1 Proceedings of Bridge Engineering Conference April 007, University of Bath, Bath, UK CRITICAL ANALYSIS OF THE LONDON MILLENNIUM FOOTBRIDGE James D. Boam University of Bath Abstract: This paper is a subjective assessment of the aesthetics, choice of design, construction method and refinements of the Millennium Bridge in London. The paper explains what caused lateral vibrations in the bridge earning it the name The Wobbly Bridge and how this problem was rectified. In addition the success of the bridge and its affect upon London will be discussed. The paper also contains simplified calculations in order to perform a basic structural analysis of the bridge. Keywords: London Millennium Bridge Suspension Bridge Lateral Vibrations Aesthetics 1 Introduction The Millennium Bridge in London is a steel footbridge across the River Thames between the Southwark Bridge, downstream, and Blackfriars Railway Bridge, upstream. The bridge is a suspension bridge and runs from the Tate Modern on the south bank towards St. Paul s Cathedral north of the river. The bridge was originally opened in June 000 but shut soon after due to unexpected swaying. After modifications and testing, the bridge was reopened in February 00. which are dominated by tall towers and noticeable main cables. Without the clear load paths that are seen on most suspension bridges it would not be unreasonable for users to assume that this bridge was long, slender and unsupported along its spans. From an engineering point of view it is difficult, despite the subtle nature of the cables, to look at the cables and not instantly appreciate their structural importance. Bridge Aesthetics Analysis of the Millennium Bridges aesthetic qualities shall be done by considering Fritz Leonhardt s ten areas of aesthetic design..1 Fulfilment of Function To satisfy this aspect of bridge aesthetics it must be clear when looking at the bridge how the structure works. Unfortunately with this bridge it is not particularly clear how the bridge works. The shallow profile and suspension cables running beneath the level of the deck makes them hard to see which is unlike most other suspension bridges Figure 1: Slender profile of the bridge makes its structure less conspicuous

2 . Proportions of the Bridge The shallow profile of the bridge is easy on the eye. The cables running both above and below the level of the deck does not make the bridge appear unusually thick as plenty of light is allowed to pass through the cables and deck connections. The piers for the bridge are thick concrete to protect the bridge from collisions with boats. This has the potential to spoil the proportions of the bridge but is cleverly avoided by using elliptical shaped piers. Here the slender appearance from the side is maintained, but as the bridge is viewed along its length the shape of the piers keeps the bridge in proportion. None of the bridge members look oversized, with a nice transition in thickness being achieved on the columns that connect the concrete pier to the rest of the bridge. The low profile of the bridge aids in preventing shadow upon the bridge.. With no towers or cables above the line of the deck it prevents casting the bridge areas of the bridge into shadow. Shadowed regions along the bridge would be undesirable due to the metallic finish and this shows a lot of attention has been devoted to combining the structure and aesthetics..3 Order The main cables of the bridge follow an elegant parabolic shape between the piers and gently fall down to their anchors at each end of the bridge. The cables do not only curve in a vertical direction, when viewed head on they curve horizontally too. This adds shape to the bridge from all angles but keeps the overall appearance smooth on the eye. The connections between the main cables and the deck sections are regular but not so close that they make the bridge look busy. As the connections gently rotate from the vertical along the length of the bridge it helps to move the eye across the whole bridge. The rounded piers and column forks help with the smoothness of the bridge and the continuity of curved edges and surfaces. both sides of it. There is little thickness to the bridge as it is steel so there are few visibility issues. The piers have been tapered which avoids them looking thicker at the top than the base and the central span is much larger than the side spans. The structure of the bridge and its setting do not leave it susceptible to finer aesthetic issues..5 Integration into the Environment Throughout London there is a large variation in architectural styles based on the cities development through time. The bridge compliments some of the nearby buildings, the modern offices and apartments, and in the skyline to the north the impressive modern financial buildings of the city. In contrast, the bridge stands out wildly to the nearby Globe theatre and St. Paul s Cathedral that it points to in the north. The metallic surface of the bridge is wildly dissimilar to the timber framework ad thatched roof of the Globe and the masonry cathedral. The bridge is right in front of the Tate Modern gallery and this is the perfect setting for the bridge. The contemporary styling of the bridge almost warrants it being classed as art and is an ideal route into the gallery. The bridges boldness and diversity is the reason why it fits into the surroundings. The mesh of different architectural styles within London means that by being of the time it integrates very well into the environment. Figure 3: Millennium Bridge in front of the Globe theatre and Tate Modern gallery.4 Refinements Figure : Elegant Shape of the bridge The innovative feature of this bridge is its low profile considering it is a suspension bridge. This allows for clear views up and down the River Thames and of buildings on.6 Texture The bridge s all over smooth metallic finish is striking but it is dull so the bridge does not shimmer or give off any glare when it is sunny. This contemporary finish fits in well with the ethos of the Tate Modern as mentioned before. The piers have a rough concrete finish which looks fine, but the harsh transition in finishes between the piers and the smooth metallic forked columns does not look right. For a bridge with such smooth flowing lines the abrupt cut off between the steel and the concrete does stand out, although the similar colours go some way to reduce this effect..7 Colour

3 The shallow profile of the cables that run alongside the deck for a vast majority of the bridge are coloured the same as the deck so they are highlighted as little as possible. The metallic finish is an effective way of ensuring a modern appearance for the bridge and making sure that it stands out amongst many brick, masonry and concrete structures. At night, the lighting along the length of the bridge displays the Blade of Light concept of the bridge. Figure 5: Spine like underside of the bridge Figure 4: Bridge at night showing Blade of Light Concept.8 Character Bridges with character all seem to have something unusual about them that set them apart but without being too ridiculous. The Millennium Bridge does posses a lot of character and this is down to its unusual form. It is a very flat suspension bridge and when comparing it to others it does stand out..9 Complexity The most complex feature of this bridge is the path of the main cables. They weave through both horizontal and vertical planes unlike ordinary suspension bridges which does fascinate the viewer most notably when looking along the length of the bridge. The innovative connectors between the bridge deck and the cables, although more complex, do not have the same affect. Their complexity is ignored by the viewer due to their apparent necessity..10 Nature Given the bridges setting, its modern appearance and that it is a suspension bridge it is unlikely to show any likenesses with nature. There is one similarity and it is best shown when beneath the level of the deck. The saddle shaped connectors between the deck and the cables look like vertebrae making the bridge seem like a spine..11 Aesthetic Summary The Millennium Bridge is an aesthetically pleasing bridge and its alternative form is fitting for both its immediate visual surroundings and the entire city of London. Although its structural function may not be entirely clear the bridge is still well proportioned and easy on the eye. 3 Design and Construction The choice of suspension bridge to cross a body of water of this size is not an irregular one, even for footbridges. The irregularity comes in the form of the suspension bridge, and this irregular shape adds a few problems into the design and construction. As it is so slender in profile, it requires the cables to be under unusually high tensile forces. These high forces have to be transferred into the ground and will require large and therefore expensive foundations. An arch bridge of three spans could have been used over the bridge but this would also have created large horizontal forces at the abutments. A tied arch central span, with the deck as the base, with simple beam bridge outer spans could also be used, but this would sacrifice the views. A similar problem would be encountered with a cable stayed bridge. Truss bridges would be too thick for the Blade of Light concept the designers envisaged. For a slender deck with few piers only suspension and cable stayed bridges are an option. To maintain the views the innovative low cable suspension design works but a similar cable stayed design seems to be less feasible. 3.1 Abutments The first stage of construction, as with almost all structures, is the foundations for the bridge piers and abutments. The foundations for the north and south abutments are both pile foundations with the sixteen piles at the north abutment and twelve piles at the south abutment. All piles are.1metres in diameter and are 8metres long and both sets of piles have a 3metre pile cap [1]. The horizontal forces from the cable at the north abutment are transferred to the pile cap via reinforced concrete beam which is connected to 1metre thick vertical shear walls. The proximity to the river and the need to transfer very large forces into the soil meant that footings

4 and other shallow foundations would have been impossible to use. An area in front of the abutment below the steps up to the bridge is used as a basement and car park for the nearby school which also would have limited the plan area of the foundations. Foundations for the south abutment of the bridge were not restricted by any underground developments, but their proximity to the river and magnitude of forces meant that pile foundations had to be used. The cables posed more of a problem, as given the geometry of the bridge, the cables and bridge deck reach the position of the abutment but approximately 3.5metres above ground level. This is what has formed the needle at the south end where the deck bifurcates and then doubles back down to ground level. Where the deck doubles back it sits on top of a large concrete ramp which is connected to the pile cap. The cables, however, are anchored back using a strut and tie. This is a clever way of gaining height without requiring extra land to bring the bridge down or materials for extra lengths of deck and cables. However, by cantilevering the cables out past the foundations, the large axial forces may try to overturn them. This is an undesirable effect as it induces moments and puts a lot of strain on the ground. horizontally it would have made it very difficult to have vertical piers. 3.3 Cables Figure 7: Bridge foundations and structure Once the foundations, piers and abutments are in place the next phase of construction is to add and anchor the cables. The cables used for the Millennium Bridge are Lock-Coil Cables. A galvanized, interlocking outer layer of wires holds all the interior trapezoidal and circular wires in position and prevents muck and grime getting in to them [3]. The choice of these cables could be an attempt to protect them from the corrosive moisture in the air, increasing their life and reducing the likelihood of replacement. Other types of cable, like wire strand core and structural core may have been a better choice. Although not as impermeable to the weather they would have been much easier to make, requiring only one or two different types of wire making it much more economical. Figure 6: South Abutment and cable strut and tie Both sets of foundations and the abutments on top of them were constructed in situ. This is a lot more viable than trying to transport twenty-eight 8metre long piles into the centre of London. 3. Piers For each of the pier foundations two 6metre diameter caissons were dug to a depth of 18metres below the river bed within a sheet pile cofferdam []. The caissons were backfilled with reinforced concrete and connected to the pier by a 3metre pile cap. The original design used driven pile foundations for the piers. Presumably it was decided the bulkier caissons would ensure better resistance to a collision with a vessel and provide a stiffer support for the cables. Each pier was constructed from three prefabricated sections each 5metres tall with gradually reducing cross sections. The steel forks at the top of the piers are connected to the concrete using sleeved high strength steel bars. As the cables move away from the supports Figure 8: Spinning of the cables about to begin after the piers are in place The cables themselves are all 10mm in diameter and run in two groups of four on either side of the deck. If this is the required area of steel then the proportions of the cables are about right. Two cables on each side may have still looked reasonable but a single coil would appear oversized. A problem with having four cables on each side is that each saddle has to have four different

5 connection points on each side, which is very unusual and will add cost in fabrication. Should any of the cables be damaged, by an accident or not, the number of cables means that the structure should have more chance resisting failure. The cables were most probably wound on site. Guide lines would lead the cable spinner over the route of the cable gradually building up the cable thickness. This seems much more practical than spinning the cable offsite and attempting to hoist it in to place and anchor it afterwards. Once completely spun and anchored back, the cables were fixed at the top of the piers using saddles. This is necessary as the piers do not add much stiffness to the deck, so under live loading the bridge would deflect a lot if the cables were allowed to slide at each pier. This also means the spans can act with some independence should a span collapse. not as strong. This decision will have a relatively small effect on the overall cost of the project considering the extensive earth works. If it reduces the long term maintenance costs of the bridge then it may prove to be a wise decision. The irregular path of the cables at shallow profile means that the deck gets a lot of its stiffness from the cables. This means that the deck does not to be braced to resist deflections from lateral wind loads []. With the cables being under so much tension and without much stiffness from the piers the deck is subject to quite large vertical deflections under live loading. To accommodate this, the bridge deck is not continuous. The deck is prefabricated into 16metre sections that are connected by movement joints. This clever design not only eliminates any stresses that would be caused by movement of the cables, but from temperature variations too. Construction is simplified too as these sections can be relatively easily slotted together. To fit these sections in place they were probably lifted into place from a barge once the cables were fitted. Figure 9: Cabling fixing at pier 3.4 Deck and Saddles There are four main components to the bridge deck and saddles; the arms, the edge tubes, the aluminium deck and the movement joints. The arms that connect the deck to the cables occur at every 8metres along the deck and are hollow box section. They vary in pitch to account for the cable paths and taper down from 450mm square at the deck to 5mm square at the cables [4]. The use of rigid arms instead of cables had to be done, as at parts of the bridge the cables hang below the height of the deck. Connecting cables would not be able to support the bridge as they would hold no tension. The rigid arms will have been used along the whole length of the bridge for aesthetic continuity. Spanning between each of the arms are steel edge tubes. These hollow circular tubes are approximately 350mm in diameter and hold up the bridge deck and the bridge lighting and balustrades [5]. The aluminium deck is 4metres wide and formed from extruded box sections. As the balustrades and the lighting are directly attached to the steel edge beams, the deck only has to cope with the live load. The design of the lighting means that, even from foot level, there is enough light at night time to negate the need for overhead lights. This aids the aesthetics of the bridge tremendously and keeps the profile slender. The choice of aluminium as a bridge deck is simply a compromise. Aluminium is more resistant to corrosion to steel but is more expensive and Figure 10: Movement joint Another feature of the bridge deck is the bifurcating section as the bridge moves over the south abutment. The effective widening of the bridge reduces its torsional restraint and this is balanced by increasing the size of the steel edge beams. As mentioned before this is a sophisticated way of reducing the amount of materials and foot print of the bridge even though it creates some added problems. There is space behind the existing bridge that could have been used to bring the bridge down in a more conventional manner. The problem with this, apart from more materials, is that it takes the bridge entrance away from the south bank walkway and would detract from people using the bridge. Although not used for any particular purpose the ground behind the bridge is a nice open space in front of the Tate Modern, another possible reason not to build upon it. 4 Loading The Millennium Bridge will have a relatively small dead load due to the lightweight deck and steel edge

6 beams. The super-imposed dead load is also relatively low as only the balustrades and tube lighting contribute to this. The live load acting on the bridge is only pedestrians as it is a footbridge. Wind was anticipated to have a minimal effect due to the deck structure and stiffness from the cables, but was modeled anyway. Temperature effects are also lessened by the deck movement joints but this still needs to be checked for differential movements and overall expansion or shrinkage. As this is a steel bridge it is unaffected by creep and can therefore be ignored. 4.1 Dead, Super-Imposed Dead and Live Loads Some of the dimensions for different structures will have to be assumed from drawings as exact figures are unavailable [5]. Due to the voided nature of a lot of the elements of the deck, specific unit weights were also taken from technical drawings [5] and shown below. We are assuming g = 10N/Kg and that the unit weight relates to half of the bridge as there are two cables. Table 1: Weight of Materials in Bridge Material Weight (kn/m) Balustrades 1. Aluminium Decking 1.1 Steel Edge Beams 1.4 Steel Arms 0.9 Cables 3.60 Note that the bridge cross section varies, especially where the deck bifurcates and for calculations on the individual spans more accurate dead load measurements will be taken. For each different span of the bridge the overall dead and super-imposed dead loads are as follows. Despite the change in section the loads are assumed to act as uniformly distributed loads (U.D.L s). The bridge spans are numbered 1 for the North span, for the central span and 3 for the southern span. Table : Dead and Super-Imposed Dead Loads on Each Bridge Span Span Dead Load (kn/m) Super-Imposed Dead Load (kn/m) The bridge is designed to carry a maximum of five thousand pedestrians. Assuming that the average person weighs 750Newtons, and taking the bridge length at 333metres it equates to a live load of 11.3kN/m. 4. Wind Loading Wind loading for this project was analysed in a wind tunnel during the early design stages but a simple worst case check can be performed. The movement joints in the deck should allow for deflections due to the wind, it shall be assumed that they have all seized up. The analysis treats the wind acting as a point load on the centroid of the section of the bridge being analysed. This is an unrealistic assumption as the wind will in all likelihood work upon the entire bridge. First the wind speed must be calculated using Eqs (1) and applying reduction factor m for footbridges. This is being calculated for span which would feel the greatest wind force. v c = vk. (1) 1S1S Table 3: Values for Eqs (1) 1 = 6ms K v = S = 1 1 S = 1. 0 = 0.8 = 31ms 1 m v c From here the total wind force on the bridge is calculated using Eqs (). Pt qa1c D Where q is defined in Eqs (3) =. () 0.613vc q =. (3) Table 4: Values for Eqs () and Eqs (3) q = 589N / m A 1 = 7m C = 8 P t = 339kN D P L and P V are being ignored. The slender profile of the bridge and pedestrian function creates a negligible P L and the interaction between the three spans from vertical loading greatly minimizes the effect of the already small force P V. A downward force on the central span causes the outer spans to rise. This cancels out the bending moment in the spans and the small value of P V means it will have little effect on any hogging moments at the piers.4.3 Temperature Effects For assessing temperature effects it must again be assumed that all the movement joints along the length of the bridge have been clogged up. Now the bridge must expand as an entire entity when exposed to heat. As one end of the bridge cantilevers away from the abutment it shall be assumed that overall expansion or contraction will cause little effect in the stress state of the bridge. Were the bridge restrained at both ends, and assuming that the bridge was built at fifteen degrees Celsius, the maximum temperature variation in London for a footbridge would be 5degrees Celsius. This equates to 300micro strain (300 x 10-6 ) and total bridge shrinkage of about 10cm. This results in an additional 60N/mm of tensile stress being carried by the bridge. The 0 degree increase in temperature results in 48N/mm of additional compressive stress in the bridge. For differential temperature across a section a group must be assumed. As the bridge is steel and aluminium it shall be considered as a group 1 bridge. This gives a

7 Positive temperature difference shown in Fig. (10) and Table 5. h h 1 h h 3 0 Figure 11: Positive Temperature Differences for Steel Bridge Table 5: Values of T x for Fig. (10) T 1 =4 C T =14 C T 3 =8 C T 4 =4 C This distribution can be assumed to be linear between 0 C and 4 C. This gives linear strain and therefore linear stress variation through the section adding 58N/mm of tension at the extreme fibres of the deck. 4.4 Strength of Components and Load Combinations First the deck must be analysed to see if it can tolerate the imposed load from the bridge users combined with its own self weight. The aluminium decking would also need to resist some additional stresses from temperature variation, but due to the thin deck these would not have a great affect. The Steel Edge beams have to be checked that they could carry the dead weight of themselves, the bridge deck and the imposed-dead load of the balustrades combined with the live load. There will be a minor affect from the wind but most of this will be taken by the suspension cables. By combining the loads with their relevant factors of safety, the 8metre hollow circular tubing can be checked in bending. By combining differential temperature effects with these loads it should show the worst case loading for this member. Table 6: Loads acting on each steel edge beam Member Load Factor Load (kn/m) Aluminium Deck Balustrade Steel Edge Beam Live Load The combined load to be carried by the steel edge beam is 1.56kN/m of beam. The maximum moment, assuming the edge beam is simply supported is calculated using Eqs. (4). T 4 T 3 T T 1 M MAX = ωl. (4) 8 M MAX is 17kNm. The edge beam is circular hollow and has an outer diameter of 350mm. By assuming a reasonable thickness of 14mm and a maximum permissible stress of 355N/mm, it is possible to estimate the stress in the extreme fibres of the beam due to dead and live loads using Eqs. (5). M MAX MAX = σ. (5) Z, the plastic modulus of the section is 150cm 3 meaning σ MAX is 138N/mm. The effect of the differential temperature chance needs to be added too. As the beam is only 350mm deep the temperature change is in fact only 16 C. This means the strain is only 19 micro strains. This in tern means that the additional stress in the bridge is only another 38N/mm. The total estimated stress is therefore 176N/mm and below the permissible level. It is likely that the circular section is thinner and it is possible that a more standard strength of mild steel (σ=75n/mm ). The saddles then have to be checked to make sure that they can carry each 8metre section of the deck onto the cables. The saddle arms appear to be thick enough to carry the loads. Combined temperature with dead and live loads would most probably be the worst load and would need to be analysed. The Cables are the next part of the structure to be analysed. Many assumptions must be made to estimate the tension in the cables. First we must assume that under the loads the cables do not deflect but we know they will deflect quite heavily as there is little stiffness in the supporting piers. We are also assuming that the each individual cable span is independent of the other and unaffected by the change in geometry and stiffness of the deck. Applying loads to different spans of the bridge will have a large affect on the tensions in the cables even though the cables are fixed at the piers. The lengthening of the cables is also neglected in the analysis. With such a shallow profile and therefore such high forces in the tension cables it is possible that the tension cables could stretch quite a lot. By applying the right load factors we can find the total load taken by one bank of four cables. Temperature effects are less likely to affect the cable as much as wind. The geometry of the cable means it has stiffness in both horizontal and vertical planes. To simplify the example the cables will be modeled as two separate cables, one in the vertical plane taking the bridge loading and the other in the horizontal plane taking the wind loading. The tensions of these imaginary cables will be resolved into the plane of the actual cable. Note that the wind blows from the side and will only be carried by one set of cables for worst case analysis as the other set will be assumed to not be in tension. The loads acting on the cable are shown in Table 7. The wind load has been converted into a U.D.L. to make it possible to analyse. The point load was simply divided by the span to get its force per unit length. This is more like wind loading which is evenly distributed and should not be modeled as a point load. Z

8 Table 7: Loads acting on each bank of Cables Member Load Factor Load (kn/m) Aluminium Deck Balustrade Steel Edge Beam Cables Live Load Wind Load The horizontal length of the cable in the centre span is 144metres and the sag is.3 metres. The total vertical load carried by the cable is.5kn/m. Using the cable geometry it is possible to calculate the horizontal force needed at each support to hold the cable in shape with Eqs. (6). H ωl =. (6) 8 f The horizontal force comes out at 5.4MN. To get the tension in the vertical cables the force must be resolved with the vertical reaction at one node of the cables. This is simply half of the applied vertical load which is 1.6MN. Using a triangle of forces the tension in the cables is 5.5MN The horizontal cables only have to take the wind load. The effective sag of these cables is approximately 1.75metres and the horizontal length is again 144metres. Using Eqs. (6). again the horizontal reaction is 3.48MN. The vertical reaction is half the total load, 169kN. Using the triangle of forces the tension in these horizontal cables is 3.48MN. Now these two tensions can be resolved to get the final tension of the actual cables. The final force carried by the worst case four cables is 5.7MN. The cables now need to be checked to see if they can resist this force. The force in each cable is a quarter the total force, assuming it is distributed evenly among the cables. We know the area of each cable, and it is reasonable to assume that the cables will be high tensile steel, with a strength of around σ=1600n/mm. Using Eqs. (7) we can calculate the stress in the cables. end of the forks. The bases of the forks are approximately.5metres in diameter and are heavily anchored into the concrete section of the pier. At this size the piers will have no trouble in supporting the cables. 5 Serviceability and Refinements The bridge was well designed to stand up under ultimate limit state and had no problems coping with the large crowds on its opening. One well documented and very noticeable flaw were the large lateral vibrations experienced by the bridge after opening. Some people on the bridge were unable to continue walking and the vibrations started to become hazardous to bridge users. These were unacceptable serviceability conditions and this forced the bridge to close only two days after opening. 5.1 Wobbly Bridge Phenomenon At first it was thought that wind buffeting had caused the lateral vibrations but this was quickly dispelled. It had also been suggested that it was the foot soldier effect, synchronization of the footsteps of large groups, but this was well understood and designed out of the bridge. The problem lay in the low damping and high live loads of the bridge as shown in Ref. [6]. Walking along the bridge caused small vibrations that could be perceived by some bridge users. As some users noticed the bridge vibrations they start to walk in step with the vibrations setting up resonant forces. This, coupled with the previously mentioned foot soldier effect, meant that more and more people start to walk in stride with the sway of the bridge. With large crowds, like on the opening day of the bridge the vibrations have large amplitude. The resonant frequencies of the individual spans were in a range similar to that of peoples strides which leant itself to lateral vibration. = F σ. (7) A From this we get a stress of 568N/mm which is well below the permissible stress level. To check these results a similar analysis of the two edge spans can be done to verify the tensions in the cable. With tensions in the cables found it is now possible to calculate the force acting on each pier. The cables running over the pier are almost flat so this means that very little force is transferred into the piers. Assuming an angle of around 5degrees between the cables and the horizontal it is possible to calculate the forces. Acting down on each fork of a pier is two lots 5.7Mn multiplied by the sine of 5degrees. This gives a force acting down on each fork of 4.48MN. As the forks are at approximately 45degrees to the horizontal it can be assumed that 3.17MN of the downward forces act axially through the forks and 3.17MN of the force will be acting perpendicularly to the Figure 1: Crowds on the Millennium Bridge on opening day experience the lateral vibrations 5. Research and experiments Experiments with pedestrians walking over moving surfaces was carries out by Southampton and Cambridge universities to find out what caused the movement of the bridge. To truly replicate the conditions of the

9 Millennium Bridge, however, testing needed to be done on the deck itself. Engineers monitored the movements as pedestrians walked on a variety of different paths and around the bridge in an attempt to recreate the behaviour of the opening days of the bridge. temporary works needed for the installation process were very complicated. This is a lesson to the designers and hopefully any other minor or otherwise considered trivial issues were addressed during the extensive improvements to the bridge. Figure 13: Two pictures of Engineers testing the bridge 5.3 Removing the Vibrations After much research a large number of dampers were designed to be retrofitted to the bridge. 37 fluid-viscous dampers were designed to run along the underside of the bridge and elsewhere along the bridge to control lateral vibrations of the bridge. These increased the natural frequency of the bridge by around three times and eliminating the change of pedestrian induced lateral vibrations. Although no vertical vibrations were experienced during the opening days of the bridge, a decision was taken to ensure that none could happen in the future. 5 Tuned Mass Dampers were installed between the saddles and the decks [7]. This retrofit programme took two years and cost five million pounds. This was a massive blow to the bridge and to London. It was seen as another Millennium project that had gone wrong and detracted from the pioneering design and striking styling of the bridge. Figure 14: Two Fluid-Viscous dampers attached to an arm of a saddle. With the need to keep the Thames in operation during the retrofit and a large amount of the works requiring access to the underside of the bridge the installation of the dampers was a very slow process. The scaffolding and Figure 15: Tuned Mass Damper on the underside of the bridge 6 Impact of the Bridge on London Despite at first appearing to be a massive failure, and not being in use for the first two years of its life, the Millennium Bridge has turned out to be quite popular in the capital. The main reason for its success lies within its positioning along the River Thames. With St. Paul s Cathedral dominating the skyline to the north, and the Tate Modern and Globe theatre right next the bridge on the south it is a perfect cultural route from one side of the city to the next. With the arts lovers and culturally stimulated people attracted to area it gives the bridge a chance to be appreciated for its architectural quality and striking aesthetic qualities. Some may disagree with the bridges proximity to such traditional buildings, like the globe, given its modern styling. All over London, however, there are contradictions of styles and building principles and it is what makes the city so unique. 7 Summary The innovative design of the Millennium Bridge is a bold and outstanding piece of architecture. With a design issue so difficult to get spot on as aesthetics the Millennium Bridge excels. Although its structure is not clear its smooth lines and clever use of colour and lighting and exceptional proportions make it a truly wonderful bridge to view. The eye is never disinterested by the shape and intricacy of the bridge. The design itself is a very clever way of maintaining slenderness but allowing views of the cityscape. The foundations make good use of the space they are in, especially considering some of the nearby buildings. The construction process was essentially standard for a suspension bridge and the right choice of materials for the structure. The one overhanging issue is the lateral vibrations that closed the bridge for two years and required costly repair works. Now it is safe to call it a successful bridge and is firmly settled as a landmark of the capital and country.

10 8 Acknowledgements The guideline notes on the presentation method of this document provided by Professor Tim Ibell were informative, clear and easy to use. They proved an invaluable aid in forming this document. The lecture series that ran alongside project, both Bridge Engineering 1 and the Drop-in sessions for this module, proved essential in gaining the knowledge required to attempt this project. 9 References [1] Fitzpatrick, T., Linking London: The Millennium Bridge [] Dallard et al, The London Millennium Footbridge [3] Gagnon, C.P., Stahl, F.L., Cable Corrosion in Bridges and Other Structures, pp [4] decking_section.html [5] drawings.html [6] Newland, D.E., Vibration of the London Millennium Footbridge: Part 1 Cause [7] Taylor, D.P., Damper Retrofit of the London Millennium Footbridge A Case Study in Biodynamic Design

Optimum proportions for the design of suspension bridge

Optimum proportions for the design of suspension bridge Journal of Civil Engineering (IEB), 34 (1) (26) 1-14 Optimum proportions for the design of suspension bridge Tanvir Manzur and Alamgir Habib Department of Civil Engineering Bangladesh University of Engineering

More information

DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab,

DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab, DESIGN OF SLABS Dr. G. P. Chandradhara Professor of Civil Engineering S. J. College of Engineering Mysore 1. GENERAL A slab is a flat two dimensional planar structural element having thickness small compared

More information

4B-2. 2. The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.

4B-2. 2. The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections. Shear Walls Buildings that use shear walls as the lateral force-resisting system can be designed to provide a safe, serviceable, and economical solution for wind and earthquake resistance. Shear walls

More information

MECHANICS OF SOLIDS - BEAMS TUTORIAL 2 SHEAR FORCE AND BENDING MOMENTS IN BEAMS

MECHANICS OF SOLIDS - BEAMS TUTORIAL 2 SHEAR FORCE AND BENDING MOMENTS IN BEAMS MECHANICS OF SOLIDS - BEAMS TUTORIAL 2 SHEAR FORCE AND BENDING MOMENTS IN BEAMS This is the second tutorial on bending of beams. You should judge your progress by completing the self assessment exercises.

More information

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI 318-14

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI 318-14 Draft Table of Contents Building Code Requirements for Structural Concrete and Commentary ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318 14) Chapter 1 General 1.1 Scope of ACI 318

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

INTRODUCTION TO BEAMS

INTRODUCTION TO BEAMS CHAPTER Structural Steel Design LRFD Method INTRODUCTION TO BEAMS Third Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering Part II Structural Steel Design and Analysis

More information

Technical Notes 3B - Brick Masonry Section Properties May 1993

Technical Notes 3B - Brick Masonry Section Properties May 1993 Technical Notes 3B - Brick Masonry Section Properties May 1993 Abstract: This Technical Notes is a design aid for the Building Code Requirements for Masonry Structures (ACI 530/ASCE 5/TMS 402-92) and Specifications

More information

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL 7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction

More information

ENGINEERING SCIENCE H1 OUTCOME 1 - TUTORIAL 3 BENDING MOMENTS EDEXCEL HNC/D ENGINEERING SCIENCE LEVEL 4 H1 FORMERLY UNIT 21718P

ENGINEERING SCIENCE H1 OUTCOME 1 - TUTORIAL 3 BENDING MOMENTS EDEXCEL HNC/D ENGINEERING SCIENCE LEVEL 4 H1 FORMERLY UNIT 21718P ENGINEERING SCIENCE H1 OUTCOME 1 - TUTORIAL 3 BENDING MOMENTS EDEXCEL HNC/D ENGINEERING SCIENCE LEVEL 4 H1 FORMERLY UNIT 21718P This material is duplicated in the Mechanical Principles module H2 and those

More information

Chapter. Earthquake Damage: Types, Process, Categories

Chapter. Earthquake Damage: Types, Process, Categories 3 Chapter Earthquake Damage: Types, Process, Categories Earthquakes leave behind a trail of damage and destruction. People s lives are affected by the loss of loved ones, destruction of property, economic

More information

CH. 2 LOADS ON BUILDINGS

CH. 2 LOADS ON BUILDINGS CH. 2 LOADS ON BUILDINGS GRAVITY LOADS Dead loads Vertical loads due to weight of building and any permanent equipment Dead loads of structural elements cannot be readily determined b/c weight depends

More information

Detailing of Reinforcment in Concrete Structures

Detailing of Reinforcment in Concrete Structures Chapter 8 Detailing of Reinforcment in Concrete Structures 8.1 Scope Provisions of Sec. 8.1 and 8.2 of Chapter 8 shall apply for detailing of reinforcement in reinforced concrete members, in general. For

More information

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General

More information

8.2 Elastic Strain Energy

8.2 Elastic Strain Energy Section 8. 8. Elastic Strain Energy The strain energy stored in an elastic material upon deformation is calculated below for a number of different geometries and loading conditions. These expressions for

More information

MECHANICS OF SOLIDS - BEAMS TUTORIAL 1 STRESSES IN BEAMS DUE TO BENDING. On completion of this tutorial you should be able to do the following.

MECHANICS OF SOLIDS - BEAMS TUTORIAL 1 STRESSES IN BEAMS DUE TO BENDING. On completion of this tutorial you should be able to do the following. MECHANICS OF SOLIDS - BEAMS TUTOIAL 1 STESSES IN BEAMS DUE TO BENDING This is the first tutorial on bending of beams designed for anyone wishing to study it at a fairly advanced level. You should judge

More information

REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE

REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE A.Rito Proponte, Lda, Lisbon, Portugal J. Appleton A2P Consult, Lda, Lisbon, Portugal ABSTRACT: The Figueira da Foz Bridge includes a 405 m long cable stayed

More information

2.0 External and Internal Forces act on structures

2.0 External and Internal Forces act on structures 2.0 External and Internal Forces act on structures 2.1 Measuring Forces A force is a push or pull that tends to cause an object to change its movement or shape. Magnitude, Direction, and Location The actual

More information

9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and guards.

9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and guards. Section 9.8. Stairs, Ramps, Handrails and Guards 9.8.1. Application 9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and

More information

INTRODUCTION TO LIMIT STATES

INTRODUCTION TO LIMIT STATES 4 INTRODUCTION TO LIMIT STATES 1.0 INTRODUCTION A Civil Engineering Designer has to ensure that the structures and facilities he designs are (i) fit for their purpose (ii) safe and (iii) economical and

More information

Truss. are both simple and A Matsuo Example continuous trusses. The

Truss. are both simple and A Matsuo Example continuous trusses. The Girder Bridge A girder bridge is perhaps the most common and most basic bridge. A log across a creek is an example of a girder bridge in its simplest form. In modern steel girder bridges, the two most

More information

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination Structural Effective Beginning with the April 2011 The structural engineering exam is a breadth and exam examination offered in two components on successive days. The 8-hour Vertical Forces (Gravity/Other)

More information

REINFORCED CONCRETE. Reinforced Concrete Design. A Fundamental Approach - Fifth Edition. Walls are generally used to provide lateral support for:

REINFORCED CONCRETE. Reinforced Concrete Design. A Fundamental Approach - Fifth Edition. Walls are generally used to provide lateral support for: HANDOUT REINFORCED CONCRETE Reinforced Concrete Design A Fundamental Approach - Fifth Edition RETAINING WALLS Fifth Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering

More information

Report on. Wind Resistance of Signs supported by. Glass Fiber Reinforced Concrete (GFRC) Pillars

Report on. Wind Resistance of Signs supported by. Glass Fiber Reinforced Concrete (GFRC) Pillars Report on Wind Resistance of Signs supported by Glass Fiber Reinforced Concrete (GFRC) Pillars Prepared for US Sign and Fabrication Corporation January, 2006 SUMMARY This study found the attachment of

More information

FOUNDATION DESIGN. Instructional Materials Complementing FEMA 451, Design Examples

FOUNDATION DESIGN. Instructional Materials Complementing FEMA 451, Design Examples FOUNDATION DESIGN Proportioning elements for: Transfer of seismic forces Strength and stiffness Shallow and deep foundations Elastic and plastic analysis Foundation Design 14-1 Load Path and Transfer to

More information

SEISMIC DESIGN. Various building codes consider the following categories for the analysis and design for earthquake loading:

SEISMIC DESIGN. Various building codes consider the following categories for the analysis and design for earthquake loading: SEISMIC DESIGN Various building codes consider the following categories for the analysis and design for earthquake loading: 1. Seismic Performance Category (SPC), varies from A to E, depending on how the

More information

Brandangersundet Bridge A slender and light network arch

Brandangersundet Bridge A slender and light network arch Brandangersundet Bridge A slender and light network arch Rolf Magne Larssen Dr. ing./ Ph.D. Dr. ing A. Aas-Jakobsen AS Oslo, Norway rml@aaj.no Rolf Magne Larssen, born 1958, received his Ph.D. in structural

More information

Types of Structures. Mass Structures. A Layered Look

Types of Structures. Mass Structures. A Layered Look Types of Structures Have you ever made a sand castle or created a snow sculpture? What about building an igloo or assembling a tent? Perhaps you have woven a basket or baked a cake. All of these objects

More information

vulcanhammer.net This document downloaded from

vulcanhammer.net This document downloaded from This document downloaded from vulcanhammer.net since 1997, your source for engineering information for the deep foundation and marine construction industries, and the historical site for Vulcan Iron Works

More information

Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26

Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26 2014 HDR Architecture, 2014 2014 HDR, HDR, Inc., all all rights reserved. Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26 Brandon Chavel, PhD, P.E.,

More information

US 51 Ohio River Bridge Engineering and Environmental Study

US 51 Ohio River Bridge Engineering and Environmental Study US 51 Ohio River Bridge Engineering and Environmental Study ITEM NOS. 1-100.00 & 1-1140.00 Prepared by: Michael Baker Jr., Inc. 9750 Ormsby Station Rd Louisville, KY 40223 August 16, 2013 Table of Contents

More information

Investigation of Foundation Failure. Step 1 - Data Collection. Investigation Steps

Investigation of Foundation Failure. Step 1 - Data Collection. Investigation Steps Foundations on Expansive Clay Soil Part 3 - Investigation of Failed Foundations Presented by: Eric Green, P.E. Structural Engineer Slide 1 Copyright Eric Green 2005 Investigation of Foundation Failure

More information

SECTION 5 ANALYSIS OF CONTINUOUS SPANS DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE LEAD AUTHOR: BRYAN ALLRED

SECTION 5 ANALYSIS OF CONTINUOUS SPANS DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE LEAD AUTHOR: BRYAN ALLRED SECTION 5 ANALYSIS OF CONTINUOUS SPANS DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE LEAD AUTHOR: BRYAN ALLRED NOTE: MOMENT DIAGRAM CONVENTION In PT design, it is preferable to draw moment diagrams

More information

8 EXTRA LIGHT GRC SANDWICH ELEMENTS FOR ROOFING IN INDUSTRIAL BUILDINGS

8 EXTRA LIGHT GRC SANDWICH ELEMENTS FOR ROOFING IN INDUSTRIAL BUILDINGS 8 EXTRA LIGHT GRC SANDWICH ELEMENTS FOR ROOFING IN INDUSTRIAL BUILDINGS MARICA DELLA BELLA and DIEGO CIAN Precompressi Centro Nord S.p.A., Italy SUMMARY: Secondary roofing elements, complementary to the

More information

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig. 7.21 some of the trusses that are used in steel bridges

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig. 7.21 some of the trusses that are used in steel bridges 7.7 Truss bridges Fig. 7.21 some of the trusses that are used in steel bridges Truss Girders, lattice girders or open web girders are efficient and economical structural systems, since the members experience

More information

DESIGN OF SLABS. Department of Structures and Materials Engineering Faculty of Civil and Environmental Engineering University Tun Hussein Onn Malaysia

DESIGN OF SLABS. Department of Structures and Materials Engineering Faculty of Civil and Environmental Engineering University Tun Hussein Onn Malaysia DESIGN OF SLABS Department of Structures and Materials Engineering Faculty of Civil and Environmental Engineering University Tun Hussein Onn Malaysia Introduction Types of Slab Slabs are plate elements

More information

Preliminary steel concrete composite bridge design charts for Eurocodes

Preliminary steel concrete composite bridge design charts for Eurocodes Preliminary steel concrete composite bridge 90 Rachel Jones Senior Engineer Highways & Transportation Atkins David A Smith Regional Head of Bridge Engineering Highways & Transportation Atkins Abstract

More information

Solid shape molding is not desired in injection molding due to following reasons.

Solid shape molding is not desired in injection molding due to following reasons. PLASTICS PART DESIGN and MOULDABILITY Injection molding is popular manufacturing method because of its high-speed production capability. Performance of plastics part is limited by its properties which

More information

EDEXCEL NATIONAL CERTIFICATE/DIPLOMA MECHANICAL PRINCIPLES OUTCOME 2 ENGINEERING COMPONENTS TUTORIAL 1 STRUCTURAL MEMBERS

EDEXCEL NATIONAL CERTIFICATE/DIPLOMA MECHANICAL PRINCIPLES OUTCOME 2 ENGINEERING COMPONENTS TUTORIAL 1 STRUCTURAL MEMBERS ENGINEERING COMPONENTS EDEXCEL NATIONAL CERTIFICATE/DIPLOMA MECHANICAL PRINCIPLES OUTCOME ENGINEERING COMPONENTS TUTORIAL 1 STRUCTURAL MEMBERS Structural members: struts and ties; direct stress and strain,

More information

6 RETROFITTING POST & PIER HOUSES

6 RETROFITTING POST & PIER HOUSES Retrofitting Post & Pier Houses 71 6 RETROFITTING POST & PIER HOUSES by James E. Russell, P.E. 72 Retrofitting Post & Pier Houses Retrofitting Post & Pier Houses 73 RETROFITTING POST AND PIER HOUSES This

More information

METHOD OF STATEMENT FOR STATIC LOADING TEST

METHOD OF STATEMENT FOR STATIC LOADING TEST Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents

More information

TECHNICAL BULLETIN. Oil Canning in Metal Roof and Metal Wall Systems. What Is Oil Canning?

TECHNICAL BULLETIN. Oil Canning in Metal Roof and Metal Wall Systems. What Is Oil Canning? TECHNICAL BULLETIN Oil Canning in Metal Roof and Metal Wall Systems What Is Oil Canning? Oil Canning can be defined as visible waviness in the flat areas of metal roofing and metal wall panels. In technical

More information

EAST LYME HIGH SCHOOL

EAST LYME HIGH SCHOOL Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed

More information

Module 7 (Lecture 24 to 28) RETAINING WALLS

Module 7 (Lecture 24 to 28) RETAINING WALLS Module 7 (Lecture 24 to 28) RETAINING WALLS Topics 24.1 INTRODUCTION 24.2 GRAVITY AND CANTILEVER WALLS 24.3 PROPORTIONING RETAINING WALLS 24.4 APPLICATION OF LATERAL EARTH PRESSURE THEORIES TO DESIGN 24.5

More information

Introduction to Solid Modeling Using SolidWorks 2012 SolidWorks Simulation Tutorial Page 1

Introduction to Solid Modeling Using SolidWorks 2012 SolidWorks Simulation Tutorial Page 1 Introduction to Solid Modeling Using SolidWorks 2012 SolidWorks Simulation Tutorial Page 1 In this tutorial, we will use the SolidWorks Simulation finite element analysis (FEA) program to analyze the response

More information

CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE

CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE 9.1 INTRODUCTION An important reason that composite piles have not gained wide acceptance in the civil engineering practice is the lack of a long

More information

Weight Measurement Technology

Weight Measurement Technology Kistler-Morse (KM) introduced bolt-on weight measuring systems three decades ago. These devices featured Walter Kistler s invention, the Microcell. Over the years, many improvements were made to the Microcell

More information

EDEXCEL NATIONAL CERTIFICATE/DIPLOMA MECHANICAL PRINCIPLES AND APPLICATIONS NQF LEVEL 3 OUTCOME 1 - LOADING SYSTEMS TUTORIAL 3 LOADED COMPONENTS

EDEXCEL NATIONAL CERTIFICATE/DIPLOMA MECHANICAL PRINCIPLES AND APPLICATIONS NQF LEVEL 3 OUTCOME 1 - LOADING SYSTEMS TUTORIAL 3 LOADED COMPONENTS EDEXCEL NATIONAL CERTIICATE/DIPLOMA MECHANICAL PRINCIPLES AND APPLICATIONS NQ LEVEL 3 OUTCOME 1 - LOADING SYSTEMS TUTORIAL 3 LOADED COMPONENTS 1. Be able to determine the effects of loading in static engineering

More information

Chapter 2 Basis of design and materials

Chapter 2 Basis of design and materials Chapter 2 Basis of design and materials 2.1 Structural action It is necessary to start a design by deciding on the type and layout of structure to be used. Tentative sizes must be allocated to each structural

More information

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL. STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill

More information

Eurocode 4: Design of composite steel and concrete structures

Eurocode 4: Design of composite steel and concrete structures Eurocode 4: Design of composite steel and concrete structures Dr Stephen Hicks, Manager Structural Systems, Heavy Engineering Research Association, New Zealand Introduction BS EN 1994 (Eurocode 4) is the

More information

Elevating Your House. Introduction CHAPTER 5

Elevating Your House. Introduction CHAPTER 5 CHAPTER 5 Elevating Your House Introduction One of the most common retrofitting methods is elevating a house to a required or desired Flood Protection Elevation (FPE). When a house is properly elevated,

More information

Chapter 5 Bridge Deck Slabs. Bridge Engineering 1

Chapter 5 Bridge Deck Slabs. Bridge Engineering 1 Chapter 5 Bridge Deck Slabs Bridge Engineering 1 Basic types of bridge decks In-situ reinforced concrete deck- (most common type) Pre-cast concrete deck (minimize the use of local labor) Open steel grid

More information

INSTRUCTIONS FOR CHAIN LINK INSTALLATION Chain Link fence & Posts Meshdirect.co.uk

INSTRUCTIONS FOR CHAIN LINK INSTALLATION Chain Link fence & Posts Meshdirect.co.uk INSTRUCTIONS FOR CHAIN LINK INSTALLATION Chain Link fence & Posts Meshdirect.co.uk This guide explains how to correctly install our chain link fencing and post system. The guide provides details of the

More information

1.054/1.541 Mechanics and Design of Concrete Structures (3-0-9) Outline 1 Introduction / Design Criteria for Reinforced Concrete Structures

1.054/1.541 Mechanics and Design of Concrete Structures (3-0-9) Outline 1 Introduction / Design Criteria for Reinforced Concrete Structures Prof. Oral Buyukozturk Massachusetts Institute of Technology Outline 1 1.054/1.541 Mechanics and Design of Concrete Structures (3-0-9) Outline 1 Introduction / Design Criteria for Reinforced Concrete Structures

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information

LAYING BLOCK AND BRICK

LAYING BLOCK AND BRICK LAYING BLOCK AND BRICK Products highlighted in this section: SAKRETE Type N Mortar Mix SAKRETE Type S Mortar Mix Brick And Block Laying Basics The first step in building a brick or block wall is to construct

More information

THE COMPOSITE DISC - A NEW JOINT FOR HIGH POWER DRIVESHAFTS

THE COMPOSITE DISC - A NEW JOINT FOR HIGH POWER DRIVESHAFTS THE COMPOSITE DISC - A NEW JOINT FOR HIGH POWER DRIVESHAFTS Dr Andrew Pollard Principal Engineer GKN Technology UK INTRODUCTION There is a wide choice of flexible couplings for power transmission applications,

More information

Pro-Lift Steel Pile Foundation Repair

Pro-Lift Steel Pile Foundation Repair Pro-Lift Steel Pile Foundation Repair Pro-Lift Steel Pile Foundation Repair System Pro-lift steel piles are designed for the stresses of Texas soils. They can have multiple steel walls, depending on the

More information

New approaches in Eurocode 3 efficient global structural design

New approaches in Eurocode 3 efficient global structural design New approaches in Eurocode 3 efficient global structural design Part 1: 3D model based analysis using general beam-column FEM Ferenc Papp* and József Szalai ** * Associate Professor, Department of Structural

More information

SPECIFICATIONS, LOADS, AND METHODS OF DESIGN

SPECIFICATIONS, LOADS, AND METHODS OF DESIGN CHAPTER Structural Steel Design LRFD Method Third Edition SPECIFICATIONS, LOADS, AND METHODS OF DESIGN A. J. Clark School of Engineering Department of Civil and Environmental Engineering Part II Structural

More information

A CRITICAL STUDY ON THE THEODOR HEUSS (NORTH) BRIDGE, DUSSELDORF

A CRITICAL STUDY ON THE THEODOR HEUSS (NORTH) BRIDGE, DUSSELDORF Proceedings of Bridge Engineering 2 Conference 2008 23 rd April 2008, University of Bath, Bath, UK I A CRITICAL STUDY ON THE THEODOR HEUSS (NORTH) BRIDGE, DUSSELDORF T. C. F. Tse 1 1 Student of Civil and

More information

Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam

Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam Design of Bridges Introduction 3 rd to 4 th July 2012 1 FUNCTION OF A BRIDGE To connect two communities which are separated by streams, river, valley, or gorge, etc. 2 EVOLUTION OF BRIDGES 1. Log Bridge

More information

Design Manual to BS8110

Design Manual to BS8110 Design Manual to BS8110 February 2010 195 195 195 280 280 195 195 195 195 195 195 280 280 195 195 195 The specialist team at LinkStudPSR Limited have created this comprehensive Design Manual, to assist

More information

Eurocode 2: Design of concrete structures

Eurocode 2: Design of concrete structures Eurocode 2: Design of concrete structures Owen Brooker, The Concrete Centre Introduction The transition to using the Eurocodes is a daunting prospect for engineers, but this needn t be the case. Industry

More information

EFFECTS ON NUMBER OF CABLES FOR MODAL ANALYSIS OF CABLE-STAYED BRIDGES

EFFECTS ON NUMBER OF CABLES FOR MODAL ANALYSIS OF CABLE-STAYED BRIDGES EFFECTS ON NUMBER OF CABLES FOR MODAL ANALYSIS OF CABLE-STAYED BRIDGES Yang-Cheng Wang Associate Professor & Chairman Department of Civil Engineering Chinese Military Academy Feng-Shan 83000,Taiwan Republic

More information

Nonlinear analysis and form-finding in GSA Training Course

Nonlinear analysis and form-finding in GSA Training Course Nonlinear analysis and form-finding in GSA Training Course Non-linear analysis and form-finding in GSA 1 of 47 Oasys Ltd Non-linear analysis and form-finding in GSA 2 of 47 Using the GSA GsRelax Solver

More information

FORM DESIGN. easy to work with, and generally available.

FORM DESIGN. easy to work with, and generally available. Forms play a major role in concrete construction. They give the plastic concrete its shape and hold it until it hardens. Forms protect the concrete, assist in curing it, and support any reinforcing rods

More information

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION General 7 www.meadowburke.com 877-518-7665 MB1109 CONCRETE FLOOR SLAB AND CASTING BED CONSTRUCTION Quality Construction Begins at Ground Level Everything

More information

Numerical Analysis of Independent Wire Strand Core (IWSC) Wire Rope

Numerical Analysis of Independent Wire Strand Core (IWSC) Wire Rope Numerical Analysis of Independent Wire Strand Core (IWSC) Wire Rope Rakesh Sidharthan 1 Gnanavel B K 2 Assistant professor Mechanical, Department Professor, Mechanical Department, Gojan engineering college,

More information

Scope of EN 1090-1 Clarification Document

Scope of EN 1090-1 Clarification Document Scope of EN 1090-1 Clarification Document This document has been submitted to the European Commission as the UK view on the scope of EN 1090-1. After discussions, including with the European Technical

More information

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar Problem 1 Design a hand operated overhead crane, which is provided in a shed, whose details are: Capacity of crane = 50 kn Longitudinal spacing of column = 6m Center to center distance of gantry girder

More information

Miss S. S. Nibhorkar 1 1 M. E (Structure) Scholar,

Miss S. S. Nibhorkar 1 1 M. E (Structure) Scholar, Volume, Special Issue, ICSTSD Behaviour of Steel Bracing as a Global Retrofitting Technique Miss S. S. Nibhorkar M. E (Structure) Scholar, Civil Engineering Department, G. H. Raisoni College of Engineering

More information

CRITICAL ANALYSIS OF THE LUPU BRIDGE IN SHANGHAI

CRITICAL ANALYSIS OF THE LUPU BRIDGE IN SHANGHAI CRITICAL ANALYSIS OF THE LUPU BRIDGE IN SHANGHAI L J H Ellis Dept. Civil & Architectural Engineering, University of Bath Abstract: This article provides a critical analysis of The Lupu Bridge in Shanghai.

More information

Removable Aluminium posts

Removable Aluminium posts Post Solent Sail Shades Ltd 120 Billington Gardens Hedge End Southampton SO30 2RT Tel/Fax: 01489 788243 www.solentsailshades.co.uk Email: info@solentsailshades.co.uk Removable Aluminium posts Single Pole

More information

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Doug Jenkins 1, Chris Lawson 2 1 Interactive Design Services, 2 Reinforced

More information

REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA

REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA 1 REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA Verners Straupe, M.sc.eng., Rudolfs Gruberts, dipl. eng. JS Celuprojekts, Murjanu St. 7a, Riga, LV 1024, Latvia e-mail:

More information

Field Damage Inspection and Static Load Test Analysis of Jiamusi Highway Prestressed Concrete Bridge in China

Field Damage Inspection and Static Load Test Analysis of Jiamusi Highway Prestressed Concrete Bridge in China Advanced Materials Research Vols. 163-167 (2011) pp 1147-1156 Online available since 2010/Dec/06 at www.scientific.net (2011) Trans Tech Publications, Switzerland doi:10.4028/www.scientific.net/amr.163-167.1147

More information

Wisconsin Building Products Evaluation

Wisconsin Building Products Evaluation Safety & Buildings Division 201 West Washington Avenue P.O. Box 2658 Madison, WI 53701-2658 Evaluation # 200813-O Wisconsin Building Products Evaluation Material Best Management Standards for Foundation

More information

FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1

FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1 FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1 4. STRUCTURAL ANALYSIS AND EVALUATION The analysis of bridges and structures is a mixture of science and engineering judgment. In most cases, use simple models with

More information

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing 1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize

More information

Wood Projects Outdoors. Post Hole Specifications. Deck Span Tables. www.jon Eakes.com

Wood Projects Outdoors. Post Hole Specifications. Deck Span Tables. www.jon Eakes.com Wood Projects Outdoors Post Hole Specifications & Deck Span Tables www.jon Eakes.com Building Fences The depth of the fence posts into the ground must be at least one foot below the frost level for your

More information

Technical handbook Panel Anchoring System

Technical handbook Panel Anchoring System 1 Basic principles of sandwich panels 3 Design conditions 4 Basic placement of anchors and pins 9 Large elements (muliple rows) 10 Small elements (two rows) 10 Turned elements 10 Slender elements 10 Cantilevering

More information

Post and Beam Construction

Post and Beam Construction Post and Beam Construction A Presentation By the Canadian Wood Council Canadian Conseil Wood canadien Council du bois Early settlers introduced the concept of post and beam construction in North America

More information

Numerical Analysis of the Moving Formwork Bracket Stress during Construction of a Curved Continuous Box Girder Bridge with Variable Width

Numerical Analysis of the Moving Formwork Bracket Stress during Construction of a Curved Continuous Box Girder Bridge with Variable Width Modern Applied Science; Vol. 9, No. 6; 2015 ISSN 1913-1844 E-ISSN 1913-1852 Published by Canadian Center of Science and Education Numerical Analysis of the Moving Formwork Bracket Stress during Construction

More information

Residential Deck Safety, Construction, and Repair

Residential Deck Safety, Construction, and Repair Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the

More information

Asphalt Shingle Application Requirements

Asphalt Shingle Application Requirements Alberta Allied Roofing Association Asphalt Shingle Application Requirements Section 1 Roof Decks 1.1 General Asphalt Shingles are not permitted to be installed directly over rigid insulation. When Asphalt

More information

Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE

Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE To satisfy the performance goals of the NEHRP Recommended Seismic Provisions, a number of characteristics are important to the

More information

How To Build A Luxury Apartment Complex In London

How To Build A Luxury Apartment Complex In London Post Tensioning Awards 2009 Project Summary Type of structure Location Architects Structural Engineer Residential with leisure suites including Swimming pool, Cinema, Virtual Golf, Wine Cellars, and Parking

More information

THE STRAIN GAGE PRESSURE TRANSDUCER

THE STRAIN GAGE PRESSURE TRANSDUCER THE STRAIN GAGE PRESSURE TRANSDUCER Pressure transducers use a variety of sensing devices to provide an electrical output proportional to applied pressure. The sensing device employed in the transducers

More information

Shade Sail Structures

Shade Sail Structures Shade Sail Structures The Complete How to" Guide Provided by:- Sail Shade World Pty Ltd There are 5 steps in creating a custom made shade sail structure: 1. Planning your structure 2. Installing your fixing

More information

P4 Stress and Strain Dr. A.B. Zavatsky MT07 Lecture 3 Statically Indeterminate Structures

P4 Stress and Strain Dr. A.B. Zavatsky MT07 Lecture 3 Statically Indeterminate Structures 4 Stress and Strain Dr... Zavatsky MT07 ecture 3 Statically Indeterminate Structures Statically determinate structures. Statically indeterminate structures (equations of equilibrium, compatibility, and

More information

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and

More information

4.3.5 - Breakaway Walls

4.3.5 - Breakaway Walls 4.3.5 - Breakaway Walls Elevation of a structure on a properly designed foundation reduces the potential for water damage from flooding. When the space below the lowest elevated floor is maintained free

More information

TARIFF CODE and updates standard

TARIFF CODE and updates standard TARIFF CODE and updates standard No HS CODE AHTN CODE PRODUCT DESCRIPTION PRODUCT TYPE STANDARDS IDENTIFIED 7207 Semi finished products of iron or non alloy steel Containing by weight less than 0.25% of

More information

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing Substrate, structural panel, bonded waterproofing The universal substrate for tiles Perfect covering No matter whether you work with mosaics or large format tiles, an absolutely level substrate with straight

More information

Designed and Engineered to Perform

Designed and Engineered to Perform History EARTH CONTACT PRODUCTS, L.L.C., is a family owned company, based in Olathe, Kansas. This company was built upon Don May s U.S. Patented fourth-generation Steel Piering System that has led to the

More information

Formwork for Concrete

Formwork for Concrete UNIVERSITY OF WASHINGTON DEPARTMENT OF CONSTRUCTION MANAGEMENT CM 420 TEMPORARY STRUCTURES Winter Quarter 2007 Professor Kamran M. Nemati Formwork for Concrete Horizontal Formwork Design and Formwork Design

More information

Reinforced Concrete Design

Reinforced Concrete Design FALL 2013 C C Reinforced Concrete Design CIVL 4135 ii 1 Chapter 1. Introduction 1.1. Reading Assignment Chapter 1 Sections 1.1 through 1.8 of text. 1.2. Introduction In the design and analysis of reinforced

More information

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM 9.1 BACKGROUND Steel is widely used in the construction of multi-storey buildings. However, steel construction is seldom used and is traditionally

More information