in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works



Similar documents
STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT Revised

Bond Release Process for New Subdivision Developments in Fairfax County

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.

8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section:

UNIT PRICE LIST January 2009

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs

DE 8 Concept Plan and Operations Study. Dover Safety Advisory and Transportation Committee October 23, 2007

Northern Nevada Water Planning Commission

Project Rankings. Fiscal Year Capital Improvement Plan

Maryland Invests $845 Million in New Highway and Bridge Projects

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST BID PROPOSAL

AREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop

CD i -STREETS- Detail #

Moving Ruston Forward. City of Ruston Infrastructure Maintenance and Improvements

Infrastructure assets are distinguished from other capital assets because they normally:

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion

Description Quantity Cost Total Cost

Corridor Goals and Objectives

Roadway Cost Per Centerline Mile Revised June 2014

APPENDIX F:TRIPLE BOTTOM LINE ANALYSIS

Goals & Objectives. Chapter 9. Transportation

Private storm drain inlet retrofitting requirements - Purpose. Sec Private storm drain inlet retrofitting requirements - Definitions.

Riverside County Transportation Department Summary of Bids

FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM

Engineering Major Service Actual Budget Projected Request Executive Adopted

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY

Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

DESCRIPTION OF WORK:

Topic 2 11/28/2012 Blocks & Street Network

Los Angeles Metro Rapid

Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City

Date. Resubmit this form during the year if there are changes in your company ownership or financial standing.

CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW)

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES

AGENCY COORDINATION AND PUBLIC INVOLVEMENT

Pavement Management Program

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County

Planning and Zoning Commission Johnston, Iowa June 29, 2015

GOUVEIA ENGINEERING. Pre-Bid Conference Meeting Minutes. City of Los Banos. Henry Miller Area Storm Drain and L Street Waterline

APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

ODOT Major Construction, Bikeways and Enhancements Report for Lucas County. (State Fiscal Years 2007 to 2010)

SECTION STORM DRAINAGE TABLE OF CONTENTS

City of Hilshire Village Pine Creek Ln Reconstruction

FIBER-OPTIC CABLE PLAN CHECK

Date Prepared: By: Wastewater Best Practices Subgroup Final Document:

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, SPP-24 & 1512-ODP-24

Executive Summary. Transportation Needs CHAPTER. Existing Conditions

"Saving Lives / Saving Time" Roadway Connections $ 21,548

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES

ADA POST INSPECTION CHECKLIST. Job No. Route County Location

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

VILLAS OF TRADITIONS AT GREY OAKS

Flood Protection in Garland Past, Present, and Future. Presented by: R. Lyle Jenkins, P.E., CFM City of Garland, Texas

FM 969 CORRIDOR. APPENDIX c

SECTION INLETS INLET LOCATIONS

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch.

Legacy Trail Extension Feasibility Study. Preliminary Cost Estimate

Designing Pedestrian Facilities for Accessibility. ADA Compliance Training. Local Programs Engineer FHWA NJ Division

SR 89/Fanny Bridge Community Revitalization Project. Draft Environmental Impact Report/ Environmental Impact Statement/ Environmental Assessment


Lincoln Downtown Master Plan Update

STORM DRAINS CHAPTER 7

CHAPTER 10 - PERMIT PROCEDURES AND BONDING REQUIREMENTS

REGIONAL NON-MOTORIZED TRANSPORTATION NETWORK

CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST

Model Subdivision and Land Development (SALDO) Subdivision/ Land Development Presentation Overview. Why Subdivision and Land Development Regulations?

LOCATIONS OF UTILITIES IN PUBLIC RIGHTS-OF-WAY Examples from various Cities

CHAPTER 10 PERMIT PROCEDURES AND BONDING REQUIREMENTS FOR CONTRACTORS

IN THE CITY COUNCIL OF THE CITY OF LIVERMORE, CALIFORNIA A RESOLUTION TO APPROVE A COMPLETE STREETS POLICY

WATER, SEWER AND TRAFFIC IT S ALL ABOUT THE FLOW

2015 STATE OF THE URBAN TRAILS. Accomplishments, Active Projects, and Next Steps

Light Rail Transit in Phoenix

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job

Presentation to Community Task Force July 9, 2007

3.1 Historical Considerations

Road Repaving and Street Safety Bond Quarterly Status Report presented to the Citizens General Obligation Bond Oversight Committee As of March 2016

I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA. PSPE Presentation, December 3, 2015

Sims Bayou Federal Flood Damage Reduction Project

CHAPTER 1181 Improvements

SECTION 3 SANITARY SEWER DESIGN

COPPER BEECH TOWNHOME DEVELOPMENT

How To Design A Bicycle Path In California

1. Water Line Maintenance 2. Sanitary Sewer Maintenance 3. Spill/Leak/Overflow Control, Response, and Containment

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

For more information, visit: rethinkingstreets.com

SECTION 6: TRANSPORTATION

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

Exhibit A Scope of Work

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES

Surface Transportation Program (STP) Projects

Guidelines for Fiber Optic Cable Permits

Transcription:

Planned Public Works Projects in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works

Planned Projects in Marina Del Rey Waterline Projects Phase II Phase III Roadway Projects Admiralty Way Intersections Improvement Admiralty Way Settlement Repair Admiralty Way at Via Marina Flood Control Project Oxford Retention Basin Enhancement Project Bikeway Project Fiji Way Bike Lane Sewer Project Sewer Manhole Lining Phase III Sewer Odor Control Marina Del Rey Projects

Marina Del Rey Projects Overview Marina Del Rey Projects

WATER LINE REPLACEMENT Marina Del Rey Waterline Replacement

Background and Existing System Constructed in 1962 with an expected 40-year service life. The existing system has exceeded its expected service life. Consists of 10-inch to 14-inch diameter water mains that currently form a loop around the Marina. Main Source of water for fire protection. Marina Del Rey Waterline Replacement

Purpose and Scope: Due to its age, the existing system is expensive to maintain and repair. Increase the reliability of the water system. Improve domestic and fire protection water demands, and decrease dependence on City of LA system. Construct a new parallel system for the entire Marina del Rey Water System Marina Del Rey Waterline Replacement

Scope: The new water system has three phases. Phase I, completed in August 2002, installed 5,500 LF of 24-inch dia. water main. Phase II will install approx. 9,500 LF of 18-inch dia. water main along Admiralty Way between Via Marina and Fiji Way. It s estimated cost is $6,500,000. Schedule: start in Fall of 2010, duration of 12 months Phase III will install approx. 9,800 LF of 18-inch dia. water main along Via Marina and dfiji Way. It s estimated cost is $7,000,000. Schedule: start in summer of 2012, duration of 12 months Marina Del Rey Waterline Replacement

Admiralty Way Intersections Improvement Admiralty Way Intersections Improvement

Purpose: To provide sufficient capacity to accommodate existing and future traffic conditions and to comply with the MDR Local Coastal Plan (LCP). Scope: Intersection Improvements Median Reconfiguration Signing and Striping Traffic Signal Upgrade Street Light Relocation Median Landscape Replacement Admiralty Way Intersections Improvement

Estimated Total Project Cost & Construction Schedule: Estimated Total Project Cost: $1,950,000 Tentative Construction Schedule: Fall of 2011 Approximate Construction Duration: 6 Months Admiralty Way Intersections Improvement

Admiralty Way Settlement Repair Admiralty Way Settlement Repair

Purpose: p To repair the settled roadway pavement and sidewalks Scope: Roadway Stabilization Reconstruct the roadway and prevent further settlement of the road and sidewalk Median Reconstruction New Curb and Gutter Install Curb Ramps Replace Existing Chain-link Fence Some work on the basin slope Admiralty Way Settlement Repair

Estimated Total Project Cost & Construction Schedule: Estimated Total Project Cost: $2,700,000 Tentative Construction Schedule: Winter of 2012, pending completion of the Admiralty Way Waterline Phase 2 project. Approximate Construction Duration: 5-7 Months Admiralty Way Settlement Repair

Admiralty Way/Via Marina Intersection Improvement Project Admiralty Way Intersection / Via Marina

Design Alternatives: There are currently two proposed alternatives for the improvements at this intersection. Triple Left-Turn Continuous Loop The scope of work will be finalized after the public review of the environmental document which is currently being drafted. Admiralty Way at Via Marina

Triple-Left Turn Concept Triple left-turn from Admiralty Way to Via Marina Double Left-Turn Lanes from Via Marina to Admiralty Way Purpose: To improve Level Of Service (LOS) and provide congestion relief at the intersection of Admiralty Way at Via Marina. To implement the road improvement required in the Marina Del Rey Local Coastal Plan (LCP) Admiralty Way at Via Marina

Continuous Loop Concept Reconfigure the existing T intersection to create continuous loop around MDR. Replace the existing park and monument at the intersection with two new parks Purpose: To improve Level Of Service (LOS) and provide congestion relief at the intersection of Admiralty Way at Via Marina. To implement the road improvements required in the LCP. Improve pedestrian safety Create attractive Gateway to MDR Accommodate future traffic conditions i Admiralty Way at Via Marina

Proposed Landscape and Gateway for Continuous Loop Alternativeti Admiralty Way at Via Marina

Estimated Total Project Cost & Construction Schedule: Triple Left-Turn Design Alternative Estimated Total Project Cost: $3,220,000 Tentative Construction Schedule: Fall of 2012 Approximate Construction Duration: 6-9 Months Continuous Loop Design Alternative Estimated Total Project Cost: $6,340,000 Tentative Construction Schedule: Fall of 2012 Approximate Construction Duration: 9-12 Months Admiralty Way at Via Marina

Oxford Retention Basin Multiuse Project Project Limits Oxford Retention Basin Multiuse Project

Purpose: Reduce flooding on Oxford Ave Enhance water quality Provide habitat Improve aesthetics Increase recreational opportunities Scope: Modification of catch basins on Oxford Ave Removal of accumulated sediment in Oxford Basin Construct a berm to increase flow around Oxford Basin Plant native vegetation Construct walking path around Oxford Basin Oxford Retention Basin Multiuse Project

Basin Planning & Landscape Berm to increase circulation in basin Observation areas (6) Plant native vegetation New less visible Omega fencing Walking gpath around basin with lighting Oxford Retention Basin Multiuse Project

Estimated Total Project Cost & Construction Schedule: Estimated Total Project Cost: $12,000,000 Tentative Construction Schedule: Spring of 2012 Approximate Construction Duration: 10 Months Oxford Retention Basin Multiuse Project

Fiji Way Bike Lane Project Location Fiji Way Bike Lane

Purpose: The project will widen Fiji Way by 2 feet and construct bike lanes from Admiralty Way to the Ballona Creek Bike Trail. The new bike lane will improve connectivity to regional bikeways, including the Ballona Creek Bike Trail, the Culver Boulevard Bike Trail, and the bike lanes on Lincoln Boulevard and Venice Boulevard. The County received a grant of $805,000 to fund a portion of the project from Metro s 2007 Call for Projects. Fiji Way Bike Lane

Estimated Total Project Cost & Construction Schedule: Estimated Total Project Cost: $1,006,000 Tentative Construction Schedule: Fall 2012 Approximate Construction Duration: 7 Months Fiji Way Bike Lane

SEWER MANHOLE LINING PROJECT PHASE III Marina Del Rey Sewer Manhole Lining Project Phase III

Purpose: p To reduce the potential of groundwater infiltration into sewer manholes in Marina dlr del Rey. Scope: BEFORE Installation of a seamless plastic coating inside 75 sewer manholes. This project will complete the lining of all the 209 manholes in Marina del Rey. AFTER Marina Del Rey Sewer Manhole Lining Project Phase III

Estimated Total Project Cost & Construction Schedule: Estimated Total Project Cost: $476,000 Tentative Construction Schedule: Summer 2011 Approximate Construction Duration: 3 months Marina Del Rey Sewer Manhole Lining Project Phase III

Admiralty Way Sewer Odor Control PROJECT LOCATION Admiralty Way Sewer Odor Control

Purpose: To control odors from a force main outlet manhole with the installation of a sanitary sewer air scrubber in the parking lot north of Admiralty Way and Via Regatta. Scope: Air Scrubber Installation Install scrubber unit and cabinet in parking lot. Trench into Admiralty Way right of way to connect 85 pipe to existing i manhole for air flow. 5 FT Landscaping around cabinet. 5 FT Admiralty Way Sewer Odor Control

Estimated Total Project Cost & Construction Schedule: Estimated Total Project Cost: $170,000 Tentative Construction Schedule: October to November 2010 Approximate Construction Duration: 1 Month Admiralty Way Sewer Odor Control