Brian Dorwart, Senior Associate, Brierley Associates Albert F. Tenbusch, Engineer, Tenbusch, Inc. June

More information

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant

More information

Village of Broadview Flood Control Assistance Program

Village of Broadview Flood Control Assistance Program Village of Broadview Flood Control Assistance Program Village of Broadview 2350 S. 25 th Avenue, Broadview, IL 60155 INTRODUCTION The Village of Broadview is served by combined sewers which carry sewage

More information

SECTION 4 EXCAVATION, TRENCHING AND BACKFILLING 4.01 SCOPE OF WORK

SECTION 4 EXCAVATION, TRENCHING AND BACKFILLING 4.01 SCOPE OF WORK 4.01 SCOPE OF WORK The work covered by this section shall consist of furnishing all materials, equipment and labor for the excavating, trenching, backfilling, and bore and jack required to install or repair

More information

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General General All sanitary sewers, manholes and force mains shall be acceptance tested, as hereinafter specified in the presence of a City representative. Acceptance testing shall be performed after backfilling

More information

SECTION IX SLIP LINING PIPELINES

SECTION IX SLIP LINING PIPELINES AN SECTION IX SLIP LINING PIPELINES February, 2008 TABLE OF CONTENTS SECTION IX - SLIP LINING PIPELINES 9.01.00 GENERAL...2 9.01.01 SCOPE... 2 9.02.00 MATERIAL...2 9.03.00 CONSTRUCTION...2 9.03.01 REQUIREMENTS...

More information

Working together to improve beach water quality. Fixing our. public and private. sewers

Working together to improve beach water quality. Fixing our. public and private. sewers Working together to improve beach water quality Fixing our public and private sewers May 2004 FIND FIX DECIDE Narrow Neck Beach on a summer day As part of Project CARE, our long-term project to improve

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,

More information

Figure 3 Pipe Cracking

Figure 3 Pipe Cracking The illustration shown below depicts the system analyzed. As-built drawings and survey information were not available; aerial photos and survey shots of inverts were used to determine the system s geometries.

More information

ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING

ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING 1.0 General 1.1 The work covered by this section consists of providing all labor, equipment, material and supplies, insurance, accessories, tools, transportation,

More information

CHAPTER 5. Storm Sewer

CHAPTER 5. Storm Sewer CHAPTER 5 Storm Sewer A. Introduction All proposed developments shall have a properly designed and constructed storm water conveyance system. This chapter deals only with the conveyance system. Storm water

More information

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Village of Shorewood, Wisconsin SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Prepared By: Thomas A. Zoulek, P.E., LEED A.P. Vice President Mid City Plumbing & Heating

More information

Analyzing The Bread & Butter Benefits of Sewer Main Pipebursting. Matt Werth General Manager PM Construction

Analyzing The Bread & Butter Benefits of Sewer Main Pipebursting. Matt Werth General Manager PM Construction Analyzing The Bread & Butter Benefits of Sewer Main Pipebursting Matt Werth General Manager PM Construction Pipebursting is the answer to many very difficult rehabilitation needs where there are almost

More information

Defense Technical Information Center Compilation Part Notice

Defense Technical Information Center Compilation Part Notice UNCLASSIFIED Defense Technical Information Center Compilation Part Notice ADP017712 TITLE: Rehabilitation of TCE-Contaminated Underground Storm Water System Using Trenchless Technology DISTRIBUTION: Approved

More information

Platte River Interceptor Slipline Rehabilitation

Platte River Interceptor Slipline Rehabilitation Platte River Interceptor Slipline Rehabilitation Owner: Metro Wastewater Reclamation District Contractor: American West, Denver CO Slipline Pipe Manufacturer : Hobas Pipe USA Presented by: Tom Furie, Area

More information

SECTION 33 11 00.19 ABANDONMENT OF WATER MAINS. A. Conform to requirements of Section 01 33 00 - Submittals.

SECTION 33 11 00.19 ABANDONMENT OF WATER MAINS. A. Conform to requirements of Section 01 33 00 - Submittals. SECTION 33 11 00.19 ABANDONMENT OF WATER MAINS PART 1: GENERAL 1.01 SCOPE A. Abandonment in place, by cutting and capping, of existing water mains, hydrants, service lines, and valves. B. Abandonment in

More information

SECTION 802 GRAVITY SEWER PIPE

SECTION 802 GRAVITY SEWER PIPE SECTION 802 GRAVITY SEWER PIPE 802-1 DESCRIPTION: This Work shall consist of furnishing all labor, materials, equipment, and incidentals required to remove and dispose of existing gravity sewer pipe if

More information

LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD

LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD www.norcalpug.com LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD Bob Fisher and Lance Stracner Ameron Protective Lining J.R. Pipeline Co Inc. Abstract: The

More information