CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R
|
|
- Leona Summers
- 8 years ago
- Views:
Transcription
1 CCTV PIPE INSPECTION AND EVALUATION For RUNWAY 17L-35R At ST. PETERSBURG CLEARWATER INTERNATIONAL AIRPORT February 2011
2 CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R ST. PETERSBURG CLEARWATER INTERNATIONAL AIRPORT Introduction American Infrastructure Development, Inc. (AID, Inc.) provided Professional Services to URS Corporation (URS) for coordinating the inspection of the existing drainage structures crossing Runway 17L-35R at St. Petersburg Clearwater International Airport (PIE). AID, Inc. procured the services of VacVision Environmental, LLC (VV) to provide CCTV pipe inspections for this project. A total of sixteen reinforced concrete pipes cross Runway 17L-35R, as shown on Exhibit A. Pipes #15 and #16 were constructed in 2005 as part of the runway extension project and were not included in this study. Specifically, the following tasks have been completed under this assignment: 1. Fourteen pipes were CCTV inspected. Four of these pipes required cleaning prior to the inspections. 2. Pipe inspections were videotaped. A report was generated for each pipe identifying the areas of concern such as water or sand infiltration through the joints, the presence of cracks, or pipe breakage at the joints. 3. Repair options were evaluated based on the pipe conditions and site constraints and a cost estimate is provided for these repairs. This brief report provides a description of the findings from the field inspections and recommendations for the repair of these pipes. This assignment does not provide information on the hydraulic capacity of these pipes crossing the runway. The recommended repairs are provided to help the Owner in maintaining their current infrastructure and are not intended to increase or modify the capacity of the airfield drainage system. Recommendations and Prioritizations Table 1 provides a description of the pipes crossing Runway 17L-35R and the recommended repairs. The repairs should meet FDOT Standard Specifications for Road and Bridge Construction, Section 431, Pipe Liner, and Section , Cured-In-Place Pipe Liner. This Table also includes a prioritization numbering which represents the severity of the problems (1 being the worst) and provides a mechanism for the Owner to begin the repairs as funding becomes available. CCTV Pipe Inspection and Evaluation RW 17L-35R - PIE Page 2 of 11
3 Table 1 Pipe prioritization and repair recommendation PRIORITY PIPE PIPE PIPE PIPE REPAIR COMMENTS RATING NUMBER TYPE SIZE LENGTH OPTION 2 1 RCP 14 X Liner Pipe should be cleaned and shells scraped prior to liner installation. 2 2 RCP 14 X Liner Pipe should be cleaned and shells scraped prior to liner installation. 2 3 RCP Liner Circumferential crack (not under the runway pavement). 1 4 RCP Liner Most pipes have sand and water infiltration. 3 5 RCP Liner 3 6 RCP Liner 1 7 RCP Liner Two bends in the pipe. Joint opening at one of the bends. Sand deposits should be cleaned prior to liner installation. 1 8 RCP Liner Circumferential crack under the runway pavement. Sand deposits should be cleaned prior to liner installation. 3 9 RCP Liner 3 10 RCP Liner 3 11 RCP Liner 1 12 RCP Liner Concrete blockage should be removed and the remaining portion of the pipe should be cleaned. Pipe outfall should be opened prior to liner installation RCP Liner 1 14 RCP 19 X Liner Roots should be removed, concrete deposits at outfall should be removed, and pipe should be cleaned prior to liner installation. CCTV Pipe Inspection and Evaluation RW 17L-35R - PIE Page 3 of 11
4 Repair Options: The owner may consider other repairs options, such as sliplining or grouting of the joints. However, these options are not preferred for this application. Most of the pipes crossing the runway connect to drainage manholes. Sliplining by inserting small pieces of pipes into these structures and grouting the annular space will be difficult, time consuming, and cost prohibitive. In addition, these existing pipes are constructed primarily of 3-ft pipe sections. Grouting the joints in these long pipes will take 3 to 5 times longer than using CIPP. Isolated joint grouting is also not recommended since the water will soon find its way to other joints, requiring further repairs. CIPP process is a very efficient and permanent process that can be accomplished in a short timeframe (potentially one pipe per day once cleaned). Since these pipes cross the primary runway at PIE, a permanent fix or improvement will provide a better solution to the aging structures. Tables 2, 3, and 4 provide approximate construction costs for the recommended repair. The unit price per linear foot is derived from FDOT s Master Pay Item List (updated 2/17/2011) and increased by 40% to take into account costs associated with professional services for bid document preparations, mobilization and night work. An average price of $175 per linear foot is used for estimating purposes. The costs are provided as a planning tool for the Owner to prioritize these repairs based on the funding availability. Actual costs may vary per pipe depending on the level of cleaning and the amount of obstructions in each pipe. Table 2 Priority #1 Pipes Cost Estimates PIPE NUMBER LENGTH UNIT PRICE TOTAL $175 $38, $175 $39, $175 $39, $175 $53, $175 $79,800 TOTAL COST: $250,425 Table 3 Priority #2 Pipes Cost Estimates PIPE NUMBER LENGTH UNIT PRICE TOTAL $175 $148, $175 $88, $175 $40,075 TOTAL COST: $276,675 CCTV Pipe Inspection and Evaluation RW 17L-35R - PIE Page 4 of 11
5 Table 4 Priority #3 Pipes Cost Estimates PIPE NUMBER LENGTH UNIT PRICE TOTAL $175 $36, $175 $37, $175 $37, $175 $38, $175 $35, $175 $69,650 TOTAL COST: $254,975 Pipe Inspections Pipe inspections were performed mostly at night with Runway 17L-35R closed to aircraft movements. The work was conducted on the days shown on Table 5. A remote controlled high resolution camera mounted on a four-wheeled electric vehicle was utilized for this work, as shown on Figure 1. Except for pipes #1 and #2, the vehicle was lowered through the drainage structures within the infield area west of the runway and the inspections were performed in the downstream direction. Pipes were inspected and videotaped along the length of each pipe section and at the joints. These videos are included as part of this report. The following sections provide detailed description of each pipe and the findings from the inspections. Appendix 1 provides the inspection reports and photos for each pipe. Table 5 Pipe Inspection Dates DATE PIPE(S) INSPECTED COMMENTS January 24, , 9 January 25, , 11, 13 January 26, , 7 January 27, , 6, 14 Pipe #3 was cleaned prior to inspections. January 28, , 12 Pipe #12 was cleaned but could not be fully inspected due to concrete obstructions in the pipe. February 14, , 2 Pipes #1 and #2 were dewatered and cleaned prior to inspections. VacVision performed this work during low tide conditions, hence the gap in the inspection dates. CCTV Pipe Inspection and Evaluation RW 17L-35R - PIE Page 5 of 11
6 Figure 1 CCTV Pipe Inspections Pipe #1 This pipe is an elliptical concrete pipe (14 X 23 ) and is approximately 846 feet long. It is located approximately 600 feet south of Runway 17L threshold connecting the infield area directly to the bay. The pipe required dewatering and cleaning prior to the inspection. It was inspected from the downstream end during the daytime. Shell build up is present along approximately 200 feet of the downstream portion of the pipe. Water infiltration is present at several joints beginning approximately 330 feet upstream of the outfall structure. Some roots were also noticed along the section of the pipe in the infield area. The pipe does not show any signs of structural damage. CCTV Pipe Inspection and Evaluation RW 17L-35R - PIE Page 6 of 11
7 To maintain the structural integrity of the soil and runway pavement section, it is recommended that the pipe be thoroughly cleaned and lined with a cured in place material (similar to the Cured-In-Place Pipe by Insituform.) The priority rate for this pipe is set at 2. Pipe #2 This pipe crosses Runway 17L-35R at approximately 1,500 feet south of Runway 17L threshold and connects the infield area directly to the bay. It is an elliptical concrete pipe (14 X 23 ) and is approximately 506 feet long. This pipe required dewatering and cleaning prior to inspection. It was inspected from the downstream end during nighttime. Minor shell build up is present at the downstream end of the pipe. Water infiltration is only present at 3 or 4 joints along the pipe. One circumferential crack was noticed close to the upstream end of the pipe within the infield area. It cannot be determined if the crack is recent or occurred during the original construction of the pipe. The pipe does not show any signs of structural damage. To maintain the structural integrity of the soil and runway pavement section, it is recommended that the pipe be thoroughly cleaned and lined with a cured in place material (similar to the Cured-In-Place Pipe by Insituform.) The priority rate for this pipe is set at 2. Pipe #3 This pipe crosses Runway 17L-35R approximately 300 feet south of Taxiway L. It is an 18 diameter concrete pipe with an approximate length of 229 feet. This pipe was inspected at night from the upstream end once it was cleaned. Water infiltration through the joints was present from the beginning of the pipe for approximately 75 feet. One circumferential crack was noticed approximately 5 feet from the beginning of the pipe. The pipe does not show any signs of structural damage. To maintain the structural integrity of the soil and runway pavement section, it is recommended that the pipe be thoroughly cleaned and lined with a cured in place material (similar to the Cured-In-Place Pipe by Insituform.) The priority rate for this pipe is set at 2. Pipe #4 This pipe crosses Runway 17L-35R approximately 700 feet south of Taxiway L. It is an 18 diameter concrete pipe with an approximate length of 220 feet. This pipe was inspected at night from the upstream end. CCTV Pipe Inspection and Evaluation RW 17L-35R - PIE Page 7 of 11
8 Water and sand infiltration through the joints was present at most joints throughout the length of the pipe. The pipe does not show any signs of structural damage. To maintain the structural integrity of the soil and runway pavement section, it is recommended that the pipe be thoroughly cleaned and lined with a cured in place material (similar to the Cured-In-Place Pipe by Insituform.) The priority rate for this pipe is set at 1. Pipe #5 This pipe crosses Runway 17L-35R approximately 1,000 feet south of Taxiway L. It is an 18 diameter concrete pipe with an approximate length of 211 feet. This pipe was inspected at night from the upstream end. Water and sand infiltration was present at 7 or 8 joints along the length of the pipe. The pipe does not show any signs of structural damage. To maintain the structural integrity of the soil and runway pavement section, it is recommended that the pipe be thoroughly cleaned and lined with a cured in place material (similar to the Cured-In-Place Pipe by Insituform.) The priority rate for this pipe is set at 3. Pipe #6 This pipe crosses Runway 17L-35R immediately north of the intersection with Runway The pipe is a 24 diameter concrete pipe with an approximate length of 222 feet. This pipe was inspected at night from the upstream end. Water and sand infiltration through several joints was noticed within the first 45 feet from the upstream end of the pipe. The pipe does not show any signs of structural damage. To maintain the structural integrity of the soil and runway pavement section, it is recommended that the pipe be thoroughly cleaned and lined with a cured in place material (similar to the Cured-In-Place Pipe by Insituform.) The priority rate for this pipe is set at 3. Pipe #7 This pipe crosses Runway 17L-35R immediately south of the intersection with Runway The upstream inlet structure is located with the pavement at the intersection of the two runways. The pipe is an 18 diameter concrete pipe with an approximate length of 224 feet. The pipe has two slight bends at approximately 17 feet and 23 feet from the upstream end. This pipe was inspected at night from the upstream end. CCTV Pipe Inspection and Evaluation RW 17L-35R - PIE Page 8 of 11
9 Water and sand infiltration through several joints was noticed along the length of the pipe. A joint separation was also noticed at one of the bends located 23 feet from the upstream end. The pipe does not show any signs of structural damage. To maintain the structural integrity of the soil and runway pavement section, it is recommended that the pipe be thoroughly cleaned and lined with a cured in place material (similar to the Cured-In-Place Pipe by Insituform.) The priority rate for this pipe is set at 1. Pipe #8 This pipe crosses Runway 17L-35R at approximately 500 feet south of the intersection with Runway The pipe is an 18 diameter concrete pipe with an approximate length of 224 feet. This pipe was inspected at night from the upstream end. Water infiltration is present at several joints within 45 feet from the upstream end. A circumferential crack is noticed at approximately 118 feet from the upstream end and directly under the runway. It cannot be determined if this crack occurred during the initial installation or at a later time. This pipe does not show any signs of structural damage. To maintain the structural integrity of the soil and runway pavement section, it is recommended that the pipe be thoroughly cleaned and lined with a cured in place material (similar to the Cured-In-Place Pipe by Insituform.) The priority rate for this pipe is set at 1. Pipe #9 This pipe crosses Runway 17L-35R at the intersection of Taxiway G and Taxiway F. The pipe is an 18 diameter concrete pipe with an approximate length of 216 feet. This pipe was inspected at night from the upstream end. Minor water and sand infiltration at isolated joints is noticed within the first 25 feet. This pipe does not show any signs of structural damage. To maintain the structural integrity of the soil and runway pavement section, it is recommended that the pipe be thoroughly cleaned and lined with a cured in place material (similar to the Cured-In-Place Pipe by Insituform.) The priority rate for this pipe is set at 3. Pipe #10 This pipe crosses Runway 17L-35R at approximately 500 feet south of Taxiway G. The pipe is an 18 diameter concrete pipe with an approximate length of 220 feet. This pipe was inspected at night from the upstream end. CCTV Pipe Inspection and Evaluation RW 17L-35R - PIE Page 9 of 11
10 Minor water and sand infiltration at isolated joints is noticed within the first 50 feet. This pipe does not show any signs of structural damage. To maintain the structural integrity of the soil and runway pavement section, it is recommended that the pipe be thoroughly cleaned and lined with a cured in place material (similar to the Cured-In-Place Pipe by Insituform.) The priority rate for this pipe is set at 3. Pipe #11 This pipe crosses Runway 17L-35R at approximately 350 feet north of Taxiway M. The pipe is an 18 diameter concrete pipe with an approximate length of 200 feet. This pipe was inspected at night from the upstream end. Water and sand infiltration was noticed at one joint. This pipe does not show any signs of structural damage. To maintain the structural integrity of the soil and runway pavement section, it is recommended that the pipe be thoroughly cleaned and lined with a cured in place material (similar to the Cured-In-Place Pipe by Insituform.) The priority rate for this pipe is set at 3. Pipe #12 This pipe crosses Runway 17L-35R immediately north of the intersection with Runway The pipe is an 18 diameter concrete pipe with an approximate length of 307 feet. This pipe was cleaned and partially inspected at night. The pipe was cleaned but could not be fully inspected due to blockage of the pipe at approximately 21 feet from the upstream end. The downstream end of the pipe was inspected during daytime. This end of the pipe seemed to have been partially blocked during a previous manhole construction project. There is water flowing through the pipe which indicates that the pipe is not fully blocked. There may also be a bend in the pipe based on the visual inspection of the pipe alignment and the location of the downstream manhole structure. It is recommended that this pipe be further inspected and blockages removed to allow for a better assessment of the condition of the crossing. The priority rate for this pipe is set at 1. Pipe #13 This pipe crosses Runway 17L-35R immediately south of the intersection with Runway The pipe is an 18 diameter concrete pipe with an approximate length of 398 feet. This pipe was inspected at night from the upstream end. CCTV Pipe Inspection and Evaluation RW 17L-35R - PIE Page 10 of 11
11 Water infiltration was noticed at approximately 7 joints located in the infield area. This pipe does not show signs of structural damage. To maintain the structural integrity of the soil and runway pavement section, it is recommended that the pipe be thoroughly cleaned and lined with a cured in place material (similar to the Cured-In-Place Pipe by Insituform.) The priority rate for this pipe is set at 3. Pipe #14 This pipe crosses Runway 17L-35R at approximately 500 feet south of the intersection with Runway The pipe is an elliptical concrete pipe (19 X 30 ) with an approximate length of 456 feet. This pipe was inspected at night from the upstream end. This pipe has circumferential cracks and broken joints at six locations. There are two broken joints and one circumferential crack under the runway pavement. It is not clear if these cracks occurred at the time of installation or at a later date. These cracks are located at the bottom of the pipes with no signs of stress observed at the top. Roots have also penetrated the joints primarily within the last 200 feet indicating the opening of the joints. As part of the 2005 runway extension, this pipe was apparently extended at the downstream end by approximately 50 feet. Concrete grouting at this junction has reduced the opening which prevented the inspection of the last 50 feet of this pipe. To maintain the structural integrity of the soil and runway pavement section, it is recommended that the pipe be thoroughly cleaned and lined with a cured in place material (similar to the Cured-In-Place Pipe by Insituform. The priority rate for this pipe is set at 1. CCTV Pipe Inspection and Evaluation RW 17L-35R - PIE Page 11 of 11
12 P-11 P-10 P-16 P-15 P-5 P-4 P-3 ST-33 ST-31 ST-29 ST-27 ST-25 ST-23 ST-21 ST-19 ST-17 ST-15 ST-13 ST-12 ST-11 ST-9 ST-7 ST-5 ST-3 P-2 P-1 ST-1 P-14 P-13 P-12 P-9 P-8 P-7 P-6 ST-34 ST-32 ST-28 ST-26 ST-24 ST-22 ST-20 ST-18 ST-16 ST-14 ST-10 ST-8 ST-6 ST-30 ST-4 ST-2 STORM STRUCTURE TABLE STORM STRUCTURE TABLE STORM STRUCTURE TABLE STORM STRUCTURE TABLE STORM STRUCTURE TABLE STR LATTITUDE/LONGITUDE PIPE PIPE LENGTH PIPE SIZE STR LATTITUDE/LONGITUDE PIPE PIPE LENGTH PIPE SIZE STR LATTITUDE/LONGITUDE PIPE PIPE LENGTH PIPE SIZE STR LATTITUDE/LONGITUDE PIPE PIPE LENGTH PIPE SIZE STR LATTITUDE/LONGITUDE PIPE PIPE LENGTH PIPE SIZE ST-1 ST '17.93" N 82 41'28.35" W 27 55'19.25" N 82 41'19.10" W P LF 14"X23" ST-7 ST '49.13" N 82 41'21.85"W 27 54'49.52" N 82 41'19.44"W P LF 18" ST-15 ST '32.91" N 82 41'019.05" W 27 54'33.12" N 82 41'16.57" W P LF 18" ST-21 ST '19.19" N 82 41'16.71" W 27 54'19.57" N 82 41'14.29" W P LF 18" ST-27 ST '4.66" N 82 41'15.04" W 27 54'7.65" N 82 41'12.15" W P LF 18" ST-3 ST '9.26" N 82 41' 26.83" W 27 55'10.01" N 82 41' 21.26"W P LF 14"X23" ST-9 ST '45.70"N 82 41'21.09" W 27 54'45.75" N 82 41'18.74" W P LF 18" ST-17 ST '28.94" N 82 41'18.20" W 27 54'30.02" N 82 41'16.04" W P LF 18" ST-23 ST '15.81" N 82 41'15.90" W 27 54'16.13" N 82 41'13.70" W P LF 18" ST-29 ST '2.43" N 82 41'14.33" W 27 54'3.14" N 82 41'9.31" W P LF 19"x30" ST-5 ST ' 52.51" N 82 41'22.28" W 27 54'53.65"N 82 41'20.04"W P LF 18" ST-13 ST '32.12" N 82 41'19.28 W 27 54'35.34" N 82 41'16.79" W P LF 24" ST-19 ST '24.50" N 82 41'17.45" W 27 54'24.41" N 82 41'15.02" W P LF 18" ST-25 ST '8.14" N 82 41'14.77" W 27 54'10.49" N 82 41'12.61" W P LF 18" ST-31 ST '55.62" N 82 41'14.93" W 27 53'56.28" N 82 41'10.05" W P LF 36" NOTES: 1. LATTITUDE/LONGITUDE LOCATIONS AND PIPE LENGTHS ARE APPROXIMATE. 2. ALL PIPES ARE RCP. ST-33 ST '51.72" N 82 41'14.26" W 27 53'52.39" N 82 41'9.39" W P LF 36" REV. NO DATE R E V I S I O N S : DESCRIPTION: EOR 4511 NORTH HIMES AVE. SUITE 200 TAMPA, FL OFFICE: FAX: MASTER SURFACE WATER MANAGEMENT PLAN ST. PETERSBURG -CLEARWATER INTERNATIONAL AIRPORT JOB NO: DRAWN: DESIGN: CHECKED: DATE: URS RBC RBC MM FEB EXHIBIT A RUNWAY 17L-35R STORMWATER PIPE CROSSINGS
13 APPENDIX 1 PIPE INSPECTION REPORTS
14 Pipe # 1 Structure ST 1 to ST 2 14 X 23 Elliptical RCP (3 Joint Spacing) General Condition: Infiltration through the joints under the runway - Shell build-up at outfall. Recommended Repair: Install Cured-In-Place Pipe (CIPP) by Insituform. Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 2 of 37
15 Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 3 of 37
16 Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 4 of 37
17 Pipe # 2 Structure ST 3 to ST 4 14 X 23 Elliptical RCP 506 (3 Joint Spacing) General Condition: Infiltration at isolated joints - Circumferential crack at one joint Recommended Repair: Install Cured-In-Place Pipe (CIPP) by Insituform. Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 5 of 37
18 Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 6 of 37
19 Pipe # 3 Structure ST 5 to ST 6 18 Diameter RCP 229 (3 Joint Spacing) General Condition: Infiltration at most joints - Circumferential crack at one joint Recommended Repair: Install Cured-In-Place Pipe (CIPP) by Insituform. Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 7 of 37
20 Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 8 of 37
21 Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 9 of 37
22 Pipe # 4 Structure ST 7 to ST 8 18 Diameter RCP 220 (3 Joint Spacing) General Condition: Infiltration at most joints Sand deposits at most joints Recommended Repair: Install Cured-In-Place Pipe (CIPP) by Insituform. Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 10 of 37
23 Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 11 of 37
24 Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 12 of 37
25 Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 13 of 37
26 Pipe # 5 Structure ST 9 to ST Diameter RCP 211 (3 joint spacing) General Condition: Infiltration at isolated joints Sand deposits at isolated joints Recommended Repair: Install Cured-In-Place Pipe (CIPP) by Insituform. Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 14 of 37
27 Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 15 of 37
28 Pipe # 6 Structure ST 13 to ST Diameter RCP 222 (3 Joint Spacing) General Condition: Infiltration at isolated joints Sand deposits at isolated joints Recommended Repair: Install Cured-In-Place Pipe (CIPP) by Insituform. Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 16 of 37
29 Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 17 of 37
30 Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 18 of 37
31 Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 19 of 37
32 Pipe # 7 Structure ST 15 to ST Diameter RCP 224 (3 Joint Spacing) General Condition: Line bends - Infiltration at isolated joints Sand deposits at isolated joints Recommended Repair: Install Cured-In-Place Pipe (CIPP) by Insituform. Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 20 of 37
33 Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 21 of 37
34 Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 22 of 37
35 Pipe # 8 Structure ST 17 to ST Diameter RCP 224 (3 Joint Spacing) General Condition: Infiltration at isolated joints Sand deposits at isolated joints Recommended Repair: Install Cured-In-Place Pipe (CIPP) by Insituform. Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 23 of 37
36 Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 24 of 37
37 Pipe # 9 Structure ST 19 to ST Diameter RCP 216 (3 Joint Spacing) General Condition: Infiltration at isolated joints Sand deposits at isolated joints Recommended Repair: Install Cured-In-Place Pipe (CIPP) by Insituform. Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 25 of 37
38 Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 26 of 37
39 Pipe # 10 Structure ST 21 to ST Diameter RCP 220 (3 Joint Spacing) General Condition: Infiltration at isolated joints Sand deposits at isolated joints Recommended Repair: Install Cured-In-Place Pipe (CIPP) by Insituform. Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 27 of 37
40 Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 28 of 37
41 Pipe # 11 Structure ST 23 to ST Diameter RCP 200 (3 Joint Spacing) General Condition: Sag at one location minor infiltration at joints Recommended Repair: Install Cured-In-Place Pipe (CIPP) by Insituform. Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 29 of 37
42 Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 30 of 37
43 Pipe # 12 Structure ST 25 to ST Diameter RCP 307 General Condition: Blockage in pipe at two locations Blockage at outfall 21 was inspected Recommended Repair: Remove obstructions to fully inspect the pipe. Install Cured-In-Place Pipe (CIPP) by Insituform. Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 31 of 37
44 Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 32 of 37
45 Pipe # 13 Structure ST 27 to ST Diameter RCP 398 General Condition Infiltration at isolated joints Recommended Repair: Install Cured-In-Place Pipe (CIPP) by Insituform. Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 33 of 37
46 Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 34 of 37
47 Pipe # 14 Structure ST 29 to ST X 30 Elliptical RCP 456 General Condition: Pipe cracks at several joints Roots in joints broken at isolated joints Recommended Repair: Install Cured-In-Place Pipe (CIPP) by Insituform. Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 35 of 37
48 Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 36 of 37
49 Appendix 1 CCTV Pipe Inspection and Evaluation - RW 17L-35R PIE Page 37 of 37
Storm Sewer Trenchless Upgrade Alternatives and Recommendations
Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for
More informationPreliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006
Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006 1.0 Background and Repair and Rehabilitation Recommendation Clay County has contracted Camp Dresser & McKee Inc. (CDM)
More informationDefense Technical Information Center Compilation Part Notice
UNCLASSIFIED Defense Technical Information Center Compilation Part Notice ADP017712 TITLE: Rehabilitation of TCE-Contaminated Underground Storm Water System Using Trenchless Technology DISTRIBUTION: Approved
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS
ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located
More informationSPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)
SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer
More informationCONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES
North American Society for Trenchless Technology (NASTT) No-Dig Show 2010 Chicago, Illinois May 2-7, 2010 Paper C-4-04 CONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES Brad Jenson
More informationAffordable Asset Management Making Use of the Data You Have: An Owner s Perspective
Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective An Owner Operator s Approach for Asset Management on a Budget Lane Longley, City of St. Petersburg Presented by the April
More informationWaste Collection Systems
Waste Collection Systems System Maintenance and Repair Maintenance and Repair Training Objectives To gain an understanding of: System Maintenance and Repair vocabulary System Maintenance and Repair techniques
More informationCCTV of Stormwater Systems. Cairns Regional Council. Commentary Guidelines #4037587
CCTV of Stormwater Systems Cairns Regional Council Commentary Guidelines Introduction Councils inherit assets through the donated asset process. In doing so, Councils immediately receive assets that are
More informationSECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE
SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE PART 1 - GENERAL 1.01 WORK INCLUDED A. This section covers the initial and final cleaning, and the initial and final
More informationREHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542
1.0 INTENT REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES 1.01 It is the intent of this specification to provide for the reconstruction of pipelines and conduits by the installation of a resin-impregnated
More informationMIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E.
MIAMI-DADE LATERAL PILOT PROGRAM James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. Hazen and Sawyer, P.C. 4000 Hollywood Boulevard Hollywood, FL 33021 ABSTRACT Since 1994 the Miami-Dade
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS
ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by
More informationMcGOEY, HAUSER and EDSALL CONSULTING ENGINEERS D.P.C.
McGOEY, HAUSER and EDSALL CONSULTING ENGINEERS D.P.C. 111 Wheatfield Drive, Suite 1 Milford, Pennsylvania 18337 (570) 296-2765 fax: (570) 296-2767 e-mail: mhepa@mhepc.com RICHARD D. McGOEY, P.E. (NY &
More informationA Comprehensive Approach to Storm Water Asset Management Planning. City of Virginia Beach Public Works Operations
A Comprehensive Approach to Storm Water Asset Management Planning City of Virginia Beach Public Works Operations Steve McLaughlin, PE April 2016 Agenda City of Virginia Beach, VA Population: 450,000 250
More informationWastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects
Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects March 2013 i Metropolitan Sewer District of Greater Cincinnati Wastewater Collection System Supplemental
More informationSan Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION
ITEM 866 SEWER MAIN TELEVISION INSPECTION 866.1 DESCRIPTION: The Contractor shall furnish all labor, materials, equipment, and incidentals to provide the televising and a NASSCO-(PACP) standard video,
More informationCCTV INSPECTION OF SEWER LINES. A. Section 02730 Sanitary Gravity Sewer Lines. B. Section 02731 Sanitary Gravity Sewer Line Testing
CCTV INSPECTION OF SEWER LINES PART 1 GENERAL 1.1 SECTION INCLUDES A. CCTV Inspections 1.2 RELATED SECTIONS A. Section 02730 Sanitary Gravity Sewer Lines B. Section 02731 Sanitary Gravity Sewer Line Testing
More informationSEWER CLEANING, INSPECTION AND ASSESSMENT
3.1 OVERVIEW Chapter 3 SEWER CLEANING, INSPECTION AND ASSESSMENT Preventive maintenance protects the investment of the sanitary sewer collection system infrastructure. Higher frequency cleaning of gravity
More informationPROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY
PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY Cured-In-Place Pipe Pressure & Gravity Lines Pipe Splitting Trenchless Pipe Replacement EcoCast Advanced
More informationSoapstone Sewer Rehabilitation Alternative Concepts Design and Associated Impacts
Soapstone Sewer Rehabilitation Alternative Concepts Design and Associated Impacts Outline Update on Soapstone Emergency Response Provide project background Provide project purpose & need Present proposed
More informationINSPECTED FOR Cynthia Sands 22137 Teri Court, West Hills February 1, 2012
INSPECTED FOR Cynthia Sands 22137 Teri Court, West Hills February 1, 2012 INSPECTED BY Dionne J. Cabuguason ACE BUILDING INSPECTORS Certified Inspectors Engineers Gen. Contractor ACE BUILDING INSPECTORS
More informationTECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines
More informationGuidelines for closed circuit television (CCTV) inspection of newly constructed sewers
Guidelines for closed circuit television (CCTV) inspection of newly constructed sewers These guidelines outline inspection, reporting and acceptance requirements for newly constructed rigid and flexible
More informationSection 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
More informationRehabilitation or Replacement? That Is The Question
Rehabilitation or Replacement? That Is The Question Chris L. Windley PE Greg Anderson, PE 94th Annual Conference November 18, 2014 Overview Project Background Existing Sewer Condition Flow Projections
More informationSewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority
Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Abstract The United States Virgin Islands Waste Management Authority
More informationWastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
More informationDIVISION 4300 STORM DRAINAGE
DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES
More informationTHE BIG FIX: Public works administration would be easy if infrastructure. San Diego s Sewer Renewal Program. By Steve Gibbs
THE BIG FIX: San Diego s Sewer Renewal Program By Steve Gibbs Public works administration would be easy if infrastructure lasted forever. It does not. Roads, bridges and sewers eventually wear out. Even
More informationCLEANING, INSPECTION, AND TESTING OF SEWERS
CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and
More informationRehabilitation Alternatives. MWEA Collection System Seminar October 1, 2009
Rehabilitation Alternatives MWEA Collection System Seminar October 1, 2009 Overview Types of Rehabilitation Trenchless Categories On-Line Replacement In-Situ Options Selecting the Best Solution Types of
More informationCoast Trunk Sewer Rehabilitation Project for the Orange County Sanitation District
Coast Trunk Sewer Rehabilitation Project for the Orange County Sanitation District Paul F. Wilson 1 and Robert J. Warren 2 1 1525 Faraday Ave, Suite 290, Carlsbad, California, USA 92008; e-mail: pwilson@pirnie.com.
More informationFigure 3 Pipe Cracking
The illustration shown below depicts the system analyzed. As-built drawings and survey information were not available; aerial photos and survey shots of inverts were used to determine the system s geometries.
More informationSection 402. STORM SEWERS
402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide
More informationSan Antonio, TX July 28, 2011
Rehabilitation of a Deteriorated 60 RCP Wastewater Interceptor Using Competing Trenchless Technologies Bruce Cole, PE Corey Anderson, EIT TAWWA/WEAT Summer Seminar San Antonio, TX July 28, 2011 Wendy Martinez,
More informationLetty Arvide-Gomar, PE
Letty Arvide-Gomar, PE Outline DIP History and Applications Corrosion Issues Internal Cleaning Technologies Rehabilitation Options DIP History and Applications Corrosion Issues Internal Cleaning Technologies
More informationPIPE INSPECTION AND REPAIR. Larry Ritchie
PIPE INSPECTION AND REPAIR Larry Ritchie February 23, 2010 PIPE INSPECTION AND REPAIR The Florida Department of Transportation builds and maintains hundreds of miles of underground infrastructure as part
More informationSECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
More informationSTORM DRAIN PIPE MAINTENANCE. a. Develop standard operating procedures for maintaining storm drain pipes.
STORM DRAIN PIPE MAINTENANCE a. Develop standard operating procedures for maintaining storm drain pipes. 2. PROCESS Storm drain pipes are to be maintained per the Storm Water System Maintenance Plan schedule.
More information2016 - SECTION 25 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER LINES
2016 - SECTION 25 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER LINES 25.1 GENERAL This section of the specifications shall form a part of the contract documents and should be read in conjunction with
More informationSewer Rehabilitation Design Requirements
Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared
More informationGuidelines for As-Built CCTV Inspections of Lined/Rehabilitated Pipe
Guidelines for As-Built CCTV Inspections of Lined/Rehabilitated Pipe P r e p a r e d B y : P r o j e c t M a x L i m i t e d 8 / 1 1 / 2 0 1 3 Supplementary Document to the CCC Specification CCTV for Christchurch
More informationPlatte River Interceptor Slipline Rehabilitation
Platte River Interceptor Slipline Rehabilitation Owner: Metro Wastewater Reclamation District Contractor: American West, Denver CO Slipline Pipe Manufacturer : Hobas Pipe USA Presented by: Tom Furie, Area
More informationATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING
ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING 1.0 General 1.1 The work covered by this section consists of providing all labor, equipment, material and supplies, insurance, accessories, tools, transportation,
More informationIndustrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems.
Industrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems. Aging pipeline infrastructure and industry s inability to evaluate and inspect has left many engineers and plant managers
More informationMainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology
2007 Pumper & Cleaner Environmental Expo International Wednesday February 7, 2007 Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology What is Cured-In-Place Pipe (CIPP)
More informationPROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS
C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates
More informationSIDE SEWER CONDITION ASSESSMENT AND REPAIR RECOMMENDATIONS
SIDE SEWER CONDITION ASSESSMENT AND REPAIR RECOMMENDATIONS Introduction City of Tacoma property owners are responsible for the construction, maintenance and repair of private side sewers, which connect
More informationDrain & Tank Cleaning
Drain & Tank Cleaning Our ever growing fleet of drain cleaning vehicles ranging from small vans to Hi-spec Jet-Vac units enable us to provide you with the right equipment at the right time. Services include:
More informationINSTALLATION OF INSITUFORM LINER
PART 1 GENERAL 1.1 SCOPE: A. This item shall include all work and materials to install, insert a flexible polyester felt liner saturated with a thermo-setting resin into the existing sewer line for rehabilitation
More informationCORPORATION OF THE CITY OF BURLINGTON SPECIFICATION INDEX FOR CCTV VIDEO INSPECTION OF PROPOSED STORM SEWERS (SPEC. NO. SS7) 1. Scope of Work SS7-1
CORPORATION OF THE CITY OF BURLINGTON SPECIFICATION INDEX FOR CCTV VIDEO INSPECTION OF PROPOSED STORM SEWERS (SPEC. NO. SS7) INDEX PAGE 1. Scope of Work SS7-1 2. Contractor Certification SS7-1 3. Flushing
More informationSA Pipe Relining is dedicated to finding simple, non intrusive
SA Pipe Relining is dedicated to finding simple, non intrusive solutions to complex problems using latest technologies and methodical work practises in an environmentally friendly and cost effective manner.
More informationThe work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
More informationMarch 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS
March 2006 CW 2140 - SEWER AND MANHOLE CLEANING TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Constructions... 1 3. CONSTRUCTION METHODS... 1 3.1 High
More informationSECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
More informationTrouble Shooting for Trenchless Liner Installation During Sewer Line Rehabilitation
Trouble Shooting for Trenchless Liner Installation During Sewer Line Rehabilitation Salam Khan*, P.E. and Christoph Dobson, P.E. Sacramento County Sanitation District 1 (CSD-1) 10545 Armstrong Avenue,
More informationCity of Regina Standard Construction Specification SECTION 1320 SEWERMAIN TESTING
1.0 GENERAL 1.1 Scope 2.0 PRODUCTS 1.1.1 The work shall consist of testing wastewater and/or storm mains to ensure construction conforms to the proper line, grade, cross section and performance. 2.1 The
More informationAPPLICATION OF GLASS-REINFORCED PLASTIC TO SEWER REHABILITATION
North American Society for Trenchless Technology (NASTT) NO-DIG 2005 Orlando, Florida April 24-27, 2005 APPLICATION OF GLASS-REINFORCED PLASTIC TO SEWER REHABILITATION Lynn Osborn 1 1 ArmourGRiP Product
More informationUVDB empowered by Achilles
UVDB empowered by Achilles DISAB Centurion: High Performance Wet/Dry Materials Handling Unit DISAB Centurion: High performance vacuum tanker that will vacuum dry or wet material The DISAB can vacuum material
More informationREVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC
REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC What is really out there? DO YOU DIG IT? INDUSTRY CONCERNS UNEXPECTED DEVELOPMENTS
More informationState of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
More informationZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022
ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 Town of Zionsville, Indiana December 19, 2012 PREPARED BY BEAM, LONGEST & NEFF, LLC. 8126 Castleton Road Indianapolis, Indiana
More informationVIDEO INSPECTION AND LASER PROFILING IN FLORIDA. AASHTO SOC Conference Larry Ritchie, FDOT August 14, 2013
VIDEO INSPECTION AND LASER PROFILING IN FLORIDA AASHTO SOC Conference Larry Ritchie, FDOT August 14, 2013 PIPE INSPECTION Over the last 5 years, the Department has spent approximately 175 million dollars
More informationUpstream Manhole Number 96746 55.9. Dry. Circumferential Location. Image Ref. At / From. Joint
Surveyors name P/O No. U-71-1168 System Owner COA Pipeline Segment Reference 936 1614 Shape Circular H Rim to Invert RCP Sewer Category Grade to Invert Ln. Method Pre-Cleaning No PreCleaning Group/ Descriptor.
More informationThe information contained in this report was compiled for the use of the Vermont Agency of
The information contained in this report was compiled for the use of the Vermont Agency of Transportation. Conclusions and recommendations contained herein are based upon the research data obtained and
More informationMeeting the Challenge of Pipeline Emergency Repair
Meeting the Challenge of Pipeline Emergency Repair Michael R. McReynolds, PE, SE 1 Tao Peng, PE, SE 2 ABSTRACTS The Metropolitan Water District of Southern California (MWD) is the nation s largest provider
More informationAppendix J: Pipe Evaluation and Replacement Options and Costs
Appendix J: Pipe Evaluation and Replacement Options and Costs STORMWATER SYSTEM INVENTORY The City of Olympia has an extensive stormwater conveyance system. As a matter prudent management of the Stormwater
More informationBeacon Hill Sewer District Standard Specifications
Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions
More informationCHAPTER 3 STORM DRAINAGE SYSTEMS
CHAPTER 3 STORM DRAINAGE SYSTEMS 3.7 Storm Drains 3.7.1 Introduction After the tentative locations of inlets, drain pipes, and outfalls with tail-waters have been determined and the inlets sized, the next
More informationSECTION 810 SEWER LINE CLEANING
SECTION 810 SEWER LINE CLEANING I. GENERAL 1.1 DESCRIPTION OF WORK The work covered by this section consists of providing all labor, equipment, material and supplies and performing all operations required
More informationUltraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation
Ultraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation Dan Broderick Director of Pipeline Rehabilitation ACHEN-GARDNER ENGINEERING,
More informationPipeline Replacement using Relining
Pipeline Replacement using Relining Mark Heathcote, March 2006 Relining of old pipeline systems is becoming an increasingly attractive option to asset owners and operators as an effective alternative to
More informationPavement Asset Management Guidance Section 5.3: Condition Surveying and Rating - Drainage
Pavement Asset Management Guidance Section 5.3: Condition Surveying and Rating - Drainage December 2014 Document Information Title Author Description Pavement Asset Management Guidance, Section 5.3: Condition
More informationSTORM DRAINS CHAPTER 7
CHAPTER 7 Chapter 7 - Storm Drains A storm drain is a drainage system that conveys water or stormwater, consisting of two or more pipes in a series connected by one or more structures. Storm drains collect
More informationMemorandum. PROJECT: Postmark Emergency Storm Repair Alternative Analysis
Memorandum CRW Engineering Group, LLC 3940 Arctic Blvd. Suite 300 Anchorage, AK 99503 (907) 562-3252 FAX 561-2273 TO: Mike Lee, P.E., Chief Engineer, ADOT/ANC FROM: Shane Blanchard, P.E. THRU: Mike Rabe,
More informationREPAIRS TO DAMAGED SEWERS
REPAIRS TO DAMAGED SEWERS A digout is the replacement of sewer or storm water pipes that are either broken or blocked due to tree roots, ground movement or ageing of pipes. When the use of high-pressure
More informationSanitary Sewer Smoke Testing
Sanitary Sewer Smoke Testing Beginning March 31, 2014 The City of Brunswick will be conducting smoke testing on the City s sanitary sewer system beginning March 31, 2014. Smoke testing will occur over
More informationREHABILITATION OR REPLACEMENT? THAT IS THE QUESTION
REHABILITATION OR REPLACEMENT? THAT IS THE QUESTION ABSTRACT Chris L. Windley PE, McKim & Creed, Inc. Ben R. Latino, Jr., PE, McKim & Creed, Inc. Greg Anderson, PE, McKim & Creed, Inc. When designing to
More informationIS THAT LINER THICK ENOUGH?
IS THAT LINER THICK ENOUGH? Philip McFarlane, Opus International Consultants Ltd ABSTRACT The amount of pipeline rehabilitation being undertaken in New Zealand is increasing each year. Larger diameter
More informationUtilizing Remaining Useful Life for Asset Management of Critical Wastewater Assets
*Jessica Brown, P.E., Freese and Nichols, Inc., (817) 312-6980; Jessica.Brown@freese.com Mazen Kawasmi, Freese and Nichols, Inc. ABSTRACT The City of Fort Worth s wastewater collection system includes
More informationSTORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F
STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix F RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4400 South Street - Piping and Collection
More informationEstimating Stormwater System Annual Maintenance and Repair Costs - A GIS Approach
October 5 2011 Estimating Stormwater System Annual Maintenance and Repair Costs - A GIS Approach 2011 SESWA Annual Conference 2011 Southeast Stormwater Associated Annual Conference Presentation Overview
More informationof Existing Conditions... 2-1
Introduction Assessment Summary Assessment Recommendation TABLE OF CONTENTS Section 1 ONE and Background... 1-1 Section 2 TWO of Existing Conditions... 2-1 2.1 Results of Site Reconnaissance... 2-1 2.1.1
More informationDRAINAGE PIPE REPAIR & RELINING SOLUTIONS
DRAINAGE PIPE REPAIR & RELINING SOLUTIONS Our technology Nuflow are the specialists in trenchless pipe relining, providing a structural repair. We provide a simple, practical, cost effective solution to
More information53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:
Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections
More informationSAWS SSO Reduction Program
SAWS SSO Reduction Program Jeff Haby, P.E. Director Sewer System Improvements February 20, 2014 TMDL Implementation Plan Technical Committee Overview Sanitary Sewer Overflows Consent Decree Overview Major
More informationENGINEERED SOLUTIONS. A2 Liner Pipe for Trenchless Technology
ENGINEERED SOLUTIONS A2 Liner Pipe for Trenchless Technology A2 Liner Pipe Restores Deteriorated Sewers Cost-Effective Rehabilitation The increasing rate of sanitary and storm sewer deterioration requires
More informationA pipe restoration system for drainage pipes
A pipe restoration system for drainage pipes NUFLOWTECH.COM.AU 1800 NUFLOW #NUFLOW NUFLOW TECHNOLOGIES 2000 PTY LTD ABN: 25 109 601 345 ACN: 109 601 345 Head Office 20 Central Park Avenue Ashmore, QLD
More informationStructural Pipe Lining Technology
Structural Pipe Lining Technology ABOUT US Nu Flow install innovative technologies to rehabilitate failing or deteriorating piping systems. These technologies are non-invasive, in-situ, and offer a greener
More informationPUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0
More informationSpecification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe
Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene
More informationprovided for improvements for each structure during these timeframes. Rehabilitation and Investment Strategies:
ASSET MANAGEMENT STRATEGY BRIDGES AND LARGE CULVERTS (>3m Span) Inventory Anticipated Asset Life Cycle Fifteen (15) bridges and eleven (11) large culverts with a span greater than 3m (refer to PSAB 3150
More informationWorking together to improve beach water quality. Fixing our. public and private. sewers
Working together to improve beach water quality Fixing our public and private sewers May 2004 FIND FIX DECIDE Narrow Neck Beach on a summer day As part of Project CARE, our long-term project to improve
More informationLIFELINE PIPELINE RESTORATION AND SEISMIC MITIGATION
LIFELINE PIPELINE RESTORATION AND SEISMIC MITIGATION Le Val LUND 1 And P E M ASCE 2 SUMMARY A number of methods are discussed which can be used for lifeline pipeline rehabilitation and improving the seismic
More informationCOMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY
COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY Revised: April 2014 Village of Wilmette, Illinois NPDES CSO Permit No. ILM580012 Chapter 1 Introduction This Operational and Maintenance
More informationDrainage DR-701. Materials Field Sampling. Purpose of the Guidance Manual. General DR 701-1
DR-701 Chapter Materials Field Sampling Drainage Subject INLETS INTRODUCTION & STORM SEWERS General Purpose of the Guidance Manual DR 701-1 STORM SEWER DEFINITION KYTC defines a storm sewer as two or more
More informationCID STREET INFRASTRUCTURE ASSESSMENT
ABSTRACT An evaluation of the street infrastructure in Foxberry Estates Phase 1, including pavement condition, verification of construction techniques, and subgrade quality. Recommendations and costs for
More informationAGENDA ITEM C9. COST/FUNDING SOURCE: $431,847.40/ Uniform Rate
AGENDA ITEM C9 DATE: February 2, 2015 TO: FROM: SUBJECT: Matt Jordan, General Manager Charles Carden, Chief Operating Officer South Pasco Transmission Main Condition Assessment Services with Pure Technologies
More informationA. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.
PART 1 GENERAL 1.1 SCOPE A. This item shall include the work necessary for the installation of storm sewer line construction. B. Reference Section 3800 Trenching and Backfill and the General Conditions,
More information