SURFACE TREATMENT BOND TEST
|
|
|
- Lesley Dalton
- 9 years ago
- Views:
Transcription
1 Test Procedure for SURFACE TREATMENT BOND TEST Effective Date: March 2011 Published: February SCOPE 1.1. This test procedure is used to determine the bond strength characteristics of the interfaces between the surface of a stabilized base layer, prime coat, and surface treatment The values given in parenthesis (if provided) are not standard and may not be exact mathematical conversions. Use each system of units separately. Combining values from the two systems may result in nonconformance with the standard. 2. APPARATUS 2.1. Forced draft oven, capable of attaining a temperature of at least 325 F± 5 F (163 ± 3 C) Pull-Off Tester with 50 mm dia 25 mm aluminum caps, draw bolts (Refer to Figure 1) Spacers (maximum diameter 1 inch, maximum thickness 1/8 inch), and base plate. (Refer to Figure 2) 2.4. Balance, readable to 0.1 g and accurate to 0.5 g. 3. MATERIALS 3.1. Plumber s putty 3.2. Plastic wrap " painter s masking tape 3.4. Two-part epoxy with a minimum 24 hr. tensile strength of 4.1 MPa (600 psi) and 24 hr. shear strength of 13.8 MPa (2,000 psi) in accordance with Tex-614-J.
2 lb (4.5 kg) weight less than 6-inches in diameter or dimension Box cutter or razor blade " wooden rolling pin 3.8. Air compressor 3.9. Paint marker Foam brushes Tongue depressors Standard handheld brush 4. SPECIMEN 4.1. Prepare a minimum of 4, 2-in tall 6-in diameter base specimens using one lift applying 50 blows of the hammer in accordance with the procedure and apparatus described in Tex-113-E. Note 1 If adding cement stabilizer, refer to Tex-120-E, Steps 5.1 to If adding lime stabilizer, refer to Tex -121-E, Steps 5.1. to If adding lime-fly ash stabilizer, refer to Tex-127-E, Steps 5.1. to Note 2 Take care to properly label specimens according to their material characteristics so as to avoid confusion later (when testing especially). 5. PROCEDURE 5.1. Sample Preparation Use four cylindrically molded specimens in accordance with section four Immediately after compacting each individual specimen, seal the sample with plastic wrap Using the painter s masking tape, apply to the circumference of the specimen leaving a minimum of a 1/8" lip above the surface that will be tested (to retain the prime/seal coat) ±5 minutes after compacting the specimens, use the box cutter or razor blade to remove the plastic covering from the top of the specimen (i.e., the surface to be tested).
3 If applying a prime coat, use the design-specified application rate and evenly distribute the prime coat over the exposed specimen surface using the foam brush. Refer to section 6.1 to determine the correct weight of prime to apply in grams. Note 1 Place specimen on scale, zero the balance, then add material until the desired weight of prime is reached. Take care to apply the appropriate weight as the foam brush tends to absorb some of the material After completing step 5.1.4, place the specimen in the oven to cure at 110 F ± 2 F for 72±4 hours After the three-day cure, remove the specimen from the oven to ambient temperature Evenly distribute 30 g of the asphalt cement binder (40 g if using asphalt emulsion) required for the seal coat design to the primed specimen surface using the tongue depressor or foam brush. This is the amount of asphalt needed for a Grade 5 seal coat aggregate. Even if the proposed field surface treatment is not a Grade 5, it is recommended that a Grade 5 be used for the laboratory evaluation to allow for more aggregate surface area to glue to the test cap. A Grade 5 aggregate also enables the test cap to be glued in a more level position than if a coarser aggregate grade is used. Note 1 Foam brushes are used when applying non-heated materials, and tongue depressors are used when applying heated materials Place the specified aggregate onto the binder immediately, in order to ensure proper seating of the aggregate (if using emulsion or cutback place aggregate on binder after the appropriate setting or curing time). Note 1 Washed grade 5 aggregate is recommended as the extra dust particles can produce erroneous test results Gently roll the rolling pin over the aggregate to apply pressure in order to properly seat the aggregate into the asphalt binder, taking care not to force the binder out from underneath the aggregate. Note 1 Proper seating generally occurs after passes with the rolling pin. Note 2 Be sure to roll in the perpendicular direction as well Place the specimens back into the oven to cure at 110±2 F for an additional 24±1 hr After the 24-hr cure, remove the specimens from the oven to ambient temperature Brush the specimen gently to remove the loose aggregate. Using compressed air, remove all remaining loose particles from the surface of the specimens (with particular attention
4 to the remaining dust particles). This will help the bonding between the epoxy and the seal coat Place a pull-off tester test disc on the center of the specimen and trace the circumference of the test disc onto the surface of the specimen using the paint marker Place the plumber s putty around the traced circle such that the inner circumference of the putty is touching the circle. Apply pressure to the putty to ensure that it fills any gaps in the surface of the seal coat to prevent epoxy from seeping outside the circle. Note 1 Mold the putty to a height that will prevent overflow of epoxy to the outside of the putty Prepare epoxy following manufacturer s instructions Place enough epoxy inside the ring of putty to ensure that the tallest rock within the ring is completely submerged Gently place the pull-off tester test disc onto the epoxy. Rotate the test disc at least 90 clockwise and counterclockwise to ensure proper distribution of the epoxy onto the test disc Place the 10 lb weight directly on top of the pull-off tester test disc to ensure that the test disc adheres properly to the specimen Allow the epoxy to cure for the time recommended by the manufacturer. Remove the weight from the specimen after the epoxy has cured Testing Specimen (Refer to Figure 3) Refer to the manufacturer s operating instruction manual to properly prepare the pull-off tester. This includes setting the machine to display the correct units and correct data collection rate Install the draw bolt into the test disc Place the base plate onto the sample such that the test disc is centered within the inner diameter of the base plate. Note 1 Position the base plate in such a way that the tensile force is applied perpendicular to the surface of the specimen. This can be accomplished by placing spacers between the specimen surface and the base plate such that the base plate becomes level or by adjusting the height of the legs of the pull-off tester With the machine disconnected from the specimen, turn the crank back to its initial position in a counterclockwise direction until slight resistance is encountered.
5 Turn the crank once in the clockwise direction to relieve the hydraulic system Connect the coupling of the draw spindle to the draw bolt of the test disc Zero the maximum load Turn the wheel clockwise until slight resistance is encountered Turn the crank steadily clockwise until specimen failure has occurred. Specimen failure is defined as a 50% reduction in the maximum observed load. Record the maximum load After specimen failure, turn the wheel in the clockwise direction until the test disc can be easily removed from the specimen by hand. Record the location of failure (i.e., which layer bond failed). If a single layer failure is not clear, record an estimated percentage of failure in each layer (e.g., failure occurred in 50% of the base layer and 50% of the prime coat). 6. CALCULATIONS 6.1. Calculate the weight of prime to be applied to each specimen given the application rate in gallons per square yard: SG AR = Wb Where: SG = specific gravity of the prime coat AR = application rate of the prime coat, gal/sq. yd. Wb = weight of binder to be applied to each specimen, g 7. REPORT 7.1. Report the following for each specimen: Maximum Load Failure location
6 8. FIGURES Figure 1. DYNA Z Pull-Off Tester and Digital Manometer.
7 Figure 2. Base Plate. Figure 3. Surface Treatment Bond Test Equipment Set-Up and Tested Lab Specimen.
Apr 17, 2000 LAB MANUAL 1811.0
Apr 17, 2000 LAB MANUAL 1811.0 1811 BULK SPECIFIC GRAVITY (GMB) AND DENSITY OF COMPACTED BITUMINOUS SPECIMENS USING PARAFFIN OR PARAFILM ASTM Designation D 1188 (MN/DOT Modified) 1811.1 SCOPE This test
COMPACTING BITUMINOUS SPECIMENS USING THE SUPERPAVE GYRATORY COMPACTOR (SGC)
Test Procedure for COMPACTING BITUMINOUS SPECIMENS USING THE SUPERPAVE TxDOT Designation: Tex-241-F Effective Date: December 2015 1. SCOPE 1.1 Use this test method to: compact cylindrical specimens of
SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE
PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE 311.1 DESCRIPTION: This item shall consist of a cement treated subgrade base course composed of a mixture of local soil, portland
HAMBURG WHEEL-TRACKING TEST
Test Procedure for HAMBURG WHEEL-TRACKING TEST TxDOT Designation: Tex-242-F Effective Date: September 2014 1. SCOPE 1.1 This test method determines the premature failure susceptibility of bituminous mixtures
SOIL-LIME TESTING. Test Procedure for. TxDOT Designation: Tex-121-E 1. SCOPE 2. APPARATUS 3. MATERIALS TXDOT DESIGNATION: TEX-121-E
Test Procedure for SOIL-LIME TESTING TxDOT Designation: Tex-121-E Effective Date: August 2002 1. SCOPE 1.1 This method consists of three parts. 1.1.1 Part I determines the unconfined compressive strength
SECTION 4Aggegate Subbase
The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages
METHOD OF TEST FOR SAMPLING AND TESTING CRUMB RUBBER MODIFIER
STATE OF CALIFORNIA BUSINESS, TRANSPORTATION AND HOUSING AGENCY DEPARTMENT OF TRANSPORTATION DIVISION OF ENGINEERING SERVICES Transportation Laboratory 5900 Folsom Boulevard Sacramento, California 95819-4612
CEEN 162 - Geotechnical Engineering Laboratory Session 7 - Direct Shear and Unconfined Compression Tests
PURPOSE: The parameters of the shear strength relationship provide a means of evaluating the load carrying capacity of soils, stability of slopes, and pile capacity. The direct shear test is one of the
MASONRY RESTORATION Lime Putty Mortar Repointing Guide
1.0 Preparation for Lime Putty Mortar Pointing 1.1 Tools & Approach A. Grinding - When used in a controlled way, angle grinders with diamond-impregnated metal blades with a maximum 1/8-inch-thickness and
A H M 531 Penetration & Ring & Ball & Ductility & Flash & Fire point By: Mu'men Al-Otoom
The Civil Engineering Center 1 Visit www.ahm531.com for more lecture notes and E-book! The Civil Engineering Center 2 Visit www.ahm531.com for more lecture notes and E-book! Introduction : The grades of
Peel Adhesion of Pressure Sensitive Tape
Harmonized International Standard Call Letters PSTC 101 Date of Issuance 10/00 Revised 10/03 Revised 05/07 Peel Adhesion of Pressure Sensitive Tape 1. SCOPE 1.1 These methods cover the measurement of the
DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION MATERIALS CONSTRUCTION REQUIREMENTS
304.06 DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION 304.01 This work consists of furnishing and placing one or more courses of aggregate and additives, if required, on a prepared subgrade.
Char-Lynn Hydraulic Motor. Repair Information. 10 000 Series. October, 1997
Char-Lynn Hydraulic Motor October, 1997 Repair Information Geroler Motor Two Speed 001 27 Retainer inside bore of valve plate bearingless motors only 4 15 16 3 6 35 Parts Drawing 25 2 2 1 19 17 36 40 47
Treatment of a surface or structure to resist the passage of water in the absence of hydrostatic pressure. presence of hydrostatic pressure.
Recommend Approval: Team Leader Date Division Chief Date Approved: Director Date Maryland Department of Transportation State Highway Administration Office of Materials Technology MARYLAND STANDARD METHOD
CA-48 TECHNICAL SPECIFICATION
CA-48 TECHNICAL SPECIFICATION SafeLane surface overlay Pavement Substrate A Cargill Deicing Technology Product Providing customers with deicing solutions that save lives and enhance commerce. Helping to
FRONT BUMPER INSTALLATION INSTRUCTIONS 2007-2011 DODGE / MERCEDES SPRINTER
Aluminess Products Inc 9402 Wheatlands Ct. #A Santee, CA 92071 619-449-9930 FRONT BUMPER INSTALLATION INSTRUCTIONS 2007-2011 DODGE / MERCEDES SPRINTER Please read before beginning Stainless steel hardware
Operating Instructions Parts List Manual Scissor Lift Pallet Truck
Operating Instructions Parts List Manual Scissor Lift Pallet Truck Note: Operator MUST read and understand this operating instructions before use this Hand Scissor Lift. Thank you for using this hand scissors
738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14)
POLYMERIC CONCRETE BRIDGE DECK OVERLAY (Adopted 02-20-14) Description The polymeric concrete bridge deck overlay shall consist of an epoxy polymer that acts together with special aggregate to form an overlay
CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS
AN ERGONARMOR COMPANY TECHNICAL INFORMATION SPECIFICATION FOR INSTALLATION 07/11 SUPERSEDES 04/00 PAGE 1 OF 6 CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS 1. SCOPE 1.1 This specification
The entire document shall be read and understood before proceeding with a test. ISTA 3B 2013 - Page 1 of 35
Packaged-Products for Less-Than-Truckload (LTL) Shipment ISTA 3 Series General Simulation Performance Test PROCEDURE VERSION DATE Last TECHNICAL Change: NOVEMBER 2012 Last EDITORIAL Change: JANUARY 2013
Computer Lane Monitor HOW TO MAKE A TAPE AND HOW TO READ A TAPE
Computer Lane Monitor T M HOW TO MAKE A TAPE AND HOW TO READ A TAPE April, 2003 SP03-8 General Description The Brunswick Lane Monitor System is designed to permanently record and read the amount of dressing
LABORATORY DETERMINATION OF CALIFORNIA BEARING RATIO
LABORATORY DETERMINATION OF CALIFORNIA BEARING RATIO STANDARD IS: 2720 (Part 16) 1979. DEFINITION California bearing ratio is the ratio of force per unit area required to penetrate in to a soil mass with
C. Section 014510 TESTING LABORATORY SERVICE.
SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,
Field Application Note
Field Application Note Reverse Dial Indicator Alignment RDIA Mis-alignment can be the most usual cause for unacceptable operation and high vibration levels. New facilities or new equipment installations
KWANG SING ENGINEERING PTE LTD
KWANG SING ENGINEERING PTE LTD 1. INTRODUCTION This report represents the soil investigation works at Aljunied Road / Geylang East Central. The objective of the soil investigation is to obtain soil parameters
INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles
INSTALLATION RECOMMENDATIONS Outdoor Rubber Tiles Prior to Installation: The Outdoor Rubber Tiles and accessory transition pieces intended for this installation have been shipped to you via a freight carrier
Gear PEPSI CAN STOVE INSTRUCTIONS
Gear PEPSI CAN STOVE INSTRUCTIONS [NOTE: Updated Instructions are now available. The new stove is less likely to develop flame leaks and the fuel/air mixture is improved. Instructions for a simmer ring
30 minutes in class, 2 hours to make the first time
Asking questions and defining problems Developing and using models Planning and carrying out investigations 30 minutes in class, 2 hours to make the first time 3 12 x 24 x ¾ inch plywood boards 1 x 12
How To Test A Base Axe
Scotch-Weld DP760 Product Data Sheet Updated : February 2009 Supersedes: June 2001 Product Description DP760 epoxy adhesive is a non-sag, two-part room temperature curing adhesive designed for use when
Highly flexible couplings
Construction and operation 8.03.00 Instructions for installation 8.03.00 Types of stress 8.04.00 Diagrams for static deformation of the coupling ring 8.05.00 Coupling size 8.07.00 Examples of combinations
Rear wheel brakes, servicing. Стр. 1 из 45. Note:
Volkswagen Touareg - Rear wheel brakes, servicing Стр. 1 из 45 46-2 Rear wheel brakes, servicing Rear brakes, FN 44 brake caliper, servicing Note: After replacing brake pads, depress brake pedal firmly
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,
Scotch-Weld TM. Epoxy Adhesive 1838 B/A Green 1838 B/A Tan 1838-L B/A Translucent. Technical Data February, 2016. Product Description
3 Scotch-Weld TM 1838 1838 1838-L Technical Data February, 2016 Description 3M TM Scotch-Weld TM s 1838 and are controlled flow products; Scotch-Weld 1838-L is flowable. These epoxy adhesives are two-part,
1.02 DESCRIPTION A. This Section specifies furnishing and installing Cast in Place Detectable/Tactile Warning Surface tiles where indicated.
CAST IN PLACE DETECTABLE/TACTILE WARNING SURFACE TILE PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Special Conditions and Division 1 Specifications
NATIONAL INSTITUTE OF BIOLOGICALS
Short Term Notice Inviting Quotations Quotations No. S.1-36/07/NIB/Engg. (Civil) Invitation to short term quotations for Repairing of damaged gypsum board false ceiling and painting with epoxy paint in
HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS
HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS Research & Development Division RD/GN/033 June 2008 THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE
WATERPROOFING FOR CONCRETE STRUCTURES
MANUAL OF CONTRACT DOCUMENTS FOR ROAD WORKS VOLUME 1 SPECIFICATION FOR ROAD WORKS SERIES 2000 WATERPROOFING FOR CONCRETE STRUCTURES Contents Clause Title Page 2001 General 2 2002 Protection of Bridge Deck
SD-0150 GENERAL PURPOSE ABS (Acrylonitrile Butadiene Styrene) (TA)
1) Product Description: SD-0150 GENERAL PURPOSE ABS (Acrylonitrile Butadiene Styrene) (TA) General Purpose ABS, SD 0150 grade, is a rigid thermoplastic with good processing characteristics. It is a high
Field Density Determination of Asphalt Concrete by the Coring Method
Field Density Determination of Asphalt Concrete by the Coring Method 1. Scope: This procedure is for determining the density of in place asphalt concrete pavement. 2. Apparatus: 2.1 Scale or balance having
Window Installation Instructions
Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for
Evaluation of In-Place Strength of Concrete By The Break-Off Method. Tarun Naik Ziad Salameh Amr Hassaballah
Evaluation of In-Place Strength of Concrete By The Break-Off Method By Tarun Naik Ziad Salameh Amr Hassaballah Evaluation of In-Place Strength of Concrete By The Break-Off Method By Tarun R. Naik Associate
TABLE OF CONTENTS CHAPTER NO. TITLE PAGE NO. ABSTRACT
vii TABLE OF CONTENTS CHAPTER NO. TITLE PAGE NO. ABSTRACT LIST OF TABLES LIST OF FIGURES LIST OF SYMBOLS AND ABBREVIATIONS iii xvii xix xxvii 1 INTRODUCTION 1 1.1 GENERAL 1 1.2 OBJECTIVES AND SCOPE OF
SIEVE ANALYSIS OF FINE AND COARSE AGGREGATES
Test Procedure for SIEVE ANALYSIS OF FINE AND COARSE AGGREGATES TxDOT Designation: Tex-200-F Effective Date: January 2016 1. SCOPE 1.1 Use this test method to determine the particle size distribution of
Testing and appraisal of Lucobit polymer effect as an additive on asphalt mixture performance
Abstract Testing and appraisal of polymer effect as an additive on asphalt mixture performance Hamid Sabbagh mollahosseini*,golazin Yadollahi**, Ershad Amoosoltani*** *, ***Executive of Engineering and
GRADATION OF AGGREGATE FOR CONCRETE BLOCK
GRADATION OF AGGREGATE FOR CONCRETE BLOCK Although numerous papers have been written concerning the proper gradation for concrete mixes, they have generally dealt with plastic mixes, and very little published
PERMEABILITY TEST. To determine the coefficient of permeability of a soil using constant head method.
PERMEABILITY TEST A. CONSTANT HEAD OBJECTIVE To determine the coefficient of permeability of a soil using constant head method. need and Scope The knowledge of this property is much useful in solving problems
Lab 1 Concrete Proportioning, Mixing, and Testing
Lab 1 Concrete Proportioning, Mixing, and Testing Supplemental Lab manual Objectives Concepts Background Experimental Procedure Report Requirements Discussion Prepared By Mutlu Ozer Objectives Students
Experimental assessment of concrete damage due to exposure to high temperature and efficacy of the repair system
MATEC Web of Conferences 6, 06002 (2013) DOI: 10.1051/matecconf/20130606002 C Owned by the authors, published by EDP Sciences, 2013 Experimental assessment of concrete damage due to exposure to high temperature
EXPERIMENT NO.1. : Vicat s apparatus, plunger
EXPERIMENT NO.1 Name of experiment:to determine the percentage of water for normal consistency for a given sample of cement Apparatus : Vicat s apparatus with plunger of 10mm dia, measuring cylinder, weighing
3 Scotch-Weld TM. Urethane Adhesives 3532 B/A 3535 B/A 3549 B/A. Technical Data January, 2010
3 Scotch-Weld TM Technical Data January, 2010 Product Description 3M Scotch-Weld 3532 B/A, 3535 B/A and 3549 B/A are two-component, polyurethane adhesives which cure at room temperature or with heat to
THE DETERMINATION OF THE MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT OF MATERIALS USING THE VIBRATORY HAMMER COMPACTION
THE DETERMINATION OF THE MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT OF MATERIALS USING THE VIBRATORY HAMMER COMPACTION 1. SCOPE The maximum dry density and optimum moisture content, as defined below,
ALLDATA Online - 2006 Dodge Truck RAM 2500 Truck 2WD L6-5.9L DSL Turbo VI... Service and Repair
Page 1 of 15 Home Account Contact ALLDATA Log Out Help PAUL REDEHOFT Select Vehicle New TSBs Technician's Reference Component Search: OK 2006 Dodge Truck RAM 2500 Truck 2WD L6-5.9L DSL Turbo VIN C Conversion
Tex-421-A, Splitting Tensile Strength of Cylindrical Concrete Specimens
Contents: Section 1 Overview...2 Section 2 Apparatus...3 Section 3 Test Specimens...4 Section 4 Procedure...5 Texas Department of Transportation 1 08/99 06/08 Section 1 Overview Effective dates: August
SPECIFIC GRAVITY OF COARSE AGGREGATE AASHTO T 85
SPECIFIC GRAVITY OF COARSE AGGREGATE AASHTO T 85 GLOSSARY Absorption: The increase in weight due to water contained in the pores of the material. Bulk Specific Gravity (also known as Bulk Dry Specific
Inspections: Central Laboratory of the Regions
Page 1 Inspections: Central Laboratory of the Regions Protocol for Open Laboratory Review of a CDOT Materials Testing Laboratory Protocol for the Inspection of Region Materials Laboratories by the Central
INDEX. Sec. No. Items Page Nos.
INDEX Sec. No. Items Page Nos. 1. Types of Pipe............... MSSP- 2 2. Concrete Pipe............... MSSP- 2 thru MSSP-3 3. ABS and PVC Truss Pipe............... MSSP- 3 4. ABS and PVC Solid Wall Pipe...............
EXPERIMENT 10 CONSTANT HEAD METHOD
EXPERIMENT 10 PERMEABILITY (HYDRAULIC CONDUCTIVITY) TEST CONSTANT HEAD METHOD 106 Purpose: The purpose of this test is to determine the permeability (hydraulic conductivity) of a sandy soil by the constant
DryWeight BulkVolume
Test Procedure for BULK SPECIFIC GRAVITY AND WATER ABSORPTION OF AGGREGATE TxDOT Designation: Tex-201-F Effective Date: January 2016 1. SCOPE 1.1 Use this method to determine the bulk specific gravity
1000-LB. TRAILER JACK OWNER S MANUAL
1000-LB. TRAILER JACK OWNER S MANUAL WARNING: Read carefully and understand all INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety precautions may result in serious
PART I SIEVE ANALYSIS OF MATERIAL RETAINED ON THE 425 M (NO. 40) SIEVE
Test Procedure for PARTICLE SIZE ANALYSIS OF SOILS TxDOT Designation: Tex-110-E Effective Date: August 1999 1. SCOPE 1.1 This method covers the quantitative determination of the distribution of particle
ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS
ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS 1. 2. 3. 3.0 Scope 1.1 This application standard shall be used where the authority having jurisdiction has adopted its use, and
product manual HS-4210 HS-4210_MAN_09.08 Digital Static Cone Penetrometer
HS-4210_MAN_09.08 product manual HS-4210 Digital Static Cone Penetrometer Introduction This Manual covers the measurement of bearing capacity using the Humboldt Digital Static Cone Penetrometer (DSCP).
Laminate Flooring T-Lock Angle-Drop Installation Instructions
TECHNICAL SERVICE Laminate Flooring T-Lock Angle-Drop Installation Instructions March 23, 2012 Read all instructions carefully before beginning installation. Make sure that the instructions are the most
METHOD A10 (a) THE DETERMINATION OF THE IN-PLACE DRY DENSITY OF SOIL OR GRAVEL BY THE SAND REPLACEMENT METHOD
METHOD A10 (a) THE DETERMINATION OF THE IN-PLACE DRY DENSITY OF SOIL OR GRAVEL BY THE SAND REPLACEMENT METHOD 1 SCOPE The in-place dry density of compacted soil or gravel, as defined below, is determined
HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS
BSW HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW is a fully reinforced Pre-Applied system membrane designed for horizontal and vertical external blind-side
DeZURIK 3-20" BAW AWWA BUTTERFLY VALVES WITH TRANSFER MOLDED SEAT
3-20" BAW AWWA BUTTERFLY VALVES WITH TRANSFER MOLDED SEAT Instruction D10386 August 2013 Instructions These instructions provide installation, operation and maintenance information for BAW Butterfly Valves.
Document Library TS Data Sheet 08609. 3M Windo-Weld Super Fast Urethane. Data Sheet. Public
Document Library TS Data Sheet 08609 Public Rev:3 Effective: 09/14/2007 Status: Active 3M Windo-Weld Super Fast Urethane Data Sheet 3M Part No.(s) 3M Part Descriptor(s) 08609 3M Windo-Weld Super Fast Urethane
Minor Cracks in Horizontal Surfaces
Cracks, chips and broken or flaking areas in concrete are not only unsightly, they can lead to further deterioration of the surface. The result is a costly replacement project as opposed to a simple repair.
Bonding Agents: The Good, the Bad, and What Works. Bond with Your Concrete
Bonding Agents: The Good, the Bad, and What Works Bond with Your Concrete Jose DonJuan Graduate Research Assistant Kyle A. Riding, Ph.D., P.E. Associate Professor Department of Civil Engineering Kansas
Survival Laser SL-001BB Laser Parts Bundle Assembly & Operation Instructions
Survival Laser SL-001BB Laser Parts Bundle Assembly & Operation Instructions WARNING: READ ALL INSTRUCTIONS AND THE ENCLOSED SAFETY PRECAUTIONS BEFORE ASSEMBLY AND USE Assemble and use these parts ONLY
UX-30 PERFORMANCE TESTING SUMMARY REPORT Revision 0
UX-30 PERFORMANCE TESTING SUMMARY REPORT Revision 0 Prepared By: Patrick L. Paquin, EnergySolutions Date Reviewed By: Mirza I. Baig, EnergySolutions Date Approved By: Thomas F. Dougherty, Columbiana Hi
www.gaylordhardwoodflooring.com
Chapter 16 Problems, Causes, and Cures Problem: Cupping Cause: Flooring absorbing excessive moisture on underside, causing expansion with raised edges. / Not leaving enough expansion space around perimeter.
How to Build Your Own CornHole Game
How to Build Your Own CornHole Game DIMENSIONS Here is a diagram with the basic measurements for the Cornhole board game. SUPPLIES 1/2 thick sheet of plywood one 4 x4 or two 2 x4 s 8 long 2 4 s (4) 4 1/2
SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. Prepared by Risi Stone Systems Used by permission.
SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS Prepared by Risi Stone Systems Used by permission. 1-800-UNILOCK www.unilock.com FOREWORD This outline specification has been prepared for
Scotch-Weld. Low-Odor Acrylic Adhesives DP810 DP810 NS. Technical Data June, 2004
3 Scotch-Weld TM Technical Data June, 2004 Product Description 3M Scotch-Weld Low-Odor Acrylic Adhesive DP810 and DP810 NS are twopart, 1:1 mix ratio, toughened structural adhesives with less odor than
COMPACTING SPECIMENS USING THE TEXAS GYRATORY COMPACTOR (TGC) PART I COMPACTING SPECIMENS USING THE TGC. Test Procedure for
Test Procedure for COMPACTING SPECIMENS USING THE TEXAS GYRATORY COMPACTOR TxDOT Designation: Tex-206-F Effective Date: December 2015 1. SCOPE 1.1 Use Part I of this test method to compact specimens of
Standard Test Procedures Manual
STP 206-4 Standard Test Procedures Manual Section: 1. SCOPE 1.1. Description of Test This method describes the procedure for determining the liquid limit, plastic limit and the plasticity index of coarse-grained
SC2000 CEMENT BONDING PROCEDURES
Pg.1 SC2000 CEMENT BONDING PROCEDURES Widely recognized as the world s finest cold vulcanizing cement REMA SC2000 is the solution to your industrial bonding problems. By using REMA UTR20 hardener with
Right Angle Grinder USA MADE FLAP DISCS
USA MADE FLAP DISC Right Angle Grinder CGW Offers the Most Extensive Line of Flap Discs in the Marketplace CGW flap discs blend and finish in one operation which replaces the traditional twostep grinding
STEERING SYSTEM - POWER
STEERING SYSTEM - POWER 1990 Nissan 240SX 1990 STEERING Nissan - Power Rack & Pinion Axxess, Maxima, Pulsar NX, Sentra, Stanza, 240SX, 300ZX DESCRIPTION The power steering system consists of a rack and
GUIDELINES FOR TESTING FRESH SELF-COMPACTING CONCRETE
Growth Contract No. GRD2-2000-30024 GUIDELINES FOR TESTING FRESH SELF-COMPACTING CONCRETE Principal author: G. DE SCHUTTER September 2005 European Research Project: MEASUREMENT OF PROPERTIES OF FRESH SELF-COMPACTING
07 21 19 Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM
07 21 19 STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM 7819 Broadview Road Cleveland, OH 44131 800-522-4522 February, 2011 SPEC NOTE: This guide specification is intended for use when specifying
BLADE REPAIR INSTRUCTION BOOKLET
BLADE REPAIR INSTRUCTION BOOKLET Contents Section I: Section II: Section III: Section IV: Section V: Section VI: Removing a Blade Refer to this section if you need to remove the blade from an oar shaft.
3 Scotch-Weld TM. Urethane Adhesives 3532 B/A 3535 B/A 3549 B/A. Technical Data March, 2002
3 Scotch-Weld TM Technical Data March, 2002 Product Description 3M TM Scotch-Weld TM 3532 B/A, 3535 B/A and 3549 B/A are two-component, polyurethane adhesives which cure at room temperature or with heat
Unit: mm(in) Item Standard value Service limit Axle shaft run out - 0.2(0.008)
Rear Wheel/Brake/Suspension 13. Rear Wheel/Brake/Suspension Service Information 13-1 Troubleshooting 13-2 Rear Wheel 13-3 Rear Cushion 13-4 Rear Swing Arm 13-7 Service Information General Safety If the
Wastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta
PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification Number: 3503-11.2.610 Rev. 2 Rubber Lined Steel Pipe and Fittings Mechanically Coupled Plain End Type System Issued Revised Approved
UGVCL/SP/591/11KV HT AB CABLE
TECHNICAL SPECIFICATION FOR 11KV AERIAL BUNCHED CABLES FOR OVERHEAD LINES (CROSSED LINKED POLYTHENE DRY GAS CURED) 1. SCOPE This specification covers requirements of XLPE insulated, 11 KV Aerial Bunched
Knowledge Domain: Plumbing Unit: Leaking Skill: Epoxy
Knowledge Domain: Plumbing Unit: Leaking Skill: Epoxy Tools and Parts Required: 1) Jar 2) Oversized lid 3) Epoxy 4) Rubber tube 5) Soapy water 6) Safety goggles 7) Latex gloves 8) Scrap stick to mix epoxy
Construction Specifications for Keyhole Pavement Coring and Reinstatement
F I N A L Construction Specifications for Keyhole Pavement Coring and Reinstatement Gas Technology Institute 1700 S. Mount Prospect Rd. Des Plaines, Illinois 60018 www.gastechnology.org Version 13 October
DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H
DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H Soil Drainage Mat with Built-In Protection Layer POLYGUARD DRAINAGE MATS are three-part prefabricated geocomposite drain consisting of a
COMMERCIAL ITEM DESCRIPTION RUBBER, SILICONE
INCH-POUND A-A-59588 January 12, 2001 SUPERSEDING ZZ-R-765E/GEN May 10, 1989 COMMERCIAL ITEM DESCRIPTION RUBBER, SILICONE The General Service Administration has authorized the use of this commercial item
Technical Data Sheet February 2014
Scotch-Weld Technical Data Sheet February 2014 Product Description s are high performance, two-part acrylic adhesives that offer excellent shear, peel, and impact performance. These toughened products
FAG Hydraulic nuts. Technical Product Information
FAG Hydraulic nuts Technical Product Information Contents Application 2 Design 2 Design variants 3 Pressure generators, connectors 4 Dimension tables for FAG hydraulic nuts (metric) 6 Dimension tables
T A B L E T 1 T E S T S A N D I N S P E C T I O N C A B L E P C U T A N D P C U T - A
T A B L E T 1 1 of 7 Tests & Inspection Cable PCUT & PCUT-A (Table T1) T E S T S A N D I N S P E C T I O N C A B L E P C U T A N D P C U T - A No. Test Scale MOC Requirements G 20:10:001:01 Defined Test
INDEX 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6
03010_Dec22_2009.pdf Page 1 of 5 INDEX Page 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6 03010_Dec22_2009.pdf
Penetration. www.koehlerinstrument.com. www.koehlerinstrument.com. Test Methods
Test Methods Penetration of Bituminous Materials ASTM D5; IP 49; DIN 52010 Cone Penetration of Lubricating Grease ASTM D217; IP 50; ISO 2137; DIN 51804; FTM 791-311, FTM 791-313 Cone Penetration of Petrolatum
Stick Together. 3 6 th grade and 3 7 th /8 th grade TEAMS PER CENTER
Stick Together MESA DAY CONTEST RULES 2015 2016 LEVEL: Grades 6-8 TYPE OF CONTEST: COMPOSITION OF TEAMS: NUMBER OF TEAMS: SPONSOR: Team 1-2 students per team 3 6 th grade and 3 7 th /8 th grade TEAMS PER
