1 Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30, $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4, $48,000 Per standards - center and skip Signage - all MI $4, $30,000 Avg. 20 signs per $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3, $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25, $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $ $9,000 emergency solar phone Gravity wall LF $ $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6, $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

2 Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150, $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100, $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100, $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50, $375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22, $352,000 7 roadway intersections Signage & Striping LS $4, $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1, $19,500 intersection lighting all Approach curb and ramps EA $3, $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10, $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

3 Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

4 ( This Page Blank.)

5 Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38, $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4, $48,000 Per standards - center and skip Signage - all MI $4, $30,000 Avg. 20 signs per $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3, $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30, $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $ $9,000 emergency solar phone Gravity wall LF $ $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7, $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

6 Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150, $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100, $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100, $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50, $25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22, $352,000 7 roadway intersections Signage & Striping LS $4, $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1, $19,500 intersection lighting all Approach curb and ramps EA $3, $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

7 Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

8 Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton

9 Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30, $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4, $48,000 Per standards - center and skip Signage - all MI $4, $30,000 Avg. 20 signs per $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3, $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25, $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $ $9,000 emergency solar phone Gravity wall LF $ $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6, $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

10 Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150, $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100, $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100, $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50, $375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22, $352,000 7 roadway intersections Signage & Striping LS $4, $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1, $19,500 intersection lighting all Approach curb and ramps EA $3, $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10, $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

11 Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

12 ( This Page Blank.)

13 Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38, $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4, $48,000 Per standards - center and skip Signage - all MI $4, $30,000 Avg. 20 signs per $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3, $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30, $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $ $9,000 emergency solar phone Gravity wall LF $ $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7, $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

14 Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150, $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100, $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100, $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50, $25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22, $352,000 7 roadway intersections Signage & Striping LS $4, $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1, $19,500 intersection lighting all Approach curb and ramps EA $3, $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

15 Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

16 Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton

17 Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30, $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4, $48,000 Per standards - center and skip Signage - all MI $4, $30,000 Avg. 20 signs per $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3, $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25, $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $ $9,000 emergency solar phone Gravity wall LF $ $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6, $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

18 Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150, $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100, $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100, $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50, $375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22, $352,000 7 roadway intersections Signage & Striping LS $4, $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1, $19,500 intersection lighting all Approach curb and ramps EA $3, $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10, $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

19 Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

20 ( This Page Blank.)

21 Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38, $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4, $48,000 Per standards - center and skip Signage - all MI $4, $30,000 Avg. 20 signs per $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3, $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30, $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $ $9,000 emergency solar phone Gravity wall LF $ $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7, $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

22 Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150, $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100, $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100, $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50, $25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22, $352,000 7 roadway intersections Signage & Striping LS $4, $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1, $19,500 intersection lighting all Approach curb and ramps EA $3, $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

23 Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

24 Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton

25 Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30, $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4, $48,000 Per standards - center and skip Signage - all MI $4, $30,000 Avg. 20 signs per $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3, $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25, $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $ $9,000 emergency solar phone Gravity wall LF $ $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6, $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

26 Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150, $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100, $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100, $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50, $375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22, $352,000 7 roadway intersections Signage & Striping LS $4, $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1, $19,500 intersection lighting all Approach curb and ramps EA $3, $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10, $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

27 Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

28 ( This Page Blank.)

29 Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38, $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4, $48,000 Per standards - center and skip Signage - all MI $4, $30,000 Avg. 20 signs per $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3, $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30, $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $ $9,000 emergency solar phone Gravity wall LF $ $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7, $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

30 Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150, $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100, $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100, $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50, $25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22, $352,000 7 roadway intersections Signage & Striping LS $4, $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1, $19,500 intersection lighting all Approach curb and ramps EA $3, $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

31 Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

32 Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton

33 Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30, $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4, $48,000 Per standards - center and skip Signage - all MI $4, $30,000 Avg. 20 signs per $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3, $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25, $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $ $9,000 emergency solar phone Gravity wall LF $ $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6, $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

34 Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150, $1,125,000 Remove rails & ties - 95% contam. Soil remediation MI $100, $375,000 Est. 0.5 contam. sites per mile Surface water remediation MI $100, $375,000 Est. 0.5 sites per mile Steel and tie/timber credit MI -$50, $375,000 Est. 0.5 contam. sites per mile SubTotal $1,725,000 Intersections Mast arm / signals assemblies EA $22, $352,000 7 roadway intersections Signage & Striping LS $4, $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1, $19,500 intersection lighting all Approach curb and ramps EA $3, $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10, $130,000 all road intersections SubTotal $1,095,500 Shelters Approach paths EA $2,000 8 $16,000 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $6,000 8 $48,000 foundation cost Landscaping EA $5,000 8 $40,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work EA $8,000 8 $64,000 general site prep. SubTotal $44,000 $352,000

35 Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges Main A LS $525,000 1 $525,000 Prefab. Steel Truss bridge with foundations Main B LS $325,000 1 $325,000 Prefab. Steel Truss bridge with foundations SubTotal $850,000 Utilities Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,270,000 Mobilization 3.0% $380,000 MOT 2.0% $250,000 Geotech and misc. Testing 2.0% $250,000 Additional items 4.0% $510,000 Contingency 10.0% $1,270,000 Asbuilts, close-out 2.0% $250,000 SubTotal $4,180,000 Project Cost Estimate Total $16,846,700

36 ( This Page Blank.)

37 Rails-with-Trails Option Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 17,800' + Separated Trail length ~ 21,700' = Total Length ~ 39,500' or 7.5 miles) Clearing and grubbing AC $38, $1,900,000 Clear all nuisance plants full width Cut and fill (single trail) CY $12 15,800 $189,600 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $13 22,000 $286,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $180 3,050 $549,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $180 4,240 $763,200 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $27 33,600 $907,200 6" bank run shell Base (dbl. trail) SY $28 48,200 $1,349,600 6" bank run shell Subbase (single trail) SY $14 15,800 $221,200 Build base as needed in poor soils Subbase (dbl. trail) SY $14 24,000 $336,000 Build base as needed in poor soils Striping NM $4, $48,000 Per standards - center and skip Signage - all MI $4, $30,000 Avg. 20 signs per $200 ea. Fence LF $24 5,000 $120,000 Chain link type as needed Ped/bike railing LF $84 1,500 $126,000 Railing on gravity wall and steep slopes Furniture MI $3, $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $30, $1,080,000 Border trees and bushes as needed Sod, seeding SY $4 130,000 $455,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $ $9,000 emergency solar phone Gravity wall LF $ $280,000 At deep cuts. Environ. protection LS $75,000 1 $75,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $7, $240,000 drainage pipe and structures Pond/swale construction EA $36,000 6 $216,000 pond/swale construction SubTotal $9,403,300

38 Rails-with-Trails Option Contamination Testing & Removal Corridor Testing LS $225,000 1 $225,000 Contam. Test every 500' x 5 sta. RR rail and tie removal MI $150, $75,000 Remove rails & ties - 95% contam. Soil remediation MI $100, $750,000 Est. 1 contam. Location per mile Surface water remediation MI $100, $750,000 Est. 1 Location per mile Steel and tie/timber credit MI -$50, $25,000 Est. 1 contam. Location per mile SubTotal $1,775,000 Intersections Mast arm / signals assemblies EA $22, $352,000 7 roadway intersections Signage & Striping LS $4, $52,000 additional signage at intersections Median EA $15,000 7 $105,000 reconstruct per plans Street lighting LS $1, $19,500 intersection lighting all Approach curb and ramps EA $3, $78,000 2 sides of 13 intersections Removal of conc. & asph. + Replace LS $10,000 5 $50,000 correcting roadway as needed Power supply w/ UPS EA $10,000 8 $80,000 power for signals Controller assembly EA $20,000 8 $160,000 controllers for signals Detection EA $5,000 9 $45,000 vehicle detection Conduit and wire - complete EA $3,000 8 $24,000 wiring at signals Remove RR signals & arms LS $10,000 0 $0 all road intersections SubTotal $965,500 Shelters Approach paths EA $2,400 8 $19,200 additional trail length - complete Shelter building EA $20,000 8 $160,000 structure cost Shelter foundation EA $7,200 8 $57,600 foundation cost Landscaping EA $6,000 8 $48,000 trees, shrubs, sod, mulch Lighting EA $2,000 8 $16,000 site lights Signage EA $1,000 8 $8,000 site signs Site work, benches, trash can, etc. EA $8,000 8 $64,000 general site prep. SubTotal $46,600 $372,800

39 Rails-with-Trails Option Trail Heads Entrance roads EA $40,000 4 $160,000 vehicle road costs Parking LS $40,000 4 $160,000 parking Shelter building EA $120,000 4 $480,000 structure cost Restroom building EA $60,000 4 $240,000 bathroom cost Landscaping LS $10,000 4 $40,000 trees, shrubs, sod, mulch Lighting LS $10,000 4 $40,000 site lights Signage LS $5,000 4 $20,000 site signs Clearing & grubbing LS $10,000 4 $40,000 clear site Site work - misc. LS $25,000 4 $100,000 general site prep. Site electrical LS $20,000 4 $80,000 site electrical - all SubTotal $340,000 $1,360,000 Bridges (2) over Philippi Creek Main A LS $625,000 1 $625,000 Prefab. Steel Truss bridge with foundations Main B LS $390,000 1 $390,000 Prefab. Steel Truss bridge with foundations SubTotal $1,015,000 Utilities at Trail Heads and Shelters w/ Water Water - potable EA $20,000 6 $120,000 water at 6 stations Sewer EA $20,000 5 $100,000 bathrooms at 4 Trail Heads + 1 shelter Reclaim (irrigation) EA $10,000 4 $40,000 irrigation at 4 Trail Heads SubTotal $260,000 Project - General Design and Survey 10.0% $1,520,000 Mobilization 3.0% $450,000 MOT 3.0% $450,000 Geotech and misc. Testing 2.0% $300,000 Additional items 4.0% $610,000 Contingency 10.0% $1,520,000 Asbuilts, close-out 2.0% $300,000 SubTotal $5,150,000 Project Cost Estimate Total $20,301,600

40 Cost Unit Descriptions UNIT AC CY EA LF LS MI NM SF SY TN DESCRIPTION Acre Cubic Yard Each Linear Foot Lump Sum Mile Net Mile Square Foot Square Yard Ton

41 Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5 miles) Clear and grub AC $30, $1,500,000 Clear all nuisance plants full width Cut and fill (single trail) CY $10 20,000 $200,000 Move cut and fill soil. Add as needed. Cut and fill (dbl. trail) CY $10 10,600 $106,000 Move cut and fill soil. Add as needed. Asphalt path (single trail) TN $150 4,400 $660,000 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Asphalt path (dbl. trail) TN $150 2,670 $400,500 2" thick = 2"*110#/SY*45,000'/3*15'/3/2000 Base (single trail) SY $22 33,600 $739,200 6" bank run shell Base (dbl. trail) SY $22 33,500 $737,000 6" bank run shell Subbase (single trail) SY $11 5,000 $55,000 Build base as needed in poor soils Subbase (dbl. trail) SY $11 10,000 $110,000 Build base as needed in poor soils Striping NM $4, $48,000 Per standards - center and skip Signage - all MI $4, $30,000 Avg. 20 signs per $200 ea. Fence LF $20 5,000 $100,000 Chain link type as needed Ped/bike railing LF $70 1,500 $105,000 Railing on gravity wall and steep slopes Furniture MI $3, $22,500 Benches, trash cans, bike racks, etc. Landscaping AC $25, $900,000 Border trees and bushes as needed Sod, seeding SY $3 130,000 $390,000 cover all disturbed areas Conduit w/ comm. Fiber LF $5 40,000 $200,000 single run, full length Emergency phones EA $ $9,000 emergency solar phone Gravity wall LF $ $280,000 At deep cuts. Environ. protection LS $60,000 1 $60,000 Silt fence, inlet prot., etc. Drainage structures & pipe EA $6, $192,000 drainage pipe and structures Pond/swale construction EA $30,000 6 $180,000 pond/swale construction SubTotal $7,024,200

UNIT PRICE LIST January 2009

UNIT PRICE LIST January 2009 UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only

More information

MINNESOTA DEPARTMENT OF TRANSPORTATION ESTIMATED PRODUCTION RATES FOR COMPUTING CONTRACT TIME

MINNESOTA DEPARTMENT OF TRANSPORTATION ESTIMATED PRODUCTION RATES FOR COMPUTING CONTRACT TIME SET-UP AND MOBILIZATION MOBILIZATION LS 1-3 Days CONTRACTOR SURVEY LS 1-3 Days REMOVALS CONCRETE PAVEMENT SQ YD 1000-4000 BITUMINOUS SURFACE SQ YD 8000-12000 CLEAR AND GRUBBING ACRE/DAY 2-4 CLEAR AND GRUBBING

More information

Description Quantity Cost Total Cost

Description Quantity Cost Total Cost APPENDIX: ITEMIZED CONSTRUCTION COST ESTIMATE Description Quantity Cost Total Cost 1 CASCADE FALLS 1a Existing Cascade Falls Upgrades Structural Repairs - Steps, Railing, Walls, Pool Lump Sum $500,000

More information

Figure 3 Pipe Cracking

Figure 3 Pipe Cracking The illustration shown below depicts the system analyzed. As-built drawings and survey information were not available; aerial photos and survey shots of inverts were used to determine the system s geometries.

More information

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts SECTION 00300 BID FORM S For additions and deletions to the Contract, the following unit prices shall be applicable for the specific items listed. Unit Prices shall be complete, in place including required

More information

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix F RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4400 South Street - Piping and Collection

More information

A. Structures Quantity Item Price Cost @ $3,500 EA

A. Structures Quantity Item Price Cost @ $3,500 EA PRINCE WILLIAM COUNTY Department of Development Services Land Development Division UNIT PRICE LIST (Performance Bonds, Landscaping Escrows, and Siltation & Erosion Control Escrows) Revised: November 17,

More information

Chapter 22. Lump Sum Project Guidelines

Chapter 22. Lump Sum Project Guidelines Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11

More information

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW NOTICE TO CONTRACTORS CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW The Nebraska Department of Roads will receive sealed bids in

More information

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets Los Angeles County Department Of Public Works Land Development Division Bond Calculation Sheets Effective July 1, 2015 COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT DIVISION ROADS COST

More information

EXHIBIT A Accessible Truck Routes Map

EXHIBIT A Accessible Truck Routes Map EXHIBIT A Accessible Truck Routes Map ASHEVILLE, NORTH CAROLINA ROUTE: A ROUTE: B ROUTE: C ROUTE: D ROUTE: E EXHIBIT A EXHIBIT B Craven Street Improvements Map ASHEVILLE, NORTH CAROLINA EXHIBIT B EXHIBIT

More information

Roadway Cost Per Centerline Mile Revised June 2014

Roadway Cost Per Centerline Mile Revised June 2014 Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743

More information

Portway Extensions Concept Development Study APPENDIX F PRELIMINARY CONSTRUCTION COST ESTIMATES

Portway Extensions Concept Development Study APPENDIX F PRELIMINARY CONSTRUCTION COST ESTIMATES Portway Extensions Concept Development Study Final Report APPENDIX F PRELIMINARY CONSTRUCTION COST ESTIMATES Portway Extensions Concept Development Study Final Report In advance of an economic impact analysis

More information

FY08 SEWER POINT REPAIRS BID TABULATION

FY08 SEWER POINT REPAIRS BID TABULATION 6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

Florida Avenue Crossing

Florida Avenue Crossing Florida Avenue Crossing Prepared for: Arapahoe County Open Spaces On behalf of the High Line Canal Working Group 6934 South Lima Street, Suite A Centennial, CO 80112 Prepared by: Felsburg Holt & Ullevig

More information

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS Appendix D RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: Riverdale Road - Rumbi Grill -

More information

The unit costs are based on the trend line of the 3 low bids for the average quantity.

The unit costs are based on the trend line of the 3 low bids for the average quantity. Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally

More information

CITY OF WINTER GARDEN CONSTRUCTION SERVICES LABOR, EQUIPMENT, AND MATERIALS BID FORM MOBILIZATION/DEMOBILIZATION

CITY OF WINTER GARDEN CONSTRUCTION SERVICES LABOR, EQUIPMENT, AND MATERIALS BID FORM MOBILIZATION/DEMOBILIZATION 1 2 3 4 < 100K Work Order > 100K Work Order < 100K Work Order > 100K Work Order % of Work Order % of Work Order % of Work Order % of Work Order 5 1 Each/Day Type I Barricade 6 1 Each/Day Type II Barricade

More information

Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps

More information

Jackson Gulch Outlet Canal Rehabilitation Project

Jackson Gulch Outlet Canal Rehabilitation Project Jackson Gulch Outlet Canal Rehabilitation Project Preliminary Budgetary Estimate for Rehabilitation February 2004 Prepared for the Mancos Water Conservancy District Jackson Gulch Reservoir 42888 County

More information

ESTIMATE OF QUANTITIES ESTIMATE OF QUANTITIES ITEM NUMBER DESCRIPTION UNIT QUANTITY ITEM NUMBER DESCRIPTION UNIT QUANTITY 201.06 CLEARING AND GRUBBING LS 1.0 402.376922 PAVEMENT DENSITY QUALITY ADJUSTMENT

More information

OOCEA PROJECT NO ; CONTRACT NO S.R. 417/BOGGY CREEK ROAD INTERCHANGE

OOCEA PROJECT NO ; CONTRACT NO S.R. 417/BOGGY CREEK ROAD INTERCHANGE BID TABULATION - BID OPENING JULY 9, 2012, 1:30 PM. OPTION 1 - BID PLANS GLF Construction Corp. The Middlesex Corp. Hubbard Construction 101-1 MOBILIZATION 1 LS $5,600,000.00 $5,600,000.00 $7,035,000.00

More information

Addendum Number 1 Request for Bids #15-004 BUD BENDER PARK REHABILITATION PROJECT City Project No. CB 1302

Addendum Number 1 Request for Bids #15-004 BUD BENDER PARK REHABILITATION PROJECT City Project No. CB 1302 Addendum Number 1 Request for Bids #15-004 City Project CB 1302 To all prospective bidders under specifications for Request for Bids #15-004, the Bud Bender Park Rehabilitation Project, City Project CB

More information

INVITATION TO BID OFFICE OF THE ORLANDO-ORANGE COUNTY EXPRESSWAY AUTHORITY ORLANDO, FLORIDA

INVITATION TO BID OFFICE OF THE ORLANDO-ORANGE COUNTY EXPRESSWAY AUTHORITY ORLANDO, FLORIDA INVITATION TO BID OFFICE OF THE ORLANDO-ORANGE COUNTY EXPRESSWAY AUTHORITY ORLANDO, FLORIDA Sealed Bids will be received in the office of the Orlando-Orange County Expressway Authority, 4974 ORL Tower

More information

REQUEST FOR BIDDER INFORMATION

REQUEST FOR BIDDER INFORMATION REQUEST FOR BIDDER INFORMATION Questions regarding the project or the Bid Documents must be in writing as required by the Instruction to Bidders. Questions must be written on this form and sent by fax

More information

TYPICAL SECTION - 24'/28' STRIP PAVING TYPICAL SECTION - 24'/28' GRAVEL STREET TYPICAL SECTIONS FOR 24'/28' STRIP PAVING AND GRAVEL STREETS

TYPICAL SECTION - 24'/28' STRIP PAVING TYPICAL SECTION - 24'/28' GRAVEL STREET TYPICAL SECTIONS FOR 24'/28' STRIP PAVING AND GRAVEL STREETS TYPICAL SECTION - 24'/28' STRIP PAVING TYPICAL SECTION - 24'/28' GRAVEL STREET TYPICAL SECTIONS FOR 24'/28' STRIP PAVING AND GRAVEL STREETS PAVEMENT WIDTH (B) PAVEMENT (C) LIP C&G (D) F.L. C&G (E) BACK

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids Bids Open: 2 pm Date: Wednesday, March 4, 2015 BASE BID SCHEDULE 1 - Rudell Road Reconstruction Project NO. CODE CONTRACT PROJECT No. B3-0470 and C4-0069 COUNTY'S ESTIMATE 1 All American Asphalt Corona,

More information

Module: Fundamental Construction Math

Module: Fundamental Construction Math Module: Fundamental Construction Math Overview: A background review of fundamental math principles, concepts, and calculation used in common construction activities including estimating, load calculations,

More information

APPENDIX K Capital Costs Methodology Report

APPENDIX K Capital Costs Methodology Report APPENDIX K Capital Costs Methodology Report September 2013 Capital Cost Estimating Report Table of Contents 1.0 Information... 5 1.1 Introduction... 5 1.2 Purpose and Goal... 5 2.0 Description of Project...

More information

Libor DRAFT Plan. Improve existing gravel parking area to create 12 parking spaces.

Libor DRAFT Plan. Improve existing gravel parking area to create 12 parking spaces. Libor DRAFT Plan Improve existing gravel parking area to create 12 parking spaces. Expand parking area to create 25 additional spaces with 2 van accessible ADA compliant handicapped stalls with asphalt

More information

WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued)

WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued) BIDDER'S PROPOSAL (continued) Item Estimated No. Description Quantity Unit Unit Cost Total Cost BASE BID 1 Traffic Control 1 LS $ $ 2 Construction Area Signs 1 LS $ $ 3 Excavation Safety 1 LS $ $ 4 Reset

More information

MIAMI BLUFFS COMMUNITY ASSOCIATION LINE ITEM BUDGET (9058)

MIAMI BLUFFS COMMUNITY ASSOCIATION LINE ITEM BUDGET (9058) MIAMI BLUFFS COMMUNITY ASSOCIATION LINE ITEM BUDGET (9058) Contract 2006 Year Dec. YTD 2007 Year Dec. YTD 2008 Annual INCOME: Fee Income: Association Fee (605000) Builder Fee (605890) Prepaid Fees (601350)

More information

Bidding and Contract Requirements:

Bidding and Contract Requirements: CITY OF LAREDO, TEXAS WATER UTILITIES DEPARTMENT 24-INCH TRANSMISSION MAIN ADDENDUM 7 June 10, 2016 To Bidder of Record: The following changes, additions, and/or deletions are hereby made a part of the

More information

Parkview Watauga, Texas

Parkview Watauga, Texas PD Zoning Request for The Property: is located at the south west corner of Starnes Road and Whitley Road in the City of. The property has approximately 500 feet of frontage on Starnes Road which will provide

More information

RED RIVER DIVERSION FARGO MOORHEAD METRO FLOOD RISK MANAGEMENT PROJECT, FEASIBILITY STUDY, PHASE 4

RED RIVER DIVERSION FARGO MOORHEAD METRO FLOOD RISK MANAGEMENT PROJECT, FEASIBILITY STUDY, PHASE 4 RED RIVER DIVERSION FARGO MOORHEAD METRO FLOOD RISK MANAGEMENT PROJECT, FEASIBILITY STUDY, PHASE 4 APPENDIX G COST ESTIMATES EXHIBIT J RAILROAD BRIDGE QUANTITIES Report for the US Army Corps of Engineers,

More information

Majors Program Cost Estimating Software. User Manual. Created by the Construction and Materials Support Center at the University of Wisconsin-Madison

Majors Program Cost Estimating Software. User Manual. Created by the Construction and Materials Support Center at the University of Wisconsin-Madison Majors Program Cost Estimating Software User Manual Created by the Construction and Materials Support Center at the University of Wisconsin-Madison August, 2011 Contents Introduction... 3 Intentions of

More information

ADDENDUM NO. 1. Manchester Boston Regional Airport, City of Manchester, NH

ADDENDUM NO. 1. Manchester Boston Regional Airport, City of Manchester, NH Hoyle, Tanner Project No. 093145 ADDENDUM NO. 1 Manchester Boston Regional Airport, City of Manchester, NH Construct Relocated Roadway Airport Service Rd. Outside Runway Object Free Area (ROFA); Construct

More information

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements Presentation July 23, 2014 A. Morton Thomas and Associates, Inc. 800 King Farm Boulevard, 4 th Floor Rockville, Maryland 20850

More information

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR ESTABLISHING CONSTRUCTION CONTRACT DURATION July 2010 DISCLAIMER: The following documentation as a whole was derived from Federal Highway Administration

More information

SEATTLE ARENA. Public Benefits Review City Council Sustainability & Transportation Committee April 19, 2016

SEATTLE ARENA. Public Benefits Review City Council Sustainability & Transportation Committee April 19, 2016 SEATTLE ARENA Public Benefits Review City Council Sustainability & Transportation Committee April 19, 2016 PUBLIC BENEFITS OVERVIEW LEGEND 3rd Ave S 1 2 Publicly Accessible Open Space & Living Machine

More information

SECTION 13 REPLACEMENT AND CLEANUP 13.01 SCOPE OF WORK

SECTION 13 REPLACEMENT AND CLEANUP 13.01 SCOPE OF WORK 13.01 SCOPE OF WORK Under this item, the Contractor will restore all lawns, trees, gardens, landscape plantings, sidewalks, ramps, trails, fences, commercial signs, water courses and sand, gravel, dirt,

More information

Helen Mercury Mine EE/CA OPINION OF PROBABLE COST

Helen Mercury Mine EE/CA OPINION OF PROBABLE COST G Cost Estimates Helen Mercury Mine EE/CA Alternative 2: Limited Action 3 Minor Road Improvements 4 Clear & Grub diversion channel areas 5 Surveying 6 Cleanup & Demobilization 7 Pull back of material 8

More information

Landscaping Regulations

Landscaping Regulations 1003.162 Landscaping Regulations 1. Scope of Provisions. This section contains the landscaping regulations that apply to all zoning districts. Developments subject to the conditional use permit procedure

More information

- 1 - Jb James Construction Llc. Measure. Total Amount. Unit Price

- 1 - Jb James Construction Llc. Measure. Total Amount. Unit Price Lead Project: H.002303.6 Parish: East Baton Rouge Routes: LA 37 Description: LA 37 at Central Thruway Type Const: GRADING, DRAIN STRUCT, SEWER FORCE MAINS, CLASS II BC, SUPERPAVE ACP, PCCP, TRAFFIC SIGNALIZATION,

More information

City of Waupun. Public Works Department 201 E. Main St. Waupun, WI (920)

City of Waupun. Public Works Department 201 E. Main St. Waupun, WI (920) 1 STORM WATER MANAGEMENT PERMIT INFORMATION...2 2 SUBMITTAL CHECKLIST...3 3 PROJECT SUMMARY SHEET...4 4 PLAN SHEET CHECKLIST...6 5 GENERAL DESIGN REQUIREMENTS CHECKLIST...8 6 WET POND SUMMARY SHEET...11

More information

DOCUMENTATION, AS-BUILT & TESTING CHECKLIST DEVELOPER REPRESENTATIVE S ACCEPTANCE AND CERTIFICATE OF COMPLETION STAGE 6

DOCUMENTATION, AS-BUILT & TESTING CHECKLIST DEVELOPER REPRESENTATIVE S ACCEPTANCE AND CERTIFICATE OF COMPLETION STAGE 6 DOCUMENTATION, AS-BUILT & TESTING CHECKLIST DEVELOPER REPRESENTATIVE S ACCEPTANCE AND CERTIFICATE OF COMPLETION STAGE 6 This checklist must be submitted prior to acceptance. (This list is not all inclusive,

More information

FDOT Specifications List

FDOT Specifications List FDOT Specifications List TABLE OF CONTENTS DIVISION II CONSTRUCTION DETAILS CLEARING CONSTRUCTION SITE 110 Clearing and Grubbing... 152 EARTHWORK AND RELATED OPERATIONS 120 Excavation and Embankment...

More information

Surface Transportation Program (STP)

Surface Transportation Program (STP) Project Name: Project Sponsor: FEDERAL FUNDS PROJECT APPLICATION TRANSPORTATION IMPROVEMENT PROGRAM 2008-2013 SALT LAKE and OGDEN/ LAYTON URBAN AREAS Surface Transportation Program (STP) Urban Surface

More information

Preliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006

Preliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006 Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006 1.0 Background and Repair and Rehabilitation Recommendation Clay County has contracted Camp Dresser & McKee Inc. (CDM)

More information

CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW)

CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW) CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW) January, 2013 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS DRAINAGE STRUCTURES DRN-01 Corrugated metal pipe drop inlet DNR-02 Storm Drain

More information

Update on Previous Related Transportation Enhancement Grants

Update on Previous Related Transportation Enhancement Grants ROUND 16 ROUND 16 Update on Previous Related Transportation Enhancement Grants Pima County and City of Tucson staff are implementing the Pima County-Tucson Safe Routes to Schools Pilot Program. This program

More information

Lump Sum Estimating: Discovery and Simulation

Lump Sum Estimating: Discovery and Simulation Lump Sum Estimating: Discovery and Simulation Brian Wasserman, Principal Investigator Center for Transportation Research and Innovation Minnesota State University, Mankato June 2012 Research Project Final

More information

Item No. 432S Portland Cement Concrete Sidewalks. 432S.1 Description

Item No. 432S Portland Cement Concrete Sidewalks. 432S.1 Description Item No. 432S Portland Cement Concrete Sidewalks 432S.1 This item shall govern the construction of Portland cement concrete sidewalks (Standard Detail No. 432S-1), as herein specified, on an approved subgrade

More information

MICHIGAN AIRPORT DEVELOPMENT PROGRAM PACKAGE MDOT Office of Aeronautics. Airport Capital Improvement Plan 2014-2018

MICHIGAN AIRPORT DEVELOPMENT PROGRAM PACKAGE MDOT Office of Aeronautics. Airport Capital Improvement Plan 2014-2018 MICHIGAN AIRPORT DEVELOPMENT PROGRAM PACKAGE MDOT Office of Aeronautics Airport Capital Improvement Plan 20142018 Prepared for: West Michigan Regional Airport Holland, Michigan August 2013 Contact: Mr.

More information

SECTION EROSION AND SEDIMENTATION CONTROL

SECTION EROSION AND SEDIMENTATION CONTROL SECTION 31 25 00 EROSION AND SEDIMENTATION CONTROL PART 1 GENERAL 1.01 SECTION INCLUDES A. This WORK shall consist of temporary measures needed to control erosion and water pollution. These temporary measures

More information

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems

More information

634 PRINTZ ROAD ATASCADERO, CA Phone UNIT PRICE (IN FIGURES) DOLLARS. CENTS UNIT PRICE (IN FIGURES) DOLLARS. CENTS

634 PRINTZ ROAD ATASCADERO, CA Phone UNIT PRICE (IN FIGURES) DOLLARS. CENTS UNIT PRICE (IN FIGURES) DOLLARS. CENTS EXPANSION OF PARK AND RIDE FACILITY AT LAS TABLAS ROAD AND BENNETT WAY TEMPLETON, CALIFORNIA CONTRACT 300379 PROJECT MANAGER: MIKE LEARY PROJECT ENGINEER: MATT REINHART BASE BID DESCRIPTION OF BID 1 BID

More information

Planning Level Cost Estimation Tool. User s Manual

Planning Level Cost Estimation Tool. User s Manual Planning Level Cost Estimation Tool User s Manual Atlanta Regional Commission Submitted By: User s Manual Table of Contents 1. INTRODUCTION... 1 2. OBJECTIVE... 1 3. FRAMEWORK OF THE TOOL... 2 4. HOW TO

More information

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works Planned Public Works Projects in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works Planned Projects in Marina Del Rey Waterline Projects Phase II Phase III Roadway Projects Admiralty

More information

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/07/16

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/07/16 198,944.52 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/07/16 330 CONTRACT ID: 092106243 PROJECT: STP 2011(241)TE CONTRACT: 04133003 AWARD AMOUNT: $1,485,304.38 PROJECTED AMOUNT: $1,485,304.37 ADJ. PROJECTED

More information

GUIDELINES - SITE PLAN APPLICATION DRAWINGS

GUIDELINES - SITE PLAN APPLICATION DRAWINGS GUIDELINES - SITE PLAN APPLICATION DRAWINGS GENERAL PLAN REQUIEMENTS All measurements must be in metric Plan scale is to be a standard scale and to suit project requirements. A scale of 1:200 to 1:400.

More information

Klingle Valley Trail - Public Meeting. January 16, 2014 @ 6:00 pm Cleveland Park Library

Klingle Valley Trail - Public Meeting. January 16, 2014 @ 6:00 pm Cleveland Park Library Klingle Valley Trail - Public Meeting January 16, 2014 @ 6:00 pm Cleveland Park Library 1 Tonight s Meeting Objective To provide project updates. To provide an overview of the project. To provide specifics

More information

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project. Smart Transportation Smart Transportation is a key concept for the Paoli Roadway Improvement Project. PennDOT s Smart Transportation Guidebook (2008) outlines a comprehensive approach to transportation

More information

This project is anticipated to require a Negative Declaration due to the potential to effect historical resources.

This project is anticipated to require a Negative Declaration due to the potential to effect historical resources. January 28, 2010 PROJECT DESIGN SCOPE ARROYO SECO BIKE TRAIL FROM SAN FERNANDO ROAD TO AVENUE 26 COUNTY OF LOS ANGELES SUPERVISORIAL DISTRICT 1 CITY OF LOS ANGELES COUNCIL DISTRICT 1 T.G. 594 J6, 7 This

More information

Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount

Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount Engineer's Estimate DiPaolo Company 4350 DiPaolo Center Glenview, IL 60025 Stark Excavating, Inc. 1805 W. Washington Street Bloomington, IL 61701 Rowe Construction 1523 N. Cottage Avenue Bloomington, IL

More information

Exhibit A Scope of Work

Exhibit A Scope of Work Exhibit A Scope of Work The agreement for S.P. 3116-142 (T.H. 169-Cross Range Expressway) includes final design plans for a 1.55 mile length of a 2 lane to 4 lane expansion project located 0.66 miles SW

More information

PROPERTY EVALUATION AND RESERVE FUND STUDY

PROPERTY EVALUATION AND RESERVE FUND STUDY PROPERTY EVALUATION AND RESERVE FUND STUDY COMPLEX NORTH & WEST AVENUES LAS VEGAS, NV Prepared for: HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM ENGINEERS 22 Monument Square Portland, ME 04101 CONTENTS

More information

CD i -STREETS- Detail #

CD i -STREETS- Detail # -STREETS- Detail # 3000 Vertical Curb, Gutter and Sidewalk 3010 Low-Profile Curb, Gutter and Sidewalk 3020 Rolled Curb, Gutter and Sidewalk 3030 Separated Sidewalk, Curb & Gutter 3040 Sidewalk Staged Construction

More information

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix. Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations

More information

COMMUNITY PLAN. Landscaping Standards

COMMUNITY PLAN. Landscaping Standards Section 12 Landscaping Standards 12.1 Introduction The street system and building form set the parameters for the landscaped areas within the community. Typically, buildings and structures dominate urban

More information

CID STREET INFRASTRUCTURE ASSESSMENT

CID STREET INFRASTRUCTURE ASSESSMENT ABSTRACT An evaluation of the street infrastructure in Foxberry Estates Phase 1, including pavement condition, verification of construction techniques, and subgrade quality. Recommendations and costs for

More information

MONETARY GUARANTY PROCEDURE PACKAGE FREDERICK COUNTY, VIRGINIA

MONETARY GUARANTY PROCEDURE PACKAGE FREDERICK COUNTY, VIRGINIA MONETARY GUARANTY PROCEDURE PACKAGE FREDERICK COUNTY, VIRGINIA Department of Planning and Development 107 North Kent Street, Suite 202 Winchester, Virginia 22601 Phone: (540) 665-5651 Fax: (540) 665-6395

More information

Article X Landscape Regulations. Landscaping - Trees

Article X Landscape Regulations. Landscaping - Trees Article X Landscape Regulations Landscaping - Trees 1 LANDSCAPING Division 51A-10.120 Current Code MANDATORY: Single family and Duplex use Uses other than single family and duplex: Perimeter Landscape

More information

STATEMENT OF PURPOSE

STATEMENT OF PURPOSE STATEMENT OF PURPOSE Community Properties, Inc. ( CPI ) is applying to Chatham County for approval of a major subdivision, Meadowview PUD (the Project ), with access to NC 87 and Old Graham Road, just

More information

UNIVERSITY OF MISSISSIPPI FIXED ASSET CAPITALIZATION POLICY

UNIVERSITY OF MISSISSIPPI FIXED ASSET CAPITALIZATION POLICY UNIVERSITY OF MISSISSIPPI FIXED ASSET CAPITALIZATION POLICY The term capitalized fixed assets includes land, improvements to land, easements, buildings, building improvements, vehicles, machinery, furniture,

More information

Date. Resubmit this form during the year if there are changes in your company ownership or financial standing.

Date. Resubmit this form during the year if there are changes in your company ownership or financial standing. COLORADO DEPARTMENT OF TRANSPORTATION CONTRACTOR PREQUALIFICATION STATEMENT (EXPERIENCE, EQUIPMENT AND FINANCIAL) Return to: Contracts & Market Analysis Prequalification Unit 4201 E. Arkansas,4th Floor

More information

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Project Name: Tax Map Parcel: Acreage: Plat: ADC Map & Grid Engineering

More information

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial

More information

Application for Site Plan Approval

Application for Site Plan Approval The is dedicated to meeting the needs of our customers. To Page 1 NOTICE TO ALL APPLICANTS: 1. Prior to making a site plan application, applicants are required to attend a site plan pre-application meeting.

More information

SECTION H - LANDSCAPING

SECTION H - LANDSCAPING H1.00 GENERAL Landscape Plans are to be prepared by a certified professional Landscape Architect who is a member of The Ontario Association of Landscape Architects (OALA). The Landscape Plan shall include

More information

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20

More information

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS 2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS GENERAL 10/16/2008 The listed average unit prices are based on the

More information

Herbicide Application. Irrigation System (Only) Sanitary System Testing & Inspections

Herbicide Application. Irrigation System (Only) Sanitary System Testing & Inspections NAICS Code Work Description Work Item 115310 - Support Activities for Forestry 221310 Water Supply and Irrigation Systems 221320 - Sewage Treatment Facilities 236118 Residential Remodelers 236220 Commercial

More information

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES NAICS CODE Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway (includes 300, 320, 327, 330, 334, 336, 337, 338) Application of prime and tack coats, leveling surfaces and

More information

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT

More information

OSHTEMO TOWNSHIP SIDEWALK/MULTI-PURPOSE PATH CONSTRUCTION STANDARDS

OSHTEMO TOWNSHIP SIDEWALK/MULTI-PURPOSE PATH CONSTRUCTION STANDARDS OSHTEMO TOWNSHIP SIDEWALK/MULTI-PURPOSE PATH CONSTRUCTION STANDARDS CONCRETE SIDEWALK CONSTRUCTION Concrete sidewalk shall conform to MDOT 2003 Standard Specifications for Construction Section 803, Concrete

More information

Preliminary Plan Application and Checklist

Preliminary Plan Application and Checklist ALL APPLICATIONS ARE DUE AT 12:00 NOON ON THE FILING DATE Office Use Only PRELIMINARY / REVISED PRELIMINARY PLAN $300.00 Fee Paid: $ Date Paid: ALL FIELDS HIGHLIGHTED IN RED ARE REQUIRED FIELDS Case No.:

More information

Hamlet of Chappaqua Improvement Project Town Board Technical Presentation

Hamlet of Chappaqua Improvement Project Town Board Technical Presentation Hamlet of Chappaqua Improvement Project Town Board Technical Presentation April 7, 2015 OBTAIN DIRECTION FROM TOWN INFRASTRUCTURE AND STORMWATER MANAGEMENT DESIGN ROADWAY AND TRAFFIC DESIGN OPTIONS STREETSCAPE

More information

Developing Critical Path Method Scheduling (CPM)

Developing Critical Path Method Scheduling (CPM) Developing Critical Path Method Scheduling (CPM) Pretest 1. An activity which is on critical path has a planned duration of 5 days. What is the total float for the activity? a. 0 b. 1 c. 2 d. 3 Pretest

More information

Single Family Residential Erosion and Sediment Control Standards

Single Family Residential Erosion and Sediment Control Standards July 2011 Planning and Development Services Single Family Residential Erosion and Sediment Control Standards This booklet contains standard plans and procedures appropriate for typical residential building

More information

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion Project Overview Sanitary Sewer System 2 Town of Surfside Project Overview Potable Water System 3 Town of Surfside Project Overview Storm Water

More information

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2016

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2016 SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2016 102.5 Bid Deposits The City of Madison bid deposit form is required for all bids unless a Biennial Bid Bond is on file or check deposit is used.

More information

Lake Junaluska Assembly Water and Sewer Capital Improvements Plan 2012

Lake Junaluska Assembly Water and Sewer Capital Improvements Plan 2012 Table of Contents Background, Objective and Method... 2 Capital Outlay - Water System... 3 Capital Outlay - Sewer System... 4 Summary... 4 Water Exhibit... 5 Sewer Exhibit....6 w w w. c a v a n a u g h

More information

Unit Prices. Department of Inspections and Permits 2664 Riva Road, Annapolis, MD 21401 Telephone: (410) 222-7790 Fax: (410) 222-7970

Unit Prices. Department of Inspections and Permits 2664 Riva Road, Annapolis, MD 21401 Telephone: (410) 222-7790 Fax: (410) 222-7970 Department of Inspections and Permits 2664 Riva Road, Annapolis, MD 21401 Telephone: (410) 222-7790 Fax: (410) 222-7970 www.aacounty.org Unit Prices Attached please find the updated costs of unit prices.

More information

CITY OF COOS BAY CITY COUNCIL Agenda Staff Report

CITY OF COOS BAY CITY COUNCIL Agenda Staff Report CITY OF COOS BAY CITY COUNCIL Agenda Staff Report MEETING DATE August 4, 2015 AGENDA ITEM NUMBER TO: Mayor Shoji and City Councilors FROM: Aaron Real, Engineering Technician THROUGH: Jim Hossley, Public

More information

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter

More information

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements Charles County Government Planning and Growth Management P.O. Box 2150, La Plata, MD 20646 (301) 645-0692 Schedule

More information