1 1

2 Basic principles of sandwich panels 3 Design conditions 4 Basic placement of anchors and pins 9 Large elements (muliple rows) 10 Small elements (two rows) 10 Turned elements 10 Slender elements 10 Cantilevering elements 10 Load bearing anchors 10 Narrow transitions over and below openings, i.e. doors and windows 10 Extending panel around corner 10 2

3 Basic principles of sandwich panels A sandwich panel is a concrete element composed of three different layers, one load bearing wall, one layer of insulation and one suspended panel. The purpose with the Panel Anchoring system is to ensure the performance of the wall by carrying the weight of the suspended panel as by temperature movements, shrinkage, mould suction etc. The suspended panel (usually the façade panel) is exposed by larger temperature differences over time compared to the load bearing wall (usually placed internally) which have a more even temperature condition (indoor climate). This result in that the suspended panel varies in size to a greater extent compared to the load bearing panel. The anchoring system is designed to ensure that the movements due to the temperature difference do not cause problems such as cracks, curving of the wall etc. The temperature movements are taken care of by a proper placement of the load bearing anchors and the restraint ties, and by aiming for an as low friction as possible between the insulation and the concrete. 3

4 Design conditions Governing documents: EC1, EC2, EC3, CEN/TS-1992, Swedish national parameters Min. quality of concrete C30/37 Min. concrete strength when demoulding 16 MPa The anchoring system is designed for a wind load according to v b = 26 m/s, terrain type II-IV, height up to 30 m, shape factor suction 1,2 shape factor pressure 0,8 Adhesion force: Well-greased steel form 1 kn/m 2, smooth wooden form 2 kn/m 2, unplanned wooden form 3 kn/m 2, If other conditions please contact us Restraint ties are not allowed to be placed sparser than cc 1200 mm Max. element length/height 7,5 m Min. thickness of the load bearing wall 90 mm, 80 mm is acceptable if you use hard insulation Thickness of the suspended panel mm Min. reinforcement in suspended panel is grid 5150 NP500AB-W Min. reinforcement In the load bearing wall is grid 5300 NP500AB-W 4

5 Function: NEO-BA2 has the task to transfer the vertical load (Qv), which arises from to the self weight of the suspended panel, to the load bearing wall. Material: Stainless steel A2 and A4 Reinforcement: Mounting bar K500B-T, grid NP500AB-W NEO-BA2 can be found in following dimensions: NEO-BA2-6: mm, NEO-BA2-8: mm, NEO-BA2-10: mm Measurments NEO-BA2 [mm] NEO-BA2-6 NEO-BA2-8 NEO-BA2-10 Ø I a min. 50 min. 50 min. 50 c min. 55 min. 55 min. 55 H a + b + c a + b + c a + b + c U min. 60 min. 60 min. 60 B min. 90 min. 90 min. 90 h min. 25 min. 25 min. 25 Mounting bar K500B-T r 2 Ø8 x Ø8 x Ø8 x 700 s 2 Ø8 x Ø10 x Ø10 x 700 For design capacities see calculation program NeoBA. 5

6 Function: NEO-BA1 can be used as a load bearing anchor in the same way as NEO-BA2, but are more commonly used as a horizontal anchor. The anchor is placed in the CoG to fix the element horizontally. This is done to control the temperature- and shrinkage movement. In situations when it is not possible to place the vertical anchors symmetrically in relation to the center of gravity, NEO-BA1 is used to take care of the rotation that arises between the suspended panel and the load bearing wall. Further, NEO-BA1 can be used as a purely load bearing anchor. Material: Stainless steel A2 and A4 Reinforcement: Mounting bar K500B-T, grid NP500AB-W NEO-BA1 can be found in following dimensions: NEO-BA1-6: mm, NEO-BA1-8: mm, NEO-BA1-10: mm Measurments [mm] NEO-BA1 NEO-BA1-6 NEO-BA1-8 NEO-BA1-10 Ø I a min. 50 min. 50 min. 50 c min. 55 min. 55 min. 55 H a + b + c a + b + c a + b + c U min. 60 min. 60 min. 60 B min. 90 min. 90 min. 90 h min. 25 min. 25 min. 25 Mounting bar K500B-T r 1 Ø8 x Ø8 x Ø8 x 700 s 1 Ø8 x Ø10 x Ø10 x 700 For design capacities see calculation program NeoBA. 6

7 Function: NEO-UB takes care of the adhesion forces during demoulding. NEO-UB is most suitable to use when the sandwich element is casted with its suspended panel facing down in the form. If the suspended panel is working as a façade it will be exposed to suction and pressure loads due to the wind, NEO-UB will transfer these loads to the load bearing wall. NEO-UB is fixed to the lower reinforcement grid before placement of the insulation. This ensures that the pin is fixed to the concrete before it starts hardening. Material: Stainless steel A2 NEO-UB can be found in following dimensions: NEO-UB-4: mm Measurements [mm] NEO-UB NEO-UB-4 Ø 4 U min. 60 I B min. 90 a U/2 + 5 c min. 55 7

8 Function: NEO-ÖB takes care of the adhesion forces during demoulding. NEO-ÖB is most suitable to use when the sandwich element is casted with its suspended panel facing up in the form. If the suspended panel is working as a façade it will be exposed to suction and pressure loads due to the wind, NEO-ÖB will transfer these loads to the load bearing wall. NEO-ÖB is inserted through the insulation, over an intersection in the reinforcement grid, and further in to the concrete. It important to do this as quickly as possible to ensure that the pin is fixed to the concrete before it starts hardening. Material: Stainless steel A2 NEO-ÖB can be found in following dimensions: NEO-ÖB-4: mm, NEO-ÖB-5: mm Mått [mm] NEO-ÖB NEO-ÖB-4 NEO-ÖB-5 Ø 4 5 U min. 60 min. 60 I B min. 90 min. 90 a min. 55 min. 55 c min. 50 min. 50 8

9 Basic placement of anchors and pins The arrangement to strive for is to have a horizontally placed NEO-BA-1 in the CoG of the element, with two NEO-BA-2 symmetrically placed on each side of the horizontal gravity line. NEO-UB and NEO-ÖB is placed in a square pattern, with a cc distance not more than 1200 mm, based on both the horizontal and vertical gravity lines. Anchors that are placed should also be aligned with one other both horizontal and vertical. Important is to keep in mind that the distances A max and B max are not exceeded. A max is the maximum distance for which the outer most anchor is placed in relation to the fixing point (F), and B max is the distance to the outer most placed pin from the fixing point (F). Alternative placement of anchors: 9

10 Large elements (multiple rows) In large elements it is important to think about which A max and B max that applies. If it is not possible to place the vertical anchors in the horizontal gravity line they should be placed underneath it instead. Small elements (two rows) The vertical anchors should be placed in the lower row. It can be necessary to place them a bit further up to be able to fit the mounting bars. Distance A is to place the centre of the anchor at a distance of A = L/ mm from the edge. Turned elements If an element needs to be turned for example during transportation, the load from the suspended panel needs to be taken care of in both directions. Therefore it needs to have anchors placed in both directions to withstand the loads. Slender elements As long as the centre distance between the pins is larger than 200 mm, they should be placed in pairs. Otherwise they should be displaced according to the picture. Min. width of the wall is L + 2 x 50 mm. 10

11 Cantilevering elements When the suspended panel cantilevers above the load bearing wall, it results in an area in which no pins can be placed to take care of wind loads or adhesion forces. This mean that amount of pins in the upper row should be increased. B = max. cc distance, Ö = distance from top edge cantilever part to the outer most pin. When Ö exceeds B/2, the distance A should be reduced to half in the upper row. The distance Ö is not allowed to exceed 900 mm. 11

12 Load bearing anchors When an opening gives the element a geometry with a separated part and forms a column like part of the element, the bearing anchor should be placed in this part. The anchor should be designed to withstand the load from the separated part. It should also be placed at the same height as the other vertical anchors. Narrow transitions over and below openings, i.e. doors and windows When the element and the opening do not admit a proper placing of pins, the pin should be placed anyway. Better one pin than nothing at all. 12

13 Thickenings (around door and windows) It is important to ensure that there is a space between the bearing wall and the supended panel. This is to allow movements between the layers. It is important not to forget the extra weight when designing the anchors. Extending panel around corner I the extending part of the element no anchors or pins should be placed. Behind this part of the element there should be a soft insulation. If the thickness of the element exceeds 400 mm a hard insulation should be used. When the thickness is larger than 400 mm a pin is placed in the CoG of the part that extends around the corner. In this case it is the pin that is regarded as the fixing point (F), and A max is measured from this pin. 13

All Weather Hall. Efficient, multipurpose & quick to build

All Weather Hall. Efficient, multipurpose & quick to build All Weather Hall Efficient, multipurpose & quick to build ALL WEATHER HALL www.deboer.com www.deboer.com ALL WEATHER HALL A flexible solution for a multitude of needs All Weather halls from De Boer provide

More information

Installation information. METTLER TOLEDO MultiRange DW150 / DW150T wall scale

Installation information. METTLER TOLEDO MultiRange DW150 / DW150T wall scale Installation information METTLER TOLEDO MultiRange DW150 / DW150T wall scale DW150 / DW150T wall scale Contents Contents Page 1. Installation... 2 1.1 Preparatory work... 2 1.2 Installing the wall plates

More information

Page 1 of 18 28.4.2008 Sven Alexander Last revised 1.3.2010. SB-Produksjon STATICAL CALCULATIONS FOR BCC 250

Page 1 of 18 28.4.2008 Sven Alexander Last revised 1.3.2010. SB-Produksjon STATICAL CALCULATIONS FOR BCC 250 Page 1 of 18 CONTENT PART 1 BASIC ASSUMPTIONS PAGE 1.1 General 1. Standards 1.3 Loads 1. Qualities PART ANCHORAGE OF THE UNITS.1 Beam unit equilibrium 3. Beam unit anchorage in front..1 Check of capacity..

More information

Aluminium systems profile selection

Aluminium systems profile selection Aluminium systems profile selection The purpose of this document is to summarise the way that aluminium profile selection should be made, based on the strength requirements for each application. Curtain

More information

8 EXTRA LIGHT GRC SANDWICH ELEMENTS FOR ROOFING IN INDUSTRIAL BUILDINGS

8 EXTRA LIGHT GRC SANDWICH ELEMENTS FOR ROOFING IN INDUSTRIAL BUILDINGS 8 EXTRA LIGHT GRC SANDWICH ELEMENTS FOR ROOFING IN INDUSTRIAL BUILDINGS MARICA DELLA BELLA and DIEGO CIAN Precompressi Centro Nord S.p.A., Italy SUMMARY: Secondary roofing elements, complementary to the

More information

MultiPost-AP anchorage device

MultiPost-AP anchorage device MultiPost-AP anchorage device MultiPost anchorage point Type 1 Fixing on reinforced concrete with large, 360 rotating stainless steel lifting eye for the simultaneous securing of max. 2 persons. This can

More information

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION General 7 www.meadowburke.com 877-518-7665 MB1109 CONCRETE FLOOR SLAB AND CASTING BED CONSTRUCTION Quality Construction Begins at Ground Level Everything

More information

MONDOATHENS BASKETBALL SET (Reference PK110)

MONDOATHENS BASKETBALL SET (Reference PK110) MONDOATHENS BASKETBALL SET (Reference PK110) DESCRIPTION The MONDOATHENS backstop unit is mainly designed for multi-sports pavilions and installations where the highest-level basketball competitions are

More information

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General

More information

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing Substrate, structural panel, bonded waterproofing The universal substrate for tiles Perfect covering No matter whether you work with mosaics or large format tiles, an absolutely level substrate with straight

More information

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the FTP

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the FTP INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES Interpretations of the FTP CONTENTS FTP1 Adhesives used in A or B class divisions (FTP Code 3.1, Res A.754 para. 3.2.3) June 2000 FTP2 Pipe and duct

More information

DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab,

DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab, DESIGN OF SLABS Dr. G. P. Chandradhara Professor of Civil Engineering S. J. College of Engineering Mysore 1. GENERAL A slab is a flat two dimensional planar structural element having thickness small compared

More information

3D Drawing. Single Point Perspective with Diminishing Spaces

3D Drawing. Single Point Perspective with Diminishing Spaces 3D Drawing Single Point Perspective with Diminishing Spaces The following document helps describe the basic process for generating a 3D representation of a simple 2D plan. For this exercise we will be

More information

EAST LYME HIGH SCHOOL

EAST LYME HIGH SCHOOL Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed

More information

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone: 0041 22 77 66 051 info@cardok.com

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone: 0041 22 77 66 051 info@cardok.com CARDOK CARLIFT Fast access to underground garages Fast, Silent, Discreet, Design, High-Tech Installation to replace an access ramp on private property Dimensions: (Built to measure, all dimensions can

More information

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE By H P Gupta & D K Gupta DIFFERENT TYPES OF DAMAGES 1.Minor cracks 0.5 to 5 mm wide in load or non-load bearing walls 2.Major

More information

CF-Mesa, CF-Light Mesa, CF-Flute, CF-Metl-Plank, CF-Striated, CF-Santa Fe, CF-Architectural Flat, CF...

CF-Mesa, CF-Light Mesa, CF-Flute, CF-Metl-Plank, CF-Striated, CF-Santa Fe, CF-Architectural Flat, CF... Building Insulations - Walls and Ceilings (FM Approval Numbers 4411, 4651, 4880, 4881, 4882) Insulating materials may occur in building construction to reduce heat or sound transmission through a wall,

More information

SECTION 6. Glass Storefront Doors:

SECTION 6. Glass Storefront Doors: SECTION 6 Glass Storefront Doors: Table of Contents 3070 Storefront Door System Description & Dimensions 6070 Storefront Door System Description & Dimensions Door Leaf Detail Optional 10 Bottom Rail Detail

More information

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance 02/15 Labko GRP cesspools Instructions for installation, operation and maintenance Reliable solutions Wastewater treatment systems Contents 1 LABKO CESSPOOLS... 3 1.1 GENERAL... 3 1.2 IMPORTANT TO KNOW

More information

Chimney systems ICOPAL WULKAN C/CI/C-eko/CI-eko

Chimney systems ICOPAL WULKAN C/CI/C-eko/CI-eko INSTALLATION MANUAL Chimney systems ICOPAL WULKAN C/CI/C-eko/CI-eko Ventilated Notified entity Building Technical and Research Institute Prague notification no. 1020 This instruction refers to double-layer

More information

HORIZONTAL INSTALLATION

HORIZONTAL INSTALLATION THERMO/SOLAR Žiar s.r.o. MANUAL FOR INSTALLATION PV SUPPORTING FRAMES HORIZONTAL INSTALLATION Technical alternation reserved A1410 1 12/2014 CONTENT ORD.NO. PAGE Mounting information 3 Mounting, flat roof

More information

HDA -----------------------------------------------------------

HDA ----------------------------------------------------------- ----------------------------------------------------------- Lightstrips ---------------------------------------------------------------------- Ceiling system for heating and cooling LIGHTSTRIPS LIGHTSTRIPS

More information

SINTEF Building and Infrastructure. Contents

SINTEF Building and Infrastructure. Contents Contents Contents... 2 1. Introduction... 3 2. Test Object... 3 3. Test Method... 4 4. Testing... 5 4.1 Hunton Asfalt Vindtett 12 mm... 5 4.2 Hunton Bitroc 15 mm... 5 4.3 Hunton Asfalt Vindtett 25 mm...

More information

Fire Preventive and Fireproof Performance Test and Evaluation Procedure Manual

Fire Preventive and Fireproof Performance Test and Evaluation Procedure Manual BR BO-01-02 Effective from June 1, 2000 Revision: March 26, 2002 Fire Preventive and Fireproof Performance Test and Evaluation Procedure Manual (Unofficial Manual) Technical Appraisal Department, Building

More information

Diameter. Swift Lift Round Recess Plug. Note: The diameter of the narrow recess plug is the same as the diameter of the round recess plug.

Diameter. Swift Lift Round Recess Plug. Note: The diameter of the narrow recess plug is the same as the diameter of the round recess plug. P-5 The P-5 is hot forged from carbon steel. The formed head provis spherical seating that the Lifting Eye engages, while a disc-shaped foot is embedd in the concrete. Due to its being a forged part, the

More information

Hanson Building Products. precast basement solutions

Hanson Building Products. precast basement solutions Hanson Building Products precast basement solutions Hanson Building Products Basement Systems Add an extra dimension and combine the inherent flexible, structural and waterproof properties of concrete

More information

Elevating Your House. Introduction CHAPTER 5

Elevating Your House. Introduction CHAPTER 5 CHAPTER 5 Elevating Your House Introduction One of the most common retrofitting methods is elevating a house to a required or desired Flood Protection Elevation (FPE). When a house is properly elevated,

More information

Holes & Selective Laser Sintering

Holes & Selective Laser Sintering SLS is one of the most accurate 3D printing processes. The process has a layer thickness of 0.1mm. This is the thickness with which a new layer is added to each part. In any direction therefore the maximum

More information

TABLE OF CONTENTS. INTRODUCTION... 5 Advance Concrete... 5 Where to find information?... 6 INSTALLATION... 7 STARTING ADVANCE CONCRETE...

TABLE OF CONTENTS. INTRODUCTION... 5 Advance Concrete... 5 Where to find information?... 6 INSTALLATION... 7 STARTING ADVANCE CONCRETE... Starting Guide TABLE OF CONTENTS INTRODUCTION... 5 Advance Concrete... 5 Where to find information?... 6 INSTALLATION... 7 STARTING ADVANCE CONCRETE... 7 ADVANCE CONCRETE USER INTERFACE... 7 Other important

More information

Natural Convection. Buoyancy force

Natural Convection. Buoyancy force Natural Convection In natural convection, the fluid motion occurs by natural means such as buoyancy. Since the fluid velocity associated with natural convection is relatively low, the heat transfer coefficient

More information

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE 86 :: Certificate in Construction Supervision (CIVIL) 12 ROOF 12.1 INTRODUCTION The structure provided to cover the house surface (floor) is known as roof. For different situation and requirement, it is

More information

7. Installation. installation 7.1.1. CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME

7. Installation. installation 7.1.1. CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME 7. Installation Window involves the fixing of window frame at an earlier construction stage and subsequent of the window sashes. This is a highly workmanship dependent process. Only trained and approved

More information

Compression load testing straw bale walls. Peter Walker Dept. Architecture & Civil Engineering University of Bath Bath BA2 7AY.

Compression load testing straw bale walls. Peter Walker Dept. Architecture & Civil Engineering University of Bath Bath BA2 7AY. Compression load testing straw bale walls Peter Walker Dept. Architecture & Civil Engineering University of Bath Bath BA2 7AY May 2004 1. Introduction Over the last 10 years a growing number of loadbearing

More information

SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word

More information

EXTeRUS. EXTeRUS - With patented design, able to join technology. and quality of materials with a charming shape. Unique

EXTeRUS. EXTeRUS - With patented design, able to join technology. and quality of materials with a charming shape. Unique EXTeR US G L A S S - With patented design, able to join technology and quality of materials with a charming shape. Unique thanks to its outstanding loading capability with 150 kg maximum weight and height

More information

Technical Notes 3B - Brick Masonry Section Properties May 1993

Technical Notes 3B - Brick Masonry Section Properties May 1993 Technical Notes 3B - Brick Masonry Section Properties May 1993 Abstract: This Technical Notes is a design aid for the Building Code Requirements for Masonry Structures (ACI 530/ASCE 5/TMS 402-92) and Specifications

More information

Module 7 (Lecture 24 to 28) RETAINING WALLS

Module 7 (Lecture 24 to 28) RETAINING WALLS Module 7 (Lecture 24 to 28) RETAINING WALLS Topics 24.1 INTRODUCTION 24.2 GRAVITY AND CANTILEVER WALLS 24.3 PROPORTIONING RETAINING WALLS 24.4 APPLICATION OF LATERAL EARTH PRESSURE THEORIES TO DESIGN 24.5

More information

Installation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: 1996. No.: SE-...

Installation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: 1996. No.: SE-... Installation guide for the SafeLine type anchorage device Tested in compliance with EN 795: 1996 No.: SE-... Version: 09.10.2008 SE 67 Subject to technical alterations! Contents 1. General information

More information

FOUNDATION DESIGN. Instructional Materials Complementing FEMA 451, Design Examples

FOUNDATION DESIGN. Instructional Materials Complementing FEMA 451, Design Examples FOUNDATION DESIGN Proportioning elements for: Transfer of seismic forces Strength and stiffness Shallow and deep foundations Elastic and plastic analysis Foundation Design 14-1 Load Path and Transfer to

More information

SLAB DESIGN. Introduction ACI318 Code provides two design procedures for slab systems:

SLAB DESIGN. Introduction ACI318 Code provides two design procedures for slab systems: Reading Assignment SLAB DESIGN Chapter 9 of Text and, Chapter 13 of ACI318-02 Introduction ACI318 Code provides two design procedures for slab systems: 13.6.1 Direct Design Method (DDM) For slab systems

More information

Uncovered Decks & Porches

Uncovered Decks & Porches Uncovered Decks & Porches Building Guides for Homeowners Why Do I need a Permit? D I D Y O U K N O W? As owner-builder you are the responsible party of record on such a permit. If your work is being performed

More information

2.9 WINDOW & DOOR BUCKS

2.9 WINDOW & DOOR BUCKS 2.9 WINDOW & DOOR BUCKS Bucks provide attachment surfaces for windows and doors while holding back concrete from these openings during concrete placement. Mark the center and edges of openings as you place

More information

ARCHITECTURAL. FritsJurgens Pivot Door System Product Range Brochure

ARCHITECTURAL. FritsJurgens Pivot Door System Product Range Brochure ARCHITECTURAL FritsJurgens Pivot Door System Product Range Brochure About Bellevue and FritJurgens -90 0 90 For over 30 years, the name Bellevue Architectural (formerly Bellevue Imports) has always been

More information

Window Glass Design 5 According to ASTM E 1300

Window Glass Design 5 According to ASTM E 1300 A User s Guide to: Window Glass Design 5 According to ASTM E 1300 A product of: 1 Table of Contents Table of Contents List of Figures Chapter 1: Window Glass Design 5 1.1 Introduction 1.2 Features ii iv

More information

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs. Skylight Installation Instructions This document provides instruction and guidelines for installation of both curb mount (CM) and self flashing (SF) unit skylights on flat, pitched (> or equal to 3/12

More information

CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS

CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings,

More information

Solid shape molding is not desired in injection molding due to following reasons.

Solid shape molding is not desired in injection molding due to following reasons. PLASTICS PART DESIGN and MOULDABILITY Injection molding is popular manufacturing method because of its high-speed production capability. Performance of plastics part is limited by its properties which

More information

Introduction...COMB-2 Design Considerations and Examples...COMB-3

Introduction...COMB-2 Design Considerations and Examples...COMB-3 SECTION DIRECTORY General Information Introduction...COMB-2 Design Considerations and Examples...COMB-3 Combination Assembly Recommendations and Limitations Composite Configurations...COMB-4 Typical Sealant

More information

EN 1991-1-6 DK NA:2007

EN 1991-1-6 DK NA:2007 EN 1991-1-6 DK NA:2007 National Annex to Eurocode 1: Actions on structures - Part 1-6: General actions Actions during execution Foreword In connection with the incorporation of Eurocodes into Danish building

More information

288 Range 24-28 tm. Technical data. www.hiab.com. Min. 4685 Max. 20970

288 Range 24-28 tm. Technical data. www.hiab.com. Min. 4685 Max. 20970 HIAB 288 Range 24-28 tm Min. 4685 Max. 20970 2842 Technical data www.hiab.com HIAB XS 288 Contents Introduction...3 Safety Regulations...4 Disclaimer...4 Explanation of Symbols...4 Explanation of Diagrams...4

More information

DESIGN OF SLABS. Department of Structures and Materials Engineering Faculty of Civil and Environmental Engineering University Tun Hussein Onn Malaysia

DESIGN OF SLABS. Department of Structures and Materials Engineering Faculty of Civil and Environmental Engineering University Tun Hussein Onn Malaysia DESIGN OF SLABS Department of Structures and Materials Engineering Faculty of Civil and Environmental Engineering University Tun Hussein Onn Malaysia Introduction Types of Slab Slabs are plate elements

More information

How to build a Pizza Oven in 4 days

How to build a Pizza Oven in 4 days How to build a Pizza Oven in 4 days Preparation day (slab) 1. Foundation 1500 deep x 1300 wide x 75mm deep Required 20 bags cement pre mix. If you already have a concrete base, you save this prep day DAY

More information

Analysis and Repair of an Earthquake-Damaged High-rise Building in Santiago, Chile

Analysis and Repair of an Earthquake-Damaged High-rise Building in Santiago, Chile Analysis and Repair of an Earthquake-Damaged High-rise Building in Santiago, Chile J. Sherstobitoff Ausenco Sandwell, Vancouver, Canada P. Cajiao AMEC, Vancouver, Canada P. Adebar University of British

More information

PPS-PPQ-BT-PIAS RESIN INSULATORS FOR OIL INSULATED ELECTRICAL MACHINES

PPS-PPQ-BT-PIAS RESIN INSULATORS FOR OIL INSULATED ELECTRICAL MACHINES PPS-PPQ-BT-PIAS RESIN INSULATORS FOR OIL INSULATED ELECTRICAL MACHINES BUSHING WITH PLUG CONNECTION WITH OUTER CONE PPS CHARACTERISTICS The PPS bushing can be used as a fixed section for the entry of medium

More information

IPR-02-64. Äspö Hard Rock Laboratory. International Progress Report. Temperature Buffer Test. Report for retaining plug and anchoring

IPR-02-64. Äspö Hard Rock Laboratory. International Progress Report. Temperature Buffer Test. Report for retaining plug and anchoring International Progress Report IPR-02-64 Äspö Hard Rock Laboratory Temperature Buffer Test Report for retaining plug and anchoring Richard Bäck Äspö HRL September 2002 Svensk Kärnbränslehantering AB Swedish

More information

Superform Products Ltd.

Superform Products Ltd. TYPICAL CORNER REINFORCING NOTE : SEE ENGINEERED REBAR SCHEDULES SUPPLIED BY THE MANUFACTURER STEEL REINFORCEMENT WALL CORNER 90 Copyright 2012 Sept. 2012 5.1.1 Rebar Spacing 6" 12" Max. Load LB./FT. 2000

More information

Detailing of Reinforcment in Concrete Structures

Detailing of Reinforcment in Concrete Structures Chapter 8 Detailing of Reinforcment in Concrete Structures 8.1 Scope Provisions of Sec. 8.1 and 8.2 of Chapter 8 shall apply for detailing of reinforcement in reinforced concrete members, in general. For

More information

HS-Steel-Classic. Curing chambers for the concrete block industry in a proven steel version

HS-Steel-Classic. Curing chambers for the concrete block industry in a proven steel version ANLAGENTECHNIK HS-Steel-Classic Curing chambers for the concrete block industry in a proven steel version + special galvanising + simple assembly due to snap-in connections and building kit system We build

More information

LAYING BLOCK AND BRICK

LAYING BLOCK AND BRICK LAYING BLOCK AND BRICK Products highlighted in this section: SAKRETE Type N Mortar Mix SAKRETE Type S Mortar Mix Brick And Block Laying Basics The first step in building a brick or block wall is to construct

More information

BSF and BCC beam connections

BSF and BCC beam connections No. 2512 Norwegian member of European Organisation for Technical Approvals, EOTA, and European Union of Agrément, UEAtc Issued: 11.09.2007 Revised: Valid until: 11.09.2012 Page: 1 of 5 BSF and BCC beam

More information

39HQ Airovision Air Handling Units

39HQ Airovision Air Handling Units 39HQ Airovision Air Handling Units Mounting instructions CONTENTS 1 - TRANSPORT AND LIFTING INSTRUCTIONS... 3 1.1 - General... 3 1.2 - Transport and storage... 3 1.3 - Roof edge protection during transport

More information

INSTRUCTIONS FOR USE

INSTRUCTIONS FOR USE 2/2013 ANCHOR BOLTS INSTRUCTIONS FOR USE - Threaded rebars ATP, AHP, AJP - Threaded high strength steel bolts ALP-L, ALP-P, AMP ATP AHP ALP-L ALP-P AMP Eurocode design according to EN1993-1-8 (2005) &

More information

If stepping is required, step at 180mm as seen in this picture.

If stepping is required, step at 180mm as seen in this picture. Cast Foundations to standard building regulations requirements. Foundations must be cast completely level, 600mm wide by 230mm deep for single storey, double storey is not allowed by NHBRC. If stepping

More information

PLASTIC CONTAINERS CONTAINER HOLDING TROLLEYS CONTAINER HOLDING CABINETS PLASTIC DRAWER UNITS DRAWER UNIT HOLDER SHELVES FOOD CONTAINERS

PLASTIC CONTAINERS CONTAINER HOLDING TROLLEYS CONTAINER HOLDING CABINETS PLASTIC DRAWER UNITS DRAWER UNIT HOLDER SHELVES FOOD CONTAINERS CONTAINER HOLDING TROLLEYS CONTAINER HOLDING CABINETS PLASTIC DRAWER UNITS DRAWER UNIT HOLDER SHELVES FOOD CONTAINERS INDUSTRIAL CONTAINERS 64 CONTAINER HOLDING TROLLEYS for the coloured containers always

More information

Guidelines for Earthquake Bracing of Residential Water Heaters

Guidelines for Earthquake Bracing of Residential Water Heaters Guidelines for Earthquake Bracing of Residential Water Heaters Department of General Services Division of the State Architect 1102 Q Street, Suite 5100 Sacramento, CA 95814 Phone: (916) 324-7099 Fax: (916)

More information

Permanent Stainless Steel Anchorage Point for Concrete, Solid Masonry and Steel Constructions

Permanent Stainless Steel Anchorage Point for Concrete, Solid Masonry and Steel Constructions ABS-Lock X / X - SR Permanent Stainless Steel Anchorage Point for Concrete, Solid Masonry and Steel Constructions The ABS-Lock X system was developed to provide both a secure single anchorage point for

More information

FORM DESIGN. easy to work with, and generally available.

FORM DESIGN. easy to work with, and generally available. Forms play a major role in concrete construction. They give the plastic concrete its shape and hold it until it hardens. Forms protect the concrete, assist in curing it, and support any reinforcing rods

More information

ICC-ES Evaluation Report Reissued September, 2010 This report is subject to re-examination in one year.

ICC-ES Evaluation Report Reissued September, 2010 This report is subject to re-examination in one year. ICC-ES Evaluation Report ESR-2270 Reissued September, 2010 This report is subject to re-examination in one year. www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council

More information

1.1 DIMENSIONS AND WEIGHT PAG. 2 1.2 LOAD CENTRE FOR LIFTING PAG. 2 1.3 STORAGE CONDITIONS PAG. 2

1.1 DIMENSIONS AND WEIGHT PAG. 2 1.2 LOAD CENTRE FOR LIFTING PAG. 2 1.3 STORAGE CONDITIONS PAG. 2 TRANSPORT AND INSTALLATION. DIMENSIONS AND WEIGHT PAG.. LOAD CENTRE FOR LIFTING PAG..3 STORAGE CONDITIONS PAG. STARTING. INSTALLATION PAG.. SPACE REQUIREMENTS PAG. 3.3 ELECTRIC CONNECTION PAG. 3 3 DESCRIPTION

More information

Chapter. Earthquake Damage: Types, Process, Categories

Chapter. Earthquake Damage: Types, Process, Categories 3 Chapter Earthquake Damage: Types, Process, Categories Earthquakes leave behind a trail of damage and destruction. People s lives are affected by the loss of loved ones, destruction of property, economic

More information

3D Drawing. Single Point Perspective with Diminishing Spaces

3D Drawing. Single Point Perspective with Diminishing Spaces 3D Drawing Single Point Perspective with Diminishing Spaces The following document helps describe the basic process for generating a 3D representation of a simple 2D plan. For this exercise we will be

More information

DE Frame with C Series Sidelight

DE Frame with C Series Sidelight TOOLS REQUIRED Tape measure 6' magnetic level 3' magnetic level Screw gun with clutch adjusted #2 phillips tip #3 phillips tip Screwdriver (used to adjust frame on will using oval slots) Pry Bar Powder

More information

Fixed Access Ladders. Table of Contents. 1. Legislative Requirements

Fixed Access Ladders. Table of Contents. 1. Legislative Requirements Fixed Access Ladders Engineering Data Sheet 2-04 Revised: January 1997 Table of Contents 1. Legislative Requirements 2. General 3. Rungs 4. Side Rails 5. Safety Cages 6. Attachment & Anchoring 7. Platforms

More information

The Roskilde Domes 2011 and 2012

The Roskilde Domes 2011 and 2012 Proceedings of the International Association for Shell and Spatial Structures (IASS) Symposium 2013 BEYOND THE LIMITS OF MAN 23-27 September, Wroclaw University of Technology, Poland J.B. Obrębski and

More information

Sliding and Folding Door Fittings Sliding Door Accessories

Sliding and Folding Door Fittings Sliding Door Accessories Sliding door lock Toplock For 1- and 2-leaf sliding doors Suitable for toughened safty glass and laminated sheet glass Suitable for DIN left and DIN right Max. weight per door leaf 120 kg For glass thickness:

More information

Dubai Municipality Standard DMS 1: Part 5: 2004

Dubai Municipality Standard DMS 1: Part 5: 2004 Specification for precast concrete blocks Part 5: Normal-weight concrete-polystyrene sandwich masonry blocks Issue Date Revision Revision Description Prepared by Approved by Authorized by 19/12/2004 Issue

More information

Egcobox Software Manuel Version 2.0. 2007-2010 Max Frank GmbH & Co. KG

Egcobox Software Manuel Version 2.0. 2007-2010 Max Frank GmbH & Co. KG Egcobox Software Manuel Version 2.0 2007-2010 Max Frank GmbH & Co. KG Egcobox Software Contents Page Contents 3-4 Overview 5-13 Example calculation type 1: cantilever balcony 14-15 Language and standard

More information

Knauf Aquapanel Interior. Tile Backing. Cement board for wet areas. Will not deteriorate in water. Easy to score and snap

Knauf Aquapanel Interior. Tile Backing. Cement board for wet areas. Will not deteriorate in water. Easy to score and snap Tile Backing Will not deteriorate in water Easy to score and snap Resistant to mould and mildew Knauf Aquapanel Interior Cement board for wet areas Knauf Aquapanel Interior Cement Board Drywall for Wet

More information

VITOSOL r 200-T SP2A. VITOSOL 200-T Type SP2A

VITOSOL r 200-T SP2A. VITOSOL 200-T Type SP2A Technical Data Manual Model Nos. and pricing: see Price List Vacuum tube collector based on the heat pipe principle For the utilisation of solar energy VITOSOL r 200-T SP2A Product may not be exactly as

More information

necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the

necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the Chapter 7 PLUMBING AND ELECTRICAL 7.1 Introduction to Plumbing and Electrical Consideration of support services such as plumbing and electrical systems from the preliminary schematics phase through final

More information

ENGINEERING COMMITTEE

ENGINEERING COMMITTEE ENGINEERING COMMITTEE Interface Practices Subcommittee AMERICAN NATIONAL STANDARD ANSI/SCTE 02 2006 Specification for F Port, Female, Indoor NOTICE The Society of Cable Telecommunications Engineers (SCTE)

More information

9.3 Two-way Slabs (Part I)

9.3 Two-way Slabs (Part I) 9.3 Two-way Slabs (Part I) This section covers the following topics. Introduction Analysis and Design Features in Modeling and Analysis Distribution of Moments to Strips 9.3.1 Introduction The slabs are

More information

Residential Deck Safety, Construction, and Repair

Residential Deck Safety, Construction, and Repair Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the

More information

Installation manual Pitched Roof Clamp System

Installation manual Pitched Roof Clamp System Van der Valk Solar Systems TRACKNG AND FXED SOLAR MOUNTNG SYSTEMS nstallation manual Pitched Roof Clamp System Version 11 EN General user instructions Solar mounting systems Congratulations on buying a

More information

19 DYNAmax Free Standing Server C A B I N E T s

19 DYNAmax Free Standing Server C A B I N E T s 9 DYNAmax Free Standing Server C A B I N E T s 9 DYNAmax Free Standing Server Cabinets FAMILY W=600mm and W=800mm DYNAmax Series Free Standing Server Cabinets DYNAmax series Servering Enclosures, provide

More information

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing 1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize

More information

Sheet metal operations - Bending and related processes

Sheet metal operations - Bending and related processes Sheet metal operations - Bending and related processes R. Chandramouli Associate Dean-Research SASTRA University, Thanjavur-613 401 Table of Contents 1.Quiz-Key... Error! Bookmark not defined. 1.Bending

More information

Fire-resistant barriers: background on requirements and determination method. Reading guide for test reports.

Fire-resistant barriers: background on requirements and determination method. Reading guide for test reports. Fire-resistant barriers: background on requirements and determination method. Reading guide for test reports. Report number C 1395-1E-RA-003 d.d. May 14, 2014 Fire-resistant barriers: background on requirements

More information

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS Johnson County Building Officials Association January 2008 Residential Foundation Guideline Foundation designs for one-and two-family dwellings may use

More information

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI 318-14

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI 318-14 Draft Table of Contents Building Code Requirements for Structural Concrete and Commentary ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318 14) Chapter 1 General 1.1 Scope of ACI 318

More information

DESIGN BY: ARCH. GIUSEPPE INZITARI

DESIGN BY: ARCH. GIUSEPPE INZITARI DESIGN BY: ARCH. GIUSEPPE INZITARI 218 FOR HIGH THICKNESS FROM 12 TO 17.5 MM - GIUMAX GIUMAX 9500 Page 220 GIUMAX 8500 Page 227 ROLLERS Page 233 GIUMAX 4500 Page 236 GIUMAX 6500 Page 244 FROM 8 TO 12 MM

More information

Plastic Injection Molding

Plastic Injection Molding Training Objective After watching this video and reviewing the printed material, the student/trainee will understand the principles and physical operations of the plastic injection molding process. An

More information

Fiberglas, Exterior Wall Thermal Insulation

Fiberglas, Exterior Wall Thermal Insulation PROJECT ENGINEER RESPONSIBILITY: This is a general specification guide, intended to be used by experienced construction professionals, in conjunction with good construction practice and professional judgment.

More information

Phnom Bakheng Conservation Project Update

Phnom Bakheng Conservation Project Update Phnom Bakheng Conservation Project Update September 2013 Major accomplishments At the Northeast corner Completed bedrock repair underneath stone shrine D12 Completed reassembly of stone shrine D11 Continued

More information

Brandangersundet Bridge A slender and light network arch

Brandangersundet Bridge A slender and light network arch Brandangersundet Bridge A slender and light network arch Rolf Magne Larssen Dr. ing./ Ph.D. Dr. ing A. Aas-Jakobsen AS Oslo, Norway rml@aaj.no Rolf Magne Larssen, born 1958, received his Ph.D. in structural

More information

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW is a fully reinforced Pre-Applied system membrane designed for horizontal and vertical external blind-side

More information

Improving thermal insulation of concrete sandwich panel buildings

Improving thermal insulation of concrete sandwich panel buildings Improving thermal insulation of concrete sandwich panel buildings Jørgen Munch-Andersen Danish Building Research Institute, Aalborg University LCUBE conference, Vienna 17-18 April 2007 Outline A general

More information

Stair Parts Installation. Tricks

Stair Parts Installation. Tricks Stair Parts Installation Tips & Tricks Introduction Your DIY staircase guide Welcome to the Stairpart home installation guide. Your stairway is both a functional and focal point in your home, so keeping

More information

EN 1991-1-7. Eurocode 1 Accidental Actions. Ton Vrouwenvelder TNO Bouw / TU Delft. EUROCODES Background and Applications

EN 1991-1-7. Eurocode 1 Accidental Actions. Ton Vrouwenvelder TNO Bouw / TU Delft. EUROCODES Background and Applications Brussels, 18-20 February 2008 Dissemination of information workshop 1 EN 1991-1-7 Eurocode 1 Accidental Actions Ton Vrouwenvelder TNO Bouw / TU Delft Brussels, 18-20 February 2008 Dissemination of information

More information

FRACASSO SCAFFOLDING PS 720

FRACASSO SCAFFOLDING PS 720 FRACASSO SCAFFOLDING PS 720 Characteristics Geometry Strengths PS 720 was designed and constructed in keeping with European regulations EN12810 and EN12811. 150 mm pin obtained by tapering the upright

More information