1 Appendix J: Pipe Evaluation and Replacement Options and Costs STORMWATER SYSTEM INVENTORY The City of Olympia has an extensive stormwater conveyance system. As a matter prudent management of the Stormwater Utility, it is necessary to know the quantity of pipe in the system and its age, condition, and life expectancy. This study focuses on the age, condition, life expectancy, and expected replacement cost of the present stormwater conveyance system (pipes). Other elements of the stormwater system that are not considered in this study are manholes, catch basins, pump stations, and storm ponds. The goals of this study are identified as the following: 1. Identify and quantify the entire existing stormwater pipe within the City of Olympia; 2. Collect data on the life expectancy of different pipe types; 3. Video select pipes to determine their condition and rate of deterioration; 4. Adopt a reliable system for storing and retrieving pipe condition information; 5. Project a useful life span for stormwater pipes; 6. Prepare a conceptual pipe replacement schedule; and 7. Prepare a pipe replacement cost estimate. The pipe replacement cost estimate can be used to plan for future budgetary needs to replace the existing system as it reaches the end of the its useful life. Storm pipes that reach the end of their useful lives can and do crack, leak, and collapse. These failures can cause street and property flooding, resulting in damage to property and streets. Pipes that collapse can result in an emergency condition where additional resources and dollars are spent responding to the emergency. Proactively replacing worn-out conveyance systems pipe can prevent future damages and efficiently uses the stormwater utility resources for replacing its infrastructure. Section 1. Type and Quantity of Pipe in Existing System The City of Olympia stormwater piping system contains approximately 670,000 feet of pipe, 4 inches in diameter and larger, composed of 5 basic materials. These include vitrified clay (VC), concrete (RCP & CP), high density polyethylene (HDPE), metal pipe (CMP), and polyvinyl chloride (PVC), and range in diameter up to 72 inches. In addition, there is approximately 109,000 feet of pipe in the combined sanitary/storm sewer system that is not included in this study because it is considered to be sanitary sewer pipe. For the purposes of this study, the various pipe diameters are grouped into four size ranges to simplify replacement cost estimating: 4 inches to 10 inches, 12 inches to 16 inches, 18 inches to 32 inches, and 36 inches and larger. The amount of pipe type in each size range is shown in the following table: J-1

2 Table 1: Existing Stormwater Pipes Size Range in Inches Vitrified Clay Concret e HDPE Metal PVC Total Percent of Total 4 to 10 24, ,000 6,000 48,000 97, , to 16 10,000 77,000 17,000 36,000 24, , to 32 7,000 44,000 11,000 33,000 7, , to , , , Total 41, ,000 34, , , , Percent of Total Section 2. Life Expectancy of Storm Pipes To determine the service life of storm pipes, a variety of different information sources were consulted. Sources included pipe manufacturers, pipe manufacturers associations, cities, counties, and state agencies. Most pipe manufacturers state a long service life for their material and a lower period for their competitors pipe materials. The information collected is summarized in Table 2. J-2

3 Table 2. Summary of Storm Pipe Life Pipe Material Manufacturer s Claimed Life Longest Duration Installed Comments City of Seattle Comments City of Tacoma Comments Pierce County Concrete 100 years 100+ years Preferred product; 60-year-old minimal pipe rehab PVC 100 year 30 years Cracks Easily Installed for 40 years 60-year-old installed pipes are okay Only SDR35 40-year-old installed pipes are okay Not available CMP 30 to 80, depends on soil resistance 120 years Will not use due to short life Rarely used due to life concerns 30-year-old pipe in need of rehab Vitrified Clay years Majority of rehab work; oldest pipe is 120 years old No Comments No Comments HDPE 70 + years 50 years Limited use; Solid wall only; Use in some central areas Limited use; Solid wall only 20-year-old installation appears as new To get an idea of the age of the storm sewer system within the City of Olympia, a sampling study approach was taken. Using the City s as-built drawings, the ages of a random sampling of pipes were determined. The ages were determined by looking at the date on the as-built drawing. A sufficient number of pipes were examined to create a distribution of pipe ages and to have a high level of confidence in the age determined. The following Table 3 summarizes the findings of the random sample. Table 3. City of Olympia Storm System Age of Pipes From Random Sample Vitrified Clay Concrete HDPE CMP PVC Sample Size 1* Oldest pipe in sample (yr) Std. Dev. Of sample (yr) Median Age in Sample (yr) Average Age in Sample (yr) Percent Confidence Interval Of Population Average Age (yr) * Numerous records were researched but only one record could be found. J-3

4 Since the sample sizes are small in relation to the population size, the 90 percent confidence level of the pipe average age is typically plus or minus five years. Thus, this study should be thought of as providing replacement time estimates in the range of plus or minus five years or within a time span of one decade. Section 3. Video Select Pipes to Determine Condition and Rate of Deterioration The objective of video inspection is two-fold: 1) Assess the condition of existing pipes, and 2) Provide a baseline to determine how the condition of storm pipe changes with age. To complete the first objective, the condition of the storm pipes inspected will be compared to those of new pipes, and some prediction of pipe life or rate of deterioration will be made. The pipes to be inspected are the oldest pipes of different material types determined in the random sample. To meet the second objective, the video inspection will be repeated in a number of years, and the change in condition in the interim period will be used to assess the aging rate of pipes. This second objective will not be completed for many years until the video inspection is preformed several times. The locations and ages of the pipes to be video inspected are given in Table 4 below. J-4

5 Table 4. Location and Age of Video Inspection Monitoring Study Storm Pipes Pipe Number Material Size (In Inches) Location Age City 10 Series Reference CR57-1 VC 30 Outfall Market Street to inlet through the port 1929 None CR57-2 VC Capital Way, Thurston to Olympia? None CR57-3 VC 8-12 Legion, Washington to Franklin? None CR57-4 Conc Chestnut, 4 th to 5 th 1927 FB-242, 1-18 CR57-5 Conc Cherry, 11 th to 12 th CR57-6 Conc Franklin, A to D 1951? CR57-7 Conc San Francisco, Pear to Quince CR57-8 CMP 8-12 East Bay Drive, near Berry CR57-9 CMP th Court, Mid-block, off Lilly CR57-10 CMP Cooper Point Road, between Caton and Carriage Loop F CR57-11 CMP I-5 ROW stream crossing at Henderson CR57-12 PVC 8-12 Buckingham, Gainsborough to South Hampton CR57-13 PVC 8-12 Mapleview Drive, Mapleview Court to Maple Ridge Court E CR57-14 PVC 8-12 Sunnyvale Court, mid-block, east of Goldcrest CR57-15 PVC 10 Caton Way, off Cooper Point Road A-B CR57-16 HDPE 8 Thomas Street, end of, south of 15 th 1967 LID673 CR57-17 HDPE 8-12 Carlyon, Boundary to Central 1977? CR57-18 HDPE Martin Way, mid-block, Sleater-Kinney to College 1978 FB960,4 The initial video inspection of the storm pipes has not been completed due to the workloads of the video inspection personnel. When the video and condition rating is performed, this section will be completed and an addendum will be prepared for this report. Section 4. Adopt a Reliable System for Storing and Retrieving Pipe Condition Information Since scoping this study, the sanitary sewer utility has researched and purchased a set of software programs that allows for the video inspection, condition rating, and storage of pipe condition information. The use of this equipment for the video inspection of storm pipes would be ideal for rating, storing, and retrieving storm pipe condition information. J-5

6 The pipe rating and storage system is not fully operational yet due to the workloads of the information technology personnel required to set up the storage devices. When this system is fully operational, all storm sewers should be inspected with the software and the relevant condition information stored for future use. Section 5. Project a Useful Life Span for Stormwater Pipes From the information gathered, it appears as though the expected life of pipe materials is in line with manufacturer s claims. Concrete, PVC, and Vitrified Clay pipes is 100 years, HDPE can currently be assumed to be slightly less at 80 years, and metal pipe can need replacement in as little as 30 years in high groundwater areas, but 50 years may be an appropriate life span. The useful lives used in this study are given below. Table 5. Useful Life of Storm Pipes Pipe Type Useful Life Vitrified Clay Concrete HDPE Metal Pipe PVC 100 years 100 years 80 years 50 years 100 years The Washington State Department of Transportation recommends a minimum design life of 50 years for all pipes. Section 6. Conceptual Pipe Replacement Schedule Using the distribution of ages in the sample, the total length of pipe within the City storm sewer system was divided up into the same age distribution. For example, if the City has 30,000 feet of a type of storm pipe and the sample had an age distribution of 33 percent at 0 to 10 years old, 33 percent at 10 to 20 years old, and 33 percent at 20 to 30 years old, then 10,000 feet would be assumed to be 0 to 10 years old, 10,000 feet at 10 to 20 years old, and 10,000 feet at 20 to 30 years old. The expected life of different pipe types from Section 1 was used to project the replacement decades of the current system s total length. The projected replacement decades of the current storm system are shown in Table 6. Note that the vitrified clay pipe was evenly divided into the next three decades since the one pipe found was 70 years old and life expectancy is 100 years. J-6

7 Table 6. Projected Length of Storm Pipe to be Replaced in a Decade Decade Ending Vitrified Clay (feet) Concrete (feet) HDPE (feet) CMP (feet) PVC (feet) Total (feet) , , , , , ,600 11, , , ,900 35, , ,900 11, , ,300 11, , , , ,400 14, , , , ,700 45, ,900 58,900 Total 34, ,600 31,700 99, , ,800 Expected Life 100 years 100 years 80 years 50 years 100 years Section 7. Prepare a Pipe Replacement Cost Estimate Currently, the most cost-effective means of replacing a failed pipe is to rehabilitate the pipe with trenchless technology. Trenchless technologies avoid expensive road restoration cost. To utilize trenchless rehabilitation, the pipe cannot be collapsed, and the pipe route cannot be changed. It is anticipated that the majority of the pipes will be replaced by trenchless technology. Currently, the best prices for trenchless pipe replacement are using cured in-place relining technology. The City of Seattle has a one-year contract with Insituform West, Inc., to reline various sized pipes. Using the distribution of different pipe sizes in the City storm system and the contract price to reline that size pipe, a weighted average cost to reline the various pipe types can be determined. For example, if the City has 30,000 feet of a type of storm pipe and the sample had a size distribution of 33 percent at 4 inches to 10 inches in diameter, 33 percent at 12 inches to 16 inches in diameter, and 33 percent at 18 inches to 32 inches in diameter, then 33 percent would cost $50 per foot to reline, 33 percent would cost $70 per linear foot to reline, and 33 percent would cost $100 per linear foot to reline. The weighted average cost to reline a random section of the storm pipe would be {(0.33x$50)+(0.33x$70)+)(0.33x$100) }=$72.6 per linear foot. J-7

8 It could be expected that with the aging of the storm sewer system over the entire country that rehabilitation technologies will advance and become more cost efficient over the next century. If this is so, the cost projections in this study will be overly conservative. Since it is impossible to predict future costs, this study uses current costs. Table 7. Distribution of Storm Pipe Sizes and Average Cost to Reline Pipe Types Pipe Sizes in Inches Vitrified Clay (Percent of Total) Concrete (Percent of Total) HDPE (Percent of Total) CMP (Percent of Total) PVC (Percent of Total) Contract Reline Cost 4 to $50 12 to $70 18 to $ or Larger $150 Weighted Reline Cost $63.47 $65.60 $76.18 $83.33 $56.64 Applying the information in Tables 6 and 7, we can estimate the cost to replace the current system and when those expenditures will take place. Expenditures to reline pipe in the future will require more in future dollars than present dollars. To adjust to future dollars, 2 percent annually compounded inflation was added to the reline cost. Table 8 presents the estimated costs to repair the current storm system. The raw data provided in this analysis results in some large variations in storm pipe expenditure between decades. The reality of financial planning is that a constant or growing budget is needed for planning purposes. A curve of best fit was determined for the raw data of the average annual repair costs. The best-fit line was a straight line starting at $85,000 and increasing at $34,500 per year. J-8

9 Table 8. Estimated Cost to Repair the Existing Storm Sewer System in Future Dollars Decades Raw Cost in Decade Raw Average Annual Cost *Smoothed Average Annual Cost 2002 to 2010 $851,000 $106,375 $85, to 2020 $3,020,000 $302,000 $430, to 2030 $7,629,000 $762,900 $775, to 2040 $6,377,000 $637,700 $1,120, to 2050 $2,985,000 $298,500 $1,465, to 2060 $22,305,000 $2,230,500 $1,810, to 2070 $2,960,000 $296,000 $2,155, to 2080 $60,266,000 $6,026,600 $2,500, to 2090 $15,728,000 $1,572,800 $2,845, to 2100 $24,168,000 $2,416,800 $3,190,000 * Smoothed data is for the middle of the decade. The data in Table 8 is shown in Figure 1 in graph form. Conclusions and Recommendations From the information presented above the following conclusions and recommendations can be made. Conclusions 1. Potentially some of the storm sewer system is reaching the end of its useful life within this decade. These pipes are the vitrified clay and CMPs. 2. CMP should not be used in current storm sewer installations. It is not allowed in the City of Olympia for pipe less than 36 inches in diameter. 3. Over the next century, storm pipe rehabilitation will be a growing industry and increasing amounts of money will have to be spent on replacing or rehabilitating storm pipes. Recommendations 1. Set up a pipe rehabilitation program to be funded in the order of $85,000 for 2002 and increased annual funding at a rate of $34,500 per year, compounded. J-9

10 2. Look for partnering opportunities with roadway overlay and rebuild project to reconstruct vitrified clay and metal pipes. 3. The cost projections in this study should be updated as pipe rehabilitation technologies advance and become more cost effective. 4. Start rating pipes and storing conditions; assess for priority replacement and projecting future replacement schedules. J-10

Estimating Stormwater System Annual Maintenance and Repair Costs - A GIS Approach

Estimating Stormwater System Annual Maintenance and Repair Costs - A GIS Approach October 5 2011 Estimating Stormwater System Annual Maintenance and Repair Costs - A GIS Approach 2011 SESWA Annual Conference 2011 Southeast Stormwater Associated Annual Conference Presentation Overview

More information

2.1 Development of Risk-Based Asset Management Framework

2.1 Development of Risk-Based Asset Management Framework SECTION 2 Development of Asset Management Framework 2.1 Development of Risk-Based Asset Management Framework As part of the master planning effort, WES developed a risk-based asset management framework

More information

ITD Pipe Materials Selection & Specification Procedures. July 2011

ITD Pipe Materials Selection & Specification Procedures. July 2011 ITD Pipe Materials Selection & Specification Procedures July 2011 INTRODUCTION: This technical memorandum is written as a guide to the selection of compliant pipe materials and the elimination of non-compliant

More information

ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022

ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 Town of Zionsville, Indiana December 19, 2012 PREPARED BY BEAM, LONGEST & NEFF, LLC. 8126 Castleton Road Indianapolis, Indiana

More information

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Storm Sewer Trenchless Upgrade Alternatives and Recommendations Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for

More information

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors. SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION

More information

Bridges & Culverts Condition by Quantity

Bridges & Culverts Condition by Quantity 3.4.3 What condition is it in? Approximately 93% of the municipality s bridge structures are in good to excellent condition, with the remaining 7% in fair condition. As a result, the municipality received

More information

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY Cured-In-Place Pipe Pressure & Gravity Lines Pipe Splitting Trenchless Pipe Replacement EcoCast Advanced

More information

Sewer Rehabilitation Design Requirements

Sewer Rehabilitation Design Requirements Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared

More information

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Abstract The United States Virgin Islands Waste Management Authority

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

Section 2100-Trenching and Tunneling

Section 2100-Trenching and Tunneling SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial

More information

SECTION 724 PIPE CULVERTS

SECTION 724 PIPE CULVERTS SECTION 724 PIPE CULVERTS 724.1 Description. This work shall consist of providing pipe or pipe arch of the diameter or shape designated, laid upon a firm bed and backfilled as specified. Where appropriate

More information

Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY

Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY Policy: This policy will replace all previous policies regarding the selection of pipe material for cross drains, drive pipe, drop pipe, storm

More information

Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan

Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan Amanda Lei - City of San Jose Alex Palmatier - HDR 2014 HDR, Inc., all rights reserved. Background Forecasting and Budget Data

More information

Township of Enniskillen. Asset Management Plan

Township of Enniskillen. Asset Management Plan Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing

More information

Stormwater Infrastructure Asset Management Plan

Stormwater Infrastructure Asset Management Plan District of West Vancouver May 18, 2010 FINAL REPORT Prepared by: AECOM Canada Ltd. 1901 Rosser Avenue, Floor 6, Burnaby, BC, Canada V5C 6S3 T 604.298.6181 F 604.294.8597 www.aecom.com Project Number:

More information

Premature Storm Drainage System Repairs and Replacement

Premature Storm Drainage System Repairs and Replacement Premature Storm Drainage System Repairs and Replacement Stewart Edwards Program Manager Design Management Team Charlotte-Mecklenburg Storm Water Services April 8, 2015 Date Agenda Storm Water Infrastructure

More information

Preliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006

Preliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006 Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006 1.0 Background and Repair and Rehabilitation Recommendation Clay County has contracted Camp Dresser & McKee Inc. (CDM)

More information

Specifications for Residential Property Owners Connection to New Public Sewer

Specifications for Residential Property Owners Connection to New Public Sewer Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the

More information

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY Revised: April 2014 Village of Wilmette, Illinois NPDES CSO Permit No. ILM580012 Chapter 1 Introduction This Operational and Maintenance

More information

SECTION 5: SANITARY SEWER SYSTEM DESIGN

SECTION 5: SANITARY SEWER SYSTEM DESIGN SECTION 5: SANITARY SEWER SYSTEM DESIGN 5.01 GENERAL Sanitary sewer improvements shall be designed to serve the ultimate level of City development as defined in the General Plan and the Wastewater Facilities

More information

X Planning X Quality X Maintenance & Operations

X Planning X Quality X Maintenance & Operations Delaware Department of Transportation Division of Transportation Solutions Design Guidance Memorandum Memorandum Number 1-20 Revised 1. Road Design Manual 2. Bridge Design Manual 3. Utilities Design Manual

More information

McGOEY, HAUSER and EDSALL CONSULTING ENGINEERS D.P.C.

McGOEY, HAUSER and EDSALL CONSULTING ENGINEERS D.P.C. McGOEY, HAUSER and EDSALL CONSULTING ENGINEERS D.P.C. 111 Wheatfield Drive, Suite 1 Milford, Pennsylvania 18337 (570) 296-2765 fax: (570) 296-2767 e-mail: mhepa@mhepc.com RICHARD D. McGOEY, P.E. (NY &

More information

APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM. Stadium Reconstruction EIR

APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM. Stadium Reconstruction EIR APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM Stadium Reconstruction EIR Appendices \ AECOM Technical Services, Inc 401 West A Street Suite 1200 San Diego, CA 92101 www.aecom.com 619-610-7600 tel 619-610-7601

More information

AGENDA ITEM C9. COST/FUNDING SOURCE: $431,847.40/ Uniform Rate

AGENDA ITEM C9. COST/FUNDING SOURCE: $431,847.40/ Uniform Rate AGENDA ITEM C9 DATE: February 2, 2015 TO: FROM: SUBJECT: Matt Jordan, General Manager Charles Carden, Chief Operating Officer South Pasco Transmission Main Condition Assessment Services with Pure Technologies

More information

Soapstone Sewer Rehabilitation Alternative Concepts Design and Associated Impacts

Soapstone Sewer Rehabilitation Alternative Concepts Design and Associated Impacts Soapstone Sewer Rehabilitation Alternative Concepts Design and Associated Impacts Outline Update on Soapstone Emergency Response Provide project background Provide project purpose & need Present proposed

More information

CHARTER TOWNSHIP OF FENTON SEWER SYSTEM FINANCIAL OVERVIEW JANUARY, 2014

CHARTER TOWNSHIP OF FENTON SEWER SYSTEM FINANCIAL OVERVIEW JANUARY, 2014 CHARTER TOWNSHIP OF FENTON SEWER SYSTEM FINANCIAL OVERVIEW JANUARY, 2014 Fenton Township receives numerous inquiries regarding the relatively high sewer use fees that Township residents have been paying

More information

Lansdowne Stormwater UPDATE

Lansdowne Stormwater UPDATE Lansdowne Stormwater UPDATE August 22, 2012 Ann Arbor Footing Drain Disconnection Stormwater Review Presentation Agenda Welcome and introductions Background on stormwater and sanitary sewer issues Footing

More information

City of Hilshire Village Pine Creek Ln Reconstruction

City of Hilshire Village Pine Creek Ln Reconstruction City of Hilshire Village Pine Creek Ln Reconstruction OVERVIEW The City will be soliciting bids for the Pine Creek Reconstruction Project with construction scheduled to begin in January 2015. This project

More information

ENGINEERED SOLUTIONS. A2 Liner Pipe for Trenchless Technology

ENGINEERED SOLUTIONS. A2 Liner Pipe for Trenchless Technology ENGINEERED SOLUTIONS A2 Liner Pipe for Trenchless Technology A2 Liner Pipe Restores Deteriorated Sewers Cost-Effective Rehabilitation The increasing rate of sanitary and storm sewer deterioration requires

More information

Defense Technical Information Center Compilation Part Notice

Defense Technical Information Center Compilation Part Notice UNCLASSIFIED Defense Technical Information Center Compilation Part Notice ADP017712 TITLE: Rehabilitation of TCE-Contaminated Underground Storm Water System Using Trenchless Technology DISTRIBUTION: Approved

More information

SEWER LINE EXTENSION DESIGN CHECKLIST

SEWER LINE EXTENSION DESIGN CHECKLIST SEWER LINE EXTENSION DESIGN CHECKLIST SWLE# Utilities Staff Date DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling design plans for

More information

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, Storm Drain Installation, of these Standard Provisions. SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and

More information

MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E.

MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. MIAMI-DADE LATERAL PILOT PROGRAM James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. Hazen and Sawyer, P.C. 4000 Hollywood Boulevard Hollywood, FL 33021 ABSTRACT Since 1994 the Miami-Dade

More information

Repair or Replacement - Band-Aids vs. Surgery

Repair or Replacement - Band-Aids vs. Surgery Repair or Replacement - Band-Aids vs. Surgery Using RCP for the Replacement of Failed or Undersized Culverts www.concrete-pipe.org Introduction and Background Our Nation s infrastructure owners are facing

More information

Sewer and Stormwater Back-ups Policy Adopted by Council October 4, 2010

Sewer and Stormwater Back-ups Policy Adopted by Council October 4, 2010 Sewer and Stormwater Back-ups Policy Adopted by Council October 4, 2010 A. Purpose The purpose of this policy is to explain how and why sewer or stormwater backups occur, what to do in the event a homeowner

More information

CHELTENHAM TOWNSHIP. SANITARY SEWER UPDATE Public Works Committee Meeting September 7, 2010 Curtis Hall

CHELTENHAM TOWNSHIP. SANITARY SEWER UPDATE Public Works Committee Meeting September 7, 2010 Curtis Hall CHELTENHAM TOWNSHIP SANITARY SEWER UPDATE Public Works Committee Meeting September 7, 2010 Curtis Hall 1 SANITARY SEWER UPDATE 1. Overview a. The Problem b. Pennsylvania Department of Environmental Protection

More information

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant

More information

WEFTEC.06. Kent Von Aspern,* Collins Orton** *Carollo Engineers 2700 Ygnacio Valley Rd Suite 300 Walnut Creek, CA 94598

WEFTEC.06. Kent Von Aspern,* Collins Orton** *Carollo Engineers 2700 Ygnacio Valley Rd Suite 300 Walnut Creek, CA 94598 Lessons Learned from Large Diameter Sanitary Sewer Pipe Bursting Project: Conversion of Abandoned Gravity Sewer Main Into Upsized Sanitary Force Main South San Francisco, CA Kent Von Aspern,* Collins Orton**

More information

Analyzing The Bread & Butter Benefits of Sewer Main Pipebursting. Matt Werth General Manager PM Construction

Analyzing The Bread & Butter Benefits of Sewer Main Pipebursting. Matt Werth General Manager PM Construction Analyzing The Bread & Butter Benefits of Sewer Main Pipebursting Matt Werth General Manager PM Construction Pipebursting is the answer to many very difficult rehabilitation needs where there are almost

More information

Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam

Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam Education Master of Business Administration University of Houston, 1985 Bachelor of Science, Civil Engineering University

More information

SPR PE Steel Reinforced Liner

SPR PE Steel Reinforced Liner ENGINEERED SOLUTIONS SPR PE Steel Reinforced Liner Reline Done Right Contech is your single source for rehabilitation of sanitary & storm sewers, culverts and bridges. Contech Engineered Solutions has

More information

High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines

High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines Jeff Schell General Manager United Pipeline Middle East, Inc. Introduction HDPE Liners A cost effective and environmentally beneficial

More information

Monterey Regional Water Pollution Control Agency. Sewer System Management Plan

Monterey Regional Water Pollution Control Agency. Sewer System Management Plan Monterey Regional Water Pollution Control Agency Sewer System Management Plan March 31, 2013 Sewer System Management Plan Introduction I. Goals II. Organization III. Legal Authority IV. Operation and Maintenance

More information

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD Re Application of the Philadelphia Water Department for Increased Rates and Related Charges Fiscal Years 2017-2018 DIRECT TESTIMONY OF STEPHEN

More information

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Village of Shorewood, Wisconsin SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Prepared By: Thomas A. Zoulek, P.E., LEED A.P. Vice President Mid City Plumbing & Heating

More information

SANITARY SEWER SYSTEM ASSESSMENT

SANITARY SEWER SYSTEM ASSESSMENT SANITARY SEWER SYSTEM ASSESSMENT What is this tool? The Sanitary Sewer System Assessment is a form that helps your utility identify and document all of the components in your utility s sanitary sewer system.

More information

CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R

CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R CCTV PIPE INSPECTION AND EVALUATION For RUNWAY 17L-35R At ST. PETERSBURG CLEARWATER INTERNATIONAL AIRPORT February 2011 CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R ST. PETERSBURG CLEARWATER INTERNATIONAL

More information

See Appendix A for additional information, or contact ASTM directly.

See Appendix A for additional information, or contact ASTM directly. DEFINITIONS Wherever used in these specification guidelines, the following words and terms have the meanings indicated. AREAWAY: A paved surface, serving as an entry area to a basement or subsurface portion

More information

provided for improvements for each structure during these timeframes. Rehabilitation and Investment Strategies:

provided for improvements for each structure during these timeframes. Rehabilitation and Investment Strategies: ASSET MANAGEMENT STRATEGY BRIDGES AND LARGE CULVERTS (>3m Span) Inventory Anticipated Asset Life Cycle Fifteen (15) bridges and eleven (11) large culverts with a span greater than 3m (refer to PSAB 3150

More information

CLEANING, INSPECTION, AND TESTING OF SEWERS

CLEANING, INSPECTION, AND TESTING OF SEWERS CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and

More information

Asset Management Approaches to Maximize Effectiveness of Your Stormwater Program

Asset Management Approaches to Maximize Effectiveness of Your Stormwater Program Asset Management Approaches to Maximize Effectiveness of Your Stormwater Program Presenters: Mark VanAuken, PE, CMS4S, ENV SP Stormwater/MS4 Discipline Leader Celine Hyer, P.E. Conveyance Market Sector

More information

Kansas City s Overflow Control Program

Kansas City s Overflow Control Program Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater

More information

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology 2007 Pumper & Cleaner Environmental Expo International Wednesday February 7, 2007 Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology What is Cured-In-Place Pipe (CIPP)

More information

Memorandum. PROJECT: Postmark Emergency Storm Repair Alternative Analysis

Memorandum. PROJECT: Postmark Emergency Storm Repair Alternative Analysis Memorandum CRW Engineering Group, LLC 3940 Arctic Blvd. Suite 300 Anchorage, AK 99503 (907) 562-3252 FAX 561-2273 TO: Mike Lee, P.E., Chief Engineer, ADOT/ANC FROM: Shane Blanchard, P.E. THRU: Mike Rabe,

More information

CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers

CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers United States Environmental Protection Agency CASE STUDY City of Grand Rapids Stormwater Asset Management Program Overview With increasing pressure to meet water quality targets, address population growth,

More information

Sanitation District No. 1 of Northern Kentucky. SD1's Sanitary and Storm Water Asset Management Program. KSPE Annual Convention

Sanitation District No. 1 of Northern Kentucky. SD1's Sanitary and Storm Water Asset Management Program. KSPE Annual Convention Sanitation District No. 1 of Northern Kentucky SD1's Sanitary and Storm Water Asset Management Program KSPE Annual Convention April 28, 2011 Background Outline CSAP Program Development CSAP Program Implementation

More information

Asset Management Plan

Asset Management Plan Corporation of the Town of Innisfil Asset Management Plan Prepared by: AECOM 55 Cedar Pointe Drive, Suite 620 705 721 9222 tel Barrie, ON, Canada L4N 5R7 705 734 0764 fax www.aecom.com Project Number:

More information

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

CHAPTER 11 STORM DRAINAGE

CHAPTER 11 STORM DRAINAGE CHAPTER 11 STORM DRAINAGE SECTION 11 GENERAL 11.1 Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. 11.2 Where required. All roofs,

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

CHAPTER 2 HYDRAULICS OF SEWERS

CHAPTER 2 HYDRAULICS OF SEWERS CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination

More information

Pipe Bursting. Case Study at Zeeland, MI Collections Seminar September 6, 2012. Presentation Agenda. What is Pipe Bursting? What is Pipe Bursting?

Pipe Bursting. Case Study at Zeeland, MI Collections Seminar September 6, 2012. Presentation Agenda. What is Pipe Bursting? What is Pipe Bursting? Pipe Bursting Case Study at Zeeland, MI Collections Seminar September 6, 2012 By: Brian Hannon, PE and John Racek, PE Presentation Agenda What is Pipe Bursting? History of Pipe Bursting Types of Pipe Bursting

More information

Wauwatosa Lateral Rehabilitation Pilot Project. Prepared for City of Wauwatosa Wauwatosa, WI January 18, 2013

Wauwatosa Lateral Rehabilitation Pilot Project. Prepared for City of Wauwatosa Wauwatosa, WI January 18, 2013 Wauwatosa Lateral Rehabilitation Pilot Project Prepared for City of Wauwatosa Wauwatosa, WI January 18, 2013 Wauwatosa Lateral Rehabilitation Pilot Project Prepared for City of Wauwatosa, Wauwatosa, WI

More information

DEPARTMENT OF ENVIRONMENTAL QUALITY

DEPARTMENT OF ENVIRONMENTAL QUALITY PROJECT IDENTIFICATION DEPARTMENT OF ENVIRONMENTAL QUALITY City of Burton Sanitary Sewer Collection System Improvements State Revolving Fund (SRF) Environmental Assessment April 2015 Applicant: Authorized

More information

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0

More information

CHAPTER 3 STORM DRAINAGE SYSTEMS

CHAPTER 3 STORM DRAINAGE SYSTEMS CHAPTER 3 STORM DRAINAGE SYSTEMS 3.7 Storm Drains 3.7.1 Introduction After the tentative locations of inlets, drain pipes, and outfalls with tail-waters have been determined and the inlets sized, the next

More information

First in Service First in Safety

First in Service First in Safety 7840 Nagle Avenue Morton Grove, Illinois 60053 847-470-5235 Fax - 847-965-9511 Wind Damage; Frequently Asked Questions: What can I do with branches that fall in my yard? Bring them out to the parkway;

More information

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

A New Strategic Asset Management Tool for Simulating Water Utilities long-term Sustainability

A New Strategic Asset Management Tool for Simulating Water Utilities long-term Sustainability A New Strategic Asset Management Tool for Simulating Water Utilities long-term Sustainability Amin Ganjidoost/Dr. Rashid Rehan/Dr. Mark Knight/Dr. Andre Unger/Dr. Carl Haas University of Waterloo, Canada

More information

LOTT ~WateJi Alliance

LOTT ~WateJi Alliance LOTT ~WateJi Alliance May 5, 2015 Lacey Olympia Tumwater Thurston County David Dougherty, P.E. Water Quality Program Washington State Department Of Ecology Southwest Regional Office P.O. Box 47775 Olympia,

More information

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent

More information

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials

More information

Township of Terrace Bay Drinking Water System Financial Plan

Township of Terrace Bay Drinking Water System Financial Plan Township of Terrace Bay Drinking Water System Financial Plan August 2014 Introduction Municipalities in Ontario recently adopted a full accrual accounting approach to tangible municipal assets in accordance

More information

08003-1 WATER SERVICE 2

08003-1 WATER SERVICE 2 08003_Mar08_2011.pdf Page 1 of 7 INDEX Page 08003-1 WATER SERVICE 2 1.1 Pipe 2 1.1.1 Copper 2 1.1.2 Polyethylene 2 1.2 Valves and Fittings 2 1.2.1 Main Stops 3 1.2.2 Curb Stops 3 1.2.3 Curb Box 3 1.2.4

More information

Standard Operating Procedures Storm Drain System Maintenance

Standard Operating Procedures Storm Drain System Maintenance s Storm Drain System Maintenance SECTIONS 1. Storm Drain System Inspections 2. Storm Drain System Cleaning 3. Storm Drain System Repairs 4. Proper Disposal of Material Storm Sewer System Cleaning Directive

More information

The City of Owen Sound Asset Management Plan

The City of Owen Sound Asset Management Plan The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to

More information

Emerging Technologies in Wastewater Collection Systems

Emerging Technologies in Wastewater Collection Systems Keville Enterprises Emerging Technologies in Wastewater Collection Systems Douglas McCutchen, CCM Brian Karmasin, P.E., BCEE CMAA Annual Conference Oct 2008 San Francisco, California Today s s Presentation

More information

REFERRAL TO RECOMMENDED DIRECTION REQUIRED RECEIPT RECOMMENDED. Dear Kathryn Lockyer,

REFERRAL TO RECOMMENDED DIRECTION REQUIRED RECEIPT RECOMMENDED. Dear Kathryn Lockyer, From: Carrnela Radice [rnailto:carmela.radice@mississauga.ca] Sent: June 28, 2013 10:14 AM To: Lockyer, Kathryn Subject: Council Resolution 0110-2013 - June 19, 2013 Dear Kathryn Lockyer, The Council of

More information

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD 21.01 SCOPE: It is the intent of the Specification to define the approved methods and materials

More information

INSTALLATION OF INSITUFORM LINER

INSTALLATION OF INSITUFORM LINER PART 1 GENERAL 1.1 SCOPE: A. This item shall include all work and materials to install, insert a flexible polyester felt liner saturated with a thermo-setting resin into the existing sewer line for rehabilitation

More information

Close-Out Documents... 9

Close-Out Documents... 9 Water and Sanitary Sewer Service Connection Requirements Service Connection Requirements... 1 Application for Services... 2 Water Meter Application... 2 Wet Tap/Tie-in Connection Requirements... 3 Meter

More information

THE BIG FIX: Public works administration would be easy if infrastructure. San Diego s Sewer Renewal Program. By Steve Gibbs

THE BIG FIX: Public works administration would be easy if infrastructure. San Diego s Sewer Renewal Program. By Steve Gibbs THE BIG FIX: San Diego s Sewer Renewal Program By Steve Gibbs Public works administration would be easy if infrastructure lasted forever. It does not. Roads, bridges and sewers eventually wear out. Even

More information

REHABILITATION OF FAILED CORRUGATED METAL PIPE SPILLWAYS PRESENTED AT JUNE 1996 REGIONAL CONFERENCE MID-ATLANTIC COUNCIL FOR SAFE DAMS

REHABILITATION OF FAILED CORRUGATED METAL PIPE SPILLWAYS PRESENTED AT JUNE 1996 REGIONAL CONFERENCE MID-ATLANTIC COUNCIL FOR SAFE DAMS REHABILITATION OF FAILED CORRUGATED METAL PIPE SPILLWAYS PRESENTED AT JUNE 1996 REGIONAL CONFERENCE MID-ATLANTIC COUNCIL FOR SAFE DAMS by Harald W. Van Aller, PE Geotechnical Engineer, Maryland Dam Safety

More information

MEMORANDUM: RECOMMENDATIONS FOR PIPE MATERIAL SELECTION

MEMORANDUM: RECOMMENDATIONS FOR PIPE MATERIAL SELECTION MEMORANDUM: RECOMMENDATIONS FOR PIPE MATERIAL SELECTION Moser and Associates Engineering for CDOT Region 6 Date: 9/30/10 Memorandum to File: Recommendations for Pipe Material Selection for Construction

More information

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix F RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4400 South Street - Piping and Collection

More information

Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe

Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe September 11, 2012 NEWEA Collection Systems Conference Presented by: Laurie L. Perkins, PE Dennis A. Dievert, PE C. Frederick

More information

TOWN OF GRIMSBY ASSET MANAGEMENT PLAN

TOWN OF GRIMSBY ASSET MANAGEMENT PLAN TOWN OF GRIMSBY ASSET MANAGEMENT PLAN August 20, 2014 DFA Infrastructure International Inc. Executive Summary ES1 Background The Town of Grimsby (Town) with a population of approximately 25,325 is located

More information

SEWER CLEANING, INSPECTION AND ASSESSMENT

SEWER CLEANING, INSPECTION AND ASSESSMENT 3.1 OVERVIEW Chapter 3 SEWER CLEANING, INSPECTION AND ASSESSMENT Preventive maintenance protects the investment of the sanitary sewer collection system infrastructure. Higher frequency cleaning of gravity

More information

The Underground Infrastructure Crisis: Rebuilding Water and Sewer Systems without a Flood of Red Ink

The Underground Infrastructure Crisis: Rebuilding Water and Sewer Systems without a Flood of Red Ink The Underground Infrastructure Crisis: Rebuilding Water and Sewer Systems without a Flood of Red Ink NTU Issue Brief #176 By Bruce Hollands January 18, 2010 Introduction: Valuable and Critical Assets With

More information

FY08 SEWER POINT REPAIRS BID TABULATION

FY08 SEWER POINT REPAIRS BID TABULATION 6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "

More information

Quantifying Inflow and Infiltration via Dyed Water Flooding

Quantifying Inflow and Infiltration via Dyed Water Flooding Quantifying Inflow and Infiltration via Dyed Water Flooding Prepared by Anna Kesler, E.I.T. Catherine Morley, P.E. Overview Historical background to City of Elmhurst I/I issues What Is Dye Flooding? What

More information

CHAPTER 11 STORM DRAINAGE

CHAPTER 11 STORM DRAINAGE CHAPTER STORM DRAINAGE SECTION PC 0 GENERAL 0. Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. Storm water discharge shall be

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

A CASE STUDY IN INFILTRATION REDUCTION THROUGH TRENCHLESS TECHNOLOGY

A CASE STUDY IN INFILTRATION REDUCTION THROUGH TRENCHLESS TECHNOLOGY A CASE STUDY IN INFILTRATION REDUCTION THROUGH TRENCHLESS TECHNOLOGY SOUTH PALOS TOWNSHIP SANITARY DISTRICT COOK COUNTY, ILLINOIS March 1999 By: Aaron E. Fundich, P.E. Robinson Engineering, Ltd. and Larry

More information

Small Dam Repair The Stone Lake Dam Story. Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C.

Small Dam Repair The Stone Lake Dam Story. Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C. Small Dam Repair The Stone Lake Dam Story Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C. 29601 1 Historical background of Stone Lake A series of three

More information

Wastewater Collection and Treatment Systems For Small Cities

Wastewater Collection and Treatment Systems For Small Cities Page 1 of 13 FISCAL SUSTAINABILITY PLAN For the, Wastewater Collection and Treatment System This plan outlines a (FSP) for the City of Small Town, County of Xxxxx, State of Kansas, as required by the Kansas

More information

CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST

CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST NOTE: The following list shall only be used as a guide and shall not be used in lieu of the specifications found in the CITY OF ANN ARBOR PUBLIC

More information