Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1
|
|
- Joella Harrington
- 8 years ago
- Views:
Transcription
1 Top plate Stud Soffit lining 45mm min nog Fix scotia bead Building underlay/james Hardie rigid air barrier Soffit Detail Building underlay/james Hardie rigid air barrier Bottom plate 25mm wide cant strip. H3.1 treated timber. Thickness to suit selected weatherboard D.P.C. Concrete slab / footing Foundation Detail 50mm Ground level 150mm min to permanent paving or 225mm min to unpaved ground to clause of E2/AS1 n_zr-l_w-tec-fig01.dwg DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1
2 Framing to NZS 3604 s to be top fixed at studs using HardieFlex TM 40 x 2.8mm nail at 90 to face, finish flush. Weatherboard width Effective Cover Building underlay/james Hardie rigid air barrier 30mm lap 16mm 20-25mm s to be face fixed at corners and down window and door openings using 60 x 3.15mm jolt head nails at 90 to face, punch 2mm below surface and fill. Concealed Nailing 30mm lap Framing to NZS 3604 Weatherboard width Effective cover Building underlay/james Hardie rigid air barrier Tongue and Groove join in weatherboard to be 100mm minimum from side of stud 15mm Typical Stud Joints must be staggered by 600mm min. 16mm Back face (bevelled) Building underlay/james 60 x 3.15mm jolthead nails at 90 to face, punch 2mm below surface and fill. Predrill top board. Exposed Nailing 16mm Front face Before pushing end joint together apply a bead of flexible sealant Jointing Off Stud n_zr-l_w-tec-fig02.dwg DIRECT FIX WEATHERBOARD FIXING FIGURE 2
3 Building underlay continuous around corner / James Blocking where required Face nail weatherboards to inner studs only 84mm 50mm min Run a bead of sealant before fixing Note: Box corner trim must not to be continuous over floor joists. 100mm 50mm min Scriber (10mm wide min) cut to fit fix with sealant to back of scriber and 75 x 3.15mm nail in 3mm predrilled hole Axent TM Trim Fix at 300mm centres staggered Typical framing at corner Axent TM Trim Scriber cut to fit Building underlay/james n_zr-l_w-tec-fig03.dwg DIRECT FIX BOXED CORNER FIGURE 3
4 Building underlay continuous around corner/james James Hardie upvc flashing Maximum 2mm gap typical 70mm x 35mm timber Blocking where required Face nail weatherboards to inner studs only Note: Box corner trim must not be continuous over solid floor joists. 84mm Apply adhesive sealant to edge of Axent TM Trim prior to installation to opposing Axent TM Trim 35mm x 35mm timber (ex 70mm x 35mm) Axent TM Trim Fix at 300mm centres staggered 100mm James Hardie upvc flashing Optional scriber (10mm wide min) cut to fit fix with sealant to back of scriber and 75 x 3.15mm nail in 3mm predrilled hole n_zr-l_w-tec-fig04.dwg DIRECT FIX BOXED CORNERS FIGURE 4
5 Face nail weatherboards to corner stud only Compound mitre corner of weatherboards, prime ends and join with adhesive sealant. 60mm Note: Adhesive sealant must be used on the full end face of both weatherboards. Push tightly together and wipe off excess. Building underlay continuous around corners/james 50 x 50mm upvc corner underflashing over building underlay James Hardie rigid air barrier or 75mm wide flashing tape over n_zr-l_w-tec-fig05.dwg DIRECT FIX MITRE CORNER FIGURE 5
6 Linea Weatherboard Note: Box corner trim must not be continuous over solid floor joists. Fix box corner with 40mm HardieFlex TM nails in indentation 400mm vertical centres. Fix to both flanges. Face nail weatherboards to inner studs only Building underlay continuous around corners/james Hardie rigid air barrier Site cut edges to be primed prior to installation Linea aluminium external box corner Maximum 2mm gap typical n_zr-l_w-tec-fig06.dwg DIRECT FIX ALUMINIUM BOX CORNER FIGURE 6
7 Building underlay/james Top board shown stopped short for clarity 50 x 50mm upvc corner underflashing over building underlay or 75mm wide flashing tape over James Hardie rigid air barrier Nail soaker into position with 2-30mm nails before fixing ends of weatherboards 15mm splay cut to end of weatherboard Face nail to second stud from corner Face nail to second stud from corner Soaker material Copper Aluminium Stainless steel Nail material Copper or phosphor bronze Hot dip galvanised Stainless steel n_zr-l_w-tec-fig07.dwg DIRECT FIX CORNER SOAKER FIGURE 7 Scale 1:10
8 Note double stud 50 x 50mm upvc corner underflashing over building underlay James Hardie rigid air barrier or 75mm wide flashing tape over Weatherboards this side to run through to stud and to be fixed first. Accurately notch top of weatherboard this side to match incoming weatherboard above Building underlay/james Weatherboards this side to be scribed into other weatherboard. Prime and seal joint between boards with sealant. Face nail this side first. Face nail this side to outer stud. n_zr-l_w-tec-fig08.dwg DIRECT FIX INTERNAL CORNER FIGURE 8 Scale 1:10
9 Note double studs Fix internal corner mould with 40mm HardieFlex TM nails in indentation 400mm vertical centres. Fix to both flanges. Building underlay continuous around corner / James Maximum 2mm gap typical Note double studs Note: Aluminium extrusion must not be continuous over solid floor joists. 25mm min James Hardie Linea aluminium 90 internal 'W' mould Site cut edges to be primed prior to installation Face nail weatherboards to outer studs only. (Pre-drill through weatherboard and aluminium). n_zr-l_w-tec-fig09.dwg DIRECT FIX INTERNAL 90 ALUMINIUM 'W' MOULD CORNER FIGURE 9
10 Note double studs Fix internal 135 corner mould with 40mm HardieFlex TM nails in indentation 400mm vertical centres. Fix to both flanges. Note: Aluminium extrusion must not be continuous over solid floor joists. Note double studs Building underlay continuous around corner / James Face nail weatherboards to outer studs only. (Pre-drill through weatherboard and aluminium). 25mm min James Hardie Linea aluminium 135 internal 'W' mould Maximum 2mm gap typical Site cut edges to be primed prior to installation n_zr-l_w-tec-fig10.dwg DIRECT FIX INTERNAL 135 ALUMINIUM 'W' MOULD CORNER FIGURE 10
11 Window frame (refer to window manufacturer for method of support and fixing) Axent TM Trim facing beyond Sill flashing with 8mm min upstand to back and tapered end dam at each end. Factory seal or site seal joint. Refer to Figure 72A of NZBC clause E2/AS1 Window liner For flashing tape detail refer to Figures 72 and 90 of NZBC clause E2/AS1. 5mm gap H3.1 treated timber planted sill or trim fix with jolt head nail through predrilled hole Linea Weatherboard General notes for materials selection 1. Flashing materials must be selected based on environmental exposure, refer to NZS 3604 and Table 20 of NZBC clause E2/AS1. 2. Building underlay must comply with acceptable solution NZBC clause E2/AS1. 3. Flashing tape must have proven compatibility with the selected building underlay/james and other materials with which it comes into contact as per Table 21 of NZBC clause E2/AS1. 35mm min cover 8mm gap nominal Flexible sealant over PEF rod to form waterproof airseal Window support packer Selected interior lining Refer to the manufacturer or supplier for technical information for these materials. n_zr-l_w-tec-fig11.dwg DIRECT FIX WINDOW SILL FLASHING WITH SILL TRAY AND FACINGS FIGURE 11
12 Proprietary tape or alternatively additional layer of building underlay over head flashing Linea Weatherboard Lintel *Outer face of weatherboard H3.1 treated timber cant strip 50mm min Face nail weatherboards to lintel 50mm strip of sealant at both ends of flashing Selected interior lining 10mm min cover 5mm min 60 x 3.15mm jolt head nails pre-drill with 3mm drill before fixing Aluminium head flashing with 15 slope 70mm H3.1 treated timber packer to suit Flashing tape over underlay required in corners only Temporary packers if required are to be removed after fixing Axent TM Trim 70mm x 35mm H3.1 treated timber packer 10mm 5mm offset 8mm gap nominal 5mm x 3mm inseal 3109 optional Window frame (refer to window manufacturer for method of support and fixing) Flexible sealant over PEF rod to form waterproof airseal Window liner Note: When James is used flashing tape to be applied to the entire window opening. Sealant must be installed between head flashing and trim in VH wind zones. Refer to Figure 71 of E2/AS1 n_zr-l_w-tec-fig12.dwg DIRECT FIX WINDOW AND DOOR HEAD WITH FACINGS FIGURE 12
13 Building underlay/james Linea Weatherboard Line of head flashing over, extends past scriber min 10mm Scriber cut to fit board 60 x 3.15mm jolt head nails pre-drill with 3mm drill before fixing Selected interior lining H3.1 treated timber packer to suit Axent TM Trim. Mitre or extend to top of head flashing fix with 75mm x 3.15mm jolt head nails 50mm 400mm centres Note wider stud required Flashing tape 100mm upstand on jamb Flexible sealant over PEF rod to form waterproof airseal Fixed at 400mm centres staggered nailing 5mm x 3mm inseal 3109 optional 10mm 8mm gap nominal Planted sill Sill flashing position 5mm gap min. Window frame (refer to window manufacturer for method of support and fixing) Window liner Note: When James is used flashing tape to be applied to the entire window opening. n_zr-l_w-tec-fig13.dwg DIRECT FIX WINDOW AND DOOR JAMB WITH FACINGS FIGURE 13
14 Window frame (refer to window manufacturer for method of support and fixing) Frame block Window liner For flashing tape detail refer to Figures 72 and 90 of NZBC clause E2/AS1. Sill flashing with 8mm min upstand to back and tapered end dam at each end. Factory seal or site seal joint. Refer to Figure 72A of NZBC clause E2/AS1 35mm min cover 10mm min 5mm gap 8mm gap nominal Flexible sealant over PEF rod to form waterproof airseal as per section of E2/AS1 Window support packer Linea Weatherboard Selected interior lining General notes for materials selection 1. Flashing materials must be selected based on environmental exposure, refer to NZS 3604 and Table 20 of NZBC clause E2/AS1. 2. Building underlay must comply with acceptable solution NZBC clause E2/AS1. 3. Flashing tape must have proven compatibility with the selected building underlay/james and other materials with which it comes into contact as per Table 21 of NZBC clause E2/AS1. Refer to the manufacturer or supplier for technical information for these materials. n_zr-l_w-tec-fig14.dwg DIRECT FIX WINDOW SILL AND DOOR WITHOUT FACING FIGURE 14
15 Lintel Proprietary tape or alternatively additional layer of building underlay over head flashing Face nail weatherboards to lintel Linea Weatherboard Aluminium head flashing with 15 slope Selected interior lining 60mm x 3.15mm jolt head nails pre-drill with 3mm drill before fixing Outer face of weatherboard H3.1 treated timber cant strip 50mm strip of sealant at both ends of flashing 10mm min cover 5mm min Flashing tape over underlay required in corners only 5mm offset 25mm 35mm min Temporary packers if required are to be removed after fixing Flexible sealant over PEF rod to form waterproof airseal Window liner 8mm gap nominal Window frame (refer to window manufacturer for method of support and fixing) Note: When James is used flashing tape to be applied to the entire window opening. Sealant must be installed between head flashing and window flange in VH wind zones. Refer Figure 71 of E2/AS1 n_zr-l_w-tec-fig15.dwg DIRECT FIX WINDOW AND DOOR HEAD WITHOUT FACINGS FIGURE 15
16 Building underlay/james Linea Weatherboard 60 x 3.15mm jolt head nails pre-drill with 3mm drill before fixing Line of head flashing above extends past scriber min 20mm Scriber Line of sill flashing below 10mm min 5mm min gap Selected interior lining Flashing tape 100mm upstand on jamb Flexible sealant over PEF rod to form waterproof airseal Window liner 8mm gap nominal Line of head flashing above Window frame (refer to window manufacturer for method of support and fixing) Note: When James is used flashing tape to be applied to the entire window opening. Alternatively window jamb can be formed as per E2/AS1 with jamb battens. n_zr-l_w-tec-fig16.dwg DIRECT FIX WINDOW AND DOOR JAMB WITHOUT FACINGS FIGURE 16
17 Note: Accurate slot to be cut in weatherboard to enable fit around head flashing. Prevent moisture ingress at end of slot by sealing gap. Building underlay/james Linea Weatherboard Flashing tape over flashing (alternatively use extra layer of building underlay) Flashing tape over building underlay/james Hardie rigid air barrier fitted around corner as shown Lintel Studs Head flashing to 5mm min gap below weatherboard Note: When James is used flashing tape to be applied to the entire window opening. n_zr-l_w-tec-fig17.dwg DIRECT FIX HEAD FLASHING TERMINATION FIGURE 17 Scale 1:10
18 Building underlay/james lap over roof underlay Flashing tape or extra layer of building underlay over flashing Nog as required Flashing 50mm min clear gap 75mm - 90mm Refer to E2/AS1 Table 7 flashing leg above bottom of weatherboard H3.1 treated timber cant strip 130mm or 200mm min see note Refer Figure 7 and Table 7 of E2/AS1 document * Selected roofing with stop end Roof underlay continued up behind flashing Edge of flashing dressed down or notched Roof framing Vertical Section * When 50 year durability for flashing is required refer Table 20 of E2/AS1 of NZBC. n_zr-l_w-tec-fig18.dwg DIRECT FIX ONE PIECE APRON FLASHING JOINT FIGURE 18
19 Building underlay/james carefully cut to suit pipe over flashing tape, carefully cut to suit pipe and seal with flexible sealant Square of flexible flashing tape to a min of 100mm outside of pipe, ensure seal with pipe bandage Pipe to have min 5 fall to outside Flexible flashing tape bandage min 25mm wide all round pipe. n_zr-l_w-tec-fig19.dwg DIRECT FIX PIPE PENETRATION FIGURE 19 Scale 1:10
20 Building underlay/james Additional building underlay or flashing tape over flashing Nog as required H3.1 treated timber cant strip 35mm min Flashing 15 min slope, rivet to metal angle, required at head only with a minimum cover of 10mm Flexible flashing tape at corners 5mm min Flashing to lap over the metal angle. Line of scriber beyond Continue building underlay around framing Metal meter box Flexible sealant over PEF rod to form waterproof airseal Metal angle sealed and riveted to box Note: When James is used flashing tape to be applied to the entire opening. n_zr-l_w-tec-fig20.dwg DIRECT FIX METER BOX AT HEAD FIGURE 20
21 Metal angle to be sealed and riveted in place. Metal meter box Site cut edges must be primed prior to installation Flexible flashing tape to sill and corners Flexible sealant over PEF rod to form waterproof airseal Continue building underlay around framing Continuous sealant to metal angle 10mm min lap over meter flange Building underlay/james Note: When James is used flashing tape to be applied to the entire opening. n_zr-l_w-tec-fig21.dwg DIRECT FIX METER BOX AT SILL FIGURE 21
22 Building underlay/james Line of head flashing over 20mm past scriber Scriber Seal against the meter box Metal meter box Continue building underlay around framing Flexible sealant over PEF rod to form waterproof airseal Metal angle to be sealed and rivet in place. Flexible flashing tape at corners Note: When James is used flashing tape to be applied to the entire opening. n_zr-l_w-tec-fig22.dwg DIRECT FIX METER BOX AT JAMB FIGURE 22
23 Deck joist 12mm min Building underlay/james Structural blocking as per Engineers design H3.2 treated timber packer to suit 3mm thick EDPM washer to suit, hole to be tight fit around bolt Fixings to Engineers design H3.2 treated timber packer 12mm thick x 150mm long H3.2 treated timber ribbon plate H3.2 treated timber packer to suit n_zr-l_w-tec-fig23.dwg DIRECT FIX DECK JUNCTION FIGURE 23
24 Building underlay/james Hardie rigid air barrier turned out over saddle flashing Linea Weatherboard Internal finished floor level 50mm min Line of Linea Weatherboard between joists cut round joists 5mm Min. gap between cladding and saddle flashing Line of cantilever joist Building underlay/james behind saddle flashing Saddle flashing at every cantilevered joist Solid blocking Deck joist 35mm 5mm Continuous inter-storey flashing 35mm min cover Line of below deck Hem to 3 edges 50mm min. upstand NOTE: (1) Building underlay at back of cavity shall be taped around joist penetrations (2) The back of the saddle flashing shall be positioned behind the cladding (3) Saddle flashing terminates over inter-storey flashing Depth of canterlevered joist 50mm min 30mm min n_zr-l_w-tec-fig24.dwg LINEA WEATHERBOARD DIRECT FIX CANTILEVERED FIGURE 24 TIMBER DECK JUNCTION
25 'X' up to 300mm Roof framing Soffit lining Fixed scotia across Linea Weatherboard Wall framing Apply flexible sealant to gaps Alternatively the scotia can be scribed and sealed to and the soffit lining For soffits more than 300mm the must be neat cut and silicone sealed to angle of soffit n_zr-l_w-tec-fig25.dwg SLOPING SOFFIT TO LINEA WEATHERBOARD JUNCTION (SECTION 'X') FIGURE 25 Scale 1:5
26 600mm Stud centres 600mm 600mm 600mm Timber cavity battens at 600mm max centres Batten fixing points Horizontal battens between verticals 800mm Maximum nog spacing 800mm 800mm Studs can be 45mm or 35mm wide The intermediate support for insulation between the studs could be a timber cavity batten, polypropylene tape or 75mm galvanised wire mesh. Refer to E2/AS1 Paragraph Polypropylene tape must be fixed horizontally and drawn taut at 300mm centres. n_zr-l_w-tec-fig26.dwg TIMBER CAVITY BATTEN FIXING FIGURE 26 0
27
28 Top plate Stud Soffit lining 45mm min nog Fix scotia bead Building underlay/james Timber cavity batten n_zr-l_w-tec-fig28.dwg TIMBER CAVITY SOFFIT JUNCTION FIGURE 28
29 Framing to NZS 3604 s to be top fixed at studs using HardieFlex TM 60 x 3.15mm FH nail at 90 to face, finish flush. Weatherboard width Effective cover Building underlay/james Timber cavity batten 30mm lap 20-25mm s to be face fixed at corners and down window and door openings using 75 x 3.15mm jolt head nails at 90 to face, punch 2mm below surface and fill. 16mm Concealed Nailing In EH wind zone and SED projects Linea Weatherboards must be face fixed with 90 X 4mm jolt head nails. 30mm lap Framing to NZS 3604 Weatherboard width Effective cover Building underlay/james Tongue and Groove joint to be 100mm minimum from side of stud Timber cavity batten 15mm 16mm Back face (bevelled) Typical Stud Timber cavity batten Building underlay/james Hardies rigid air barrier Cavity 75 x 3.15mm jolthead nails at 90 to face. Punch 2mm below surface and fill. Pre-drill top board. 16mm Exposed Nailing Front face Before pushing end joint together apply a bead of flexible sealant Jointing Off Stud n_zr-l_w-tec-fig29.dwg TIMBER CAVITY WEATHERBOARD FIXING FIGURE 29
30 Building underlay continuous around corner / James Hardie rigid air barrier Blocking where required Linea Weatherboard Face nail weatherboards to inner studs only 10mm gap between battens 50mm min Timber cavity battens 84mm Apply adhesive sealant to edge of Axent TM Trim prior to installation to opposing Axent TM Trim 50mm x 10g wood thread screw in pre drilled c/sk hole 100mm 50mm min James Hardie Axent TM Trim Fix at 300mm centres staggered Scriber (10mm wide min) cut to fit Linea Weatherboard fix with sealant to back of scriber and 75 x 3.15mm jolt head nail in 3mm predrilled hole Note: Box corner trim must not be continuous over solid floor joists. n_zr-l_w-tec-fig30.dwg TIMBER CAVITY BOXED CORNER FIGURE 30
31 Linea Weatherboard 10mm gap Face nail weatherboards to corner stud only Building underlay continuous around corners / James Hardie rigid air barrier Compound mitre corner of weatherboards, prime ends and join with adhesive sealant. 70mm Note! Adhesive sealant must be used on the full end face of both weatherboards. Push tightly together. 70mm Timber cavity batten 50mm x 50mm upvc corner underflashing n_zr-l_w-tec-fig31.dwg TIMBER CAVITY MITRE CORNER FIGURE 31
32 Linea Weatherboard Note: Box corner trim must not be continuous over solid floor joists. Fix box corner with 40mm HardieFlex TM nails in indentation 400mm vertical centres. Fix to both flanges. 10mm gap Face nail weatherboards to inner studs only Site cut edges to be primed prior to installation Linea aluminium external box corner Building underlay continuous around corners / James Timber cavity battens Maximum 2mm gap typical n_zr-l_w-tec-fig32.dwg TIMBER CAVITY ALUMINIUM BOX CORNER FIGURE 32
33 Building underlay/james Timber cavity battens Top shown stopped short for clarity 15mm splay cut to end of weatherboard Face nail to second stud from corner Face nail to second stud from corner Nail soaker into position with 2-50mm nails before fixing ends of weatherboards Soaker material Copper Aluminium Stainless steel Nail material Copper or phosphor bronze Hot dip galvanised Stainless steel n_zr-l_w-tec-fig33.dwg TIMBER CAVITY EXTERNAL CORNER SOAKER FIGURE 33 Scale 1:10
34 Timber cavity battens 50mm x 50mm upvc corner underflashing Weatherboards this side to run through to stud and to be fixed first Note double stud Accurately notch top of weatherboard this side to match incoming weatherboard above Weatherboards this side to be scribed into other weatherboard. Prime and seal joint between boards with sealant Building underlay/james Face nail this side first Face nail this side to outer stud n_zr-l_w-tec-fig34.dwg TIMBER CAVITY INTERNAL CORNER FIGURE 34 Scale 1:10
35 Studs as required Fix internal corner mould with 40mm HardieFlex TM nails in indentation 400mm vertical centres. Fix to both flanges. Building wrap continuous around corner / James Hardie rigid air barier Site cut edges to be primed prior to installation Studs as required Linea Weatherboard Linea aluminium 90 internal 'W' mould Maximum 2mm gap typical Timber cavity battens Face nail weatherboards to outer studs only. (Pre-drill through weatherboard and aluminium). Note: Aluminium extrusion must not be continuous over solid floor joists. n_zr-l_w-tec-fig35.dwg TIMBER CAVITY INTERNAL 90 ALUMINIUM 'W' MOULD CORNER FIGURE 35
36 Note double studs Fix internal 135 corner mould with 40mm HardieFlex TM nails in indentation 400mm vertical centres. Fix to both flanges. Note: Aluminium extrusion must not be continuous over solid floor joists. Building underlay continuous around corner/james Hardie rigid air barrier Linea Weatherboard Face nail weatherboards to outer studs only. (Pre-drill through weatherboard and aluminium) Site prime the cut ends prior to installation James Hardie Linea aluminium 135 internal 'W' mould Maximum 2mm gap typical Timber cavity battens Site prime the cut ends prior to installation Note double studs n_zr-l_w-tec-fig36.dwg TIIMBER CAVITY INTERNAL 135 ALUMINIUM 'W' MOULD CORNER FIGURE 36
37 600mm 600mm 600mm 600mm Stud centres Timber cavity battens at 600mm centres Batten fixing points Horizontal battens between verticals at soffit Additional battens at window opening Window 800mm 800mm 800mm Maximum nog spacing Studs can be 45mm or 35mm wide The intermediate support for insulation between the studs could be a timber cavity batten, polypropylene tape or 75mm galvanised wire mesh. Refer to E2/AS1 Paragraph Polypropylene tape must be fixed horizontally and drawn taut at 300mm centres. n_zr-l_w-tec-fig37.dwg TIMBER CAVITY BATTEN LAYOUT AT WINDOW OPENING FIGURE 37 0
38
39 Proprietary tape or alternatively additional layer of building underlay over head flashing Linea Weatherboard Face nail weatherboards to lintel H3.1 treated timber cant strip 35mm min Lintel 15mm Aluminium head flashing to min 15 slope Timber cavity batten 10mm min 5mm James Hardie upvc vent strip Selected interior lining 70mm H3.1 treated timber packer to suit Optional Axent TM Trim 10mm 70mm x 35mm H3.1 treated timber packer 5mm x 3mm inseal 3109 optional Window frame (refer to window manufacturer for method of support and fixing) Note: When James is used flashing tape to be applied to the entire window opening. Sealant must be installed between head flashing and trim in VH and EH wind zones and SED pressures. Alternatively, the head flashings can be formed with stop ends as per E2/AS1 75mm x 3.15mm jolt head nails pre-drill with 3mm drill before fixing Flashing tape over underlay required in corners only 8mm gap nominal Flexible sealant over PEF rod to form waterproof airseal Window liner Temporary packers if required are to be removed after fixing n_zr-l_w-tec-fig39.dwg TIMBER CAVITY WINDOW AND DOOR HEAD WITH FACINGS FIGURE 39
40 Line of head flashing above, extends past scriber min. 10mm Scriber cut to fit board H3.1 treated timber packer to suit Optional Axent TM Trim. Mitre or extend to top of head flashing. Building underlay / James 75 x 3.15mm jolt head nails pre-drill with 3mm drill before fixing Selected interior lining 50mm 400mm centres Flashing tape 100mm upstand on jamb 400mm centres staggered nailing 10mm 8mm gap nominal 5 x 3mm inseal 3109 optional Line of planted sill below Window frame (refer to window manufacturer for method of support and fixing) Flexible sealant over PEF rod to form waterproof airseal Window liner Timber cavity battens Note: When James is used flashing tape to be applied to the entire window opening. n_zr-l_w-tec-fig40.dwg TIMBER CAVITY WINDOW AND DOOR JAMB WITH FACINGS FIGURE 40
41
42 Timber cavity batten Proprietary tape or alternatvely additional layer of building underlay over head flashing Face nail weatherboards to lintel Linea Weatherboard Lintel H3.1 treated timber cant strip Selected interior lining James Hardie upvc vent strip min 5mm Aluminium head flashing to min 15 slope Window frame (refer to window manufacturer for method of support and fixing) 15mm 10mm min cover 25mm 35mm min 75 x 3.15mm jolt head nails pre-drill with 3mm drill before fixing Flashing tape over underlay required in corners only 8mm gap nominal Flexible sealant over PEF rod to form waterproof airseal Window liner Temporary packers if required to be removed Note: after fixing When James is used flashing tape to be applied to the entire window opening. Sealant must be installed between head flashing and flashing and trim in VH and EH wind zones and SED projects. Alternatively, the head flashings can be formed with stop ends as per E2/AS1 n_zr-l_w-tec-fig42.dwg TIMBER CAVITY WINDOW AND DOOR HEAD WITHOUT FACINGS FIGURE 42
43 Building underlay/james Timber cavity batten 75 x 3.15mm jolt head nails pre-drill with 3mm drill before fixing Linea Weatherboard Line of head flashing above, extends past scriber 20mm min. Selected interior lining Flashing tape 100mm upstand on jamb Flexible sealant over PEF rod to form waterproof airseal Head flashing 20mm past scriber 10mm min cover 8mm gap nominal Scriber Window frame (refer to window manufacturer for method of support and fixing) Window liner Note: When James is used flashing tape to be applied to the entire window opening. n_zr-l_w-tec-fig43.dwg TIMBER CAVITY WINDOW AND DOOR JAMB WITHOUT FACINGS FIGURE 43
44 Sealant at end of head flashing to vertical batten Cut timber batten to suit head flashing which continues 20mm past window opening scriber. Batten to seal onto head flashing Building underlay/james Hardie rigid air barrier Timber cavity batten Linea Weatherboard Flashing tape over flashing (alternatively use extra layer of building underlay) Lintel James Hardie upvc vent strip with 15mm min cover Flashing tape over building underlay/james Hardie rigid air barrier fitted around corner as shown Head flashing with 15 min slope to 5mm min gap below weatherboard Studs Timber cavity batten Note: When James is used flashing tape to be applied to the entire window opening. n_zr-l_w-tec-fig44.dwg HEAD FLASHING TERMINATION FIGURE 44 Scale 1:5
45 Nog as required Building underlay / James lap over roof underlay Flashing tape or extra layer of building underlay over flashing Timber cavity batten 75mm min Refer to E2/AS1 Table 7 50mm min clear gap flashing leg above bottom of weatherboard 15mm Flashing H3.1 treated timber James Hardie upvc vent strip 130mm or 200mm min see note Refer Figure 7 and Table 7 of E2/AS1 document * Selected roofing with stop end Roof underlay continued up behind flashing Edge of flashing dressed down or notched Roof framing Vertical Section * When 50 year durability for flashing is required refer Table 20 of E2/AS1 of NZBC. n_zr-l_w-tec-fig45.dwg TIMBER CAVITY ONE PIECE APRON FLASHING JOINT FIGURE 45
46 Building underlay/james Timber cavity battens Flashing tape or extra layer of building underlay over flashing Flashing upstand taped over building underlay/james Hardie rigid air barrier Selected roofing Fall * Apron flashing with tapered stopend. Weatherboard to be carefully cut over stopend and sealed. 50x50mm upvc corner flashing fitted over timber cavity batten and under fascia board. Flashing to finish between the lap of weatherboards * When 50 year durability for flashing is required refer Table 20 of E2/AS1 of NZBC. Fascia board Soffit End of spouting must be 10mm min clear of finished weatherboards Selected spouting n_zr-l_w-tec-fig46.dwg TIMBER CAVITY ONE PIECE GUTTER/WALL JUNCTION FIGURE 46 Scale 1:10
47 Timber cavity battens Building underlay / James carefully cut to suit pipe Square of flexible flashing tape to a min of 100mm outside of pipe, ensure seal with pipe bandage Pipe to have min 5 fall to outside over flashing tape, carefully cut to suit pipe and seal with flexible sealant Flexible flashing tape bandage min 25mm wide all round pipe. n_zr-l_w-tec-fig47.dwg TIMBER CAVITY PIPE PENETRATION FIGURE 47 Scale 1:10
48 Timber cavity batten Building underlay/james Nog as required Additional building underlay or flashing tape over flashing H3.1 treated timber cant strip 35mm min Flashing 15 min slope Flexible flashing tape at corners Continue building underlay around framing 15mm 5mm min Metal meter box Flexible sealant over PEF rod to form waterproof airseal 10mm min cover Line of scriber beyond Metal angle sealed and riveted to box Note: When James is used flashing tape to be applied to the entire opening. n_zr-l_w-tec-fig48.dwg TIMBER CAVITY METER BOX AT HEAD FIGURE 48
49 Flexible flashing tape to sill and corners Metal angle to be sealed and riveted in place. Metal meter box Continuous sealant to metal angle Site cut edges to be primed prior to installation Flexible sealant over PEF rod to form waterproof airseal Continue building underlay around framing 10mm min lap over meter flange Building underlay/james Note: When James is used flashing tape to be applied to the entire opening. Timber cavity batten n_zr-l_w-tec-fig49.dwg TIMBER CAVITY METER BOX AT SILL FIGURE 49
50 Building underlay/james Timber cavity batten Continue building underlay around framing Line of head flashing Scriber Flexible flashing tape at corners Seal against the meter box Metal meter box Flexible sealant over PEF rod to form waterproof airseal Metal angle to be sealed and rivet in place. Note: When James is used flashing tape to be applied to the entire opening. n_zr-l_w-tec-fig50.dwg TIMBER CAVITY METER BOX HEAD FLASHING AT JAMB FIGURE 50
51 Building underlay/james Pressed penetrations for services with fitted nylon plugs Meter box substructure with 5 sloping top and bottom for moisture egress Building underlay / James and flexible flashing tape to dressed framed opening Removable hinged door to meter box Polycarbonate viewing window 225mm Back plane rail system to sit meters 640mm 600mm Electra Meter Box Electrical mounting bracket Pressed penetrations for services with fitted nylon plugs 5 Pre-drilled holes for screw fixing flange to exterior wall framing. Inseal tape backing to steel flange against building underlay Additional flexible flashing tape to lap over flange and building underlay fully around perimeter 90mm framing Locking bolt to hinged removable door panel Electra flashing section prefixed and sealed to meter box casing Timber cavity batten n_zr-l_w-tec-fig51.dwg TIMBER CAVITY FIX METER BOX FIGURE 51 Scale 1:5
52 Building underlay/james Bottom plate Timber cavity batten Flooring to finish 10mm back from outside of framing Building underlay / James lap over flashing Solid timber perimeter joist H3.1 Treated timber cant strip to suit Floor joist 35mm min cover Refer to E2/AS1 Table 7 James Hardie upvc vent strip Purpose made flashing 15 min slope. Refer Table 20 of E2/AS1 for flashing durability 35mm min cover 15 mm 15mm min gap Top plate Vertical Section Note: This detail is required to limit cavities to a maximum of 2 stories or 7 metres. Refer E2/AS1 clause Weatherboard fixed to top plate. Do not fix to joist Building underlay to min lap Timber cavity batten n_zr-l_w-tec-fig52.dwg TIMBER CAVITY DRAINAGE JOINT FIGURE 52
53 Studs Battens to be kept away from corner 40mm Studs Building underlay/james 50 x 50mm upvc corner flashing Linea internal scribed corner Linea Weatherboard 150mm min to face of window or door jamb stud Timber cavity batten Timber cavity batten Parapet or balustrade studs n_zr-l_w-tec-fig53.dwg TIMBER CAVITY ENCLOSED DECK BALUSTRADE TO WALL FIGURE 53 Scale 1:5
54 Building underlay/james Flexible flashing tape to extend min 50mm down face of battens Flexible flashing tape dressed up and adhered to building underlay/james behind battens Sloping packer Flashing Tape Application Prior to Metal Flashing Fixing Building underlay/james Studs Timber cavity battens Rivet and seal capping to saddle flashing across top Metal saddle flashing under parapet capping refer E2/AS1 Figure 12 for min dimensions Parapet flashing with underlay n_zr-l_w-tec-fig54.dwg TIMBER CAVITY ENCLOSED BALUSTRADE TO WALL FIGURE 54 Scale 1:10
55 Bottom plate D.P.C. Building underlay / James over membrane Deck waterproof membrane carry up behind building underlay/james Hardie rigid air barrier past wall framing bottom plate. Floor structure 25mm wide cant strip H3.1 treated timber. Thickness to suit selected weatherboard. 50mm 50mm min. 100mm min. 150mm min membrane upstand Corner fillet Direct Fixed Detail Enclosed deck structure Bottom plate Building underlay / James over membrane Timber cavity batten D.P.C. Floor structure Deck waterproof membrane carry up behind building underlay/james Hardie rigid air barrier past wall framing bottom plate. Corner fillet Cavity Detail 20mm nominal cavity * 25mm wide cant strip H3.1 treated timber. Thickness to suit selected weatherboard. 30mm James Hardie upvc vent strip. Mitre at corners. Enclosed deck structure 50mm 50mm min. 100mm min. 150mm min membrane upstand * Drain holes in James Hardie upvc vent strip are sufficient to achieve ventilation openings of 1000mm² per lineal metre n_zr-l_w-tec-fig55.dwg DIRECT FIXED AND TIMBER CAVITY AT ENCLOSED DECK FIGURE 55
56 H3.1 treated timber packer to form slope 5 slope min See Table 7 E2/AS1 for both sides Metal capping flashing must be fixed to sides only Underlay to provide isolation of metal flashing to timber H3.1 treated timber packer Birds beak edge when this detail used on ballustrade Building underlay continuous over framing / James Hardie rigid air barrier n_zr-l_w-tec-fig56.dwg TIMBER CAVITY FIX PARAPET FLASHING FIGURE 56
57 'X' Roof framing Soffit lining Apply flexible sealant to seal to soffit Wall framing Timber cavity batten The must be neat cut and silicone sealed to angle of soffit Alternatively a scotia can be scribed and sealed to and the soffit lining n_zr-l_w-tec-fig57.dwg LINEA WEATHERBOARD JUNCTION (SECTION 'X') CAVITY TO CABLE FIGURE 57 Scale 1:5
58
59 Deck joist 12mm min Building underlay/james Structural blocking as per Engineers design H3.2 treated timber packer to suit Fixings to Engineers design 3mm thick EDPM washer to suit, hole to be tight fit around bolt H3.2 treated timber packer 12mm thick x 150mm long H3.2 treated timber packer to suit H3.2 treated timber ribbon plate H3.2 treated timber cavity batten n_zr-l_w-tec-fig59.dwg DIRECT FIX DECK JUNCTION FIGURE 59
60 Timber cavity batten Building underlay/james Hardie rigid air barrier turned out over saddle flashing Linea Weatherboard Internal finished floor level 50mm min Line of Linea Weatherboard between joists cut round joists 5mm Min. gap between cladding and saddle flashing Line of cantilever joist Building underlay/james behind saddle flashing Saddle flashing at every cantilevered joist Solid blocking Deck joist 35mm 5mm Continuous inter-storey flashing. refer to Figure 52 for inter-storey joint detail 35mm min cover Line of below deck Hem to 3 edges 50mm min. upstand NOTE: (1) Building underlay at back of cavity shall be taped around joist penetrations (2) The back of the saddle flashing shall be positioned behind the cladding (3) Saddle flashing terminates over inter-storey flashing Depth of canterlevered joist 50mm min 30mm min n_zr-l_w-tec-fig60.dwg LINEA WEATHERBOARD TIMBER CAVITY CANTILEVERED FIGURE 60 TIMBER DECK JUNCTION
61 Door frame (refer to window manufacturer for method of support and fixing) Door support as supplied by window manufacturer Edge of cladding and vertical section under door flange to be sealed before door is installed. Apply continuous 6mm bead of Bostik Seal n Flex -1 or Sika Sikaflex 11FC adhesive sealant 10mm min Packer DPC Window liner Timber trim 7.5mm gap nominal 30x1.6mm C Series stainless steel brad nail Selected coating 100mm min. paved ground 175mm min. unpaved ground Screw H3.1 treated angled packer to suit Refer to the manufacturer or supplier for technical information for these materials. General notes for materials selection 1. Flashing materials must be selected based on environmental exposure, refer to NZS 3604 and Table 20 of the NZBC E2/AS1. 2. Building underlay must comply with acceptable solution E2/AS1 and NZS Flashing tape must have proven compatibility with the selected building underlay and other materials with which it comes into contact as per Table 21 of E2/AS1. 4. to have sealed butt joint over batten at each corner of opening. n_zr-l_w-tec-fig61.dwg DOOR SILL SUPPORT DETAIL FIGURE 61
62 Building underlay Timber cavity batten Flashing tape or extra layer of building underlay over flashing Flashing upstand behind building underlay Selected roofing * Apron flashing with tapered stopend. Weatherboard to be carefully cut over stopend and sealed. Fall Sheet to be cut over the taper stop end and finished 50mm above apron flashing Batten behind Soffit 50 x 50mm metal corner flashing fitted over cavity batten and under fascia board. Packing rod and sealant between end of fascia and Linea Weatherboard Fascia board Provide drainage slot in soffit panel under flashing leg Selected spouting (shown stopped short for clarity) Spouting must finish 10mm min clear of finished weatherboards (cut back for clarity) * When 50 year durability for flashing is required refer Table 20 NZBC E2/AS1 document. n_zr-l_w-tec-fig62.dwg JUNCTION BETWEEN LINEA WEATHERBOARD AND FASCIA BOARD FIGURE 62 Scale 1:10
63 Flexible flashing tape dressed up and adhered to building underlay/james Hardie rigid air barrier behind battens Building underlay/james Timber cavity battens Fall Rivet and seal capping to saddle flashing across top Packing rod and sealant between end of fascia and Fascia Back flashing n_zr-l_w-tec-fig63.dwg ENCLOSED ROOF TO WALL INTERSECTION FIGURE 63 Scale 1:10
The WANZ Guide to Window Installation
The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 Ver. 1.1 Page 2 of 74 Contents Overview Page 5 Objective Page 5 Scope Page 5 Opening Preparation Page 7 Step P1 Preliminary Check
More informationThe WANZ Guide to Window Installation
The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 2 of 60 Contents Overview 5 Objective 5 Scope 5 Opening Preparation 7 Step P1 Preliminary Check 8 Step P2 Cut the Underlay 9 Step
More information!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035
Decra Plus Drawing no DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 Description Shown In Decra Brochure Most Commonly Used Detail t~êã=oççñ=b~îéë=aéí~áä=b~îéë=lîéêü~åö=táíü=fåëìä~íéç=c~ëåá~=~åç=pçññáí
More informationNRG 75 CRF NRG GREENBOARD WALL SYSTEM
NRG GREENBOARD WALL SYSTEM NRG Energy Efficient Building Systems is pleased to announce a revolution in lightweight cladding systems. NRG Building Systems is the first and only company to achieve CodeMark
More informationHow-To-build guide timber windows
How-To-build guide timber windows What you can build using this guide This guide shows you how to install a factory-made timber casement window into a house with a weatherboard cladding. Casement windows
More informationLeaky Homes Financial Assistance Package (FAP) Repair plan example
LEAKY HOMES FINANCIAL ASSISTANCE PACKAGE FACT SHEET Repair Plan Example - June 2014 Page 1 Leaky Homes Financial Assistance Package (FAP) Repair plan example Introduction This repair plan example is intended
More informationFLASHMAN WINDOW AND DOOR FLASHING SYSTEM. Product. Scope. Appraisal No. 573 [2013]
FLASHMAN WINDOW AND DOOR FLASHING SYSTEM This Appraisal replaces BRANZ Appraisal No. 573 (2007). Amended 05 February 2016. BRANZ Appraisals Technical Assessments of products for building and construction.
More informationClad Direct Glaze Window Installation Instructions
Clad Direct Glaze Window Installation Instructions Sill flashing and sealing: 2. An overview of the proper flashing sequence is shown in figure 1. Please read entire installation instructions carefully
More informationInstallation Details. D1 General D2 Walls D3 Ceilings D4 Reference. D Installation Details
D Installation Details D1 General D2 Walls D3 Ceilings D4 Reference D Installation Details D Contents D1 General Installation and Fastening Sequence for Steel Studs D1.1 Fastener Selection D1.3 D2 Walls
More informationKAHU RESIDENTIAL ROOFING RRKA DETAIL LIST
KAHU DETAIL LIST 00 / 24 COVER SHEET 01 / 24 ROOF RIDGE 02 / 24 SAWTOOTH RIDGE 03 / 24 SAWTOOTH EAVE 04 / 24 ROOF VALLEY 05 / 24 ROOF - CHANGE PITCH 06 / 24 EAVE WITH METALLINE FASCIA 07 / 24 EAVE WITH
More informationHow To Repair A Boat Landing Deck With A Boat Bed
RESIDENTIAL INSULATED SHEATHING INSTALLATION GUIDE Residential Insulated Sheathing Installation Guide ROXUL COMFORTBOARD IS Table of Contents Slab-on-grade-to Above Grade Wall...1 Foundation Wall at Footing
More informationFLASHCLAD VERTICAL WEATHERBOARD CAVITY SYSTEM. Product. Scope. Appraisal No. 829 [2013] Appraisal No. 829 (2013) Amended 05 February 2016
WEATHERBOARD CAVITY SYSTEM Amended 05 February 2016 BRANZ Appraisals Technical Assessments of products for building and construction. Flashclad Limited PO Box 346 Kaiapoi 7633 North Canterbury Tel: 0800
More informationWindow Installation Instructions
Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for
More informationSuperform Products Ltd.
TYPICAL CORNER REINFORCING NOTE : SEE ENGINEERED REBAR SCHEDULES SUPPLIED BY THE MANUFACTURER STEEL REINFORCEMENT WALL CORNER 90 Copyright 2012 Sept. 2012 5.1.1 Rebar Spacing 6" 12" Max. Load LB./FT. 2000
More informationINSTALLATION OF A BAY WINDOW
INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening
More information300mm. 2mm MIN GAP. PLACE 100mm X 100mm. SO THAT IT IS 38mm INTO
INSTALL PEEL & STICK (P&S) GUSSETS WITH PRIMER AS PER MANUFACTURERS INSTRUCTIONS 2mm MIN GAP IN SHEATHING STEP 1 PLACE 100mm X 100mm PIECE OF P&S IN CORNER SO THAT IT IS 38mm INTO THE OPENING EACH WAY
More informationFig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION
SIPS SCREWS WITH MINIMUM 1" PENETRATION IN WOOD MEMBER IN SIP WALL PANEL CONNECTED TO @ 24" O.C. MAXIMUM OUTSIDE SKIN EACH SIDE OF FRAMING TYP. AS RECOMMENDED BY FOAM CORE AS EACH SIDE OF FRAMING TYP.
More informationInstallation Window Building In Details
Installation Window Building In Details INSTALLATION Photo courtesy of Rowe Aluminium DATE: NOVEMBER 2009 REPLACES: AUGUST 2003 INSTALLATION Installation Replaces: Scale: NOT TO SCALE Vantage snap-on couplers
More informationStorage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.
Installation Guide Before you begin, take the time to read this entire guide to clearly understand the requirements and steps to follow for proper installation. Warning Do not install defective material.
More informationH-Stud Area Separation Wall System
12 TH EDITION 09 21 16.33/NGC H-Stud Area Separation Wall System 09 21 16.33 139 H-STUD AREA SEPARATION WALL SYSTEM The fire-protection of gypsum-based Area Separation Walls is demonstrated in dramatic
More informationTimber Decks. Technical Note. March 2007
Timber Decks Technical Note. March 2007 This Technical Note contains general information for residential timber decks and floor frame structures for veranda s, patios etc which are exposed to the weather.
More informationRESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings
More informationBrick Veneer Construction
Brick Veneer Construction Check list of suggested tools & support items Claw hammer Tape measure 3/4" [19 or 20] Wood chisel Wood or plastic shims Pry bar Utility knife Caulking and caulking gun Power
More informationResidential Inspection Guidelines
Residential Inspection Guidelines 201 Pre-Pour Foundation Dimensions Building Location Certificate - if required in the building consent Construction and Advice Notes Check the building dimensions against
More informationHfHMD uses LP SmartSide siding and trim.
HfHMD uses LP SmartSide siding and trim. These products are: More durable than cement fiber board. Much more volunteer-friendly to install. When installed correctly, have a 5/50- year pro-rated warranty.
More informationThe better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs
The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................
More informationMarch 14, 2007. Installation of Bay, Bow and Garden Windows
March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed
More informationThe compliance of a roof to part of a new house at 28D Rata Street, Oxford, Waimakariri
Determination 2009/103 The compliance of a roof to part of a new house at 28D Rata Street, Oxford, Waimakariri 1. The matters to be determined 1.1 This is a determination under Part 3 Subpart 1 of the
More informationResidential Deck Safety, Construction, and Repair
Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the
More informationEXTERNAL WATERPROOFING MEMBRANES BEST PRACTICE GUIDELINES
Building and Construction Industry A joint industry initiative produced by BSA Supershow logo.indd 1 30/01/2008 9:43:29 AM EXTERNAL WATERPROOFING MEMBRANES BEST PRACTICE GUIDELINES FAILING WATERPROOFING
More informationCONSTRUCTION DETAILS & LOAD DESIGN CHARTS
Office and Production 126 New Pace Rd., PO Box 279 Newcomerstown, OH 43832 1-800-446-2188, Fax: 740-498-4184 www.buildwithsips.com CONSTRUCTION DETAILS & LOAD DESIGN CHARTS Table of Contents Description
More informationPANELIZED HOME INSTALLATION GUIDELINE
PANELIZED HOME INSTALLATION GUIDELINE A typical home package will be constructed of Snap-N-Lock Insulated Panels clad with steel skins. 4" panels will be used for the walls, and 6" panels for the roof.
More informationInstalling Window and Door Mouldings
Installing Window and Door Mouldings About Window and Door Mouldings The trim around windows and doors greatly influences the look and style of your interior. They also bridge the gaps and cover spaces
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised November 27, 2013 the Easton - R 12'x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.
More informationAsphalt Shingle Application Requirements
Alberta Allied Roofing Association Asphalt Shingle Application Requirements Section 1 Roof Decks 1.1 General Asphalt Shingles are not permitted to be installed directly over rigid insulation. When Asphalt
More informationSun Windows General Information Sun New Construction Window Installation Instructions
Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten
More informationDocument type: Practice Note Title: External and internal membranes Document number: AC2234 Version: 5. 1. Purpose
Document type: Practice Note Title: External and internal membranes Document number: AC2234 Version: 5 1. Purpose The purpose of this practice note is to address the incidence of deck and roof membrane
More informationSTRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM
Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM 9.1 BACKGROUND Steel is widely used in the construction of multi-storey buildings. However, steel construction is seldom used and is traditionally
More informationmajestic install ation guide barcelona three sided enclosure 24mm surface mounted wall channels and underframe to base
majestic install ation guide barcelona three sided enclosure 24mm surface mounted wall channels and underframe to base These Instructions are for a left and right handed unit. The diagrams show a left
More informationResidential Roofing Guide
Residential Roofing Guide TABLE OF CONTENTS Building Detail and Accessories...... 1 Panel Introduction and Handling...... 2 Cutting and Trimming.... 3 Roof Preparation..... 3 Roof Slope..... 3 Re-roofing...
More informationWe urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.
Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden
More informationTable of Contents. Western States RustWall Wall and Soffit Panels Installation, Flashings & Shop Drawing Detail Guide
Western States RustWall Wall and Soffit Panels Installation, Flashings & Shop Drawing Detail Guide Table of Contents Section Page Section Page Notes to Designer /Installers.. 1 Fastener Placement and Selection.2-3
More information7. Installation. installation 7.1.1. CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME
7. Installation Window involves the fixing of window frame at an earlier construction stage and subsequent of the window sashes. This is a highly workmanship dependent process. Only trained and approved
More informationWe urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.
Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden
More informationHow to secure your property after a disaster
How to secure your property after a disaster The Red Guide to Recovery HOuse secured properly Board-Up of Windows, Doors and Roof Hole. Lot secured with Perimeter Fencing. Fires, floods, tornadoes, hurricanes,
More informationRooflight INSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS Rooflight These instructions should be used for: Installing Permanent Trickle Ventilation: Constructing & Waterproofing a Timber Upstand Curb: Installing & Waterproofing Proprietary
More informationHow To Build A Gambrel Roof And A Gable End Roof
Dutch Gable or Gambrel Roof and The Scotch Valley The folowing pages are an extract from Carp 12 text TAFE NSW Construction and Transport Division 71 HIP and VALLEY ROOFING GAMBREL / DUTCH GABLE The effect
More informationThese instructions will show you how to install an internal door into a non-loadbearing partition wall. The instructions are split into three parts.
No 8 in the series of 'How to' brochures produced by PlaceMakers, New Zealand How to Frame and Hang a Door These instructions will show you how to install an internal door into a non-loadbearing partition
More informationServices Enclosures and Protected Shafts - Maintaining Compartmentation
Introduction When a fire resisting element is used to provide fire compartmentation, every opening that allows services to pass through the element must be adequately protected by sealing, or fire stopping
More informationCERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011
CERTIFICATE NAME OF PRODUCT No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 H-CONTROL REFLEX+ reflective insulating vapour control layer for roof and wall applications MANUFACTURER ACTIS
More informationContents. APA Construction Details. Full fill cavity walls 2-13. Partial fill cavity walls 14-25. Solid externally insulated walls 26-37
Contents Pages Full fill cavity walls 2-13 Partial fill cavity walls 14-25 Solid externally insulated walls 26-37 Appendix (BRE confirmation of Ψ and y-values) 38-40 Page 1 of 40 APA Construction Details
More informationrationel WINDOWS WITH VISION
Brick / Blockwork 340mm Cavity Wall Interface Detail Cill BW-001A 5 x 50mm Woodscrews (Staggered) By Installer 20 x 90mm Standard Timber Packer With Upstand Bedded To Frame In Silicone By Installer Aluminium
More informationI-Line - Snap-On Feature
Oct 2012 I-Line - Snap-On Feature DATA SHEET Snap-On features - Guaranteed truelines every time Bailey I-Line Snap-On is an architectural cladding feature offering creative possibilities for architects
More informationINSTALLATION INSTRUCTIONS for Premium Pocket Windows (JII022) IMPoRtaNt INFoRMatIoN & glossary. safety & HaNdlINg
Thank you for selecting JeLd-weN products. Attached are JeLd-weN s recommended installation instructions for pocket (replacement) double-hung, casement, awning, picture or transom windows, designed to
More informationClassic Products, Inc. ClickLock Standing Seam Installation Manual
Classic Products, Inc. ClickLock Standing Seam Installation Manual Classic Products, Inc. 8510 Industry Park Drive Piqua, OH 45356 800.543.8938 Table of Contents page Introduction 1. 1 Starter. 2. 1 Panels.
More informationFree 12 x 8 Shed Plan With Illustrations, Blueprints & Step By Step Details
Free 12 x 8 Shed Plan With Illustrations, Blueprints & Step By Step Details Brought To You By: MyShedPlans Click Here To Download 12,000 Shed Plans >> 12 x 8 Basic Shed This 8 12-ft. shed features a simple
More informationEnvelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit
R-H-DI1 INSULATION BATT NR-E-IB1 Avoid Using Batt Insulation With Metal Framing Batt insulation should not be used with metal framing systems. Although it is common to see fiberglass batt insulation installed
More informationHORIZONTAL INSTALLATION
THERMO/SOLAR Žiar s.r.o. MANUAL FOR INSTALLATION PV SUPPORTING FRAMES HORIZONTAL INSTALLATION Technical alternation reserved A1410 1 12/2014 CONTENT ORD.NO. PAGE Mounting information 3 Mounting, flat roof
More informationDE Frame with C Series Sidelight
TOOLS REQUIRED Tape measure 6' magnetic level 3' magnetic level Screw gun with clutch adjusted #2 phillips tip #3 phillips tip Screwdriver (used to adjust frame on will using oval slots) Pry Bar Powder
More informationAMERICAN GOTHIC PLAYHOUSE
AMERICAN GOTHIC PLAYHOUSE Project Plan #856 Sheet 1 of 5 Pick a spot and get started with the beautiful that your kids will love. The design of the playhouse includes 35 square feet of interior space plus
More informationBarewood Octagon and Elongated Windows Installation Instructions
Step-by-step instructions to a beautiful window. Measuring and Installation of your new window from Century Specialty Windows couldn't be easier with our step-by-step instructions. Quality, function and
More informationFinal inspections are completed by site visit only. Access to fenced yards shall be planned.
ROOFING RESIDENTIAL BUILDING INSPECTIONS DEPARTMENT www.ci.blaine.mn.us This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building Code, Blaine City ordinances,
More informationWhen considering Roof drainage design the following should be taken into account:
Roof Drainage Design The primary objective of a gutter or spouting system is to remove water from the roof catchment area and channel that water to the ground drainage. Water ingress can have detrimental
More informationUbiflex. Non-lead flashing system
Ubiflex Non-lead flashing system Ubiflex non-lead flashing Ubiflex is a non-lead waterproof flashing material which can be used in most applications where lead is traditionally used to provide a weatherproof
More informationPERGOLAS AND CARPORTS
TECHNICAL DATA SHEET ISSUED BY TIMBER QUEENSLAND PERGOLAS AND CARPORTS RECOMMENDED PRACTICE // MARCH 2014 19 This data sheet contains Timber Queensland s recommendations for attached and detached timber
More informationGUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS 174-180 PHILLIP STREET, SYDNEY
GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS 174-180 PHILLIP STREET, SYDNEY July 2008 1.0 SCOPE These guidelines describe the way in which air conditioning units shall be installed or replaced
More informationIMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION
INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER SEALANT REQUIRED TO COMPLETE THIS INSTALLATION: (Not supplied) Sika Sikasil NG (Arctic White) To seal the WHITE shower door and returns to the shower tray.
More informationSUPER SHED. Indoor shelter for your outdoor tools.
SUPER SHED Indoor shelter for your outdoor tools. Not everyone needs a garden shed. But, if you've no more space on your garage wall for that new leaf rake, if you can't find your potting trowel because
More informationCupa Natural Slate Roofing design and fixing guide
Cupa Natural Slate Roofing design and fixing guide Cupa Natural Slate synonymous with quality Currently the Spanish slate industry is the undisputed market leader in natural slate production, with 90%
More informationSAMPLE INSTRUCTIONS. Best Barns USA Assembly Book. the Denver. 12'x 12' or 12'x16' Revised November 29, 2010
Best Barns USA Assembly Book Revised November 29, 2010 SAMPLE INSTRUCTIONS the Denver 12'x 12' or 12'x16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775
More informationGYPSUM AREA SEPARATION FIREWALLS GA-620-2011
GYPSUM AREA SEPARATION FIREWALLS GA-620-2011 GA-620-2011 Copyright 2011 Gypsum Association All rights reserved. Printed in U.S.A. Characteristics, properties, or performance of materials or systems herein
More informationThe formation of roof waterproofing details calls for
3.5 BUILT-UP ROOFING DETAIL DESIGN INTRODUCTION The formation of roof details calls for a combination of the skills of the designer and the roofer. There are many different approaches to detail design
More informationDuPont Tyvek ThermaWrap R5.0 Installation Guidelines for New Construction Using Vinyl, Brick and Stone Claddings
Tyvek ThermaWrap R5.0 Installation Guidelines for New Construction Using Vinyl, Brick and Stone Claddings VERSION 1/16 FOR SINGLE FAMILY HOMES AND LOW RISE MULTI-FAMILY BUILDINGS LESS THAN 4 STORIES Tyvek
More informationINSTALLATION INSPECTION GUIDE FOR 3RD PARTY INSPECTORS FOR PAREX USA EXTERIOR INSULATION AND FINISH SYSTEMS
INSTALLATION INSPECTION GUIDE FOR 3RD PARTY INSPECTORS FOR PAREX USA EXTERIOR INSULATION AND FINISH SYSTEMS Introduction This inspection guide is organized to follow the EIF System's Installation Guide.
More informationEXAMPLE BILL OF MATERIALS
EXAMPLE BILL OF MATERIALS COMPONENTS 00.001 YELLOW ENVELOPE PACK 0 1 - LABELLED "ATTENTION BUILDER". [CONSISTS OF :- A3 & A4 PLANS, PLANS CONSTRUCTION MANUAL, BILL-OF-MATERIALS, VARIOUS DETAILS.] 00.002
More informationInstallation Guide. Bath and Wall Surrounds SERIES 7104 1021861-2-B
Installation Guide and Wall Surrounds SERIES 7104 1021861-2-B Thank You For Choosing Sterling We appreciate your commitment to Sterling value. Please take a few minutes to review this manual before you
More informationHURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES
HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES 101 Retrofits Required. Pursuant to Section 553.844 553.884, Florida Statutes, strengthening of existing site-built,
More informationMark Cramer Inspection Services, Inc.
Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction
More informationInsulView Window Installation Instructions
InsulView Window Installation Instructions 1. The entire building is normally sheeted with the 2" 2 ½ OR 3 wall panel and the windows installed at a later time. A window retrofit of an existing building
More informationNCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)
NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:
More informationWELCOME. Recommended Window Installation. 1.5 credits Minnesota Department of Labor and Industry
WELCOME Recommended Window 1.5 credits Minnesota Department of Labor and Industry In accordance with the Department of Labor and Industry s statute 326.0981, Subd. 11, This educational offering is recognized
More informationVinyl Greenhouse Window Page 2 of 6 New Contruction Installation Instructions
New Construction Installation Instructions EPLACEMENT Installation Instructions Page 2 of 6 New Contruction Installation Instructions 1. Frame rough opening equal to window call out size. ough opening
More informationImportant Information for Installer & Homeowner
Important Information for Installer & Homeowner Homeowner: Please keep this information for your records, do not discard! Installation Instructions for Wood Frame Construction Replacement (See other side
More informationWINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING
WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING IMPORTANT NOTICES AND INFORMATION Read these instructions in their entirety prior to installing windows. Any local building code requirements
More informationInstallation Instructions
Installation Instructions 1. Position the unit onto bridging packers. These keep the unit away from any water sitting inside the frame. 2. Centralise the unit within the frame and pack the edges with appropriate
More informationInstallation Guide the Conservation Rooflight
Installation Guide the Conservation Rooflight > a roof window range suitable for pitched roofs between 17.5o and 65o > details for use with flashing kit January 2014 Version: CR_001INST Rev B 1 SECTION
More informationNEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK
ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within
More informationThe better way to build TM. Installation Manual. EXTERIOR WALL SIPs
The better way to build TM Installation Manual EXTERIOR WALL SIPs July 2015 EXTERIOR WALL SIPs Installation Manual Table of Contents Topics General Requirements................................... 3 Materials..............................................
More informationVA25014B0516 VA CINCINNATI PROJECT NO. 539-328 INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION 09 29 00 GYPSUM BOARD
SECTION 09 29 00 GYPSUM BOARD PART 1 - GENERAL 1.1 DESCRIPTION This section specifies installation and finishing of gypsum board, vapor retarder and air and moisture barrrier. 1.2 RELATED WORK A. Installation
More informationG VYCOR DECK PROTECTOR
G VYCOR DECK PROTECTOR Self-Adhered Flashing Contractor s Guide DECKS AND DETAIL AREAS For longer lasting decks, install Grace Vycor Deck Protector. FROM THE MAKERS OF G Ice & Water Shield What Self-Adhered
More informationBUILD A CARPORT. 2 - Planning the carport. 3 - Designing the carport
BUILD A CARPORT You only need basic DIY and woodworking skills to build a carport. The most important part of the job is setting the supporting posts truly vertical - a job for which another pair of hands
More informationDetached accessory structures that contain no conditioned floor area are exempt.
RESIDENTIAL ROOFING PERMITS: A roofing permit is required for roofing of residential dwellings and garages in accordance with Section R105 of the International Residential Code. Updated 11/2013 City of
More informationInstallation Instructions For Slider Casement Air Conditioners
Installation Instructions For Slider Casement Air Conditioners NOTE: These instructions describe installation in a typical wood framed window with a wood SLIDE-BY sash, or installation in a metal CASEMENT
More informationDuPont Tyvek ThermaWrap R5.0 Installation Guidelines for New Construction Using Stone Veneer or Lap Siding, e.g. Fiber Cement and Wood/Cedar
Tyvek ThermaWrap R5.0 Installation Guidelines for New Construction Using Stone Veneer or Lap Siding, e.g. Fiber Cement and Wood/Cedar VERSION 1/16 FOR SINGLE FAMILY HOMES AND LOW-RISE MULTI-FAMILY BUILDINGS
More informationDecember 2013. J-Ply Roofing, Flooring and Decking
December 2013 J-Ply Roofing, Flooring and Decking Introduction J-Ply plywood is manufactured in New Zealand by Juken New Zealand Limited (JNL) and marketed by New Zealand Wood Products Limited. The J-Ply
More informationK17.11 DOOR BOLTS K17 DOORS 01.09.2013
K17 DOORS K17.11 01.09.2013 Waregemstraat 5-9870 Zulte - Belgium - T. +32 9 388 88 81 - F. +32 9 388 88 21 - commercial@sobinco.com - www.sobinco.com CONTENTS 1. Locking set series 86000...K17.11.03 2.
More informationWATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12
WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 87 88 GOOD INDUSTRY PRACTICES 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12.1 BACKGROUND Most roofs in Singapore are constructed using reinforced
More informationPREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS
Application Instructions for THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR OTHER ROOFING
More informationMemtec Single Ply PVC Membrane Roofing and Waterproofing Technology. Modern Efficient Performance Cost Effective Flat Roofing Systems
Memtec Single Ply PVC Membrane Roofing and Waterproofing Technology Modern Efficient Performance Cost Effective Flat Roofing Systems Introduction A complete range of Memtec Roofing and Waterproofing Single
More informationINSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nailing fin. While the use of these installation instructions
More information