SCOPE OF WORK (INSTRUMENTATION) CHILLER PACKAGE CPCL EURO IV PROJECT MR No: LC-MR-4010

Size: px
Start display at page:

Download "SCOPE OF WORK (INSTRUMENTATION) CHILLER PACKAGE CPCL EURO IV PROJECT MR No: LC-MR-4010"

Transcription

1 SW01 Page 1 of 8 SCOPE OF WORK (INSTRUMENTATION) CHILLER PACKAGE CPCL EURO IV PROJECT MR No: LCMR4010 A Issued for Bids KT MN RP Rev. No Date Purpose Prepared by Checked by Approved by Format No F1 Rev. 0

2 SW01 Page 2 of 8 Sr. No. Description By Package Vendor By EIL/Owner 1.0 Overall Scope of work 1.1 Design, engineering, procurement, testing, factory acceptance, supply and transportation of Package Unit. 1.2 Site activities eg. site transport, site testing, installation, calibration, precommissioning, loop checking, and commissioning of package unit. 1.3 Site assistance during site installation, testing, calibration, precommissioning, loop checking and commissioning. 1.4 Site acceptance test of complete package and guarantee runs, as applicable. 2.0 Detailed Scope of Work 2.1 Basic Engineering Activities Basic design, sizing, selection (Type, material, range etc), specifications / data sheets, of complete instrumentation including associated NDT requirements as per package requirements 2.2 Detailed engineering, procurement and supply of all instrumentation equipments and related activities (as applicable) for; Instruments as per package requirements Local control panel / panels and instrument gauge boards, Junction boxes, complete with all instruments, as per package unit requirements Complete hardware and software for the fully engineered control system as per package requirements, such as; a) Distributed Control System b) Programmable Logic Controller c) Any other Format No F1 Rev. 0

3 SW01 Page 3 of Complete application engineering of Package unit instrumentation for control system supplied by others (control system not in package vendor scope) as per package unit requirements Fieldbus instrumentation (when specified in Package / Tender) including; a) Complete field engineering including supply of fieldbus components, fieldbarrier, junction box for Field bus and spur cables. b) Complete field engineering as per fieldbus field components supplied by purchaser Supply of all type of cables (e.g. signal, control, power, serial, fieldbus etc) as per specifications and actual requirements; a) Within the Package Unit battery limits. b) Between Package battery limit to Satellite Rack Room (SRR) c) All serial cables or special cables within or outside the package battery limit. d) All fieldbus cables within or outside the battery limit required for the package Interface engineering for the package instrumentation with subpackages and purchaser's control system including supply of interface junction boxes Complete installation material including cables and accessories, junction boxes, pipes/tubes, fittings, valves and valve manifolds, stanchion, instrument supports, cable trays / ducts, prefabricated canopies for instruments, channel base for local panel / system cabinets / consoles, heat tracers, insulation, painting material, etc as required Complete analysers / analyser system, as necessary, as per package requirements Engineering for construction / installation including preparation of all construction drawings and documents Power supply distribution and related Format No F1 Rev. 0

4 SW01 Page 4 of 8 engineering for package vendor supplied items 2.3 Statutory approvals, as applicable (CCOE / PESO, IBR etc.) 2.4 Factory Testing and Acceptance related activities Factory testing, calibration and acceptance as per package requirements for; a) All instruments and related accessories. b) Analysers and related accessories. c) Local control panel and related accessories. d) Control system and related equipments. e) Any other instrumentation item not specifically covered above Participation in factory acceptance testing of control system (when control system is not supplied by Package vendor), and testing as per engineering documents supplied by package vendor. (Note1) 2.5 Installation related activities Installation of all instruments and their accessories in package scope of supply including instrument hookup; a) Within prefabricated skid units. (Note2) b) For nonskid mounted items within the package battery limits. (Note2) Installation of local control panel and gauge boards, as applicable, including supply of all installation material as required; a) Within prefabricated skid units (Note3) b) Nonskid mounted local control panel and gauge board (if any) items but within the package battery limit (Note3) Installation of analysers / analyser system and their accessories, as applicable Installation of control system and related accessories, supplied by vendor, as per package Format No F1 Rev. 0

5 SW01 Page 5 of 8 requirements Laying of all type of cables for package vendor supplied items and cables supplied by package vendor including special cables, system cables etc; a) Within prefabricated skids up to the interface junction boxes. b) Outside the prefabricated skids but within the package battery limits. c) Between package battery limit to Satellite Rack Room (SRR), if applicable. d) Between package battery limit to Main control room (MCR). e) Any other cable not specifically indicated but required to complete the instrumentation related activities Instrument air and its distribution within the package unit battery limit, as required Utility distribution, as required, within the battery limit of the package (such as cooling water, nitrogen, steam) specifically required for Instrumentation activities Earthing / grounding system for package instrumentation items, such as; a) Instruments, analyzers, local panels, gauge board, junction boxes etc supplied by package vendor. b) Control system supplied by package vendor. c) Integration with plant earthing system Auxiliary installation related activities necessary for instrumentation eg; a) Heat tracing of impulse lines and instruments within package battery limits. b) Insulation of impulse lines and instruments as applicable with package battery limit. c) Painting of impulse lines, instrument trays / ducts, structural members, supports within the package battery limit. Format No F1 Rev. 0

6 SW01 Page 6 of Power supply and its distribution; a) Power supply up to battery limit for instruments / analysers / control system (Destination load centre as local control panel / Local control room / local panel as applicable) b) Distribution of power supply within the battery limit of package (e.g. for instruments, analysers, local control panel, subpackaged items etc.) c) Distribution of power supply for control system installed in purchaser's control room. 2.6 Field testing, calibration, loop checking, precommissioning and commissioning activities; a) Field testing, calibration and loop checking of package vendor supplied Items. b) Precommissioning and commissioning of complete package along with control system. c) Only precommissioning and commissioning assistance. 2.7 Site acceptance testing for complete instrumentation fully integrated as per contract requirements. 2.8 Coordination activities; a) Coordination with purchaser during engineering, procurement, factory testing, site activities and site acceptance testing. b) Coordination with various vendors / contractors / manufacturers / sub packaged vendors etc associated with package instrument supplies and services. c) Coordination with suppliers of special instruments / instrumentation items, analysers, control system etc. for availability of their specialist during start up and commissioning. 2.9 Documentation as per Package requirements; a) For all instruments, analysers, equipments, control system as per package requirements. Format No F1 Rev. 0

7 SW01 Page 7 of 8 b) System engineering documentation for control system and related equipments as per package requirements. c) Asbuilt documentation for the complete instrumentation system as per package vendor scope. (Note4) 2.10 Spares and spare parts a) Mandatory spares as per package requirements. i) Pre Defined Mandatory Spares. ii) Engineering spares as defined in package. iii) Consumable spares as per package requirements. iv) Startup and commissioning spares as per package requirements. b) 2 years Operations & Maintenance spares Warranty and warranty maintenance for Instrumentation items Postwarranty maintenance for instrumentation items. _ 3.0 ENGINEERING OF BID PACKAGE 3.1 The package vendor shall be responsible for carrying out the basic engineering for proceeding with detailed engineering for all instruments shown in P&ID attached elsewhere in the package and instrument sizing, utility consumption, specifying derived data in process data sheets, type and material selection of instruments wherever required. This shall also include actual transfer / implementation of the information provided in the form of notes in P&ID and instrument data sheets / equipment data sheets and other documents provided in the tender package. 3.2 The package vendor shall thoroughly review and approve vendor drawings for all instruments and accessories before forwarding to EIL/Owner. Only the approved drawings duly stamped and signed by a competent engineer of the package vendor shall be sent to EIL/Owner. 3.3 The package vendor shall submit all instrument specifications and data sheets as per EIL datasheet, which shall be provided after order. Also instrument specification as per ISA format is also acceptable. On ISA formats, the formats of which are attached to the Instrumentation specification. Format No F1 Rev. 0

8 SW01 Page 8 of The procurement of all instruments shall be strictly from the manufacturers listed in EIL/Owner approved vendor list included elsewhere in this bid package. If EIL/Owner vendor list does not cover some instrument items, the package vendor shall submit the subvendor list for such instrument items for EIL/Owner approval. 3.5 The Purchase Requisitions for all instruments shall consist of specifications / data sheets, special instructions, make / model nos. of instruments, technical catalogues, type test certificates from statutory authorities, standard specifications, inspection and testing requirements, quality requirements, deviation list etc. In case of any deviation from tender documents, the same must be clearly stated in the deviation list along with reasons for the same. In case of no deviation, NO DEVIATION shall be written in the deviation list. In case deviation is not clearly stated in the material requisition and detected in later stage after review of the material requisition, the package vendor shall be responsible for any implication to resolve the deviation. NOTES: 1. Bidder shall verify the implementation of logic and control scheme by DCS/PLC system vendor during FAT and Verification checks shall be carried out before startup. It is the responsibility of bidder to ensure the capacity control scheme fully operational, without which the chiller package is not considered commissioned. 2. The assembly of instruments, probes, transducers, junction boxes, gauge boards with in the skid shall be by bidder and shall be tested at shop. No assembly shall be carried out at site. 3. The local control panel and gauge board shall be provided fully assembled, tested, wired, complete with all instruments, items, terminals boxes and cable entries in installed condition. No assembly will be carried out at site. Only panel installation and termination shall be done at site by others. 4. The Bidder shall provide complete logic for the Package. The logic provided shall be implemented in purchaser s PLC. The completeness and correctness of logic is bidder s responsibility. Format No F1 Rev. 0

INSTALLATION COMMISSIONING

INSTALLATION COMMISSIONING SPECIFICATION PREFACE SHEET DEPARTMENT: Engineering / Electrical SHEET 1 OF 13 AREA: Norðurál Grundartangi Reduction Plant SPEC No: REV: C2 STANDARD TECHNICAL SPECIFICATION FOR INSTRUMENTATION INSTALLATION

More information

Building Commissioning 17900-1

Building Commissioning 17900-1 SECTION 17900 BUILDING COMMISSIONING PART 1 - GENERAL 1.01 WORK DESCRIPTION: A. General: 1. The Commissioning process is a joint team effort to ensure that all mechanical equipment, controls, and systems

More information

NC State University Design and Construction Guidelines Division 26 Fire Alarm Systems

NC State University Design and Construction Guidelines Division 26 Fire Alarm Systems NC State University Design and Construction Guidelines Division 26 Fire Alarm Systems 1.0 Purpose A. The following guideline provides the minimum standards and requirements for fire alarm systems. 2.0

More information

H.V.A.C. Design Plumbing Design

H.V.A.C. Design Plumbing Design H.V.A.C. Design H.V.A.C. Design Mira Costa College Arts Complex CP Upgrade 1. PART 1 GENERAL 1.1. DESCRIPTION SECTION 23 09 00 HVAC INSTRUMENTATION AND CONTROL 2. PART 2 - PRODUCTS 2.1. Materials

More information

270526-TC Grounding and Bonding for Telecommunications Systems

270526-TC Grounding and Bonding for Telecommunications Systems 270526-TC Grounding and Bonding for Telecommunications Systems Part 1 - General Related Documents The following related sections of the OT standards shall also be applicable to this section. OT Engineer

More information

Security Systems Intrusion Alarm

Security Systems Intrusion Alarm Dufferin-Peel Catholic District School Board STANDARD TEXT GUIDELINE FOR Security Systems for SECONDARY AND ELEMENTARY SCHOOLS Prepared by the Plant Department With Assistance from Vision Dynamics Formatted

More information

Mechanical Engineer. Process Engineer. Civil Engineer. PFD 001 - Inlet works and screening 40.0 27. PFD 002 - Membrane Bioreactor 34.

Mechanical Engineer. Process Engineer. Civil Engineer. PFD 001 - Inlet works and screening 40.0 27. PFD 002 - Membrane Bioreactor 34. 1.00 Site Visit / Data Gathering Scope definition & design verification,inspection of the site, Collation of information, Condition report and priorities, Cost estimates and Preliminary programme 35.5

More information

ADDENDUM TO THE CONTRACT. for the. Bartlett Regional Hospital Server Room Cooling System Replacement. Contract No. E12-149

ADDENDUM TO THE CONTRACT. for the. Bartlett Regional Hospital Server Room Cooling System Replacement. Contract No. E12-149 ADDENDUM TO THE CONTRACT for the ENGINEERING DEPARTMENT Bartlett Regional Hospital Server Room Cooling System Replacement Contract No. E12-149 ADDENDUM NO.: TWO CURRENT DEADLINE FOR BIDS: January 20, 2012

More information

SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT

SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION A. The Work specified in this Section consists of designing, furnishing and installing factory-assembled

More information

ISA CERTIFIED AUTOMATION PROFESSIONAL (CAP ) CLASSIFICATION SYSTEM

ISA CERTIFIED AUTOMATION PROFESSIONAL (CAP ) CLASSIFICATION SYSTEM ISA CERTIFIED AUTOMATION PROFESSIONAL (CAP ) CLASSIFICATION SYSTEM Domain I: Feasibility Study - identify, scope and justify the automation project Task 1: Define the preliminary scope through currently

More information

Sample Company SECTION 019113 GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES

Sample Company SECTION 019113 GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES SECTION 019113 GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES A. The Owner will contract separately and directly for the majority of the commissioning work

More information

Degree programme in Automation Engineering

Degree programme in Automation Engineering Degree programme in Automation Engineering Course descriptions of the courses for exchange students, 2014-2015 Autumn 2014 21727630 Application Programming Students know the basis of systems application

More information

HANDOVER OF DISTRIBUTION NETWORK ASSETS (ELECTRICITY & WATER)

HANDOVER OF DISTRIBUTION NETWORK ASSETS (ELECTRICITY & WATER) Procedure # Page 1 of 19 HANDOVER OF DISTRIBUTION NETWORK ASSETS (ELECTRICITY & WATER) Prepared by: Asset Information Department Manager Reviewed by: Asset Management Director Endorsed by: Executive Operations

More information

E-Version SECTION 15318 - CHLORINATION SYSTEM PART 1 - GENERAL PART 2 - PRODUCT

E-Version SECTION 15318 - CHLORINATION SYSTEM PART 1 - GENERAL PART 2 - PRODUCT SECTION 15318 - CHLORINATION SYSTEM PART 1 - GENERAL 1.1. SCOPE OF WORK A. Under this item the Contractor shall furnish and install a sodium hypochlorite solution metering system complete with all accessories

More information

TRANSNET PIPELINES. TPL 25 Tarlton Commissioning Plan

TRANSNET PIPELINES. TPL 25 Tarlton Commissioning Plan TPL 25 Tarlton Commissioning Plan Issue Date: 03/07/2015 Revision No.: A Project No.: 11992 Date: 03/07/2015 Document Title: TPL25 Tarlton Commissioning Plan Author: Edward Standen Revision Number: A Checked

More information

EXTENDED 10 YEAR LIMITED LIFETIME WARRANTY LIMITED LIFETIME WARRANTY

EXTENDED 10 YEAR LIMITED LIFETIME WARRANTY LIMITED LIFETIME WARRANTY EXTENDED 10 YEAR LIMITED LIFETIME WARRANTY Spectrum Manufacturing warrants that the heat pumps and air handling equipment (if purchased with a Water to Water System) manufactured by Spectrum Manufacturing

More information

Engineering Support Services

Engineering Support Services GE Power & Water Water & Process Technologies Support Services for the Automation and Control of Water and Process Applications It Starts with Listening for Customer Value Automation and process control

More information

O C M III. Open Channel Flow Monitor

O C M III. Open Channel Flow Monitor O C M III Open Channel Flow Monitor Part 1. General 1.1 Scope A. This section describes the requirements for an ultrasonic flow transmitter with sensor and temperature compensation probe. B. Under this

More information

A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project.

A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project. DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) SECTION 23 08 02 PART 1 GENERAL 1.01 AUTHORITY (CxA) A. The Commissioning Authority (CxA) has been contracted or will be contracted directly

More information

Statement of Work. 3.0 Details of Service Pre Start-up. - 1 - Cooling Start-up Service. Installation Service. Table of Contents. 1.0 Executive Summary

Statement of Work. 3.0 Details of Service Pre Start-up. - 1 - Cooling Start-up Service. Installation Service. Table of Contents. 1.0 Executive Summary Installation Service Statement of Work - 1 - Cooling Start-up Service Cooling Start-up Service Service 1.0 Executive Summary Table of Contents 1.0 Executive Summary 2.0 Features & Benefits 3.0 Details

More information

C. Conform to requirements of Americans with Disabilities Act (ADA).

C. Conform to requirements of Americans with Disabilities Act (ADA). SECTION 28 31 00 - FIRE ALARM AND DETECTION SYSTEMS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Fire alarm and detection systems 1.2 REFERENCES A. NFPA 70 - National Electrical Code B. NFPA 72 - National

More information

Salof Companies Modularized Gas Liquefaction Plants

Salof Companies Modularized Gas Liquefaction Plants LNG Salof Companies Modularized Gas Liquefaction Plants A modularized approach to save costs, while increasing productivity, quality, safety, and schedule. Salof Companies LNG Table of Contents 1 Introduction...

More information

SWITCHGEAR SOLUTIONS FOR MISSION CRITICAL APPLICATIONS. Presented by SAI Advanced Power Solutions

SWITCHGEAR SOLUTIONS FOR MISSION CRITICAL APPLICATIONS. Presented by SAI Advanced Power Solutions SWITCHGEAR SOLUTIONS FOR MISSION CRITICAL APPLICATIONS POWER DISTRIBUTION RACKS IN A MISSION CRITICAL SYSTEM MODULES IN A MISSION CRITICAL SYSTEM UPS Convertor Main Inverter Load Battery BPC UPS & BATTERY

More information

JAWAHARLAL NEHRU UNIVERSITY

JAWAHARLAL NEHRU UNIVERSITY School of Biotechnology JAWAHARLAL NEHRU UNIVERSITY New Delhi 110 067 Tender No. JNU/SBT/DBT-BUILDER/Data Centre/2015-16 Sealed Quotation for the establishment of a Data Centre for High-End Computational

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 24 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia S TABLE OF CONTENT SCOPE 2 DEFINITIONS

More information

Wired versus wireless trade-offs

Wired versus wireless trade-offs A PUBLICATION OF THE INTERNATIONAL SOCIETY OF AUTOMATION Wired versus wireless trade-offs How to choose for new installations By Moazzam Shamsi Figure 5. Steam trap monitoring with Rosemount 708 wireless

More information

BANGLADESH POWER DEVELOPMENT BOARD. Consulting Services for Ghorasal 365 MW Combined Cycle Power Plant Construction Project

BANGLADESH POWER DEVELOPMENT BOARD. Consulting Services for Ghorasal 365 MW Combined Cycle Power Plant Construction Project BANGLADESH POWER DEVELOPMENT BOARD Consulting Services for Ghorasal 365 MW Combined Cycle Power Plant Construction Project EOI Enquiry No.2320-BPDB(Sectt)/Dev-21/81 Dated: 19.11.2013 DOCUMENT FOR EXPRESSION

More information

Engineered Solutions

Engineered Solutions Engineered Solutions Long established partnerships bring together the world s leading instrumentation companies within BKW. Our manufacturing facility enables us to quickly adapt standard instruments to

More information

Device Management Jonas Berge Emerson Process Management

Device Management Jonas Berge Emerson Process Management Device Management Jonas Berge Emerson Process Management 1 Topics What is intelligent device management? Integrated operations Why do I need a handheld field communicator? With fieldbus, I can do everything

More information

COMMISSIONING OF FIRE ALARM SYSTEMS

COMMISSIONING OF FIRE ALARM SYSTEMS COMMISSIONING OF FIRE ALARM SYSTEMS OWNER FURNISHED The owner directly contracts an independent third party commissioning agent for this project. This Commissioning Plan has been included for reference

More information

SECTION 13421 PROGRAMMABLE LOGIC CONTROLLERS AND COMPUTER CONTROL SYSTEM PART 1 GENERAL. 1.01 Summary. A. Section Includes:

SECTION 13421 PROGRAMMABLE LOGIC CONTROLLERS AND COMPUTER CONTROL SYSTEM PART 1 GENERAL. 1.01 Summary. A. Section Includes: SECTION 13421 PROGRAMMABLE LOGIC CONTROLLERS AND COMPUTER CONTROL SYSTEM PART 1 GENERAL 1.01 Summary A. Section Includes: 1. The ISS shall furnish all labor, materials, equipment, services and incidentals

More information

Ceiling Mount Air Handler Manual

Ceiling Mount Air Handler Manual www.surna.com 303.993.5271 Ceiling Mount Air Handler Manual Models: CMAH12, CMAH18, CMAH24, CMAH30, CMAH36, CMAH48, CMAH60 Revised: September 2014 Table of Contents Warranty Information 4 Limited Warranty

More information

FIRE ALARM AND DETECTION SYSTEMS SECTION 16721

FIRE ALARM AND DETECTION SYSTEMS SECTION 16721 PART 1 - GENERAL 1.01 WORK INCLUDED FIRE ALARM AND DETECTION SYSTEMS SECTION 16721 A. Provide a complete fully addressable, power limited, fire detection and evacuation system. The system shall be connected

More information

Commissioning Plan Preparation Guide. Version 2.0 (Replaces Project Test Plans Preparation Guide, Version 1.0, September 2012)

Commissioning Plan Preparation Guide. Version 2.0 (Replaces Project Test Plans Preparation Guide, Version 1.0, September 2012) Commissioning Plan Preparation Guide Version 2.0 (Replaces Project Test Plans Preparation Guide, Version 1.0, September 2012) September 2013 Commissioning Plan Preparation Guide Contents 1.0 Introduction...

More information

Integrated Custom Systems

Integrated Custom Systems Integrated Custom Systems Compact panels Standard Manifolds & Assemblies Electronic pressure control Custom manifolds & Assemblies Automated test benches S t r e a m l i n e y o u r p r o c e s s Complete

More information

ABB PSPS Erich Steinmann; Generator control-2013

ABB PSPS Erich Steinmann; Generator control-2013 ABB PSPS Erich Steinmann; Generator control-2013 GENERATOR CONTROL THE MODULAR SOLUTION FOR GENERATORS To make sure that power is efficiently converted into electric energy, it is necessary to supervise

More information

Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)

Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) 1. In addition to the information scheduled below, the pre-tender designer is responsible for: (i)

More information

SECTION 16721 FIRE ALARM AND DETECTION SYSTEMS

SECTION 16721 FIRE ALARM AND DETECTION SYSTEMS SECTION 16721 FIRE ALARM AND DETECTION SYSTEMS The equipment requirements of this section apply to the IUB Campus. The IUPUI Campus has a preferred vendor agreement for fire alarm systems. Contact Pat

More information

SECTION 11 78 13 MORTUARY REFRIGERATORS

SECTION 11 78 13 MORTUARY REFRIGERATORS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 11 78 13 MORTUARY REFRIGERATORS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable in

More information

SECTION 28 05 00 COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY

SECTION 28 05 00 COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY SECTION 28 05 00 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specifications Sections, apply

More information

Invitation to Bid FIRE ALARM & DETECTION SYSTEM

Invitation to Bid FIRE ALARM & DETECTION SYSTEM Invitation to Bid FIRE ALARM & DETECTION SYSTEM Responses to an Invitation to Bid will be received by the Purchasing Supervisor, Sumner County Board of Education, 1500 Airport Road, Gallatin, TN 37066

More information

Fundamentals of HVAC Control Systems

Fundamentals of HVAC Control Systems ASHRAE Hong Kong Chapter Technical Workshop Fundamentals of HVAC Control Systems 18, 19, 25, 26 April 2007 2007 ASHRAE Hong Kong Chapter Slide 1 Chapter 5 Control Diagrams and Sequences 2007 ASHRAE Hong

More information

SECTION 23 81 43 HEAT PUMPS

SECTION 23 81 43 HEAT PUMPS SECTION 23 81 43 HEAT PUMPS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Packaged rooftop heat pumps. 1.2 REFERENCES A. American Society of Heating, Refrigerating and Air-Conditioning Engineers:

More information

Project Close Out Summary

Project Close Out Summary Project Close Out Summary 1. Final Cleaning and Inspection 2. Testing and Certification 3. Demonstration of Systems and Equipment 4. Inspections by Authorities Having Jurisdiction 5. O&M Manuals and As

More information

EXPRESSION OF INTEREST

EXPRESSION OF INTEREST EXPRESSION OF INTEREST White Rose Extension Project (WREP) EOI / Prequalification Drag Chains EOI-101414-115 Mustang Canada, Inc is seeking prequalification responses from interested companies for provision

More information

U.S. Department of Energy CSP Program Review

U.S. Department of Energy CSP Program Review U.S. Department of Energy CSP Program Review Award Number: DE-FC36-08GO18035 Speaker: Amanda Steindorf Flagsol LLC May 17 19, 2011 Overview Project Objectives Project Summary to Date Project Impact on

More information

2301.1 Scope: Communications and Electronic Systems addressed in this section include:

2301.1 Scope: Communications and Electronic Systems addressed in this section include: Chapter 23 COMMUNICATIONS / ELECTRONIC SYSTEMS SECTION 2301 - GENERAL 2301.1 Scope: Communications and Electronic Systems addressed in this section include: 1. Fire Alarm System 2. Telecommunication and

More information

ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric energy and heat -

ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric energy and heat - Doc. : 08C00031_e Date : 10.02.2009 Page : 1 / 9 ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric - (Preliminary) Doc. : 08C00031_e

More information

ISA108 Intelligent Device Management (IDM)

ISA108 Intelligent Device Management (IDM) ISA108 Intelligent Device Management (IDM) Intelligent Digital Devices - Have Self-Diagnostics and More Eight-channel two-wire temperature transmitter Intelligent two-wire on/off valve 2 Fully integrated

More information

Prep Plus Bulletin. Bulletin No. 004 August 15, 2007

Prep Plus Bulletin. Bulletin No. 004 August 15, 2007 Prep Plus Bulletin Marine Division Bulletin No. 004 August 15, 2007 Boat Builder Bulletin The 2008 engine model SDS communication connectors have been changed from an 8 pin round housing to a 4 pin square

More information

PROGRAM CRITERIA FOR ELECTRICAL ENGINEERING TECHNOLOGY

PROGRAM CRITERIA FOR ELECTRICAL ENGINEERING TECHNOLOGY PROGRAM CRITERIA FOR ELECTRICAL ENGINEERING TECHNOLOGY Scope These program criteria apply to programs having titles involving Electrical Engineering Technology including: electrical engineering, electrical

More information

REQUEST FOR BID. Server/Computer and VAV Controls with Backup Bid

REQUEST FOR BID. Server/Computer and VAV Controls with Backup Bid 1. INTRODUCTION REQUEST FOR BID Server/Computer and VAV Controls with Backup Bid The Northwest Arkansas Regional Airport Authority is seeking bids for the replacement of VAV box controllers, the shielded

More information

INSTRUCTIONS FOR BUILDINGS WITH FIRE PROTECTION EQUIPMENT

INSTRUCTIONS FOR BUILDINGS WITH FIRE PROTECTION EQUIPMENT INSTRUCTIONS FOR BUILDINGS WITH FIRE PROTECTION EQUIPMENT FIRE EXTINGUISHERS,SPRINKLER SYSTEMS AND FIRE ALARMS Attachment #1 Inspection of Fire Extinguishers Fire Extinguishers must be tested according

More information

Government of Himachal Pradesh Transport Department Shimla

Government of Himachal Pradesh Transport Department Shimla Government of Himachal Pradesh Transport Department Shimla Pre-Qualification of Consultants / Architects for the Construction of I&C Building and Infrastructure for Baddi at Himachal Pradesh On behalf

More information

DELAWARE STATE FIRE MARSHAL FIRE ALARM SYSTEM CERTIFICATE OF INSTALLATION

DELAWARE STATE FIRE MARSHAL FIRE ALARM SYSTEM CERTIFICATE OF INSTALLATION Phone System Owner Phone System Engineered by: of Record Drawings: of System Manuals: of Test Reports: System Installer 1. GENERAL INFORMATION Phone Delaware License No: Certificate Holder No. System Supplier

More information

Alain Nifenecker - General Electric Manager Controls Engineering

Alain Nifenecker - General Electric Manager Controls Engineering GE Energy Benefits of Integrating a Single Plant-Wide Control System Into a Standard Plant Design Philosophy Authors: Luis Cerrada Duque - Empresarios Agrupados Director of I&C Department Charles Weidner

More information

RTP s NUCLEAR QUALITY ASSURANCE PROGRAM

RTP s NUCLEAR QUALITY ASSURANCE PROGRAM RTP s NUCLEAR QUALITY ASSURANCE PROGRAM RTP operates under one quality program, whether you purchase products that are commercial grade, nuclear safety-related or industrial safety compliant (IEC 61508).

More information

Online Vibration Monitoring

Online Vibration Monitoring Brandon DeVier My Background 1992 B.S. Physics 3 years with Predict Technologies 13 years with DLI Engineering Online Vibration Monitoring Systems Experience Online Systems Product Manager 3 years planning,

More information

Section 3 - Evaluation and Qualification Criteria

Section 3 - Evaluation and Qualification Criteria Páge 1 of 13 This Section contains all the criteria that the Employer shall use to evaluate bids and qualify Bidders. In accordance with ITB 34 and ITB 35, no other methods, criteria and factors shall

More information

General LAN Guidelines and Sign off process as mentioned in the Tender Document for High Court Coordinator

General LAN Guidelines and Sign off process as mentioned in the Tender Document for High Court Coordinator General LAN Guidelines and Sign off process as mentioned in the Tender Document for High Court Coordinator Survey and Document preparation Agencies employed for providing LAN System Integration Services

More information

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT 1.1 General 1.1.1 These Special Conditions of Contract supplement the General Instructions.

More information

1. Objective: Guidelines for repair/rehabilitation of AC traction motors.

1. Objective: Guidelines for repair/rehabilitation of AC traction motors. 1. Objective: Guidelines for repair/rehabilitation of AC traction motors. 2. Description of Traction motor: 2.1 The AC Traction motor used in the existing HHP locomotives is a four-pole threephase asynchronous

More information

The Pennsylvania State University ------------- Physical Security Office. Intrusion Alarm. Performance Specification

The Pennsylvania State University ------------- Physical Security Office. Intrusion Alarm. Performance Specification The Pennsylvania State University ------------- Physical Security Office Intrusion Alarm Performance Specification By PHYSICAL SECURITY OFFICE Group (Access Controls & Electronic Security Programs) and

More information

1.0 General. Inspection, Testing, and Maintenance 1 of 8

1.0 General. Inspection, Testing, and Maintenance 1 of 8 1.0 General 1.1 Scope This specifications covers the minimum requirements for the inspection, testing, and maintenance of the existing Notifier fire alarm systems at Bergen Community College (BCC) campus

More information

Data Centre Testing and Commissioning

Data Centre Testing and Commissioning Data Centre Testing and Commissioning What is Testing and Commissioning? Commissioning provides a systematic and rigorous set of tests tailored to suit the specific design. It is a process designed to

More information

SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK

SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK 1 GENERAL 1.1 GENERAL REQUIREMENTS A. This Section is coordinated with and complementary to the General Conditions and Supplementary General Conditions

More information

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F MEDFORD FABRICATION CSC, INC Quality System Manual Date of issue: 03/25/2010 Revision : F Table of Contents System Description 1.0 Introduction 2.0 Company Quality Policy 3.0 Organization Charts 4.0 Quality

More information

SLC Standards Leadership Council

SLC Standards Leadership Council SLC Standards Leadership Council Putting the Focus on Facilities Asset Lifecycle Grant Hartwright 2015-03-19 Copyright 2015 Noah Consulting LLC. All Rights Reserved. Page 1 Putting the Focus on Facilities

More information

HP 3PAR StoreServ 7000 Storage Installation and Startup Service

HP 3PAR StoreServ 7000 Storage Installation and Startup Service Technical data HP 3PAR StoreServ 7000 Storage Installation and Startup Service HP Care Pack Services For a smooth startup, the HP 3PAR StoreServ 7000 Storage Installation and Startup Service provides deployment

More information

ABSTRACT. The Guidelines Section F is related to the Purchasing requirements of NSQ100 (Chapter 7.4). Summary

ABSTRACT. The Guidelines Section F is related to the Purchasing requirements of NSQ100 (Chapter 7.4). Summary Page 1 / 9 ABSTRACT This document is the Section F to NSQ-100 Guidelines. Its objective is to help to the understanding of NSQ-100 requirements through some examples or recommendations and descriptions

More information

EXHIBIT A SCOPE OF WORK

EXHIBIT A SCOPE OF WORK EXHIBIT A SCOPE OF WORK 1. (Contractor) shall provide fire alarm system maintenance/repair/testing services as described herein to the California Department of Veterans Affairs (hereinafter CDVA, CalVet,

More information

A CASE STUDY: PERFORMANCE AND ACCEPTANCE TEST OF A POWER AND DESALINATION PLANT. Keywords : Power Plant, Boiler Capacity, Electrical Power

A CASE STUDY: PERFORMANCE AND ACCEPTANCE TEST OF A POWER AND DESALINATION PLANT. Keywords : Power Plant, Boiler Capacity, Electrical Power A CASE STUDY: PERFORMANCE AND ACCEPTANCE TEST OF A POWER AND DESALINATION PLANT Atef M Al Baghdadi Water and Electricity Authority Abu Dhabi, U.A.E Keywords : Power Plant, Boiler Capacity, Electrical Power

More information

PART A. Option 1: City Hall & POA Supply and Install Lenel Onguard Security Upgrade and supply and Install Axis IP Cameras

PART A. Option 1: City Hall & POA Supply and Install Lenel Onguard Security Upgrade and supply and Install Axis IP Cameras PART A Option 1: City Hall & POA Supply and Install Lenel Onguard Security Upgrade and supply and Install Axis IP Cameras General The City of Guelph has standardized on Lenel OnGuard as the corporate access

More information

Quality Assurance Manual. QAM-2013-Rev2

Quality Assurance Manual. QAM-2013-Rev2 QAM-2013-Rev2 President s Policy and Authorization of Quality Control The management system for the Steel Structural Fabrication of Pinnacle Industrial Services entrusted through furnishing high quality

More information

Technical Specifications for West Campus Data Center HVAC System

Technical Specifications for West Campus Data Center HVAC System Technical Specifications for West Campus Data Center HVAC System I. Mechanical Systems Requirements A. HVAC Primary Data Centers, Automation HVAC is to be provided on a 24 hours per day, 365 days per year

More information

Acceptance Codes APPENDIX - A. Acceptance Criteria

Acceptance Codes APPENDIX - A. Acceptance Criteria 1111 Receipt of a satisfactory Test Report from WSDOT Materials Laboratory is required indicating the lot (or lots) or batch of material meets the requirement of the specifications under which it is listed.

More information

Condensing unit type EPSILON-ECHOS LE Technical information manual

Condensing unit type EPSILON-ECHOS LE Technical information manual Condensing unit type EPSILON-ECHOS LE Technical information manual 2 > EPSILON ECHOS Water chiller > EPSILON ECHOS /HP Reversible heat pump > EPSILON ECHOS /ST Water chiller with storage tank and pumps

More information

Programming Logic controllers

Programming Logic controllers Programming Logic controllers Programmable Logic Controller (PLC) is a microprocessor based system that uses programmable memory to store instructions and implement functions such as logic, sequencing,

More information

How To Manage A Project

How To Manage A Project Project Management - Maintenance Management p. 105 to 112 Project Management - Maintenance Management PGP / OCP-E PGP / OCP Project Management Major Grassroots Projects 5 Days Level: Foundation To provide

More information

Provide Outsourcing services In the areas of Engineering Design & Project Management Consultancy Services

Provide Outsourcing services In the areas of Engineering Design & Project Management Consultancy Services Indian Pride in Engineering and Consultancy Provide Outsourcing services In the areas of Engineering Design & Project Management Consultancy Services CON S S Business Objectives Multi-discipline Engineering

More information

Consultancy Services Proposal

Consultancy Services Proposal Consultancy Services Proposal August, 2007 ISO 9001 : 2000 CERTIFIED www.genivar.com 5858 Côte-des-Neiges Rd, 4 th Floor, Montreal, Quebec, Canada, H3S 1Z1 Telephone: (1) 514 340-0046 Fax: (1) 514 340-2847

More information

INQUIRY. www.synthosgroup.com

INQUIRY. www.synthosgroup.com INQUIRY CONTRACTOR SELECTION for EPCM quote for investment deal: Construction of Waste to Energy (WTE) facility for SYNTHOS DWORY 7 Sp. z ograniczoną odpowiedzialnością S.K.A. in Oświęcim Extent of inquiry:

More information

Terms of Reference. to INQUIRY No: 04/2014

Terms of Reference. to INQUIRY No: 04/2014 Nowa Sól, 26.05.2014. Terms of Reference to INQUIRY No: 04/2014 For the investment project " EGG WHITE PROTEIN MEMBRANE UNTRAFILTRATION DEVICE in the project titled: "Getting new products by isolation

More information

GUIDELINES FOR AUGUST 1995

GUIDELINES FOR AUGUST 1995 GUIDELINES FOR ELECTRICAL ENGINEERING SERVICES AUGUST 1995 PUBLISHED BY: PROFESSIONAL ENGINEERS AND GEOSCIENTISTS OF NEWFOUNDLAND & LABRADOR (PEGNL) P.O. Box 21207, St. John's, NL A1A 5B2 Telephone: (709)

More information

Heating, Ventilation, Air Conditioning and Refrigeration (HVACR)

Heating, Ventilation, Air Conditioning and Refrigeration (HVACR) Heating, Ventilation, Air Conditioning and Refrigeration (HVACR) I. Demonstrate safety skills in typical HVACR work situations to NATE Core Installer Knowledge Areas for Technician Excellence for Safety

More information

COMMISSIONING OF HVAC SYSTEMS

COMMISSIONING OF HVAC SYSTEMS FORM CL-01 SYSTEMS / EQUIPMENT INCLUDED : SYSTEM STARTUP CHECKLIST I - PRE - STARTUP INSPECTION EQUIPMENT MOUNTING & SETTING CONTROL, INTERLOCK & POWER WIRING ALIGNMENT OF MOTORS & DRIVES PIPING, CONNECTIONS

More information

Buckeye Detection Systems Fixed Detection Systems Application Survey

Buckeye Detection Systems Fixed Detection Systems Application Survey Buckeye Detection Systems Fixed Detection Systems Application Survey Channel Partner Representative : Company Name: Representative: BDS Representative: Client Contact Information : Company Name: Company

More information

Provision of Accounts Payable Service

Provision of Accounts Payable Service Oman LNG LLC Pre-Qualification of Tenderers NGF-14-761 Provision of Accounts Payable Service GUIDELINES Response to this questionnaire shall be completed in English by a senior member of your company.

More information

ADS Chapter 564 Security Communications

ADS Chapter 564 Security Communications ADS Chapter 564 Security Communications Document Quality Check Date: 10/02/2012 Partial Revision Date: 12/30/2011 Responsible Office: SEC/CTIS File Name: 564_100212 12/30/2011 Partial Revision Functional

More information

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet.

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet. INTRODUCTION This document describes an inspection system broken down into four separate levels. When Inspection Level IV is invoked, this system meets the requirements of former MIL-I-45208A. The primary

More information

ELECTRICIAN TRADE REGULATION

ELECTRICIAN TRADE REGULATION Province of Alberta APPRENTICESHIP AND INDUSTRY TRAINING ACT ELECTRICIAN TRADE REGULATION Alberta Regulation 274/2000 With amendments up to and including Alberta Regulation 122/2014 Office Consolidation

More information

RADIATION MONITORING SYSTEMS

RADIATION MONITORING SYSTEMS RADIATION MONITORING SYSTEMS Area monitors Process monitors In-line, Adjacent-to-Line monitors Local/remote processors, Data Acquisition Systems NUPIC Certified, NRC Approved Vendor Wide Range Sensitivity

More information

Special Specification 6033 Computerized Transportation Management System

Special Specification 6033 Computerized Transportation Management System 6033 Special Specification 6033 Computerized Transportation Management System 1. DESCRIPTION Relocate computerized transportation management system (CTMS) equipment as shown on the plans and as described

More information

SECTION 16720 - FIRE AND SMOKE ALARM SYSTEM. City of San Diego, CWP Guidelines

SECTION 16720 - FIRE AND SMOKE ALARM SYSTEM. City of San Diego, CWP Guidelines PART 1 -- GENERAL 1.1 WORK OF THIS SECTION SECTION 16720 - City of San Diego, CWP Guidelines A. The WORK of this Section includes providing manual and automatic fire alarm and smoke detection systems meeting

More information

Procurement Specification for a High Security Lift Arm Barrier (HSLAB) EB950 CR Armstrong High Security Lift Arm Barrier

Procurement Specification for a High Security Lift Arm Barrier (HSLAB) EB950 CR Armstrong High Security Lift Arm Barrier Procurement Specification for a High Security Lift Arm Barrier (HSLAB) EB950 CR Armstrong High Security Lift Arm Barrier A. Requirement This document is to be used to specify the physical and operational

More information

TECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.)

TECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.) TECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.) 1. Requirement: Two (02) Nos. DC Type, 3 phase, 3 wire Projection Welding Machine is required for welding of ventilation M.S. / Stainless

More information

ALL CLEAR ON THE BACK SIDE!

ALL CLEAR ON THE BACK SIDE! Future Solutions Now Presenting the M-2000 family of control systems for use in both hollow glass and press ware operations. The Integrated System is comprised of individual controllers networked together

More information

713 Open Channel Flowmeter and Transmitter. All-in-one package for open channel flow measurement.

713 Open Channel Flowmeter and Transmitter. All-in-one package for open channel flow measurement. and Transmitter All-in-one package for open channel flow measurement. 3.1 NEW Class 1, Division 1 Approved Sensor As our products are continuously improved, we reserve the right to make any change in the

More information

SPARE PARTS EXPLODED VIEW GAS WALL BOILERS Model GENUS PREMIUM FS CUENOD. R8216470-01EN - Edition 01-26/10/2009

SPARE PARTS EXPLODED VIEW GAS WALL BOILERS Model GENUS PREMIUM FS CUENOD. R8216470-01EN - Edition 01-26/10/2009 Instantaneous Gas Water Heaters Storage Gas Water Heaters SPARE PARTS EXPLODED VIEW GAS WALL BOILERS Model R8216470-01EN - Edition 01-26/10/2009 Boilers CUENOD Renewable 3121488 12 EAA1...... 3124527 25

More information