Northern Nevada Water Planning Commission
|
|
- Vincent Jefferson
- 8 years ago
- Views:
Transcription
1 : NNWPC Agenda Item 6 Northern Nevada Water Planning Commission DATE: November 29, 2011 STAFF REPORT TO: FROM: SUBJECT: Chairman and Members, Northern Nevada Water Planning Commission Jim Smitherman, Water Resources Program Manager Report by the Regional Transportation Commission ( RTC ) on its SouthEast Connector project, including issues related to Steamboat Creek and flood management; and, possible direction to staff SUMMARY RTC Project Manager Garth Oksol has prepared a PowerPoint presentation to provide an update on the SouthEast Connector ( SEC ). The SEC will be a 6 lane arterial roadway with two new at-grade signalized intersections. The new intersections will be at Mira Loma Drive and Pembroke Drive. The SEC will originate at the existing intersection of South Meadows Parkway and Veterans Parkway on the south end and will terminate at the existing intersection of Greg Street and Sparks Boulevard on the north end. In regard to the Truckee River Flood Project and Steamboat Creek, the SEC has been integrated into the US Army Corps of Engineers Flood Model. The RTC s goal was to abide by the draft flood mitigation ordinances of the three local governments and: Not raise the water surface elevation of a 117-year flood event Not cause any adverse impact to any improvements as part of the flood control project Not increase flows Provide at least 1:1 mitigation adjacent to the alignment. The RTC submitted the preliminary design and proposed mitigation to the Truckee River Flood Project staff in In a letter dated November 12, 2008, the Flood Project staff found that the proposed mitigation as part of the preliminary design is acceptable. The SEC will adhere to all federal, state, and local requirements. Recent design efforts have provided a 1.2 to 1 ratio for flood mitigation. That means for every one shovel full of dirt being placed in the flood pool for the roadway, 1.2 shovels full of dirt are being removed for flood volume mitigation. The Steamboat Creek restoration plan is being planned in a synergistic manner with the flood volume mitigation. Please refer to the SouthEast Connector Environmental Aspects attachment for more information. BACKGROUND A north-south roadway connecting the southern part of the Truckee Meadows to the eastern part of the Truckee Meadows has been planned for more than 35 years. This arterial is proposed to reduce traffic congestion on I-80, US 395/I-580, Virginia Street, southeast McCarran Boulevard, Double R Boulevard, and Longley Lane.
2 : NNWPC Agenda Item 6 The southeastern part of the Truckee Meadows is underserved by regional roadways. Comparing the west and east sides of the Truckee Meadows, 13 regional roads on the west side carry 130,000 trips per day, while only three east side regional roads carry 102,000 trips a day, that is almost 80% of the west-side trips on just under 25% of the regional roads. RECOMMENDATION Staff recommends that the NNWPC accept this report on the SouthEast Connector project and provide direction as appropriate. JS:jd Page 2 of 2
3 SouthEast Connector Environmental Aspects The SouthEast Connector (SEC) will have numerous environmental benefits attributed to the final, complete project. Among these will be improved air quality, increased acreage of wetlands, restored Steamboat Creek, and recreational opportunities among others. The following information will briefly touch on these benefits. Air Quality Vehicular emissions contribute to degradation in air quality. Idling vehicles add more pollution to the environment than moving vehicles. With the completion of the SEC, regional traffic congestion will reduce on the existing transportation network and will therefore reduce carbon dioxide and dust pollution by 260,000 pounds, or 130 tons. Wetlands Creation and Enhancement acres of Waters of the US (ponds, creeks, rivers, and wetlands) have been identified within the project boundaries. Early avoidance measures as part of the project development showed the SEC roadway would have a direct impact to approximately 10 acres of Waters of the US. At that time, the team established a goal of a 2:1 ratio for mitigation. Meaning that for every one acre of impact, two acres would be constructed, giving a total of 20 acres of constructed wetlands. The next step was to look at minimization efforts to further reduce impacts to Waters of the US. The minimization efforts reduced the direct roadway impacts from 10 acres to 3.14 acres. Of these 3.14 acres, 1.96 acres are wetlands. The project team has maintained the original proposal of 20 acres of wetlands creation for a wetlands ratio of 10:1, instead of the original proposed ratio of 2:1. In addition to the 20 acres of wetlands to be created, 19 acres of Season Wetland Whitetop will be restored to a mosaic of emergent marsh, seasonal wetland meadow and open water aquatic bed habitats. The area of this proposed restoration exists along the eastern edge of the Rosewood Lakes Golf Course and extends from Mira Loma Drive, north to the open pond south of Pembroke Drive. This area is totally dominated by whitetop. The whitetop domination has resulted in very little plant diversity and very low value of habitat. The restoration plan is set up so that the area is no longer conducive for whitetop growth and will promote a more native, diverse plant environment. Restored Steamboat Creek The entire length of the SEC resides within the boundaries of Critical Flood Zone 1. In order to mitigate for the construction of the roadway, the project team has proposed a fill to excavation ratio of 1:1.2. In essence, for every 1 shovelful of material placed within the Flood Zone, 1.2 shovelfuls will be removed. In order to accommodate the removal, the project team will construct a mitigation channel parallel to the SEC roadway. This mitigation channel allows an
4 opportunity to restore Steamboat Creek by relocating the creek to the mitigation channel. This relocation allows for enhancement and restoration of the creek. By relocating Steamboat Creek to the mitigation channel multiple benefits will be realized. Those benefits include: Restoring channel sinuosity, i.e. meander Reducing channel flow energy which will reduce bank erosion Add approximately 5,000 linear feet to the centerline length of Steamboat Creek Increasing dissolved oxygen levels in the creek water Moderate ph levels and temperatures of the creek water, improving water quality for aquatic and vegetative life Constructed riffles to improve aquatic and vegetative life Promoting and enhancing biodiversity Constructing a more natural flood plain for the Steamboat Creek; this currently does not exist. Recreational Opportunities As a basic plan the SEC will have a 10 foot wide multi-use path parallel to the 5.5 mile roadway. This multi-use path will be used in-lieu of the more traditional sidewalks and bike lanes and will be located on one side of the roadway on existing ground. Once completed, the multi-use path will connect the Truckee River Trail to the network of trails in Double Diamond, Damonte Ranch, and Curti Ranch. The decision to use this multi-use path concept was multipurpose driven. The shared multi-use path reduces fill in the Flood Zone, reduces the project s impact to Waters of the US, allows a safer environment for pedestrians and bicyclists, and allows for opportunities to connect to other recreational features. These other recreational features are conceptual and still in development stages. Funding for each and every item has not been completely identified and/or secured. Additional funding opportunities and partnerships will be sought after. The Resource Team and the Stakeholders Team have discussed the possibilities of incorporating the following items into the overall project: Interpretive trails along the wetlands and the restored Steamboat Creek Photography blinds Canoe Trail Fitness Trail Benches Avian habitat and perches Aquatic habitats As well as other opportunities not yet realized
5 Please contact Garth Oksol, Project Manager if you are interested in assisting with the possible recreational opportunities. SouthEast Connector Flood Mitigation The RTC has been working in concert with the Truckee River Flood Management Agency (TRFMA). From the beginning the RTC has had the following goals as it relates to the Flood Project: Not increase the water surface elevation of a 1997 flood event (117 year flood) Not increase flows Allow water to get from one side of the SEC to the other Not adversely impact any improvements that are part of the Flood Project s Locally Preferred Plan. In September 2008, the RTC submitted a preliminary flood model of the SEC with the project mitigation efforts. On November 12, 2008, Director Naomi Duerr wrote the RTC a letter stating This mitigation has been included by Mr. Oksol in the preliminary design of the roadway and is acceptable to this office. Recent engineering efforts have focused on advancing our preliminary design efforts while keeping the final outcome the same or better as it relates to the four items listed above. The RTC anticipates submitting an updated model with the roadway and mitigation efforts in the most recent flood model to the TRFMA by the fall of 2011.
Executive Director s Recommendation Commission Meeting: July 11, 2013
Executive Director s Recommendation Commission Meeting: July 11, 2013 PROJECT Russell Road Widening Phase 2 United States Marine Corps Base Quantico Prince William County, Virginia SUBMITTED BY United
More information1.7.0 Floodplain Modification Criteria
1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:
More informationMarch 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633
ADDENDUM TO THE MICHELSON WATER RECLAMATION PLANT PHASE 2 & 3 CAPACITY EXPANSION PROJECT FEBRUARY 2006 FINAL ENVIRONMENTAL IMPACT REPORT AND THE SAN JOAQUIN FRESHWATER MARSH ENHANCEMENT PLAN REVISED SEPTEMBER
More informationin Marina Del Rey Prepared by: County of Los Angeles Department of Public Works
Planned Public Works Projects in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works Planned Projects in Marina Del Rey Waterline Projects Phase II Phase III Roadway Projects Admiralty
More informationDESIGN ASSISTANCE APPLICATION
DESIGN ASSISTANCE APPLICATION for FY 2016 NEW RIVER MULTI USE PATH: PINNACLE PEAK ROAD TO HAPPY VALLEY ROAD CITY OF PEORIA APPLICATIONS ARE DUE VIA ONLINE SUBMITTAL BY 10:00 AM ON MONDAY, JUNE 29, 2015
More informationEnvironmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization
Introduction A visual examination of Doolittle Creek in a highly developed suburban county in Georgia yielded telltale signs of a creek whose original streambed had been altered. Examination of official
More information3.1 Historical Considerations
3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible
More informationSims Bayou Federal Flood Damage Reduction Project
Sims Bayou Federal Flood Damage Reduction Project A. Gene Rushing, Jr., P.E., PMP HCFCD Project Manager January 15, 2014 Harris County s Watersheds Historical Flooding in Harris County 1929 1935 HCFCD
More informationSan Francisco Bay Area Wetlands Restoration Program Design Review Group. Project Summary Outline
San Francisco Bay Area Wetlands Restoration Program Design Review Group Project Summary Outline The project proponent desiring to have a project considered by the Design Review Group (DRG) shall provide
More informationFinal Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum
Final Report Dixie Creek Restoration Project Funded by Plumas Watershed Forum Plumas Corporation January 2009 1 Background FR-CRM staff presented this project to the Dixie Valley Landowners Association
More informationPUBLIC NOTICE Application for Permit
PUBLIC NOTICE Application for Permit 30-Day Notice Issue Date: June 20, 2016 Expiration Date: July 20, 2016 US Army Corps of Engineers No: NWP-2010-535 Oregon Department of State Lands No: 58311-RF Interested
More informationLEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN
1 AUGUST 2011 LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN KEY ELEMENTS OF THE PLAN: 1. Replace the existing unsafe Ragged Mountain dam with a new dam and raise the reservoir pool level initially
More informationMEETING DATE: February 08, 2008
Truckee River Flood Management Project FLOOD PROJECT COORDINATING COMMITTEE STAFF REPORT MEETING DATE: February 08, 2008 DATE: February 1, 2008 TO: Flood Project Coordinating Committee Members FROM: Naomi
More informationGoal 1 To protect the public health, safety and property from the harmful effects of natural disasters.
Plan Framework for Coastal Management The purpose of this element is to provide for the protection of residents and property in within the coastal area of the host community, and to limit expenditures,
More informationInformational Workshop Public Meeting Kanawha Falls Bridge Project
Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal
More informationImproving Access in Florida International University Biscayne Bay Campus Executive Summary
EXECUTIVE SUMMARY Improving Access in Florida International University Biscayne Bay Campus Executive Summary Prepared for: Miami-Dade County Metropolitan Planning Organization (Miami-Dade MPO) Prepared
More informationChapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS
Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter
More informationCommunity Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects
City of Los Angeles Department of Public Works Bureau of Engineering Machado Lake Ecosystem Rehabilitation Project & Wilmington Drain Multi-Use Project Community Workshop 5 February 24, 2009 In association
More informationSTATEMENT OF PURPOSE
STATEMENT OF PURPOSE Community Properties, Inc. ( CPI ) is applying to Chatham County for approval of a major subdivision, Meadowview PUD (the Project ), with access to NC 87 and Old Graham Road, just
More informationTHE RUSKIN COMMUNITY PLAN
THE RUSKIN COMMUNITY PLAN Introduction Ruskin is a historic community situated on the shores of Tampa Bay, the Little Manatee River and the Ruskin Inlet, approximately 16 miles southeast of Tampa. The
More informationECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project
ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION Lower Carmel River Floodplain Restoration and Enhancement Project I. Description of the Project and its Relationship to Other Projects in the Proposal The Lower
More informationHighway 138 Corridor Solutions Study Roseburg, Oregon. Technical Memorandum #4: Concept Development and Screening DRAFT
Highway 138 Corridor Solutions Study Roseburg, Oregon Technical Memorandum #4: DRAFT Prepared for Oregon Department of Transportation, Region 3 3500 NW Stewart Parkway Roseburg, Oregon 97470 Prepared by
More informationSR 89/Fanny Bridge Community Revitalization Project. Draft Environmental Impact Report/ Environmental Impact Statement/ Environmental Assessment
SR 89/Fanny Bridge Community Revitalization Project Draft Environmental Impact Report/ Environmental Impact Statement/ Environmental Assessment 2015 Meeting Purpose Provide a summary description of alternatives
More informationAN INITIATIVE TO IMPROVE
L OW E R C A R M E L R I V E R A N D L AG O O N F L O O D P L A I N R E S TO R AT I O N A N D E N H A N C E M E N T P R O J E C T AN INITIATIVE TO IMPROVE FLOOD PROTECTION RESTORE AND PROTECT RIPARIAN
More information12MAP-21, a funding and authorization bill to govern U.S. federal surface MONITORING IMPLEMENTATION AND PERFORMANCE
MONITORING IMPLEMENTATION AND PERFORMANCE 12MAP-21, a funding and authorization bill to govern U.S. federal surface transportation spending, creates a data-driven, performance-based multimodal program
More informationRoadway Cost Per Centerline Mile Revised June 2014
Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743
More informationAGENCY COORDINATION AND PUBLIC INVOLVEMENT
5 AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5.1 AGENCY COORDINATION As part of the planning process for the Oregon Avenue Final EA, DDOT conducted an agency coordination program. This coordination included
More informationBEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.
Smart Transportation Smart Transportation is a key concept for the Paoli Roadway Improvement Project. PennDOT s Smart Transportation Guidebook (2008) outlines a comprehensive approach to transportation
More informationCITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR
CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA RSTP Funds Joint Application FOR Tinker Creek Pedestrian Bridge: Tinker Creek and Glade Creek Greenways Connection Date: September 15, 2014 RSTP Project Profile
More informationHow To Plan A Buffer Zone
Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other
More informationMission Creek Flood Control & Restoration Project. City of Fremont, Alameda County
Mission Creek Flood Control & Restoration Project City of Fremont, Alameda County Agenda Background Why are proposed improvements necessary? Proposed project components Challenges Construction schedule/phasing
More informationBolton Resource Management Tract Management Plan TRCA Delegation to Town of Caledon Council. July 8, 2014
Bolton Resource Management Tract Management Plan TRCA Delegation to Town of Caledon Council July 8, 2014 TRCA AUTHORITY MEETING #6/13: THAT the draft Bolton Resource Management Tract Management Plan dated
More informationANGORA FIRE RESTORATION PROJECT
ANGORA FIRE RESTORATION PROJECT U.S. Forest Service LAKE TAHOE BASIN MANAGEMENT UNIT Duncan Leao Vegetation Management Planner Richard Vacirca Forest Aquatics Biologist 3 PHASES OF FIRE REHAB Phase I Rehab:
More informationAPPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES
Los Angeles County Metropolitan Transportation Authority (Metro) 2009 Transportation Improvement Program Call for Projects APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan
More informationKENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs
KENTUCKY TRANSPORTATION CABINET Department of Rural and Municipal Aid Office of Local Programs Office of Local Programs Transportation Enhancements Safe Routes to School Congestion Mitigation and Air Quality
More informationExecutive Summary. Transportation Needs CHAPTER. Existing Conditions
CHAPTER 1 Executive Summary The City of Forest Grove Transportation System Plan (TSP) was updated to keep it consistent with recent growth trends in the city and other transportation planning efforts in
More informationCHAD R. GOURLEY SPECIALTY EMPLOYMENT
CHAD R. GOURLEY P.O. Box 919 Verdi, Nevada 89439 phone 775.345.9960 cell 775.250.8140 chad_gourley at att.net SPECIALTY Restoration of riverine, spring, and wetland ecosystems, specializing in a process
More informationPLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580
More informationPresentation to Community Task Force July 9, 2007
Alternative Evaluation Results Presentation to Community Task Force July 9, 2007 Outline of Presentation Overview of alternative evaluation Alternative evaluation methodology Process and assumptions General
More informationGLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold
CHAPTER 11 GLOSSARY OF TERMS Active Channel The channel that contains the discharge Leopold where channel maintenance is most effective, sediment are actively transported and deposited, and that are capable
More informationAdopted 9/23/98 CHATTAHOOCHEE CORRIDOR PLAN. The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are:
CHATTAHOOCHEE CORRIDOR PLAN Adopted 9/23/98 PART 1: GOALS. POLICY. COVERAGE. A. Goals The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are: 1. Preservation and protection
More information3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN
3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards
More informationGeneral Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]
General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] Purpose These rules set forth the conditions under which a person may, without an individual removal-fill permit
More informationPUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015
PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015 AT ACTON TOWN HALL FAULKNER ROOM 472 MAIN STREET ACTON, MASSACHUSETTS 7:00 PM FOR THE PROPOSED ASSABET RIVER RAIL TRAIL (ARRT) IN THE TOWNS OF ACTON
More information2011 Operations, Maintenance, Monitoring and Rehabilitation Plan
State of Louisiana Coastal Protection and Restoration Authority of Louisiana 2011 Operations, Maintenance, Monitoring and Rehabilitation Plan for East Marsh Island Marsh Creation State Project Number TV-21
More informationMission Reach Self-Guided Tour Mission Concepción Portal Loop and Mission Reach Phase II Embayment Loop
Mission Reach Self-Guided Tour Mission Concepción Portal Loop and Mission Reach Phase II Embayment Loop Welcome to the Mission Reach! The Mission Reach Ecosystem Restoration and Recreation Project is transforming
More informationREGIONAL NON-MOTORIZED TRANSPORTATION NETWORK
Chapter 10 Bicycle and Pedestrian SAFETEA-LU legislation requires that non-motorized users be considered in the LRTP. The legislation allows for bicycle and pedestrian safety to be incorporated into the
More informationThe Teton Creek Restoration Project Summary:
The Teton Creek Restoration Project Summary: The Teton Creek Restoration Project area extends for approximately one mile upstream from the Cemetery Road Bridge and includes the Aspen Pointe, The Aspens
More informationA Cost Analysis of Stream Compensatory Mitigation Projects in the Southern Appalachian Region 1
A Cost Analysis of Stream Compensatory Mitigation Projects in the Southern Appalachian Region 1 J. Bonham 2 and K. Stephenson Abstract Recently the US Army Corps of Engineers (the Corps) has increased
More informationCLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,
More information2015 STATE OF THE URBAN TRAILS. Accomplishments, Active Projects, and Next Steps
2015 STATE OF THE URBAN TRAILS Accomplishments, Active Projects, and Next Steps Agenda What is an Urban Trail? Accomplishments Active Projects Next Steps What is an Urban Trail? Goals of Urban Trail Program:
More informationBriefing Paper on Lower Galveston Bay and Bayou Watersheds Lower Bay I: Armand Bayou to Moses Lake and Adjacent Bay Waters
Briefing Paper on Lower Galveston Bay and Bayou Watersheds Lower Bay I: Armand Bayou to Moses Lake and Adjacent Bay Waters Jim Lester, PhD. and Lisa Gonzalez Houston Advanced Research Center Galveston
More informationSCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY
SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY 1.0 Conditions and requirements for permits A permit to use and develop the
More informationMotorcycle & Pedestrian Master Plans in Indianapolis, Indiana
PROJECT PURPOSE The Warsaw + Winona Lake Bicycle and Pedestrian Master Plan establishes a comprehensive framework for a connected bicycle and pedestrian system that will be used for both recreation and
More informationDescription Quantity Cost Total Cost
APPENDIX: ITEMIZED CONSTRUCTION COST ESTIMATE Description Quantity Cost Total Cost 1 CASCADE FALLS 1a Existing Cascade Falls Upgrades Structural Repairs - Steps, Railing, Walls, Pool Lump Sum $500,000
More informationInterlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010
Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?
More informationApplying HUD s Floodplain Management and Wetlands Protection Standards U.S. Department of Housing and Urban Development Office of Environment and
Applying HUD s Floodplain Management and Wetlands Protection Standards U.S. Department of Housing and Urban Development Office of Environment and Energy Executive Order 11988 Floodplain Management Training
More informationHaynes Recreation Center, Laredo, TX. Data Matrix and Sustainability Benchmarks
Haynes Recreation Center, Laredo, TX Data Matrix and Sustainability Benchmarks (Updated Spring 2010) 1 Standard Benchmarks BENCHMARKS UNITS PRE PROJECT GOAL Property value (pre/post) Assessed or redevelopment
More informationUrban Stream Restoration Defining the Full Benefits of a Project. Warren C. High MACTEC Engineering and Consulting
Urban Stream Restoration Defining the Full Benefits of a Project Warren C. High MACTEC Engineering and Consulting Economics in the Decision Process Return on Investment Willingness to Pay Municipal Growth
More informationSUP07-6: Shenandoah Waste Services, LLC Special Use Permit Application for A Materials Recovery Center in a M1 (Industrial) Zoning District
SUP07-6: Special Use Permit Application for A Materials Recovery Center in a M1 (Industrial) Zoning District Location and Proposed Use The subject 33.76 acre parcel (Tax Map # 42A5 (A) 79) is located on
More informationUpper Des Plaines River & Tributaries, IL & WI Feasibility Study
Upper Des Plaines River & Tributaries, IL & WI Feasibility Study Jeffrey Zuercher Project Manager Chicago District February 19, 2014 Study Partnership: US Army Corps of Engineers Agenda Background Study
More informationSAN DIEGO GAS & ELECTRIC COMPANY SOUTH BAY SUBSTATION RELOCATION PROJECT TRAFFIC MANAGEMENT PLAN SEPTEMBER 2014
SAN DIEGO GAS & ELECTRIC COMPANY SOUTH BAY SUBSTATION RELOCATION PROJECT TRAFFIC MANAGEMENT PLAN SEPTEMBER 2014 Traffic Management Plan TABLE OF CONTENTS 1 INTRODUCTION... 1 2 OBJECTIVES... 1 3 APPLICABLE
More informationFILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request
FILE NO.: Z-6915-C NAME: Gamble Road Short-form PCD and Land Alteration Variance Request LOCATION: Located on the Northwest corner of Chenal Parkway and Gamble Road DEVELOPER: Davis Properties P.O. Box
More informationComprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis
Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Transportation & Mobility projects that meet the following criteria: enhances regional mobility; supports public transit;
More information12 February 8, 2012 Public Hearing APPLICANT:
12 February 8, 2012 Public Hearing APPLICANT: PROPERTY OWNER: VIRGINIA BEACH ASSOCIATES, LC REQUEST: Conditional Change of Zoning (I-1 to Conditional A-36) STAFF PLANNER: Faith Christie ADDRESS / DESCRIPTION:
More informationFLOOD PLAIN DESIGNATION AND PROTECTION
CITY OF RICHMOND FLOOD PLAIN DESIGNATION AND PROTECTION BYLAW NO. 8204 EFFECTIVE DATE - SEPTEMBER 8, 2008 CONSOLIDATED FOR CONVENIENCE ONLY This is a consolidation of the bylaws listed below. The amendment
More informationThe Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08
The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 Fairfax County requires developers to post a performance bond if they are
More informationDowntown Tampa Transportation Vision
Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org
More informationFederal Guidelines for STP-U Funding
MPC 5.f Attachment 1 STP-U Eligibility Guidelines Page 1 of 5 Federal Guidelines for STP-U Funding SURFACE TRANSPORTATION PROGRAM (STP) ELIGIBLE EXPENDITURES PERIOD AVAILABLE: FY + 3 Years FUND: Highway
More informationGold Ray Dam Interagency Technical Team Meeting
Gold Ray Dam Interagency Technical Team Meeting Agenda Public Outreach, Funding, Monitoring EA/BA/Permit Updates Deconstruction Plans Fish Passage & Salvage Plan Hydraulic Modeling Next Steps Public Outreach,
More informationAccident Analysis of Sheridan Road between Isabella Street and South Boulevard
Accident Analysis of Sheridan Road between Isabella Street and South Boulevard Prepared for TranSystems Corporation for the City of Evanston Submitted by Regina Webster & Associates, Inc. Date: 08/15/2008
More informationBowmanville Marsh Habitat Restoration and Public Access Project
Bowmanville Marsh Habitat Restoration and Public Access Project Terms of Reference for Detailed and Conceptual Design Works December 2015 1.0 Background and Purpose The Bowmanville Marsh Habitat Restoration
More informationFINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012
FINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012 Table of Contents TABLE OF CONTENTS Table of Contents... 1 Executive Summary... 2 1 Objective... 4 2 Study Approach...
More informationAREA: 0.16 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF
FILE NO.: Z-9020 NAME: Hometown Tax Service Short-form PD-O LOCATION: Located at 3008 West 12 th Street DEVELOPER: Mark Green 65 Westfield Loop Little Rock, AR 72210 SURVEYOR: Kittler-Roberts Group, LLP
More information9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015
9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Kunzman Associates, Inc. 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Prepared by: Bryan Crawford Carl Ballard,
More informationDRAFT SOUTH FORK SKYKOMISH RIVER
DRAFT SOUTH FORK SKYKOMISH RIVER 9 levees and revetments / Approximately 1.1 miles of river bank are armored Revetments provide limited, localized erosion protection, but impact habitat Frequent and costly
More informationDESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
More informationThe Basics of Chapter 105 Waterways and Wetlands Permitting in PA
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers
More informationStormwater Wetland Design and Construction Mitigation Duke Bitsko. Construction Activities, Schedule and Sequence Tom Ritchie
September 7, 2011 Welcome Catherine Daly Woodbury DCR Coordination Dan Driscoll Project Background Catherine Daly Woodbury Stormwater Wetland Design and Construction Mitigation Duke Bitsko Construction
More informationRestoration Planning and Development of a Restoration Bank
Restoration Planning and Development of a Restoration Bank Black Creek Pioneer Village, South Theatre 8:30 a.m. to 3:30 p.m. Habitat Restoration and Environmental Monitoring Projects Section Restoration
More informationCelebrating over 50 years of service MEMORANDUM
Celebrating over 50 years of service MEMORANDUM TO: Town of Tyre Ronald F. McGreevy, Supervisor JN. 1650.001.001 FROM: Adam Cummings, P.E., BCEE DATE: 3 September 2015 SUBJECT: Project Proposal SEQRA Documentation
More informationKoser Field. 7th St SE 2.25
Submited on: 1/31/2014 Managing Entity: Contact Information: Watford City Park District PO Box 13 Watford City, ND 58854 Robin Arndt PO Box 13 Watford City, ND 58854 PHONE : Email: sarndt@ruggedwest.com
More informationRhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.
American Recovery and Reinvestment Act (ARRA) Emergency Watershed Protection Program Floodplain Easements Rhode Island Natural Resources Conservation Service Rhode Island NRCS received approximately $2.4
More informationMICHIGAN S LANDSCAPE ARCHITECTS
MICHIGAN S LANDSCAPE ARCHITECTS protecting the health, safety, and welfare of our citizens site design land use planning master planning streetscape design brownfield redevelopment guidelines and regulations
More informationAPPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)
APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) To be considered for STP funding, a proposed project must
More informationFloodplain Connectivity in Restoration Design
Floodplain Connectivity in Restoration Design 2015 Symposium on Restoration in a Contaminated Environment: Lessons Learned and Challenges in Moving Forward Part II April 2015 Karin Boyd Applied Geomorphology,
More informationTres Rios del Norte Feasibility Study
Tres Rios del Norte Feasibility Study Santa Cruz River Pima County, Arizona February 2011 Study Area: 18 Miles of Santa Cruz River (Prince to Sanders), portions of City of Tucson, Town of Marana, and unincorporated
More informationEAST BETHEL PLANNING COMMISSION MEETING June 24, 2014
EAST BETHEL PLANNING COMMISSION MEETING June 24, 2014 The East Bethel Planning Commission met for a Regular Planning Commission Meeting on June 24, 2014 at 7:00 P.M for their regular meeting at City Hall.
More informationLand Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
More informationDRAFT. Light Rail Corridor Shared-Use Path Study. September 2014. Prepared for: Prepared by:
Light Rail Corridor Shared-Use Path Study Prepared for: Prepared by: Introduction With the plans to extend transit from ewtown Road to the oceanfront in the City of Virginia Beach progressing, there is
More informationCHAPTERTWO. Alternatives 2.1 ALTERNATIVES DEVELOPMENT PROCESS
2. Section 2 TWO CHAPTERTWO 2.1 ALTERNATIVES DEVELOPMENT PROCESS This EIS has been prepared in compliance with the Council on Environmental Quality (CEQ) regulations for implementing NEPA (40 CFR 1500-1508).
More informationEngagement with the community will be in accordance with Council s Community Participation Policy.
CLARENCE CITY COUNCIL ASSET MANAGEMENT 7 DEC 2015 86 11.5 ASSET MANAGEMENT 11.5.1 CLARENCE STREET SAFETY ASSESSMENT PROJECT (File No 04-03-01) EXECUTIVE SUMMARY PURPOSE The purpose of this report is to
More informationChehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013
Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate
More informationArkansas River Corridor Vision & Master Plan
A r k a n s a s R I v e r C o r r I d o r P l a n Arkansas River Corridor Vision & Master Plan July 2005 Indian Nations Council of Governments A r k a n s a s R I v e r C o r r I d o r P l a n Partnership
More informationMid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014)
Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014) Summary Description Proposed Project: Light Rail Transit 10.9 Miles, 9 Stations Total
More informationRevising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan
Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan Throughout the Plan 1. There is a fundamental need for the revised plan to address how
More informationBlacklands Corridor Feasibility Study. Public Meeting November 7, 2013 McClendon Elementary School Nevada, TX
Blacklands Corridor Feasibility Study Public Meeting November 7, 2013 McClendon Elementary School Nevada, TX Overview Welcome and Project Overview Michael Morris Recent Progress Analyzing Existing and
More informationRESOLUTION NO. WHEREAS, the 2016-2017 City Budget Forecast estimates that housing
RESOLUTION NO. WHEREAS, the 2016-2017 City Budget Forecast estimates that housing (21.6 percent) and transportation (14.9 percent) are the two largest expense categories for the typical Austin family;
More information14-97. 14-97.002 Definitions. For the purposes of this rule chapter the following definitions shall apply unless the context clearly shows otherwise:
14-97 14-97.001 Purpose. This rule chapter sets forth an access control classification system and access management standards to implement the State Highway System Access Management Act of 1988. The implementation
More informationDraft Non Transportation Performance Measures Including Related Qualitative Assessment of Example Sections
Draft Non Transportation Performance Measures Including Related Qualitative Assessment of Example Sections Phil Erickson Community Design + Architecture Mike Johnson HDR Engineering CTF Charrette Approach
More information