1 Steve Wood ill of Quantities Housing Tender ated: 18 pril 2008

2 3-2 4 PRSON HS 1 - SU-STRUTUR SU-STRUTUR 11: GROUN INVSTIGTION Machine excavation of trial holes xcavate trial holes; backfill with excavated material, compacted in 250 mm layers; maximum depth not exceeding: 4.00 m 2 m FOUNTIONS 20: XVTING N FILLING NO ONTMINT SOIL LLOW FOR Machine excavation Oversite excavation to remove topsoil, average depth: 150 mm 144 m xcavation to reduce levels, depth not exceeding: 0.25m 22 m Trench excavation to receive foundations, pile caps and ground beams, depth not exceeding: 2.00 m 59 m reaking up obstructions with machine driven hammer xtra over excavation for breaking out: concrete or brickwork 1 m Timber earthwork support to loose ground To sides of excavation not exceeding 2.00 m apart, depth not exceeding: F 2.00 m 198 m Off site disposal of material arising from earthworks Removed, including providing a suitable tip: G machine loading 95 m , isposal 3-1/1 To ollection: 4,922.18

3 3-2 4 PRSON HS 1 - SU-STRUTUR llow to keep excavations clear of surface water item llow to keep excavations clear of ground water item Surface treatment Level and compact: bottoms of excavations 144 m Membranes Lotrak equal geotextile sheeting; 150 mm side and end laps: horizontal; over 300 mm wide 144 m Filling to excavations with imported materials Filled in making up levels; by machine; compacting in layers: Tp type 1 22 m IN SITU ONRT & LRG P ONRT 10: MIXING, STING, URING IN SITU ONRT Plain in situ concrete; mix RN2 Foundations; poured on or against earth or unblinded hardcore: F generally 59 m , RIKWORK TO P MSONRY F10: RIK N LOK WLLING Walls urox or equal Supablocs in gauged mortar (1:1:6): G H 100 mm 7 N/mm2 blocks 12 m mm 7 N/mm2 blocks Trench fill 8 m Facing bricks, P 300:00 per 1000 in gauged mortar (1:1:6); flush pointing both sides: I half brick thick; stretcher bond 12 m /2 To ollection: 8,622.88

4 3-2 4 PRSON HS 1 - SU-STRUTUR F30: SSORIS N SUNRY ITMS Forming cavities Form cavity to hollow wall: 100 mm wide 12 m IN SITU ONRT & LRG P ONRT 10: MIXING, STING, URING IN SITU ONRT Plain in situ concrete; mix 25P Filling hollow walls: not exceeding 150 mm thick 1 m MSONRY F30: SSORIS N SUNRY ITMS amp proof courses and cavity trays Hyload pitch polymer d.p.c.; forming cavity trays: over 300 mm wide 18 m Hyload pitch polymer d.p.c.; horizontal: not exceeding 225 mm wide 15 m GROUN FLOOR ONSTRUTION 60: PRST N OMPOSIT ONRT KING precast concrete beam and block composite flooring system; comprising precast beams with 100mm block infill; cement slurry grouting to joints with (1:3) mix mortar or Hollowcore Floor units if deemed more appropriate Floors: Ground Level 225mm thick: 132 m , ir bricks; Ryton plastic; telescopic for cavity walls; built in F 215 x 75mm 14 nr /3 To ollection: 5,519.86

5 3-2 4 PRSON HS ollection for SU-STRUTUR 3-1/1 4, /2 8, /3 5, To Summary: 19,064.92

6 3-2 4 PRSON HS 2 - UPPR FLOORS UPPR FLOORS GNRLLY G20: RPNTRY, TIMR FRMING N FIRST FIXING Floors Treated sawn softwood; grade S3; basic sizes: 50 x 200 mm 330 m , x 200 mm doubled up as trimmers 30 m Strutting and bridging; treated sawn softwood; grade GS; basic sizes: Herringbone strutting: 38 x 38 x 200 mm deep 48 m T SPW galvanised joist hangers; building into masonry Type S; joist size: 50 x 200 mm 120 Nr UILING FRI SUNRIS P10: SUNRY INSULTION, PROOFING WORK N FIR STOPS Insulation quilts rown glass fibre insulation quilt; generally; thickness: horizontal; 100 mm thick laid between joists 120 m LININGS, SHTHING & RY PRTITIONING K11: RIGI SHT FLOORING, SHTHING, LININGS N SINGS V313 moisture resistant tongued and grooved chipboard boarding; S5669: F 18 mm thick; over 300 mm wide 120 m , /1 To ollection: 5,239.38

7 3-2 4 PRSON HS 2 - ROOF ROOF ROOF STRUTUR PRSON HOUS STRUTURL & RSSING G20: RPNTRY, TIMR FRMING N FIRST FIXING Plates or the like Treated sawn softwood; grade GS; basic sizes: 50 x 100 mm 62 m Trussed rafters; preservative treated and stress graded softwood Plots 1 & 2 esign and manufacture trussed roof members together with sundry timbers and metalwork Item 3, , Plots 3 esign and manufacture trussed roof members together with sundry timbers and metalwork Item 1, , extra over for abutment to Plot 4 item Straps and frame cramps 30 x 2.5 mm T galvanised mild steel restraint straps; fixing to woodwork: F 1000 mm long; once bent 62 Nr Sundry Metalwork items in roof including canopies 3 Nr LING & OVRING H60: PLIN ROOF TILING H65: SINGL LP ROOF TILING Sloping coverings oncrete interlocking tile roofing; Redland or equal; 38 x 25 mm tanalised softwood battens; Type 1F underfelt: G 412 x 332 mm Richmond or equal: 112 mm lap 209 m , Underslating felt; fixing with battens (measured separately), 150 mm laps all round: 3-2/1 To ollection: 12,684.19

8 3-2 4 PRSON HS 2 - ROOF S 747; Type 1F 209 m aves, verges, ridges, hips or the like F double course at eaves; 46 m verge with undercloak; bed and point cement mortar (1:3): 14 m Ventilated ridge tiles; bed and point in cement mortar (1:3) 11 m Hip tiles; bed and point in cement mortar (1:3) 26 m extra over for cutting to valleys 19 m Included LING & OVRING H71: L SHT OVRINGS N FLSHINGS aves, ridges, skirtings, fascias, flashings, aprons or the like Sheet lead; S 1178; working over fillets, slating or tiling: G H I ode 4 stepped flashings; wedging into grooves with lead wedges; mm girth 6 m ode 4 flashings; wedging into grooves with lead wedges; mm girth 3 m ode 6 valley gutters or the like; 450 mm girth or fibreglass 19 m UILING FRI SUNRIS Mineral wool insulation Quilts J 300mm thick horizontal laid and compressed over members at 450mm centres 120 m ROOF RING & VS TRTMNT ISPOSL SYSTMS R10: RINWTR PIPWORK N GUTTRS PV Rainwater pipes and fittings; Pipes; fixing with standard clips to masonry backgrounds: 3-2/2 To ollection: 2,852.94

9 3-2 4 PRSON HS 2 - ROOF 68 mm diameter including all bends etc 39 m extra for connecting to gulleys 7 nr extra for connecting to butt 3 nr PV Rainwater gutters and fittings; S 4576 Gutters; fixing with standard clips to woodwork backgrounds: 112 mm diameter including all outlets etc 46 m UPV FSI N SOFFIT ORING F Supply and fix upvc soffit and fascia 46 m , Supply and fix upvc soffit to underside of entrance porches 6 m /3 To ollection: 3,329.75

10 3-2 4 PRSON HS ollection for ROOF 3-2/1 12, /2 2, /3 3, To Summary: 18,866.88

11 3-2 4 PRSON HS 2 - STIRS STIRS STRUTUR L30: STIRS, WLKWYS N LUSTRS Staircases, handrails and balustrades Standard stock flight staircases; closed riser kite winder flight unit; 13 riser; 1000 mm overall width; total rise 2700 mm softwood staircase 3 Nr , LUSTRS & HNRILS alustrades; stair and landing kits; hemlock spindles and newels; string capping and moulded handrail; newel caps; type: Georgian design staircase balustrade - raking 9 m Georgian design staircase balustrade - straight 3 m Handrails: 50 x 75 mm; softwood moulded fixed to masonry - raking 9 m x 75 mm; softwood moulded fixed to masonry - striaght 3 m /1 To ollection: 3,102.24

12 3-2 4 PRSON HS 2 - XTRNL WLLS XTRNL WLLS GNRLLY F10: RIK N LOK WLLING avity walls Facing bricks, P 300:00 per 1000, in gauged mortar (1:1:6); flush pointing one side: half brick skins; stretcher bond 206 m , urox Supablocs in gauged mortar (1:1:6): 100 mm skins 7 N/mm2 blocks 206 m , Features ontrasting brick panels; facing bricks, P 300:00 per 1000, in gauged mortar (1:1:6); flush pointing all exposed edges: extra over facings for contrasting brick Quoins 20 m orbols 4 course high by one brick wide 2 nr Sills and copings; facing bricks, P per 1000, in gauged mortar (1:1:6); flush pointing all exposed edges: F G brick on edge sills; 50 mm projection weathered; half brick wide (snapped headers) 38 m brick on edge verge; 50 mm projection weathered; half brick wide (snapped headers) 9 m extra over for soldier course above windows curved 41 m F30: SSORIS N SUNRY ITMS Forming cavities Form cavity to hollow wall: H 100 mm wide 206 m uild in wall ties; 5 per m2: I 3 x 19 mm stainless steel twisted ties 200 mm long 206 m losing cavities 3-2/1 To ollection: 16,875.78

13 3-2 4 PRSON HS 2 - XTRNL WLLS Thermabate insulated cavity closer; hollow PV-u extrusion with core of polyisocyanate foam; fixed in accordance with manufacturer's instructions; to suit cavity width: mm; Thermabate m avity wall insulation rown ritherm avity Slab 32 Filling to cavity walls 100mm thick 206 m , Proprietary steel lintels; IG galvanised polyester powder coated; insulated; built into brick or block walling standard duty; length: F 1900 mm 1 Nr mm 3 Nr mm 23 Nr , mm 3 Nr /2 To ollection: 4,181.11

14 3-2 4 PRSON HS ollection for XTRNL WLLS 3-2/1 16, /2 4, To Summary: 21,056.89

15 3-2 4 PRSON HS 2F - WINOWS & XTRNL OORS WINOWS & XTRNL OORS GNRLLY L10: WINOWS, ROOFLIGHTS, SRNS N LOUVRS Windows Jeld Wen or equal softwood windows; Stormsure Range; casement; plain; fitted with standard sill; complete with ironmongery; size approx: Secured by esign F G 1200 x 1050mm obscured glass 3 Nr x 1050mm 4 Nr x 1200mm 1 Nr x 1200mm 7 Nr , x 1350mm 4 Nr , x 900mm obscure glass 3 Nr Plywood former to top of windows 41 m oors oors to match window spec H 1200 x 1980mm outward opening french doors 3 nr , L20: OORS, SHUTTRS N HTHS Secure by design exterior doorsets IG doors or equal external doorsets complete with ironmongery I 938 x 1980mm including ironmongery 3 Nr , L10: WINOWS, ROOFLIGHTS, SRNS N LOUVRS Mastic pointing Pointing frames one side with mastic sealant: J standard 162 m UILING FRI SUNRIS P20: UNFRM ISOLT TRIMS, SKIRTINGS N SUNRY ITMS 3-2F/1 To ollection: 10,869.19

16 3-2 4 PRSON HS 2F - WINOWS & XTRNL OORS Window boards or the like; wrought softwood; basic sizes Window boards; nosed and tongued: 25 x 200 mm 38 m F/2 To ollection:

17 3-2 4 PRSON HS ollection for WINOWS & XTRNL OORS 3-2F/1 10, F/ To Summary: 11,254.13

18 3-2 4 PRSON HS 2G - INTRNL WLLS & PRTITIONS INTRNL WLLS N PRTITIONS LORING MSONRY F10: RIK N LOK WLLING Walls urox Supablocs in gauged mortar (1:1:6): 100 mm 7 N/mm2 blocks 322 m , F30: SSORIS N SUNRY ITMS Forming cavities uild in wall ties; 5 per m2: 3 x 19 mm stainless steel twisted ties 200 mm long 322 m NON LORING F G Timber or metal stud partitions comprising 1 layer 12.5mm soundblock board fixed to both sides of partition on 75 x 38mm studs. avity to be filled with 25mm Isover PR insulation taped and jointed for direct decoration 210 m , layer soundblock 12.5mm thick fixed with dabs to masonry taped and jointed for direct decoration 248 m , insulated wallboard K17 fixed with plaster dabs to masonry, taped and jointed for direct decoration 210 m , mm plywood plugged and screwed to masonry in kitchens and bathrooms 111 m , Mastic pointing to walls 237 m G/1 To ollection: 25,128.65

19 3-2 4 PRSON HS 2H - INTRNL OORS INTRNL OORS OORS N RHITRVS L20: OORS, SHUTTRS N HTHS Interior doors Wood venered pre-finished softwood interior solid core 6 panel doors; 35 mm thick: 838 x 1981 mm; 6 panel door 27 Nr , FRMS N LININGS L20: OORS, SHUTTRS N HTHS Softwood jambs, heads, sills, mullions, transoms or the like Wrought softwood plain jambs or heads: 25 x 100 mm 135 m , P20: UNFRM ISOLT TRIMS, SKIRTINGS N SUNRY ITMS eads, stops or the like; wrought softwood; basic sizes Stops: 19 x 38 mm 135 m rchitraves, skirtings, picture rails or the like; wrought softwood; basic sizes rchitraves; bullnosed or chamfered and rounded: 19 x 75 mm 270 m IRONMONGRY P21: IRONMONGRY Seals and excluders Supply and fit fire resisting intumescent strip to woodwork backgrounds: Palusol; White 15 m General ironmongery S Good Housing Quality 3-2H/1 To ollection: 3,722.25

20 3-2 4 PRSON HS 2H - INTRNL OORS Supply and fit ironmongery to woodwork backgrounds; hinges: 100 mm pressed steel butts 30 Pr Supply and fit ironmongery to woodwork backgrounds; door closers: Perko door closer 30 Nr Supply and fit ironmongery to woodwork backgrounds; locks and latches: mortice latch 27 Nr athroom door lock assembly 6 Nr Supply and fit ironmongery to woodwork backgrounds; door furniture: lever furniture 27 Set Supply and fit ironmongery to woodwork backgrounds; general items: F door stop fixed to skirting 27 Nr H/2 To ollection: 1,097.76

21 3-2 4 PRSON HS ollection for INTRNL OORS 3-2H/1 3, H/2 1, To Summary: 4,820.01

22 3-2 4 PRSON HS 3 - FINISHS FINISHS WLL FINISHS SURF FINISHS M20: PLSTR, RNR N ROUGHST OTINGS arlite lightweight plastering with 2 mm arlite finish plaster To walls; 13 mm thick; two coat work; to masonry backgrounds with browning backings: over 300 mm wide 4 m eads, stops, edging strips and arches xpamet austenitic stainless steel render beads and stops; fixing in accordance with manufacturer's instructions: angle bead ref m RMI WLL TILING M40: STON, ONRT, QURRY N RMI TILING N MOSI Glazed ceramic tiling; S6431; fixing with tile adhesive, grouting with neat white cement; to floated backings To walls; 100 x 100 x 5.5 mm tiles: P SUM 15m2 over 300 mm wide 27 m , isolated areas not exceeding 1m2 12 nr not exceeding 300 mm wide 15 m SR FLOOR FINISHS M10: MNT : SN, ONRT SRS N TOPPINGS ement and sand (1:3); trowelled finish To floors and landings: F 75 mm thick 120 m , ccessories 3-3/1 To ollection: 4,047.00

23 3-2 4 PRSON HS 3 - FINISHS Reinforcement; chicken wire floors; width exceeding 300mm 120 m UILING FRI SUNRIS P10: SUNRY INSULTION, PROOFING WORK N FIR STOPS Insulation boards Kingspan thermafloor TF70 or equal thermal insulation sheets to concrete slab ground floor construction; laid to floors; thickness: floors; width exceeding 300mm 120 m , Vapour barrier; polythene floors; width exceeding 300mm 120 m floors; vertical; width not exceeding 300mm 104 m TIMR FLOOR FINISHS VINYL N RPT M50 RUR/PLSTIS/ORK/LINO/RPT TILING/ SHTING Latex self levelling compound Work to floors width exceeding 300mm 120 m Marley Safetread standard safety floor, seam welded; fixing with adhesive 2.5mm work to floors F width exceeding 300mm 58 m , mastic seal G edges of vinyl floor to skirting 95 m ntrance Mats Heckmondwicke arrier matting; attleship Slate: fully adhered to screeded floor: as M50/120 H allow for matting at entrance inc frame size 1100 x 1000mm 3 nr SKIRTINGS 3-3/2 To ollection: 4,420.94

24 3-2 4 PRSON HS 3 - FINISHS P20: UNFRM ISOLT TRIMS, SKIRTINGS N SUNRY ITMS rchitraves, skirtings, picture rails or the like; wrought softwood; basic sizes Skirtings; bullnosed or chamfered and rounded: 19 x 100 mm 316 m , x 100 mm cut to stair profile 9 m ILING FINISHS LININGS, SHTHING & RY PRTITIONING K10: PLSTROR RY LINING, PRTITIONS N ILINGS Gyproc linings; 12.5 mm plasterboard to woodwork backgrounds taped and joint finish Linings to ceilings: F over 300 mm wide 248 m , over 300 mm wide; in staircase areas 9 m extra over for MR boards 58 m xtra for loft access 3 nr M20: PLSTR, RNR N ROUGHST OTINGS Thistle finishing plaster To ceilings; 2 mm thick; one coat work; to plasterboard backgrounds including scrimming joints and filling nail holes; board finish: G over 300 mm wide 248 m , M31: FIROUS PLSTR Gyproc coving Gyproc coving; fixing with adhesive: H 127 mm girth 51 m INTRNL ORTIONS M60: PINTING N LR FINISHING mulsion paint 3-3/3 To ollection: 6,366.96

25 3-2 4 PRSON HS 3 - FINISHS Prepare, apply one mist coat and two full coats; plasterboard backgrounds: walls 522 m , ceilings 182 m ggshell paint Prepare, apply one undercoat and two full coats; plasterboard backgrounds: walls 196 m ceilings 58 m Gloss paint; woodwork backgrounds; two undercoats, one top coat Prepare, knot, prime and stop, apply two undercoats and one top coat gloss paint; general surfaces: F G over 300 mm girth 116 m over 300 mm girth stairs 24 m n.e. 300 mm girth 527 m , XTRNL ORTIONS Gloss paint; woodwork backgrounds; two undercoats, one top coat Prepare, knot, prime and stop, apply two undercoats and one top coat gloss paint; general surfaces: H I over 300 mm girth 55 m n.e. 300 mm girth 57 m Preservative stain Prepare, apply one coat Sadolins base and two coats Sadolins lassic finish; glazed windows and screens; J K over 300 mm girth 10 m not exc 300 mm girth 7 m /4 To ollection: 6,025.80

26 3-2 4 PRSON HS ollection for FINISHS 3-3/1 4, /2 4, /3 6, /4 6, To Summary: 20,860.70

27 3-2 4 PRSON HS 4 - FITTINGS FITTINGS KITHN FITTINGS FURNITUR & QUIPMNT N11: OMSTI KITHN FITTINGS Kitchen units; proprietary standard ready assembled; Howdens Greenwich range or equal ase units: 300 x 600 mm 3 Nr x 600 mm 6 Nr Sink base units: 1000 x 600 mm sink unit; 3 Nr ppliance and Full Height Housings room cupboard 3 nr Wall units: 1000 x 284 x 735 mm high; wall unit 3 Nr Worktops: F 600 x 30 mm thick; single roll edge 21 m Sinks; complete with taps and associated fittings; fixing in position: G stainless steel; inset: bowl and half: complete with mixer taps 3 Nr Sundry Items H Sundry kitchen items 3 nr Mastic pointing Pointing I standard 30 m WRROS & OTHRS John arr Premium softwood interior panel doors; 35 mm thick: in wardrobe doors J 838 x 1981 mm; 6 panel door 6 Nr /1 To ollection: 4,078.50

28 3-2 4 PRSON HS 4 - FITTINGS FRMS N LININGS L20: OORS, SHUTTRS N HTHS Softwood jambs, heads, sills, mullions, transoms or the like Wrought softwood plain jambs or heads: 25 x 100 mm 21 m P20: UNFRM ISOLT TRIMS, SKIRTINGS N SUNRY ITMS eads, stops or the like; wrought softwood; basic sizes Stops: 19 x 38 mm 21 m rchitraves, skirtings, picture rails or the like; wrought softwood; basic sizes rchitraves; bullnosed or chamfered and rounded: 19 x 75 mm 42 m P21: IRONMONGRY General ironmongery Supply and fit ironmongery to woodwork backgrounds; hinges: 100 mm pressed steel butts 6 Pr Supply and fit ironmongery to woodwork backgrounds; locks and latches: mortice latch 3 Nr Supply and fit ironmongery to woodwork backgrounds; door furniture: F G lever furniture 3 Set hat and coats hooks 3 nr UILING FRI SUNRIS P20: UNFRM ISOLT TRIMS, SKIRTINGS N SUNRY ITMS over fillets, trims or the like; wrought softwood; basic sizes 3-4/2 To ollection:

29 3-2 4 PRSON HS 4 - FITTINGS urtain attens: 13 x 50 mm 40 m IRING UPORS Supply and install slatted shelving to airing cupboard 6 nr /3 To ollection:

30 3-2 4 PRSON HS ollection for FITTINGS 3-4/1 4, / / To Summary: 5,085.73

31 3-2 4 PRSON HS 4 - SNITRY PPLINS SNITRY PPLINS GNRLLY N13: SNITRY PPLINS N FITTINGS Sanitary fittings Twyfords Neptune or qual Shower enclosures; complete with fittings; fixing in position: plastic curtain and rail, one sided 3 Nr aths; complete with taps and shower attachment and associated fittings; fixing in position: pressed steel; Neptune 3 Nr asins; complete with taps and associated fittings; fixing in position: vitreous china; Neptune basin 6 Nr , W suites; complete with cistern, seat and flap and associated fittings; fixing in position: low level washdown; Neptune water saving 6/4 design 6 Nr , Showers; complete with taps and associated fittings; fixing in position: surface mounted mechanical valve and spray head; Hans Grohe or equal thermastacaly controlled with water saving device 9-12 litres per minute 3 Nr , N10: GNRL FIXTURS, FURNISHINGS N QUIPMNT Mirrors Mirrors; 6 mm thick safety glass; polished bevelled edges; fixing with brass screws including polyethylene washers and screw caps; size: F 450 x 600 mm 6 Nr UILING FRI SUNRIS P21: IRONMONGRY General ironmongery Supply and fit ironmongery to woodwork backgrounds; general items: 3-4/1 To ollection: 5,096.04

32 3-2 4 PRSON HS 4 - SNITRY PPLINS towel rail 6 Nr toilet roll holder 6 Nr OXING IN SRVIS llow to box in sanitaryware cistern and pipes overal height 1000mm 6 m llow to box in pipes etc 45 m , llow for bath panel and frame 3 nr /2 To ollection: 2,193.00

33 3-2 4 PRSON HS ollection for SNITRY PPLINS 3-4/1 5, /2 2, To Summary: 7,289.04

34 3-2 4 PRSON HS 4 - OTHR ISPOSL INSTLLTIONS SOIL N VNT PIPS llow for SVP pipes to each property 3 nr WI 3 Nr WST PIPS N OVRFLOWS llow for waste pipes to each property 3 nr llow for condensate pipework from boilers 3 nr WI 3 Nr /1 To ollection: 1,725.99

35 3-2 4 PRSON HS 5 - MHNIL INSTLLTIONS WTR INSTLLTIONS INOMING SRVIS S12: HOT N OL WTR (SMLL SL) Polythene pipework and fittings Polyethylene pipework; blue 12 bar medium duty; compression couplings; laying in trench; diameter: 20 mm 50 m Supply and install Water meter 8 nr HOT & OL WTR Hot and cold water installations opper service pipework and fittings; plastic storage cistern; copper megaflow cylinder; pipe and equipment insulation; testing on completion; two storey dwelling: F G Kitchen; 2 athrooms 3 Nr 2, , extra for outside taps 3 nr extra for washing machine connections 3 nr extra for ishwasher connections 3 nr WI 3 nr /1 To ollection: 8,833.76

36 3-2 4 PRSON HS 5 - HTING INSTLLTIONS SP HTING INSTLLTION HTING INSTLLTIONS OMPLT entral heating installations Gas fired wet system including radiators, sedbuck boiler with minimum 90% efficiency and all controls and thermostatic valves two storey two bed house unit; 10 radiators: 3 Nr 4, , WI 3 nr /1 To ollection: 13,467.24

37 3-2 4 PRSON HS 5 - LTRIL INSTLLTIONS LTRIL INSTLLTIONS LTRIL INSTLLTIONS GNRLLY omestic wiring installations omplete electrical installation comprising: power circuits; lighting circuits; outlets; switches; consumer unit; immersion heater; cooker point; testing: F G H 2 edroom House 3 Nr 2, , llow for external lighting and power 3 Nr Supply and install lectric meter cabinet 3 nr Supply and install mains operated smoke detectors with rechargeable battery 3 nr Supply and install optical smoke detectors 3 nr Supply and install ionisation smoke detector 3 nr llow for spur point for future security alarm system 3 Nr WI 3 nr /1 To ollection: 10,545.87

38 3-2 4 PRSON HS 5 - VNTILTION INSTLLTIONS VNTILLTION SYSTMS GNRLLY Whole House Ventilation System Supply and install a whole house natural ventillation system Ref; Passivent by Willan uilding Services or equal 3 nr 1, , xtract Fans Supply and install humidistat fans to kichens 3 nr N/ Supply and install humidistat extract fans to bathrooms 6 nr N/ Tumble rier Vents Supply and install tumble drier vents 3 nr uilders Works in onnection With Ventillation WI 3 nr /1 To ollection: 3,986.40

39 3-2 4 PRSON HS 5F - GS INSTLLTIONS GS INSTLLTION GNRLLY Supply and install gas cooker point in kitchen including all pipework from meter 3 nr Supply and install boiler gas point in the kitchen including all pipework from meter 3 nr Supply and install gas meter 3 nr Included Supply and install new gas meter cabinet 3 nr F/1 To ollection:

40 3-2 4 PRSON HS 5G - TLOM INSTLLTIONS OMMUNITION INSTLLTION TV & RIO RIL SYSTM Supply and install TV/FM/ aerial systen to each house including 2 nr points 3 nr TLPHON llow to supply 4nr telephone points to various locations within each house 12 nr , G/1 To ollection: 1,391.40

41 3-2 4 PRSON HS 5H - OTHR WORKS OTHR WORKS SOLR POWR WTR SUPPLIS Solar Powered Water Supply Supply and install solar hot water panel Sonnenkraft SK500 SHW and connect to hot water system 3 nr N/ Feature Seat onstruct feature seat to external low level wall approx size 1200 x 350 x 500mm high 3 nr H/1 To ollection:

42 3-2 4 PRSON HS Summary for ill F 2G 2H F 5G 5H SU-STRUTUR 19, UPPR FLOORS 5, ROOF 18, STIRS 3, XTRNL WLLS 21, WINOWS & XTRNL OORS 11, INTRNL WLLS & PRTITIONS 25, INTRNL OORS 4, FINISHS 20, FITTINGS 5, SNITRY PPLINS 7, OTHR 1, MHNIL INSTLLTIONS 8, HTING INSTLLTIONS 13, LTRIL INSTLLTIONS 10, VNTILTION INSTLLTIONS 3, GS INSTLLTIONS TLOM INSTLLTIONS 1, OTHR WORKS Total: 182, Summary for ill 3

43 4-3 5 PRSON HOUS 1 - SU-STRUTUR SU-STRUTUR 11: GROUN INVSTIGTION Machine excavation of trial holes xcavate trial holes; backfill with excavated material, compacted in 250 mm layers; maximum depth not exceeding: 4.00 m 2 m FOUNTIONS 20: XVTING N FILLING NO ONTMINT SOIL LLOW FOR Machine excavation Oversite excavation to remove topsoil, average depth: 150 mm 60 m xcavation to reduce levels, depth not exceeding: 0.25m 9 m Trench excavation to receive foundations, pile caps and ground beams, depth not exceeding: 2.00 m 21 m reaking up obstructions with machine driven hammer xtra over excavation for breaking out: concrete or brickwork 1 m Timber earthwork support to loose ground To sides of excavation not exceeding 2.00 m apart, depth not exceeding: F 2.00 m 71 m Off site disposal of material arising from earthworks Removed, including providing a suitable tip: G machine loading 36 m , isposal 4-1/1 To ollection: 1,913.71

44 4-3 5 PRSON HOUS 1 - SU-STRUTUR llow to keep excavations clear of surface water item llow to keep excavations clear of ground water item Surface treatment Level and compact: bottoms of excavations 60 m Membranes Lotrak equal geotextile sheeting; 150 mm side and end laps: horizontal; over 300 mm wide 60 m Filling to excavations with imported materials Filled in making up levels; by machine; compacting in layers: Tp type 1 9 m IN SITU ONRT & LRG P ONRT 10: MIXING, STING, URING IN SITU ONRT Plain in situ concrete; mix RN2 Foundations; poured on or against earth or unblinded hardcore: F generally 21 m , RIKWORK TO P MSONRY F10: RIK N LOK WLLING Walls urox or equal Supablocs in gauged mortar (1:1:6): G H 100 mm 7 N/mm2 blocks 7 m mm 7 N/mm2 blocks Trench fill 3 m Facing bricks, P 300:00 per 1000 in gauged mortar (1:1:6); flush pointing both sides: I half brick thick; stretcher bond 7 m /2 To ollection: 3,462.68

45 4-3 5 PRSON HOUS 1 - SU-STRUTUR F30: SSORIS N SUNRY ITMS Forming cavities Form cavity to hollow wall: 100 mm wide 7 m IN SITU ONRT & LRG P ONRT 10: MIXING, STING, URING IN SITU ONRT Plain in situ concrete; mix 25P Filling hollow walls: not exceeding 150 mm thick 0.21 m MSONRY F30: SSORIS N SUNRY ITMS amp proof courses and cavity trays Hyload pitch polymer d.p.c.; forming cavity trays: over 300 mm wide 11 m Hyload pitch polymer d.p.c.; horizontal: not exceeding 225 mm wide 7 m GROUN FLOOR ONSTRUTION 60: PRST N OMPOSIT ONRT KING precast concrete beam and block composite flooring system; comprising precast beams with 100mm block infill; cement slurry grouting to joints with (1:3) mix mortar or Hollowcore Floor units if deemed more appropriate Floors: Ground Level 225mm thick: 52 m , ir bricks; Ryton plastic; telescopic for cavity walls; built in F 215 x 75mm 8 nr /3 To ollection: 2,229.35

46 4-3 5 PRSON HOUS ollection for SU-STRUTUR 4-1/1 1, /2 3, /3 2, To Summary: 7,605.74

47 4-3 5 PRSON HOUS 2 - UPPR FLOORS UPPR FLOORS GNRLLY G20: RPNTRY, TIMR FRMING N FIRST FIXING Floors Treated sawn softwood; grade S3; basic sizes: 50 x 200 mm 120 m x 200 mm doubled up as trimmers 18 m Strutting and bridging; treated sawn softwood; grade GS; basic sizes: Herringbone strutting: 38 x 38 x 200 mm deep 26 m T SPW galvanised joist hangers; building into masonry Type S; joist size: 50 x 200 mm 60 Nr UILING FRI SUNRIS P10: SUNRY INSULTION, PROOFING WORK N FIR STOPS Insulation quilts rown glass fibre insulation quilt; generally; thickness: horizontal; 100 mm thick laid between joists 52 m LININGS, SHTHING & RY PRTITIONING K11: RIGI SHT FLOORING, SHTHING, LININGS N SINGS V313 moisture resistant tongued and grooved chipboard boarding; S5669: F 18 mm thick; over 300 mm wide 52 m /1 To ollection: 2,220.38

48 4-3 5 PRSON HOUS 2 - ROOF ROOF ROOF STRUTUR -3 5 PRSON HOUS STRUTURL & RSSING G20: RPNTRY, TIMR FRMING N FIRST FIXING Plates or the like Treated sawn softwood; grade GS; basic sizes: 50 x 100 mm 24 m Trussed rafters; preservative treated and stress graded softwood Plots 4 esign and manufacture trussed roof members together with sundry timbers and metalwork Item 2, , extra over for abutment to Plot 3 item Straps and frame cramps 30 x 2.5 mm T galvanised mild steel restraint straps; fixing to woodwork: 1000 mm long; once bent 24 Nr Sundry Metalwork items in roof including canopies 1 Nr LING & OVRING H60: PLIN ROOF TILING H65: SINGL LP ROOF TILING Sloping coverings oncrete interlocking tile roofing; Redland or equal; 38 x 25 mm tanalised softwood battens; Type 1F underfelt: F 412 x 332 mm Richmond or equal: 112 mm lap 100 m , Underslating felt; fixing with battens (measured separately), 150 mm laps all round: G S 747; Type 1F 100 m aves, verges, ridges, hips or the like H double course at eaves; 29 m /1 To ollection: 5,660.53

49 4-3 5 PRSON HOUS 2 - ROOF verge with undercloak; bed and point cement mortar (1:3): 3 m Ventilated ridge tiles; bed and point in cement mortar (1:3) 9 m Hip tiles; bed and point in cement mortar (1:3) 11 m extra over for cutting to valleys 10 m Included LING & OVRING H71: L SHT OVRINGS N FLSHINGS aves, ridges, skirtings, fascias, flashings, aprons or the like Sheet lead; S 1178; working over fillets, slating or tiling: F G ode 4 stepped flashings; wedging into grooves with lead wedges; mm girth 6 m ode 4 flashings; wedging into grooves with lead wedges; mm girth 3 m ode 6 valley gutters or the like; 450 mm girth or fibreglass 10 m UILING FRI SUNRIS Mineral wool insulation Quilts H 300mm thick horizontal laid and compressed over members at 450mm centres 56 m ROOF RING & VS TRTMNT ISPOSL SYSTMS R10: RINWTR PIPWORK N GUTTRS PV Rainwater pipes and fittings; Pipes; fixing with standard clips to masonry backgrounds: I J K 68 mm diameter including all bends etc 16 m extra for connecting to gulleys 3 nr extra for connecting to butt 1 nr /2 To ollection: 1,615.12

50 4-3 5 PRSON HOUS 2 - ROOF PV Rainwater gutters and fittings; S 4576 Gutters; fixing with standard clips to woodwork backgrounds: 112 mm diameter including all outlets etc 29 m UPV FSI N SOFFIT ORING Supply and fix upvc soffit and fascia 29 m , Supply and fix upvc soffit to underside of entrance porches 3 m /3 To ollection: 1,616.00

51 4-3 5 PRSON HOUS ollection for ROOF 4-2/1 5, /2 1, /3 1, To Summary: 8,891.65

52 4-3 5 PRSON HOUS 2 - STIRS STIRS STRUTUR L30: STIRS, WLKWYS N LUSTRS Staircases, handrails and balustrades Standard stock flight staircases; closed riser flight unit; with half landing; 13 riser; 1000 mm overall width; total rise 2700 mm softwood staircase 1 Nr LUSTRS & HNRILS alustrades; stair and landing kits; hemlock spindles and newels; string capping and moulded handrail; newel caps; type: Georgian design staircase balustrade - raking 3 m Georgian design staircase balustrade - straight 1 m Handrails: 50 x 75 mm; softwood moulded fixed to masonry - raking 3 m x 75 mm; softwood moulded fixed to masonry - striaght 1 m /1 To ollection: 1,034.08

53 4-3 5 PRSON HOUS 2 - XTRNL WLLS XTRNL WLLS GNRLLY F10: RIK N LOK WLLING avity walls Facing bricks, P 300:00 per 1000, in gauged mortar (1:1:6); flush pointing one side: half brick skins; stretcher bond 114 m , urox Supablocs in gauged mortar (1:1:6): 100 mm skins 7 N/mm2 blocks 114 m , Features ontrasting brick panels; facing bricks, P 300:00 per 1000, in gauged mortar (1:1:6); flush pointing all exposed edges: extra over facings for contrasting brick Quoins 5 m Sills and copings; facing bricks, P per 1000, in gauged mortar (1:1:6); flush pointing all exposed edges: brick on edge sills; 50 mm projection weathered; half brick wide (snapped headers) 14 m extra over for soldier course above windows curved 18 m F30: SSORIS N SUNRY ITMS Forming cavities Form cavity to hollow wall: F 100 mm wide 114 m uild in wall ties; 5 per m2: G 3 x 19 mm stainless steel twisted ties 200 mm long 114 m losing cavities Thermabate insulated cavity closer; hollow PV-u extrusion with core of polyisocyanate foam; fixed in accordance with manufacturer's instructions; to suit cavity width: H mm; Thermabate m /1 To ollection: 9,297.68

54 4-3 5 PRSON HOUS 2 - XTRNL WLLS avity wall insulation rown ritherm avity Slab 32 Filling to cavity walls 100mm thick 114 m , Proprietary steel lintels; IG galvanised polyester powder coated; insulated; built into brick or block walling standard duty; length: 1900 mm 6 Nr mm 2 Nr mm 2 Nr mm 2 Nr /2 To ollection: 1,521.60

55 4-3 5 PRSON HOUS ollection for XTRNL WLLS 4-2/1 9, /2 1, To Summary: 10,819.28

56 4-3 5 PRSON HOUS 2F - WINOWS & XTRNL OORS WINOWS & XTRNL OORS GNRLLY L10: WINOWS, ROOFLIGHTS, SRNS N LOUVRS Windows Jeld Wen or equal softwood windows; Stormsure Range; casement; plain; fitted with standard sill; complete with ironmongery; size approx: Secured by esign F 1200 x 1050mm obscured glass 1 Nr x 1700mm 1 Nr x 1200mm 5 Nr , x 900mm 1 Nr x 900mm obscure glass 1 Nr Plywood former to top of windows 17 m oors oors to match window spec G 1800 x 1980mm outward opening french doors 1 nr L20: OORS, SHUTTRS N HTHS Secure by design exterior doorsets IG doors or equal external doorsets complete with ironmongery H 938 x 1980mm including ironmongery 2 Nr , L10: WINOWS, ROOFLIGHTS, SRNS N LOUVRS Mastic pointing Pointing frames one side with mastic sealant: I standard 72 m UILING FRI SUNRIS P20: UNFRM ISOLT TRIMS, SKIRTINGS N SUNRY ITMS 4-2F/1 To ollection: 5,166.33

57 4-3 5 PRSON HOUS 2F - WINOWS & XTRNL OORS Window boards or the like; wrought softwood; basic sizes Window boards; nosed and tongued: 25 x 200 mm 16 m F/2 To ollection:

58 4-3 5 PRSON HOUS ollection for WINOWS & XTRNL OORS 4-2F/1 5, F/ To Summary: 5,328.41

59 4-3 5 PRSON HOUS 2G - INTRNL WLLS & PRTITIONS INTRNL WLLS N PRTITIONS LORING MSONRY F10: RIK N LOK WLLING Walls urox Supablocs in gauged mortar (1:1:6): 100 mm 7 N/mm2 blocks 56 m , F30: SSORIS N SUNRY ITMS Forming cavities uild in wall ties; 5 per m2: 3 x 19 mm stainless steel twisted ties 200 mm long 56 m NON LORING F G Timber or metal stud partitions comprising 1 layer 12.5mm soundblock board fixed to both sides of partition on 75 x 38mm studs. avity to be filled with 25mm Isover PR insulation taped and jointed for direct decoration 85 m , layer soundblock 12.5mm thick fixed with dabs to masonry taped and jointed for direct decoration 56 m insulated wallboard K17 fixed with plaster dabs to masonry, taped and jointed for direct decoration 116 m , mm plywood plugged and screwed to masonry in kitchens and bathrooms 32 m Mastic pointing to walls 110 m G/1 To ollection: 8,603.95

60 4-3 5 PRSON HOUS 2H - INTRNL OORS INTRNL OORS OORS N RHITRVS L20: OORS, SHUTTRS N HTHS Interior doors Wood venered pre-finished softwood interior solid core 6 panel doors; 35 mm thick: 838 x 1981 mm; 6 panel door 10 Nr FRMS N LININGS L20: OORS, SHUTTRS N HTHS Softwood jambs, heads, sills, mullions, transoms or the like Wrought softwood plain jambs or heads: 25 x 100 mm 50 m P20: UNFRM ISOLT TRIMS, SKIRTINGS N SUNRY ITMS eads, stops or the like; wrought softwood; basic sizes Stops: 19 x 38 mm 50 m rchitraves, skirtings, picture rails or the like; wrought softwood; basic sizes rchitraves; bullnosed or chamfered and rounded: 19 x 75 mm 100 m IRONMONGRY P21: IRONMONGRY Seals and excluders Supply and fit fire resisting intumescent strip to woodwork backgrounds: F Palusol; White 30 m H/1 To ollection: 1,647.50

61 4-3 5 PRSON HOUS 2H - INTRNL OORS General ironmongery S Good Housing Quality Supply and fit ironmongery to woodwork backgrounds; hinges: 100 mm pressed steel butts 11 Pr Supply and fit ironmongery to woodwork backgrounds; door closers: Perko door closer 11 Nr Supply and fit ironmongery to woodwork backgrounds; locks and latches: mortice latch 10 Nr athroom door lock assembly 2 Nr Supply and fit ironmongery to woodwork backgrounds; door furniture: lever furniture 10 Set Supply and fit ironmongery to woodwork backgrounds; general items: F door stop fixed to skirting 10 Nr H/2 To ollection:

62 4-3 5 PRSON HOUS ollection for INTRNL OORS 4-2H/1 1, H/ To Summary: 2,051.30

63 4-3 5 PRSON HOUS 3 - FINISHS FINISHS WLL FINISHS SURF FINISHS M20: PLSTR, RNR N ROUGHST OTINGS arlite lightweight plastering with 2 mm arlite finish plaster To walls; 13 mm thick; two coat work; to masonry backgrounds with browning backings: over 300 mm wide 4 m eads, stops, edging strips and arches xpamet austenitic stainless steel render beads and stops; fixing in accordance with manufacturer's instructions: angle bead ref m RMI WLL TILING M40: STON, ONRT, QURRY N RMI TILING N MOSI Glazed ceramic tiling; S6431; fixing with tile adhesive, grouting with neat white cement; to floated backings To walls; 100 x 100 x 5.5 mm tiles: P SUM 15m2 over 300 mm wide 10 m isolated areas not exceeding 1m2 4 nr not exceeding 300 mm wide 5 m SR FLOOR FINISHS M10: MNT : SN, ONRT SRS N TOPPINGS ement and sand (1:3); trowelled finish To floors and landings: F 75 mm thick 49 m ccessories 4-3/1 To ollection: 1,593.00

64 4-3 5 PRSON HOUS 3 - FINISHS Reinforcement; chicken wire floors; width exceeding 300mm 49 m UILING FRI SUNRIS P10: SUNRY INSULTION, PROOFING WORK N FIR STOPS Insulation boards Kingspan thermafloor TF70 or equal thermal insulation sheets to concrete slab ground floor construction; laid to floors; thickness: floors; width exceeding 300mm 49 m Vapour barrier; polythene floors; width exceeding 300mm 49 m floors; vertical; width not exceeding 300mm 22 m TIMR FLOOR FINISHS VINYL N RPT M50 RUR/PLSTIS/ORK/LINO/RPT TILING/ SHTING Latex self levelling compound Work to floors width exceeding 300mm 49 m Marley Safetread standard safety floor, seam welded; fixing with adhesive 2.5mm work to floors F width exceeding 300mm 25 m mastic seal G edges of vinyl floor to skirting 29 m ommercial grade carpet to communual areas Heckmondwicke arrier matting; attleship Slate: fully adhered to screeded floor: as M50/120 H allow for commercial grade matting at entrance inc frame size 1100 x 1000mm 1 nr SKIRTINGS 4-3/2 To ollection: 1,739.67

65 4-3 5 PRSON HOUS 3 - FINISHS P20: UNFRM ISOLT TRIMS, SKIRTINGS N SUNRY ITMS rchitraves, skirtings, picture rails or the like; wrought softwood; basic sizes Skirtings; bullnosed or chamfered and rounded: 19 x 100 mm 66 m x 100 mm cut to stair profile 6 m ILING FINISHS LININGS, SHTHING & RY PRTITIONING K10: PLSTROR RY LINING, PRTITIONS N ILINGS Gyproc linings; 12.5 mm wallboard to woodwork backgrounds taped and joint finish Linings to ceilings: F over 300 mm wide 94 m extra over for MR boards 25 m xtra for loft access 2 nr over 300 mm wide; in staircase areas 4 m M20: PLSTR, RNR N ROUGHST OTINGS Thistle finishing plaster To ceilings; 2 mm thick; one coat work; to plasterboard backgrounds including scrimming joints and filling nail holes; board finish: G over 300 mm wide 94 m M31: FIROUS PLSTR Gyproc coving Gyproc coving; fixing with adhesive: H 127 mm girth 20 m INTRNL ORTIONS M60: PINTING N LR FINISHING mulsion paint 4-3/3 To ollection: 2,321.42

66 4-3 5 PRSON HOUS 3 - FINISHS Prepare, apply one mist coat and two full coats; plasterboard backgrounds: walls 38 m ceilings 69 m ggshell paint Prepare, apply one undercoat and two full coats; plasterboard backgrounds: walls 78 m ceilings 25 m Gloss paint; woodwork backgrounds; two undercoats, one top coat Prepare, knot, prime and stop, apply two undercoats and one top coat gloss paint; general surfaces: F G over 300 mm girth 67 m over 300 mm girth stairs 12 m n.e. 300 mm girth 96 m XTRNL ORTIONS Gloss paint; woodwork backgrounds; two undercoats, one top coat Prepare, knot, prime and stop, apply two undercoats and one top coat gloss paint; general surfaces: H I over 300 mm girth 36 m n.e. 300 mm girth 32 m Preservative stain Prepare, apply one coat Sadolins base and two coats Sadolins lassic finish; glazed windows and screens; J K over 300 mm girth 27 m not exc 300 mm girth 25 m /4 To ollection: 2,238.10

67 4-3 5 PRSON HOUS ollection for FINISHS 4-3/1 1, /2 1, /3 2, /4 2, To Summary: 7,892.19

68 4-3 5 PRSON HOUS 4 - FITTINGS FITTINGS KITHN FITTINGS FURNITUR & QUIPMNT N11: OMSTI KITHN FITTINGS Kitchen units; proprietary standard ready assembled; Howdens Greenwich range or equal ase units: 400 x 600 mm 2 Nr x 600 mm 1 Nr Sink base units: 1000 x 600 mm sink unit; 1 Nr orner base units: 800 x 600 mm; 300 mm door; drawerline 1 Nr ppliance and Full Height Housings room cupboard 1 nr Wall units: F 1000 x 284 x 735 mm high; wall unit 2 Nr Worktops: G 600 x 30 mm thick; single roll edge 7 m Sinks; complete with taps and associated fittings; fixing in position: H stainless steel; inset: bowl and half: complete with mixer taps 1 Nr Sundry Items I Sundry kitchen items 1 nr Mastic pointing Pointing J standard 10 m WRROS & OTHRS 4-4/1 To ollection: 1,440.50

69 4-3 5 PRSON HOUS 4 - FITTINGS John arr Premium softwood interior panel doors; 35 mm thick: in wardrobe doors 838 x 1981 mm; 6 panel door 2 Nr FRMS N LININGS L20: OORS, SHUTTRS N HTHS Softwood jambs, heads, sills, mullions, transoms or the like Wrought softwood plain jambs or heads: 25 x 100 mm 7 m P20: UNFRM ISOLT TRIMS, SKIRTINGS N SUNRY ITMS eads, stops or the like; wrought softwood; basic sizes Stops: 19 x 38 mm 7 m rchitraves, skirtings, picture rails or the like; wrought softwood; basic sizes rchitraves; bullnosed or chamfered and rounded: 19 x 75 mm 14 m P21: IRONMONGRY General ironmongery Supply and fit ironmongery to woodwork backgrounds; hinges: 100 mm pressed steel butts 2 Pr Supply and fit ironmongery to woodwork backgrounds; locks and latches: F mortice latch 1 Nr Supply and fit ironmongery to woodwork backgrounds; door furniture: G H lever furniture 1 Set hat and coats hooks 1 nr UILING FRI SUNRIS 4-4/2 To ollection:

70 4-3 5 PRSON HOUS 4 - FITTINGS P20: UNFRM ISOLT TRIMS, SKIRTINGS N SUNRY ITMS over fillets, trims or the like; wrought softwood; basic sizes urtain attens: 13 x 50 mm 16 m IRING UPORS Supply and install slatted shelving to airing cupboard 2 nr /3 To ollection:

71 4-3 5 PRSON HOUS ollection for FITTINGS 4-4/1 1, / / To Summary: 1,936.11

72 4-3 5 PRSON HOUS 4 - SNITRY PPLINS SNITRY PPLINS GNRLLY N13: SNITRY PPLINS N FITTINGS Sanitary fittings Twyfords Neptune or qual Shower enclosures; complete with fittings; fixing in position: plastic curtain and rail, one sided 1 Nr aths; complete with taps and shower attachment and associated fittings; fixing in position: pressed steel; Neptune 1 Nr asins; complete with taps and associated fittings; fixing in position: vitreous china; Neptune basin 2 Nr W suites; complete with cistern, seat and flap and associated fittings; fixing in position: low level washdown; Neptune water saving 6/4 design 2 Nr Showers; complete with taps and associated fittings; fixing in position: surface mounted mechanical valve and spray head; Hans Grohe or equal thermastacaly controlled with water saving device 9-12 litres per minute 1 Nr N10: GNRL FIXTURS, FURNISHINGS N QUIPMNT Mirrors Mirrors; 6 mm thick safety glass; polished bevelled edges; fixing with brass screws including polyethylene washers and screw caps; size: F 450 x 600 mm 2 Nr UILING FRI SUNRIS P21: IRONMONGRY General ironmongery Supply and fit ironmongery to woodwork backgrounds; general items: 4-4/1 To ollection: 1,698.68

73 4-3 5 PRSON HOUS 4 - SNITRY PPLINS towel rail 2 Nr toilet roll holder 2 Nr OXING IN SRVIS llow to box in sanitaryware cistern and pipes overal height 1000mm 2 m llow to box in pipes etc 15 m llow for bath panel and frame 1 nr /2 To ollection:

74 4-3 5 PRSON HOUS ollection for SNITRY PPLINS 4-4/1 1, / To Summary: 2,429.68

75 4-3 5 PRSON HOUS 4 - OTHR ISPOSL INSTLLTIONS SOIL N VNT PIPS llow for SVP pipes to each property 1 nr WI 1 Nr WST PIPS N OVRFLOWS llow for waste pipes to each property 1 nr llow for condensate pipework from boilers 1 nr WI 1 Nr /1 To ollection:

76 4-3 5 PRSON HOUS 5 - MHNIL INSTLLTIONS WTR INSTLLTIONS INOMING SRVIS S12: HOT N OL WTR (SMLL SL) Polythene pipework and fittings Polyethylene pipework; blue 12 bar medium duty; compression couplings; laying in trench; diameter: 20 mm 10 m Supply and install Water meter 1 nr HOT & OL WTR Hot and cold water installations opper service pipework and fittings; plastic storage cistern; copper megaflow cylinder; pipe and equipment insulation; testing on completion; two storey dwelling: F G Kitchen; 2 athrooms 1 Nr 2, , extra for outside taps 1 nr extra for washing machine connections 1 nr extra for ishwasher connections 1 nr WI 1 nr /1 To ollection: 2,757.52

77 4-3 5 PRSON HOUS 5 - HTING INSTLLTIONS SP HTING INSTLLTION HTING INSTLLTIONS OMPLT entral heating installations Gas fired wet system including radiators, sedbuck boiler with minimum 90% efficiency and all controls and thermostatic valves two storey 3 bed house unit; 11 radiators: 1 Nr 4, , WI 1 nr /1 To ollection: 4,539.00

78 4-3 5 PRSON HOUS 5 - LTRIL INSTLLTIONS LTRIL INSTLLTIONS LTRIL INSTLLTIONS GNRLLY omestic wiring installations omplete electrical installation comprising: power circuits; lighting circuits; outlets; switches; consumer unit; immersion heater; cooker point; testing: F G H 3 edroom House 1 Nr 2, , llow for external lighting and power 1 Nr Supply and install lectric meter cabinet 1 nr Supply and install mains operated smoke detectors with rechargeable battery 1 nr Supply and install optical smoke detectors 1 nr Supply and install ionisation smoke detector 1 nr llow for spur point for future security alarm system 1 Nr WI 1 nr /1 To ollection: 3,605.59

Sports Buildings: budget costs for the Flood Relief Fund

Sports Buildings: budget costs for the Flood Relief Fund Sports Buildings: budget costs for the Flood Relief Fund The list below provides typical costs for flood insurance works, typically required by sports clubs or facilities. The list is not exhaustive but

More information

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses.

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses. The Townhouses Park View Place A A Compass House A T T T Royal Wharf Gardens Endeavour House T A A Thameside House T Sienna House A A A A T Apartments Townhouses River Thames Compass House Compass House

More information

Extension. for. Pretend Customer 123 A Road HA7 9BP. at: 123 A Road HA7 9BP

Extension. for. Pretend Customer 123 A Road HA7 9BP. at: 123 A Road HA7 9BP for Pretend Customer at: Pretend Customer Site address: Monday, 23 November 2015 Dear Pretend Customer, Subject: Thank you for your valued enquiry and instructions to quote for the above project. We are

More information

SCHEDULE OF FINISHES AMBLE RIDGE RETIREMENT VILLAGE

SCHEDULE OF FINISHES AMBLE RIDGE RETIREMENT VILLAGE SCHEDULE OF FINISHES AMBLE RIDGE RETIREMENT VILLAGE SITEWORKS FOUNDATIONS & SURFACE BED Site to be cleared and leveled. Builder s rubble to be carted away. As per Engineer s design, with USB green waterproofing.

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035 Decra Plus Drawing no DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 Description Shown In Decra Brochure Most Commonly Used Detail t~êã=oççñ=b~îéë=aéí~áä=b~îéë=lîéêü~åö=táíü=fåëìä~íéç=c~ëåá~=~åç=pçññáí

More information

How to report a repair

How to report a repair How to report a repair for repairs to your home? We are committed to making sure your home is in a good state of repair. To meet our legal responsibilities we will: Keep the exterior (eg roof, walls, doors,

More information

NRG 75 CRF NRG GREENBOARD WALL SYSTEM

NRG 75 CRF NRG GREENBOARD WALL SYSTEM NRG GREENBOARD WALL SYSTEM NRG Energy Efficient Building Systems is pleased to announce a revolution in lightweight cladding systems. NRG Building Systems is the first and only company to achieve CodeMark

More information

LONDON BOROUGH OF HACKNEY BUILDING SERVICES ENGINEER REPORT GAS HOUSE, SPRINGFIELD PARK, HACKNEY

LONDON BOROUGH OF HACKNEY BUILDING SERVICES ENGINEER REPORT GAS HOUSE, SPRINGFIELD PARK, HACKNEY LONDON BOROUGH OF HACKNEY BUILDING SERVICES ENGINEER REPORT GAS HOUSE, SPRINGFIELD PARK, HACKNEY 10 TH JUNE 2011 London Borough of Hackney Page 1 of 6 Brief Description of the Proposed Works The existing

More information

Good Craftsmanship Guide. Carpentry and Joinery- Carcassing

Good Craftsmanship Guide. Carpentry and Joinery- Carcassing Good Craftsmanship Guide Carpentry and Joinery- Carcassing Introduction This Good Craftsmanship Guide highlights key problems with the major elements of Carpentry and Joinery - Carcassing, and gives guidance

More information

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing Substrate, structural panel, bonded waterproofing The universal substrate for tiles Perfect covering No matter whether you work with mosaics or large format tiles, an absolutely level substrate with straight

More information

TENANT AND LANDLORD REPAIR RESPONSIBILITIES

TENANT AND LANDLORD REPAIR RESPONSIBILITIES TENANT AND LANDLORD REPAIR RESPONSIBILITIES REPAIR LANDLORD TENANT Notifying Repairs Any alteration or improvement you have carried out to the property Permission required Water damage caused by push-on

More information

Building Control Guidance Note

Building Control Guidance Note Issued 01/01/13 Rev Page 1 of 5 If you intend to convert an existing loft space into additional rooms you will need to apply for Building Regulation Approval. You may also need Planning Permission if you

More information

Residential Inspection Guidelines

Residential Inspection Guidelines Residential Inspection Guidelines 201 Pre-Pour Foundation Dimensions Building Location Certificate - if required in the building consent Construction and Advice Notes Check the building dimensions against

More information

Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1

Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1 Top plate Stud Soffit lining 45mm min nog Fix scotia bead Building underlay/james Hardie rigid air barrier Soffit Detail Building underlay/james Hardie rigid air barrier Bottom plate 25mm wide cant strip.

More information

RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002

RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002 RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002 INDEX New Build Flat and Pitched Roofs Rainwater Goods Porches to Existing Buildings / Covered Links etc, Between Buildings Floors /

More information

Cost Guide MARKET SUMMARY OVERVIEW REPAIRS AND MAINTENANCE ELECTRICAL ROOFING & ROOF DRAINAGE (UP TO TWO STOREYS; FIXED TO EXISTING ROOF FRAME)

Cost Guide MARKET SUMMARY OVERVIEW REPAIRS AND MAINTENANCE ELECTRICAL ROOFING & ROOF DRAINAGE (UP TO TWO STOREYS; FIXED TO EXISTING ROOF FRAME) Cost Guide < 1 > MARKET SUMMARY OVERVIEW Low interest rates and competitive construction pricing makes now a great time to renovate or build a new home. Interest rates are at historic lows and can be fixed

More information

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space) COST OF WORK FORM All costs shown are estimates using base grade materials, taxes, and labor. For houses where a higher quality is indicated, the costs should be increased for work requiring upgraded materials.

More information

Ubiflex. Non-lead flashing system

Ubiflex. Non-lead flashing system Ubiflex Non-lead flashing system Ubiflex non-lead flashing Ubiflex is a non-lead waterproof flashing material which can be used in most applications where lead is traditionally used to provide a weatherproof

More information

This section gives you some helpful information and tips on running your home and the equipment in it.

This section gives you some helpful information and tips on running your home and the equipment in it. 67 This section gives you some helpful information and tips on running your home and the equipment in it. Electricity Fuse board (electrical consumer unit) Make sure you know where your fuse board is and

More information

Installation Details. D1 General D2 Walls D3 Ceilings D4 Reference. D Installation Details

Installation Details. D1 General D2 Walls D3 Ceilings D4 Reference. D Installation Details D Installation Details D1 General D2 Walls D3 Ceilings D4 Reference D Installation Details D Contents D1 General Installation and Fastening Sequence for Steel Studs D1.1 Fastener Selection D1.3 D2 Walls

More information

Additions and Alterations

Additions and Alterations Additions and Alterations Addition and alteration construction is a miscellaneous grouping of home improvement and renovation projects that are generally geared toward the enhancement of an existing principal

More information

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003) NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:

More information

PLEASE REFER TO YOUR INDIVIDUAL QUOTE

PLEASE REFER TO YOUR INDIVIDUAL QUOTE STANDARD INCLUSIONS AND EXCLUSIONS SECONDARY DWELLING 16/04/2014 PLEASE REFER TO YOUR INDIVIDUAL QUOTE Inclusions Super Structure: Timber Frames including Roof Trussing and Framing, Internal and External

More information

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C. CLIENT Inspection Report 271 Front St. Alert Bay, B.C. Island Building Inspections 2013 V ANCOUVER I SLAND B. C. Elevation Photos For the Property at 271 Front Street Alert Bay, BC ELEVATION PICTURES Front

More information

Estimating Database Checklist

Estimating Database Checklist Estimating Database Checklist If you are creating a new estimating database for projects, the following list offers a thorough listing of Main and Sub Categories. You can also use it as a checklist to

More information

CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP)

CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP) CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP) Work Groups Composition and Weightings of Sub-indices CURRENT AS AT 1 JANUARY 2013 Issued by the CPAP Committee Distributed by the Association of South African

More information

Mark Cramer Inspection Services, Inc.

Mark Cramer Inspection Services, Inc. Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction

More information

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN 46787 Phone (260) 723-5131 Sales Fax (260) 723-6396 whitley@whitleyman.

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN 46787 Phone (260) 723-5131 Sales Fax (260) 723-6396 whitley@whitleyman. Building Type Building Code Whitley Classroom Buildings BOCA, UBC, SBCCI, NEC, ADA Structural Support Outrigger construction standard, Whitley model classrooms. Main support beams to be 12 11.8# per lineal

More information

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer

More information

Mike and Jen Sample 111 Main St. Tabb, VA. 23699 888-9999 SPECIFICATION LIST

Mike and Jen Sample 111 Main St. Tabb, VA. 23699 888-9999 SPECIFICATION LIST Mike and Jen Sample 111 Main St. Tabb, VA. 23699 888-9999 SPECIFICATION LIST 10. PLANS AND PERMITS The Contractor shall provide all necessary plans and procure permits for building, plumbing, electrical,

More information

THE VOID LETTABLE STANDARD

THE VOID LETTABLE STANDARD THE VOID LETTABLE STANDARD North West Leicestershire District Council is responsible for allocating empty Council owned homes. The Lettable standard has been agreed in consultation with the tenants of

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised November 27, 2013 the Easton - R 12'x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.

More information

(02) 6766 1477 266 Peel Street TAMWORTH www.singlebuilders.com.au. STANDARD INCLUSIONS (Residential)

(02) 6766 1477 266 Peel Street TAMWORTH www.singlebuilders.com.au. STANDARD INCLUSIONS (Residential) (02) 6766 1477 266 Peel Street TAMWORTH www.singlebuilders.com.au STANDARD INCLUSIONS (Residential) INCLUSIONS PRE-CONSTRUCTION ~ SITE WORKS ~ FOUNDATIONS Plans: Preparation of building plans and specifications

More information

Energy Company Obligation (ECO): Technical Monitoring Questions

Energy Company Obligation (ECO): Technical Monitoring Questions Energy Company Obligation (ECO) Technical Monitoring Questions v1 30/05/2013 Energy Company Obligation (ECO): Technical Monitoring Questions Under ECO suppliers are required to instruct suitably qualified

More information

PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY

PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY GENERAL SPECIFICATIONS These specifications are intended to cover the construction of the

More information

Planned maintenance works. What you need to know

Planned maintenance works. What you need to know Planned maintenance works What you need to know How to contact us L&Q Direct Cray House, 3 Maidstone Road Sidcup, Kent, DA14 5HU Tel: 0800 015 6536 Tel: 020 8045 4011 (local rate) Calls may be recorded

More information

Repair Responsibilities A Guide for Sadeh Lok Residents

Repair Responsibilities A Guide for Sadeh Lok Residents Repair Responsibilities A Guide for Sadeh Lok Residents Sadeh Lok is responsible for most of the repairs that may arise in and around your home, but not all. Each repair type is given a likely priority

More information

C, D Only if fitted by Sadeh Lok. A, B, C Category dependent upon impact on residents enjoyment of their home

C, D Only if fitted by Sadeh Lok. A, B, C Category dependent upon impact on residents enjoyment of their home Repair Responsibilities A Guide for Sadeh Lok Residents Sadeh Lok is responsible for most of the repairs that may arise in and around your home, but not all. Each repair type is given a likely priority

More information

FIRE RATED GLAZING System Guide

FIRE RATED GLAZING System Guide SYSTEM GUIDE Issue date: 05-05-2015 Expiry date: 31-12-2016 System Guide Introduction Pyropanel Developments are specialists in fire rated glazing solutions, and our systems are designed for easy installation

More information

www.citiesinspection.com October 5, 2015 Dear Client,

www.citiesinspection.com October 5, 2015 Dear Client, www.citiesinspection.com October 5, 2015 Dear Client, On 9/14/2015, Cities Inspection Service, Inc. completed a building inspection of the property located at 123 Oak Street, Someplace, Minnesota for you.

More information

WASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST

WASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST 0 RIVERSIDE DRIVE, OTTAWA, ON A0.0 COVER SHEET / DRAWING LIST A0. LEGEND AND GENERAL NOTES A0. GENERAL NOTES A0. GENERAL NOTES A0. TYPICAL WASHROOM WALL/SINK SECTION A0. DETAIL - CONTROL JOINT A0. DETAIL

More information

Rochdale Building Control Guide. Approved Document C. Site preparation and resistance to contaminants and moisture

Rochdale Building Control Guide. Approved Document C. Site preparation and resistance to contaminants and moisture Rochdale Building Control Guide Approved Document C Site preparation and resistance to contaminants and moisture Dampness is often misdiagnosed within buildings, the approved document deals with prevention

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

Multi-layer Insulation Blanket for Roofs

Multi-layer Insulation Blanket for Roofs Multilayer Insulation Blanket for Roofs Thermal Insulation in a 40mm thin, flexible, multilayer membrane Meets requirements of L1A, L1B 2010 In accordance with BR443 NHBC Acceptance Pitched & Flat roof

More information

Installation Instructions

Installation Instructions Installation Instructions 1. Position the unit onto bridging packers. These keep the unit away from any water sitting inside the frame. 2. Centralise the unit within the frame and pack the edges with appropriate

More information

DIY GUIDE 10 EASY STEPS FOR TREATMENT OF RISING DAMP

DIY GUIDE 10 EASY STEPS FOR TREATMENT OF RISING DAMP DIY GUIDE 10 EASY STEPS FOR TREATMENT OF RISING DAMP CONTENTS WHAT IS RISING DAMP STEP 1 SURVEY STEP 2 METER READINGS STEP 3 CONCLUSION STEP 4 PREPARATION FOR TREATMENT STEP 5 TYPE OF TREATMENT STEP 6

More information

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................

More information

QS 004 DEPARTMENT OF PUBLIC WORKS REPUBLIC OF SOUTH AFRICA BUILDING COST DATABASE

QS 004 DEPARTMENT OF PUBLIC WORKS REPUBLIC OF SOUTH AFRICA BUILDING COST DATABASE DEPATMENT OF PUBLIC WOKS EPUBLIC OF SOUTH AFICA BUILDING COST DATABASE AUGUST 2012 DEPATMENT OF PUBLIC WOKS EPUBLIC OF SOUTH AFICA BUILDING COST DATABASE POJECT DATA SHEET NOTE Bills of Quantities Stage

More information

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM 9.1 BACKGROUND Steel is widely used in the construction of multi-storey buildings. However, steel construction is seldom used and is traditionally

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

C31 Property Damage Appraisal

C31 Property Damage Appraisal C31 Property Damage Appraisal Sample Exam IMPORTANT The time allowed for this exam is 3 hours. Total marks: 200 You must hand in this paper and any paper used for rough work to the supervisor when you

More information

INSTALLATION OF A BAY WINDOW

INSTALLATION OF A BAY WINDOW INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening

More information

How To Repair A Boat Landing Deck With A Boat Bed

How To Repair A Boat Landing Deck With A Boat Bed RESIDENTIAL INSULATED SHEATHING INSTALLATION GUIDE Residential Insulated Sheathing Installation Guide ROXUL COMFORTBOARD IS Table of Contents Slab-on-grade-to Above Grade Wall...1 Foundation Wall at Footing

More information

Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing

Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing Schluter -KERDI-BOARD The universal substrate for tiles Flat. Level. Plumb. Square. No matter the quality, cost, or extravagance of

More information

Including. Rubershield-Pro. Breather Membrane

Including. Rubershield-Pro. Breather Membrane Including RubershieldPro Breather Membrane 2 Ruberoid produces a wide range of underslating membranes, primarily to be installed below tiles, slates or metal roofing providing a secondary barrier against

More information

AMERICAN GOTHIC PLAYHOUSE

AMERICAN GOTHIC PLAYHOUSE AMERICAN GOTHIC PLAYHOUSE Project Plan #856 Sheet 1 of 5 Pick a spot and get started with the beautiful that your kids will love. The design of the playhouse includes 35 square feet of interior space plus

More information

Dealing with damp and mould growth

Dealing with damp and mould growth Dealing with damp and mould growth Dampness affects many homes in Britain. There are three main causes of dampness. This guide aims to help you to work out what may be the cause of the damp and how you

More information

Holz Choices & Specifications

Holz Choices & Specifications March 21, 2011 0. SALES AND DESIGN 1. UTILITIES AND PERMITS Holz Choices & Specifications 2. EXCAVATION AND LOT PREPARATION Job Beginning date of Monday May 2 nd, 2011 ALTERNATE: Garage walls as drawn

More information

LAYING BLOCK AND BRICK

LAYING BLOCK AND BRICK LAYING BLOCK AND BRICK Products highlighted in this section: SAKRETE Type N Mortar Mix SAKRETE Type S Mortar Mix Brick And Block Laying Basics The first step in building a brick or block wall is to construct

More information

KEEP ASBESTOS YOUR QUICK GUIDE DON T BE AN EASY TARGET THIS GUIDE

KEEP ASBESTOS YOUR QUICK GUIDE DON T BE AN EASY TARGET THIS GUIDE KEEP THIS GUIDE ASBESTOS YOUR QUICK GUIDE DON T BE AN EASY TARGET Asbestos could be in the house or building you are working on right now. Left alone, it isn t dangerous. However, once disturbed, tiny

More information

Cascade Remodeling Inc. PO Box 25687 Portland, OR 97298 Catalyzing Euphoria Phone (503) 297-2055, FAX (503) 297-0579 CCB # 67007

Cascade Remodeling Inc. PO Box 25687 Portland, OR 97298 Catalyzing Euphoria Phone (503) 297-2055, FAX (503) 297-0579 CCB # 67007 SPECIFICATIONS For Sample Customer SCOPE OF WORK: The contractor will provide labor and/or materials for the work as outlined in the estimate and the following specification. The contractor s estimate

More information

Repairs: who s responsible?

Repairs: who s responsible? Your responsibilities as a tenant in a sheltered scheme Condensation Condensation Damage Damage caused by you Domestic appliances We will repair domestic appliances if they have been provided by us Keys

More information

PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE

PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE Sl.No. PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE Description of item Qty Unit Rate Amount 1 Demolishing tile work/cement concrete/( carefully taking out the closet and other

More information

CARPENTRY - HOUSING. This is the sloping length of a right-angled triangle.

CARPENTRY - HOUSING. This is the sloping length of a right-angled triangle. CARPENTRY - HOUSING PART 2: GABLE ROOFS The gable roof is classified as being double-pitched and one of the simplest roof forms, due to the fact that all rafters in the roof are exactly the same length

More information

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage:

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage: Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016 * Garage construction requires permits (electrical, building) * Permits must be applied for at the time. * Dial

More information

CHAPTER 2 QUANTITY TAKE-OFF

CHAPTER 2 QUANTITY TAKE-OFF CHAPTER 2 QUANTITY TAKEOFF The quantity takeoff is an important part of the cost estimate. It must be as accurate as possible and should be based on all available engineering and design data. Use of appropriate

More information

The formation of roof waterproofing details calls for

The formation of roof waterproofing details calls for 3.5 BUILT-UP ROOFING DETAIL DESIGN INTRODUCTION The formation of roof details calls for a combination of the skills of the designer and the roofer. There are many different approaches to detail design

More information

The WANZ Guide to Window Installation

The WANZ Guide to Window Installation The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 Ver. 1.1 Page 2 of 74 Contents Overview Page 5 Objective Page 5 Scope Page 5 Opening Preparation Page 7 Step P1 Preliminary Check

More information

Sun Windows General Information Sun New Construction Window Installation Instructions

Sun Windows General Information Sun New Construction Window Installation Instructions Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten

More information

Cost Estimate. Page 1. Description Qty Price UM Draw Me Total. LAND 5 Lot Price 6 Closing Costs on Lot 7 Interest On Lot 8 9

Cost Estimate. Page 1. Description Qty Price UM Draw Me Total. LAND 5 Lot Price 6 Closing Costs on Lot 7 Interest On Lot 8 9 Page 1 1 2 3 4 IMPORTANT: BE SURE TO INCLUDE SALES TAX AND DELIVERY CHARGES LAND 5 Lot Price 6 Closing Costs on Lot 7 Interest On Lot 8 9 TOTAL LAND (LINES 5-7) 10 11 DESIGN 12 * Architecture 13 Engineering

More information

Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION

Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION SIPS SCREWS WITH MINIMUM 1" PENETRATION IN WOOD MEMBER IN SIP WALL PANEL CONNECTED TO @ 24" O.C. MAXIMUM OUTSIDE SKIN EACH SIDE OF FRAMING TYP. AS RECOMMENDED BY FOAM CORE AS EACH SIDE OF FRAMING TYP.

More information

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table

More information

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings

More information

How To Build A Gambrel Roof And A Gable End Roof

How To Build A Gambrel Roof And A Gable End Roof Dutch Gable or Gambrel Roof and The Scotch Valley The folowing pages are an extract from Carp 12 text TAFE NSW Construction and Transport Division 71 HIP and VALLEY ROOFING GAMBREL / DUTCH GABLE The effect

More information

VA25014B0516 VA CINCINNATI PROJECT NO. 539-328 INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION 09 29 00 GYPSUM BOARD

VA25014B0516 VA CINCINNATI PROJECT NO. 539-328 INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION 09 29 00 GYPSUM BOARD SECTION 09 29 00 GYPSUM BOARD PART 1 - GENERAL 1.1 DESCRIPTION This section specifies installation and finishing of gypsum board, vapor retarder and air and moisture barrrier. 1.2 RELATED WORK A. Installation

More information

Irvinton Village Apartments 2901 Fulton Houston, Texas 77009 Houston Housing Authority J. Allen Management Managing Agent

Irvinton Village Apartments 2901 Fulton Houston, Texas 77009 Houston Housing Authority J. Allen Management Managing Agent Irvinton Village Apartments 2901 Fulton Houston, Texas 77009 Houston Housing Authority J. Allen Management Managing Agent Scope for Irvinton Village Unit #512 Overall Scope: Demolition, Renovation, and

More information

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic

More information

BUILDING PERMIT SPECIFICATIONS

BUILDING PERMIT SPECIFICATIONS BUILDING PERMIT SPECIFICATIONS The below noted requirements are based upon La Plata County Building Code. These specifications are not intended as a complete set of requirements, but are intended to provide

More information

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel What is GigaCrete GigaCrete is a family of products based on low carbon footprint Green ceramic binders

More information

12.1 Schlüter -KERDI-BOARD

12.1 Schlüter -KERDI-BOARD I n n o v a t i v e p r o f i l e s 12.1 Schlüter -KERDI-BOARD S u b s t r a t e U N I V E R S A L S T R U C T U R A L P A N E L, B O N D E D W A T E R P R O O F I N G Application and Function Schlüter

More information

Total Home Inspection Checklist

Total Home Inspection Checklist Total Home Inspection Checklist Use a checklist like this to make sure that you are looking at all parts of the house. Check off those items that are in good condition and make notes about those that are

More information

SUGGESTED CONSTRUCTION SEQUENCE - Owner Builders

SUGGESTED CONSTRUCTION SEQUENCE - Owner Builders SUGGESTED CONSTRUCTION SEQUENCE - Owner Builders ARRANGE SERVICES Arrange with your electrician a temporary supply of electricity. Also organise with your plumber a water supply for the duration of the

More information

Scope of works. Name Job# TBA -1. Project: Bathroom Renovation

Scope of works. Name Job# TBA -1. Project: Bathroom Renovation Scope of works Name Job# TBA -1 Address Date Suburb P. code Phone H BH 0 Mobile E-mail Project: Bathroom Renovation.01 Demolition Strip out and remove from site: All existing fixtures, fittings and cabinets

More information

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances. Basement Finishing Guide Community Development Department Building Inspections Division 5200 85 th Avenue North / Brooklyn Park, MN 55443 Phone: (763) 488-6379 / Fax: (763) 493-8171 6/15 www.brooklynpark.org

More information

Section 4.3. Separating Floors. Timber frame floor with I-Beams. Upgrading existing timber floor with new ceiling. Timber frame floor with

Section 4.3. Separating Floors. Timber frame floor with I-Beams. Upgrading existing timber floor with new ceiling. Timber frame floor with Section Separating Floors Timber frame floor with I-Beams Product: Earthwool Acoustic Roll and Floorfoam Easy Edge Strip Timber frame floor with solid timber joists Product: Earthwool Acoustic Roll and

More information

Knauf Aquapanel Interior. Tile Backing. Cement board for wet areas. Will not deteriorate in water. Easy to score and snap

Knauf Aquapanel Interior. Tile Backing. Cement board for wet areas. Will not deteriorate in water. Easy to score and snap Tile Backing Will not deteriorate in water Easy to score and snap Resistant to mould and mildew Knauf Aquapanel Interior Cement board for wet areas Knauf Aquapanel Interior Cement Board Drywall for Wet

More information

PDmB, Inc. Definitions

PDmB, Inc. Definitions Page 1 of 11 Definitions S Satisfactory Meets industry standards for proper material and installation NP Not Present Condition or item was not present at time of inspection NI Not Inspected Condition or

More information

Window Installation Instructions

Window Installation Instructions Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for

More information

plumbing products guide

plumbing products guide plumbing products guide radiator pipe guide & seals A significant development in the drive to reduce air leakage and heat loss. Installations such as that shown are all too common. The detail is poorly

More information

Residential Roofing Guide

Residential Roofing Guide Residential Roofing Guide TABLE OF CONTENTS Building Detail and Accessories...... 1 Panel Introduction and Handling...... 2 Cutting and Trimming.... 3 Roof Preparation..... 3 Roof Slope..... 3 Re-roofing...

More information

March 14, 2007. Installation of Bay, Bow and Garden Windows

March 14, 2007. Installation of Bay, Bow and Garden Windows March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed

More information

BOQ for Plumbing, Sanitary Works

BOQ for Plumbing, Sanitary Works BOQ for Plumbing, Sanitary Works Page 1 of 6 Sr.No Item Description Quantity Unit Rate Amount (Rs.) 1 SANITARY FIXTURES Providing & Fixing star white colour vitreous china wall mounted wc with 1a heavy

More information

ADDENDUM # 1 To: 1112-909-62-3698 RFP for: Various Construction Maintenance & Repair Services

ADDENDUM # 1 To: 1112-909-62-3698 RFP for: Various Construction Maintenance & Repair Services 818 S. FLORES ST. SAN ANTONIO, TEXAS 78204 www.saha.org Procurement Department ADDENDUM # 1 To: 1112-909-62-3698 RFP for: Various Construction Maintenance & Repair Services Remove and replace in their

More information

Installation Window Building In Details

Installation Window Building In Details Installation Window Building In Details INSTALLATION Photo courtesy of Rowe Aluminium DATE: NOVEMBER 2009 REPLACES: AUGUST 2003 INSTALLATION Installation Replaces: Scale: NOT TO SCALE Vantage snap-on couplers

More information

STEP-BY-STEP. construction guide. Delivering better priced Conservatories, Sun Lounges and Garden Rooms via the Internet.

STEP-BY-STEP. construction guide. Delivering better priced Conservatories, Sun Lounges and Garden Rooms via the Internet. STEP-BY-STEP construction guide Delivering better priced Conservatories, Sun Lounges and Garden Rooms via the Internet. Welcome to our CONSERVATORY AND SUNROOM CONSTRUCTION GUIDE What is the specification

More information

Revised Specifications & Scale of Amenities for General Pool Residential Accommodation (Type I to VI) Revised Amenities.doc

Revised Specifications & Scale of Amenities for General Pool Residential Accommodation (Type I to VI) Revised Amenities.doc Revised Specifications & Scale of Amenities for General Pool Residential Accommodation (Type I to VI) 1 Specifications for Residential Buildings S Type I, II, III & Servant Qrs. Type IV Type V and VI Existing

More information

Important Information for Installer & Homeowner

Important Information for Installer & Homeowner Important Information for Installer & Homeowner Homeowner: Please keep this information for your records, do not discard! Installation Instructions for Wood Frame Construction Replacement (See other side

More information

C05. S03. P02 P08 FireWall. Including C05. S01. P02 Specialist partitions introduction

C05. S03. P02 P08 FireWall. Including C05. S01. P02 Specialist partitions introduction C05. S03. P02 P08 Including C05. S01. P02 Specialist partitions introduction C05 Specialist partitions Introduction Specialist partitions This section details specialist lightweight systems where high-security,