1 Dutch Gable or Gambrel Roof and The Scotch Valley The folowing pages are an extract from Carp 12 text TAFE NSW Construction and Transport Division 71
2 HIP and VALLEY ROOFING GAMBREL / DUTCH GABLE The effect of the gambrel ends is produced at the span ends by combining gables with a hipped roof. The gables are formed by extending the ridge board past the hip and ridge junction and then filling-in the extension like a gable. The small gables, or gablets, produced may be clad with a range of materials, such as flat fibre-cement sheet, timber weatherboards, Colorbond metal, Weathertex boards, Hardi-plank boards, etc. Isometric View Generally, a timber barge board is used to finish the junction between the roof tiles and the sheeting on the gable, with a lead flashing sealing the joint between the gable cladding and the tiled roof surface. Plan Fig. 117 Typical gambrel shape Where the verges are not pointed, a Colorbond barge and barge soaker/ gutter system may be used. Fig. 118 Colorbond barge and barge soaker/gutter 72 TAFE NSW Construction and Transport Division
3 Preparing The Gambrel End The lead flashing, usually 230 mm wide min., is laid across the width of the gambrel. It is turned up behind the cladding, minimum of 50 mm, and beaten over the profile of the roof tiles to form a waterproof seal. The lead flashing should be a minimum of 1.8 mm thick, also referred to as 20 kg lead, and run the full width of the gambrel plus a minimum of 300 mm either side of the hip centre. There must be an allowance for expansion of the lead due to heat absorption, therefore the maximum length of any one piece should be 2.0m lapped a minimum of 150 mm. 100 Fixing through sheet Walling plate 20kg Lead flashing Jack rafter Dutch-hip and rafters Fig. 119 Positioning the lead flashing Position of roof battens and tiles The lead should be coated with paint, plastic, rubber or bitumen to avoid galvanic action between dissimilar metals occurring. The bottom of the lead flashing should be set a minimum of 90 mm above the jack rafters to allow for tile battens and a course of roof tiles to fit under with ease. Note: Roofing lead exposed to temperatures of 40 C, or above, for prolonged periods will cause the lead to grow up to 2 mm in any 2.0 m length. This inevitably ends up causing stress splits in the width of the lead and leakage will occur. F.C. strip to Barge Lead flashing extended Sarki Hip tiles Fig. 120 Alternative gambrel end preparation and finish TAFE NSW Construction and Transport Division 73
4 HIP and VALLEY ROOFING Constructing The Gambrel STEP 1 Extend the ridge to the desired length in increments of rafter spacings. The most common method is to allow for a longer ridge during original construction, however the ridge may be extended later by strapping or fish-plating extensions to the end of the normal length hip roof ridge. Set out rafter positions on the plates Hip, line of intersection on plan Run of gambrel rafters Three additional pairs of common rafters required on this case. Fig. 121 Extending the ridge on centre line by rafter spacings. Galv. steel strap or nail plates Ridge extended as required Centering rafter Centering rafter Hip Creeper Extended hip Long hip Jack or crown-end rafter Long hip Jack or crown-end rafter fitted under ridge extension PLAN VIEW Fig. 122 Alternative method of extending the ridge 74 TAFE NSW Construction and Transport Division
5 STEP 2 Temporarily prop the end of the ridge to prevent sagging. Plumb up from the string line position, mark the end of the ridge and cut to length. Fit pairs of common rafters at the marked spacings to frame up the end. Brace Plumb line String line Prop Adjust ridge for height marked on prop. Centre up and plumb to line. Check for level and then secure brace. Fig. 123 Prop end of ridge STEP 3 Determine the position of the jack rafters and height of pitching plate by plumbing up the outside faces of the rafter plate positions onto the last pair of common rafters (Gambrel end rafters). This also determines the cutting length of the jack rafters. Gambrel rafter may be held against common rafter to obtain this point Locating position for pitching plate Fig. 124 Determine position and length of jack rafters. TAFE NSW Construction and Transport Division 75
6 HIP and VALLEY ROOFING STEP 4 Lay the pitching plate on the wall plate and transfer the rafter set outs onto it. Fit the inside edge of the pitching plate against the Gambrel rafters, measured the length of the plumb cut common rafter down. Align the outside of the first jack rafter with the set out mark on the gambrel rafters and bolt the pitching plate into place. Bolt to rafters Position & level the pitching plate Transfer rafter set-out from end-wall plate onto the pitching plate Place at bottom of plumb line Fig. 125 Set out pitching plate and fix into place STEP 5 Notch ends of jack rafters and fix into place using a string line to maintain a constant straight line. String line Pitching plate Rafters notched over pitching plate level with string line Gambrel rafters NOTE: In the case of tiled roofs, rafters must work full tile courses. Creeper Short hip Fig. 126 Fix jack rafters into place 76 TAFE NSW Construction and Transport Division
7 Note: Prepare ends of jack rafters, as shown below. Set out, cut and fit the short hips into place, as shown below. String line Gambrel rafter Pitching plate String line Plumb line Pitching plate Fig. 127 Notching jack rafters Fig. 128 Fitting string line Half mitre measured & marked Short hip measured from this point Fixing point marked on common rafter Short hip Fig. 129 Determine hip measuring point Fig. 130 Assemble hips STEP 6 Fit gambrel end trimming studs and ceiling trimmers. Fit collar ties as required. Fit gable trimming studs and fix lining. Fit barge boards and flashing. NOTE: Hanging and strutting beams have been omitted for clarity. Fig. 131 Complete the framing to the gambrel end TAFE NSW Construction and Transport Division 77
8 HIP and VALLEY ROOFING Alternative Gambrel Construction Method Fig. 132 Alternative method 78 TAFE NSW Construction and Transport Division
9 Methods Used for Small Spans Fig. 133 Use of ridge extension Fig. 134 Framing onto hip for small gambrel end TAFE NSW Construction and Transport Division 79
10 HIP and VALLEY ROOFING Determining the Length of the Ridge The ridge may be extended by any length, but for convenience of construction it is usually extended by rafter spacings. Once the length has been determined the ridge is set out as for gable and hip roofs, i.e. laying the ridge along the top wall plate and transferring the rafter set out positions directly onto it. STEP 1 Determine the length of the ridge between apex points: Length of roof - Span of roof m STEP 2 Determine the length of the ridge extension at each end, based on rafter spacings: (3 Rafter spacings) x 2 (3 x 0.450) x x m STEP 3 Add the lengths together to find the total length: m Fig. 135 Typical Gambrel roof plan STEP 4 As the length at this point is based on centre line length, half a rafter thickness must be added to each end to obtain the cutting length of the ridge. For this example the rafters are 35 mm thick: m Order: 1/ TAFE NSW Construction and Transport Division
11 SCOTCH VALLEY CONSTRUCTION This method is used as an alternative to conventional construction to form a valley. The valley board is replaced with a Lay board, which is laid on top of the rafters to form a fixing platform for the feet of the minor span valley creepers. The scotch valley is mainly used where an addition is added to an existing building. It provides a quick and very efficient method of construction, requiring little or no disturbance to the existing roof. The existing rafters remain in place to support the lay board, which in turn supports the feet of the valley creepers. This system may also be adapted for use where dormer windows are built into existing roofs. Fig. 140 Application of the scotch valley Fig. 141 Scotch valley construction TAFE NSW Construction and Transport Division 81
12 HIP and VALLEY ROOFING Method of Construction The following method is applied to roofs having the same pitch. STEP 1 Locate the height of the minor span ridge on the common rafters of the existing main roof. Fig. 142 Obtaining ridge height STEP 2 Position the ridge and rafters to form the minor roof. Fig. 143 Framing up the minor span 82 TAFE NSW Construction and Transport Division
13 STEP 3 Measure the length of the lay board, then cut and fix into position. Fig. 144 Measuring the lay board STEP 4 Measure the length of the longest creeper. Use plumb bevel common rafter for the top of the creeper and level bevel common rafter and edge bevel creeper for the compound foot cut. The remainder of the creepers can be set out using the steel square or by calculating a deduction from long point to long point. Fig. 145 Cutting and fixing the valley creepers TAFE NSW Construction and Transport Division 83
14 HIP and VALLEY ROOFING GLOSSARY OF TERMS Adjacent - Apex - Bisect - Circa - Cluster - Complimentary - Constant - Corbelled - Dihedral - F.C. - Hypotenuse - Inclined - In-situ - In-to-over - Lined on-the-rake - Parapet - Patent - Means it is placed next to or found beside something. This is the very top or point of something, like the apex of a roof, meaning where members come together at a common top position. This means to cut, separate or divide something exactly in half, such as when a 90 angle is bisected it becomes two 45 angles. This means around, approximately, round about, etc. Usually refers to dates when estimating the age of a building or structure such as circa 1854, also written as (c 1854). This is a term, which refers to a group or gathering of a number of members in a frame, such as a roof cluster, which consists of the end of the ridge, two centring rafters, a crown end rafter and two hip rafters. In this case it means any two angles, which make up a right angle. In this case it means a number, quantity or amount, which is used as the basis for several calculations. For example the length of 1.414m is a constant, which may be used to calculate the 45 hypotenuse length of a right-angled triangle, once the length of one side is known. Refers to stepped out brickwork used to support other members, such as corbelled eaves. This is the angle formed between any two surfaces where they meet along a common length, such as a ridge in a roof. A dihedral angle is formed between the underside of the two roof surfaces or where a roof surface meets a parapet wall, etc. This is an abbreviation for fibre cement, similar to the product Hardiflex. This is the angled side of a right-angled triangle. Means to be at an angle to something, such as an inclined strut or brace. This is an abbreviated version meaning in situation or position, such as pouring concrete in-situ, meaning to pour in place into the formwork. This is a method used for marking the spacings of members. It literally means marking from the inside face or edge of one member to the outside face or edge of the next member. It is equal to working centre-to-centre but is more practical for fixing purposes as it allows one edge to be lined up with the mark, so it is easily seen, ready for fixing. This is a term used to describe the ceiling lining of a pitched roof, which is fixed to the underside of the rafters. There is no access to the roof structure as there is no roof space formed. This is a vertical wall or gable, which extends past the line of the roof to enclose the roof from view. The parapet is usually constructed of brickwork or timber framing and clad with sheet material. This is a term used to describe a product which has had its design registered with the Patents office. It is the original idea of a person or persons, which cannot be copied without consent. 84 TAFE NSW Construction and Transport Division
15 Primed - Scribe - Slat - Soffit- This is a protective white or pink paint coating applied to timber before it is fixed into place. It seals the timber and provides a surface ready to take undercoat paint prior to the finishing coats. It helps to prevent timber decay from occurring. This is where the shape of one piece is to be fitted to the surface shape of another. It may also refer to anything placed in-situ and marked to suit the final resting position of that member, such as scribing a hip in position. Refers to a thin narrow piece of timber or several thin arrow pieces put together to make something else, such as slats of timber used to make a sheet of lattice. This is the horizontal under face of a structure or lining. The eaves soffit is the underside face of the eaves sheeting. Trapezoid - This is an irregular quadrilateral with only two parallel sides. The shape may be found on the side roof surface of a hip roof made up of the fascia, ridge and two hips TAFE NSW Construction and Transport Division 85
CARPENTRY - HOUSING. This is the sloping length of a right-angled triangle.
CARPENTRY - HOUSING PART 2: GABLE ROOFS The gable roof is classified as being double-pitched and one of the simplest roof forms, due to the fact that all rafters in the roof are exactly the same length
More information!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035
Decra Plus Drawing no DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 Description Shown In Decra Brochure Most Commonly Used Detail t~êã=oççñ=b~îéë=aéí~áä=b~îéë=lîéêü~åö=táíü=fåëìä~íéç=c~ëåá~=~åç=pçññáí
More informationSTRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM
Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM 9.1 BACKGROUND Steel is widely used in the construction of multi-storey buildings. However, steel construction is seldom used and is traditionally
More informationFLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL
FLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL Table of Contents Introduction... 2 Components... 3 Step 1 Marking out the Perimeter of the Carport... 3 Step 2a Footing Set-Out for Concrete Block Pad
More informationInstruction Manual 19/9/01. Flat Roof Carport
Flat Roof Carport Thank you for choosing this quality carport. We strongly recommend that you read these instructions thoroughly. The carport you are building may vary from a carport previously bought
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised November 27, 2013 the Easton - R 12'x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.
More informationPOST AND FRAME STRUCTURES (Pole Barns)
POST AND FRAME STRUCTURES (Pole Barns) Post and frame structures. The following requirements serve as minimum standards for post and frame structures within all of the following structural limitations:
More informationROOF CONSTRUCTION Roof Styles Gable Roof Hip Roof Gambrel Roof
ROOF CONSTRUCTION The overall appearance of a building is greatly affected by the roof lines and the roofing materials. The designer has many standard designs to choose from and should be able to find
More informationAsphalt Shingle Application Requirements
Alberta Allied Roofing Association Asphalt Shingle Application Requirements Section 1 Roof Decks 1.1 General Asphalt Shingles are not permitted to be installed directly over rigid insulation. When Asphalt
More informationINSTALLATION. General. Important Note. Design. Transport
General The roof trusses you are about to install have been manufactured to precise engineering standards. To ensure that the trusses perform as designed, it is essential that they be handled, erected
More informationAfter reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE
86 :: Certificate in Construction Supervision (CIVIL) 12 ROOF 12.1 INTRODUCTION The structure provided to cover the house surface (floor) is known as roof. For different situation and requirement, it is
More informationFLAT ROOF BOX SPAN CARPORTS
AGS/NC/03 FLAT ROOF BOX SPAN CARPORTS Thank you for choosing this quality product. We strongly recommend that you read these instructions thoroughly. Please take your time and do not rush the erection
More informationROOF CONSTRUCTION Roof Styles Gable Roof Hip Roof Gambrel Roof
ROOF CONSTRUCTION The overall appearance of a building is greatly affected by the roof lines and the roofing materials. The designer has many standard designs to choose from and should be able to find
More informationKAHU RESIDENTIAL ROOFING RRKA DETAIL LIST
KAHU DETAIL LIST 00 / 24 COVER SHEET 01 / 24 ROOF RIDGE 02 / 24 SAWTOOTH RIDGE 03 / 24 SAWTOOTH EAVE 04 / 24 ROOF VALLEY 05 / 24 ROOF - CHANGE PITCH 06 / 24 EAVE WITH METALLINE FASCIA 07 / 24 EAVE WITH
More informationSTEEL BUILDINGS RECOMMENDED INSTALLATION GUIDE
STEEL BUILDINGS RECOMMENDED INSTALLATION GUIDE 3 TO 30 METRE SPAN TILT UP METHOD SUPPLIED BY: Last update 8 December 2010 2010 FBHS (Aust) Pty Limited FBHS (Aust) Pty Limited ABN 83 126 232 504 trading
More informationPREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS
Application Instructions for THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR OTHER ROOFING
More informationFree 12 x 8 Shed Plan With Illustrations, Blueprints & Step By Step Details
Free 12 x 8 Shed Plan With Illustrations, Blueprints & Step By Step Details Brought To You By: MyShedPlans Click Here To Download 12,000 Shed Plans >> 12 x 8 Basic Shed This 8 12-ft. shed features a simple
More information1. Concrete: T W L / 27 = Concrete C.Y. Multiply Feet Thickness x Feet Width x Feet Length / 27 = Cubic Yards.
Formulas: Formula Letters: H= Height BCY = Bank Cubic Yards L= Length CCY = Compact Cubic Yards P= Perimeter LCY = Loose Cubic Yards LF = Linear Feet or Lineal Feet BF = Board Foot or Feet SF = Square
More informationAMERICAN GOTHIC PLAYHOUSE
AMERICAN GOTHIC PLAYHOUSE Project Plan #856 Sheet 1 of 5 Pick a spot and get started with the beautiful that your kids will love. The design of the playhouse includes 35 square feet of interior space plus
More informationHURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES
HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES 101 Retrofits Required. Pursuant to Section 553.844 553.884, Florida Statutes, strengthening of existing site-built,
More informationFCA CARPENTRY & JOINERY THEORY. 10 SIMPLE ROOF CONSTRUCTION Part 2
CARPENTRY & JOINERY FCA CARPENTRY & JOINERY THEORY 10 SIMPLE ROOF Double Roofs A double roof is a roof whose rafters are of such a length that they require an intermediate support. This support is usually
More informationUbiflex. Non-lead flashing system
Ubiflex Non-lead flashing system Ubiflex non-lead flashing Ubiflex is a non-lead waterproof flashing material which can be used in most applications where lead is traditionally used to provide a weatherproof
More informationLeaky Homes Financial Assistance Package (FAP) Repair plan example
LEAKY HOMES FINANCIAL ASSISTANCE PACKAGE FACT SHEET Repair Plan Example - June 2014 Page 1 Leaky Homes Financial Assistance Package (FAP) Repair plan example Introduction This repair plan example is intended
More informationThe WANZ Guide to Window Installation
The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 Ver. 1.1 Page 2 of 74 Contents Overview Page 5 Objective Page 5 Scope Page 5 Opening Preparation Page 7 Step P1 Preliminary Check
More informationFORM DESIGN. easy to work with, and generally available.
Forms play a major role in concrete construction. They give the plastic concrete its shape and hold it until it hardens. Forms protect the concrete, assist in curing it, and support any reinforcing rods
More informationSUPER SHED. Indoor shelter for your outdoor tools.
SUPER SHED Indoor shelter for your outdoor tools. Not everyone needs a garden shed. But, if you've no more space on your garage wall for that new leaf rake, if you can't find your potting trowel because
More informationFig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION
SIPS SCREWS WITH MINIMUM 1" PENETRATION IN WOOD MEMBER IN SIP WALL PANEL CONNECTED TO @ 24" O.C. MAXIMUM OUTSIDE SKIN EACH SIDE OF FRAMING TYP. AS RECOMMENDED BY FOAM CORE AS EACH SIDE OF FRAMING TYP.
More informationLinea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1
Top plate Stud Soffit lining 45mm min nog Fix scotia bead Building underlay/james Hardie rigid air barrier Soffit Detail Building underlay/james Hardie rigid air barrier Bottom plate 25mm wide cant strip.
More informationScrew Patterns Roof & Walls 403-279-2766 TR-36 MD-36 TSM-32. PBR-Panel
Screw Patterns Roof & Walls Overlap Underlap ¾ 9 TR-36 36 5/8 6 MD-36 36 ½ 8 TSM-32 32 1¼ 12 PBR-Panel 36 Bottom Edge Screw Pattern apply to every profile except for MD36 (1 screw beside every rib) High
More information8/18/14. Introduction to. Framing. Terminology and Concepts
8/18/14 Introduction to Framing Terminology and Concepts Terminology: Framing Level Two points on exactly the same horizontal plane. Square Intersecting lines or faces that form an exact 90 angle. Plumb
More informationROOFS - Guidance for Repair, Maintenance and Replacement
ROOFS - Guidance for Repair, Maintenance and Replacement Guilford Association Architectural Committee ROOFING Slate and tile roofs are a critical design feature of Guilford homes. The homes were designed
More informationStandard Technical Details
Standard Technical Details Construction Details Valley 2 Loose Hip 2 Hip End - Standard 3 Hip End - Multiple Girders 4 Barn Hip 5 Part/Bonnet Hip 5 Hip Corner 6 Scissors 8 Raised Tie 8 Dog Leg Intersection
More informationBUILD A CARPORT. 2 - Planning the carport. 3 - Designing the carport
BUILD A CARPORT You only need basic DIY and woodworking skills to build a carport. The most important part of the job is setting the supporting posts truly vertical - a job for which another pair of hands
More informationGuide to Safe Building Practices
Guide to Safe Building Practices Guide to Safe Building Practices This is a guide for tradesmen, builders and contractors to help them build, repair and retrofit buildings and particularly roofs, with
More informationMarch 14, 2007. Installation of Bay, Bow and Garden Windows
March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed
More informationThe WANZ Guide to Window Installation
The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 2 of 60 Contents Overview 5 Objective 5 Scope 5 Opening Preparation 7 Step P1 Preliminary Check 8 Step P2 Cut the Underlay 9 Step
More informationSchlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing
Substrate, structural panel, bonded waterproofing The universal substrate for tiles Perfect covering No matter whether you work with mosaics or large format tiles, an absolutely level substrate with straight
More informationSection A Roof Truss
Section A Roof Truss Truss Types Wisconsin Truss, Inc. can build a variety of truss types, pictured below are some common examples. Common Bobtail Scissor Mono Studio Dual Slope Cathedral Tray Vault Parallel
More informationThe better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs
The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................
More informationRoof Tutorial. Chapter 3:
Chapter 3: Roof Tutorial The majority of Roof Tutorial describes some common roof styles that can be created using settings in the Wall Specification dialog and can be completed independent of the other
More informationThe minimum reinforcement for the stem wall is the placement of:
PolySteel creates an ideal insulated stem wall for concrete slabs that can make this part of your project easier and faster, in addition to making your finished project more energy-efficient. Figures 3.20
More informationRaising the Roof Creating Roofs in Revit David Cohn
David Cohn AB322-1 Roofs are one of the most complex architectural elements to model, but with Revit you can create just about any type of roof. This class will explore the best methods for creating various
More informationGood Craftsmanship Guide. Carpentry and Joinery- Carcassing
Good Craftsmanship Guide Carpentry and Joinery- Carcassing Introduction This Good Craftsmanship Guide highlights key problems with the major elements of Carpentry and Joinery - Carcassing, and gives guidance
More informationChapter 6 ROOF-CEILING SYSTEMS
Chapter 6 ROOF-CEILING SYSTEMS Woodframe roof-ceiling systems are the focus of this chapter. Cold-formed steel framing for a roof-ceiling system also is permitted by the IRC but will not be discussed;
More informationThe formation of roof waterproofing details calls for
3.5 BUILT-UP ROOFING DETAIL DESIGN INTRODUCTION The formation of roof details calls for a combination of the skills of the designer and the roofer. There are many different approaches to detail design
More informationThe compliance of a roof to part of a new house at 28D Rata Street, Oxford, Waimakariri
Determination 2009/103 The compliance of a roof to part of a new house at 28D Rata Street, Oxford, Waimakariri 1. The matters to be determined 1.1 This is a determination under Part 3 Subpart 1 of the
More informationResidential Roofing Guide
Residential Roofing Guide TABLE OF CONTENTS Building Detail and Accessories...... 1 Panel Introduction and Handling...... 2 Cutting and Trimming.... 3 Roof Preparation..... 3 Roof Slope..... 3 Re-roofing...
More informationapplication instructions
application instructions ARCHITECTURAL COLLECTION PRIMED BOLD PROFILE 120 SERIES LAP SIDING (D5, T4, D8, T5, Q4) General At the time of manufacture, siding meets or exceeds the performance standards set
More informationCupa Natural Slate Roofing design and fixing guide
Cupa Natural Slate Roofing design and fixing guide Cupa Natural Slate synonymous with quality Currently the Spanish slate industry is the undisputed market leader in natural slate production, with 90%
More informationROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS
ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS 1. 2. 3. 3.0 Scope 1.1 This application standard shall be used where the authority having jurisdiction has adopted its use, and
More informationRoof Framing Geometry & Trigonometry for Polygons
Roof Framing Geometry & Trigonometry for Polygons section view polygon side length polygon center inscribed circle central angle plan angle working angle plan view plan view projection B angle B exterior
More informationNRG 75 CRF NRG GREENBOARD WALL SYSTEM
NRG GREENBOARD WALL SYSTEM NRG Energy Efficient Building Systems is pleased to announce a revolution in lightweight cladding systems. NRG Building Systems is the first and only company to achieve CodeMark
More informationPERGOLAS AND CARPORTS
TECHNICAL DATA SHEET ISSUED BY TIMBER QUEENSLAND PERGOLAS AND CARPORTS RECOMMENDED PRACTICE // MARCH 2014 19 This data sheet contains Timber Queensland s recommendations for attached and detached timber
More informationHfHMD uses LP SmartSide siding and trim.
HfHMD uses LP SmartSide siding and trim. These products are: More durable than cement fiber board. Much more volunteer-friendly to install. When installed correctly, have a 5/50- year pro-rated warranty.
More informationINSTALLATION OF A BAY WINDOW
INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening
More informationPANELIZED HOME INSTALLATION GUIDELINE
PANELIZED HOME INSTALLATION GUIDELINE A typical home package will be constructed of Snap-N-Lock Insulated Panels clad with steel skins. 4" panels will be used for the walls, and 6" panels for the roof.
More informationCity of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures
City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures SECTION 7201 - PURPOSE The purpose of this appendix chapter is to establish minimum prescriptive standards
More informationRoof Rehab (Roof truss) Classroom Activity
Roof Rehab (Roof truss) Classroom Activity The Classroom Activity introduces students to the context of a performance task, so they are not disadvantaged in demonstrating the skills the task intends to
More informationCONTENTS. General conditions 2. Material requirements 3. Terms 4. Estimating shingle requirements 4. Roof preparation 6. Shingle application 9 - 1 -
CONTENTS General conditions Material requirements 3 Terms 4 Estimating shingle requirements 4 Roof preparation 6 Shingle application 9 Shingle Shingle application application guide guide - - b a 3a 3b
More information2.1. Architectural Character. Mountain. Agrarian. Craftsman. Gold Rush
2 A r c h i t e c t u r a l C h a r a c t e r 2.1 Introduction Development within the corridor is not required to be any one architectural style but should incorporate elements from one of the following
More informationREDLAND DRY BONDING GUTTER. Installation Instructions for Redland Dry Bonding Gutter
REDLAND DRY BONDING GUTTER Installation Instructions for Redland Dry Bonding Gutter 1 Introduction 1.1 TECHNICAL DATA Dimensions: 3 m long x 210 mm wide Material: Glass-fibre/polyester composite. Pitch
More informationHow To Repair A House
Assessing Structural Damages Please note-this presentation is only intended to be used as a basic educational tool and is by no means all encompassing. Each property should be treated on a case by case
More informationTechnology at its best. Benefits
Protecting what s under your roof from the elements is simplicity itself with Ruberoid Roofing Shingles. Roofing Shingles make ideal roofing; they are attractive, easy to install and are perfect for use
More informationCITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles
CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503 Re-Roofing: Asphalt Shingles This is a summary of the standard requirements based on the
More informationFinal inspections are completed by site visit only. Access to fenced yards shall be planned.
ROOFING RESIDENTIAL BUILDING INSPECTIONS DEPARTMENT www.ci.blaine.mn.us This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building Code, Blaine City ordinances,
More informationMark Cramer Inspection Services, Inc.
Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction
More informationRESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings
More informationBungalow. Essential Elements. Prominent porch columns,
Bungalow Essential Elements Prominent porch columns, especially square or battered piers Deep porches One or one and a half stories Roof that is either hipped with low pitch or gabled with moderate to
More informationSuperform Products Ltd.
TYPICAL CORNER REINFORCING NOTE : SEE ENGINEERED REBAR SCHEDULES SUPPLIED BY THE MANUFACTURER STEEL REINFORCEMENT WALL CORNER 90 Copyright 2012 Sept. 2012 5.1.1 Rebar Spacing 6" 12" Max. Load LB./FT. 2000
More informationLAYING BLOCK AND BRICK
LAYING BLOCK AND BRICK Products highlighted in this section: SAKRETE Type N Mortar Mix SAKRETE Type S Mortar Mix Brick And Block Laying Basics The first step in building a brick or block wall is to construct
More informationInstallation Manual for STANDING SEAM ROOFING
Installation Manual for STANDING SEAM ROOFING Absolute Steel Toll Free 877-833-3237 / Phone 480-768-1618 / Fax 480-768-1514 www.metalroofingsource.com Standing Seam features approximately one-inch high
More informationCI SfB. (4-) Nn2. Onduline. Mini Profile. Onduline Garden Roof Range. Onduline Building Products Ltd
CI SfB (4-) Nn2 Onduline Mini Profile Onduline Garden Roof Range Onduline Building Products Ltd Onduline Garden Roof Range Onduline Mini Profile The new Onduline Mini Profile sheets have been designed
More informationMulti-layer Insulation Blanket for Roofs
Multilayer Insulation Blanket for Roofs Thermal Insulation in a 40mm thin, flexible, multilayer membrane Meets requirements of L1A, L1B 2010 In accordance with BR443 NHBC Acceptance Pitched & Flat roof
More informationExtension. for. Pretend Customer 123 A Road HA7 9BP. at: 123 A Road HA7 9BP
for Pretend Customer at: Pretend Customer Site address: Monday, 23 November 2015 Dear Pretend Customer, Subject: Thank you for your valued enquiry and instructions to quote for the above project. We are
More informationTIMBER FRAME STANDARD DETAILS SEPTEMBER 09
Building 1 Grosvenor Court, Hipley Street OLD WOKING, SURREY GU22 9LL Tel: +44 (0) 1483 769518 Fax: +44 (0) 1483 770863 E-mail: design@silvatecdesign.com Internet: www.silvatecdesign.com TIMBER FRAME STANDARD
More informationHow To Retaining Wall Guide
How To Retaining Wall Guide Before you start: Consents and Engineering Building Consent Retaining walls over 1.5m high will require a building consent from the Local Body Council. Walls that carry extra
More informationBrick Veneer Construction
Brick Veneer Construction Check list of suggested tools & support items Claw hammer Tape measure 3/4" [19 or 20] Wood chisel Wood or plastic shims Pry bar Utility knife Caulking and caulking gun Power
More informationPreformed Metal Roofing and Siding
Page -1-1. GENERAL 1.1. Description This specification along with the drawings covers the furnishing of all material, products, equipment, accessories, tools, services, transportation, labor and supervision
More informationBRIDGE & SUPPLY COMPANY. Installation Guide. Ultra 2000. Includes:
BRIDGE & SUPPLY COMPANY Installation Guide Ultra 2000 Includes: Ultra 2000 Installation Guide Stock Trim Profiles Ultra 2000 Trim Installation Guide Page 2 Table of Contents Ultra 2000 Profile, Colors
More informationINSTALLATION MANUAL For Grand Rib-3 / Multi Purpose / & Classic Rib Roofing Panels
INSTALLATION MANUAL For Grand Rib-3 / Multi Purpose / & Classic Rib Roofing Panels Grand Rib-3 / Multi-Purpose / Classic Rib Grand Rib-3 / Multi-Purpose / & Classic Rib Grand Rib 3 panels are a strong,
More informationSHINGLE APPLICATION GUIDE
SHINGLE APPLICATION GUIDE CONTENTS 01. General conditions 01. Material requirements 02. Terms 07. Estimating shingle requirements 08. Roof preparation 10.Shingle application E version 2006 GENERAL CONDITIONS
More informationRooflight INSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS Rooflight These instructions should be used for: Installing Permanent Trickle Ventilation: Constructing & Waterproofing a Timber Upstand Curb: Installing & Waterproofing Proprietary
More informationCERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011
CERTIFICATE NAME OF PRODUCT No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 H-CONTROL REFLEX+ reflective insulating vapour control layer for roof and wall applications MANUFACTURER ACTIS
More informationFire Preventive and Fireproof Performance Test and Evaluation Procedure Manual
BR BO-01-02 Effective from June 1, 2000 Revision: March 26, 2002 Fire Preventive and Fireproof Performance Test and Evaluation Procedure Manual (Unofficial Manual) Technical Appraisal Department, Building
More informationHERITAGE WOODGATE LAMINATED ASPHALT SHINGLES Dallas, TX
Application Instructions for THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR OTHER ROOFING
More informationBuilding Construction. Lightweight construction. Conventional Construction
Ventilation 53 Building Construction The firefighter s ability to safely and efficiently ventilate a building through its roof will depend to some degree on the firefighter s understanding of roof construction.
More informationTHE DEWALT RAFTER SQUARE
THE DEWALT RAFTER SQUARE The DEWALT Rafter Square is designed to provide a quick, accurate, and repeatable means for laying out and cutting the various cuts on common, hip, valley and jack rafters used
More informationElectrical Wiring Technical Bulletin
Electrical Wiring Technical Bulletin Overview In general, SIP construction is easier and more cost effective when things are planned and thought out before the panels are manufactured. This process will
More informationRoof Tutorial. Chapter 3:
Chapter 3: Roof Tutorial The first portion of this tutorial can be completed independent of the previous tutorials. We ll go over some common roof styles that can be created using settings in the Wall
More informationConstruction Guide. Pitched Roof Patio Pitched Roof Awning
Construction Guide Pitched Roof Patio Pitched Roof Awning Photographs are indicative only, and may contain elements not supplied in kits. Add thousands of dollars value to your home Typically can be erected
More informationWet Area Construction. Carpentry - Residential Construction. Product Code: 5603
E PL SA M Wet Area Construction Carpentry - Residential Construction Product Code: 5603 Publishing details: Second Edition 2012 TAFE NSW Training and Education Support, Industry Skills Unit Orange and
More informationCLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.
CLIENT Inspection Report 271 Front St. Alert Bay, B.C. Island Building Inspections 2013 V ANCOUVER I SLAND B. C. Elevation Photos For the Property at 271 Front Street Alert Bay, BC ELEVATION PICTURES Front
More informationInstalling Window and Door Mouldings
Installing Window and Door Mouldings About Window and Door Mouldings The trim around windows and doors greatly influences the look and style of your interior. They also bridge the gaps and cover spaces
More informationChapter 9: INSTALLING ROOFING
9.1 LEAK BARRIER (ICE AND WATER SHIELD) 9.2 SHINGLE UNDERLAYMENT 9.3 INSTALLING GUTTER APRON AND GABLE D-EDGE 9.4 INSTALLING SHINGLES 9.5 RIDGE VENT AND CAP Tools needed by each volunteer: Hammer (16 oz.
More informationTYPICAL PATIO COVERS 111
City of Laguna Niguel Building Division 30111 Crown Valley Pkwy Laguna Niguel, CA 92677 (949) 362-4360 FAX 362-4369 www.cityoflagunaniguel.org TYPICAL PATIO COVERS 111 PLEASE NOTE: This information Bulletin
More informationIncluding. Rubershield-Pro. Breather Membrane
Including RubershieldPro Breather Membrane 2 Ruberoid produces a wide range of underslating membranes, primarily to be installed below tiles, slates or metal roofing providing a secondary barrier against
More informationPre-Drywall Inspection Report
SM MEDALLION INSPECTIONS helping people make informed decisions Pre-Drywall Inspection Report 5657 Garden Valley Place Milton, Georgia 30024 Prepared for Betsy and Paul Dougherty January12, 2015 Medallion
More informationInstallation Details. D1 General D2 Walls D3 Ceilings D4 Reference. D Installation Details
D Installation Details D1 General D2 Walls D3 Ceilings D4 Reference D Installation Details D Contents D1 General Installation and Fastening Sequence for Steel Studs D1.1 Fastener Selection D1.3 D2 Walls
More informationSTANDARD OPEN PATIO COVER
STANDARD OPEN PATIO COVER BUILDING & SAFETY DIVISION 201 E. LA HABRA BLVD. LA HABRA, CA 90631 62-90-9710 Call Before You Dig 1-800-227-2600 PLEASE NOTE: This information Bulletin is made available to assist