NATIONAL INSTITUTE OF BIOLOGICALS



Similar documents
WASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST

BILL OF QUANTITY FOR THE WORK OF "REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP"

PART 1 GENERAL 1.1 SECTION INCLUDES

Project : CONSTRUCTION OF BUILDING(including electrical and plumbing works) FOR NATIONAL CENTRE FOR SUSTAINABLE COASTAL MANAGEMENT,CHENNAI

VA25014B0516 VA CINCINNATI PROJECT NO INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION GYPSUM BOARD

SECTION COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

Owner's Manual & Assembly Instructions

CEILING SYSTEMS. Between us, ideas become reality. Installing. Suspended Ceilings. North America Version

Installation Details. D1 General D2 Walls D3 Ceilings D4 Reference. D Installation Details

Window Installation Instructions

James M. Pleasants Company

PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE

Schedule of Quantities

HVAC Vents & Diffusers


STATE BANK OF INDIA.

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta

PART E SPECIFICATIONS

WORKFLOW CHART. Installation Instructions For Genna LED 3.5 Wall Wash. Housing and Plaster Plate. General Information. Genna Trim and LED Module

INSTALLATION OF A BAY WINDOW

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

Tender schedule. Rate in

SECTION FREIGHT & PARKING GARAGE ELEVATORS PART I - GENERAL

Mold Preventing I nterior System

H-Stud Area Separation Wall System

Sliding and Folding Door Fittings Sliding Door Accessories

BOQ for Plumbing, Sanitary Works

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

Rudder Repair and refinish

Sealant. 30" Model No D: 17-7/8" TO 18-3/8" (454 to 466mm) W: 29-3/4" TO 30-1/4" (756 to 768mm) Under Countertop Installation

Central Purchase unit National Institute of Technology Srinagar Soil Mechanics Lab of Civil Engineering Department.

SECTION ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

PAINT REMOVAL SYSTEM PAINT REMOVAL SPECIFICATION SAFE WORK METHOD STATEMENT FOR LEAD PAINT REMOVAL

Standard from CSI Part Section Format For Wood Framing For Metal Framing For Gypsum Sheathing

PANELIZED HOME INSTALLATION GUIDELINE

ATLANTA MODEL SPECIFICATIONS

Your guide to home maintenance. Flat Roofs

Total Quantity: IMPORTANT: Plans are to be used with 3 x6 Plexiglass (SKU # ).

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

SCHEDULE OF RATE FOR ARC FOR MAINTENANCE OF CP & ASSOCIATED SYSTEM FOR HVJ, DVPL - I and DVPL - II PIPELINE UNDER KHERA PIPELINE JURISDICTION

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

FG MOISTURE MONITOR Installation & Operation Manual

BOQ SPECIFICATIONS. The Blind system consist of a coated aluminium tube of 38 mm diameter with provision of fabric clamping.

AMERICAN GOTHIC PLAYHOUSE

PART-II (COMMERCIAL / PRICE BID) DESIGN, SUPPLY AND INSTALLATION OF CUSTOMIZED STEEL LAB FURNITURE.AT N.C.C.S., PUNE

THE METALITH PERIMETER SECURITY SYSTEM INSTALLATION INSTRUCTIONS. Attention

Chapter 3 Pre-Installation, Foundations and Piers

COATING & WRAPPING OF UNDERGROUND PIPING

AZEK Rail Install Guide

7. Installation. installation CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME

Triarch Products Over Various Interior Substrates

RadianceRail Installation Guide

Select Radiators Installation Guide

Installation Instructions For Aurora LED Accent Housing 3 Round & Square Trimless AL2-ARE3 & AL2-ASE3. Fig.1 Complete Fixture

SECTION STANDING SEAM METAL ROOFING

@ 5% of Tendered amount as per the tender condition 90 Days Rs.500/- amount as per the tender condition. Date Time Venue

IMPACT DAMAGE RESISTANT WALL SYSTEMS

Armanet BEKAERT. Armanet THE CONSTRUCTIVE IDEA. Render & plaster @@@

plumbing products guide

FRAME PROFILE MASONRY METAL DOOR FRAME FLUSH MASONRY KD MITER CORNER JOINT. #8 Screw (MS002485) Required on all fire rated KD frames. Bend Tabs.

INDEX. Chapter8. air master. Perforated Ceiling Diffusers

Embedded Parts Introduction - Anchors

Clad Direct Glaze Window Installation Instructions

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS PHILLIP STREET, SYDNEY

CABLE TRENCH INSTALLATION GUIDE

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Repairing Drywall Techniques for fixing everything from popped screws to big holes

London Farm Kitchen Sinks

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

March 14, Installation of Bay, Bow and Garden Windows

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

Manual lifting and handling

FireWall. High performance fireresistant. FireWall.

THE INDIAN OVERSEAS BANK. T e n d e r. Interior Work THE INDIAN OVERSEAS BANK BELA BRANCH. OWNER Chief Regional Manager

Colonnade Security Pipe

DENVER MODEL 30 X 30 SPECIFICATIONS

glass & Glazing Products

FSD35, FSD36 AND FSD37 COMBINATION FIRE and SMOKE DAMPERS

Hanson Building Products. precast basement solutions

TS 813 GROUNDING AND BONDING TTD TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD CONTROLLER CABINET GROUNDING

6mm Two Door Offset Quadrant

ALKALI-RESISTANT WATERPROOFING AND DECOUPLING MEMBRANE UNDER CERAMIC TILES AND NATURAL STONE

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW

Quadrant Shower Enclosure. Telephone Cleaning. All chrome surfaces should be cleaned using a clean damp cloth.

Installation Instructions

Packaged Terminal Air Conditioner Wall Sleeve Installation

TECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.)

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

How to Install Hardwood Flooring Over a Sub Floor

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

Includes specifications for: Surface Cleaning & Mounting Hardware.

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

COASTLINE QUADRANT ENCLOSURE. Installation / Maintenance Instructions Rev

CONSTRUCTION OF PERIMETER FENCE - COMMERCIAL AND T&D OFFICE COMPOUND, ONVERWAGT

Classic Products, Inc. ClickLock Standing Seam Installation Manual

SURFACE TREATMENT BOND TEST

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

Transcription:

Short Term Notice Inviting Quotations Quotations No. S.1-36/07/NIB/Engg. (Civil) Invitation to short term quotations for Repairing of damaged gypsum board false ceiling and painting with epoxy paint in Animal House in NIB Noida. Sealed Quotations are invited from experienced contractors for Repairing of damaged gypsum board false ceiling and painting with epoxy paint in Animal House in NIB Noida on the attached quotation form. Please quote most competitive rates for this work, on the enclosed quotation format including all taxes, duties, T & P etc. required for proper completion of work. The quotation form may be down loaded from NIB Website www.nib.gov.in. free of cost. Sealed Quotation should be dropped in NIB tender box or reach NIB, Noida on or before the closing date, i. e., 03.09.2015 up to 3:00 P.M. and the same shall be opened on the same day at 4:00 P.M. in presence of the representatives of the contractor, who wish to be present during opening of the quotations. Late quotations will not be received and treated as rejected. (P.C.P. Mahapatra) Administrative officer 1

Quotation No. S.1-36/07/NIB/Engg. (Civil) Name of Work: Repairing of damaged gypsum board false ceiling and painting with epoxy paint in Animal House in NIB Noida - Reg. 1. Introduction: The National Institute of Biologicals (NIB), Noida, invites sealed quotations from the experienced contractors on prescribed quotation form for Repairing of damaged gypsum board false ceiling and painting with epoxy paint in Animal House at NIB Noida. The work is to be done within a shortest possible time on urgent basis. 2. Scope of Work: Gypsum board false ceiling which is damaged due to water leakages from pipes above it is to be cut & removed in regular shape and size. Repairing of false ceiling is to be done by fixing new gypsum board. Necessary cut-outs for light fittings, AC grills, fire sprinklers etc. will be made in the false ceiling. The repaired portion of the false ceiling will be finished and painted with epoxy primer, paint matching with the surrounding area. Patch work epoxy paintings will be done in animal rooms and corridors by removing peeled- off patches, carrying out necessary repairs by filling undulations with plaster of paris, chalk mitti etc., applying priming coat and epoxy paint matching with surrounding area. Patch work painting of animal room steel doors is to be done by duco/ aerosol paint to match with existing colour shade. The work site will be cleaned- off any debris, malwa etc. and the debris, malwa shall be disposed- off outside NIB Campus at municipal designated dump yard. 3. Time of Completion: The repairing work shall be completed within the shortest possible time however complete work shall be completed within 15 (Fifteen) days from the date of issue of work order. The work may be kept on hold for some time for coordination with other activities or other urgent office works. Suitable time extension will be given for such period of hold without any increase in the rates/cost. 2

4. Payment: Payment will be made after completion of work and production of bill by the Contractor. 5. Bill of Quantity: The quantities given in the quotation form are approximate quantities. Payment shall be made as per the measurement of actual work done at site. 6. Tools & Tackles: a) All tools, tackles such as cutting machine, drill machine set, cutters, ladders, ropes, working plate forms, false ceiling channels for renewing, paint brush, epoxy paint material etc. will be arranged by the contractor and no extra payment shall be made for the same. b) Water & Electricity: Water & Electricity for carrying out the works will be provided by NIB at one point near the site free of cost. 7. Right to accept or reject the Quotations: Director NIB reserves the right to accept or reject any or all the quotations without assigning any reason thereof. Stamp of bidder with Signature of authorized Signatory, 3

No. S.1-36/07/NIB/Engg. (Civil) QUOTATION Subject: Repairing of damaged gypsum board false ceiling and painting with epoxy Paint in Animal House in NIB Noida. Srl. No. Description of items Unit Qty. Rate (Rs.) 1. Repairing of damaged gypsum board false ceiling Sft. 1000 by cutting it in regular shape & size, repairing/ renewing of false ceiling sections wherever required. Re-fixing gypsum board in false ceiling with necessary screws, including supply of jointing compound, jointing tape, making openings for light fittings, AC grills, trap door etc. as per direction of NIB. All materials such as jointing tape, jointing compound, screws, false ceiling sections etc. will be provided by the contractor. However gypsum board for repairing work will be provided by NIB, complete work. 2. Patch work painting on gypsum board false ceiling Sft. 1200 with epoxy paint two or more coats on new work with approved quality epoxy paint including applying priming coat in the colour shade matching with existing. Two or more coats to make the surface smooth. 3. Patch work painting of walls with epoxy paint Sft. 600 including scrapping peeled-off patches with wall putty, filling cracks, undulations etc. to make the surface smooth for painting including applying primer wherever required complete work. Two or more coats on old work with approved quality epoxy paint. 4. Painting in patches on stainless steel doors with Sft. 200 duco/ aerosol paint including s/o all materials, labour, T&P etc. required for proper completion of work 5. Providing and fixing false ceiling at all height Sft. 180 including providing and fixing of frame work made of special sections, power pressed from M.S sheets and galvanized with zinc coating of 120 gms/sqm (both side inclusive) as per IS: 277 and consisting of Amount (Rs.) 4

angle cleats of size 25 mm wide x 1.6mm thick with flanges of 27 mm and 37 mm, at 1200mm centre to centre, one flange fixed to the ceiling with dash fastener 12.5 mm dia x 50mm along with 6mm dia bolts, other flange of cleat fixed to the angle hangers of 25x10x0.50 mm of required length with nuts & bolts of required size and other end of angle hanger fixed with intermediate G.I. channels 45x15.0.9 mm running at the spacing of 1200 mm centre to centre, to which the ceiling section 0.5 mm thick bottom wedge of 80 mm with tapered flang4es of 26mm each having lips of 10.5 mm, at 450 mm centre to centre, shall be fixed in a direction perpendicular to G.I. intermediate channel with connecting clips made out of 2.64 mm dia x 230 mm long G.I. wire at every junction, including fixing perimeter channels 0.5 mm thick 27mm high having flanges of 20mm and 30 mm thick 27 mm high having flanges of 20 mm and 30 mm long, the perimeter of ceiling fixed to wall/ partition with the help of rawl plugs at 450mm centre, with 25mm along dry wall screws @ 230mm interval, including fixing of gypsum board to ceiling section and perimeter channel with the help of dry wall screws of size 3.5 x 25 mm at 230 mm c/c, including jointing and finishing to a flush finish of tapered and square edges of the board with recommended jointing compound, jointing tapes, finishing with jointing compound in 3 layers covering up to 150mm on both sides of joint and two coats of primer suitable for board, all as per manufactures specification and also including the cost of making openings for light fittings, grills, diffusers, cut outs made with frame of perimeter channels suitable fixed, all complete as per drawings, specification and direction of the Engineering in Charges but excluding the cost of painting with : 12.5 mm thick tapered edge gypsum moisture resistant board Total Taxes extra if not included the rates Sub Total Amount (in words) Rs... Date: Place:. Stamp of bidder with signature of authorized signatory, 5