1 PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY GENERAL SPECIFICATIONS These specifications are intended to cover the construction of the proposed Two Storey Residence as shown on the plans and described in these specifications. The entire work is to be finished in every part with a first class job to the full extent of the meaning of plans and specifications. 1.0 STAKING OUT Boundary monuments shall be properly established and be located and proper set shall be checked with the drawings. The building shall be staked out with all the lines and grades shown on the drawings shall be established before excavation is started. Basic batter boards and reference work shall be erected at such places where they will not be disturbed during the construction of the foundation. 2.0 EXCAVATION AND LEVELLING Excavation shall be to the depths indicated bearings values. Excavations for footings and foundations carried below required depths shall be filled with concrete and bottom of such shall be leveled. Where excavation for footings rest on fill, excavation shall be carried deeper until the desired stratum is reached for safe bearing capacity of soil. Whenever water is encountered in the excavation process it shall be remove by paling or pumping. Care being taken that the surround particles of soil are not disturbed or removed. 3.0 FILLING AND BACKFILLING Backfill shall be placed to in layers not exceeding six (6) inches in thickness, each Layer being thoroughly wetted and compacted by tamping or rolling. The top two (2) inches of backfill shall consist of sand under gravel and other approved materials thoroughly compacted by wetting and compacting. Backfill may only be done after forms have been removed from footings, piers, foundation walls and hen concrete is hard enough to resist pressure resulting from filling.

2 4.0 FILLING MATERIALS Filling materials shall be poured and compacted as required for the area and elevation of the building as specifically indicated on the drawings. 5.0 CONCRETE WORKS Concrete mixtures to be used in this project are the following: CLASS A.: 1:2:4 CLASS B.: 1:2:5:5 CLASS C.: 1:3:6 - for columns, beams, footings and tie beams. - for walks, driveways, hollow blocks mortar, filler and plastering. - for floor and slabs on fill. Cement for the concrete shall conform to the requirement and specifications for Portland cement. Before concrete is placed embedded items shall have been inspected and tested, cleared and graded washed gravel and sand for all concrete work. Portland cement shall be Republic, Northern, Atlas or its equivalent. 6.0 REINFORCEMENT 20 mm dia deformed bar - to be used for beams 16 mm dia deformed bar - to be used for column reinforcement. 16 mm dia deformed bar - to be used for beams and footings reinforcement as well as for footing tie beam. 12 mm dia deformed bar - to be used for horizontal and vertical bar 10 mm dia deformed bar - to be used for beams stirrups and lateral ties # 16 G.I. Wire to be used for all steel bar intersections Reinforcing steel bar shall conform to fire resistive requirements o f the ASTM Standard best known for building practices. 7.0 MASONRY 6 x 8 16 CHB - to be used for all lower and upper exterior walls. 4 x 8 16 CHB - to be used for all interior walls. Concrete hollow blocks shall be non-load bearing block and should conform to fire resistive ratings. All units shall be restored for a period of not less than that time unless the strength exceed those mentioned in these specifications.

3 8.0 CARPENTRY AND JOINERY WORK Lumber shall be the approved quality of the respective kinds of various parts of the work, well seasoned, thoroughly dry and free from large, loose or unsound knots, shakes and other imperfections shall be coated with creosote or equivalent. TANGUILE - for all exposed wood works such as door jambs, frames, joists and cabinets. APITONG - for all unexposed lumber for framings. ¼ THK HARDIFLEX BOARD - to be used for all types of ceiling finishes including bathroom and toilets. 3/8 THK PLYWOOD - to be used fro all formworks. 2x4x10 COCO LUMBER fro scaffoldings. 9.0 REMOVAL OF FORMS SUSPENDED SLABS 21 DAYS BEAMS 21 DAYS COLUMNS AND WALLS 2 DAYS FOUNDATIONS 2 DAYS 10. ARCHITECTURAL FINISHING SCHEDULE 10.1 FLOORING Flooring for ground floor shall be.30x.30 or.40x.40 Ceramic tiles finish and Narra Parquet for Second Floor. Flooring of Den/Guest room shall be.30x.30 Vinyl Tiles. Flooring of Toilet and Bath shall be.20x.20 Ceramic Tiles any color and brand which is acceptable to the Owner/Architect. Flooring of Terrace (ground and second floor) shall be.30x.30 Ceramic Tiles WALLING

4 All bottom walling shall.20x.20 Ceramic Tiles any color and brand which is acceptable to the Owner/Architect. All interior walling shall be plain cement finish white in color with black or brown painted baseboard. All exterior wall shall use plastered painted finish. Other finishes shall be followed strictly as indicated on the plans ROOFING AND TINSMITHING WORKS Roofing materials specified herein shall be gauge 26 Long Span Pre-Painted Rib-Type. Flashing, ridge rolls and valley roll shall be gauge 26 Pre-Painted. Gutter shall be preformed Ga. 24 Pre-Painted and design are shown on the plans. It shall have a minimum slope of 1/8 per foot DOORS MAIN ENTRANCE DOOR SERVICE DOORS OTHER DOORS T & B DOOR PANEL DOOR TANGUILE PANEL DOOR HOLLOW CORE FLUSH DOOR ONE SIDE WATER RESISTANT The cylindrical lockset Stanley or equal for service doors and hollow core flush door lockset for others. Use Stanley door hinges or equal WINDOWS Steel casement windows for all window sets on sides and rear with 3/16 thk. glass to be provided with insect screen incorporated on the window frame and fire escape. Size of bars to be used shall be ¼ sq. bar. Verify also the design and sizes of windows reflected on working drawings PAINTING WORKS All paints to be used shall be Sinclair, Boysen or its equivalent and the following shall be followed: EXTERIOR MASONRY LATEX PAINT PRIMER COAT 2 FINAL COATS INTERIOR MASONRY LATEX PAINT PRIMER COAT 2 FINAL COATS EXTERIOR WOOD FINISHED EXTERIOR HOUSE PAINT AND 2 FINAL COATS INTERIOR WOOD FINISHED 2 COATS FLATWALL ENAMEL AND MUST RECEIVE PUTTY Painting covers complete painting and finishing of wood, plasters, concrete, metal or other surfaces, exterior or interior of the building.

5 All paint materials shall meet the requirements of paint materials under classification class A All colors shall be in accordance with samples to be approved by the Color choice shall be left to the Owner of the building with the advice of the architect in charge of construction ELECTRICAL SPECIFICATION All electrical installations shall be done in the provisions of the latest Philippine Code, rules and regulations of the municipality or city and the requirements of the local power company. All materials to be used shall be approved type for purpose and location Service entry shall be two phase, 220 AC system. There shall be only one drop to the building. Minimum size of wires shall be 2.0 mm2 TW for switch and lighting line 3.5 mm2 for power line in 12mm diameter PVC conduit. All equipment shall be adequately and effectively grounded junction. Whenever required and necessary, properly dimensioned pull and junction boxes shall be installed at convenient locations. Although not specified nor indicated in the drawings. All electrical wirings shall be installed in moldex flexible conduits or PVC if run is embedded in concrete or CHB. All wirings that run between roof and ceiling shall be installed in flexible conduits and properly supported with knobs and reinsulated mica tubes PLUMBING WORKS All works shall be done under the supervision of a licensed Master Plumber and in strict accordance with the specifications and of the methods as prescribed by the National Plumbing Code of the Philippines. Alternative material is allowed, provided such alternate is approved by an engineer such as PVC pipes for sewer and drainage pipes.

6

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

Superform Products Ltd.

Superform Products Ltd. TYPICAL CORNER REINFORCING NOTE : SEE ENGINEERED REBAR SCHEDULES SUPPLIED BY THE MANUFACTURER STEEL REINFORCEMENT WALL CORNER 90 Copyright 2012 Sept. 2012 5.1.1 Rebar Spacing 6" 12" Max. Load LB./FT. 2000

More information

CONSTRUCTION STAGES STAGE 1: PRELIMINARY WORK, AUXILIARY MATERIALS, TOOLS

CONSTRUCTION STAGES STAGE 1: PRELIMINARY WORK, AUXILIARY MATERIALS, TOOLS CONSTRUCTION STAGES STAGE 1: PRELIMINARY WORK, AUXILIARY MATERIALS, TOOLS - TOOLS AUXILIARY MATERIALS FOR INSTALLATION OF MOLDS CONSTRUCTION OF FOUNDATIONS PREPARATION OF THE CONSTRUCTION SITE MARKING

More information

The City of Maplewood Public Works Department Guidelines to Obtaining a Building Permit

The City of Maplewood Public Works Department Guidelines to Obtaining a Building Permit The City of Maplewood Public Works Department Guidelines to Obtaining a Building Permit Topic Page WHAT IS A BUILDING PERMIT? 2 WHY DO I NEED A BUILDING PERMIT? WHEN DO I NEED A BUILDING PERMIT? EXAMPLES

More information

The minimum reinforcement for the stem wall is the placement of:

The minimum reinforcement for the stem wall is the placement of: PolySteel creates an ideal insulated stem wall for concrete slabs that can make this part of your project easier and faster, in addition to making your finished project more energy-efficient. Figures 3.20

More information

SECTION 7 FOUNDATIONS

SECTION 7 FOUNDATIONS SECTION 7 FOUNDATIONS TYPICAL CONSTRUCTION METHOD Before any new building is erected, remove all stumps and roots from the soil to a depth of at least 12" below the surface of the ground in the area to

More information

METHANE HAZARD MITIGATION STANDARD PLAN: SIMPLIFIED METHOD FOR SMALL ADDITIONS

METHANE HAZARD MITIGATION STANDARD PLAN: SIMPLIFIED METHOD FOR SMALL ADDITIONS INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LABC Chapt. 71 Effective: 01-01-2014 DOCUMENT NO.: P/BC 2014-102 Revised: Previously Issued As: P/BC 2011-102 METHANE HAZARD MITIGATION STANDARD

More information

4. ANCHOR BOLTS AND STRAPS a. ½" anchor bolts shall be embedded 7" into concrete a maximum of 6' on center and 12" from corners and ends of plates.

4. ANCHOR BOLTS AND STRAPS a. ½ anchor bolts shall be embedded 7 into concrete a maximum of 6' on center and 12 from corners and ends of plates. GENERAL CODE REQUIREMENTS (BASEMENTS) 1. FOOTINGS a. Footings shall be below frost line depth (42"). b. For an 8" foundation wall, footings shall be no less than 8" deep and 16" wide. c. Steel reinforcement

More information

Cost Effectiveness of using Low Cost Housing Technologies in Construction

Cost Effectiveness of using Low Cost Housing Technologies in Construction Available online at www.sciencedirect.com Procedia Engineering 14 (2011) 156 160 The Twelfth East Asia-Pacific Conference on Structural Engineering and Construction Cost Effectiveness of using Low Cost

More information

Proposed Minimum Subterranean Termite Treatment Standards

Proposed Minimum Subterranean Termite Treatment Standards Proposed Minimum Subterranean Termite Treatment Standards Introduction This document is intended to serve as a model for states considering the adoption of standards for soil application of termiticides.

More information

SUMMARY OF BILL OF QUANTITIES

SUMMARY OF BILL OF QUANTITIES SUMMARY OF BILL OF QUANTITIES GN. FUVAHMULAKU JETTY Summary Bill No Description Amount 1 PRELIMINERIES 0.00 2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6

More information

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE - The original section of this building was constructed in 1941. The exterior walls are built of good quality stone. In the early 1980 s a similar addition was added to the north elevation. The exterior

More information

LAYING BLOCK AND BRICK

LAYING BLOCK AND BRICK LAYING BLOCK AND BRICK Products highlighted in this section: SAKRETE Type N Mortar Mix SAKRETE Type S Mortar Mix Brick And Block Laying Basics The first step in building a brick or block wall is to construct

More information

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains

More information

UNDERSLAB AND SLAB PLUMBING

UNDERSLAB AND SLAB PLUMBING CPA Underslab/Slab Plumbing Page 1 of 5 Building Division UNDERSLAB AND SLAB PLUMBING City of Palo Alto (CPA) Building Inspection 285 Hamilton Ave. Inspection Request: 650 329-2496 IVR # 203 Revision Date:02/11/11

More information

Permitting & Inspection Process. City of Liberal Building Department 324 N. Kansas Ave. Liberal, KS (620)

Permitting & Inspection Process. City of Liberal Building Department 324 N. Kansas Ave. Liberal, KS (620) Permitting & Inspection Process City of Liberal Building Department 324 N. Kansas Ave. Liberal, KS 67905 (620) 626-2260 This information is intended to help our customers obtain building permits. Sections

More information

C31 Property Damage Appraisal

C31 Property Damage Appraisal C31 Property Damage Appraisal Sample Exam IMPORTANT The time allowed for this exam is 3 hours. Total marks: 200 You must hand in this paper and any paper used for rough work to the supervisor when you

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C. CLIENT Inspection Report 271 Front St. Alert Bay, B.C. Island Building Inspections 2013 V ANCOUVER I SLAND B. C. Elevation Photos For the Property at 271 Front Street Alert Bay, BC ELEVATION PICTURES Front

More information

Two complete sets of plans that are legible and drawn to conventional scale are required to be submitted with the Building Permit Application Form.

Two complete sets of plans that are legible and drawn to conventional scale are required to be submitted with the Building Permit Application Form. Site Plan Checklist This checklist provides homeowners a summary of the Building Permit submission requirements for constructing a residential building. Construction of a building, including pre-fabricated

More information

A presentation by Ar. Maria Benita O. Regala. fuap Manager, Housing Technology Development Office (HTDO), NHA

A presentation by Ar. Maria Benita O. Regala. fuap Manager, Housing Technology Development Office (HTDO), NHA STANDARDS FOR HOUSING DESIGNAND CONSTRUCTION Relevance/Applicability in View of New Normal A presentation by Ar. Maria Benita O. Regala. fuap Manager, Housing Technology Development Office (HTDO), NHA

More information

XYZ Corporation. Project Waterproofing Handbook. 23 June 2008. Working Set Rev. 0. Project Address: 8888 Main Street York, PA 88888

XYZ Corporation. Project Waterproofing Handbook. 23 June 2008. Working Set Rev. 0. Project Address: 8888 Main Street York, PA 88888 Arch itectu ral Te sting Inc. XYZ Corporation 23 June 2008 Project Waterproofing Handbook Working Set Rev. 0 Project Address: 8888 Main Street York, PA 88888 Prepared By: Architectural Testing 4 Rancho

More information

BILL OF QUANTITY FOR THE WORK OF "REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP"

BILL OF QUANTITY FOR THE WORK OF REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP BILL OF QUANTITY FOR THE WORK OF "REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP" Sl. 1 DISMANTLING WORK 1.1 Stripping off worn out plaster (outside and inside) and raking out joints

More information

Masonry Details That Work

Masonry Details That Work Masonry Details That Work Prepared by Dr. Michael A. Hatzinikolas, Ph.D., P.Eng. Canadian Masonry Research Institute 2000 INTRODUCTION The Canadian Masonry Research Institute The Canadian Masonry Research

More information

HOMEOWNERS E-BOOK ON TYPES OF FOOTINGS AND HOW TO FORM THEM.

HOMEOWNERS E-BOOK ON TYPES OF FOOTINGS AND HOW TO FORM THEM. HOMEOWNERS E-BOOK ON TYPES OF FOOTINGS AND HOW TO FORM THEM. Welcome to Homeowners Construction E-books. In this e-book I will cover the basics for installation of footings for various structures. Since

More information

Does Wall Township require an inspection by the building department on resale of a home?

Does Wall Township require an inspection by the building department on resale of a home? Selling your home Does Wall Township require an inspection by the building department on resale of a home? No. We do not require a Certificate of Continued Occupancy on the resale of home. A Smoke Detector,

More information

Building Division 209 Pearl Street Council Bluffs, IA Office: (712) Fax: (712) Website:

Building Division 209 Pearl Street Council Bluffs, IA Office: (712) Fax: (712) Website: Building Division 209 Pearl Street Council Bluffs, IA 51503 Office: (712) 328-4625 Fax: (712) 328-7007 Website: http://www.councilbluffs-ia.gov Residential One Story Detached Accessory Structure Please

More information

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development

More information

The Manitoba Water Services Board SECTION 027110 Standard Construction Specifications September 2013 Page 1 of 12

The Manitoba Water Services Board SECTION 027110 Standard Construction Specifications September 2013 Page 1 of 12 September 2013 Page 1 of 12 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work shall consist of the supply and construction of a chain link fence, barb wire fences or mesh fences as shown on the Plans or

More information

Cascade Remodeling Inc. PO Box 25687 Portland, OR 97298 Catalyzing Euphoria Phone (503) 297-2055, FAX (503) 297-0579 CCB # 67007

Cascade Remodeling Inc. PO Box 25687 Portland, OR 97298 Catalyzing Euphoria Phone (503) 297-2055, FAX (503) 297-0579 CCB # 67007 SPECIFICATIONS For Sample Customer SCOPE OF WORK: The contractor will provide labor and/or materials for the work as outlined in the estimate and the following specification. The contractor s estimate

More information

Mark Cramer Inspection Services, Inc.

Mark Cramer Inspection Services, Inc. Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction

More information

Lighthouse Engineering, L.L.C.

Lighthouse Engineering, L.L.C. Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: Office@LighthouseEng.com Thursday, September 04, 2014 TO: Our Client RE: Initial Engineering

More information

EAST LYME HIGH SCHOOL

EAST LYME HIGH SCHOOL Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed

More information

After my recent inspection at the above property we submit our findings as follows.

After my recent inspection at the above property we submit our findings as follows. THE Auckland Home Check Ltd Pre Purchase House Inspections Bob Hodges-Registered Master Builder PO Box 137280, Parnell, Auckland. Phone 09 377 1086 Mob 021 284 1728 Date of Inspection 1 August 2007 House

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

NY Rising Housing Recovery Program

NY Rising Housing Recovery Program 1 Applicant: John Doe Home: (111) 111-1111 Property: 1111 Main Street Nearby, NY 11111-1111 Assessor: Inspector Applicant Number: 059-HA-00000-13 Type of Loss: Hurricane Date Contacted: 9/18/2013 Date

More information

Structural Inspection Foundations

Structural Inspection Foundations Structural Inspection Foundations 0211 Footings Concrete pad and continuous footings The concrete footings consist of continuous strip footings at the building perimeter of the following sizes: 16 wide

More information

STANDARD OPEN PATIO COVER

STANDARD OPEN PATIO COVER STANDARD OPEN PATIO COVER BUILDING & SAFETY DIVISION 201 E. LA HABRA BLVD. LA HABRA, CA 90631 62-90-9710 Call Before You Dig 1-800-227-2600 PLEASE NOTE: This information Bulletin is made available to assist

More information

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application.

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. Article II provides rules governing the allowable connection to the City POTW and the construction and inspection of

More information

Home Building Task Checklist. * This checklist was adapted from information provided by Consumer Advocate, Tom Landis of OwnerBuilder.

Home Building Task Checklist. * This checklist was adapted from information provided by Consumer Advocate, Tom Landis of OwnerBuilder. Home Building Checklist Website: wwwhouse-n-home-buildingcom Email:info@house-n-home-buildingcom PRECONSTRUCTION PHASE ZONING Land Use Easements, Set Backs Access, Street Improvements Utilities Available

More information

16 2 10.3 Materials and Colors

16 2 10.3 Materials and Colors 16 2 10.3 Materials and Colors To create a harmonious and coherent image for each development, building designs shall pay close attention to choice of materials and colors. Building construction shall

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003) NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:

More information

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing 1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize

More information

FORM DESIGN. easy to work with, and generally available.

FORM DESIGN. easy to work with, and generally available. Forms play a major role in concrete construction. They give the plastic concrete its shape and hold it until it hardens. Forms protect the concrete, assist in curing it, and support any reinforcing rods

More information

COMMONLY USED RESIDENTIAL BUILDING CODES

COMMONLY USED RESIDENTIAL BUILDING CODES COMMONLY USED RESIDENTIAL BUILDING CODES INTERNATIONAL RESIDENTIAL CODE (2009) form revised 5/10 FOUNDATION 1. DESIGN OF FORMWORK. Section 1906.1 IBC 2009, Section R404.1.2.3.6 IRC 2009, ACI 318 Section

More information

INFORMATION BULLETIN NO.

INFORMATION BULLETIN NO. One- and Two-Family Standard Garage Slab and Foundation Wall Details for use with the 2012 International Residential Code (IRC) INFORMATION BULLETIN NO. 114-2012 October 1, 2012 City Planning & Development

More information

SECTION 32 31 13 CHAIN LINK FENCES AND GATES

SECTION 32 31 13 CHAIN LINK FENCES AND GATES SECTION 32 31 13 CHAIN LINK FENCES AND GATES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Fence framework, fabric, and accessories. 2. Excavation for post bases. 3. Concrete foundation for posts

More information

Building Trades. Carpentry 1. Career & Technical Education Utah State Office of Education

Building Trades. Carpentry 1. Career & Technical Education Utah State Office of Education A course that generally prepares individuals in the following areas: basic safety, introduction to blueprint reading, introduction to power tools, introduction to hand tools, and introduction to construction

More information

GASTON COUNTY BUILDING INSPECTIONS MANUFACTURED HOME PERMIT REQUIREMENTS

GASTON COUNTY BUILDING INSPECTIONS MANUFACTURED HOME PERMIT REQUIREMENTS GASTON COUNTY Department of Building Inspections Mailing Address: P. O. Box 1578, Gastonia, NC 28053-1578 Phone:(704) 866-3155 Street Address: 128 West Main Avenue, Gastonia, NC 28052 Fax:(704) 866-3966

More information

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN 46787 Phone (260) 723-5131 Sales Fax (260) 723-6396 whitley@whitleyman.

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN 46787 Phone (260) 723-5131 Sales Fax (260) 723-6396 whitley@whitleyman. Building Type Building Code Whitley Classroom Buildings BOCA, UBC, SBCCI, NEC, ADA Structural Support Outrigger construction standard, Whitley model classrooms. Main support beams to be 12 11.8# per lineal

More information

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION SPECIFICATION EO-5023 REVISION 3 MARCH 2003 REQUIREMENTS FOR

More information

6 RETROFITTING POST & PIER HOUSES

6 RETROFITTING POST & PIER HOUSES Retrofitting Post & Pier Houses 71 6 RETROFITTING POST & PIER HOUSES by James E. Russell, P.E. 72 Retrofitting Post & Pier Houses Retrofitting Post & Pier Houses 73 RETROFITTING POST AND PIER HOUSES This

More information

SECTION 31 20 00 EARTH MOVING

SECTION 31 20 00 EARTH MOVING SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to

More information

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings

More information

Project Report. Structural Investigations Hotel del Sol Yuma, Arizona

Project Report. Structural Investigations Hotel del Sol Yuma, Arizona Project Report Structural Investigations Yuma, Arizona Prepared by: 2619 Spruce Street Boulder, CO 80302 303-444-3620 Prepared for: Principle Engineering Group, Inc. 833 East Plaza Circle, Suite 100 Yuma,

More information

Building Code Clarifications - 7. Fire Resistance

Building Code Clarifications - 7. Fire Resistance Building Code Clarifications - 7. Fire Resistance 7.1 (15-12-030) Use of combustibles in Type III construction roof assemblies Code Section (15-12-030) Use of Combustibles was revised on May 17, 2000,

More information

POST AND FRAME STRUCTURES (Pole Barns)

POST AND FRAME STRUCTURES (Pole Barns) POST AND FRAME STRUCTURES (Pole Barns) Post and frame structures. The following requirements serve as minimum standards for post and frame structures within all of the following structural limitations:

More information

PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE

PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE Sl.No. PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE Description of item Qty Unit Rate Amount 1 Demolishing tile work/cement concrete/( carefully taking out the closet and other

More information

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table

More information

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

PROGRAM NAME: Historic/Cultural Resources: Section 14.09 of the Parks, Recreation and Historic Preservation Law.

PROGRAM NAME: Historic/Cultural Resources: Section 14.09 of the Parks, Recreation and Historic Preservation Law. Page 1 of 6 PROGRAM NAME: PROGRAM MUNICIPALITY: PROGRAM COUNTY: ENTIRE PROJECT DESCRIPTION (INCLUDE ALL FUNDING SOURCES): Area of Statutory/Regulatory Compliance Historic/Cultural Resources: Section 14.09

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information

WIRING METHODS CHAPTER 37

WIRING METHODS CHAPTER 37 CHAPTER 37 WIRING METHODS SECTION E3701 GENERAL REQUIREMENTS E3701.1 Scope. This chapter covers the wiring methods for services, feeders and branch circuits for electrical power and distribution. E3701.2

More information

BILL OF QUANTITIES Part No.: Part Description

BILL OF QUANTITIES Part No.: Part Description Page 1 of 5 A. REMOVAL OF STRUCTURES 801 Demolition of Existing Structure lot 1 in words in words B. MASONRY WORKS 506(1)a Masonry Units (CHB) sq.m. 58.80 in words in words C. FABRICATED MATERIALS & HARDWARE

More information

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE STRUCTURAL INSPECTION REPORT DRAFT 201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE TOWN OF PRESCOTT Date: November 2013 GENIVAR No.: 131-20617-00 2611 Queensview Drive, Suite 300, Ottawa,

More information

3. Where the existing roof has two or more applications of any type of roof covering.

3. Where the existing roof has two or more applications of any type of roof covering. City of Huntington Beach Department of Planning & Building REROOFING REQUIREMENTS 2000 Main Street, Huntington Beach, CA 92648 Office: (714) 536-5241 Fax: (714) 374-1647 This bulletin provides information

More information

Requirements for Building Application Submission

Requirements for Building Application Submission THE DEVELOPMENT CONTROL AND PLANNING BOARD P O Box 597 Phone: 869 465-2277 Bladen Commercial Development Fax: 869 465-5842 Basseterre, St. Kitts Email: phyplskb@caribsurf.com To: Architects, Designers

More information

October 30, 2014. Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr.

October 30, 2014. Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr. 117 S. Market St. Benton, AR 72015 * 501-315-2626 * Fax 501-315-0024 October 30, 2014 Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR Re: Report of Findings,, Benton, Arkansas, Dear Mr. Vick: This

More information

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

D Sample Notices to Property Owners, Sample Affidavits, and Other Material D Sample Notices to Property Owners, Sample Affidavits, and Other Material These samples are offered to illustrate specific points in the Desk Reference. States and communities should examine them carefully

More information

Louisiana Administrative Code Title 51 Part XIII. Sewage Disposal

Louisiana Administrative Code Title 51 Part XIII. Sewage Disposal Louisiana Administrative Code Title 51 Part XIII. Sewage Disposal Regulations Regarding Septic Tank Installations with Field Beds/Absorption Trenches For Individual Residential Installations Chapter 3.

More information

SECTION 4 EXCAVATION, TRENCHING AND BACKFILLING 4.01 SCOPE OF WORK

SECTION 4 EXCAVATION, TRENCHING AND BACKFILLING 4.01 SCOPE OF WORK 4.01 SCOPE OF WORK The work covered by this section shall consist of furnishing all materials, equipment and labor for the excavating, trenching, backfilling, and bore and jack required to install or repair

More information

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................

More information

Historic Preservation Certification Application Part 2 343-345 Main Street West South Haven, Vermont NPS Project No. 12345

Historic Preservation Certification Application Part 2 343-345 Main Street West South Haven, Vermont NPS Project No. 12345 Exterior Features 1 site and drainage 2 foundation 3 wood siding and trim 4 exterior doors 5 windows / storm windows 6 porches front and rear 7 chimneys 8 roofing Interior Features 9 frame 10 basement

More information

Excerpts from the Canadian National Building Code (NBC)

Excerpts from the Canadian National Building Code (NBC) Excerpts from the Canadian National Building Code (NBC) Reproduced here with Permission of the Copyright Owner, the National Research Council of Canada, Institute for Research in Construction. For more

More information

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N PLAN REVIEW FOR: PROJECT NAME: OWNER: ARCH/DESIGNER: ADDRESS: Ph/Fx: Plans Dated: E-mail: Sealed By: Estimated Project Cost - $ REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

More information

Building permits are required for decks exceeding 30 inches above grade or attached to a dwelling.

Building permits are required for decks exceeding 30 inches above grade or attached to a dwelling. RESIDENTIAL DECKS 1685 CROSSTOWN BOULEVARD NW, ANDOVER, MINNESOTA 55304 (763) 755-8700 FAX (763) 755-8923 WWW.ANDOVERMN.GOV Building permits are required for decks exceeding 30 inches above grade or attached

More information

Foundation Evaluation Report for PROPERTY ADDRESS Houston, Texas 77089. August 30, 2012. Prepared for:

Foundation Evaluation Report for PROPERTY ADDRESS Houston, Texas 77089. August 30, 2012. Prepared for: A Full Service Real Estate Inspection & Engineering Firm for Houston, Texas 77089 August 30, 2012 Prepared for: CLIENT S NAME MAILING ADDRESS Houston, Texas 77089 Prepared by: Charles J. Jenkins, P.E.

More information

TS 802 HANDWELLS. HANDWELL CAST IN PLACE WITH 460 mm DIA. COVER. PRECAST HANDWELL WITH 460 mm DIA. COVER HANDWELLS, GENERAL INSTALLATION REQUIREMENTS

TS 802 HANDWELLS. HANDWELL CAST IN PLACE WITH 460 mm DIA. COVER. PRECAST HANDWELL WITH 460 mm DIA. COVER HANDWELLS, GENERAL INSTALLATION REQUIREMENTS TORONTO TRANSPORTATION January 2012 TS 802 HANDWELLS TABLE OF CONTENTS 1. DRAWINGS TTD 802.001 TTD 802.005 TTD 802.006 TTD 802.010 TTD 802.020 TTD 802.021 TTD 802.026 HANDWELL CAST IN PLACE WITH 320 mm

More information

RESIDENTIAL DECK CONSTRUCTION

RESIDENTIAL DECK CONSTRUCTION RESIDENTIAL DECK CONSTRUCTION The City of Wausau has compiled the following excerpts from the Wisconsin Administrative Code/Uniform Dwelling Code (UDC) and Wisconsin Public Service Corporation Service

More information

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space) COST OF WORK FORM All costs shown are estimates using base grade materials, taxes, and labor. For houses where a higher quality is indicated, the costs should be increased for work requiring upgraded materials.

More information

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME 1 THE BUILDING PROCESS The focus of Woodland Homes building department is Quality, Service and Predictability. Through

More information

CM3 - PLANNING OF CONSTRUCTION TECHNOLOGY

CM3 - PLANNING OF CONSTRUCTION TECHNOLOGY CM3 - PLANNING OF CONSTRUCTION TECHNOLOGY BMEEPEKA701 Introduction BMEEPEKA701 CM3 - Planning of construction technology Dr. Adrienn Lepel, Dr. István Vidovszky Requirements 1 mid-semester test. Presence

More information

HOUSE BUILDING DIGEST

HOUSE BUILDING DIGEST HOUSE BUILDING DIGEST (Construction Specifications-Foundations) Creating Enabling Environment for Affordable Housing for All This is an attempt by BMTPC to provide useful but often ignored information

More information

RESIDENTIAL MASONRY A BEST PRACTICES GUIDE

RESIDENTIAL MASONRY A BEST PRACTICES GUIDE RESIDENTIAL MASONRY A BEST PRACTICES GUIDE Build With Brick Build With Boral CONTENTS BRICK :01 MASONRY CEMENT :03 MASONRY SAND :04 WALL TIES :05 STEEL LINTELS :07 DRAINAGE WALL SYSTEM :09 FLASHING :11

More information

PART 1 GENERAL 1.1 SECTION INCLUDES

PART 1 GENERAL 1.1 SECTION INCLUDES J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including

More information

ROOFING. Community Development Department Building Division 952-939-8394 eminnetonka.com

ROOFING. Community Development Department Building Division 952-939-8394 eminnetonka.com ROOFING Community Development Department Building Division 952-939-8394 eminnetonka.com This handout is intended only as a guide and is based in part on the 2007 Minnesota State Building Code and good

More information

York County Building Plan Format Requirements

York County Building Plan Format Requirements York County Building Plan Format Requirements MINIMUM RECOMMENDED STANDARDS FOR BUILDING PLANS: The type and number of drawings will depend greatly upon the size, nature and complexity of the project.

More information

SECTION VALVE BOXES AND METER VAULTS

SECTION VALVE BOXES AND METER VAULTS SECTION 03 48 20 VALVE BOXES AND METER VAULTS PART 1: GENERAL 1.01 SECTION INCLUDES A. Valve boxes for water and cleanout boxes for wastewater service. B. Meter boxes for water service. C. Meter vaults

More information

Vision Home Inspection

Vision Home Inspection Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the

More information

SANITARY SEWER MANHOLE CONSTRUCTION 2.2 PORTLAND CEMENT AND PORTLAND CEMENT CONCRETE (PCC):

SANITARY SEWER MANHOLE CONSTRUCTION 2.2 PORTLAND CEMENT AND PORTLAND CEMENT CONCRETE (PCC): PART 1 GENERAL 1.1 SCOPE: A. This item includes the work necessary for the construction and installation of sanitary sewer manholes. B. The Contractor may, at his option, use cast-in-place type manholes,

More information

CHECK SLIP. REMARKS ITEM OF WORK (Yes ) 3. Grid levels of the entire layout. 4. Demarcation of blocks as per approved Layout

CHECK SLIP. REMARKS ITEM OF WORK (Yes ) 3. Grid levels of the entire layout. 4. Demarcation of blocks as per approved Layout ITEM OF WORK (Yes ) I. SITE PREPARATON 1. Clearance of site (jungle clearance) 2. Setting of base line and bench mark. 3. Grid levels of the entire layout. 4. Demarcation of blocks as per approved Layout

More information

SECTION CEMENT AND LIME MORTAR PART 1 GENERAL:

SECTION CEMENT AND LIME MORTAR PART 1 GENERAL: SECTION 04110 CEMENT AND LIME MORTAR PART 1 GENERAL: 1.1 DESCRIPTION: The work shall consist of furnishing all labor, materials, equipment, and tools necessary for all mortar work for masonry construction

More information

Structure and roofs. Structural reinforcement of the walls

Structure and roofs. Structural reinforcement of the walls Structure and roofs Structural reinforcement of the walls Any walls that had large cracks or were structurally weakened due to the wearing effect of time were reinforced and restored using timber or brick

More information

TERRASPAN LIFT & SLIDE DOOR

TERRASPAN LIFT & SLIDE DOOR TERRASPAN LIFT & SLIDE DOOR BUILDING OPENING PREPARATION GUIDE READ THESE INSTRUCTIONS COMPLETELY BEFORE STARTING ANY INSTALLATION Kolbe & Kolbe Millwork, Co., Inc. 1323 S. 11th Ave. Wausau, Wisconsin

More information

Estimating Database Checklist

Estimating Database Checklist Estimating Database Checklist If you are creating a new estimating database for projects, the following list offers a thorough listing of Main and Sub Categories. You can also use it as a checklist to

More information

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training Foundations 65 5 FOUNDATIONS by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. 66 Foundations Foundations 67 FOUNDATIONS Let's assume that the retrofit has been done correctly from the roofline

More information

1036 Parkway Ct. Phone: 770-932-0202 Buford, GA 30518 Fax: 770-945-0041

1036 Parkway Ct. Phone: 770-932-0202 Buford, GA 30518 Fax: 770-945-0041 CONSTRUCTION 1. A. GENERAL 1.A.1. The intent of this specification is to set forth construction and design standards that will result in an installation of modular cabinetry requiring FLUSH OVERLAY CONSTRUCTION.

More information

Residential Deck Safety, Construction, and Repair

Residential Deck Safety, Construction, and Repair Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the

More information

R E S I D E N T I A L H O U S I N G

R E S I D E N T I A L H O U S I N G HL 252 Rev. April 1997 R E S I D E N T I A L H O U S I N G CONTROLLING EXTERNALWATER PROBLEMS FOR RESIDENCES I II III IV V Lot Drainage Gutter Water Management Foundation Waterproofing Floor Slab Waterproofing

More information