1 Procedure No.: SOP-0203 Page: 1 of 5 Preparer: Owner: Approver: Safety Safety Safety 1. PURPOSE The purposes of this procedure is to ensure safe excavation, reduce the potential of damaging underground pipes or cables, and ensure proper handling of excavated soil in accordance with Environmental regulations by establishing guidelines for excavation, drilling and trenching on BASF Midga property. 2. DEFINITIONS Competent Person One who is designated by the contractor, with respect to excavation and trenching, who is capable of identifying existing and predictable hazards in the surroundings, or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate the condition. Excavation - any man-made cut, cavity, trench, or depression in an earth surface, formed by earth removal. NOTE: Removal of concrete paving or earthen material less than one foot does not constitute an excavation. Trench (Trench excavation) a narrow excavation (in relation to its length) made below the surface of the ground. In general, the depth is greater than the width, but the width of a trench (measured at the bottom) is not greater than 15 feet. If forms or other structures are installed or constructed in the excavation so as to reduce the dimension measured from the forms or structure to the side of the excavation to 15 feet or less (measured at the bottom of the excavation), the excavation is also considered to be a trench. Shield (Shield system) - a structure that is able to withstand the forces imposed on it by a cave-in and thereby protect employees within the structure. Shields can be permanent structures or can be designed to be portable and moved along as work progresses. Additionally, shields can be either pre-manufactured or jobbuilt in accordance with 29 CFR (c)(3) or (c)(4). Shields used in trenches are usually referred to as trench boxes or trench shields. Shoring (Shoring system) a structure such as metal hydraulic, mechanical or timber shoring system that supports the sides of an excavation and which is designed to prevent cave-ins. Sloping (Sloping system) - a method of protecting employees from cave-ins by excavating to form sides of an excavation that are inclined away from the
2 Procedure No.: SOP-0203 Page: 2 of 5 3. SCOPE excavation so as to prevent cave-ins. The angle of incline required to prevent a cave-in varies with differences in such factors as soil type, environmental conditions of exposure, and application of surcharge loads. This procedure applies to BASF employees, outside engineering firms and contractors involved in excavation, drilling, pile driving, and trenching activities greater than one foot in depth. 4. PROCEDURE Excluded from this procedure are mining operations, excavations at the mines (downdrains, pipes, etc.), drilling wells, digging piers, and pipeline repairs. These operations are covered under our safe work procedure and other work instructions. The BASF Representative (Project Engineer, Environmental Engineer, Construction Engineer, etc.,) requesting the excavation will: Review drawings that show the exact excavation location and extent. When necessary, walk the excavation site with appropriate individuals. The EHS department will: Review all projects per the STEP review process. Some considerations are: Areas or close to areas of known soil and/or groundwater contamination. Areas where remediation is currently on-going. Undeveloped areas where potential wetlands are present.
3 Procedure No.: SOP-0203 Page: 3 of 5 The Engineering Manager (or designated representative): Review drawings to develop an understanding of the excavation location and details. Review all existing underground piping and electrical drawings and or CAD files on the area to be excavated. When necessary, walk the excavation site with the appropriate individuals. Consult with the IE group as needed for Instrument/Electrical issues. The project engineer (or designated representative) will: Issue applicable safe work permits and confined space permits. Insure contractor does not begin work without proper permits. If an excavation is more than 4 feet deep and not sloped, a Confined Space permit may be required. For example if the excavation is in close proximity to a hazardous gas that could settle in the excavation. Conduct inspections of excavations, prior to the start of the work and as needed throughout the shift. Inspections shall include the adjacent areas, protective systems for evidence of a situation that could result in possible cave-ins, indications of failure of a protective system, and hazardous atmospheres or other hazardous condition. Make sure the contractor understands the location of all underground obstructions. Emergency conditions In the event of an emergency such as a chemical spill or an underground fire, evacuate a safe distance and contact your BASF representative. If needed contact emergency services. GENERAL For excavations outside the BASF property line, a notification to the Utilities Protection Center at must be made in advance. All proper PPE requirements will be followed (hard hat, safety glasses, safety toed shoes, etc.)
4 Procedure No.: SOP-0203 Page: 4 of 5 Excavations four feet or greater are required to have a sloping or shoring system to protect workers in the excavation. All surface encumbrances that create a hazard to employees shall be removed or supported, as necessary, to safeguard employees. If a person is working in a trench that is not sloped then a stairway, ladder, ramp or other safe means of egress shall be located in trench excavations that are 4 feet or more in depth and placed no farther than 25 feet apart for lateral travel. No employee shall be permitted underneath loads handled by lifting or digging equipment. Employees shall not work in excavations where there is accumulated water or in excavations where water is accumulating, unless adequate precautions have been taken to protect the employee against hazards posed by water accumulation. Excavated materials or other materials or equipment will be placed no closer than 4 feet from the edge of the excavation. If applicable, excavations will have adequate barricades, guard rails, hand rails, warning lights, orange mesh fence, etc. as needed for protection of personnel, vehicles or equipment working or passing adjacent to the excavation site. If heavy equipment is to be operated near the edge of the excavation site, the sides of the excavation will be adequately braced to prevent collapse. When approaching the estimated location of underground obstructions, the exact location of the obstruction shall be determined by safe and acceptable means such as but not limited to hand digging, probing, etc. A bucket watch will be used when digging around utilities or other obstructions like tanks or structures. Inspections shall be made after every rainstorm or other hazard increasing occurrence by the employees performing the work. SHORING Any excavation requiring the need for shoring material will use a manufactured shoring system or a system that has been engineered, tested and certified. Where timber shoring is used, it must meet OSHA 29 CFR subpart P appendix C (Timber shoring for trenches).
5 Procedure No.: SOP-0203 Page: 5 of 5 Shoring systems will be installed in accordance with manufacturers guidelines. 5. RESPONSIBILITIES 6. RELATED DOCUMENTS Section Revision Revised By Date Revised All SOP Review EM 8/11/2013
There is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation.
Part 1926 Subpart P Introduction The Occupational Safety and Health Administration (OSHA) issued its first Excavation and Trenching Standard in 1971 to protect workers from excavation hazards. Since then,
More informationTrenching and Excavation Safety
1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines related to excavation and trenching in pipeline construction activities. These guidelines are applicable to the locating, marking
More informationTrenching and Shoring Procedures
Trenching and Shoring Procedures Scope & Application This policy sets forth the official practices required for excavations General Requirements Soil Types Testing Methods Aluminum hydraulic shoring Benching
More informationExcavation & Trenching Procedure
Excavation & Trenching 1. Overview The will ensure, as far as is reasonably practicable, that the conduct of work relating to excavation and trenching will not be harmful to the health and safety of employees
More informationHERSHEY ENTERTAINMENT AND RESORTS COMPANY TRENCHING AND SHORING TRAINING
HERSHEY ENTERTAINMENT AND RESORTS COMPANY TRENCHING AND SHORING TRAINING I. Purpose II. III. IV. Definitions Procedures Inspections A. Soil Types V. Testing Methods A. Manual Tests VI. VII. VIII. IX. Spoil
More informationCompetent. Person Manual. Course Preview TRENCHSAFETY
Course Preview Competent Person Manual A guide to industry standards, practices, and regulatory requirements for OSHA Construction Industry Regulations 29 CFR 1926, Subpart P - Excavations TRENCHSAFETY
More informationUniversity of Tennessee Safety Guidelines
University of Tennessee Safety Guidelines Policy Subject: Trenching and Shoring Guidelines Effective Date: 9/1/12 Area Affected: Any departments who are involved in excavation work and trenching. Reviewed/Revised:
More informationLadder, Scaffolding, and Excavation Safety Plan
Ladder, Scaffolding, and Excavation Safety Plan Environmental Health, Safety, and Risk Management Department Box 6113, SFA Station Nacogdoches, Texas 75962-6113 Revised: January 2011 LADDERS In reducing
More informationWalking and Working Surface Checklist:
Walking and Working Surfaces Purpose: This information is presented to improve the level of safety in our operations, and to inform you that we will comply with the OSHA Standard 29 CFR 1910.23. Responsibility:
More informationGoM Region Ground Disturbance Safe Work Practice (SWP) Document Number: CD # UPS-US-SW-GOM-HSE-DOC-00083-2
GoM Region Ground Disturbance Safe Work Practice (SWP) Page 1 of 6 GoM Region Ground Disturbance Safe Work Practice (SWP) Document Number: CD # UPS-US-SW-GOM-HSE-DOC-00083-2 Document Authority: GoM H&S
More informationExcavation, Trenching and Shoring Safety and OSHA s Excavation Standard
Excavation, Trenching and Shoring Safety and OSHA s Excavation Standard AFSCME Training and Education Institute Manual This material was produced under grant number 46C4 DT05 from the Occupational Safety
More informationSECTION 25. Excavation and Trenching
SECTION 25 Excavation and Trenching 25.A General. The requirements of this Section are applicable to all Government and contractor work forces when their employees are performing excavation or trenching
More informationEXCAVATOR SAFETY TRAINING
EXCAVATOR SAFETY TRAINING INSPECTION CHECKLIST INSPECTION AREA INSPECTION RESULTS Sat. Unsat. N/A Comments Carrier & Car Body Rotation system Tracks Rollers Frame, welds, bolts Drive system Upper Structure
More informationProcedure for Working in or around Excavations
RMS WHS Procedure: PN 066P12 (for Policy No. PN066) Procedure for Working in or around 1 of 15 Contents 1 Purpose... 3 2 Scope... 3 3 General requirements... 4 4 Definitions... 4 5 Responsibilities...
More informationTRENCHING AND SHORING EXCAVATIONS PROGRAM
TRENCHING AND SHORING EXCAVATIONS PROGRAM TRENCHING AND SHORING EXCAVATIONS PROGRAM The purpose of this program is to provide information to our company employees and to interested persons that Northern
More informationSECTION 02200 SUPPORT OF EXCAVATION
SECTION 02200 PART 1 GENERAL 1.01 DESCRIPTION A. Section including specifications for design and installation of excavation support. B. Section also includes specifications for excavation support systems
More informationJobsite Safety Inspection Checklist
Jobsite Date Superintendent Inspector Jobsite Safety Inspection Checklist Pass Fail N/A General The company has a written safety program that is site specific where necessary. Emergency telephone numbers
More informationSafety. Vopak Fundamentals on Safety
Safety Vopak Fundamentals on Safety Introduction Every person working at a Vopak location should be able to go home at the end of the working day without having suffered or caused harm in any way. Eliminating
More informationE4055. Quiz. Soil Classification. Name: SOIL CLASSIFICATION QUESTIONS
E4055 Soil Classification Quiz SOIL CLASSIFICATION Name: Date: QUESTIONS 1 TRUE/FALSE 1. An average cave-in can drop five yards or 13,500 pounds of dirt. 2. A competent person should be knowledgeable of
More informationConstruction Safety. Mark Reising, Tetra Tech, Inc. NARPM Training Program nd Annual nd Annual NARPM Training Program. NARPM Training Program
Construction Safety Mark Reising, Tetra Tech, Inc. 22 nd Annual 22 22 NARPM Training Program nd Annual nd Annual NARPM Training Program NARPM Training Program 0 Construction Concerns Excavations Confined
More informationNuclear Safe Work Practice 4.2. Operation of Light / Heavy Equipment
Rev.0 September 5, 2011 VERIFY HARD COPY AGAINST WEB SITE IMMEDIATELY PRIOR TO USE Nuclear Safe Work Practice 4.2 Operation of Light / Heavy Equipment 1.0 PURPOSE/SCOPE NSWP 4.2-3 This Safe Work Practice
More informationSlip, Trip & Fall Program Table of Contents
Slip, Trip & Fall Program Table of Contents I. Introduction... 2 II. Scope... 2 III. Definitions... 2 IV. Responsibilities... 4 V. Practices... 5 VI. Slip-Fall Facility Checklist... 7 VII. References...
More informationBUILDING OVER OR NEAR WATER & SEWER MAINS POLICY
MURRAY SHIRE COUNCIL BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY ADOPTED: 1 May 2012 1 BUILDING OVER OR NEAR WATER AND SEWER MAINS POLICY CONTENTS 1. Objective... 2 2. Requirements for Building Near
More informationFall Protection, Title 29 Code of Federal Regulations (CFR) Part 45, Subpart M, Fall Protection, 1926.500, 1926.501, 1926.502, and1926.
STANDARDS Fall Protection, Title 29 Code of Federal Regulations (CFR) Part 45, Subpart M, Fall Protection, 1926.500, 1926.501, 1926.502, and1926.503 1.0 Purpose This document meets the requirements outlined
More informationPreventing Slips, Trips, & Falls
Preventing Slips, Trips, & Falls OSHA s Walking & Working Surfaces, & Fall Protection Standards Contents Introduction and Purpose General Injury Prevention Overview of Slips, Trips and Falls Types of Housekeeping
More informationExcavation Safe Working Practices
Excavation Safe Working Practices The Construction (Health, Safety and Welfare) Regulations 1996 under Excavations (Regulation 12) states that:- All practicable steps shall be taken where necessary to
More informationBest Practices for Excavation. Best Practices for. Excavation
Best Practices for Excavation Contents Introduction...3 Management commitment...3 Employee involvement... 3 Communication...4 Safety education and training...4 Injury reporting and treatment...6 Return
More information4. How often should vehicles being used at worksites be inspected?
Notes for Scoring: The correct answer is highlighted in yellow. The source for the answer is listed in red. 1. Ground Fault Circuit Interrupters (GFCI) are required by the National Electrical Code: a.
More informationSAFETY AND HEALTH PROGRAM
PROGRAM NUMBER NO. PAGES 05-005 10 REVISION ISSUE DATE Revision 2 11/1/2005 SAFETY AND HEALTH PROGRAM Confined Space Entry 1.0 INTRODUCTION Confined Space Entry is a serious workplace hazard, capable of
More informationCONSTRUCTION SAFETY POLICY
California Institute of Technology CONSTRUCTION SAFETY POLICY Caltech Environment, Health, and Safety Office 1200 E. California Blvd., M/C 25-6 Pasadena, CA 91125 Phone: 626.395.6727 Fax: 626.577.6028
More informationCONSTRUCTION SAFETY. NOTE: Barriers, guards, and warning signs are required to ensure safety against existing hazards.
CONSTRUCTION SAFETY Introduction The following sections provide general guidelines and procedures for construction safety. This chapter covers the following topics: TOPIC PAGE General Construction Guidelines
More informationv ations Exca OregonOSHA Safe practices for small business owners and contractors
Exca v ations Safe practices for small business owners and contractors OregonOSHA How to dig your own grave No protective system Spoils too close Excavator bucket over worker No hard hat No means for entering
More informationSlip, Trip & Fall Program Table of Contents
Slip, Trip & Fall Program Table of Contents I. Introduction...2 II. Scope...2 III. IV. Definitions...2 Responsibilities...4 V. Practices...5 VI. Slip-Fall Facility Checklist...7 VII. VIII. Training...8
More informationELEVATED WORK POLICY
ELEVATED WORK POLICY 1.0 BACKGROUND The purpose of this program is to prevent accidents and injuries to workers from falls and to provide employees with the information for the safe use of fall protection
More informationHSE Requirements for Contractors
PROJECT DEFINITION AND CONTACTS Project Title: Kodak is obligated to identify any known and potential Health, Safety, and Environmental (HSE) hazards to individuals who might be affected by them. This
More informationSAFETY TRAINING CLASSES & SERVICES LIST
SAFETY TRAINING CLASSES & SERVICES LIST CUSTOM CLASS ROOM TRAINING AVAILABLE, BACKED WITH ON-SITE SUPPORT SAFETY, TRAINING COURSES OFFERED BY OUR CERTIFIED ELITE RISK CONTROL TEAM: EM 385-1-1 (Military)
More informationGUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables
Engineering Department SEPTEMBER, 2007 GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables General Requirements This section applies to all public and private utilities,
More informationPressure Testing (Hydrostatic / Pneumatic) Safety Guidelines
The INGAA Foundation, Inc. 1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines for the safety of all personnel and the general public during pressure (e.g., hydrostatic, pneumatic)
More informationOSHA Scaffold Standard for Construction. 29 CFR 1926 Subpart L
OSHA Scaffold Standard for Construction 29 CFR 1926 Subpart L EH&S Jim Walker What is the revised OSHA scaffold standard for construction? Issued on August 30, 1996 and became effective on November 29,
More informationRisk Control Services Technical Bulletin. Slip, Trip and Fall Prevention
Risk Control Services Technical Bulletin Slip, Trip and Fall Prevention Background The average person takes between 3,000 and 5,000 steps a day (do the math that adds up to over 1 million steps a year).
More informationOne-third of all fatalities in the U.S. construction
Guardrail systems: Fall prevention for floor and wall openings and open-sided floors One-third of all fatalities in the U.S. construction industry result from falls from elevations. Falls from elevations
More informationIndependent Contractor Policy
Independent Contractor Policy This Policy has been implemented to prevent accidents and personal injuries. It is not intended to be entirely inclusive. It is the responsibility of the Independent Contractor
More informationContractor s Safe Working Agreement
Contractor s Safe Working Agreement This statement provides details on how I/we, the Trade Contractor will manage the health and safety hazards associated with my/our work. ASSESSING WORKPLACE HEALTH AND
More informationFixed and Portable Ladders- A Guide to OSHA Rules
Fixed and Portable Ladders- A Guide to OSHA Rules Introduction Working on and around stairways and ladders is hazardous. Stairways and ladders are major sources of injuries and fatalities among construction
More informationWalking Working Surfaces and Fall Protection Program
DEPAUL UNIVERSITY Walking Working Surfaces and Fall Protection Program Environmental Health & Safety March 2015 TABLE OF CONTENTS SECTION PAGE NO. 1.0 PURPOSE AND SCOPE 3 2.0 BASICS FOR STAFF, FACULTY,
More informationAPPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
More informationSECTION 31 20 00 EARTH MOVING
SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to
More informationAPPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
More informationCompany Name Company Address Company Phone Number Company Fax Number
Job Hazard Analysis Plumbing Company Name Company Address Company Phone Number Company Fax Number Job/Task Plumbing fixture and piping Date Prepared: 08.04.2010 installation Project Name: Project Name
More informationProcedure. Working at Heights. 1. Purpose. 2. Scope. 3. Definitions. 4. Planning. 4.1. QUT risk check. 4.2. Work at Height permit
Procedure Working at Heights 1. Purpose The purpose of this procedure is to establish compliance requirements and specify precautions to be taken during the conduct of work at height within QUT to prevent
More informationOccupational Health and Safety Officer
Occupational Health and Safety Officer APPLY TODAY participants at NO COST as a commitment to skills development in Northern BC. To determine your eligibility call Rob Bryce at 250-960-5982. ABOUT UNBC
More informationRobert Winters, CSP - 412.952.6662
Scaffolding in the Construction Industry Robert Winters, CSP - 412.952.6662 Harsco's Core Ideology Our Core Purpose To build teams that win with integrity anywhere in the world Our Core Values 1. Uncompromising
More informationEQUIPMENT SAFETY EARTHMOVING MATERIAL HANDLING NAVFAC MIDLANT
EQUIPMENT SAFETY EARTHMOVING MATERIAL HANDLING COMMON EARTHMOVING EQUIPMENT SKID LOADERS BACKHOE FRONT END LOADER GRADERS SCRAPERS BULL DOZERS Lots of stuff Here! COMMON MATERIAL HAULING TRUCKS ALL TYPES
More informationSTATE OF ALASKA DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH REVIEW BOARD P.O. BOX 21149 JUNEAU, AK 99802
STATE OF ALASKA DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH REVIEW BOARD P.O. BOX 21149 JUNEAU, AK 99802 STATE OF ALASKA, DEPARTMENT ) OF LABOR, DIVISION OF LABOR ) STANDARDS AND SAFETY, ) OCCUPATIONAL
More informationMillersville University - Office Of Environmental Health & Safety Scope & Application
Confined Space Entry Millersville University - Office Of Environmental Health & Safety Scope & Application The Confined Space Entry (CSE) program applies to the safe working practices for entering and
More informationWALKING-WORKING SURFACES (SLIPS, TRIPS, AND FALLS)
WALKING-WORKING SURFACES (SLIPS, TRIPS, AND FALLS) Slips, trips, and falls constitute the majority of general industry accidents. They cause 15% of all accidental deaths, and are second only to motor vehicles
More informationLadder Program and Training Materials
Prepared by Built Insurance Brokerage LLC Ladder Program and Training Materials Table of Contents Ladder Program... 1 Appendix A... 5 Appendix B... 7 Employee Handout... 9 Presentation Instructor Notes...
More informationSAFETY STAND DOWN Focus Four Hazards
SAFETY STAND DOWN Focus Four Hazards This information is to help you organize your Stand Down. This is a suggested agenda for the onsite supervision. Please review prior to facilitating the material. Summary
More informationElevating Your House. Introduction CHAPTER 5
CHAPTER 5 Elevating Your House Introduction One of the most common retrofitting methods is elevating a house to a required or desired Flood Protection Elevation (FPE). When a house is properly elevated,
More informationALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN
ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN Best Management Practices (BMPs) will be implemented during construction of the Allegany Wind Power Project to prevent and contain spills.
More information68 Metal Industry Guidelines for Safe Work
3 68 Metal Industry Guidelines for Safe Work section 3 high-risk 3 activities Metal Industry Guidelines for Safe Work 69 section 3 high risk activities 3.1 working at heights Falls from heights have been
More informationFALL PROTECTION PROGRAM
FALL PROTECTION PROGRAM Page 2 of 15 Table of Contents Applicability... 3 Overview... 3 Definitions... 3 Responsibilities... 5 Risk Assessment... 6 Risk Management... 7 Roof Access Procedure 10 Rescue
More informationCourse Description List
Course Description List Arc Flash This course is used to raise awareness about the specific electrical hazards of an arc flash. This course will also introduce a new CSA Standard on workplace electrical
More informationFall protection systems and practices Duty to have fall protection Protection at or above 6' level.
Duty to have fall protection Protection at or above 6' level. Walking/working surfaces inspected before work begins. Employees can only work on surfaces strong enough to support them. Page 1 Protection
More informationAerial/Scissor Lift Program. Environmental Health & Safety Office
Aerial/Scissor Lift Program Environmental Health & Safety Office August 2013 Revised 08/2013 - Rev 4.0 Table of Contents INTRODUCTION... 1 PURPOSE... 1 SCOPE... 1 RESPONSIBILITIES... 1 DEFINITIONS:...
More informationConfined Space Air Monitoring
November 2008 Vol. 26. No. 3 Confined Space Air Monitoring Scott Shinn, C.I.H. Scott Shinn is a Certified Industrial Hygienist with 3M OH&ESD Technical Service and Regulatory Affairs. Summary Over the
More informationTremline Pty Ltd trading as The Hills Bark Blower
JSA No: Rev: 10011 Date: 10010 ABN 1 07 880 6 Website: wwwbarkblowercomau Job Number Start Time: Vehicle : Max Length Hose Date: Company Name: Product: Quantities Depth Job site address: Description of
More informationHow To Prevent An Accident From Happening
8-2.001 January 2011 Reducing slips, trips and falls in the construction industry Introduction For construction industry employees, injuries resulting from a slip, trip or fall (STF) are the most common
More informationEMPLOYEE FALL PROTECTION
EMPLOYEE FALL PROTECTION You can fall from any height and be seriously injured or killed. In the construction industry, as well as any other industry, when falls from heights happen, they are usually very
More informationSECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.
SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price
More informationFALL PROTECTION WORK PLAN
FALL PROTECTION WORK PLAN INSTRUCTIONS A written fall protection work plan must be implemented by each employer on a job site where a fall hazard of 10 feet or greater exists, in accordance with OSHA Standards.
More informationCivil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.
Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer
More informationHydraulic Excavators
Chapter 8 Hydraulic Excavators Hydraulic excavators are designed to excavate below the ground surface on which the machine rests. These machines have good mobility and are excellent for general-purpose
More informationSeven. Easy Steps. Your Own Walkway, Without Mortar. or Concrete. to Installing. Driveway and Patio
Seven Easy Steps to Installing Your Own Walkway, Driveway and Patio Without Mortar or Concrete Brick is one of the world s oldest and most enduring building materials. Those same qualities also make it
More informationOverhead Power Line Safety for Contractors
Overhead Power Line Safety for Contractors By following simple procedures, you can save lives and prevent accidents. Working Safely As a contractor, before you can even break ground on a construction project,
More informationGuidelines for Excavations
O c t o b e r 2 0 0 1 Guidelines for Excavations in the vicinity of gas lines Technical Standards & Safety Authority Putting Public Safety First Guidelines for Excavations in the Vicinity of Gas Lines
More informationOSHA Training Institute Education Centers Course Descriptions
U.S. DEPARTMENT OF LABOR Occupational Safety and Health Administration (OSHA) OSHA Training Institute Education Centers Course Descriptions www.oshamidatlantic.org 800-875-4770 U. S. D E P A R T M E N
More informationTown of Clinton. TRENCH PERMIT 242 Church St.Clinton Ma. 01510 Telephone# Office (978) 365-4128 FAX (978) 612-0202. This Section for Official use only
Town of Clinton TRENCH PERMIT 242 Church St.Clinton Ma. 01510 Telephone# Office (978) 365-4128 FAX (978) 612-0202 Tony Zahariadis Building Commissioner Zoning Enforcement Officer This Section for Official
More informationDrew University Ladder Safety Program Policy and Inspection Procedure Draft 0412
PURPOSE To establish and define the procedures to ensure that ladders at Drew University are installed, used, inspected and maintained in accordance with applicable standards. REFERENCES OSHA Portable
More information2. may only be used to fit test negative pressure air-purifying respirators that must achieve a fit factor of 100 or less.
OSHA - 20 Questions 1.How many days does the employer have to provide the employee or designated representative access to their medical records or apprise the employee or designated representative requesting
More informationSan Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION
ITEM 866 SEWER MAIN TELEVISION INSPECTION 866.1 DESCRIPTION: The Contractor shall furnish all labor, materials, equipment, and incidentals to provide the televising and a NASSCO-(PACP) standard video,
More informationLadder Use in Construction Guideline
Ladder Use in Construction Guideline Forward This guideline has been prepared to assist workplace parties in understanding their obligations under the Occupational Health and Safety Act (OHSA) and its
More informationOPTIONAL INFORMATION GUARDING FLOORS, STAIRS, AND OTHER OPENINGS SELF INSPECTION CHECKLIST
OPTIONAL INFORMATION Name of School: Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: GUARDING FLOORS, STAIRS, AND OTHER OPENINGS Guidelines: This checklist covers some of the
More informationRisk Management Department Safety & Worker s Compensation Training Classes
Risk Management Department Safety & Worker s Compensation Training Classes The following safety and worker s compensation training is available from Risk Management and is scheduled by contacting the Risk
More informationGEORGIA INSTITUTE OF TECHNOLOGY ENVIRONMENTAL HEALTH AND SAFETY LADDER SAFETY PROCEDURE
PURPOSE The purpose of this program is to establish the minimum requirements for the safe and proper use of ladders (including wooden, metal, and fiberglass ladders) and the minimum requirements for the
More informationTHE COMPETENT PERSON & SOIL TESTING. This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation.
THE COMPETENT PERSON & SOIL TESTING This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation. Featured are: INTRODUCTION: A brief description of the program and the
More informationFall Protection Basics for Construction Activities
Fall Protection Basics for Construction Activities Washington State has revised fall protection rules, effective April 1, 2013. This booklet provides an overview of the requirements. www.lni.wa.gov/safety
More informationCONSTRUCTION FIRE SAFETY PLANNING GUIDELINES
CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES Review the following information pertaining to Construction Fire Safety Planning: B.C. Building Code Sections 8.1 up to and including Subsection 8.2.3 B.C.
More informationCONFINED SPACE HAZARD ANALYSIS. In order to determine if the space is a confined space, please answer Yes or No to the following questions:
Appendix A Name of Confined Space: Space Location: CONFINED SPACE HAZARD ANALYSIS In order to determine if the space is a confined space, please answer Yes or No to the following questions: A. IS IT A
More informationOptimal Trench Protection
Optimal Trench Protection Key to Safety and Cost-Effectiveness Rentals Sales Service Supplies Introduction The best possible trench protective solutions are critical to the success of underground construction
More informationFall Protection System: A system put in place to protect workers from falling. (i.e. installation of guardrails, fall arrest, fall restraint, etc.
SWP (6) FALL PROTECTION PROGRAM The following information on Fall Protection has been based around the BC OHS Regulations, standards, policies and guidelines. Prior to starting work outside of BC, the
More informationSTANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall
More informationCONSTRUCTION SITE HEALTH AND SAFETY SELF AUDIT
www.veritas-consulting.co.uk CONSTRUCTION SITE HEALTH AND SAFETY SELF AUDIT This checklist identifies some of the hazards most commonly found on construction sites. The questions it asks are intended to
More informationALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR 1910.252 WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600
OSHA REGULATION: 9 CFR 90.5 WELDING, CUTTING, AND BRAZING ( HOT WORK ) A. POLICY. This procedure follows requirements set forth in 9 CFR 90.5.. This policy applies to all Hot Work operations being done
More informationEngineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge.
TM TM Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. SM The Leading Edge. 10 One Major Causes of foundation settlement or more conditions may
More informationSafe Operating Procedure
Safe Operating Procedure (Revised 07/09) HOT WORK PERMIT OPERATIONS (For assistance, please contact EHS at (402) 472-4925, or visit our web site at http://ehs.unl.edu/) Authority In recognition of the
More informationCHAPTER 10. FALL PROTECTION PROGRAM
CHAPTER 10. FALL PROTECTION PROGRAM 1000 GENERAL. This chapter establishes policy for developing fall protection programs to protect all Federal Aviation Administration (FAA) personnel working at elevated
More informationNEW YORK CITY DEPARTMENT OF DESIGN AND CONSTRUCTION EMPLOYEE SAFETY, HEALTH, AND ENVIRONMENTAL FIELD REFERENCE GUIDE TABLE OF CONTENTS
Revised April 2015 TABLE OF CONTENTS SECTION 1- Introduction and Basic Safety Precautions DDC Safety and Health Policy Statement Introduction In Case of... Time, Distance, and Shielding Proper Clothing
More informationCHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES
GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES WATER RESOURCES MANAGEMENT DIVISION Water Investigations
More informationWINDOW AND DOOR REPLACEMENT REQUIREMENTS
WINDOW AND DOOR REPLACEMENT REQUIREMENTS Should you have any questions after reading the following information, please call the Building Inspection Department at 651-439-4439 to discuss the topics of concern.
More information