Data Centre Infrastructure Assessment



Similar documents
Server Room Thermal Assessment

Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009

Power and Cooling for Ultra-High Density Racks and Blade Servers

Power Distribution Considerations for Data Center Racks

Improve competiveness of IDC and enterprise data centers with DCIM

Introducing Computational Fluid Dynamics Virtual Facility 6SigmaDC

Improving Rack Cooling Performance Using Airflow Management Blanking Panels

Selecting Rack-Mount Power Distribution Units For High-Efficiency Data Centers

Choosing Close-Coupled IT Cooling Solutions

(Examples of various colocation sites)

Improving Rack Cooling Performance Using Airflow Management Blanking Panels

Airflow Simulation Solves Data Centre Cooling Problem

Data Center Rack Systems Key to Business-Critical Continuity. A White Paper from the Experts in Business-Critical Continuity TM

Re Engineering to a "Green" Data Center, with Measurable ROI

Data Center Power Distribution at the Cabinet Level: The top 12 questions you need to ask to improve data center energy effciency

8 Intelligent PDUs. Intelligent Power Distribution Units for Data Centers

Mejora la Eficiencia Operativa en Centros de Datos

2006 APC corporation. Cooling Solutions and Selling Strategies for Wiring Closets and Small IT Rooms

Benefits of. Air Flow Management. Data Center

Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings

Server Technology, Inc.

Small Data / Telecommunications Room on Slab Floor

How To Improve Energy Efficiency In A Data Center

Cooling a hot issue? MINKELS COLD CORRIDOR TM SOLUTION

Thermal Monitoring Best Practices Benefits gained through proper deployment and utilizing sensors that work with evolving monitoring systems

Considerations for a Highly Available Intelligent Rack Power Distribution Unit. A White Paper on Availability

Dealing with Thermal Issues in Data Center Universal Aisle Containment

Measuring Power in your Data Center: The Roadmap to your PUE and Carbon Footprint

How to Meet 24 by Forever Cooling Demands of your Data Center

Data Centre Energy Efficiency Operating for Optimisation Robert M Pe / Sept. 20, 2012 National Energy Efficiency Conference Singapore

Supporting Cisco Switches In Hot Aisle/Cold Aisle Data Centers

How To Run A Data Center Efficiently

APC APPLICATION NOTE #112

Managing Cooling Capacity & Redundancy In Data Centers Today

Application Briefs: Remote Office Environment

Thermal Optimisation in the Data Centre

Power Distribution Units (PDUs): Power monitoring and environmental monitoring to improve uptime and capacity planning

Implement Data Center Energy Saving Management with Green Data Center Environment and Energy Performance Indicators

Top 12 Questions to Consider When Choosing UPS Systems for Network/Server Applications

DATA CENTER SOLUTIONS

Reducing Room-Level Bypass Airflow Creates Opportunities to Improve Cooling Capacity and Operating Costs

7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America

Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency

Energy Efficiency Opportunities in Federal High Performance Computing Data Centers

Ten Steps to Solving Cooling Problems Caused by High- Density Server Deployment

Optimum Climate Control For Datacenter - Case Study. T. Prabu March 17 th 2009

Data Center Infrastructure Management (DCIM) Demystified

SmartDesign Intelligent, Integrated Infrastructure For The Data Center. Solutions For Business-Critical Continuity

RELIABLE AND FLEXIBLE POWER FOR YOUR DATA CENTRE

Environmental Data Center Management and Monitoring

Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings

Cooling Audit for Identifying Potential Cooling Problems in Data Centers

Power Management Strategies for High-Density IT Facilities and Systems. A White Paper from the Experts in Business-Critical Continuity TM

How green is your data center?

Data Center Infrastructure Management: ERP for the Data Center Manager

HIGHLY EFFICIENT COOLING FOR YOUR DATA CENTRE

Greening Commercial Data Centres

5 Reasons. Environment Sensors are used in all Modern Data Centers

Server Technology, Inc.

DATA CENTER RACK SYSTEMS: KEY CONSIDERATIONS IN TODAY S HIGH-DENSITY ENVIRONMENTS WHITEPAPER

Racks & Enclosures. Deliver. Design. Define. Three simple words that clearly describe how we approach a Data Center project.

Great Lakes Data Room Case Study

Colocation and Cloud Hosting Solutions. Build a strong and efficient physical infrastructure that delivers service reliability and profitability

The Benefits of Supply Air Temperature Control in the Data Centre

Modularized and Multi-Functional Power Distribution for Cabinets 3.01

RACKMOUNT SOLUTIONS. 1/7/2013 AcoustiQuiet /UCoustic User Guide. The AcoustiQuiet /UCoustic User Guide provides useful

Energy Management Solutions

Managing Data Centre Heat Issues

Australian Government Data Centre Strategy

Data Center Cooling: Fend Off The Phantom Meltdown Of Mass Destruction. 670 Deer Road n Cherry Hill, NJ n n

Green Data Centre Design

AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY

Access Server Rack Cabinet Compatibility Guide

Energy Efficiency Best Practice Guide Data Centre and IT Facilities

AIR-SITE GROUP. White Paper. Green Equipment Room Practices

Free Cooling in Data Centers. John Speck, RCDD, DCDC JFC Solutions

Data Center Power Distribution and Capacity Planning:

Power Distribution in Data Centers: STARLINE Track Busway, PX ipdus and Power IQ

How to Maximize Data Center Efficiencies with Rack Level Power Distribution and Monitoring

Energy Efficiency and Availability Management in Consolidated Data Centers

vcloud SERVICE Virtual Tech in partnership with Equinix - vcloud Service

Cabinets 101: Configuring A Network Or Server Cabinet

ADC-APC Integrated Cisco Data Center Solutions

Ten Steps to Increasing Data Center Efficiency and Availability through Infrastructure Monitoring

GUIDE TO ICT SERVER ROOM ENERGY EFFICIENCY. Public Sector ICT Special Working Group

Office of the Government Chief Information Officer. Green Data Centre Practices

Power and Cooling Guidelines for Deploying IT in Colocation Data Centers

CenterMind P+ Intelligent Power Management for your Data Center

Sealing Gaps Under IT Racks: CFD Analysis Reveals Significant Savings Potential

CANNON T4 MINI / MICRO DATA CENTRE SYSTEMS

Data Center Cooling A guide from: Your partners in UPS Monitoring Systems

In Row Cooling Options for High Density IT Applications

Intelligent Power Distribution in the Data Center

Transcription:

Data Centre Infrastructure Assessment Prepared for: ACME INC SAMPLE REPORT Attention: Mr DC Manager This report represents a generic sample data centre audit for a generic customer by Focus Group Technologies. This report gives an indication of the areas of identification and recommendations that FGT will perform. Date: Tuesday, 2 March 2010 Version: 1.0 Prepared by: Phil Jones The business and project information contained in this document is the property of Focus Group Technologies Pty Ltd, and is supplied without liability for errors or omissions. This information has been prepared for ACME INC who is entitled to use or copy the information only for the purposes for which it is intended, otherwise no other part may be reproduced, used or disclosed except as authorised in writing by Focus Group Technologies Pty Ltd

Contents 1 Document Information... 3 2 Executive Summary... 4 2.1 Observations:... 4 2.2 Recommendation Summary... 4 3 Physical infrastructure... 5 3.1 Quality Racking... 5 3.2 Blanking Panels... 5 3.3 Monitors within racks... 6 3.4 Cable Management... 6 4 Power Audit... 7 5 Rack Location... 11 6 Power Analysis Summary... 9 7 Power Analysis Detail... 10 8 Temperature Heat Map Floor View... 11 9 Temperature Heat Map - Rack... 13 10 Power Observations... 15 11 Power Recommendations... 16 12 Cooling... 17 13 UPS Power... 17 14 Environmental Monitoring... 18 15 Subsequent recommendations:... 19 16 About Us... 20 16.1 Focus Group Technologies... 20 Focus Group Technologies Pty Ltd. ACN 140 391 171 ABN 51 140 391 171 Page 2

1 Document Information Document Author Name: Phil Jones Principal Consultant Focus Group technologies Telephone: 0422 58 40 60 E-Mail: phil.jones@fgtech.com.au Document Review Date Version Description Author Reviewer 1/02/2010 Version 1.0 Initial Draft Phil Jones AAA Document Distribution Name Title Organisation Phil Jones Principal Consultant FGT Mark Polti Sales Executive FGT Mr DC manager Data Centre Facilities Manager ACME Inc Focus Group Technologies Pty Ltd. ACN 140 391 171 ABN 51 140 391 171 Page 3

2 Executive Summary ACME Inc engaged Focus Group Technologies to undertake a Data Centre Assessment of their current rack infrastructure located at Harbour MSP. The onsite visit by the engineer had the following observation and recommendations: 2.1 Observations: The current installation is of 3 racks within the Global Switch Data Centre. Overall environmental conditions are excellent as provided by the DC Current Power draw is over utilised above available capacity Operating temperature of racked equipment is within range of ASHRAE guidelines Some efficiencies can still be gained via following data centre best practices 2.2 Recommendation Summary Priority High Impact is High. Action must be taken and be addressed immediately Power utilisation of Racks 1 and 2 are above allocated power. This is currently resulting in excess charges from your service provider. This can be achieved by: o Acquiring additional racks adjacent to the current racks and move some devices in to the new racks. i.e..spread the load across more racks o Or moving the current equipment to rack space that provides more power per rack. With at least 50-100% more than measured to account for peaks and growth. Priority Medium Action should be taken and be addressed in the next month or so. Implement environmental monitoring Priority Low Action will result in Best Practice and can be addressed in time. Implement blanking panels in the racks Replace the monitor in Rack 3 with a pull out flip-top LCD monitor. Focus Group Technologies is happy to provide CUSTOMER with a quotation to perform any or all of these services. Focus Group Technologies Pty Ltd. ACN 140 391 171 ABN 51 140 391 171 Page 4

3 Physical infrastructure 3.1 Quality Racking Server rack cabinets are important to your business success because they provide space for vital equipment that is crucial to the survival of your organization. If you select the right server rack, you will keep your equipment cool, your power running, and your downtime minimized. Racks should be a size and quality that allow for the intended equipment and provide room for cable management and airflow. Observation Quality racks are implemented Recommendation Nil 3.2 Blanking Panels Unused vertical space in rack enclosures creates an unrestricted recycling of hot air that causes equipment to heat up unnecessarily. The use of blanking panels can reduce this problem. Observation Blanking Panels are not implemented Recommendation Implement blanking panels in the racks Focus Group Technologies Pty Ltd. ACN 140 391 171 ABN 51 140 391 171 Page 5

3.3 Monitors within racks Monitors on shelves create an open space that permits hot exhaust air to return to equipment air intake resulting in overheating. This is a similar effect to not having blanking panels. Observation Monitors on shelves are being used Recommendation Replace the monitor in Rack 3 with a pull out flip-top LCD monitor. 3.4 Cable Management Cable management refers to the process of routing and placing cables within a rack environment. Poor cable management can not only lead to damaged cables or increased time to add or change out cables, but can block critical airflow or access. This can lead to inefficiencies in the performance of your equipment or even downtime Bad cable management Good cable management Observation Cable management was observed to be adequate, some improvements could be made to improve airflow and cable identification. Recommendation Improve cable management by routing cables to the side of the servers. Focus Group Technologies Pty Ltd. ACN 140 391 171 ABN 51 140 391 171 Page 6

4 Power 4.1 Redundancy of Power to Racks Power to the rack should be provided by dual sources to dual Power Distribution Units (PDUs). Redundant PDUs ensure uptime in the event of issue or failure in the power source, PDU or cabling. Observation Redundant PDUs were implemented. Recommendation Nil 4.2 Redundancy of Power in servers In addition to redundant connections to the individual devices, redundant power supplies should be implemented. Where redundant power supplies do not exist in the device, an Automatic Transfer Switch (ATS) can assist. The ATS is a dual input, rack-mountable power distribution unit (PDU) with a built in automatic transfer switch. The Micro Smart Switch is capable of receiving power from two independent AC power sources and utilises a built-in automatic AC transfer switch to quickly switch between them. This provides AC power line redundancy to critical computer or communications equipment in a rack environment. Observation ATS have not been implemented Recommendation Implement ATS technology for single power supply devices. Focus Group Technologies Pty Ltd. ACN 140 391 171 ABN 51 140 391 171 Page 7

4.3 Audit of Power Usage ACME Inc engaged Focus Group Technologies to undertake a power audit of their current rack infrastructure located at Harbour MSP. The purpose of this audit is to perform device level analysis of the power consumption so as to determine which devices are consuming what power. In addition, temperature measurements of the rack and surrounding areas were taken. Method As downtime could not occur, out of band external power monitoring was selected as the method of monitoring the power consumption. External monitoring in this case was conducted via a handheld clamp meter on each individual device Accuracy In band monitoring techniques (such as intelligent PDUs, in line power meters) are the most accurate form of measurement, but requires that the equipment is already installed or downtime occurs to place them in the power path. External monitoring in this case was conducted via a handheld clamp meter. The clamp meter has a resolution of 0.1 AMP with a ± 5% error rate. Individual devices or servers were measured at a point in time and those measurements added to provide a rack total. While the total power usage measured per rack will be accurate to within a few amps, more importantly the relative power usage of the devices will be comparable and valuable. The data recorded was a series of point in time measurements of a 2 hour period. As such the data does not represent a maximum or average power utilisation, rather the draw as measured. Focus Group Technologies Pty Ltd. ACN 140 391 171 ABN 51 140 391 171 Page 8

6 Power Analysis Summary Location: Date and Time: Performed by: DC Smith St Monday 1 st March 10am -12pm Phil Jones/FGT Rack Number: 1 Total Power (Amps): 13.2A Total Power (Watts): Available Amps (Both PDUS): 3168 watts 32A Utilisation of PDU: (must be < 50%) 41.25% Utilisation of PDU in the event of single PDU failure: (must be < 100%) 82.5% Rack Number: 2 Total Power (Amps): 7.6A Total Power (Watts): Available Amps (Both PDUS): 1824 watts 32A Utilisation of PDU: (must be < 50%) 23.75% Utilisation of PDU in the event of single PDU failure: (must be < 100%) 47.5% Rack Number: 3 Total Power (Amps): 4.0A Total Power (Watts): Available Amps (Both PDUS): 960 watts 32A Utilisation of PDU: (must be < 50%) 12.5% Utilisation of PDU in the event of single PDU failure: (must be < 100%) 25.0% Focus Group Technologies Pty Ltd. ACN 140 391 171 ABN 51 140 391 171 Page 9

7 Power Analysis Detail

8 Rack Location The diagram below shows the rack locations and orientation within the data centre.

9 Temperature Heat Map Floor View This heat map shows the surface temperature of the data centre floor around the racks. The monitored temperature is between 16.4ºC at the front to 21ºC at the rear. Focus Group Technologies Pty Ltd. ACN 140 391 171 ABN 51 140 391 171 Page 12

10 Temperature Heat Map - Rack Rack Front View ` This heat map shows the surface temperature of the front of the racks. The monitored temperature is between 15.4ºC at the bottom to 26.2ºC at the top left (west) Focus Group Technologies Pty Ltd. ACN 140 391 171 ABN 51 140 391 171 Page 13

Rack Front View This heat map shows the surface temperature of the rear of the racks. The monitored temperature is between 18.6ºC at the bottom to 32.0ºC at the top right (west) Focus Group Technologies Pty Ltd. ACN 140 391 171 ABN 51 140 391 171 Page 14

11 Power Observations It is our understanding that the allocated power per rack is 1600Watts. The table below shows the relative power usage versus allocated: Rack Power Usage (W) Allocated (W) % difference 1 3168 1600 198% 2 1824 1600 114% 3 960 1600 60% Total 5952 4800 124% Clearly Racks 1 and 2 are over utilised from a power draw perspective, while rack 3 is well within limits. As shown in the analysis detail, no particular single device appears to be a major contributor to the power usage, rather the number and density of the devices. Rack 1 is over drawing the power allocation due to: More devices than the other racks Larger number of high power draw devices (e.g. storage, v245s) The power draw of these racks is well within current industry norms (usually 16 or 32 amps per rack). A concentration of high power draw equipment also results in temperature hot spots. For example, greater power draw in rack 1 results in a hot spot near the top of the rear of rack 1. This also results in a slightly higher temperature at the front of rack 1(26.2ºC) from hotter air circulating to the front and not being sufficiently cooled. Focus Group Technologies Pty Ltd. ACN 140 391 171 ABN 51 140 391 171 Page 15

12 Power Recommendations As mentioned in the observations no particular single device appears to be a major contributor to the power usage, rather the number and density of the devices. Additionally the total power usage is 124% over the total allocated; as such redistribution within the 3 racks would not solve the current problem. As such the recommendations are as follows: (in no particular order) Acquire additional racks adjacent to the current rack/s and move some devices in to the new racks. i.e..spread the load across more rack/s Move the current equipment to rack space that provides more power per rack. With at least 50-100% more than measured to account for peaks and growth. With either situation, we recommend that the 3 (or more) racks are evenly distributed for power load so as to even out temperature variations. Focus Group Technologies Pty Ltd. ACN 140 391 171 ABN 51 140 391 171 Page 16

13 Cooling Cooling capability is provided by the service provider and as such the infrastructure was not assessed in this document. 14 UPS Power UPS capability is provided by the service provider and as such the infrastructure was not assessed in this document. Focus Group Technologies Pty Ltd. ACN 140 391 171 ABN 51 140 391 171 Page 17

15 Environmental Monitoring Environmental Monitoring and control is crucial to the smooth running of your data centre. To maximise system reliability you should aim for a stable environment free from wild fluctuations. The key areas of concern are: Temperature Humidity Wetness (optional) Airflow (optional) Observation: Environmental monitoring is currently not implementation Recommendation: Implement an environmental monitoring system that provides alerting and historical reporting. Focus Group Technologies Pty Ltd. ACN 140 391 171 ABN 51 140 391 171 Page 18

16 Subsequent recommendations: Lastly, if the type of data prepared from this report is beneficial to you in the longer term, we would recommend that Intelligent PDUs or inline power meters be investigated to provide more accurate and detailed information. Intelligent PDUs will allow you to have features such as: Outlet-Level Current/Voltage/Power Metering with Threshold/Alert Capabilities Long term reporting and trending of power usage Capability to Remotely Switch Outlets Through On-Board Web Electronic Overcurrent Protection Sequential Startup Internal Temperature Sensor and Two Optional External Sensors A move or redistribution of racks equipment would be an ideal time to implement such technology. Focus Group Technologies Pty Ltd. ACN 140 391 171 ABN 51 140 391 171 Page 19

17 About Us 17.1 Focus Group Technologies Focus Group Technologies is a specialist data centre management solution provider combining best of breed technology with experienced design, consulting and implementation skills. Here at Focus Group Technologies we like to do things a little different from your typical reseller or systems integrator. Our business is based upon the following guiding principles: Focus Hence our name. We WILL focus on what we do and nothing else. This means we are good at what we do. If we are not the experts we are not going to try and sell you that solution. Sustainability Is vital in all our dealings and relationships with our vendors, business partners and you, our customer. FGT is here for the long haul. Sustainability guarantees we will be here to support your business now and into the future. Website: www.fgtech.com.au Focus Group Technologies Pty Ltd. ACN 140 391 171 ABN 51 140 391 171 Page 20