PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE

Save this PDF as:
 WORD  PNG  TXT  JPG

Size: px
Start display at page:

Download "PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE"

Transcription

1 Sl.No. PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE Description of item Qty Unit Rate Amount 1 Demolishing tile work/cement concrete/( carefully taking out the closet and other necessary materials and refix without causing any damage, etc manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. (i) Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix) Cum Providing and fixing white vitreous china pedestal type water closet (European type W.C. pan) with seat and lid, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever), conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required, etc complete all as per the (i) W.C. pan with ISI marked black solid plastic seat and lid 3 Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering etc complete all as per the direction of (i) 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) 4 Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of kg/sqm mixed with water proofing cement kg/ sqm. This layer will be allowed to air cure for 4 hours. b) Second layer of slurry of kg/sqm mixed with water proofing cement kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry etc complete all as per the direction of 6.00 Each Cum Sqm

2 5 Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), including pointing the joints with white cement and matching pigment etc complete all as per the 6 Engaging labours(mason) for masonry work for plastering and other patch works along toilets to do the maintenance works wherever required including jungle clearance, site cleaning, etc complete all as per the direction of civil engineering wing supplyco. 7 Supplying materials for repairing and plumbing maintenance in toilets including taps, floor trap, waste line pipes, all necessary fittings, fixtures, material charges, etc complete all as per the direction of civil engineering wing supplyco. 8 Plastering 12mm thick with cement mortar using sand specified below, finished rough including scaffolding, curing, etc; complete for SURFACES. Mix specified is for cement : coarse sand. NOTE : i) CM 1:3 OR CM 1:4 is generally applicable for ceilings and RCC surfaces unless otherwise specified etc complete all as per the direction of Sqm Nos L.S (i) 12 mm cement plaster of mix 1:4 (1cement : 4 coarse sand) Sqm Applying one or more coats of cement primer of approved brand and manufacture on wall/beam surface along duct portion and where ever required etc complete all as per the 10 Providing and fixing Polyvinyl Chloride (PVC) pipes, having thermal stability for water supply including all PVC plain & brass threaded fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement,trenching,refilling & testing of joints complete as per direction of civil engineering wing supplyco Sqm (i) 25 mm nominal outer dia Pipes (10kg/cm 2 ) Mtr (ii) 32 mm nominal outer dia Pipes (10kg/cm 2 ) Mtr iii)63 mm nominal outer dia Pipe (6kg/cm 2 ) Mtr iv)110 mm nominal outer dia Pipe (6kg/cm 2 ) Mtr Unforseen items Total :

3 I... (contractor) hereby agree to undertake to execute the work at estimate rate. % below estimate rate. % above eestimate rate as per standared specification and sanctioned drawings as directed by the Supplyco Engineering wing. Manager (E&CP) Contractor Address Phone No:

4 Name of work : Construction of R.C.C Drainage along back side of the Head office Building at Gandhinagar Estimate Sl.No. Description of item Quantity Unit Rate Amount 1 Demolishing brick work manually/ by mechanical means and removing the existing waste materials around the site including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. (i) In cement mortar 9.00 Cum Earth work in excavation by mechanical means / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth,lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed including all cost and conveyance of tools and plants, labour charges etc complete as per the direction of engineering wing KSCSC (i) All kinds of soil Cum Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering etc complete all as per the direction of i)1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) 7.00 Cum Centering and shuttering including strutting, propping, etc. and removal of form for Drain side walls, etc whereever required, all cost and conveyance of materials & labour charges etc., complete all as per the direction of engineering wing KSCSC Sqm Providing and laying in position specified grade of reinforced cement concrete, including smooth finish over the surface, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : etc complete all as per the i) 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) Cum

5 6 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level, including all cost and conveyance of materials, labour charges etc complete all as per the (i) Thermo-Mechanically Treated bars Kg Unforseen if any Total I... (contractor) hereby agree to undertake to execute the work at estimate rate. % below estimate rate. % above eestimate rate as per standared specification and sanctioned drawings as directed by the Supplyco Engineering wing. Manager (E&CP) Contractor Address Phone No:

6 PROVIDING RAIN WATER HARVESTING IN PANAMPALLY NAGAR QUARTERS, KOCHI ESTIMATE Sl.No. Description of item Qty Unit Rate Amount 1 Providing and fixing Polyvinyl Chloride (PVC) pipes, having thermal stability for water supply (for rain water harvesting and additional plumbing works) including all PVC plain & brass threaded fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement,trenching,refilling & testing of joints complete as per direction of civil engineering wing supplyco. i)75 mm nominal outer dia Pipe (10kg/cm 2 ) 3 Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering etc complete all as per the Mtr (i) 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) 4 Steel reinforcement using TMT bars for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level etc complete all as per the 5 Providing and placing on terrace (at all floor levels) polyethylene water storage tank, ISI : marked ( syntex or other approved brand) with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes and the base support for tank ( for rain water collecting tank) Cum Kg per litre Unforseen items Total : I... (contractor) hereby agree to undertake to execute the work at estimate rate. % below estimate rate. % above eestimate rate as per standared specification and sanctioned drawings as directed by the Supplyco Engineering wing.

7 Manager (E&CP) Contractor Address Phone No:

Delhi Urban Shelter Improvement Board Govt. of NCT of Delhi Office of Executive Engineer C-1

Delhi Urban Shelter Improvement Board Govt. of NCT of Delhi Office of Executive Engineer C-1 To DSRItem Delhi Urban Shelter Improvement Board Govt of NCT of Delhi Office of Executive Engineer C- Name of Work : C/O 980 (G+4) five storeyed EWS low cost Housing for slum Dwellers (under JNNURM) at

More information

BOQ for Plumbing, Sanitary Works

BOQ for Plumbing, Sanitary Works BOQ for Plumbing, Sanitary Works Page 1 of 6 Sr.No Item Description Quantity Unit Rate Amount (Rs.) 1 SANITARY FIXTURES Providing & Fixing star white colour vitreous china wall mounted wc with 1a heavy

More information

STATE BANK OF INDIA.

STATE BANK OF INDIA. Page 1 of 5 B SANITARY, PLUMBING & DRAINAGE STATE BANK OF INDIA. PROPOSED RURAL SELF EMPLOYMENT TRAINING INSTITUTE AT RAIGARH IN C.G. DIRECTOR'S BUNGALOW SCHEDULE OF ITEMS-PLUMBING AND SANITARY WORK 1

More information

SUMMARY (PLUMBING WORKS)

SUMMARY (PLUMBING WORKS) PROPOSED OBCRSETI BUILIDNG AT JASSOWAL, DEHRADUN, UTTRAKHAND SUMMARY (PLUMBING WORKS) SL. DESCRIPTION OF ITEMS PAGE REFE. AMOUNT (RS.) I PLUMBING WORKS 1.0 SH: SANITARY FIXTURES BOQ (P ) - - 2.0 SH: SOIL,

More information

BILL OF QUANTITY FOR THE WORK OF "REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP"

BILL OF QUANTITY FOR THE WORK OF REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP BILL OF QUANTITY FOR THE WORK OF "REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP" Sl. 1 DISMANTLING WORK 1.1 Stripping off worn out plaster (outside and inside) and raking out joints

More information

NUMBER # TEXT # NUMBER # TEXT # NUMBER NUMBER # Sl. No. Item Description Quantity Units Estimated Rate TOTAL AMOUNT Without Taxes

NUMBER # TEXT # NUMBER # TEXT # NUMBER NUMBER # Sl. No. Item Description Quantity Units Estimated Rate TOTAL AMOUNT Without Taxes Validate Print Help Percentage BoQ Tender Inviting Authority: M (SKG) Name of Work: Raising of existing stone boundary wall of ITPO land at Ghazipur area, Delhi Contract No: 180/ITPO/04/Engg./2016-17 Bidder

More information

Toilet Plumbing. Here is a selection of different types of W.Cs and urinals. Can you match the pictures to the names below?

Toilet Plumbing. Here is a selection of different types of W.Cs and urinals. Can you match the pictures to the names below? Toilet Plumbing. Here is a selection of different types of W.Cs and urinals. Can you match the pictures to the names below? J. H. I. A. European water closet B. Indian style W.C C. Urinal corner (to be

More information

TYPICAL ESTIMATE OF A RAINWATER COLLECTION UNIT (110 mm / 150 mm dia PVC Pipelines)

TYPICAL ESTIMATE OF A RAINWATER COLLECTION UNIT (110 mm / 150 mm dia PVC Pipelines) TYPICAL ESTIMATE OF A RAINWATER COLLECTION UNIT (110 mm / 150 mm dia PVC Pipelines) A. 110 mm dia PVC Pipeline (to collect rainwater from roof) Laying and fitting of 110 mm PVC pipes of 6 metres length

More information

Tender schedule. Rate in

Tender schedule. Rate in Name of work Maintanance work for hajj house at Karipur for the year 2012 Tender schedule Sl. No 1 1.00 Cubic Probable Quantity Description of work 2 8.00 Cubic 3 12.00 Cubic 4 7.00 Cubic Dismantling,

More information

ESTIMATE (CIVIL) BASED ON DSR 2013 NAME OF THE WORK :- A.R.M. CIVIL WORK OF E.S.I.C. SRO BUILDING AND RESIDENTIAL QUARTERS FOR THE YEAR

ESTIMATE (CIVIL) BASED ON DSR 2013 NAME OF THE WORK :- A.R.M. CIVIL WORK OF E.S.I.C. SRO BUILDING AND RESIDENTIAL QUARTERS FOR THE YEAR ESTIMATE (CIVIL) BASED ON DSR 2013 NAME OF THE WORK :- A.R.M. CIVIL WORK OF E.S.I.C. SRO BUILDING AND RESIDENTIAL QUARTERS FOR THE YEAR 2014-2015 Sr. No Description of item Qty. Estimated may be more or

More information

CHECK SLIP. REMARKS ITEM OF WORK (Yes ) 3. Grid levels of the entire layout. 4. Demarcation of blocks as per approved Layout

CHECK SLIP. REMARKS ITEM OF WORK (Yes ) 3. Grid levels of the entire layout. 4. Demarcation of blocks as per approved Layout ITEM OF WORK (Yes ) I. SITE PREPARATON 1. Clearance of site (jungle clearance) 2. Setting of base line and bench mark. 3. Grid levels of the entire layout. 4. Demarcation of blocks as per approved Layout

More information

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown

More information

Project : CONSTRUCTION OF BUILDING(including electrical and plumbing works) FOR NATIONAL CENTRE FOR SUSTAINABLE COASTAL MANAGEMENT,CHENNAI

Project : CONSTRUCTION OF BUILDING(including electrical and plumbing works) FOR NATIONAL CENTRE FOR SUSTAINABLE COASTAL MANAGEMENT,CHENNAI Project : CONSTRUCTION OF BUILDING(including electrical and plumbing works) FOR NATIONAL CENTRE FOR SUSTAINABLE COASTAL MANAGEMENT,CHENNAI TENDER CLARIFICATIONS- no 3 dated 3rd Oct 13 issued in response

More information

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE 86 :: Certificate in Construction Supervision (CIVIL) 12 ROOF 12.1 INTRODUCTION The structure provided to cover the house surface (floor) is known as roof. For different situation and requirement, it is

More information

RENOVATION OF WORK PERTAINING TO CIVIL, INTERIOR AND PLUMBING WORKS FOR GROUND FLOOR OF BASUNDHARA ARARTMENT AT RAJA S.C. MULLICK ROAD, KOLKATA-86

RENOVATION OF WORK PERTAINING TO CIVIL, INTERIOR AND PLUMBING WORKS FOR GROUND FLOOR OF BASUNDHARA ARARTMENT AT RAJA S.C. MULLICK ROAD, KOLKATA-86 RENOVATION OF WORK PERTAINING TO CIVIL, INTERIOR AND PLUMBING WORKS FOR GROUND FLOOR OF BASUNDHARA ARARTMENT AT RAJA S.C. MULLICK ROAD, KOLKATA-86 Sl.No. DESCRIPTION OF ITEMS UNIT RATE QUANTITY AMOUNT

More information

BILL OF QUANTITIES FOR CIVIL WORKS FOR 8MW POWER PLANT

BILL OF QUANTITIES FOR CIVIL WORKS FOR 8MW POWER PLANT BILL OF QUANTITIES FOR CIVIL WORKS FOR 8MW POWER PLANT ITEM Description Unit Quantity (approx) [A] A-1 EARTH WORK Earthwork in excavation in all types of soil/rock but excluding hard rock requiring blasting

More information

Close Coupled & Back To Wall WC Saintaryware. Fitting Instructions

Close Coupled & Back To Wall WC Saintaryware. Fitting Instructions Close Coupled & Back To Wall WC Saintaryware Fitting Instructions Before starting any installation project please consider the following: Prior to drilling into walls, check there are no hidden electrical

More information

PLASTERING, PAINTING AND POLISHING

PLASTERING, PAINTING AND POLISHING Plastering, Painting and Polishing :: 95 13 PLASTERING, PAINTING AND POLISHING 13.1 INTRODUCTION After the completion and making the building infrastructure strong in order to save it and its fittings

More information

Smt

Smt GUJARAT ENERGY TRANSMISSION CORPORATION LTD TRANSMISSION CIRCLE, NADIAD Name of work : MAINTENANCE & WATER PROOFING OF E TYPE QUARTER BLOCK AT 66 KV VASO S/S. SCHEDULE- B ITE M DESCRIPTION OF ITEM UNIT

More information

CHAPTER NO. 27 QUANTITIES OF MATERIALS

CHAPTER NO. 27 QUANTITIES OF MATERIALS CHAPTER NO. 27 QUANTITIES OF MATERIALS Note :- One cement bag weighs 50 kg. and measures 0.03472 cum. Sr. No. Description Unit Quantities Fine aggregates Coarse aggregates 1 2 3 4 5 6 27.1 Cement concrete

More information

DETAILED ESTIMATE. Name of Work :Construction of Village Resource Centre (VRC) at KVK, South Tripura, Birchandra Manu.

DETAILED ESTIMATE. Name of Work :Construction of Village Resource Centre (VRC) at KVK, South Tripura, Birchandra Manu. DETAILED ESTIMATE Name of Work :Construction of Village Resource Centre (VRC) at KVK, South Tripura, Birchandra Manu. Estimated Cost : Rs. 3,55,813.00 TIME FOR COMPLETION : 90 (Ninety)) days. Description

More information

Chapter. Restoration of Damaged Structures

Chapter. Restoration of Damaged Structures 5 Chapter Restoration of Damaged Structures Bringing back a damaged structure to its pre-earthquake state and original strength is called restoration. This is the first step of building rehabilitation.

More information

- From the Makers of India s Finest Designer Homes

- From the Makers of India s Finest Designer Homes Quality isn't something that can be argued into a document or promised into it It must be put there on the structure If it isn't put there, even the finest sales ta lk in the world won't act as a substitute,

More information

By K M Chanda, HUDCO

By K M Chanda, HUDCO QUALITY ASSURANCE AND MONITORING IN PROJECT IMPLEMENTATION PERIOD By K M Chanda, HUDCO HUDCO HOUSE, LODHI ROAD NEW DELHI-110003 Quality Control regulates and measures: Adequacy of the construction procedure

More information

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE By H P Gupta & D K Gupta DIFFERENT TYPES OF DAMAGES 1.Minor cracks 0.5 to 5 mm wide in load or non-load bearing walls 2.Major

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

TS 802 HANDWELLS. HANDWELL CAST IN PLACE WITH 460 mm DIA. COVER. PRECAST HANDWELL WITH 460 mm DIA. COVER HANDWELLS, GENERAL INSTALLATION REQUIREMENTS

TS 802 HANDWELLS. HANDWELL CAST IN PLACE WITH 460 mm DIA. COVER. PRECAST HANDWELL WITH 460 mm DIA. COVER HANDWELLS, GENERAL INSTALLATION REQUIREMENTS TORONTO TRANSPORTATION January 2012 TS 802 HANDWELLS TABLE OF CONTENTS 1. DRAWINGS TTD 802.001 TTD 802.005 TTD 802.006 TTD 802.010 TTD 802.020 TTD 802.021 TTD 802.026 HANDWELL CAST IN PLACE WITH 320 mm

More information

Cost Effectiveness of using Low Cost Housing Technologies in Construction

Cost Effectiveness of using Low Cost Housing Technologies in Construction Available online at www.sciencedirect.com Procedia Engineering 14 (2011) 156 160 The Twelfth East Asia-Pacific Conference on Structural Engineering and Construction Cost Effectiveness of using Low Cost

More information

LAYING BLOCK AND BRICK

LAYING BLOCK AND BRICK LAYING BLOCK AND BRICK Products highlighted in this section: SAKRETE Type N Mortar Mix SAKRETE Type S Mortar Mix Brick And Block Laying Basics The first step in building a brick or block wall is to construct

More information

Waterproofing Showers and Bathrooms Guide

Waterproofing Showers and Bathrooms Guide August 2016 1 Waterproofing Showers and Bathrooms Guide The purpose of this guide is to provide guidance on how a shower area or wet room can be successfully waterproofed and tiled with the products available

More information

SUMMARY OF BILL OF QUANTITIES

SUMMARY OF BILL OF QUANTITIES SUMMARY OF BILL OF QUANTITIES GN. FUVAHMULAKU JETTY Summary Bill No Description Amount 1 PRELIMINERIES 0.00 2 GROUND WORK 0.00 3 CONCRETE 0.00 4 MASONRY, PLASTERING 0.00 5 METAL AND TIMBER WORKS 0.00 6

More information

PREMISES DEPARTMENT WORKS AT BANK'S THIRUVANANTHAPURAM MAIN BRANCH BUILDING AT M.G ROAD, THIRUVANANTHAPURAM.

PREMISES DEPARTMENT WORKS AT BANK'S THIRUVANANTHAPURAM MAIN BRANCH BUILDING AT M.G ROAD, THIRUVANANTHAPURAM. ट ट बक ऑफ़ वणक र (भ रत य ट ट बक क सहय ग ) ध न क य लय: तवनतपरम STATE BANK OF TRAVANCORE (Associate of the State Bank of India) Head Office, Thiruvananthapuram Phone 0471-2192442, 2192406 PREMISES DEPARTMENT

More information

Ferrocement components for low cost housing in developing countries

Ferrocement components for low cost housing in developing countries Ferrocement components for low cost housing in developing countries Kantharaju*, Centre for Habitat Technologies, India K Vasudev, Centre for Habitat Technologies, India S Kulkarni, Centre for Habitat

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

- MINI - APPLICATION GUIDE THE PROVEN PERFORMER THAT NEVER LETS GO REV

- MINI - APPLICATION GUIDE THE PROVEN PERFORMER THAT NEVER LETS GO REV The solution. - MINI - APPLICATION GUIDE THE PROVEN PERFORMER THAT NEVER LETS GO REV 04/11 Australian Made & Owned INTRODUCTION BondCrete the proven performer has evolved since 1951 into the most versatile

More information

SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT. RCC Framed Structure confirming with zone II seismic detailing. Reinforced Cement Concrete

SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT. RCC Framed Structure confirming with zone II seismic detailing. Reinforced Cement Concrete SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT 1. CONSTRUCTION: Foundation Super Structure Internal Walls External Walls Roof Retaining Walls RCC footing RCC Framed Structure confirming with zone II seismic

More information

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02. L_All_Vocatinal_Ed_Construction Sector: Construction Sr. No Specialisation Page No 1 Construction and Building Technology 02 1 P a g e 2 P a g e VOCATIONAL EDUCATIONAL QUALIFICATION FRAMEWORK (Sector -

More information

CONSTRUCTION SUMMARY OF THE PEREIRA HOUSE AT MADOL, VERNA GOA.

CONSTRUCTION SUMMARY OF THE PEREIRA HOUSE AT MADOL, VERNA GOA. CONSTRUCTION SUMMARY OF THE PEREIRA HOUSE AT MADOL, VERNA GOA. On our visit to the house of Conceicao Pereira s house we decided to make many changes that were needed to improve the living conditions of

More information

(NIT NO. 11/ ) ( G

(NIT NO. 11/ ) ( G MUNICIPAL CORPORATION KOTA (NIT NO. 11/2011-12) ( G Schedule) (Copy No. 33) Name of Work : Construction of Toilet in Ward No. 39 near Bheru ji mandir, in Division II, NNK. Estimated Cost : Rs 2.81 Lacs

More information

Date of Opening Tender : (11.00 AM) (Envelop A) Date of Opening Tender : (11.00 AM) (Envelop B) Issued To:

Date of Opening Tender : (11.00 AM) (Envelop A) Date of Opening Tender : (11.00 AM) (Envelop B) Issued To: MUNICIPAL CORPORATION KOTA (NIT NO. 10/2011-12) ( G Schedule) (Copy No. 33) Name of Work : Construction of Toilet in Ward No. 39 near Bheru ji mandir, in Division II, NNK. Estimated Cost : Rs 2.81 Lacs

More information

Borges Construction Company A limited liability Corporation Page1 of 1

Borges Construction Company A limited liability Corporation Page1 of 1 Page1 of 1 The following is a quote to remodel the master bathroom at your home: Materials Labor Demolition 1 Dumpster $ 225.00 $ - 2 Remove existing carpet $ - $ 50.00 3 Remove existing tile $ - $ 80.00

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY

PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY GENERAL SPECIFICATIONS These specifications are intended to cover the construction of the

More information

Retail Price List 2015

Retail Price List 2015 Retail Price List 2015 SETTING MORTARS SERVOFLEX TRIO SUPER TEC Flexible Full Transfer Thin Set and Medium Bed Mortar 20 KG Flexible, cement-based thin set and medium bed mortar with polymer additive for

More information

Fixing Instructions:

Fixing Instructions: Fixing Instructions: 01 Porcelain to Screeded Concrete Floors Surface Tiles can be fixed to all structurally sound surfaces consisting of concrete, sand and cement screeds and renders, blockwork, masonry,

More information

31. ECO-INFO -- SEPTIC SAFE PROTECT YOUR HEALTH AND ENVIRONMENT YOUR SEPTIC PUMP-OUT SYSTEM with SELF ASSESSMENT TROUBLE SHOOTING GUIDE

31. ECO-INFO -- SEPTIC SAFE PROTECT YOUR HEALTH AND ENVIRONMENT YOUR SEPTIC PUMP-OUT SYSTEM with SELF ASSESSMENT TROUBLE SHOOTING GUIDE 31. ECO-INFO -- SEPTIC SAFE PROTECT YOUR HEALTH AND ENVIRONMENT YOUR SEPTIC PUMP-OUT SYSTEM with SELF ASSESSMENT TROUBLE SHOOTING GUIDE Edited 21/12/01 Wyong Shire Council has many non sewered areas that

More information

The walls of a building are generally constructed by bricks and the method of joining bricks in different fashions is called brick work.

The walls of a building are generally constructed by bricks and the method of joining bricks in different fashions is called brick work. Brick Work :: 55 9 BRICK WORK 9.1 INTRODUCTION The walls of a building are generally constructed by bricks and the method of joining bricks in different fashions is called brick work. 9.2 OBJECTIVES After

More information

Saferand easierinstallation

Saferand easierinstallation EN 85-07 Saferand easierinstallation IföSigninstallationsystem andifösignbuilt-incistern www.ifosanitar.com/sign Aneffectivesolution withmanyadvantages. Ifö Sign installation system makes life a little

More information

HOUSE BUILDING DIGEST

HOUSE BUILDING DIGEST HOUSE BUILDING DIGEST (Construction Specifications-Foundations) Creating Enabling Environment for Affordable Housing for All This is an attempt by BMTPC to provide useful but often ignored information

More information

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains

More information

CHAPTER 11 STORM DRAINAGE

CHAPTER 11 STORM DRAINAGE CHAPTER 11 STORM DRAINAGE SECTION 11 GENERAL 11.1 Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. 11.2 Where required. All roofs,

More information

Shower and Floor Gullies Channel Drain and Tile Drain SECTION

Shower and Floor Gullies Channel Drain and Tile Drain SECTION Shower and Floor Gullies Channel Drain and Tile Drain SECTION 2 Shower and Floor Gullies, Channel Drain and Tile Drain 29 General Information Shower and Floor Gullies McAlpine has responded to market conditions

More information

SECTION VALVE BOXES AND METER VAULTS

SECTION VALVE BOXES AND METER VAULTS SECTION 03 48 20 VALVE BOXES AND METER VAULTS PART 1: GENERAL 1.01 SECTION INCLUDES A. Valve boxes for water and cleanout boxes for wastewater service. B. Meter boxes for water service. C. Meter vaults

More information

CUBICLE SYSTEMS LTD. CI/SfB 74 X IPS. Pre-plumbed Wall Duct Access Panel System

CUBICLE SYSTEMS LTD. CI/SfB 74 X IPS. Pre-plumbed Wall Duct Access Panel System CUBICLE SYSTEMS LTD CI/SfB 74 X IPS Pre-plumbed Wall Duct Access Panel System ISO 9001:2000 IPS the perfect washroom solution plumbing wall duct panel system and cubicles installed in one operation Cubicle

More information

plumbing products guide

plumbing products guide plumbing products guide radiator pipe guide & seals A significant development in the drive to reduce air leakage and heat loss. Installations such as that shown are all too common. The detail is poorly

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information

KANTI BIJLEE UTPADAN NIGAM LIMITED (KBUNL) SCHEDULE (BILL) OF QUANTITIES (Percentage Rate Contract)

KANTI BIJLEE UTPADAN NIGAM LIMITED (KBUNL) SCHEDULE (BILL) OF QUANTITIES (Percentage Rate Contract) KANTI BIJLEE UTPADAN NIGAM LIMITED (KBUNL) (A Joint Venture of NTPC Ltd. And BSEB ) NOTICE INVITING TENDER NO. 50/OT/KBUNL- MTPP/Balance-Formation /PKG-II/2014 Dated 10.11.2014 Tender and Contract document

More information

SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications describes construction of permeable interlocking concrete

More information

Guide to working on Public Sewers

Guide to working on Public Sewers Guide to working on Public Sewers affected by Building Works Introduction Severn Trent Water Ltd requires the work to be done in order to protect the public sewer and minimise the risk of us having to

More information

ITB-YEM-SCER Procurement of Security Upgrades for the Supreme Commission for Elections and Referendum (SCER) Bill of Quantities

ITB-YEM-SCER Procurement of Security Upgrades for the Supreme Commission for Elections and Referendum (SCER) Bill of Quantities ITB-YEM-SCER-06-2014- Procurement of Security Upgrades for the Supreme Commission for Elections and Referendum (SCER) Bill of Quantities Item Description Unit Qty Unit Price 1. External GATE No. (1) /

More information

Keramix. Interior. Waterproofing Kit Product and Application Guide

Keramix. Interior. Waterproofing Kit Product and Application Guide Keramix Interior Waterproofing Kit Product and Application Guide Walls 1. Moisten walls with water using a brush before levelling. 2. If needed, smooth the surface with Kiilto OT Light, TM DF, TT, SR DF

More information

CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP)

CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP) CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP) Work Groups Composition and Weightings of Sub-indices CURRENT AS AT 1 JANUARY 2013 Issued by the CPAP Committee Distributed by the Association of South African

More information

CITY OF NEEDLES SEPTIC SYSTEM REQUIREMENTS

CITY OF NEEDLES SEPTIC SYSTEM REQUIREMENTS CITY OF NEEDLES SEPTIC SYSTEM REQUIREMENTS Area of Disposal Fields and Seepage Pits The minimum effective absorption area in disposal fields in square feet (m²) and in seepage pits in square feet (m²)

More information

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high. CI/SfB Tn6 L6813 September 2013 RIW CAVITY DRAIN R20 R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high. Other systems are available for specific uses,

More information

Contura Collection. caroma.com.au

Contura Collection. caroma.com.au Contura Collection caroma.com.au caroma 02 Contura Collection Introducing Contura from Caroma. Strikingly sculptural and curvaceous, Contura is the embodiment of organic beauty. Offering luxurious style

More information

LONDON BOROUGH OF HACKNEY BUILDING SERVICES ENGINEER REPORT GAS HOUSE, SPRINGFIELD PARK, HACKNEY

LONDON BOROUGH OF HACKNEY BUILDING SERVICES ENGINEER REPORT GAS HOUSE, SPRINGFIELD PARK, HACKNEY LONDON BOROUGH OF HACKNEY BUILDING SERVICES ENGINEER REPORT GAS HOUSE, SPRINGFIELD PARK, HACKNEY 10 TH JUNE 2011 London Borough of Hackney Page 1 of 6 Brief Description of the Proposed Works The existing

More information

ICRC WORK SPECIFICATIONS IRAQ WATER AND HABITAT

ICRC WORK SPECIFICATIONS IRAQ WATER AND HABITAT ICRC WORK SPECIFICATIONS IRAQ WATER AND HABITAT GOVERNORATE : DISTRICT : LOCATION : DOHUK SUMEL SUMEL GO code : IRAK GEN ASSENG0 TITLE : Sharia / PHCC / Rehabilitation SO n : SO 03 WPA n : KIR16 0015 Job

More information

GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS

GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS 13.1 13.2 2006 Edition SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS GENERAL

More information

1 cum. 1 cum. 1 cum. 1 cum. 1 cum. 1 cum. 1 cum. 1 metre. 1 metre. 1 metre

1 cum. 1 cum. 1 cum. 1 cum. 1 cum. 1 cum. 1 cum. 1 metre. 1 metre. 1 metre DSR 2002 ITEM NO DESCRIPTION RATE RATE IN WORDS PER UNIT EARTHWORK 2.1 Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal

More information

ALKALI-RESISTANT WATERPROOFING AND DECOUPLING MEMBRANE UNDER CERAMIC TILES AND NATURAL STONE

ALKALI-RESISTANT WATERPROOFING AND DECOUPLING MEMBRANE UNDER CERAMIC TILES AND NATURAL STONE Mapeguard WP System ALKALI-RESISTANT WATERPROOFING AND DECOUPLING MEMBRANE UNDER CERAMIC TILES AND NATURAL STONE Products used: Mapeguard WP 200, Mapeguard ST, Mapeguard IC, Mapeguard EC, Mapeguard WP

More information

Archaeological Survey of India, Delhi Circle, Safdarjung Tomb, New Delhi Name of office District/State Probable Time of Completion

Archaeological Survey of India, Delhi Circle, Safdarjung Tomb, New Delhi Name of office District/State Probable Time of Completion Archaeological Survey of India, Delhi Circle, Safdarjung Tomb, New Delhi-110003 Name of office District/State Probable Time of Completion Last date of sale and submission Superintending Archaeologist,

More information

CHAPTER 11 STORM DRAINAGE

CHAPTER 11 STORM DRAINAGE CHAPTER STORM DRAINAGE SECTION GENERAL. Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage..2 Where required. All roofs, paved areas,

More information

C. Trenching, Backfilling, and Compacting: STD SPEC H. Polyethylene Sheet or Tube Encasement: STD SPEC

C. Trenching, Backfilling, and Compacting: STD SPEC H. Polyethylene Sheet or Tube Encasement: STD SPEC STANDARD SPECIFICATION SECTION 15090 BLOW-OFF ASSEMBLIES PART 1 - GENERAL 1.01 DESCRIPTION This section includes materials, installation, and testing of blow-off assemblies. Unless otherwise noted on the

More information

Division 2 Section 32 14 13.19 Section 02795

Division 2 Section 32 14 13.19 Section 02795 Note: The text must be edited to suit specific project requirements. It should be reviewed by a qualified civil or geotechnical engineer, or landscape architect familiar with the site conditions. Edit

More information

Sludge Trap Tank with Basket Filter included, ECODEPUR SPT According with European Standard

Sludge Trap Tank with Basket Filter included, ECODEPUR SPT According with European Standard Sludge Trap Tank with Basket Filter included, ECODEPUR SPT According with European Standard 12566-1 INTRODUCTION The Sludge Trap Tank with Basket Filter included, ECODEPUR SPT are equipments appropriated

More information

Schedule of Quantities

Schedule of Quantities CIVIL WORK (A) 1 Providing and fixing corrugated galvanised iron sheets of 20 B.W.G. for roofing with wind ties including fastening with galvanised iron screw and bolts and lead and bitumen washers as

More information

Design and plan for blocks

Design and plan for blocks Student Design and plan for blocks What you will learn When you have fi nished this section, you should be able to: Work out how many blocks you need Plan how the blocks will fi t together Describe the

More information

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors Improving the flood resistance of your home Advice sheet 6: Flood-resilient This sheet provides guidance on identifying different types of floor, assessing the routes floodwater may enter, and describes

More information

12.1 Schlüter -KERDI-BOARD

12.1 Schlüter -KERDI-BOARD I n n o v a t i v e p r o f i l e s 12.1 Schlüter -KERDI-BOARD S u b s t r a t e U N I V E R S A L S T R U C T U R A L P A N E L, B O N D E D W A T E R P R O O F I N G Application and Function Schlüter

More information

NATIONAL INSTITUTE OF BIOLOGICALS

NATIONAL INSTITUTE OF BIOLOGICALS Short Term Notice Inviting Quotations Quotations No. S.1-36/07/NIB/Engg. (Civil) Invitation to short term quotations for Repairing of damaged gypsum board false ceiling and painting with epoxy paint in

More information

Section 402. STORM SEWERS

Section 402. STORM SEWERS 402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide

More information

What Causes Foundation Leaking?

What Causes Foundation Leaking? A home's foundation has the odds stacked against it from the day it's built. When a home is excavated to make room for the foundation walls, space is left between the outer edge of the foundation wall

More information

8.7 Schluter -KERDI-LINE

8.7 Schluter -KERDI-LINE 8.7 Schluter -KERDI-LINE INNOVATIVE SOLUTIONS FOR CERAMIC AND STONE TILE LINEAR DRAINS FOR BONDED WATERPROOFING ASSEMBLIES Application and Function 8.7 Schluter -KERDI-LINE is a low profile linear floor

More information

LS 2540 SEWER LATERALS AND INSPECTION TEES

LS 2540 SEWER LATERALS AND INSPECTION TEES LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal

More information

ARCHITECTURAL PRECAST CONCRETE

ARCHITECTURAL PRECAST CONCRETE CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 03450-1 PART 1 GENERAL 1.1 Related Work.1 All Division 1 Specification Sections.2 Section 02233 Granular Base.3 Section 02311 Site Grading.4 Section 03100

More information

A Practical Guide to Class 2 Sewage Treatment Systems (Leaching Pit)

A Practical Guide to Class 2 Sewage Treatment Systems (Leaching Pit) A Practical Guide to Class 2 Sewage Treatment Systems (Leaching Pit) Access Hatch Swale to take away drainage 150 mm (6 ) Inlet Open jointed material 500 mm (24 ) 900 mm (3 ) Impermeable soil High Groundwater

More information

UNOPS UNITED NATIONS OFFICE FOR PROJECT SERVICES PROJECT BOQ. Original Issue Kabul University Project - Site Office Mobilization Kabul, Afghanistan

UNOPS UNITED NATIONS OFFICE FOR PROJECT SERVICES PROJECT BOQ. Original Issue Kabul University Project - Site Office Mobilization Kabul, Afghanistan UNOPS UNITED NATIONS OFFICE FOR PROJECT SERVICES PROJECT BOQ Original Issue Kabul University Project Site Office Mobilization Kabul, Afghanistan Project Components: 1. Site Office Establishment NOTICE

More information

Attachment G-1: Pit Latrine Diagram. Fig E.1a: Pit Latrine. Fig E.1b: Plan View of Twin Pits

Attachment G-1: Pit Latrine Diagram. Fig E.1a: Pit Latrine. Fig E.1b: Plan View of Twin Pits Attachment G-1: Pit Latrine Diagram Fig E.1a: Pit Latrine Fig E.1b: Plan View of Twin Pits Fig E.1c: Section of a water-sealed pan Fig E.1d: 3D view of Overflow Pipe Fig E.1e: 2D view of Overflow Pipe

More information

Gramalaya Tiruchirapalli. Appropriate technologies on low-cost toilets

Gramalaya Tiruchirapalli. Appropriate technologies on low-cost toilets Gramalaya Tiruchirapalli Appropriate technologies on low-cost toilets Gramalaya Tiruchirapalli Appropriate Low-cost toilet technology An Indian perspective Toilet Technology cum Training center Gramalaya

More information

CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is

CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is ~: ~,,' " CITY OF ST. CA THARINE S BY-LAW NO. cn- Olc.4 A By-law to regulate sanitary and storm drainage. WHEREAS the Council of the Corporation of the City of St. Catharines, is authorized by the provisions

More information

Standard Specification K105 Water Reticulation

Standard Specification K105 Water Reticulation Standard Specification K105 Water Reticulation INDEX K105.1 SCOPE OF WORK 3 K105.2 STANDARDS 3 K105.3 MATERIALS 3 K105.3.1 Pipes and Fittings 3 K105.3.2 Storage and Handling 4 K105.3.3 Bedding and Haunching

More information

CHAPTER 11 STORM DRAINAGE

CHAPTER 11 STORM DRAINAGE CHAPTER STORM DRAINAGE SECTION PC 0 GENERAL 0. Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. Storm water discharge shall be

More information

Measuring Drainage Below Ground in Accordance with ARM4:an Introductory Demonstration

Measuring Drainage Below Ground in Accordance with ARM4:an Introductory Demonstration Dublin Institute of Technology ARROW@DIT Other Resources School of Surveying and Construction Management 2013-04-24 Measuring Drainage Below Ground in Accordance with ARM4:an Introductory Demonstration

More information

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

EXHIBIT A. Technical Specifications for Water and Sewer Service Lines EXHIBIT "A Technical Specifications for Water and Sewer Service Lines Water and Sewer Line Bedding and Backfill: Drawings show cross-section of trench, pipe laid on top of 6" min. bedding material, bedding

More information

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057 Lecturer: Jim Cahill 29 th November 2011 TABLE OF CONTENTS SUMMARY 1 MAIN BODY SECTION

More information

Issue of the Guidelines on Prevention of Water Seepage in New Buildings

Issue of the Guidelines on Prevention of Water Seepage in New Buildings graphic: Buildings Department Your REF 來 函 檔 號 :. OUR REF 本 處 檔 號 :.BD GR/1-55/173 FAX 圖 文 傳 真 :..28400451 TEL 電 話 :..2626 1717 www.info.gov.hk/bd To : All Authorized Persons 7 March 2005 Registered Structural

More information

Revised Specifications & Scale of Amenities for General Pool Residential Accommodation (Type I to VI) Revised Amenities.doc

Revised Specifications & Scale of Amenities for General Pool Residential Accommodation (Type I to VI) Revised Amenities.doc Revised Specifications & Scale of Amenities for General Pool Residential Accommodation (Type I to VI) 1 Specifications for Residential Buildings S Type I, II, III & Servant Qrs. Type IV Type V and VI Existing

More information

CONSTRUCTION STAGES STAGE 1: PRELIMINARY WORK, AUXILIARY MATERIALS, TOOLS

CONSTRUCTION STAGES STAGE 1: PRELIMINARY WORK, AUXILIARY MATERIALS, TOOLS CONSTRUCTION STAGES STAGE 1: PRELIMINARY WORK, AUXILIARY MATERIALS, TOOLS - TOOLS AUXILIARY MATERIALS FOR INSTALLATION OF MOLDS CONSTRUCTION OF FOUNDATIONS PREPARATION OF THE CONSTRUCTION SITE MARKING

More information

Saint Gobain Gyproc India Ltd. (Formerly India Gypsum Ltd.)

Saint Gobain Gyproc India Ltd. (Formerly India Gypsum Ltd.) Saint Gobain Gyproc India Ltd. (Formerly India Gypsum Ltd.) Gyproc Plasters The cracks in cement sand plaster are an inherent feature which cannot be completely prevented but can only be controlled and

More information